proyecto en manila filipinas
TRANSCRIPT
H U R A S I T EMauricio Navarro
SCHOOL SITE
HOUSING
Longitudinal section
higheste
levatio
n
levelchange
levelchange
levelchange
Acces
A
Longitudinal zonification
Lowrise
housing
HOUSING
BCD
Med
ium
rise
housing
MIX USE
Lowrise
housing
HOUSING
Single level
PARK
ING
PLOT AND ZONIFICATION1. ZONE A
PARKING
2. ZONE BLOW RISE RES
3. ZONE CSTOREYS – RES
4. ZONE DLOW RISE RES (1-2)
5. ZONE E ADMINISTRATIVE
6. ZONE FLOW RISE
PLOT Orientation
Character HousingTipology
Population Height(m.)
Green Areas
Surface(s.q.m.)
Use
A E-W PUBLIC - 0 2.5 0% 1663 PARKING
B N-S RESIDENTIAL 1-2 STOREYS
336 2.5 to 5 25.3% 830 x 4 DWELLING
C E-W MIX USE 3 STOREYS
462 2.5 to 7.5 42% 2009 x 2 LEISURE, DWELLING, COMMERCE
D W-E RESIDENTIAL 1-2 STOREYS
70 2.5 to 5 44.5% 945 x 2 DWELLING
E W-E ADMINISTRATIVE/SERVICE
- 0 2.5 – 5 0% 486 STORAGECOMMERCE,POST, ADM.
F S-N RESIDENTIAL 1 STOREYS
118 2.5 32.12% 2615 DWELLING
TOTAL 4 197 sqm 13 992
Planification
48.43
19
0.973.36 1 4.28 1
1.2110.57 1 3.11 7.27
1.014.35
1.064.09
1.013.1351.73
Kinder Garden
For Rent( Comercial Areas )
Workshops and mix Use Rooms
Housing AreaHousing Area
Housing Area
Housing Area4 story building
3 story building
4 story building4 story building
Housing Area
Housing Area
Housing Area
Housing Area
Minimarket (1st �oor 0f 4)
Informal trade area
Internet Cafe ( 1st �oor) of 4
Parking Area
Parking Area
Parking Area
Sports Area
swimming pool
-3mt
-3mt
Local:+/-0 level
Local:+/-0 level
General +/- 0 mt
General +/- 0 mt
General +/- 0 mt
General +1.5General +2.75General +2.5General +1.25
General +0.75
General +0.75General +0.75General +2.25
General +0.75
General +0.75General +0.75General +1.5
Dwelings with posibilities ofExpansion. Includes 6 to 8 dwelers.
ONE FAMILY HOUSES
Administration
Square
0 5 10 20
Esc. Mts.
6 apartments / �oor
6 apartments / �oor
3 apartments / �oor
12
3
!,2 and 3Apartments buildings.
N
48.43
19
0.973.36 1 4.28 1
1.2110.57 1 3.11 7.27
1.014.35
1.064.09
1.013.1351.73
D
AA`
EE`
C`C
D`
B
B`
A - A´ Section
B - B´ Section
C- C´ Section
D- D´ Section
E- E´ Section
C- C Section
3mt
6mt
Parking
Building 1Aparments and comercial areas in the first floor.
Building 2Aparments and comercial areas in the first floor.
Building 3Comercial areas for Rent
Sports, Administration and workshop
Building 2
Building 1
Fin