  • 8/19/2019 PSU Planner Training Manual

    1/136

    Penn State University (PSU)

    FAM - Planner Training Manual

    Prepared By 

  • 8/19/2019 PSU Planner Training Manual

    2/136

    2 Planner Training Manual

    Revision History

    Revision Date: March 11, 2014

    Revision Number: 1

    Revision # Date Collaborator Description

    1.0 March 11, 2014 EDI Initial Document

    Click here to enter

    a date. 

    Record of Review

    Date Reviewer Purpose

    Click here to enter

    a date. 

    Click here to enter

    a date. 

    Click here to enter

    a date. 

    Click here to enter

    a date. 

  • 8/19/2019 PSU Planner Training Manual

    3/136

    Planner Training Manual 3

    Training Guide Contents

    1  FAM - Work Reception Center Training ......................................................................................... 9 

    1.1  FAM Project Overview ....................... ......................... .......................... ......................... 9 

    1.2  Maximo Overview .......................... .......................... ........................ ......................... ..... 9 

    1.3  Work Reception Center Training Manual ....... ......................... ........................... ............ 9 

    2  OPP Work Order Management ..................................................................................................... 10 

    2.1  Overview of Work Orders and Workflow .............................. .......................... .............. 10 

    2.2  Work Types .......................... .......................... ......................... ......................... ........... 11 

    2.3  Work Order Workflow Process for On Demand Work (CM, SVC, TS, MP, and EV) ...... 12 

    2.3.1 Phase 1 – Triage and Planning .................................................................................................... 15

    2.3.1.1  WRC Triages ........................................................................................................................................ 15 

    2.3.1.2  Planner Plans (Optional) ................................................................................................................. 17 

    2.3.1.3  EXERCISE: Plan CM Work Order and Route for Scheduling ....... ...... ....... ...... ....... ...... ....... . 19 

    2.3.1.4  EXERCISE: Plan CM Work Order and Route for Approval ....... ...... ....... ...... ...... ....... ...... ..... 27 

    2.3.1.5  EXERCISE: Plan CM Work Order and Place in Backlog ...... ....... ...... ....... ...... ....... ...... ....... .... 29 

    2.3.1.6  Approval (Optional) .......................................................................................................................... 33 

    2.3.2 Phase 2 – Scheduling and Execution........................................................................................ 35

    2.3.2.1  Scheduler Schedules (Optional).................................................................................................... 36 

    2.3.2.2  Supervisor Assigns ............................................................................................................................ 37 

    2.3.2.3  Craftsperson Executes/Updates ................................................................................................... 39 

    2.3.3 Phase 3 – Post Completion Review and Closure................................................................ 43

    2.3.3.1  Planner Post-Completion Review (Optional) ........................................................................... 43 

    2.3.3.2  Final Billing Complete (Integration) ........................................................................................... 44 

  • 8/19/2019 PSU Planner Training Manual

    4/136

    4 Planner Training Manual

    2.3.3.3  Work Order Closed ............................................................................................................................ 44 

    2.4  Work Order Workflow for Key Request Process ........................ ........................ ........... 45 

    2.4.1 Phase 1A – Non-OPP Request Triage and Approval ........................................................ 47

    2.4.1.1  P & PS Reviews Request .................................................................................................................. 47 

    2.4.1.2  OPP Approval of Controlled Keys ................................................................................................. 51 

    2.4.2 Phase 1B – OPP Request Triage and Approval ................................................................... 55

    2.4.2.1  OPP Access Coordinator Creates Key Request......................................................................... 55 

    2.4.2.2  OPP Access Coordinator Coordinates Approval for Key Request .......... ...... ....... ...... ....... . 56 

    2.4.3 Phase 2–

     Planning, Scheduling and Execution .................................................................. 60

    2.4.4 Phase 3 – Key Pick Up and Closure ........................................................................................... 60

    2.4.4.1  Work Reception Center Records Pick Up Information ......................................................... 60 

    2.4.4.2  Final Billing Complete (Integration) ........................................................................................... 61 

    2.4.4.3  Work Order Closed ............................................................................................................................ 62 

    2.5  Work Order Workflow Process for Preventive Maintenance................... ....................... 63 

    2.5.1 Phase 1 – Work Order Generation ............................................................................................ 64

    2.5.2 Phase 2 – Planning, Scheduling and Execution .................................................................. 64

    2.5.3 Phase 3 – Post-Completion Review and Closure ............................................................... 64

    2.6  Work Order Workflow Process for Jobs ..... .......................... .......................... .............. 65 

    2.6.1 Phase 1 – Create Job ......................................................................................................................... 67

    2.6.1.1  OPP Accounting Creates Job ........................................................................................................... 67 

    2.6.2 Phase 2 – Planning, Scheduling and Execution .................................................................. 68

    2.6.3 Phase 3 – Post-Completion Review and Closure ............................................................... 68

  • 8/19/2019 PSU Planner Training Manual

    5/136

    Planner Training Manual 5

    2.7  Work Order Workflow Process for Fixed Tasks ........................................ .................... 69 

    2.7.1 Phase 1 – Create Fixed Task ......................................................................................................... 70

    2.7.2 Phase 2 – Execution .......................................................................................................................... 70

    2.7.3 Phase 3 – Closure ............................................................................................................................... 71

    2.9  Components of a Work Order .......................... ........................ ......................... ........... 72 

    2.9.1 Work Order Tab – Header Section ............................................................................................ 72

    2.9.2 Work Order Tab – Job Details Section .................................................................................... 73

    2.9.3 Work Order Tab – Budget Section ............................................................................................ 74

    2.9.4 Work Order Tab–

     Priority Section ........................................................................................... 75

    2.9.5 Work Order Tab – Scheduling Information Section ........................................................ 76

    2.9.6 Work Order Tab – Responsibility Section............................................................................. 77

    2.9.7 Plans Tab – Tasks Section ............................................................................................................. 77

    2.9.8 Plans Tab – Labor Section ............................................................................................................. 78

    2.9.9 Plans Tab – Material Section ........................................................................................................ 78

    2.9.10 Assignments Tab – Assignments Section .............................................................................. 79

    2.9.11 Actuals Tab – Labor Section ......................................................................................................... 80

    2.9.12 Actuals Tab – Materials Section ................................................................................................. 80

    2.9.13 Cost Tab – Current Billing Section ............................................................................................ 81

    2.9.14 Cost Tab – Fiscal Work Order Costs Section ........................................................................ 82

    2.9.15 Cost Tab – Work Order Costs Section ..................................................................................... 83

    2.9.16 Log Tab – Work Log Section......................................................................................................... 84

    2.9.17 Failure Reporting Tab ..................................................................................................................... 85

  • 8/19/2019 PSU Planner Training Manual

    6/136

    6 Planner Training Manual

    3  Classifications .............................................................................................................................. 87 

    3.1  Overview of Classifications ......................... ......................... ......................... ............... 87 

    3.2  Working with Classifications ............................ ........................ ......................... ........... 87 

    3.2.1 Creating Classifications .................................................................................................................. 87

    3.2.1.1  Exercise: Create an Asset Classification ..................................................................................... 87 

    3.2.2 Updating Classifications ................................................................................................................. 89

    3.2.2.1  Exercise: Update an Asset Classification to Add an Attribute....... ....... ...... ....... ...... ...... ...... 90 

    5  Locations  ...................................................................................................................................... 92 

    5.1  Overview of Locations ................................................................................................. 92 

    5.2  Location Types .......................... ......................... ......................... ......................... ....... 93 

    5.3  Working with Locations ........................... ......................... ......................... ................... 94 

    5.3.1 Creating Locations ............................................................................................................................ 94

    5.3.1.1  Exercise – Creating a Location ...................................................................................................... 94 

    5.3.1.2  Exercise – Associating a Location to a System ......................................................................... 97 

    5.3.2 Update or Inactivate Location ..................................................................................................... 98

    5.3.2.1  Exercise – Updating the Priority on a Location ....................................................................... 99 

    5.3.2.2  Exercise – Inactivating a Location................................................................................................ 99 

    5.4  Components of a Location .......................... ......................... ......................... ............. 101 

    5.4.1 Location Tab – Header Section .................................................................................................101

    5.4.2 Location Tab–

     Systems, Parent, and Children Sections ..............................................102

    5.4.3 Assets Tab – Assets Section ........................................................................................................103

    5.4.4 Assets Tab – History Section ......................................................................................................103

  • 8/19/2019 PSU Planner Training Manual

    7/136

    Planner Training Manual 7

    5.4.5 Specifications Tab – Header and Specifications Section .............................................104

    6  Assets  ......................................................................................................................................... 105 

    6.1  Overview of Assets ........................ ......................... ......................... ......................... . 105 

    6.2   Asset vs. Locations........................ ......................... ......................... ......................... . 106 

    6.3  Working with Assets .................................................................................................. 107 

    6.3.1 Creating Assets..................................................................................................................................107

    6.3.1.1  Exercise – Creating an Asset ....................................................................................................... 107 

    6.3.1.2  Exercise – Moving an Asset ......................................................................................................... 110 

    6.3.1.3  Exercise – Decommissioning an Asset ..................................................................................... 112 

    6.4  Components of an Asset ........................................................................................... 113 

    6.4.1 Assets Tab – Details Section .......................................................................................................113

    6.4.2 Asset Tab – Purchase Information, Budget and Costs Sections ...............................114

    6.4.3 Spare Parts Tab – Subassemblies and Spare Parts Sections .....................................115

    6.4.4 Meters Tab – Meters Section......................................................................................................115

    6.4.5 Specifications Tab – Header and Specifications Section .............................................116

    7  Job Plans  .................................................................................................................................... 118 

    7.1  Overview of Job Plans ....................... ......................... .......................... ..................... 118 

    7.2  Creating and Activating a Job Plan .......................... ......................... ........................ . 119 

    7.2.1 Planner Creates New Job Plan ...................................................................................................120

    7.2.1.1  Exercise: Create Job Plan and Submit for Approval ....... ...... ....... ...... ....... ...... ....... ...... ....... 120 

    7.2.1.2  Exercise: Activate Job Plan that has been Approved by all Reviewers ...... ....... ...... ...... 123 

    7.3  Revising a Job Plan ....................... ......................... ......................... ......................... . 124 

  • 8/19/2019 PSU Planner Training Manual

    8/136

    8 Planner Training Manual

    7.3.1 Planner Creates Job Plan Revision ..........................................................................................126

    7.3.1.1  Exercise: Create Job Plan Revision and Submit for Approval ...... ....... ...... ....... ...... ...... ... 126 

    7.3.1.2  Exercise: Activate Job Plan Revision that has been Approved by all Reviewers ....... 127  

    7.3.2 Planner Inactivates Job Plan ......................................................................................................128

    7.3.2.1  Exercise: Inactivate Job Plan ...................................................................................................... 128 

    8  Preventive Maintenance ............................................................................................................. 129 

    8.1  Overview of Preventive Maintenance ........................... ......................... ..................... 129 

    8.2  Working with PMs .......................... .......................... ........................ ......................... . 130 

    8.3  Creating and Activating a Preventive Maintenance Record ....................... ................. 130 

    8.3.1 Planner Creates New PM .............................................................................................................132

    8.3.1.1  Exercise: Create PM and Submit for Approval ....... ...... ....... ....... ...... ...... ....... ....... ...... ...... .... 132 

    8.3.1.2  Exercise: Activate PM that has been Approved by all Reviewers..... ....... ...... ....... ...... .... 134 

    8.4  Revising a PM ........................... ......................... ......................... ......................... ..... 135 

    8.4.1 Planner Creates Job Plan Revision ..........................................................................................135

    8.4.1.1  Exercise: Modify PM Frequency ............................................................................................... 135 

    8.4.2 Planner Inactivates Job Plan ......................................................................................................136

    8.4.2.1  Exercise: Inactivate PM................................................................................................................ 136 

  • 8/19/2019 PSU Planner Training Manual

    9/136

    Planner Training Manual 9

    1  FAM - Work Reception Center Training

    1.1  FAM Project OverviewFAM (Facilities Asset Management System) is a major step forward in the evolution of

    Enterprise Asset Management (EAM) at Penn State. The FAM system is built on the Maximo

    7.5 platform. Efficient use of the Maximo 7.5 system to perform everyday asset and work

    management tasks will be critical to realizing the goals of the FAM project.

    1.2  Maximo Overview

    IBM® Maximo® Asset Management is an integrated productivity tool and database that

    helps you manage all of your asset types on a single software platform. Built on a service-oriented architecture (SOA), Maximo Asset Management delivers a comprehensive view of

    all asset types, their conditions and locations, and the work processes that support them, to

    provide you with optimal planning, control, audit, and compliance capability.

    The Maximo database provides critical information about assets and locations, includingkey attributes, their configuration, and their physical and logical relationships to other

    resources. Using Maximo, you can manage and track events related to your assets from

    cradle to grave including creating, assigning, monitoring, notifying, and reporting on key

    work and work support processes such as work orders and purchase orders, including

    status, from start to finish.

    1.3  Work Reception Center Training Manual

    This training manual focuses on the role of the Planner user as it executes functions in theFAM system. This manual will cover the applications and use cases that a Planner user willbe expected to perform, on regular basis, inside of the system. The manual may not cover

    some functionality that the Planner has access to if it is not directly related to a common

    activity that they are expected to perform.

    Specifically, this manual covers overviews, processes and specific exercise associated with

    the following topics:

      Work Management

      Locations

      Assets

      Classifications

      Job Plans  Preventive Maintenance

  • 8/19/2019 PSU Planner Training Manual

    10/136

    10 Planner Training Manual

    2  OPP Work Order Management

    2.1  Overview of Work Orders and Workflow

    Work Orders are used to identify, plan, schedule, execute and track the work that

    is performed at Locations and/or on Assets and systems throughout the campus.

    Initially, a work order is a request for work to be performed. Once completed, awork order is a record of activities performed that make up the history of our

    Locations, Assets and systems.

    The information that is contained on a work order includes the following:

      The tasks that were performed

      The labor hours involved in performing the work

      The services used, if any

      The materials used, if any

      The tools required to do the work

      The assets worked on

      The locations where the work was performed

    When you create a work order, you initiate the work management process and

    create a historical record of the work requested and performed. The work

    management process in the FAM system is controlled by an electronic workflow

    process. This workflow, based on work types, ensures the right steps are

    performed, by the right people, in the right order and at the right time. At certain

    times in the workflow, direct assignments will determine who is to take action on

    a record. At other times, information on the work order including status,

    responsible group/individual, and assignment status will determine who is to take

    action. At all times, any status changes to be performed on a work order record

    will be done using workflow options.

     As a work order record is processed through the work management workflow,

    more sections of the work order record will be populated with the information

    about what was both planned to be done and what was actually done.

    In this section of the training manual you will learn about the basic components of

    Work Order and Job records, the different Work Types, and the workflow

    processes for each Work Type.

  • 8/19/2019 PSU Planner Training Manual

    11/136

    Planner Training Manual 11

    2.2  Work Types

    Work Types are assigned to Work Orders to categorize them by the nature of the

    work being performed. Ultimately, this serves two very important purposes:

      Categorization of Work

      Processing of Work

    Categorization is the concept that it allows you to sort the work already

    performed or still in progress to determine how your facilities are performing. For

    example, is most of the work you are doing trouble or breakdown work or is most

    of it preventive maintenance. An organization that is trying to establish an

    Enterprise Asset Management (EAM) program and not just a repair service

    considers this type of informatiProcessing of work is the concept that different types of work require different

    pre-, post-, and in progress processing tasks. For example, a corrective

    maintenance work order to repair a failure requires planning to analyze the failure

    and identify a fix. Whereas, a preventive maintenance work order already has a

    plan defined for it and does not need any planning prior to execution. In order to

    ensure that the right steps are done by the right people at the right time, we must

    have processes that dictate what those steps are based on work type.

     Along with the FAM implementation, the following Work Types will be used for

    work orders:

    Work Type Abbr. Definition

    Corrective

    Maintenance

    CM Work to return an asset/location to its designed

    intent after a failure.

    Service Work SVC Work that does not affect the reliability or

    maintenance history of any assets/locations and is

    not related to a failure. Typically driven by

    customer request.

    Minor Project MP Smaller changes, enhancements, and upgrades toassets/locations that do not require a contract.

    May require some design assistance and level 1

    permitting, but limited to work with a single funding

    source.

  • 8/19/2019 PSU Planner Training Manual

    12/136

    12 Planner Training Manual

    Work Type Abbr. Definition

    Trouble

    Shooting

    TS Performance of an assessment in support of the

    planning process prior to performing another work

    type. Should be a child to a work order of another

    type.

    Event EV Work related to a distinct event that does not

    affect the reliability or maintenance history of any

    assets/locations.

    Preventive

    Maintenance

    PM Proactive work to maintain an asset/location in

    performance of its designed intent.

    Job JOB Larger changes, enhancements, and upgrades to

    assets/locations that require a contract. Require

    design assistance, permitting beyond level 1, and

    may involve multiple funding sources. Typically

    associated with a Tririga Contract Number.

    Fixed Task FT Routine, recurring, operational work. (Also known

    as Standing Orders.)

    Key Request KR Work related to new keys or re-keying generated

    from a Key Request.

    The following sections will describe how each of the above work types are

    processed. Note that Corrective Maintenance (CM), Service Work (SVC), Minor

    Project (MP), Trouble Shooting (TS), and Event (EV) work orders all follow the

    same workflow process and are collectively referenced as On-Demand Work in

    the following section.

    2.3  Work Order Workflow Process for On Demand Work (CM, SVC,TS, MP, and EV)

    On-demand work (CM, SVC, TS, MP and EV work types) is typically initiated

    based on a customer request, tradesperson problem report, or as a follow up

    work order. For this reason, these work orders must be triaged and, in some

    cases, planned before they are assigned and executed. It should be noted that

    any work order that is submitted without a work type will initially follow this

  • 8/19/2019 PSU Planner Training Manual

    13/136

    Planner Training Manual 13

    workflow. From start to finish, work orders with these work types may proceed

    through the following phases, each of which will be described in greater detail:

    Phase 1 – Triage and Planning Triage

    Planning

     Approval

    Phase 2 – Scheduling and Execution Scheduling

     Assignment

    Execution

    Phase 3 – Post-Completion Review

    and Closure

    Post-Completion Review

    Closure

    The workflow is being presented in phases because the workflow is set up to

    behave a little differently in each of these phases.

    During Phase 1  –  Triage and Planning, workflow is set up to make discrete

    assignments to individuals and groups where the assigned individuals are the

    1 - Triageand Planning

    2 -Scheduling

    andExecution

    3 - Reviewand Closure

  • 8/19/2019 PSU Planner Training Manual

    14/136

    14 Planner Training Manual

    only users that can access the workflow options for the record. During this

    phase, workflow actions show exactly who is assigned and records reside in

    specific users’ workflow inbox.

    During Phase 2  – Scheduling and Execution, work orders are not actively in a

    workflow, meaning that there are not discrete assignments to individuals orgroups and anyone with appropriate permissions is allowed to access the

    workflow options for the record. During this phase, users that are responsible

    for the record are engaged via Start Center result sets and/or saved queries in

    the appropriate applications. During this phase, users primarily use specific

    function-based applications like Scheduler, Assignment Manager, Mobile Work

    Manager, or Quick Reporting to interact with the record. Whenever a status

    change is required, the user still uses workflow, but is presented with all of the

    available status change options at that particular point in the process. The

    reason for this design is to allow applications like Assignment Manager and

    Mobile Work Manager to function most efficiently without workflow getting in theway.

    During Phase 3  –  Post-Completion Review, workflow is again set up to make

    discrete assignments to individuals and groups where the assigned individuals

    are the only users that can access the workflow options for the record. During

    this phase, workflow actions show exactly who is assigned and records reside in

    specific users’ workflow inbox. Once the Work Order is in a waiting to be closed

    (WCLOSE) status, the work orders are not in workflow at all. At this point, work

    orders are sitting in a “Waiting to Close” status and will automatically be close

    when an integration informs Maximo that billing is complete.

  • 8/19/2019 PSU Planner Training Manual

    15/136

    Planner Training Manual 15

    2.3.1  Phase 1 – Triage and Planning

    2.3.1.1  WRC Triages

    The workflow begins when a work order is submitted via SuiteReq, a mobile

    device, or created directly in Maximo and routed. The workflow first assigns the

    record to the Work Reception Center (WRC) person group. Every person in this

    person group will receive an assignment for the work order and it will be

    displayed in their workflow in-box. Any user from that group can perform the

    next step in workflow to take ownership of the record for triage, which will end

    the assignment for all other users of the group and remove it from their workflow

    in-boxes. Once one of the users from the group has taken ownership of the

    record via workflow, the record will move into a status of “TRIAGE” and reside

    only in the owners workflow in-box.

    Note:  The owner will be the only user that can perform the next routing

    step.

     At the “Triage” step in the workflow, the WRC can review and make updates to

    the record. Key fields to review/update:

    WRC Triages

    PlannerPlans

    (Optional)

    Approval(Optional)

    On to Phase2 -

    Schedulingand

    Execution

  • 8/19/2019 PSU Planner Training Manual

    16/136

    16 Planner Training Manual

    Key Fields for Triage Step:

    Description/Long Description Work Type

     Asset/Location GL Account/Customer Billing Number

    Urgency/Priority Target Start/Finish

    Responsibility Fields

    Once the WRC has completed their updates to the record, they have a limited

    number of workflow routing options that are described below:

    Option What Happens Next Dependencies

    Cancel the Work Order Work Order Status goes

    to Cancel (CAN) and

    workflow stops.

    Process ends.

    Not required, but might

    populate Work Log

    section with reason for

    cancellation.

    Emerging work – Route

    directly to Work Group

    Work Order Status goes

    to Approved (APPR) and

    workflow stops.

    Work Order goes directly

    to Phase 2 of process.

    Must do either  of the

    below first:

      Populate the Work

    Group Field OR 

      Create

    assignment for

    Technician

    (Emergencies)

    Not Emerging work – 

    Route to Planner Group

    Work Order Status goes

    to Waiting Planning

    (WPLAN) and gets

    assigned to the specified

    Planner Group.

    Must populate the

    Planner Group field first.

    Place Work Order back

    into WRC Queue.

    Work Order Status goes

    back to New (NEW) and

    gets assigned to the

    WRC Person Group.

    N/A

  • 8/19/2019 PSU Planner Training Manual

    17/136

    Planner Training Manual 17

    Note:  It should be noted that the “Emerging Work” option would be

    selected in the case of an emergency Work Order, where the dispatched

    Technician has already been assigned.

    2.3.1.2  Planner Plans (Optional)

    If the “non-Emerging” option is selected, workflow will assign the Work Order to

    the Planner Group person group identified on the Work Order. Every person in

    this person group will receive an assignment for the work order and it will be

    displayed in their workflow in-box. Any user from that group can perform the next

    step in workflow to take ownership of the record for planning, which will end the

    assignment for all other users of the group and remove it from their workflow in-

    boxes. Once one of the users from the group has taken ownership of the record

    via workflow, the record will move into a status of “PLANNING” and reside only in

    the owners workflow in-box.

    Note:  The owner will be the only user that can perform the next routing

    step.

     At the “Planning” step in the workflow, the Planner can review and make

    updates to the record. Key fields/sections to review/update:

    Key Fields/Sections for Planning Step:

    Description/Long Description Work Type

     Asset/Location Urgency/Priority

    Target Start/Finish Job Plan

    Duration Work Group

    Plans Tab – Steps Plans Tab - Labor

    Plans Tab – Materials

    Once the Planner has completed their updates to the record, they have a limited

    number of workflow routing options that are described below:

  • 8/19/2019 PSU Planner Training Manual

    18/136

    18 Planner Training Manual

    Option What Happens Next Dependencies

    Cancel the Work Order Work Order Status goes

    to Cancel (CAN) and

    workflow stops.

    Process ends.

    Not required, but might

    populate Work Log

    section with reason for

    cancellation.

    Route Work Order for

    Waiting to be Scheduled

    Work Order Status goes

    to Waiting to be

    Scheduled (WSCH) and

    workflow stops.

    Work Order goes to

    Phase 2 of process.

    Not required, but might

    populate the following

    first:

      Work Group

      Scheduler Group

    Place the Work Order

    into Backlog.

    Work Order Status goes

    to Backlog (BACKLOG)

    and workflow stops.

    Work Order can be

    resubmitted to workflow

    at any time and it will go

    back to the Planner.

    Must populate the

    Backlog Reason field

    first.

    Route the Work Order for Approval

    Work Order Status goesback to Waiting Approval

    (WAPPR) and gets

    assigned to the Person in

    the Approver field.

    Must populate Approverfield first.

    Place the Work Order

    Back into the Waiting

    Planning Queue

    Work Order Status goes

    back to Waiting Planning

    (WPLAN) and gets

    assigned to the Planner

    Person Group on the

    Work Order.

    N/A

  • 8/19/2019 PSU Planner Training Manual

    19/136

    Planner Training Manual 19

    2.3.1.3  EXERCISE: Plan CM Work Order and Route for Scheduling

    Work Orders that require planning will be located in your “Inbox/Assignments”

    portlet on your Start Center with a description of “Work Order [Work Order #]

    Needs to be Planned.” 

    1. Log in to Maximo with your username and password.2. In your “Inbox/Assignments” portlet, click on the Work Order that you will

    start planning.

    3. Click on the “Route Workflow” Icon on the toolbar.4. With “Take Ownership of Work Order for planning” selected, click on “OK”. 

    NOTE: Performing this step takes the record out of the Planner Groupqueue and assigns it directly to you. This reduces the possibility ofmultiple users trying to plan the same Work Order.

    Typically, at this point in the process, the Planner user would review and update

    key fields on the Work Order prior to routing it on to the next step. In thisexercise, you will be asked to populate some these fields. Please note thatdepending on the record you selected, these fields may already have the values

    specified in them.

    Before proceeding with planning the Work Order, you would want to review and

    validate the following:

  • 8/19/2019 PSU Planner Training Manual

    20/136

    20 Planner Training Manual

      The Asset or Location is precise and accurate for the work being

    requested or problem reported.

      The Work Type is accurate.

    Next you would determine if “Extensive” or “Minimum” planning is required. Thisdrives how much time you will invest in planning the record and, therefore, whichsteps you will perform as well as how much time you will invest in performingthose steps. (This is really a sliding scale and should be defined by your

    organization. Sample definitions provided below.)

      Minimum – 

    o  Work has no historical value.o  Work estimate is not more than 4 total work hours.o  While parts may be required, no ordering is necessary.

      Extensive – o  All other work.

    o  How much time you spend on the additional planning steps wouldbe a sliding scale related to the size and complexity of the job.

    Important:  Minimum planning still REQUIRES some definition of

    scope and REQUIRES identification of planned labor. ALL Work

    Orders that go through planning should have planned labor even if it is

    an educated guess. This is critical information for scheduling.

    For this exercise, we will assume that “Extensive” planning is required.

    For extensive planning, you would review the work history of the Asset orLocation in Maximo to determine trends and conditions. This can be done manyways in Maximo. The simplest being:

    5. Select “View Work Details” from the lookup on the Location or Asset fieldon the Work Order.

  • 8/19/2019 PSU Planner Training Manual

    21/136

    Planner Training Manual 21

    6. When done reviewing the work history, select “OK.” 

    Typically, for extensive planning, you would also perform a field inspection tovalidate the request/problem, begin scoping the work, and identify potentialconstraints.

    7. To define the scope of work, you can update the short description of theWork Order by entering text in the Description field. (You can click on theLong Description icon to add additional text, if necessary)

    Note: Scope should be limited to a very high-level definition of

    actions or repairs to be executed (not step-by-step) including prep,coordination and wrap-up activities as well as actual work. Itshould also include identification of critical coordination elements

    for the work like access restrictions or required clearances.

    8. Save the record .9. Navigate to the Plans tab of the Work Order by clicking on it to begin

    planning the work.

  • 8/19/2019 PSU Planner Training Manual

    22/136

    22 Planner Training Manual

    To create the steps to perform the work:

    10. Select New Row in the Tasks section of the Plans tab.

    11. Enter text into the Task Summary f ield to describe the first step of theWork Order.

    Note: For complex jobs, you may want to populate the duration for

    each step. This would simply be done to make calculating theoverall job duration easier.

     Also, if there is a condition monitoring point reading to be recorded,the ID of the Condition Monitoring Point can be entered in theMeasure Point field.

    12. Repeat steps 9 and 10 to add two additional steps to the Work Plan.

    Alternate Method:  If a suitable Job Plan for the work alreadyexists, attach it by populating the Job Plan ID in the Job Plan field

    on the main Work Order tab.

    Note: if “minimum” planning, do not spend time searching for a JobPlan. Only attach if already known.

    13. Save the record .

  • 8/19/2019 PSU Planner Training Manual

    23/136

    Planner Training Manual 23

    To identify the Materials required for the work:

    14. Open the Materials tab on the Plan tab by clicking on it.

    15. Select New Row on the Materials tab of the Plans tab.16. Enter ‘821630’ in the Item Number field, enter ‘2’ in the Quantity field, and

    enter ‘Area 1’ in the Storeroom field.

    17. Select New Row on the Materials tab of the Plans tab.18. In the Line Type field, open the drop-down list and select Material.

  • 8/19/2019 PSU Planner Training Manual

    24/136

    24 Planner Training Manual

    19. Enter ‘Sealant’  in the Item Description field, enter ‘1’ in the Quantity field,enter ‘EA’ in the Order Unit field, enter ’25’ in the Unit Cost field, and enter‘4105’ in the Vendor field.

    Alternate Method: You can also select materials to plan for theWork Order by using the “Select Materials” or “Select Asset Spare

    Parts” buttons. 

    Note: Tools can be added on the Tools tab of the Plan tab in asimilar fashion. Add a new row for each planned tool from the Toolroom and enter the Tool ID and quantity. (If special tools are goingto be required, but do not need to be issued from the Tool room,include in the Work Order Description.)

    20. Save the record .

    To identify the Labor required for the work: 

    21. Open the Labor tab on the Plan tab by clicking on it.

    22. Select New Row on the Labor tab of the Plans tab.

  • 8/19/2019 PSU Planner Training Manual

    25/136

    Planner Training Manual 25

    23. Select the Select Value icon next to the Skill Level field to bring up a listof available Craft/Skill combinations.

    24.Select the “Carpentry Field – 301 – 00” Craft/Skill by clicking on it.  

    25.Enter ‘1’ in the Quantity field (already populated) and enter ‘1’ in the

    Regular Hours field to indicate that you will need one this Craft/Skill forone hour.

    Note: In most cases, for labor durations, an educated guess by theplanner is sufficient. This is particularly true for “minimum” plannedWork Orders. For “extensive” Work Orders you might look at histor ical

    actuals from similar jobs.

  • 8/19/2019 PSU Planner Training Manual

    26/136

    26 Planner Training Manual

    Important:  Craft, Quantity and Duration will be critical information forevaluating resource demand when scheduling and assigning usingScheduling and Dispatch applications. This information should beprovided on ALL work orders!

    26. Save the record .

    To enter additional Planning/Scheduling/Routing information:

    27. Navigate back to the main Work Order tab by clicking on it.

    28. Enter ‘1’ in the Duration field in the Scheduling Information section  tosignify that the Work Order should take 1 hour to complete, once started.

    Note: Duration is the duration of the Work Order from start to finish.This is not the total effort. This is the amount of time that will elapsefrom when the work is initially started to when it can be called

    complete.

     Also, you may optionally populate the Customer Reqd Start and Finish

    Dates at this time. This is the allowable maintenance window for whenthis work can be scheduled.

    29.Enter ‘GENERAL’ in the Work Group field to identify the Work Group that

    is to be responsible for the work.

    30. Save the record .

    To indicate that the Work Order is now planned and ready for scheduling:

  • 8/19/2019 PSU Planner Training Manual

    27/136

    Planner Training Manual 27

    31. Select the Route Workflow icon .32.Select the “Proceed to Available Routing Options” option and select OK.  

    33.Select the “Work Order planned. Ready for scheduling.” option and select

    OK.

    Planning on this Work Order is now complete and the planner’s responsibility isdone. This Work Order will now be picked up a by a scheduler to definescheduled start and finish dates.

    2.3.1.4  EXERCISE: Plan CM Work Order and Route for Approval

    In this exercise, the Work Order that is planned will need to be routed for

     Approval before it can be scheduled.

    1. Log in to Maximo with your username and password.

    2. In your “Inbox/Assignments” portlet, click on the Work Order that you willstart planning.

  • 8/19/2019 PSU Planner Training Manual

    28/136

    28 Planner Training Manual

    3. Click on the “Route Workflow” Icon on the toolbar.4. With “Take Ownership of Work Order for planning” selected, click on “OK”.  

    5. Utilize what you learned in the previous exercise to plan this Work Order.Including:

      Defining Scope

      Adding Work Plan Tasks

      Adding Planned Materials

      Adding Planned Labor  Identifying Duration and Work Group

    6. Save the record .

    To route the Work Order for approval:

    7. Enter ‘UATSUP1’ in the Approver field in the Responsibilities section ofthe main Work Order tab.

    Note: The person entered into the Approver field is the person

    responsible for obtaining any necessary approvals prior to

  • 8/19/2019 PSU Planner Training Manual

    29/136

    Planner Training Manual 29

    beginning work. The Work Order record will be assigned to thespecified individual in workflow and they will need to use workflowto indicate the Work Order is approved.

    8. Select the Route Workflow icon .

    9. Select the “Proceed to Available Routing Options” option and select OK.  

    10.Select the “Work Order requires approval. Route to assigned Approver.”option and select OK.

    Planning on this Work Order is now complete and the planner’s responsibility is

    done. This Work Order will now be reviewed and approved by the reviewer and

    routed on for scheduling if approved. If it is not approved, it will return to the

    planner for additional planning or cancellation.

    2.3.1.5  EXERCISE: Plan CM Work Order and Place in Backlog

    In this exercise, the Work Order that is planned will be placed into backlog after

    planning is complete.

    1. Log in to Maximo with your username and password.

  • 8/19/2019 PSU Planner Training Manual

    30/136

    30 Planner Training Manual

    2. In your “Inbox/Assignments” portlet, click on the Work Order that you willstart planning.

    3. Click on the “Route Workflow” Icon on the toolbar.4. With “Take Ownership of Work Order for planning” selected, click on “OK”.  

    5. Utilize what you learned in the previous exercise to plan this Work Order.Including:

      Defining Scope  Adding Work Plan Tasks

      Adding Planned Materials

      Adding Planned Labor

      Identifying Duration and Work Group

    6. Save the record .

    To place the Work Order in backlog:

    7. Select the Select Value icon next to the Backlog Reason field on the main

    Work Order tab of the Work Order.

  • 8/19/2019 PSU Planner Training Manual

    31/136

    Planner Training Manual 31

    8. Select a Backlog Reason of “Other” by clicking on it.  

    Note: If “other” is selected as the Backlog Reason, the planner

    should provide a note in the Work Log explaining the situation.

    9. Navigate to the Log tab by clicking on it.

    10. Select New Row in the Work Log section.11.Enter ‘UPDATE’ in the Type field. Enter a reason for placing the Work

    Order in backlog in the Summary field.

  • 8/19/2019 PSU Planner Training Manual

    32/136

    32 Planner Training Manual

    12. Select the Route Workflow icon .13.Select the “Proceed to Available Routing Options” option and select OK.  

    14.Select the “Place Work Order in Backlog.” option and select OK.

    Planning on this Work Order is now complete and the planner’s responsibility  isdone, for now. This Work Order is no longer in workflow and is in a status ofBACKLOG. Workflow can be restarted on this Work Order at any time. When

    workflow is restarted the record will be routed back to the Planner that placed it inbacklog to review and take action on.  

  • 8/19/2019 PSU Planner Training Manual

    33/136

    Planner Training Manual 33

    2.3.1.6  Approval (Optional)

    If the “Route for Approvals” option is selected, workflow assigns the Work Order

    to the individual identified as the Approver on the Work Order.

    Note:  At this point, the Work Order will reside only in the Approversworkflow in-box. The Approver will be the only user that can perform the

    next routing step.

     At the “Approval” step in the workflow, the Approver user would review all of the

    information provided on the Work Order and coordinate any necessary

    approvals that are exterior to the Maximo system.

    Once the Approver has decided if they approve of the Work Order, they have a

    limited number of workflow routing options that are described below:

    Option What Happens Next Dependencies

     Approve the Work Order Work Order Status goes

    to Waiting to be

    Scheduled (WSCH) and

    workflow stops.

    Work Order goes to

    Phase 2 of process.

    N/A

    Not Approve the Work

    Order

    Work Order Status goes

    back to the Planning

    (PLANNING) status and

    is assigned to the

    Planner that planned the

    Work Order

    Not required, but might

    populate Work Log

    section with reason for

    not approving.

     At the end of this phase of the process, the Work Order will be in one of the

    following conditions:

    Possible Ending Conditions for Phase1 of Process

    Next Steps

    1. Canceled status with workflow

    stopped.

    N/A

  • 8/19/2019 PSU Planner Training Manual

    34/136

    34 Planner Training Manual

    Possible Ending Conditions for Phase

    1 of Process

    Next Steps

    2. Approved status with workflow

    stopped.

    Supervisor picks up Work Order in saved

    queries to be assigned. (Phase 2)

    3. Waiting to be Scheduled status

    with workflow stopped.

    Scheduler picks up Work Order in saved

    queries to be scheduled. (Phase 2)

    4. Backlog Status with workflow

    stopped.

    Planner picks up Work order in saved

    queries to be restarted at Planning step.

    (Phase 1)

  • 8/19/2019 PSU Planner Training Manual

    35/136

    Planner Training Manual 35

    2.3.2  Phase 2 – Scheduling and Execution

     As described above, during this phase, work orders are not actively in a workflow

    in between actions.

    Note:  This means that there are not discrete assignments to individuals

    or groups. It also means that anyone with appropriate permissions is

    allowed to access the workflow options for the record.

    During this phase, users that are responsible for the record find their records via

    Start Center result sets and/or saved queries in the appropriate applications.

    During this phase, users primarily use specific function-based applications like

    Scheduler, Assignment Manager, Mobile Work Manager, or Quick

    Reporting to interact with the record.

    Important:  Whenever a status change is required, the user uses the

    workflow button and is presented with all of the available status change

    options at that particular point in the process.

    Once an option is selected, the workflow fires to make the status change and

    then immediately stops again. The reason for this design is to allow applications

    like Assignment Manager and Mobile Work Manager to function most efficiently

    without workflow getting in the way.

    In Phase 2  – Scheduling and Execution, a work order can begin in one of two

    places. Either:

    Scheduler Schedules(Optional)

    Supervisor AssignsCraftsperson

    Executes/UpdatesCraftsperson

    CompletesOn to Phase 3 -

    Review and Closure

  • 8/19/2019 PSU Planner Training Manual

    36/136

    36 Planner Training Manual

    1. A Work Order requires scheduling and comes into the process in a

    Waiting to be Scheduled status (WSCH)

    OR

    2. The Work Order is emerging work and comes into the process in the

     Approved (APPR) status.

    Note:  Work Orders in an Approved status bypass the scheduling steps

    and go directly to the Supervisor.

    2.3.2.1  Scheduler Schedules (Optional)

    For Work Orders in a Waiting to be Scheduled (WSCH) status, Schedulers would

    utilize a Start Center Result Set, Saved Query in Work Order Tracking, or Saved

    Query in a Scheduling application to identify which Work Orders are ready to bescheduled. They would use either Work Order Tracking or a Scheduling

    application to update the following Key Fields:

    Key Fields for Scheduling Step:

    Scheduled Start Scheduled Finish

    Duration Work Group

    Once the Scheduler has completed their updates to the record, they have a

    limited number of workflow routing options that are described below:

    Option What Happens Next Dependencies

    Route Work Order for

    Execution

    Work Order Status goes

    to Approved (APPR) and

    workflow stops.

    Supervisor picks up

    Work Order in saved

    queries to be assigned.

    Must populate Work

    Group field.

    Not required, but should

    populate the following

    first:

      Scheduled Start

      Scheduled Finish

  • 8/19/2019 PSU Planner Training Manual

    37/136

    Planner Training Manual 37

    Option What Happens Next Dependencies

    Route the Work Order

    back to the Planner

    Group for additional

    planning

    Work Order Status goes

    back to Requires Re-

    planning (REPLAN) and

    gets assigned to thePlanner Person Group

    on the Work Order.

    Work Order goes back to

    Phase 1.

    Must populate the

    Planner Group first.

    2.3.2.2  Supervisor Assigns

     All work that is in an approved status is ready to be assigned to craftspeople.This includes Work Orders that have been scheduled, like in the previous step, or

    Work Orders that were identified as “Emerging” and routed directly to approved

    from the “Triage” steps in Phase 1.

    To assign approved Work Orders, Supervisors would typically utilize a Saved

    Query in the Assignment Manager  application to identify which Work Orders are

    ready to be assigned.

    Note: a Supervisor might also use a Start Center Result Set  or Saved

    Query in Work Order Tracking to catch one-off Work Orders that need to

    be assigned.)

    In Assignment Manager , the Supervisor would assign the Work Order to a

    craftsperson or craftspeople.

    Key Fields for Assignment Step:

    Laborer Assignment Start Date

    Note:  Often, this step will be performed across multiple records at the

    same time.

    Important:  There is no need for a Supervisor to change the status of the

    Work Order at this point, if the work is assigned. Craftspeople will see

    their assigned records on the Mobile Device or in their Saved Queries

    regardless of status.

  • 8/19/2019 PSU Planner Training Manual

    38/136

    38 Planner Training Manual

    The Supervisor does have the following workflow options available to them, if

    they choose to exercise them:

    Note:  All of these options only change the status of the record and then

    workflow stops immediately again.

    Option What Happens Next Dependencies

    Change Status to

    “Rescheduling Required” 

    Work Order Status goes

    to Rescheduling

    Required (RSCH) and

    workflow stops.

    Scheduler picks up Work

    Order in saved queries to

    be scheduled.

    Not required, but might

    populate Work Log

    section with reason for

    rescheduling.

    Change Status to

    “Reassignment

    Required” 

    Work Order Status goes

    to Reassignment

    Required (REASSIGN)

    and workflow stops.

    Supervisor picks up

    Work Order in saved

    queries to be assigned.

    If moving to another

    Work Group, must

    populate Work Group

    field.

    Change Status to

    “Waiting Materials” 

    Work Order Status goes

    to Waiting on Materials

    (WMATL) and workflow

    stops

    Supervisor/Technician

    picks up Work Order in

    saved queries when

    materials arrive.

    N/A

  • 8/19/2019 PSU Planner Training Manual

    39/136

    Planner Training Manual 39

    Option What Happens Next Dependencies

    Change Status to “In

    Progress” 

    Work Order Status goes

    to In Progress (INPRG)

    and workflow stops.

    Technician continues to

    process Work Order just

    like APPR.

    N/A

    Note: The Supervisor Assigns step could be executed more than

    once on a Work Order. This is particularly true for multi-craft Work

    Orders or when work is interrupted across shifts.

    Important:  Emergency work (work that is dispatched before a WorkOrder is even created) will actually come out of the “Triage” steps

    with a craftsperson already assigned and in the approved status.

    These work orders will immediately show up as assigned for the

    craftsperson.

    2.3.2.3  Craftsperson Executes/Updates

    Craftspeople will be able to see the Work Orders that are assigned to them inseveral locations:

      Start Center Result Set

      Quick Reporting (via Saved Query)

      Mobile Work Manager

     At this point in the process, craftspeople will begin preparing for and working on

    their assigned Work Orders. They will utilize Quick Reporting or Mobile Work

    Manager  to perform updates like:

    Key Fields/Sections for Updating Work Orders during Execution:

    Labor Tab (Time Entries) Materials Tab

    Failure Codes Work Log

  • 8/19/2019 PSU Planner Training Manual

    40/136

    40 Planner Training Manual

    Craftspeople via Mobile Work Manager  and/or Quick Reporting have the ability

    to make several status changes while in the “Execution” phase of the process.

    The status changes will happen automatically based on actions in Mobile Work

    Manager , but can be initiated in Quick Reporting via workflow.

    Note:  Not all of these status changes are required. They are available toprovide more information or alert the appropriate people of issues.

    Option What Happens Next Dependencies

    Change Status to

    “Reassignment

    Required” 

    Work Order Status goes

    to Reassignment

    Required (REASSIGN)

    and workflow stops.

    Supervisor picks up

    Work Order in saved

    queries to be assigned.

    If moving to another

    Work Group, must

    populate Work Group

    field.

    Change Status to

    “Waiting Materials” 

    Work Order Status goes

    to Waiting on Materials

    (WMATL) and workflow

    stops

    Supervisor/Technician

    picks up Work Order in

    saved queries when

    materials arrive.

    N/A

    Change Status to “In

    Progress” 

    Work Order Status goes

    to In Progress (INPRG)

    and workflow stops.

    Technician continues to

    process Work Order justlike APPR.

    N/A

  • 8/19/2019 PSU Planner Training Manual

    41/136

    Planner Training Manual 41

    Option What Happens Next Dependencies

    Change Status to

    “Received” (MOBILE

    ONLY) 

    Work Order Status goes

    to Received

    (RECEIVED).

    Technician continues to

    process Work Order just

    like APPR.

    Happens automatically

    when a Work Order is

    received on the Mobile

    Device.

    Change Status to

    “Started” (MOBILE

    ONLY) 

    Work Order Status goes

    to Started (STARTED).

    Technician continues to

    process Work Order just

    like APPR.

    Happens automatically

    when a Work Order is

    started on the Mobile

    Device.

    Change Status to “Hold”(MOBILE ONLY) 

    Work Order Status goesto Hold (HOLD).

    Technician continues to

    process Work Order just

    like APPR.

    Happens automaticallywhen a Work Order is put

    on hold on the Mobile

    Device.

    Change Status to

    “Complete” 

    Work Order Status goes

    to Complete (COMP).

    Work Order enters backinto workflow for post-

    completion processing,

    Phase 3 of process.

    Not required, but the

    following should be

    entered first:

      Labor Time

      Materials

      Failure Codes

      Work Log Updates

    Note: Until the Work Order is in the complete (COMP) status, it might be

    reassigned multiple times and be taken through several of the statuses

    above. In some cases, it may even be taken the same status more than

    once.

    Once a Work Order is taken to the complete (COMP) status, the workflow will

    automatically pick it up and take into Phase 3 of the process.

     At the end of this phase of the process, the Work Order can only be in one

    condition:

  • 8/19/2019 PSU Planner Training Manual

    42/136

    42 Planner Training Manual

    Possible Ending Conditions for Phase

    2 of Process

    Next Steps

    1. Complete status with workflow

    restarted.

    Workflow will evaluate the Work Order

    for post-completion processing.

    Important:  When the Work Order is set to the Complete (COMP) status,

    workflow will automatically uncheck the “Accepts Charges?” flag on the

    work order. This is to protect against new charges potentially being

    initiated after the financial system “final bills” the Work Order. All actuals

    updates should take place before completing the Work Order.  

  • 8/19/2019 PSU Planner Training Manual

    43/136

    Planner Training Manual 43

    2.3.3  Phase 3 – Post Completion Review and Closure

    In Phase 3 – Post Completion Review and Closure, a work order is immediately

    evaluated and routed one of two ways. Either:

    1. If the “JP Changes?” box is checked on the Work Order, the workflow will

    change the status to Waiting Review (WREVIEW) and assign the record

    to the Planner person group identified on the Work Order.

    OR

    2. If the “JP Changes?” box is not checked on the Work Order, workflow will

    change the status of the Work Order to waiting to be closed (WCLOSE)

    and workflow will stop on the record.

    2.3.3.1  Planner Post-Completion Review (Optional)

    If a post-completion review is required, the workflow will assign the record to the

    Planner person group identified on the Work Order. Every person in this person

    group will receive an assignment for the work order and it will be displayed in

    their workflow in-box.

    Note:  Any user from that group can perform the next step in workflow to

    record the review as complete.

    PlannerPerforms Post-

    CompletionReview

    (Optional)

    Final BillingComplete

    (Integration)

    Work OrderClosed

    (Automatic)Process Ends

  • 8/19/2019 PSU Planner Training Manual

    44/136

    44 Planner Training Manual

     A planner would review this Work Order to determine if, based on feedback from

    the crafts, the associated Job Plan needs to be updated. (Or, potentially, other

    updates that might be identified by the craft.) The following key fields should be

    reviewed by the Planner in this situation:

    Key Fields/Sections for Post-Completion Review Step:

    Work Log (for Craft Comments) Plans Tab – Steps

    Plans Tab - Labor Plans Tab - Materials

     Actuals Tab – Labor Actuals Tab - Materials

    Description/Long Description Job Plan

    The only option available at this point in the process is to say that the review iscomplete, any actions as a result of the review take place independently of the

    Work Order or workflow.

    Option What Happens Next Dependencies

    Mark Review as

    Complete

    Work Order Status goes

    to Waiting to be Closed

    (WCLOSE) and workflow

    stops.

    N/A

    2.3.3.2  Final Billing Complete (Integration)

    Work Orders will remain in a waiting to be closed (WCLOSE) until they are “Final

    Billed.” An integration with the VM system will update the billing information on

    Work Orders and eventually mark the Work Order as “Final Billed”.

    2.3.3.3  Work Order Closed

     An escalation will monitor the system for Work Orders that are in the waiting to

    be closed (WCLOSE) status and are marked as “Final Billed” and will

    automatically change the status of these records to closed (CLOSE.)

  • 8/19/2019 PSU Planner Training Manual

    45/136

    Planner Training Manual 45

    2.4  Work Order Workflow for Key Request Process

    Key request work (the KEY work type) is initiated based on a customer request

    and requires a review for validity. For this reason, these work orders must be

    triaged before they are planned, assigned and executed. There are also some

    specific steps to perform prior to closure for these Work Orders. From start to

    finish, work orders with these work types may proceed through the following

    phases, each of which will be described in greater detail:

    Phase 1A – Non-OPP Request Triage

    and Approval

    Triage

     Approval

    Phase 1B – OPP Request Triage and

     Approval

    Triage

     Approval

    Phase 2 – Planning, Scheduling and

    Execution

    Planning

    Scheduling

    1A - Non-OPP

    RequestApproval

    1B - OPPRequest

    Approval

    2 -Planning,

    Scheduling,Execution

    3 - KeyPick Up

    andClosure

  • 8/19/2019 PSU Planner Training Manual

    46/136

    46 Planner Training Manual

     Assignment

    Execution

    Phase 3 – Key Pick Up and Closure Key Pick Up

    Closure

    The workflow is being presented in phases because the workflow is set up to

    behave a little differently in each of these phases.

    During Phases 1A or 1B  – the workflow is set up to make discrete assignments

    to individuals and groups where the assigned individuals are the only users that

    can access the workflow options for the record. During this phase, workflow

    actions show exactly who is assigned and records reside in specific users’

    workflow inbox.

    During Phase 2 – Planning, Scheduling and Execution, KEY Work Orders follow

    the exact same process as “On-Demand Work” described in the previous

    section. Once a Work Order leaves Phase 1A or 1B of this process, it starts at

    the “WPLAN” step of the “On-Demand Work” process and follows the same

    steps of that process until the Work Order is completed (COMP) at the end of

    Phase 2.

    During Phase 3  – Key Pick Up and Closure, workflow is again set up to make

    discrete assignments to individuals and groups where the assigned individuals

    are the only users that can access the workflow options for the record. During

    this phase, workflow actions show exactly who is assigned and records reside in

    specific users’ workflow inbox. Once the Work Order is in a waiting to be closed

    (WCLOSE) status, the work orders are not in workflow at all. At this point, work

    orders are sitting in a “Waiting to Close” status and will automatically be closed

    when an integration informs Maximo that billing is complete.

  • 8/19/2019 PSU Planner Training Manual

    47/136

    Planner Training Manual 47

    2.4.1  Phase 1A – Non-OPP Request Triage and Approval

    2.4.1.1  P & PS Reviews Request

    The workflow begins when a Key Request is submitted via SuiteReq. The

    workflow first assigns the record to the Police and Public Services (P&PS)

    person group. Every person in this person group will receive an assignment for

    the work order and it will be displayed in their workflow in-box.

    Exception: The assignment list for Master Keys will be a smaller sub-set

    of the P&PS Person group and is dictated by membership in the

    P&PSMAST person group.

     Any user from that group can perform the next step in workflow to take ownership

    of the record for review, which will end the assignment for all other users of the

    group and remove it from their workflow in-boxes. Once one of the users from

    the group has taken ownership of the record via workflow, that record will only

    reside in the owners workflow in-box.

    Note:  The owner will be the only user that can perform the next routing

    step.

    P & PSReviewsRequest

    P & PSApprovesRestricted

    Keys(Optional)

    OPP Approvalfor Controlled

    Keys

    (Optional)

    Phase 2 -Planning

    Schedulingand Execution

  • 8/19/2019 PSU Planner Training Manual

    48/136

    48 Planner Training Manual

     At the “P&PS Review” step in the workflow, the P&PS user can review and make

    updates to the record. Key fields to review/update, most of which reside on the

    “Keys” tab of Work Order Tracking:

    Key Fields for Triage Step:

    Description/Long Description Work Type

     Asset/Location Grand Master?

    Building Master? Animal Facility?

     Athletic Facility? Leased Property?

    Building Entry? Can Be Facilitated Electronically?

    Under AC’s Dept. Control?  Mechanical, Electrical or Tele. Room?

    Note: The Key Request should also have a Key Request Form attached

    to it that should be reviewed.

    Once the P&PS user has completed their review/updates to the record, they will

    have a series of workflow routing options that are described below:

    The initial options available to the user are:

    1. The request is for non-Restricted Key.

    OR

    2. The request is for a Restricted Key.

    Based on their selection, their next routing options are different.

    If Non-Restricted Key is Selected

    Option What Happens Next Dependencies

    Requester is authorized

    to request for building

    specified.

    Work Order Status goes

    to Waiting to be Planned

    (WPLAN) and is

    assigned to the Planner

    Group on the Work

    Order.

    The Work Order goes to

    Phase 2.

    Planner Group must be

    identified on Work Order.

  • 8/19/2019 PSU Planner Training Manual

    49/136

    Planner Training Manual 49

    Option What Happens Next Dependencies

    Requester is NOT

    authorized to request for

    building specified

    THEN

    External approval has

    been received.

    Work Order Status goes

    to Waiting to be Planned

    (WPLAN) and is

    assigned to the PlannerGroup on the Work

    Order.

    The Work Order goes to

    Phase 2.

    Planner Group must be

    identified on Work Order.

    The person contacted for

    approval should be

    captured in the Work

    Log.

    Requester is NOT

    authorized to request for

    building specified

    THEN

    External approval has

    NOT been received

    Work Order status goes

    to canceled (CAN).

    Workflow stops.

     A Cancellation Reason

    should be captured in the

    Cancel Reason field on

    the Work Order.

    Note:  For the “Requester is NOT authorized to request for building

    specified” options above. The Work Order will remain assigned to the

    P&PS user immediately after this selection with instructions to get

    approval. Once approval is obtained, the user can workflow the record to

    indicate if approval was granted or not.

    If Restricted Key is Selected

    Option What Happens Next Dependencies

    Key request is NOT for a

    controlled key. Proceed

    to options.

    THEN

    P&PS does not approve

    request

    Work Order status goes

    to canceled (CAN).

    Workflow stops.

     A Cancellation Reason

    should be captured in the

    Cancel Reason field on

    the Work Order.

  • 8/19/2019 PSU Planner Training Manual

    50/136

    50 Planner Training Manual

    Option What Happens Next Dependencies

    Key request is NOT for a

    controlled key. Proceed

    to options.

    THEN

    P&PS does not require

    external approvals and

    approves request.

    Work Order status goes

    to Waiting Planning

    (WPLAN) and the record

    is assigned to thePlanner Group on the

    Work Order.

    The Work Order goes to

    Phase 2.

    Planner Group must be

    identified on Work Order.

    Key request is NOT for a

    controlled key. Proceed

    to options.

    THEN

    External approvals are

    required.

    Work Order remains

    assigned to P&PS user

    until external approvals

    are obtained. User can

    then use workflowoptions to either approve

    or cancel request.

    If approving, Planner

    Group must be identified.

    If canceling, a Cancel

    Reason should be

    populated.

    Key request IS for a

    controlled key. Route for

    approvals.

    Work Order goes to a

    Waiting Approval status

    and is assigned to the

    OPP Director of

    Buildings and Grounds.

    N/A

    Note:  The options with “THEN” in them above mean that the user is

    presented with a second set of routing options after selecting the first

    option.

  • 8/19/2019 PSU Planner Training Manual

    51/136

    Planner Training Manual 51

     A process flow summarizing the routing possibilities available in the P&PS

    Review step is provided below:

    2.4.1.2  OPP Approval of Controlled Keys

    If the request is for an OPP Controlled key, the workflow will assign the record to

    the OPP Director of Buildings and Grounds person group.

    Note:  It is expected that there is only one person in this group at any

    time, but it is set up as person group to allow for easy change out of thename, when applicable.

     Any user from that group can perform the next step in workflow which is to make

    decisions on the level of approvals of required.

    Request Owned

    by P&PS User

    for Review

    Restricted

    Key?

    AC

    Authorizedfor Building?

    P&PS Obtains

    External

    Approval

    RequestApproved. Work

    Order to Waiting

    Planning

    (Phase 2)

    Request

    Rejected. Work

    Order to

    Canceled(END)

    External

    ApprovalsRequired?

    OPP

    ControlledKey?

    P&PS Obtains

    External

    Approval

    P&PS

    Approves?

    Request

    Approved. Work

    Order to Waiting

    Planning

    (Phase 2)

    Request

    Rejected. Work

    Order to

    Canceled

    (END)

    Request

    Rejected. Work

    Order to

    Canceled(END)

    Request

    Requires OPPApproval. Phase

    1 Continues.

    Y

    N N

    Y

    N

    Y

    Y

    N Y N

    YN

    Y

    N

  • 8/19/2019 PSU Planner Training Manual

    52/136

    52 Planner Training Manual

     At the “OPP Approval of Controlled Keys” step in the workflow, the Director can

    review and make updates to the record. Key fields to review/update, most of

    which reside on the “Keys” tab of Work Order Tracking:

    Key Fields for Triage Step:

    Description/Long Description Work Type

     Asset/Location Grand Master?

    Building Master? Animal Facility?

     Athletic Facility? Leased Property?

    Building Entry? Can Be Facilitated Electronically?

    Under AC’s Dept. Control?  Mechanical, Electrical or Tele. Room?

    Note: The Key Request should also have a Key Request Form attached

    to it that should be reviewed.

    Once the Director has completed their review/updates to the record, they will

    have a series of workflow routing options that are described below:

    The initial options available to the user are:

    1. The request is NOT for a Mechanical Room.

    OR

    2. The request is for a Mechanical Room.

    Based on their selection, their next routing options are different.

    If NOT a Mechanical Room Key is Selected

    Option What Happens Next Dependencies

     Appropriate approvals

    have been obtained

    outside the system.

    Work Order Status goes

    to Waiting to be Planned

    (WPLAN) and is

    assigned to the Planner

    Group on the Work

    Order.

    The Work Order goes to

    Phase 2.

    Planner Group must be

    identified on Work Order.

  • 8/19/2019 PSU Planner Training Manual

    53/136

    Planner Training Manual 53

    Option What Happens Next Dependencies

     Appropriate approvals

    could NOT be obtained

    outside the system

    Work Order status goes

    to canceled (CAN).

    Workflow stops.

     A Cancellation Reason

    should be captured in the

    Cancel Reason field on

    the Work Order.

    Note:  For the “Request is NOT for a Mechanical Room” option above.

    The Work Order will remain assigned to the Directory immediately after

    this selection with instructions to get approval. Once approval is obtained,

    the user can workflow the record to indicate if approval was granted or

    not.

    If Mechanical Room Key is SelectedWorkflow will assign the record to users in each of the following person groups:

      Director of Building and Grounds

      EH&S

      OPP Safety

     At least one user from each group will have to go in and select a routing option

    before the request can proceed. The options available to users is provided

    below:

    Option What Happens Next Dependencies

    Request is approved. If all three reviews select

    this option, the Work

    Order status goes to

    Waiting Planning

    (WPLAN) and is

    assigned to the Planner

    Group on the Work

    Order.

    The Work Order goes toPhase 2.

    Planner Group must be

    identified on Work Order.

  • 8/19/2019 PSU Planner Training Manual

    54/136

    54 Planner Training Manual

    Option What Happens Next Dependencies

    Request is NOT

    approved.

    If even one user selects

    this option, the Work

    Order status goes to

    canceled (CAN) andworkflow stops.

     A Cancellation Reason

    should be captured in the

    Cancel Reason field on

    the Work Order.

     A process flow summarizing the routing possibilities available in the OPP Review

    step is provided below:

    Request Ownedby OPP Directorof Buildings and

    Grounds forReview

    MechanicalRoom?

    Director ObtainsExternalApproval

    RequestApproved. WorkOrder to Waiting

    Planning(Phase 2)

    RequestRejected. Work

    Order toCanceled

    (END)

    All Approve?

    RequestApproved. WorkOrder to Waiting

    Planning(Phase 2)

    RequestRejected. Work

    Order toCanceled

    (END)

    N

    Y

    Y

    N

    From P&PSReview, for OPPControlled Key

    (WAPPR)

    EH&S, OPPSafety, and

    Director of B&GAll Review

    N

    Y

  • 8/19/2019 PSU Planner Training Manual

    55/136

    Planner Training Manual 55

     At the end of this phase of the process, the Work Order will be in one of the

    following conditions:

    Possible Ending Conditions for Phase

    1A of Process

    Next Steps

    1. Canceled status with workflowstopped.

    N/A

    3. Waiting to be Planned (WPLAN)

    status with Work Order assigned to

    Planner Group.

    Planner takes ownership of record to

    plan Work Order.

    2.4.2  Phase 1B – OPP Request Triage and Approval

    2.4.2.1  OPP Access Coordinator Creates Key Request

    Key Requests for OPP Employees are created directly in Maximo by an OPP

     Access Coordinator (AC) based on a request from an OPP Employee (outside

    system.) The OPP AC will use Work Order Tracking  to create the Key

    Request Work Order. Key fields to populate, most of which reside on the “Keys”

    tab of Work Order Tracking:

    OPP AccessCoordinatorCreates Key

    Request

    OPP AccessCoordinatorCoordinates

    Approvals forKey Request

    Phase 2 -Planning

    Scheduling andExecution

  • 8/19/2019 PSU Planner Training Manual

    56/136

    56 Planner Training Manual

    Key Fields for Key Request Creation Step:

    Description/Long Description Work Type = KEY

    GL Account Urgency

     Asset/Location Grand Master?

    Building Master? Animal Facility?

     Athletic Facility? Leased Property?

    Building Entry? Can Be Facilitated Electronically?

    Under AC’s Dept. Control?  Mechanical, Electrical or Tele. Room?

    Planner Group Work Group

    Important:  The Work Type of “KEY” must be entered and saved on the

    new Work Order for Maximo to display the “Keys” tab that contains most

    of the Key Request information.

    Once the Key Request Work Order has been created, the OPP AC will start

    workflow on the record by selecting the “Route Workflow” icon.  

    2.4.2.2  OPP Access Coordinator Coordinates Approval for Key Request

    The workflow begins when a Key Request has been started in workflow by an

    OPP AC. The workflow first assigns the record to the OPP Access Coordinator

    person group. Every person in this person group will receive an ass ignment for

    the work order and it will be displayed in their workflow in-box.

     Any user from that group can perform the next step in workflow to take

    ownership of the record for review, which will end the assignment for all other

    users of the group and remove it from their workflow in-boxes. Once one of the

    users from the group has taken ownership of the record via workflow, the record

    will only reside in the owners workflow in-box.Note:  The owner will be the only user that can perform the next routing

    step.

     At the “OPP AC Review” step in the workflow, the OPP AC user can review and

    make updates to the record, if needed.

  • 8/19/2019 PSU Planner Training Manual

    57/136

    Planner Training Manual 57

    Once the OPP AC user has completed their review/updates to the record, they

    will have a series of workflow routing options that are described below:

    The initial options available to the user are:

    1. The request is NOT for a Special Key.

    OR

    2. The request is for a Special Key.

    Based on their selection, their next routing options are different.

    If Non-Special Key is Selected

    Option What Happens Next Dependencies

    Key Request is

    approved.

    Work Order Status goes

    to Waiting to be Planned

    (WPLAN) and isassigned to the Planner

    Group on the Work

    Order.

    The Work Order goes to

    Phase 2.

    Planner Group must be

    identified on Work Order.

    Key Request is NOT

    approved.

    Work Order status goes

    to canceled (CAN).

    Workflow stops.

     A Cancellation Reason

    should be captured in the

    Cancel Reason field on

    the Work Order.

    If Special Key is Selected

    The Work Order remains assigned to the OPP AC with instructions to obtain the

    appropriate approvals outside the system. Once the appropriate people have

    been contacted, the OPP AC will have the following workflow routing options.

  • 8/19/2019 PSU Planner Training Manual

    58/136

    58 Planner Training Manual

    Option What Happens Next Dependencies

    Key Request is approved

    by outside approvers.

    Work Order Status goes

    to Waiting to be Planned

    (WPLAN) and is

    assigned to the PlannerGroup on the Work

    Order.

    The Work Order goes to

    Phase 2.

    Planner Group must be

    identified on Work Order.

    The people providing

    approval should be

    captured in the Work Log

    of the Work Order.

    Key Request is NOT

    approved by outside

    approvers.

    Work Order status goes

    to canceled (CAN).

    Workflow stops.

     A Cancellation Reason

    should be captured in the

    Cancel Reason field on

    the Work Order.

  • 8/19/2019 PSU Planner Training Manual

    59/136

    Planner Training Manual 59

     A process flow summarizing the routing possibilities available in the OPP AC

     Approval step is provided below:

     At the end of this phase of the process, the Work Order will be in one of the

    following conditions:

    Possible Ending Conditions for Phase

    1A of Process

    Next Steps

    1. Canceled status with workflow

    stopped.

    N/A

    3. Waiting to be Planned (WPLAN)

    status with Work Order assigned to

    Planner Group.

    Planner takes ownership of record to

    plan Work Order.

    Request Owned

    by OPP AC andfor Review/ 

    Coordination

    Special Key?OPP AC Obtains

    ExternalApproval

    RequestApproved. WorkOrder to Waiting

    Planning

    (Phase 2)

    RequestRejected. Work

    Order toCanceled

    (END)

    Approve?

    RequestApproved. Work

    Order to Waiting

    Planning(Phase 2)

    RequestRejected. Work

    Order toCanceled

    (END)

    N

    Y

    Y

    N

    Y

    N

  • 8/19/2019 PSU Planner Training Manual

    60/136

    60 Planner Training Manual

    2.4.3  Phase 2 – Planning, Scheduling and Execution

    Phase 2 of the Key Request workflow process begins with the Work Order being

    assigned to the Planner Group in a Waiting to be Planned (WPLAN) status.

    From this point, Phase 2 of the Key Request workflow process is identical to the“On Demand Work Management” process for planning, scheduling, and

    execution. The Work Order will follow those process steps until it reaches the

    status of Complete (COMP). Please see the appropriate steps of that section to

    see how a Key Request is planned, scheduled and executed.

    When the Work Order reaches the complete (COMP) status, Phase 3 of the Key

    Request Process begins.

    2.4.4  Phase 3 –

     Key Pick Up and Closure

    2.4.4.1  Work Reception Center Records Pick Up Information

    In Phase 3  – Key Pick Up and Closure, a Work order is initially assigned to the

    Work Reception Center person group. Every