• Reject the PWCS proposal to build a fourth coal terminal in Newcastle on the following grounds:– negative health consequences for the residents of Newcastle due to coal dust

– contribution to catastrophic climate change – international legal requirements to protect Ramsarlisted wetlands

– national & State requirements to protect threatened Golden Bell Frog and Migratory Bird Habitat and no proven off‐sets for endangered species

Page 3: Prue Bodsworth PAC Presentation.pptx [Read-Only] › resources › pac › media › files › ...Microsoft PowerPoint - Prue Bodsworth PAC Presentation.pptx [Read-Only] Author wedgwook

• Should you still consider approving T4 you must include the following recommendations:– Covered coal stockpiles– Coal trains going onsite must be covered– Reduced reliance on Newcastle potable water supplies

– No discharge of polluted water from the site into the Hunter River

Page 4: Prue Bodsworth PAC Presentation.pptx [Read-Only] › resources › pac › media › files › ...Microsoft PowerPoint - Prue Bodsworth PAC Presentation.pptx [Read-Only] Author wedgwook
Page 5: Prue Bodsworth PAC Presentation.pptx [Read-Only] › resources › pac › media › files › ...Microsoft PowerPoint - Prue Bodsworth PAC Presentation.pptx [Read-Only] Author wedgwook

• An additional 70Mt of coal exported will mean roughly 19,000 additional train trips between the Hunter mines and the port and back again, the capacity to export coal from an additional 8 to 10 mega mines and four new 1.5km coal stockpiles will substantially add to PM10 emissions in Newcastle and the Hunter Valley

• Community in Tighes Hill, Carrington Waratah, Mayfield to CBD (& along the rail corridor) already suffer from existing coal dust levels

Page 6: Prue Bodsworth PAC Presentation.pptx [Read-Only] › resources › pac › media › files › ...Microsoft PowerPoint - Prue Bodsworth PAC Presentation.pptx [Read-Only] Author wedgwook
Page 7: Prue Bodsworth PAC Presentation.pptx [Read-Only] › resources › pac › media › files › ...Microsoft PowerPoint - Prue Bodsworth PAC Presentation.pptx [Read-Only] Author wedgwook

• Covering coal stockpiles will– Reduce coal dust levels through protection from wind

– Reduce water consumption due to new covered coal stockpiles using temperature detection systems & reduced evaporation rate of water

– Reduce the accumulation of toxic water through protection of coal piles from rainwater

Page 8: Prue Bodsworth PAC Presentation.pptx [Read-Only] › resources › pac › media › files › ...Microsoft PowerPoint - Prue Bodsworth PAC Presentation.pptx [Read-Only] Author wedgwook

• Stipulate that coal trains that are to enter the T4 site must be covered

• People living along the rail corridor are sick of the dust that comes from the coal trains. The rail corridors are black with coal dust that comes coal wagons

Page 9: Prue Bodsworth PAC Presentation.pptx [Read-Only] › resources › pac › media › files › ...Microsoft PowerPoint - Prue Bodsworth PAC Presentation.pptx [Read-Only] Author wedgwook

• PWCS use 400ML/year an estimated additional 43ML/year from T4

• The use of our freshwater supplies to wash coal is a complete misuse of what is becoming a scarce resource

• Covering coal stockpiles reduces water use

Page 10: Prue Bodsworth PAC Presentation.pptx [Read-Only] › resources › pac › media › files › ...Microsoft PowerPoint - Prue Bodsworth PAC Presentation.pptx [Read-Only] Author wedgwook

• PWCS has a history of licence breaches regarding release of toxic water from site

• water that escaped from the other PWCS coal terminals was contaminated with coal sediments containing heavy metals such as aluminium, barium, chromium, lead, copper and zinc

• Covering coal stockpiles will stop the accumulation of contaminated water