Public HearingMay 22, 2012

Board of County Commissioners

Case: CDR-11-11-264

Project: Stillwater Crossings & Center Bridge Planned Development/Land Use Plan (PD/LUP) - Substantial Change

Applicant: John Prowell

District: 1

Stillwater Crossings & Center Bridge PD/LUP Stillwater Crossings & Center Bridge PD/LUP

Request: To consider a substantial change to the approved Stillwater Crossings & Center Bridge Planned Development/Land Use Plan (PD/LUP):

1) Transfer 30 Single-family units from Parcel CB-6 to CB-8,

2) Request the following waivers from the Original Horizon West Village Code for

Parcel CB-6 only:

a) Request a waiver from Section 38-1384(b) and (c) to allow the block depths to be less than 240 feet and block lengths to be less

than 300 feet;

b) Request a waiver from Section 38-1386(b)(2) to allow the minimum average lot size to be

3,500 square feet in lieu of 4,800 square feet;

Stillwater Crossings & Center Bridge PD/LUPStillwater Crossings & Center Bridge PD/LUP

Request Cont’d:

c) Request a waiver from Section 38-1386(b)(4) to allow for a minimum lot width of 32 feet in lieu of 40 feet;

d) Request a waiver from Section 38-1386(b)(5) to allow the minimum lot depth requirement

to be 112 feet in lieu of 120 feet;

e) Request a waiver from Section 38-1386(b)(8) (a) to allow the front porch setback to be

reduced from 10 feet to 7 feet; and

f) Request a waiver from Section 38-1386(b)(8) (b) to allow the side yard setback to be

reduced from five feet to four feet.

Stillwater Crossings & Center Bridge PD/LUPStillwater Crossings & Center Bridge PD/LUP

Zoning

Stillwater Crossings & Center Bridge PD/LUPStillwater Crossings & Center Bridge PD/LUP

Future Land Use

Stillwater Crossings & Center Bridge PD/LUPStillwater Crossings & Center Bridge PD/LUP

PD Land Use Plan

Stillwater Crossings & Center Bridge PD/LUPStillwater Crossings & Center Bridge PD/LUP

Action Requested

Find the request consistent with the Comprehensive

Plan and approve the Substantial Change to the

approved Stillwater Crossings & Center Bridge

PD/LUP dated “Received March 27, 2012,” subject to

the five (5) conditions in the staff report.

Stillwater Crossings & Center Bridge PD/LUPStillwater Crossings & Center Bridge PD/LUP

Public HearingMay 22, 2012

Board of County Commissioners