projected water system ultimate buildout scenario
TRANSCRIPT
kj
kj
kj
$K
$K
!.
!.!.
!.
$K
$K
")
!.
!.
$K $K$K $K
#*
#*
#*
#
# #
#
#
!
!
!
!
!
!
!
!
500 Ø
400 Ø
400 Ø
500 Ø
400 Ø
450 Ø
500 Ø
500 Ø
600 Ø
300 Ø
300 Ø
500 Ø
300 Ø
300 Ø
300 Ø
300 Ø
300 Ø
200 Ø
300 Ø 300 Ø
300 Ø
300 Ø300 Ø300 Ø
300 Ø
250 Ø
250 Ø
300 Ø
300 Ø
300 Ø
400 Ø
300 Ø
300 Ø
300 Ø
300 Ø
300 Ø
´ Legend#* Existing Region / Town Water Storage
(Sharon & Holland Landing east tanks to be decommissioned)
!. Existing Region / Town Well") Existing Town Water Pump Station$K Exist. / Prop. Region Water Meter Chamber! Proposed Pressure Reducing Valve# Proposed Region Water Storage
Existing Region Trunk WatermainProposed Region Trunk WatermainProposed Town Trunk Watermain
Proposed Pressure District BoundaryService Area Boundary
kj Special Study AreaNatural Heritage Systems A and B
GreenbeltWatercourseWaterbody
PROJECTED WATER SYSTEMULTIMATE BUILDOUT SCENARIO
0 1 20.5 Km Figure No. 4Project No. 5941
April 2009
NOTE: TOWN EXISTING AND PROPOSED LOCALSYSTEMS ARE NOT SHOWN.INFRASTRUCTURE ALIGNMENTS SHOWN ARECONCEPTUAL.
EAST 'A'
EAST
CENTRAL 'A'
CENTRALWEST
Queensville Sd Rd
Doane Rd
Mount Albert Rd
Herald Rd
Davis Dr
Ward
en Av
e
Wood
bine A
ve
Futu
re Hw
y 404
Lesli
e St
Yong
e St
2nd C
once
ssion
Bathu
rst S
t
Green Lane
EAST Proposed Pressure District
Hwy 4
04