P T H A N T O N G P R E C IS IO N M A N U F A C T U R IN G B A T A M
S h im a n o H a lf Ye a r ly P r e s e n t a t io n1 2 0 10 H
PONC & Floor Profit SOT Performance Quality Performance RTY Clean Production Self Quality – Process & Detectbility TPM New Project Speed – Production Flexibility Aggressiveness – New Era/Value
Nov '09 Dec '09 Jan '10 Feb '10 Mar '10 Apr '10
Sorting & Rework $ 377 $ 68 - - $ 282 -
Reduce Scrap Cost $ 423 $ 974 $ 902 $ 1,059 $ 1,163 $ 1,125
Line NC $ 145 $ 631 $ 217 $ 532 $ 436 $ 680
Consumable $ - $ - $ - $ - $ - $ 380
Electrical & Water $ - $ - $ - $ - $ - $ -
Floor Profit $ - $ - $ - $ 600 $ 1,335 $ 90
Total Cost Saving $ 945 $ 1,673 $ 1,119 $ 2,191 $ 3,216 $ 2,275
PONC & Floor Profit
Sales and PONC+Floor Profit percentage Nov'09 Dec'09 Jan'10 Feb'10 Mar'10 Apr'10
Sales $ 72,528.20 $ 163,573.92 $ 191,168.54 $ 151,718.51 $ 192,459.95 $ 184,977.15
PONC $ 945.00 $ 1,673.00 $ 1,119.00 $ 1,591.00 $ 1,881.00 $ 2,185.00
Percentage 1.30% 1.02% 0.59% 1.05% 0.98% 1.18%
Floor Profit $ 600.00 $ 1,335.00 $ 90.00
Percentage 0.00% 0.00% 0.00% 0.40% 0.69% 0.05%
SOT Performance
60
65
70
75
80
85
90
95
SOT
SOT
SOT 91 91 91 91 92 87
Nov '09 Dec '09 Jan '10 Feb '10 Mar '10 Apr '10
Nov '09 Dec '09 Jan '10 Feb '10 Mar '10 Apr '10
Target 100 100 100 100 100 100
SOT 91 91 91 91 92 87
Grade B B B B B BDue To 1 item part have ECN of Material change, but check sheet is not updating for HrBAction :Follow up to SPL, and more documented if any ECN
Due to our Factory have Land slideAction :Build Construction, ASAP with Developer
Due to material shortage, because is skip order to supplierAction :Cross check for material order by weekly ( Purchasing & PC)
Due to DATT tooling inconsistencyAction :Analysis of Inconsistency and do Some renewal Component
Due to Tooling Broken for Outer Plate GS, because of Scrap stackingAction :To open up for Increase dimension hole for scrap
Due to tooling problem, and Re-profiling of DATT (RDCT-50)Action :Re-profile of all DATT Tooling
75
80
85
90
95
100
Incoming Ac Result
Incoming Ac Result
Incoming Ac Result 97.1 99.2 99.2 96.2 100 97.2
Nov '09 Dec'09 Jan'10 Feb'10 Mar '10 Apr '10
Quality Performance Nov '09 Dec'09 Jan'10 Feb'10 Mar '10 Apr '10
Target 100 100 100 100 100 100
Incoming Ac Result 97.1 99.2 99.2 96.2 100 97.2
Grade B A A B A B
Achieve Achieve
Due to Inner Plate 310 SAC 8 Lot
Tooling DATT Inconsistency, and
wear off
Re-profile ToolingDATT
Nov ’09 = Dimension = 0 case , appearance = 0 case , jig Problem = 1 case
Dec ’09 = Dimension = 1 case , appearance = 0 case , jig Problem = 0 case
Jan ’10 = Dimension = 0 case , appearance = 0 case , jig Problem = 1 case
Feb ’10 = Dimension = 1 case , appearance = 0 case , jig Problem = 0 case
Mar ’10 = Dimension = 0 case , appearance = 0 case , jig Problem = 0 case
Apr ’10 = Dimension = 0 case , appearance = 0 case , jig Problem = 0 case
QFR Nov '09 ~ Apr '10
0
0.5
1
1.5
2
2.5
Incoming NC
QFR
Incoming NC 1 1 1 1 0 2
QFR 0 0 0 0 0 0
Nov '09 Dec '10 Jan '10 Feb '10 Mar '10 Apr '10
NC Category
Kokeshi / Mix0%
Dimension75%
Gauge Problem (Can't detect)
25%
10
8
0
2
4
6
8
10
2H 2009 1H 2010
NC Cases
New award DQC part for 1H 2010
Release : 27 Mar 2010
10 item14 item
S/N Part code Prod Model Part Name
1 40002604 RD 3400 Inner Plate GS
2 40002602 RD 3400 Inner Plate SS
3 40002611 RD 3400 Outer Plate GS
4 40002609 RD 3400 Outer Plate SS
5 40002552 RD TX70 Adapter GS
6 40002592 RD M410 Outer Plate
7 40002248 FD M410 CF Plate
8 40003000 SL MC37 Upper Plate R
9 40005139 RD TY18 Adapter Datt
10 40015646 ST 2300SP Support Spacer R/L
DQC =Shimano Part =
DQC achieve 71 %
RTY – 100%Item Nov '09 Dec '09 Jan '10 Feb '10 Mar '10 Apr '10
ADAPTER DATT RD-CT 50 99.46% 99.97% 99.91% 99.92% 99.92% 99.93%
ADAPTER DATT RD-TX70 - 98.44% 99.32% 99.93% 99.92% 99.91%
INNER PLATE RDM-310 99.81% 99.75% 99.81% 99.94% 99.10% 99.94%
OUTER PLATE RDM-410 99.91% 99.87% 99.84% 99.82% 99.93% 99.92%
C/F PLATE FDM-410 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
INNER PLATE SS RD-4500 99.74% 99.84% 99.92% 99.85% 99.90% 99.95%
INNER PLATE GS RD-4500 99.92% 99.57% 99.96% 99.89% 99.86% 99.92%
OUTER PLATE SS RD-3400 99.89% 99.83% 99.84% 99.85% 99.95% 99.94%
OUTER PLATE GS RD-3400 99.77% 99.41% 99.92% 99.87% 99.99% 99.93%
SUPPORT SPACER ST-2300 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
UPPER PLATE SLM-37 - - - - - -
CHAIN GUIDE FDM-191-6 - - - - - 74.00%
RTY for 100% is only get 2 item Other item we get of 99% above
Clean Production• Maintain of Clean for the box using Covering plastic bag –
start October 2009
• Establishing of 5S Committee – start February 2010
• Prevent Leak Out Oil and Over usage in the m/c use oil dispenser
Before After
Program- Weekly awareness of 5S principal
- Weekly Floor 5S Audit- Monthly 5S Award of Department Competition
Self Quality – Process & Detectbility
• WI for Inspection Check sheet• Jig & Gauge monthly verification ( Pin Gauge, block gauge ),
start Dec ‘10• Updating WI as Quality history Alert, start Mar ‘10• Reviewed Outgoing Inspection as comparing Detectbility with
Customer Inspection, start April ’10 HPM Outgoing SBM PQA
Lot Inspection 191 136Lot Accept 133 133
Lot NC 58 3
Prevent NC part can’t detection
TPM
Operator can repair and maintain machine , Tools, and Product Quality themselvesMaintenance by Operator
Analysis themselves for easy operating, easy method of working, and updating if any different with WIOrganize the workplace
Check the machine leak out, air pressure gauge, Part visual checking and Critical dimensionIndependent Inspection & Corrective Action
Understand the purpose of Controlling Inspection and the point InspectionGeneral Inspection
Put right Equipment in the right placeStandard For Orderliness
Find the any abnormal in the ProcessAction at Source the Problem
Cleaning of work areaBasic Cleaning - Orderliness
ActivitiesStep
OEE
62.99%80.09%69.51%OEE
97.59%99.86%99.91%Quality
93.24%92.45%92.47%Performance
69.22%86.75%75.24%Availability
Apr'10Mar'10Feb'10
• FD M191 Inner Plate Chain Guide
FA Approved on 18 March ’10, start production 20 March ‘10
7 Process
New Project of 1H 2010
Blanking ( Semi Progressive ) Forming Piercing Piercing &
TrimmingBurring &
Chamfering Piercing Taping
Speed – Production Flexibility
1. Auto Progressive for Shimano• FDM410 Cable Fixing === output : 3000/hr• ST2300 Support Spacer === output : 2000/hr
The Auto can be Flexible for Increase 50% Capacity, see the we have empty m/c for Auto
History PO for 1H 2010
Nov'09 Dec'09 Jan'10 Feb'10 Mar'10 Apr'10Cable Fixing 157,6 K 360 K 300 K 300 K 430 K 500 KSP Spacer 51,4 K 79,4 K 22 K 24 K 30 K 65 K
2. Semi Progressive
Increasing 20 % speed capacity of :
- Provide Conveyor between m/c process to easy transfer
- Increase Troubleshooting person to in-charge 1 line/ model
Aggresiveness – New Era / Value