Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 1 of 83 Revision: 2.0 Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01 10 November 2017 Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet. Rev Date Name 0 28-09-2017 C. Tanis 1.1 16-10-2017 Rev ETA, Cancelled jobs 13.23 ,13.25 new jobs: 13.28 ,13.29,13.30,13.31,13.32, 13.33 Demarcation descr job 13.1, rev job 13.4 1.2 Add job 13.34 1.3 31-10-2017 Add job 13.35 ,13.36,13,37,13.38 Nordnes Dry-dock 2017 Project Specification Docking and Repairs

Upload: others

Post on 12-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 1 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Rev Date Name

0 28-09-2017 C. Tanis

1.1 16-10-2017 Rev ETA, Cancelled jobs 13.23 ,13.25 new jobs: 13.28 ,13.29,13.30,13.31,13.32, 13.33 Demarcation descr job 13.1, rev job 13.4

1.2 Add job 13.34

1.3 31-10-2017 Add job 13.35 ,13.36,13,37,13.38

Nordnes Dry-dock 2017

Project Specification Docking and Repairs

Page 2: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

General FFPV Nordnes , built in 2001 , and is used for subsea rock installation. Subsea rock installation is an important service that Van Oord has been supplying to the offshore industry for a long time. ‘We were at the cradle of the development of flexible fall pipe vessels and have been the market leader in the North Sea region for almost 30 years.. And is used to apply stones on subsea pipelines and cables. The vessel is planned for major repairs scheduled for 8 th December 2017. The weight of the vessel =25063 GT Dimensions Length overall 166.70 m Breadth overall 26.23 m Moulded depth 14.00 m Draught 10.51 m The vessel is equipped with an accommodation of 50 persons.

1) Schedule Indication of expected ETA & duration of repairs – in dock/ afloat. Description of lead items which will determine the duration in dock – in shipyard]. ETA, is planned for 8-17 December 2017 Duration of the repairs is planned 8 weeks. Excluding sea trails. Biggest job is the renewal of the cargo hold protection plates , and renewal of the striking plates. Modification of the BSC (bucket storage construction) Blasting and the painting of the boom construction. And overhaul of the main engine and AUX engines On the bucket storage container a modification will be applied ,same as Stornes. -BSC specification for details. Enlarge the striking plate in the cargo hold. And painting of the cargo hold The cargo boom will be dismantled and blasted and painted to original spec. Refitting of cables and sensor cabling and E-drive. The BSC will be dismantled , blasted and modified and Painted. Striking plates in holds to be renewed , an extended with double plates of 12 mm. Solidur Tivar blue 88, plating in cargo holds to be renewed. Main engine to be overhauled. Aux generator’s CATERPILLAR to be overhaul Hull painting Rudder maintenance. Deck hatch maintenance Belting system.

Page 3: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 3 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

2) Index ............................................................................................................................................................................................................... 1 General ................................................................................................................................................................................................. 2 1) Schedule ...................................................................................................................................................................................... 2 2) Index............................................................................................................................................................................................. 3 3) Scope of works shipyard ........................................................................................................................................................... 4

4.1) General services ......................................................................................................................................................................... 4 4.2) Dry-dock jobs .............................................................................................................................................................................. 4 4.3) Afloat jobs ................................................................................................................................................................................... 5 4.4) Owner arranged jobs by third party – for information only ....................................................................................................... 6

Dry-dock jobs – Ship specific ............................................................................................................................................................ 7 13.1 Maintenance boom ................................................................................................................................................................... 7

13.2 Change suction line deck wash pumps HiPaproom ..................................................................................................................... 23 13.3 Install pilot ladder frame ......................................................................................................................................................... 24 13.4 Enlarge striking plate cargo hold ............................................................................................................................................. 26 13.5 Welding crack in void space tk 73/HFO ................................................................................................................................... 28 13.6 Cleaning ER Ventilation duct ................................................................................................................................................... 30 13.7 Install air dryer for BSC ............................................................................................................................................................ 32 13.8 Removal of Hydraulic Cylinders cargo hatches off /on ........................................................................................................... 34 13.9 Renewal bearing and Thordon bush of rudder ........................................................................................................................ 36 13.10 Welding of bunker fuel line in void 76 ................................................................................................................................... 38 13.11 Repair seal steering-gear cylinder ......................................................................................................................................... 40 13.12 Funnel new generator room update drip tray ....................................................................................................................... 42 13.13 Boom chute support bracket renew ...................................................................................................................................... 43 13.14 Fairleads repair ...................................................................................................................................................................... 44 13.15 ADCP overboard to be checked ............................................................................................................................................. 46 13.16 Staging for Solidur low friction lining renewal ,15 mm ......................................................................................................... 48 13.17 Blasting to SA 2,5 and painting cargo holds .......................................................................................................................... 51 13.18 Cleaning Sand filter of Reverse osmose filter ........................................................................................................................ 53

Afloat jobs – ship specific ................................................................................................................................................................ 55 13.20 Cleaning Painting accommodation decks .............................................................................................................................. 55 13.21 Dismantling of cargo hatches ................................................................................................................................................ 57 13.22 Place new foundation tunnel belt drive ................................................................................................................................ 58 13.23 Change of watertight door boatswain store (rev 1.1) ........................................................................................................... 59 13.24 Weld cracks in foundation vibrators ...................................................................................................................................... 61 13.25 Place lifting container 20 ft , install walkway and stairs (rev 1.1) .......................................................................................... 63 13.26 renewal of bends scupper pipes inside WBTs & sieve location ............................................................................................ 64 13.27 install a new ladder with safety guard for the navigation mast ............................................................................................ 65 13.28 Welding drain in HV room (rev 1.1) ....................................................................................................................................... 67 13.29 Insulate C deck cabins (rev 1.1) ............................................................................................................................................. 69

13.30 Relocate stripping line wash water tank 48 and 51 (rev 1.1) .................................................................................................... 70 13.31 Mechanical assistance Flex pro (rev 1.1) ............................................................................................................................... 71 13.32 Mechanical welding assistance Macgregor (rev 1.1) ............................................................................................................. 72 13.33 Renewal of solidur plating in all cargo holds (6) under supervision of Company Maker specialist (rev 1.2) ........................ 73 13.34 Renew 2pcs support for cargo unloading boom due to cracks in deck ..................................................................... 74 (rev 1.2)............................................................................................................................................................................................ 74 13.35 Replacement of grating on tower top platform (rev 1.3) ...................................................................................................... 75 13.36 Change of watertight door HIPAP room (rev 1.3) .................................................................................................................. 77 13.37 Wartsila propulsion maintenance on thrusters (rev 1.3) ...................................................................................................... 78 13.38 Replacement of speed log sensor and housing(rev 1.3) ........................................................................................................ 79

Overview of third parties .................................................................................................................................................................. 83

Page 4: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 4 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

3) Scope of works shipyard Find an overview below of the scope of works for the shipyard*.

4.1) General services Description Tender

reference Status

1 Shore power 440V, 800A, 60Hz 2.3 Confirmed

2 Cooling water connection 2.2/2.3 Confirmed

3 Crankshaft deflection measurements 2.2 Confirmed

4 Undocking (ballast water connection) 2.2 Confirmed

5 Fire line under pressure (complete repair period) 2.2 Confirmed

6 Fixed firefighting installation (out of service in Engine room) confirmed

4.2) Dry-dock jobs Description Tender

reference Status

1

Maintenance, blasting and painting of cargo unloading boom according Hempel spec

13.1 Confirmed

2 Change suction line deck wash pumps HiPaproom 13.2 Confirmed

3 Install pilot ladder frame 13.3 Confirmed

4 Enlarge striking plate 13.4 confirmed

5 Welding crack Void space tank 73 13.5 Confirmed

6 Rudder off/ on, bearings and seals 5.1 After inspection

7 Rudder seal renewal 5.2.03 confirmed

8 Rudder clearances 5.2..02 06 Confirmed

9 Movable rudder staging 5.0 Confirmed

10 Staging near prop shaft 5.5 confirmed

11 Wear down measurements propeller shaft for BV 5.5.02 confirmed

12 Take blade tip clearance 5.4 confirmed

13 Polish propeller blades in situ 5.4.02.01 confirmed

14 Change suction line deck wash pumps HiPaproom confirmed

15 Scraping hull, HP wash, spot blasting, painting of hull, Flat bottom Vertical sides Top side’s, bullwark

3.4 after inspection (A.I)

16 Blasting and painting BSC acc to Hempel spec. CH 14 0615 Nordnes BSC mod spec rev 1

confirmed

17 Blasting and painting Boom acc to Hempel spec. 13.1 // 3.4,boom spec

confirmed

18 Cargo hold blasting under Solidur 1,2,3,4,5,6,7 to sa2.5 CH3 // 13.17

AI

19 Staging building and removing for Solidur CH2 // 13.16

confirmed

20 Cargo hold painting under Solidur 1,2,3,4,5,6,7 CH3 // 13.17

planned

21 Painting new steel in way of striking plate Ballast tank 13.17 AI

Page 5: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 5 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

22 Painting new steel in way of striking plate Fresh water tank 13.17 AI

23 Painting C loop exterior 3.4 A.I

24 Painting ROV tower exterior 3.4 A.I.

25 Painting thruster house exterior. 3.4 A.I

26 renewal anodes on hull Exact amount in drydock 3.5 AI

27 Cleaning of tanks MDO TK 2, 16,17,12, 17 PS,16 PS, tank 76 4.2 // CH12

confirmed

28 Cleaning sump tank (13.1m3) 12.2.01.01 confirmed

29 Boom dismantling from vessel Off /On (Heavy Lift 160 T 13.1 Boom spec

confirmed

30 Boom Spot repair ,Cleaning Fresh water and painting 13.1 confirmed

31 Welding bunker line TK 2 in void 76 13.9 confirmed

32 Steering gear cylinder repair 0615-WO-008046 13.11 Confirmed

33 Clean /inspect and overhaul all hull Valves present to BV. 7.2 confirmed

34

Welding cracks in Sponsoons (inspection by crew) welding by yard 2.1 A.I

35 Renewal of solidur plating in all cargo holds (6) under supervision of Company Maker specialist

13.33 Planned

36 Wartsila propulsion assistance 13. planned

37 Replacement of speed log sensor and housing 13.38 planned

4.3) Afloat jobs Description Tender

reference Status

1 Painting accommodation/superstructure deck a/b/c/d 13.20 After inspection

2 Painting ROV tower exterior 3.4 After insp.

3 Renew scuppers in wbt (0615-WO017272) 13.26 confirmed

4 Dismantle cargo hatches YARD in conjunction (Macgregor) 13.21 Confirmed

5 Place new foundation tunnel belt drive 13.22 Confirmed

6 Off /on cylinders cargo hatches 8 psc After inspection

5 Cleaning tank sewage 57 12,4 m3 ,48,51 4.2 // CH12 Confirmed

6 Cleaning Ballast tanks , 33/34/35/3643/44/45/46 4.2 //CH12 Confirmed

7 Cleaning revers osmose filter 13.18 Confirmed

8 Cleaning funnel and re-route sump ventilation (wo-006336) - Confirmed

9 Extend de-aération pipe downwards. Make drip tray 0615-WO-6336 13.12 Confirmed

10 Steering gear cylinder off / on 8.20.9 confirmed

11 Renew brake lining m3 mid aft PS 6.3.03.01

planned

12 Renew Brake lining mooring winch 6.3.03.01

planned

13 0615-W0-014703 Renew stud bolts various manholes on deck 4.1.01 AI

14 0615-WO-017528 Renewal of FIFI / deck wash piping in the engine room 7.2.02 confirmed

15 Add extra scupper pipe sb side (0615-WO 18137 7.2.02 Confirmed

16 Maintenance rubber bulkhead doors BSUS Belt. - planned

17 Welding drain in HV room 13.28 planned

18 Insulate cabins on C deck 13.29 planned

19 Relocate stripping line in tank 48 and 51. 13.30 planned

20 Mechanical assistance Flexpro 13.31 confirmed

21 Mechanical assistance Macgregor 13.32 confirmed

Page 6: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 6 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

22 Renew 2pcs support for cargo unloading boom due to cracks in deck 13.34 confirmed

23 Replacement of grating on tower top platform 13.35 planned

24 Change of WT door HIPAP room 13.36 PLanned

4.4) Owner arranged jobs by third party – for information only Description Tender

reference Status

1 Overhaul main engines – MAK Bolier Confirmed

2 Overhaul Caterpillar engines Pon Power Confirmed

3 Maintenance Belt system Bsus Flexpro Confirmed

4 Renewal of Vodas to Vocam Van Oord Confirmed

5 Repairs of thrusters seals by Wartsila Wartsila prop confirmed

6 Thrusters maintenance. Wartsila Wartsila Prop planned

7 Renewal of galley floor, walls and ceiling

Kranendonk Confirmed

8 Sewage lines in accommodation Stout planned

9 Pipelines cunifer/GRE in ER Stout plannend

10 Fresh water hot waterlines Stout planned

11 Reverse osmose filter maintenance Hatenboer planned

12 UT measurement team MME planned

13 Cable on boom , remove and refit Bakker Sl planned

14 Maintenance drives in fore ship ABB electr planned

15 Sensor calibrating MSA planned

16

Maintenance navtex ,ecdis on bridge Alphatron planned

17 Galley maintenance Bouter planned

18 steering gear cylinder Evergreen planned

19 Bridge floor Kranendonk planned

20 Hallway near galley linoleum to be renewed. Kranendonk planned

21 ABB turbo maintenance ABB Turbo confirmed

22 Overhaul hydraulic cylinder hatches. Evergreen planned

23 Renewal of several bunks Kranendonk planned

24 Install complete new Airco systems tower area. Klimaatservice confirmed

25 Removal and renewal of Solidur lining plates in cargo holds - planned

*Not limited to.

Page 7: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 7 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Dry-dock jobs – Ship specific

13.1 Maintenance boom

WO number: 0615-WO-003675

Deck/ Engine room: DECK

Class related: no

Dry-dock/ afloat: afloat

Cost code:100

Damage/ project/ modification number:

Drawn up by: FDK

Date: 25-09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: deck Drawings/ documents related:

0615-110.35.08.1.pdf DRAWINGS BOOM CONVEYOR

0615-540.10.04.1.pdf A UPGRADE MANUAL VOL.1 GENERAL INFORMATION

0615-540.10.04.2.pdf A UPGRADE MANUAL VOL.2 ELECTRICAL DRAWINGS

0615-540.10.04.3.pdf A UPGRADE MANUAL VOL.3 GEN., ELECTR. POWER & CTRL SYSTEM

0615-540.10.04.4.pdf A UPGRADE MANUAL VOL.4 ELECTR. POWER & CTRL SYSTEM, HYDR./MECH.

0615-540.10.05.1.pdf B UPGRADE MANUAL VOL.1 GENERAL INFORMATION

0615-540.10.05.2.pdf B UPGRADE MANUAL VOL.2 ELECTR. POWER & CTRL. SYSTEM

0615-540.10.05.3.pdf B UPGRADE MANUAL VOL.3 FIELD DEVICES

0615-540.10.05.4.pdf B UPGRADE MANUAL VOL.4 HYDRAULICS & MECHANICAL

Job description for Yard:

Relation with Specification of Tender:

Work scoop on conveyor boom Nordnes: Demobilization of boom from ship

1. Electrical disconnection. (Sub-contractor van Oord) Disconnect all cables from ship to boom in a proper manner so that cables can be reused.

• All power cable to conveyor drive unit PS and STB side of boom

• All power cables to hydraulic unit

• All Light cables, PS and SB

• All sensor cables, PS and SB

• Camera cable

• Network cable

Page 8: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 8 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

2. Hydraulic (Sub-contractor van Oord) Disconnect hydraulic lifting cylinder from boom and withdraw cylinder rod in cylinder house. Let the lifting cylinder hang alongside the C-loop tower. Prevent any damage on cylinder and c-loop house Drain hydraulic unit on boom and disconnect all hoses. Close all hydraulic connection to prevent contamination of the hydraulic oil and hydraulic parts. Remove hydraulic unit from boom base and transport to Hydrauvision for overhaul. (Yard’s assistance required)

3. Boom chute (Yard scope)

Remove the chute and chute support between the c-loop tower and the conveyor belt to create some lifting space for removing the boom. We need

lifting height.

4. Kingpin and swing gear (Yard scope) Remove cover from swing gear from de drive unit

Chute

Chute support

Page 9: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 9 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Gear cover

Cover Kingpin

Gear cover

Page 10: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 10 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

If gear cover and Kingpin cover are removed, the boom can be lift from the Kingpin. Kingpin will stay in its support because the pin is fastened with shock fast orange. We have to fasten the gearwheel so it can’t be turnover during lifting.

5. Remove of first support (Yard scope) Remove the bolts of the support, consult drawing for this

If support is removed boom will still be supported by the Kingpin and the big support at the end of the boom.

6. Lifting Boom from ship and store boom at location . (Yard scope) Connect lifting gear on the lifting eyes on top of the boom and lift boom from ship Make lifting plan, and all permits needed for lifting boom. Weight of boom is in documentation. Store boom on supports of 1,5 m height (dock blocks). Lifting points can be find on the drawings and weight of boom is approx 160 ton excl hydraulic lifting cylinder

Cover Kingpin

First support

Page 11: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 11 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Pictures of lifting boom in 2012 Vlissingen.

Page 12: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 12 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Page 13: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 13 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Alternative for disconnecting boom. (yard scope) Instead of lifting boom from spindle we can reject the boom Pivots (see pictures) and drawing C579630

7. Remove angle transmitter on SB side pivot of Boom 8. Remove covers from both pins (SB and PS) 9. Remove locking pin (6) on top and bottom of pivot shaft 10. Reject shaft SB and PS after supporting boom on deck or hanging in crane if possible.

Page 14: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 14 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Page 15: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 15 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Page 16: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 16 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Page 17: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 17 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Page 18: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 18 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Boom on supports and at location.

1. Electrical (Sub-contractor van Oord) Remove all electrical wires on the boom in shuts way that we can rewire after blasting boom. All wires shut be numbered and rewired according to wire diagrams of boom Remove all electrical pipe protection and wire supports. Remove lighting Remove bearing monitor sensors incl. wire Remove data cable. Remove emergency stops, mechanical and electrical

2. Mechanical (Yard scope) Remove all hand railing Remove all SS protecting grid alongside boom above conveyor belt Remove all gratings on both side of boom Remove cupboard of gear driving conveyor belt. Remove under plating from conveyor belt (rev 1.3) Remove roller foundations (rev 1.3)

3. Conveyor belt (Sub-contractor van Oord) Under guidance of ems-tech/ Flexpro Remove all scrapers Remove belt Remove driving unit Removing hydraulic tension cylinder incl guidance frame and pulley Remove all drive- A, tail- D and E, tension- C and B pulleys (See pdf BMH pulleys bearing locations) Remove all bearing houses of pulleys. Remove all support pulleys incl. their supports from Boom frame Remove all scrapers When boom is total empty (Yard scope) Blast boom according to Hempel specs Blast all supports of conveyor supports rollers Paint blast steel with one layer of primer Make steel repair where needed in accordance with TSI Reinstall all that was removed with new part supplied by van Oord or with reused parts in consultant with van Oord TSI

Below some pictures of boom and details with explanations

Page 19: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 19 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Page 20: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 20 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Conveyor drive

bearingmonitor

Power supply drive Conveyor belt

Page 21: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 21 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Bearing monitor

Lighting wirering

Elec wires

Several Light tubes

Page 22: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 22 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Electrical supervision ,Bakker

Bakker

Page 23: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 23 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.2 Change suction line deck wash pumps HiPaproom WO number:0615-WO

Deck/ Engine room: engine room

Class related: yes

Dry-dock/ afloat: dry dock

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date:7-09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Hipap room Drawings/ documents related: MOC

Job description for Yard:

Relation with Specification of Tender:

-Decommissioning existing pump installation - remove electrical connections. -modify the hull inlet according to drawing -modify the pump skid. -make the new piping according to drawing. - BUREAU Veritas approved hull valve to be mounted. (in stock)

13.2

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Installation seawater condensers

Klimaatservice Holland

Page 24: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 24 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.3 Install pilot ladder frame WO number:0615-WO00177

Deck/ Engine room: Deck

Class related: Yes

Dry-dock/ afloat: Afloat

Cost code:

Damage/ project/ modification number:

Drawn up by:

Date:

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: On trunnion deck to deck Frame is purchased by VO and ready for delivery. Drawings/ documents related: 0615-800.00.15.1 0615-800.00.15.2

Job description for Yard:

Relation with Specification of Tender:

-Clear deck in way of location supports -remove old paint in way of supports Structure of pilot ladder arrangement to be in line with structure below deck. Lump sum price

- access ,and staging when required.

- Including cranage and hoisting plan

- Including lighting and ventilation

- Including fireguard.

- Covering of vulnerable parts and cables

- Fire guard under deck

- Removal of oily area’s under deck if applicable

- Bolds & nuts owner supplied.

- When welds are tested/examined by the method requested by BV . Disturbed paint Locations can be painted to original paint specification . with Hempadur. Paint owner supplied

13.2

Page 25: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 25 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Page 26: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 26 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Contact ships SO before starting the job. -request for applicable permit ships SO - supply hoisting plan. -

13.4 Enlarge striking plate cargo hold WO number:0615-WO03674

Deck/ Engine room: Deck

Class related: Yes

Dry-dock/ afloat: drydock

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 07-

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: In cargo hold 1,2,3,4,6,and 7 Material to be delivered by yard, A36 Steel = 22m thickness +/- 4.9m X 3.9 meter Drawings/ documents related: 0615-110.02.02.3

Job description for Yard:

Relation with Specification of Tender:

13.4 // 13.16 //13.17

Page 27: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 27 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

-

• Note: Steel removal and renewal and double plates are only on SB side of cargo holds

applicable

• All Solidur plating on PS and SB side and bottom sides of all holds needs to be removed

(scrapped) and renewed , this entire area needs to be blasted and painted according to

Hempel spec (yard scope ref job 13.17). Solidur plating removal and renewal is Van Oord

sub-contractor scope. (disposal old Solidur plating is yard scope)

Existing plate to be renewed to original dimensions AH36 steel (22 mm or 25 ) Striking Plate and double plates in total of 6 HOLDS on SB side.

- access and staging when required.

- Including cranage and hoisting plan

- Including lighting and ventilation

- Including fireguard.

- WPS

- Covering of vulnerable parts and cables

- Removal of oily area’s under deck if applicable

- When plate is fitted present to TSI before welding.

- When welds are tested/examined by the method requested by BV . Locations can be painted to original Hempel paint spec after repairs.

Page 28: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 28 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

• For steel price calculations please refer to under mentioned area description parameters per

hold and only on SB: (ref made to picture above)

Left doubler: 1.4 meter x 3.9 mtr thickness = 12mm, S235 mild steel.

Right doubler 1.4 meter X 3.9 mtr thickness =12 mm Under doubler. 1 meter approx. x 5,25mtr thickness =12 mm

Striking plate = 2.45 x 3.9 m +/_ = 22 thick original. (exact dimensions to be determined after

UT measurements). UT measurements of area in vicinity of striking plates to be executed (by Van

Oord sub-contractor)

Renewal is OK to modify to 25 mm. AH 36 steel. All welding to be done before the new lining is to be applied. And all blasting and painting to be finished before the new lining is applied.

Disturbed paint in Ballast tanks to be repair to Hempel Spec. Disturbed paint in fresh water tanks to be repair to Hempel Spec. Cleaning up area when repairs are finished.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. -request for applicable permit. - supply hoisting plan. -Block hoisting area for lifting operations

13.5 Welding crack in void space tk 73/HFO WO number:0615-WO006051

Deck/ Engine room: Deck

Class related: no

Dry-dock/ afloat: afloat

Cost code: 100

Damage/ project/ modification number:

Drawn up by: CTA

Date: 07—09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: HFO tank1 fr 114-fr136

Page 29: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 29 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Drawings/ documents related: 0615-100.02.01.1

Job description for Yard:

Relation with Specification of Tender:

- inform SO and ships crew -open manhole and ventilate tank HFO tank 1 Open and ventilate void tank 73

HFO tank 1 to be cleaned for hot work in location of crack. Cleaning of the crack by grinding. Dye check the crack. -mark the end of the crack (+/-18 cm) -prepare weld seam -Weld the weld seam. -preform applicable test method according to the BV rules.

- Including lighting and ventilation

- Including fireguard.

- Covering of vulnerable parts and cables

- Removal of oily area’s under deck if applicable

- When welds are tested/examined by the method requested by BV .

- Mechanical cleaning in way of weld seams.

- Location where paint is burned area to be painted to original HEMPEL paint spec.

13.5

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Page 30: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 30 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Contact ships SO before starting the job. - -

13.6 Cleaning ER Ventilation duct WO number:0615-WO06336

Deck/ Engine room: Deck

Class related: no

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 07—09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Engine room cleaning air duct Reroute sump ventilation line downwards according to picture and sketch.

Drawings/ documents related:

Job description for Yard:

Relation with Specification of Tender:

- Cleaning of oily area in in ventilation duct.

13.6

Page 31: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 31 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

-Diameter DN 150 ,4 meter pipeline inclusive brackets. bends and drip tray

- Including lighting and ventilation

- Including fireguard.

- Protecting cables and vulnerable parts.

-

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. - -

Page 32: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 32 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.7 Install air dryer for BSC WO number:0615- W0-018322

Deck/ Engine room: Deck

Class related: no

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 07—09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: SB Bosun store Leaflet Atlas Copco CD25 Frame 205 till 210 Drawings/ documents related: Leaflet CD25

Job description for Yard:

Relation with Specification of Tender:

- Install air dryer. CD 25

- Including lighting and ventilation

- Including fireguard.

13.7

Page 33: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 33 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. -THP Bakker Sliedrecht arranges the power supply -

Page 34: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 34 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.8 Removal of Hydraulic Cylinders cargo hatches off /on WO number:0615-WO4977

Deck/ Engine room: Deck

Class related: no

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 07—09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: On deck fr 40 till fr 200 Drawings/ documents related:

Job description for Yard:

Relation with Specification of Tender:

_Inform ER staff - Decommission hydraulic system of Cargo hatches. - All these maintenance job on Cargo hatches in consultation with Macgregor.

Disconnect Hydraulic lines Remove cylinder and hoist it to shore. Make cylinder ready for transport , to manufacturer or specialist. When cylinder is returned to the yard ,mount in original position. Connect hydraulic lines. De-airate the lines before operation. Inform ER staf. Test installation with ER staf.

13.8

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. - -

Page 35: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 35 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Page 36: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 36 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.9 Renewal bearing and Thordon bush of rudder WO number: 0615-WO-017002

Deck/ Engine room: Engine room

Class related: no

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 07—09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: FR 0 steering gear room. Drawings/ documents related: 0615-230.10.02.1 0615-230.10.01.1 page 33 pos44 NMF NEUENFELDER MASCHINENFABRIK HAMBURG 0615-230.10.02.9 = Thordon bush d =682 D =756.87

Job description for Yard:

Relation with Specification of Tender:

Page 37: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 37 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

_Inform ER staff -decommission of rudder installation, -Electrical connections -hydraulical -drain and blind off hydraulic lines with steel plugs. -take rudder clearance’s (last readings 060 and 1.35 mm) Report to VO CHE/and TSI.

- Renew Thordon Bush - Renew Bearing Spherical roller bearing (Rudder stock) - Renew Seals - Seals are on STOCK. -

Dismantle rope guard rudder according to drawing Dismantle rudder according to makers instruction manual.

-Mount rudder with new seal according to makers instruction manual. -Rudder installation to be commisioned. -Tested for proper function -CHE and Captain to be invited for “”0”” indication verification.

13.9 5.1 5.2

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. -

Page 38: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 38 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.10 Welding of bunker fuel line in void 76 WO number: 0615-WO-008136

Deck/ Engine room: Engine room

Class related: no

Dry-dock/ afloat: afloat

Cost code: 200

Damage/ project/ modification number:

Drawn up by: CTA

Date: 07-09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: FR 37 till 45 Tk 2 Drawings/ documents related:

Job description for Yard:

Relation with Specification of Tender:

_Inform ER staff -request for applicable permit. -follow the SWP of confined space entry. -removes tank manhole. -Cleaning of void 76 -the line runs true Void Space 76 (frame 37 t/m 45) en -Diameter is DN 150 -The length is +/-3 meters - 3 weld sleeves are used in the tank, -2 bends of 45 drgr. -welding in situ, no flanges in void.

13.10

Page 39: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 39 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. -

Page 40: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 40 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.11 Repair seal steering-gear cylinder WO number: 0615-WO-008046

Deck/ Engine room :Engine room

Class related: yes

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 07-09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: FR 0 steering gear room. Drawings/ documents related: 0615-230.10.01.1 534-4000-04(1) NMF NEUENFELDER MASCHINENFABRIK HAMBURG

Job description for Yard:

Relation with Specification of Tender:

_Inform ER staff -decommission of rudder installation, -disconnect Electrical connections -hydraulical disconnect and drain the lines . - Disconnect hydraulic lines attached to the cylinder and block openings properly with steel plugs. -make hoisting arrangement. (cylinder weight is CA 600kg) -Remove 2 pins 160 H6

13.11

Page 41: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 41 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Remove hydraulic cylinder from rudder and replace with repaired cylinder.

Transport cylinder and shafts to Yard workshop and clean for inspection.

Clean pins and bushes and present to owner for inspection. Inspect rod on scuffing damage’s Fit cylinder in place with same or [Owner's] supplied new parts. (seal package) Test cylinder on the working pressure 280 Bar. Invite TSI of VO to witness End of rod. Half way of the rod. (test leakage over the piston) Beginning of the rod.

After completion all to be refitted in position and connected as original.

Price lump sum for item, per cylinder:

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. - -

Page 42: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 42 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.12 Funnel new generator room update drip tray WO number: 0615-WO-006336

Deck/ Engine room: Engine room

Class related: no

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 07—09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: funnel Drawings/ documents related:

Job description for Yard:

Relation with Specification of Tender:

_ cleaning oily area in funnel. -

13.12

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. - -

Page 43: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 43 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.13 Boom chute support bracket renew WO number: 0615-WO-0012126

Deck/ Engine room: Engine room

Class related: no

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 22—09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: funnel Drawings/ documents related:

Job description for Yard:

Relation with Specification of Tender:

The brackets at the forward side where the chute support from the boom is resting on are bended due to the forces on the boom chute. ( see also attached documents) The total is 4 pcs . 2 pcs are the same and the other 2 are a flipped version. Before each bracket had 4 bolts M16 this will be 6 bolts M20, also the plates will be 20mm instead of 16 mm This means that the bottom flange of the support(where it is bolted to the bracket) has to be renewed as well. The support is shaded in the drawing ( 180*100mm) The drawings with all dimensions are included Also the lower forward post is slightly bended and needs some extra reinforcement and if possible straighten again. The extra bar can be decided during repair

13.13

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. - -

Page 44: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 44 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.14 Fairleads repair WO number: 0615-WO-0013423

Deck/ Engine room: Engine room

Class related: no

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 22—09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Foredeck ,2 on port side 1 on sb side (no 6) Aft deck 3 pieces Mid SB and PS. Drawings/ documents related: See attached documents concerning the fairleads to be repaired and overhauled The horizontal rollers to be replaced, Vertical fairleads overhaul. Spare rollers are on stock on board.

Job description for Yard:

Relation with Specification of Tender:

13.14

Page 45: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 45 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Page 46: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 46 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. - -

13.15 ADCP overboard to be checked WO number: 0615-W0-018093

Deck/ Engine room: Engine room

Class related: no

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 22—09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Page 47: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 47 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: FR 109 Drawings/ documents related: 0615-110.10.03.1

Job description for Yard:

Relation with Specification of Tender:

Gate valve DN 700 Investigate condition of valve , from dock side. Clean valve ,seal , gate. When valve is beyond repair Remove and refit of valve housing ADCP overboard valve to be checked due to leakage The ADCP overboard valve was leaking through when closed. The valve and blade seatings to be checked and if necessary dressed up for the valve to close up without leaking again.

13.15

Page 48: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 48 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. - -

13.16 Staging for Solidur low friction lining renewal ,15 mm WO number: 0615-W0-

Deck/ Engine room: Deck

Class related: no

Dry-dock/ afloat: afloat

Cost code:200

Damage/ project/ modification number:

Drawn up by: CTA

Date: 22—09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Cargo hold 1,2,3,4,,6,7 Tivar blue line A (low friction lining) Job in combination with job 13.4

Page 49: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 49 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Drawings/ documents related: 0615-110.02.01.2

Job description for Yard:

Relation with Specification of Tender:

Build staging in way of cargo holds To renew the lining in Cargo holds 1,2,3,4,6,7 Staging used for Striking plate job 13.4

13.4 // 13.16 //13.17

Page 50: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 50 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Solidur TIvar blue THP(mounting group) needs staging to remove the lining material. And rebuild staging after painting Contact ships SO before starting the job. - -

Page 51: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 51 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.17 Blasting to SA 2,5 and painting cargo holds

WO number: 0615-W0-

Deck/ Engine room: Deck

Class related: no

Dry-dock/ afloat: afloat

Cost code:200

Damage/ project/ modification number:

Drawn up by: CTA

Date: 22—09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Cargo hold 1,2,3,4,6,7 Job in combination with job 13.4 Drawings/ documents related: Hempel specification 0615-110.02.01.2

Job description for Yard:

Relation with Specification of Tender:

Build staging in way of cargo holds. Cleaning of Steel underneath the Solidur plating. Surface preparation proposal : Oil and grease etc. to be removed by emulsion cleaning. Salts and other contamination to be removed by high pressure fresh water hosing. When the surface is dry: Damaged and rusty shop primer as well as welds to be abrasive blasted to Sa. 2½ according to ISO 8501-1:2007 with a surface profile corresponding to Rugo test No. 3 BN 10a. . Dust off residues. In conjunction with Striking plate job 13.3 Painting before ,low friction lining application : HEMPEL'S GALVOSIL 15702 Blasting and painting surface is +/- 3250 m2

Page 52: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 52 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Page 53: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 53 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job.

13.18 Cleaning Sand filter of Reverse osmose filter

WO number: 0615-W0-

Deck/ Engine room: engine room

Class related: no

Dry-dock/ afloat: afloat

Cost code:200

Damage/ project/ modification number:

Drawn up by: CTA

Date: 22—09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Hatenboer Water, Reverse osmosefilter Drawings/ documents related: 0615-240.06.01.1

Job description for Yard:

Relation with Specification of Tender:

Vacuum truck with hoses to be used in this cleaning job. Or manual cleaning of sand filter. Manufacturer engineer shall execute the maintenance works.

13.18

Page 54: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 54 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. - -

Page 55: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 55 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Afloat jobs – ship specific

13.20 Cleaning Painting accommodation decks WO number: 0615-WO-006672

Deck/ Engine room: Deck

Class related: No

Dry-dock/ afloat: afloat.

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 18-09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: -5 -till fr 37 Deck A Deck B Deck C Deck D Drawings/ documents related: Hempel paint spec.

Job description for Yard:

Relation with Specification of Tender:

-Protecting windows -cleaning HP washing 250 Bar fresh water of the accommodation bulkheads, doors /hatches -hand tooling on rusty area’s - touched up of damaged area’s -sufficient staging clean and paint Deck a,b,c,d -total estimated area is 1027 ,m2 -to be maintained to Hempel paint spec.

13.20

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Crew will remove safety items on bulkhead , and frame holders.

Page 56: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 56 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Page 57: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 57 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.21 Dismantling of cargo hatches WO number:

Deck/ Engine room: Deck

Class related: Yes

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA/FDK

Date:19-09-217

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: On deck Drawings/ documents related: 0615-110.21.05.1

Job description for Yard:

Relation with Specification of Tender:

After measurements the hatches needs to be lifted ashore. 6 hatches total Biggest weight is 47 tons. Hoisting plan to be arranged and submitted to VO before any actions can be executed. Hydraulic installation to be decommissioned. Hydraulic lines to be drained. Repair plan to be executed under supervision of Macgregor. After dry dock repairs the hatches to hoisted on the seating’s and mounted as original.

13.21

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Macgregor will assist in these handling of the Hatches

Macgregor

Page 58: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 58 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.22 Place new foundation tunnel belt drive WO number: 0615-WO4097

Deck/ Engine room: Deck

Class related: Yes

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date:19-09-217

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: In tunnel

Drawings/ documents related: 20141223145211882 drawing foundation

Job description for Yard:

Relation with Specification of Tender:

VO bought a new foundation of the E-motor of the Tunnel belt (on stock) Foundation to be removed from bsus frame -hoisting arrangement /plan to be made. -apply necessary pad eyes. -remove old foundation New foundation to be aligned as original. New foundation to be welded.

13.22

Page 59: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 59 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

-align E motor to foundation ,by use of vibracons SKF -Vibracons are on stock on board the vessel

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

SKF Machine support/Multralign

13.23 Change of watertight door boatswain store (rev 1.1) WO number: 0615-WO-010935

Deck/ Engine room: Deck

Class related: YES

Dry-dock/ afloat: afloat.

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 21-09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Frame 207 Boatswain store

Page 60: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 60 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Drawings/ documents related: Winel Door NO 34

Job description for Yard:

Relation with Specification of Tender:

Details -size 600*1400

Left hinged Handle size 400 mm No insulation Water pressure 2 mWc / 0.2 bar (according drawing)

Location on the vessel

*old frame to be cut out of bulkhead. * new frame and door are on stock on board. *new frame to be fitted without tension. * inspect new door and rubber seal before the job.

- Including lighting and ventilation

- Including fireguard.

- Covering of vulnerable parts and cables

- Removal of oily area’s under deck if applicable

- When welds are tested/examined by the method requested by BV .

- Location where paint is burned area to be painted to original HEMPEL paint spec. -cleaning area when job is done.

13.23

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Crew will remove items/spares on the worksite

Page 61: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 61 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.24 Weld cracks in foundation vibrators WO number: 0615-WO-010942

Deck/ Engine room: Deck

Class related: YES

Dry-dock/ afloat: afloat.

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 21-09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Tunnel SB side- 32,27,21,19,18,,10,9,7,5 PS side- 13,11 Drawings/ documents related:

Job description for Yard:

Relation with Specification of Tender:

Foundation of vibrators crack due to much welding. Several foundations of vibrators are cracked Cracked weld to be gouged. Fire watch in the tunnel and in the hold SB side- 32,27,21,19,18,,10,9,7,5 PS side- 13,11

Hydraulic Vibrators Number of vibrators : 34 pcs

Max. centrifugal force : 20 kN

Frequency : 3600 rpm The vibrators wil1 be mounted to separate bars fitted between hopper stiffeners

13.24

Page 62: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 62 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

In tunnel Cargo hold 1,2,3,4,6,7

Location on the vessel

- Covering of vulnerable parts

- FF-Weld cracks in foundation vibrators

- REMARK only use stitch welding

- End of bracket not to be welded,

- Removal burned paint

- Cleaning

- Painting disturbed paint original HEMPEL paint spec. Clearing work area

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Crew will remove loose items on the worksite (spares and or material)

Page 63: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 63 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.25 Place lifting container 20 ft , install walkway and stairs (rev 1.1) WO number: 0615-WO-015432

Deck/ Engine room: Deck

Class related: NO

Dry-dock/ afloat: afloat.

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 21-09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: FR 100 PS

Drawings/ documents related:

Job description for Yard:

Relation with Specification of Tender:

13.25

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Page 64: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 64 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.26 renewal of bends scupper pipes inside WBTs & sieve location WO number: 0615-WO-017272

Deck/ Engine room: Deck

Class related: YES

Dry-dock/ afloat: afloat.

Cost code:200

Damage/ project/ modification number:

Drawn up by: CTA

Date: 25-09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Deck PS and SB. DN100 total: 6 pcs DN150 total: 9 pcs DN 200

Drawings/ documents related: 0615-250.21.02.7

-open and ventilate Manholde -measure conditions of the tanks , - Entry Permit -Hot work permit -Build staging in tank id nessasry. - cut the worn bend out of the scupper. -cut the worn pipe. (if nesssary)

Detail

Job description for Yard:

Relation with Specification of Tender:

All scupper pipe bends on PS and 2 on SB to be cut and new to be inserted, except the following:

13.26

Page 65: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 65 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

WBT's 43,45,ex-42. WBT41 is already temporary repaired with steel repair, WBT39&WBT37 are clogged with rocks. DN100 inside WBT 33,35,37,39,41, DN150 inside PWT27H, inside T4, 45 - 1pc DN200 inside void 75 & 76 ALL scupper pipes on PS deck and few on SB to be modified with a sunken sieve. Deep enough to allow the SOPEP-plug to be installed and to reach with you hand to remove rocks. This will prevent future blockages if rocks are washed through the scupper pipes. Cut the pipes at enough distance from below the main deck and insert sieve and reweld the pipes. Sieve same as is now ON deck. DN100 total: 5 pcs + 1 pc SB inside old tank 42 DN150 total: 5 pcs + 4 pcs SB (wbt44,T5,wbt46 2*) DN200 total: 2 pcs Sieves on deck to remain adjacent to the inserted ones.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Inform safety officer before lifting operations.

13.27 install a new ladder with safety guard for the navigation mast WO number: 0615-WO-015604

Deck/ Engine room: Deck

Class related: YES

Dry-dock/ afloat: afloat.

Cost code:200

Damage/ project/ modification number:

Drawn up by: CTA

Date: 25-09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Edeck

Drawings/ documents related: Safety instructions Hotwork permit

Page 66: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 66 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Length of safety cage is =/- 6 meters in lengt. Safe area to reach licht bulbs on top of mast.

- - remove insulation from ceiling bridge -Hot work permit -Build staging on monkey deck - cut the worn bend out of the scupper. - When welding on E deck , remove ceiling panels on the bridge

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Inform safety officer before lifting operations.

Page 67: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 67 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.28 Welding drain in HV room (rev 1.1) WO number: 0615-WO-008136

Deck/ Engine room: Engine room

Class related: no

Dry-dock/ afloat: afloat

Cost code: 200

Damage/ project/ modification number:

Drawn up by: CTA

Date: 10—10-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Drawings/ documents related:

Job description for Yard:

Relation with Specification of Tender:

_Inform ER staff -Request for applicable permit. Install a New drain line for AC installation Diameter DN 50 Lengt is +/- 14 meter. 1 T piece 1 x 90 welding elbow

3X 3 x 45° Remove floor plating in HV room incl rubber floorcovering. - - adapt flooring plates where the line is penetrating the plate.

- Welding pipe supports. - Supply pipe clamps in fasteners. - Make bulkhead penetration. - Repair disturbed paint. - Place back floor plates. - Place back rubber mat. - Apply pipe clamps in tunnel - Apply sufficient pipe supports. - Al supports to be painted to Hempel spec.

13.28

Page 68: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 68 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Place back floor plating in HV room incl rubber floorcovering.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job. -Klimaatservice Holland will install the installation.

Page 69: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 69 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.29 Insulate C deck cabins (rev 1.1) WO number: 0615-W0-017993

Deck/ Engine room: Engine room

Class related: no

Dry-dock/ afloat: afloat

Cost code: 200

Damage/ project/ modification number:

Drawn up by: CTA

Date: 10—10-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Fr 28 on C deck Drawings/ documents related: Insulation C deck 13.29

Job description for Yard:

Relation with Specification of Tender:

_Inform ships staff -Request for applicable permit. Ask keys of applicable cabins to ship staff.

Remove ceiling panels Store properly for re- use Remove AC /heating armature Remove /refit TL armatures Store properly in cabin for re use.

- fix insulation blanked (ROCKWOOL)120 mm thick

- 1 cabin = approx. 16.7 m2

- Total of 4 cabins 67 m2 Mount back ceiling panels Mount back AC /heating armature.

13.29

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job.

Page 70: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 70 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.30 Relocate stripping line wash water tank 48 and 51 (rev 1.1) WO number: 0615-WO-016382

Deck/ Engine room: Engine room

Class related: no

Dry-dock/ afloat: afloat

Cost code: 200

Damage/ project/ modification number:

Drawn up by: CTA

Date: 10—10-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Tank 48 tank 51 From fr 40 till fr 110 Drawings/ documents related: 0615-250.05.01.1

Job description for Yard:

Relation with Specification of Tender:

_ Inform ships staff _ open and ventilate manhole tank 48 and tank 51.

_ Supply entry permit of tk 48 and 51 Suction pipe is located over 1/2 the length of the tank forward of the centre. Plan for tank 48: cut the pipe inside the tank and run from fr.68 to fr.38 and +/-0,5-1,0mtr towards CL. This is possible through present frames.

- 10x 0,7 m =7 m DN 80 schedule 40 - Welding of sufficient pipe brackets in the tank - Repair the disturbed paint with 2 layers. - Hot dip Galvanise new pipe.

Tank 51: Suction presently situated at +/- fr.92. Tank begins at fr.85 -+/- 5 meters pipe DN 80 ,schedule 40 - 1 bend

- Welding of sufficient pipe brackets in the tank every 2 frames. - Repair the disturbed paint with 2 layers Hempel - Hot dip Galvanise new pipe.

Pipe to be brought more to fr.85 straight aft.

13.30

Page 71: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 71 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job.

13.31 Mechanical assistance Flex pro (rev 1.1) WO number: 0615-WO-00

Deck/ Engine room: DECK

Class related: no

Dry-dock/ afloat: afloat

Cost code: 200

Damage/ project/ modification number:

Drawn up by: CTA

Date: 13—10-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Drawings/ documents related:

Job description for Yard:

Relation with Specification of Tender:

Mechanical assistance and rigging for our subcontractor Flex pro for belt system maintenance. BSUS maintenance

Boom belt maintenance Dismantling pulleys; 40 days -2 men.

13.31

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Page 72: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 72 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Contact ships SO before starting the job.

13.32 Mechanical welding assistance Macgregor (rev 1.1) WO number: 0615-WO-00

Deck/ Engine room: DECK

Class related: no

Dry-dock/ afloat: afloat

Cost code: 200

Damage/ project/ modification number:

Drawn up by: CTA

Date: 13—10-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Drawings/ documents related:

Job description for Yard:

Relation with Specification of Tender:

Mechanical assistance and steelwork/welding for our subcontractor Macgregor. Assistance with jobs :

Compression strip Stopper blocks Coaming table Maintenance worn parts Duration 14 days

• 2 men. (containing 1 welder and 1 steel worker). small forklift to handle the wheels of hatches.

13.32

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Page 73: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 73 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Contact ships SO before starting the job.

13.33 Renewal of solidur plating in all cargo holds (6) under supervision of Company Maker specialist (rev 1.2)

WO number: 0615-WO-00

Deck/ Engine room: DECK

Class related: no

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 18-10-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: All Cargo holds Drawings/ documents related: See below description of Solidur Makers’ specialist

Job description for Yard:

Relation with Specification of Tender:

Please quote accordingly:

1. Van Oord will supply the plates with pre-drilled holes and studs, nuts and spacers

2. Van Oord will supply supervision and sufficient stud welding machines (item 5) 3. Solidur plate removal, steelwork as per specification in way of Solidur, preservation work

as per specification and Solidur plate installation to be competed in 6 weeks max. See attachment for job description (example) “0615 Nordnes Appendix for SOLIDUR lining plates rev 2.PDF”

13.33

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Contact ships SO before starting the job.

Page 74: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 74 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.34 Renew 2pcs support for cargo unloading boom due to cracks in deck

(rev 1.2) WO number:

Deck/ Engine room: Yard

Class related: Yes

Dry-dock/ afloat: afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: F. Dekeukeleire

Date: 20-10-2017

Steel Yes Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Midship Drawings/ documents related: Drawing Fortification Boom support 16-10-2017

Job description for Yard:

Relation with Specification of Tender:

Renew 2pcs support for cargo unloading boom due to cracks in deck.

13.34 // CH 10

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

1. Clean area around supports 2. Cut deck plate around supports, size 750x750x15 3. Cut support pipes according to drawing 4. Make steel pipe according to drawing 5. Weld new deck plate as insert according to BV rules. Size 750x750x15 6. Weld steel plate in support pipe according to drawing 7. Weld steel plate on new insert right above frame under deck 8. Check welding with UT measurement

Yard

Page 75: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 75 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.35 Replacement of grating on tower top platform (rev 1.3) WO number: 0615-WO-018373

Deck/ Engine room: Deck

Class related: No

Dry-dock/ afloat: Afloat

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 30-10-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Top platform of tower Frame 90 - 100

Drawings/ documents related: 0615-110.20.02.8 - TOWER TOP PLATFORM 8/8

Page 76: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 76 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Job description for Yard:

Relation with Specification of Tender:

The steel gratings are very rusted. Renew the steel gratings on top deck tower, by fiber gratings. Gratings will be supplied by Van Oord.

- Remove gratings of top platform - Copy dimensions of old grating to new grating - Place new gratings

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Grating supplied by Van Oord

Page 77: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 77 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

13.36 Change of watertight door HIPAP room (rev 1.3) WO number: 0615-WO-

Deck/ Engine room: Deck

Class related: YES

Dry-dock/ afloat: afloat.

Cost code: 100

Damage/ project/ modification number:

Drawn up by: CTA

Date: 21-09-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: Frame 100 Drawings/ documents related: Winel Door :600 x 1400 0615-110.20.09.1 wt door hipap room Proposal drawing for door to HiPap-room Drwng 0615-110.21.08.1 Access door to HiPap-room

Job description for Yard:

Relation with Specification of Tender:

Details -size 600*1400

Left hinged Handle size 400 mm No insulation waterpressure 2 mWc / 0.2 bar (according drawing)

Location on the vessel

*old frame to be cut out of bulkhead. * new frame and door are on stock on board. *new frame to be fitted without tension.

13.36

Page 78: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 78 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

* inspect new door and rubber seal before the job.

- Including lighting and ventilation

- Including fireguard.

- Covering of vulnerable parts and cables

- Removal of oily area’s under deck if applicable

- When welds are tested/examined by the method requested by BV .

- Location where paint is burned area to be painted to original HEMPEL paint spec. -cleaning area when job is done.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Crew will remove items/spares on the worksite

13.37 Wartsila propulsion maintenance on thrusters (rev 1.3) WO number:

Deck/ Engine room: Engine room

Class related: No

Dry-dock/ afloat: Dry dock

Cost code:

Damage/ project/ modification number:

Drawn up by: CTA

Date: 09-11-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: All thrusters and propeller ( 7 in total ). Located at various locations. T1 – Bow thruster T2 – Bow thruster T3 – Bow thruster T4 – Retractable thruster T5 – Retractable thruster T6 – Stern thruster T7 – CP-Propeller

Page 79: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 79 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Job description for Yard:

Relation with Specification of Tender:

Job includes:

- Mechanical assistance for subcontractor Wartsila propulsion. Please provide assistance of 2 men for 21 days.

- Perform dye penetrant checks on all blade bolts.

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

Maintenance and inspection steerable and transverse thrusters & CP-Propeller m/v “Nordnes”

13.38 Replacement of speed log sensor and housing(rev 1.3) WO number:

Deck/ Engine room: Engine room

Class related: YES

Dry-dock/ afloat: Drydock

Cost code:

Damage/ project/ modification number:

Drawn up by: JKO

Date: 09-11-2017

Steel Piping Cleaning Transport

Mechanical Electrical Painting Hydraulic

Confined space Hot work permit Ventilation Working at heights

Entrance permit Gas free permit Lighting Heavy lifting (>5 ton)

Location of repair: In a tank between frame 215 and 216.

Page 80: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 80 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

The speed log is located at the starboard side of the centre line.

Drawings/ documents related: No official dimensions available. Measurements to be taken at location.

Job description for Yard:

Relation with Specification of Tender:

As no sufficient documentation is available. The replacement of the speed log is a tailor made job at location. The job includes:

- Opening of the tank.

Page 81: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 81 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

- Measurement of location. - Remove old speed log and hull penetration. - In case new speed log does not fit, relocate opening in hull. - Repair according to BV rules

Scope of work related to this job done by Crew/ Subcontractor:

Crew/ Subcontractor

New speed log supplied by Van Oord

Page 82: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 82 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Page 83: Project Specification Docking and Repairs...Project Specification Docking and Repairs Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 2 of 83 Revision: 2.0 Doc. Nr. VOMS

Document: 0615 Nordnes Repair Specification rev 1.3 CTA Page: 83 of 83

Revision: 2.0

Doc. Nr. VOMS-PR3.07-SMD-IN-01-05 Reference: VOMS-PR3.07-SMD-IN-01

10 November 2017

Disclaimer: Document may be subject to change. Check the latest version on eDOCS or intranet.

Overview of third parties Find an overview below of appointed possible Subcontractors*.

Scope of works Third Party

1 Class surveyor BV Bureau Veritas

2 Supervision of painting application Hempel

3 Aux Engines Pon Power

4 Main Engine Bolier

5 Renewal of Vodas to Vocam Van Oord/Automation

6 Electrical installation Bakker Sliedrecht

7 Piping specialist GRE/Cunifer Stout pijpleidingen

8 Galley Bouter

9 Upholstery Kranendonk

10 Sensor calibration MSA

11 UT measurements MME

12 Turbo charging ABB

13 Drive maintenance ABB Electronics

14 Thrusters Wartsila Propulsion

15 Maintenance Bsus Flexpro

16 Hatches deck cago Macgregor

17 Navtex on bridge Alphatron

18 Aircon HV room Klimaat Service

19 Solidur plating removal and renewal Vatis /Quadrant

20 Overhaul hydr cylinders Evergreen

21 Reverse osmose filter maintenance Hatenboer

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

*Not limited to.