Public Hearing - April 30, 2014 & May 1, 2014 Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties I-43 North-South Freeway Corridor Study Public Hearing WELCOME Purpose of the hearing: Obtain public opinion on the following aspects of the I-43 North-South Freeway Corridor Study Proposed improvements and alternaves being considered The Environmental Impact Statement (EIS) is the decision document for the proposed improvements. Copies of the Draſt EIS are available at today’s hearing Project acvies that require authorizaon from the U.S. Army Corps of Engineers under the Clean Water Act; For example, placing fill into waters of the U.S. including wetlands Thank you for attending and contributing to the I-43 North-South Corridor Study!

Upload: others

Post on 18-Nov-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Public Hearing - April 30, 2014 & May 1, 2014 Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties

I-43 North-South FreewayCorridor Study

Public Hearing

WELCOMEPurpose of the hearing:

Obtain public opinion on the following aspects of the

I-43 North-South Freeway Corridor Study

• Proposed improvements and alternatives being considered

• The Environmental Impact Statement (EIS) is the decision document for the proposed improvements. Copies of the Draft EIS are available at today’s hearing

• Project activities that require authorization from the U.S. Army Corps of Engineers under the Clean Water Act; For example, placing fill into waters of the U.S. including wetlands

Thank you for attending and contributing to the I-43 North-South Corridor Study!

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

I-43 NORTH-SOUTH FREEWAY CORRIDOR STUDY

BIKE AND PEDESTRIAN ACCOMMODATIONS IN A DIVERGING DIAMOND INTERCHANGE (DDI) 08.15.2013

RA

MP

RA

MP

RA

MP

RA

MP

Bike/Pedestrian AccessSIDE ROAD

INTE

RS

TATE

= East= West

ARROWCOLORS

Bike and Pedestrian Accommodations in a Diverging Diamond Interchange (DDI) Brown Deer Road

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Alternative Screening Summary: I-43 Mainline (North of Green Tree Road)

Retain Alternative for Detailed StudyAlternatives

NORTH SEGMENT: GREEN TREE ROAD TO WIS 60

CORRIDOR-WIDE LOWER LEVEL IMPROVEMENTS

Modernization - 6 lanes

Modernization - 4 lanes

TSM and TDM Measures Only

TSM/TDM Plus Spot Improvements

TSM/TDM Plus Reconstruction without Capacity Expansion

Milwaukee County Option Inside widening

See Modernization 6 lanes Evaluation Factors above

See Modernization 6 lanes Evaluation Factors above

See Modernization 6 lanes Evaluation Factors above

Ozaukee County Option 1Inside widening

Ozaukee County Option 2Outside widening

AddressesDesign

DeficienciesImproves

Safety

YES YES YES YES See Magnitude of Environmental impacts below See widening options below

YESAddresses design deficiencies, improves safety

concerns, future traffic demand andis consistent with regional plans

YESAddresses design deficiencies, improves safety

concerns, future traffic demand andis consistent with regional plans

NOHigher magnitude of impacts to wetlands, streams

and farmland compared towidening to inside

NODoes not address future traffic demand;

not consistent with regionaltransportation plans

NOAs stand-alone alternative, does not address design deficiencies, safety issues or future traffic demand; not consistent with regional transportation plans

NODoes not address design deficiencies or future traffic demand; limited improvement of safety issues; not

consistent with regional transportation plansNO

Does not address future traffic demand; not consistent with regional transportation plans

MODERATE Wetland impacts

MODERATE Wetland impacts

LOW No impacts

LOW No impacts

LOW/MODERATE Minimal impacts

MODERATE/HIGH Impacts to wetlands and farmlands,

stream relocation

LOW Minimal wetland impacts

$57.2

$117.6

R/W Impacts

R/W impacts

Limited R/W impacts

Limited R/W impacts

Limited R/W impacts

Limted widening andR/W impactsYES YES NO NO

YES YES NO NO

NO NO NO NO

NO NO NO

Relative Total Cost(construction, right-of-way

(R/W) acquisition)$ (millions)*

Magnitude of Environmental Impacts

AddressesFutureTraffic

Demand

Consistentwith

RegionalPlan

Key Purpose and Need Factors Other Factors

NOTE: All Build Alternatives include Transportation System Management (TSM)/Transportation Demand Management (TDM) measures *Current Year Dollars

Preferred Alternative

YES(spot locations)

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Alternative Screening Summary: County C (Pioneer Road) Interchange

Retain Alternative for Detailed StudyAlternatives

COUNTY C (PIONEER ROAD) INTERCHANGE

Diamond

Spot Improvements

AddressesDesign

DeficienciesImproves

Safety

YES YES YES YES

NO NO NO

MODERATEWetland impacts; no relocations

LOWWetland impacts; no relocations

YESMaintains existing interchange configuration but improves

traffic operations

NODoes not address design deficiencies or future traffic demand; limited improvement of safety issues; not

consistent with regional transportation plans

$9.7Structure replacement and

R/W impacts

Structure replacement likely due to age

Relative Total Cost(construction, right-of-way

(R/W) acquisition)$ (millions)*

Magnitude of Environmental Impacts

AddressesFutureTraffic

Demand

Consistentwith

RegionalPlan

Key Purpose and Need Factors Other Factors

NOTE: All Build Alternatives include Transportation System Management (TSM)/Transportation Demand Management (TDM) measures *Current Year Dollars

Preferred Alternative

YES(spot locations)

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Alternative Screening Summary: Highland Road

Retain Alternative for Detailed StudyAlternatives

HIGHLAND ROAD (no existing interchange at this location)

No Access

Tight Diamond

AddressesDesign

DeficienciesImproves

Safety

N/A N/A YES NO

YES YES YES YES

LOW/MODERATEWetland impacts; no relocations;

increased congestion and impacts toPort Washington Road/Mequon Road

intersection

LOW/MODERATEWetland impacts; no relocations

YESNo interchange would be constructed without a local cost

share agreement

YESAlternative conforms to regional plans by creating a full interchange at this location; helps manage future traffic

demand at Port Washington Road intersections withMequon Road and County C (Pioneer Road)

$0.7**No interchange constructed

$20.7Retaining walls required;

R/W impacts

Relative Total Cost(construction, right-of-way

(R/W) acquisition)$ (millions)*

Magnitude of Environmental Impacts

AddressesFutureTraffic

Demand

Consistentwith

RegionalPlan

Key Purpose and Need Factors Other Factors

NOTE: All Build Alternatives include Transportation System Management (TSM)/Transportation Demand Management (TDM) measures *Current Year Dollars ** For Intersection improvements required at Mequon Road and Port Washington Road

Preferred Alternative

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Alternative Screening Summary: Mequon Road Interchange

Retain Alternative for Detailed StudyAlternatives

MEQUON ROAD/WIS 167 INTERCHANGE

Tight Diamond - Mainline Shifted East

Partial Offset Diamond

Spot Improvements

Single Point

AddressesDesign

DeficienciesImproves

Safety

YES YES YES YES

YES YES YES YES

NO NO NO

LOW/MODERATE1 business relocation and 1 residential

tenant relocation; wetland impacts

LOW/MODERATE1 business relocation and 1 residential

tenant relocation; wetland impacts

LOWNo wetland impacts; no relocations

YESImproves traffic operations by increasing distance between

Port Washington Road/Mequon Road intersection and southbound ramps; requires improvements to Port

Washington Road/Mequon Road intersection

NODoes not address design deficiencies or future traffic

demand; limited improvement of safety issues; not consistent with regional transportation plans

NOImproves traffic operations by further increasing distance

between Port Washington Road/Mequon Road intersection and southbound exit ramp; requires

improvements to Port Washington Road/Mequon Road intersection

NOInsufficient distance between southbound ramps and Port

Washington Road/Mequon Road intersection-does not address traffic operations problems; highest cost alternative

LOWWetland impacts; no relocations

$8.5**Fewer new structures and

R/W required

$16.5**More structures required

Larger overpass structures required

No structure or R/Wimpacts

YES YES NO YES

Relative Total Cost(construction, right-of-way

(R/W) acquisition)$ (millions)*

Magnitude of Environmental Impacts

AddressesFutureTraffic

Demand

Consistentwith

RegionalPlan

Key Purpose and Need Factors Other Factors

NOTE: All Build Alternatives include Transportation System Management (TSM)/Transportation Demand Management (TDM) measures *Current Year Dollars ** With Highland Road interchange. See Highland Road Alternative Screening Summary to see additional costs to Mequon Road intersections without a Highland Road interchange.Preferred Alternative

YES(spot locations)

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Alternative Screening Summary: County Line Road Interchange

Retain Alternative for Detailed StudyAlternatives

COUNTY LINE ROAD INTERCHANGE

Split Diamond Hybrid

Partial Diamond

With Katherine Drivegrade separation

Without grade separation

With grade separation

With Katherine Drivegrade separation

Split Diamond

Full Diamond

Spot Improvements

AddressesDesign

DeficienciesImproves

Safety

YES YES YES

NOSEWRPC would

need to update long range plan to

include a full access interchange

YES YES YES

NOSEWRPC would

need to update long range plan to

include a full access interchange

NODoes not meet

FWHA Requirements to provide all traffic

movements

YES YES YES

YES YES YES

NOSEWRPC would

need to update long range plan to

include a full access interchange

NOSEWRPC would

need to update long range plan to

include a full access interchange

NOSEWRPC would

need to update long range plan to

include a full access interchange

NOSEWRPC would

need to update long range plan to

include a full access interchange

YES YES YES

LOW/MODERATENo relocations; 1 acre wetland impacts; travel pattern changes; maintains local

access

LOW/MODERATENo relocation; 1 acre wetland impacts

LOW/MODERATELimited R/W; wetland impacts

LOW/MODERATELimited R/W; wetland impacts

YESProvides for all traffic movements consistent with federal

policy; minimizes impacts to surrounding homes and businesses; maintains access for local traffic compared to

grade separated split diamond alternative

LOW/MODERATENo relocations; 1 acre wetland impacts; travel pattern changes; maintains local

access

YESProvides for all traffic movements consistent with federal

policy; minimizes impacts to surrounding homes and businesses; maintains access for local traffic compared to

grade separated split diamond alternative

YESDoes not provide for all traffic movements; addresses design deficiency of exit ramp weave movement with Brown Deer

Road interchange northbound exit ramp; serves the surrounding land use and community well

NOProvides standard full diamond interchange that provides for

all traffic movements consistent with federal policy

NOProvides for all traffic movements consistent with federal

policy; minimizes impacts to surrounding homes and businesses

NOProvides for all traffic movements consistent with federal

policy; minimizes impacts to surrounding homes and businesses

NOProvides for all traffic movements consistent with federal

policy; minimizes impacts to surrounding homes and businesses

NOAlternative has highest cost, R/W acquisition and

relocations compared to other alternatives that address design deficiencies, safety issues and future traffic demand

MODERATE/HIGHWetland impacts; 6 to 9 residential

relocations for new overpass; changed travel pattern

LOW/MODERATELimited R/W; wetland impacts; changed

travel pattern

LOWLimited R/W and wetland impacts, no

relocations

$20.1Construct new full

interchange; limitedR/W impacts

$22.9Construct new full

interchange; limitedR/W impacts

No Access YES YES N/A NO

LOW/MODERATEWetland impacts; no relocations; travel

pattern changes for surrounding community; traffic diverted to other

interchanges

YESAlternative would eliminate all access but does not adversely

affect design deficiencies, safety issues or future traffic demand; consistent with federal policy to avoid partial traffic

movements at interchanges

$12.9Two ramps removed;

new structures

$15.5

$16.5Construct new full

interchange

$19.4Construct new full

interchange

$28.8Construct new full

interchange; R/W impacts

$21.2Construct new full

interchange

Two ramps constructed;Limited R/W required

NO NOYES(spot locations)

NO

YES YES YES

YES YES YES

Relative Total Cost(construction, right-of-way

(R/W) acquisition)$ (millions)*

Magnitude of Environmental Impacts

AddressesFutureTraffic

Demand

Consistentwith

RegionalPlan

Key Purpose and Need Factors Other Factors

NOTE: All Build Alternatives include Transportation System Management (TSM)/Transportation Demand Management (TDM) measures *Current Year DollarsPreferred Alternative

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Alternative Screening Summary: Brown Deer Road Interchange

Retain Alternative for Detailed StudyAlternatives

BROWN DEER ROAD INTERCHANGE

Diamond

Diverging Diamond

Spot Improvements

Single Point

Horseshoe

AddressesDesign

DeficienciesImproves

Safety

YES YES YES YES

YES YES YES YES

NO NO NO

LOW/MODERATEWetland impacts; no relocations

LOW/MODERATEWetland impacts; no relocations

LOWLimited wetland impacts

YESIncreases distance between ramp terminal and Brown Deer

Road/Port Washington Road intersection; cost, traffic operations and R/W acquisition comparable to other

alternatives

NODoes not address design deficiencies or future traffic

demand; limited improvement of safety issues; not consistent with regional transportation plans

YESIncreases distance between ramp terminal and Brown Deer Road/Port Washington Road intersection; cost, traffic operations and R/W acquisition comparable to

other alternatives

NOSkewed angle between I-43 and Brown Deer Road creates traffic safety concerns with this interchange configuration

NOAlternative has highest cost, R/W acquisition and

relocations compared to other alternatives that address design deficiencies, safety issues and future traffic demand

LOWLimited wetland impacts; no relocations

MODERATE1 commercial relocation; wetland impacts

$12.2Minimal structures and R/W impacts; retains Brown Deer

Road bridges

$11.2Low R/W impacts; retains Brown Deer Road bridges

Minimal structures and R/W acquisition; retains Brown

Deer Road bridges

Minimal structures and R/W impacts

Multiple structures; R/W impacts; replaces Brown

Deer Road bridgesYES YES

NAAlternative

eliminated - no analysis

YES

YES NO YES YES

Relative Total Cost(construction, right-of-way

(R/W) acquisition)$ (millions)*

Magnitude of Environmental Impacts

AddressesFutureTraffic

Demand

Consistentwith

RegionalPlan

Key Purpose and Need Factors Other Factors

NOTE: All Build Alternatives include Transportation System Management (TSM)/Transportation Demand Management (TDM) measures *Current Year Dollars

Preferred Alternative

YES(spot locations)

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Alternative Screening Summary: Good Hope Road Interchange

Retain Alternative for Detailed StudyAlternatives

GOOD HOPE ROAD INTERCHANGE

Tight Diamond

Tight Diamond (Mainline Shifted West)

Spot Improvements

Diverging Diamond

Tight Diamond with Northbound Ramp Split (Hook Ramp)

Split Diamond

Single Point

Single Point with Northbound Ramp Split (Hook Ramp)

Horseshoe

AddressesDesign

DeficienciesImproves

Safety

YES YES YES YES

YES YES YES YES

NO NO NO

MODERATE1 residential relocations; wetland impacts

MODERATE2 residential relocations; wetland impacts

LOW1 residential relocation

MODERATE1 residential relocation; wetland impacts

MODERATE1 residential relocation; wetland

impacts

YESMaximizes distance between northbound ramp terminal intersection with Good Hope Road and the Good Hope

Road/Port Washington Road intersection; retains existing Good Hope Road bridges

NODoes not address design deficiencies or future traffic

demand; limited improvement of safety issues; not consistent with regional transportation plans

NOFurther increases distance between northbound ramp

terminal intersection with Good Hope Road and the Good Hope Road/Port Washington Road intersection

NOLocal concerns about commercial relocation and

neighborhood impacts of hook ramp

NOHigh cost; high R/W acquisition and relocation impacts;

potential traffic increase in residential area

NOSubstantial widening of Good Hope Road bridges needed to accommodate ramps; No added benefit compared to tight

diamond alternatives

NODoes not address future traffic demand; short weaving distance between ramp terminals and Port Washington

Road; creates lane continuity issues at Port Washington Road

NOHigh cost; high R/W acquisition and relocation impacts

NOSimilar to Single Point, but traffic operations improved with

separate northbound hook; local concerns about commercial relocation and neighborhood impacts of hook ramp

MODERATE1 residential relocations and 1 business

relocation; wetland impacts

MODERATE/HIGH3 residential relocations; wetland impacts;

increases traffic volume on Green Tree Road

MODERATE2 residential relocations; wetland impacts

MODERATE1 residential and 1 business relocation;

wetland impacts

$17.3Relatively low construction

cost; retains Good Hope Road bridges; R/W impacts

$18.3Relatively low construction cost; replaces Good Hope

Road bridges; R/W impacts

Relatively low cost interchange to construct; retains Good Hope Road

bridges; lower R/W acquisition

Relatively low cost interchange to construct; retains Good Hope Road bridges; R/W acquisition

No right-of-way (R/W) impacts

Similar to Single Point but slightly higher R/W impact

Relatively low cost interchange to construct;

widens existing Good Hope Road bridge; R/W acquisition

Multiple structures; high R/W acquisition; retains Good Hope Road bridges

Multiple structures; replaces Good Hope Road bridges;

R/W impacts

YES YES

NAAlternative

eliminated - no analysis

NAAlternative

eliminated - no analysis

YES

YES YES NO NO

YES YES YES YES

YES YES YES YES

YES YES YES

YES YESYES with

modification (tight right

turn)

YES

Relative Total Cost(construction, right-of-way

(R/W) acquisition)$ (millions)*

Magnitude of Environmental Impacts

AddressesFutureTraffic

Demand

Consistentwith

RegionalPlan

Key Purpose and Need Factors Other Factors

NOTE: All Build Alternatives include Transportation System Management (TSM)/Transportation Demand Management (TDM) measures *Current Year Dollars

Preferred Alternative

YES(spot locations)

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Alternative Screening Summary: I-43 Mainline (South Segment)

RaisedJean Nicolet access option 1

RaisedJean Nicolet access option 2

See Raised Alternative Evaluation Factors above

See Raised Alternative Evaluation Factors above

Retain Alternative for Detailed StudyAlternatives

SOUTH SEGMENT: SILVER SPRING DRIVE to GREEN TREE ROAD

Modernization - 6 lanesShifted East

Modernization - 6 lanesShifted West

Modernization - 6 lanesElevated over UPRR

Modernization – 6 lanesCentered

Spot Improvements

Modernization - 4 lanesCentered

Modernization – 6 lanesRaised

Modernization – 6 lanesDepressed

AddressesDesign

DeficienciesImproves

Safety

YES YES YES YES

YES YES YES YES

YES YES YES YES

MODERATE/HIGH11 residential and 1 business relocation;

limited wetland impact; minor R/W impact to Nicolet High School east

playfields, potential historic properties

MODERATE/HIGH9 residential and 1 business relocation;

limited wetland impact; impacts to Nicolet High School athletic field and parking area;

impact to potential historic propertiesMODERATE/HIGH

2 residential relocations; impacts to potential historic properties; R/W impacts

to Nicolet High School east playfield; changed travel patterns; visual impacts

MODERATE/HIGH11 relocations; limited wetlands impact,

R/W impact to potential historic properties and Nicolet High School athletic field and east playfields; similar to shifted east and

shifted west alternativesMODERATE/HIGH

11 residential relocations and 1 business relocation; impacts to wetlands, potential historic properties; R/W impact to Nicolet

High School east playfields; visual impacts; changed travel patterns

YESMaintains Jean Nicolet Road; minimizes R/W and relocation impacts on west side; profile depressed to minimize visual

impacts; minimizes impact to potential historic sites compared to centered and shifted west alternatives;

City of Glendale supports this alternative

NOLimits R/W and relocation impacts; creates aesthetic impacts

and maintenance concerns

NOMaintains continuous Jean Nicolet Road; minimizes R/W and relocation impacts on east side; profile depressed to

minimize visual impacts

NODoes not address design deficiencies or future traffic demand; limited improvement of safety issues; not

consistent with regional transportation plans

NODoes not address future traffic demand; not consistent

with regional transportation plans

NOSee Jean Nicolet access options below

NOR/W and relocation impacts to both sides of highway with no

added benefit

NODiscontinuous Jean Nicolet Road did not substantially reduce impacts compared to the at-grade alternatives; Substantial

disruption to neighborhood access

NOLowering I-43 creates drainage difficulties, as well as increasing construction complexity; minimal profile

difference in area of concern with at-grade alternatives

NODiscontinuous Jean Nicolet Road did not substantially reduce impacts compared to the at-grade alternatives; Substantial

disruption to neighborhood access

LOW No impacts

LOW Minimal impacts

MODERATE/HIGHSee Raised Alternative Magnitude of

Environmental Impacts above

MODERATE/HIGH11 residential relocations and 1 business

relocation; impacts to wetlands, potential historic properties and Nicolet High School

east playfields; changed travel patterns; drainage issues

MODERATE/HIGHSee Raised Alternative Magnitude of

Environmental Impacts above

Retaining walls along I-43

$67.6R/W on Port Washington

Road

$67.0R/W on Jean Nicolet

Road

R/W on Jean NicoletRoad and Port

Washington Road

No (R/W) impacts

Substantial structures required and retaining walls

Retaining walls along I-43; additional bridges at new

underpass locations

Limited widening andR/W impactsYES YES NO NO

YES YES YES YES

YES YES YES YES

NO NO NO

YES YES YES YES

Relative Total Cost(construction, right-of-way

(R/W) acquisition)$ (millions)*

Magnitude of Environmental Impacts

AddressesFutureTraffic

Demand

Consistentwith

RegionalPlan

Key Purpose and Need Factors Other Factors

NOTE: All Build Alternatives include Transportation System Management (TSM)/Transportation Demand Management (TDM) measures *Current Year DollarsPreferred Alternative

YES(spot locations)

I-43 North-South FreewayCorridor Study

Public Hearing - April 30, 2014 & May 1, 2014

2014 I-43 Resurface Project1500’ South of Lexington Boulevard to WIS 32

1st RehabilitationMilwaukee County 1970-79Ozaukee County 1982

I-43 ConstructionMilwaukee County 1956-57Ozaukee County 1966-67

2nd Rehabilitation

3rd Rehabilitation*

Exce

llen

tP

oor

Pavem

ent

Con

dit

ion

* Many states decide to reconstructin place of further rehabilitations

Typical Pavement Life Cycles

I-43 resurfaced 1996-98

I-43 resurfacing scheduled for 2014

= Current I-43 Pavement Conditions

12-15 Yrs20-25 Yrs 8-10 Yrs 5-8 Yrs

Pavement LifeI-43 North-South Freeway Corridor Study

60

167

100

Silver Spring Dr

W Good Hope Rd

Highland Rd

CTH

W

CTH

W

Port Washington Rd

Lakefield Rd

County Line Rd

Donges Bay Rd

LakeMichigan

(not to scale)

FOXPOINT

RIVERHILLS

BROWNDEER

MILWAUKEE

GLENDALE

BAYSIDE

Lexington Blvd

Ozaukee Co

Milwaukee Co

MEQUON

GRAFTON

LEGENDMajor Roadways

N

Mequon Rd

Brown Deer Rd

County C (Pioneer Rd)

County W

County W

Project Limits

32

APRIL 2014 - NOVEMBER 20142014 I-43 Resurfacing Project

Average Life SpanPavement: 50-60 years; Bridges: 50-75 years; Traffic Operations Beyond 2040: operations evaluated as needed

Southbound exit ramp lengthened - parallel ramp (Mequon Road Interchange)

Replace existing beam guard (1500’ south of Lexington Boulevard to Brown Deer Road)

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

TOWN OF GRAFTON

VILLAGE OF GRAFTON

MEQUON

Lake Michigan

ULA

O R

OA

DW

IS 6

0

FALLS

ROA

D

LAKEFIE

LD R

OA

D

PIO

NEER R

OA

DCOU

NTY

C

BON

NIW

ELL R

OA

D

HIG

HLA

ND R

OA

D

GLE

N O

AKS LA

NE

WIS

167

DON

GES B

AY

ROA

D

MEQ

UON

ROA

D

PORT WASHINGTON ROAD

LAKESHORE DRIVE

UNION PACIFIC RAILROAD

PORT WASHINGTON ROAD

Milwaukee River

Ulao Creek

Aerial - SEWRPC 2010

(not shown to scale)

PROJECT NEED

• Pavement, freeway design, and geometric deficiencies

• Safety issues

• Increasing traffic volumes

• Consistency with regional planning

• Maintain regional transportation linkages

What we heard:MAINLINE COMMENTS

• Freeway already congested expand to 6-lanes

• Leave the freeway 4-lanes or more transit over widening

• Median barrier; low-tension cable guard not working

• Poor pavement conditions

• Manage additional stormwater runoff*

• Pavement striping on freeway not visible

View the Mainline Alternative and Typical Section to see how these issues are addressed

ULAO CREEK COMMENTS

• Drainage concerns*

COUNTY C COMMENTS

• Difficult to merge onto freeway

View the County C Alternative to see how these issues are addressed

BONNIWELL COMMENTS

• Drainage concerns*

MEQUON COMMENTS

• Backups occuring at all of ramps

• Difficult to merge onto freeway

• Concerns with impacts to wetlands east of interchange

• Comments for and against Park-Ride

View the Mequon Road Alternative to see how these issues are addressed

HIGHLAND COMMENTS

• Adding an interchange would reduce traffic on Port Washington Road

• Adding an interchange would provide more direct access to Concordia, MATC, and Columbia St. Mary’s - Ozaukee

• Adding an interchange would reduce traffic on Lakeshore Drive

• Adding an interchange may negatively impact traffic in adjacent neighborhoods

• Not in favor of higher taxes to pay local share of interchange

• New interchange would require improved intersection at Highland Road and Port Washington Road

View the Highland Road Alternative to see how these issues are addressed

NOISE BARRIER COMMENTS

• Comments for and against the addition of a noise barrier

• Comments requesting roadway to be lowered

• Use excess soil for bermSee Noise Barrier booth for barrier determination process and barrier samples

1

WIS 60 INTERCHANGE

• Substandard ramp design

• Substandard bridge vertical curve

• Substandard I-43 mainline horizontal curves

1I-43 MAINLINE

• Substandard vertical curve, decision site distance

• Substandard for stopping site distance

3I-43 MAINLINE

• Narrow outside shoulders along entire length

5MEQUON ROAD

• Substandard intersection spacing

• Heavy congestion, weave maneuvers, crashes

• Substandard vertical curve, decision site distance

• Substandard bridge clearance• Substandard I-43 mainline

vertical curves

6

6

COUNTY C INTERCHANGE

• Substandard ramp design, decision site distance

• Substandard bridge clearance

• Substandard I-43 mainline horizontal curves

4FALLS ROAD

• Substandard bridge clearance

2

234

5

*Drainage/Stormwater concerns associated with the full project will be addressed and solutions will be presented at future public meetings.

Resurface 1982

Resurface 1997

Proposed Resurface 2014

Original Construction 1966-67

I-43 North-South FreewayCorridor StudyProject Need Review and Comments from Public Information Meeting #1

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

MILWAUKEE

GLENDALE

RIVER HILLS

BAYSIDE

MEQUON

FOX POINT

DON

GES B

AY

ROA

D

ZEDLE

R LA

NE

COU

NTY

LINE R

OA

D

PORT WASHINGTON ROAD

FAIR

Y C

HASM

ROA

D

WIS

100

BROW

N D

EER R

OA

D

DEA

N R

OA

D

BRA

DLE

Y R

OA

D

CA

LUM

ET R

OA

D

GOOD H

OPE R

OA

D

GREEN

TREE R

OA

D

SILV

ER S

PRIN

G D

RIV

E

PORT WASHINGTON ROADPORT WASHINGTON ROADJEAN NICOLET ROAD

BEN

DER R

OA

D

Indian Creek

Fish Creek

Milwaukee RiverMilwaukee River

WHITEFISH BAY

Aerial - SEWRPC 2010

(not shown to scale)

COUNTY LINE COMMENTS

• Intersection at County Line Road and Port Washington Road is dangerous

• Northbound off ramp too close to Brown Deer Road ramps

View the County Line Road Alternative to see how these issues are addressed

BROWN DEER COMMENTS

• Merging onto and off of ramp is difficult

• Add more lighting

• Short ramp tapers push vehicle onto freeway too fast

• New interchange is better but still busy and unsafe - keep the bridge

• Extend auxiliary lane for Port Washington Road ramp

View the Brown Deer Road Alternative to see how these issues are addressed

INDIAN CREEK COMMENTS

• Manage stormwater*

MAINLINE COMMENTS

• Freeway already congested expand to 6-lanes

• Leave the freeway 4-lanes or more transit over widening

• Poor pavement conditions

• Manage additional stormwater runoff*

• Pavement striping on freeway not visible

• Add landscaping to enhance beauty of the corridor

• Provide reversible center lane

View the Mainline Alternative to see how these issues are addressed

CLOVERNOOK AREA

• Many noise barrier comments for and against

• Maintain access to Jean Nicolet Road

• Connect local streets under or over I-43

View the South End Alternative to see how these issues are addressed

NORTHSHORE WATER COMMISSION FACILITIES

• Avoid impacts to water facility

*View the South End Alternatives to see how these issues are addressed

NICOLET HIGH SCHOOL

• Manage stormwater*

• Avoid/minimize impacts to sports fields/parking lot

View the South End Alternative to see how these issues are addressed

SILVER SPRING COMMENTS

• Bikes and pedestrians crossing through this area are unsafe

GOOD HOPE COMMENTS

• Short ramp tapers to merge onto freeway northbound and southbound

• Backups getting on and off ramps

• Conflicts getting onto I-43 from Port Washington Road

View the Good Hope Road Alternative to see how these issues are addressed

BENDER MAINLINE COMMENTS

• 6-lane to 4-lane transition creates backups

View the South End Alternative to see how these issues are addressed

PROJECT NEED• Pavement, freeway

design, and geometric deficiencies

• Safety issues

• Increasing traffic volumes

• Consistency with regional planning

• Maintain regional transportation linkages

PORT WASHINGTON ROAD

• Substandard bridge clearance

• Substandard horizontal alignment

8COUNTY LINE ROAD

• Undesirable partial interchange

• Substandard bridge clearance

• Substandard I-43 mainline vertical curves

9

I-43 MAINLINE

• Inadequate outside shoulders entire length

NOISE BARRIER COMMENTS

• Comments for and against the addition of a noise barrier

• Comments requesting roadway to be lowered

• Use excess soil for bermSee Noise Barrier booth for barrier determination process and barrier samples

11

11

BROWN DEER ROAD

• Substandard intersection spacing from ramp terminals

• Short entrance/exit weaving sections

• Heavy congestion, weave manuvers, crashes

• Substandard ramp design, decision site distance

• Substandard I-43 mainline horizontal curves

10

10

GOOD HOPE ROAD

• Substandard intersection spacing from ramp terminals

• Short entrance weaving sections

• Heavy congestion, weave manuvers, crashes

• Substandard ramp design, decision site distance

• Substandard I-43 mainline horizontal curves

12

1213

I-43 MAINLINE

• Substandard vertical curves, decision site distance (7 locations)

• Substandard horizontal curves

• Lane drop at Bender Road

• Substandard for stopping site distance

14

14

GREEN TREE ROAD

• Deteriorating bridge conditions

• Substandard bridge clearance

13UP RAILROAD

• Substandard bridge clearance

15

15

SILVER SPRING DRIVE

• Substandard bridge clearance

• Substandard vertical curve, decision site distance

• Substandard ramp, decision site distance

16

16

98

DONGES BAY ROAD

• Substandard bridge clearance

7

7

What we heard:

*Drainage/Stormwater concerns associated with the full project will be addressed and solutions will be presented at future public meetings.

Resurface 1976Resurface 1979Reconstruct 1991-92

Resurface 1982

Resurface 1997Resurface 1996-98

Proposed Resurface 2014

Original Construction 1956-57 Original Construction 1966-67

I-43 North-South FreewayCorridor StudyProject Need Review and Comments from Public Information Meeting #1

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

60

167100

Silver Spring Dr

W G

ood Hope Rd

Highland Rd

Mequon Rd

Brown D

eer Rd

Port Washington Rd

Port Washington Rd

County C

(Pioneer Rd)

Lakefield Rd

County Line Rd

Donges Bay Rd

(not to scale)FOXPOINT

RIVERHILLS

GLENDALE

BAYSIDE

Ozaukee C

oM

ilwaukee C

o

MEQUON GRAFTON

N

CorridorLOS; A.M.2040Build

60

167100

Silver Spring Dr

W G

ood Hope Rd

Highland Rd

Mequon Rd

Brown D

eer Rd

Port Washington Rd

Port Washington Rd

County C

(Pioneer Rd)

Lakefield Rd

County Line Rd

Donges Bay Rd

(not to scale)FOXPOINT

RIVERHILLS

GLENDALE

BAYSIDE

Ozaukee C

oM

ilwaukee C

o

MEQUON GRAFTON

N

CorridorLOS; A.M.2040No-Build

60

167100

Silver Spring Dr

W G

ood Hope Rd

Highland Rd

Mequon Rd

Brown D

eer Rd

Port Washington Rd

Port Washington Rd

County C

(Pioneer Rd)

Lakefield Rd

County Line Rd

Donges Bay Rd

(not to scale)FOXPOINT

RIVERHILLS

GLENDALE

BAYSIDE

Ozaukee C

oM

ilwaukee C

o

MEQUON GRAFTON

N

CorridorLOS; A.M.Existing *

LOS

A

B

C

D

E

F

Description

Free Flow (Light volume, no congestion)

Reasonably Free Flow (Light volume, very little congestion)

Stable Flow (Moderate volumes & little congestion)

Approaching Unstable Flow (Moderate volumes & congestion)

Unstable Flow (Moderate to heavy volumes & significant congestion)

Forced or Breakdown Flow (Heavy volumes, very significant congestion)

Segment LOS Designation Based Upon Field Observation of Congested Conditions

2010 Average Weekday Daily Traffic (AWDT)

2040 Forecast Traffic Volumes (AWDT)

2006-2010 Crash Data

75,000 VPD 60,560 VPD

97,000 VPD

54,940 VPD

90,000 VPD

49,000 VPD

72,000 VPD

53,620 VPD

87,000 VPD 82,000 VPD

Milwaukee County - 622 total crashes Ozaukee County - 465 total crashes

85,460 VPD

128,000 VPD 121,000 VPD

A.M. Peak Hour Level of Service (LOS)

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

60

167100

Silver Spring Dr

W G

ood Hope Rd

Highland Rd

Mequon Rd

Brown D

eer Rd

Port Washington Rd

Port Washington Rd

County C

(Pioneer Rd)

Lakefield Rd

County Line Rd

Donges Bay Rd

(not to scale)FOXPOINT

RIVERHILLS

GLENDALE

BAYSIDE

Ozaukee C

oM

ilwaukee C

o

MEQUON GRAFTON

N

CorridorLOS; P.M.2040Build

60

167100

Silver Spring Dr

W G

ood Hope Rd

Highland Rd

Mequon Rd

Brown D

eer Rd

Port Washington Rd

Port Washington Rd

County C

(Pioneer Rd)

Lakefield Rd

County Line Rd

Donges Bay Rd

(not to scale)FOXPOINT

RIVERHILLS

GLENDALE

BAYSIDE

Ozaukee C

oM

ilwaukee C

o

MEQUON GRAFTON

N

CorridorLOS; P.M.2040No-Build

60

167100

Silver Spring Dr

W G

ood Hope Rd

Highland Rd

Mequon Rd

Brown D

eer Rd

Port Washington Rd

Port Washington Rd

County C

(Pioneer Rd)

Lakefield Rd

County Line Rd

Donges Bay Rd

(not to scale)FOXPOINT

RIVERHILLS

GLENDALE

BAYSIDE

Ozaukee C

oM

ilwaukee C

o

MEQUON GRAFTON

N

CorridorLOS; P.M. Existing

LOS

A

B

C

D

E

F

Description

Free Flow (Light volume, no congestion)

Reasonably Free Flow (Light volume, very little congestion)

Stable Flow (Moderate volumes & little congestion)

Approaching Unstable Flow (Moderate volumes & congestion)

Unstable Flow (Moderate to heavy volumes & significant congestion)

Forced or Breakdown Flow (Heavy volumes, very significant congestion)

Segment LOS Designation Based Upon Field Observation of Congested Conditions

2010 Average Weekday Daily Traffic (AWDT)

2040 Forecast Traffic Volumes (AWDT)

2006-2010 Crash Data

75,000 VPD 60,560 VPD

97,000 VPD

54,940 VPD

90,000 VPD

49,000 VPD

72,000 VPD

53,620 VPD

87,000 VPD 82,000 VPD

85,460 VPD

128,000 VPD 121,000 VPD

Milwaukee County - 622 total crashes Ozaukee County - 465 total crashes

P.M. Peak Hour Level of Service (LOS)

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

WE AREHERE

• Interchange must be included in the Regional Transportation Plan

• 2035 SEWRPC Regional Transportation Plan recommends a Highland Road interchange

• Perform a detailed analysis based on 2040 traffic forecast• Complete an Interchange Justification Report (IJR) • Includes socioeconomic, environmental, safety, and operational factors• Federal Highway Administration approves IJR• Request from local community to construct an interchange• Determine local cost share

New Interchange Access Approval Process Highland Road

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Transportation Demand Management - Public Transit

#****

#

X

##**** ##

#

#

#****

###

#

#**** #

#****

#****

# ###****

#

#****

#X

#

#

#

#****

#****

#

# #****

#****

X

#

X

XY

#****

#****

#

#****

#****

X

#

XY

X

#

X#****

#****#****##

#

#

# #

#****#

# ##

#****#

#

#

#****

#

#****X

##

#****

#****

#****

XY

#****#

#

#

#

Map 33

RECOMMENDED PARK-RIDELOTS UNDER THE YEAR 2035

REGIONAL TRANSPORTATION PLAN

Source: SEWRPC

0 1 2 3 4 5 6 MILES

³FEET0 5 10 15 20 25 30 35 40,000

#

X

#****

XY

EXISTING PARK-RIDE LOT--SERVED BY EXISTING OR PROPOSED PUBLIC TRANSIT

EXISTING PARK-RIDE LOT--NOT SERVED BY EXISTING OR PROPOSED PUBLIC TRANSIT

PROPOSED PARK-RIDE LOT--SERVED BY PROPOSED PUBLIC TRANSIT

PROPOSED PARK-RIDE LOT--NOT SERVED BY PROPOSED PUBLIC TRANSIT

141

## ##

#

****#

#

###

#

# #

#

#

# ##

#

#

#

#

********

****

****

#

#

#

****

#

##

#

###

#

#

#

#

#

****

#

# #

#

****

##

#

##

#

#

#

#

#

#

#

#

#

#

#****

#

#

#

#

#

#

#

#

#

Map 28

REVISED PUBLIC TRANSIT ELEMENT OF THE REGIONAL TRANSPORTATION SYSTEM

PLAN: YEAR 2035

WALK ACCESS TRANSIT SERVICE AREA

EXPRESS BUS ROUTE

RAPID BUS ROUTE - NONFREEWAY PORTION

RAPID BUS ROUTE - FREEWAY PORTION

RAPID/EXPRESS BUS ROUTE

SERVICE AREA

Source: SEWRPC.

COMMUTER RAIL

TRANSIT STATIONS

WITH PARKING

WITHOUT PARKING****

#

0 0.7 1.4 2.1 2.8 3.5 Miles

GRAPHIC SCALE

0 8,000 16,000 24,000 32,000 40,000 Feet

FIXED GUIDEWAY ROUTEHIGH SPEED RAIL

INSET

****#

SEEINSET

STREETCAR

109

The I-43 North-South Freeway Corridor Study can accommodate future transit improvements recommended in the 2035 Regional Transportation Plan (SEWRPC).Per Review, Update and Reaffirmation of the Year 2035 Regional Transportation Plan, June 2010.

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

• Transportation System Management (TSM) TSM elements improve existing transportation facilities and travel efficiency through highway and street traffic

management and other measures to help alleviate congestion.

Included in the I-43 North-South Freeway corridor:• Ramp Metering• Traffic Detectors• Freeway Monitoring/Advisory Information • Closed circuit television cameras• Crash investigation sites• Enhanced mile-marker reference posts (with highway shield and mile number)

• Transportation Demand Management (TDM) TDM elements reduce personal vehicular travel or shift travel to alternative times and routes, allowing for more efficient

use of the existing transportation system’s capacity.

Included in the I-43 North-South Freeway corridor:• See “Transportation Demand Management - Public Transit” display

Transportation System Management & Transportation Demand Management

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties PIM 3 - August 20 & 22, 2013

Transportation Demand Management - Public Transit

#****

#

X

##**** ##

#

#

#****

###

#

#**** #

#****

#****

# ###****

#

#****

#X

#

#

#

#****

#****

#

# #****

#****

X

#

X

XY

#****

#****

#

#****

#****

X

#

XY

X

#

X#****

#****#****##

#

#

# #

#****#

# ##

#****#

#

#

#****

#

#****X

##

#****

#****

#****

XY

#****#

#

#

#

Map 33

RECOMMENDED PARK-RIDELOTS UNDER THE YEAR 2035

REGIONAL TRANSPORTATION PLAN

Source: SEWRPC

0 1 2 3 4 5 6 MILES

³FEET0 5 10 15 20 25 30 35 40,000

#

X

#****

XY

EXISTING PARK-RIDE LOT--SERVED BY EXISTING OR PROPOSED PUBLIC TRANSIT

EXISTING PARK-RIDE LOT--NOT SERVED BY EXISTING OR PROPOSED PUBLIC TRANSIT

PROPOSED PARK-RIDE LOT--SERVED BY PROPOSED PUBLIC TRANSIT

PROPOSED PARK-RIDE LOT--NOT SERVED BY PROPOSED PUBLIC TRANSIT

141

## ##

#

****#

#

###

#

# #

#

#

# ##

#

#

#

#

********

****

****

#

#

#

****

#

##

#

###

#

#

#

#

#

****

#

# #

#

****

##

#

##

#

#

#

#

#

#

#

#

#

#

#****

#

#

#

#

#

#

#

#

#

Map 28

REVISED PUBLIC TRANSIT ELEMENT OF THE REGIONAL TRANSPORTATION SYSTEM

PLAN: YEAR 2035

WALK ACCESS TRANSIT SERVICE AREA

EXPRESS BUS ROUTE

RAPID BUS ROUTE - NONFREEWAY PORTION

RAPID BUS ROUTE - FREEWAY PORTION

RAPID/EXPRESS BUS ROUTE

SERVICE AREA

Source: SEWRPC.

COMMUTER RAIL

TRANSIT STATIONS

WITH PARKING

WITHOUT PARKING****

#

0 0.7 1.4 2.1 2.8 3.5 Miles

GRAPHIC SCALE

0 8,000 16,000 24,000 32,000 40,000 Feet

FIXED GUIDEWAY ROUTEHIGH SPEED RAIL

INSET

****#

SEEINSET

STREETCAR

109

The I-43 North-South Freeway Corridor Study can accommodate future transit improvements recommended in the 2035 Regional Transportation Plan (SEWRPC).

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

PURPOSE & NEED ALTERNATIVE DEVELOPMENT

ALTERNATIVESCREENING

RECOMMENDEDALTERNATIVE SELECTION

2012 2013 2014

Functional Plans

Public Information Meeting (PIM)

Public Hearing

Draft Environmental Impact Statement (EIS)

Final EIS

Recommended Alternative

Screened Alternative

Initial Alternative Development

ALTERNATIVE DEVELOPMENT

ENVIRONMENTAL

PUBLIC INVOLVEMENT

Record of Decision (ROD), Environmental Clearance

12/2012

8 /2013

1/2014

2/2014

1/2014

8/2014

8/2014

8/2012, 1/2013 & 8/2013

4/2014

STUDY MILESTONE TARGETS(Subject to change)

DataGathering

Alternative Development

Environmental

Agency Coordination

Public Involvement

AGENCY COORDINATION

Technical Advisory Committee (TAC) &Community Advisory Committee (CAC)

12/2012, 3/2013, 7/2013, 4/2014

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

Study Schedule

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Engineering

2014 I-43Resurfacing*

Environmental Study

Potential Real Estate Acquisition

20142013 2015 2016 2017 2018 2019 2020 2021 2022

Construction

*Funded and programmed to be completed in 2014. All other timelines beyond the Environmental Study are based on funding availability and legislative approval.

Possible Construction Schedule

*Funded and scheduled to be completed in 2014. All other timelines beyond the Environmental Study are based on funding availability and legislative approval.

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Noise Barrier Effectiveness

Noise Barrier

Sound Wave Diffraction

Noise Barrier Effectiveness

50 Feet 100 Feet 200 Feet 300 Feet

Noise Reduction

Greatest Benefit Little to NoNoticeable Benefit

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Executive SummaryI-43 North-South Freeway Corridor Study Draft EIS

ES-11

Table ES-1: Impacts Summary

Environmental Factors

Alternatives

No-Build Build1

Brown Deer Road Interchange County Line Road Interchange Highland Road Interchange

DiamondDiverging Diamond2 No Access

Split Diamond Hybrid2, 3 Partial Diamond No Access Tight Diamond2

New right of way (acres) 0 23.12 1.84 2.14 1.59 1.72 1.72 0 1.32

Traffic LOS in design year 2040 E/F C/D C/D C/D NA C C N/A C

Residential relocations 0 12 0 0 0 0 0 0 0

Commercial relocations 0 3 0 0 0 0 0 0 0

Total wetland (acres) 0 20.3 0.75 0.72 1.01 1.03 1.03 2.10 5.43

Advanced identification of wetland disposal areas (acres) 0 2.51 0 0 0 0 0 0 0

Environmental corridors and isolated natural resource areas (acres) 0 4.07 0 0 0 0 0 0 0.16

Stream crossings 214 204 0 0 1 1 1 0 0

100-year floodplain crossings 8 7 0 0 0 0 0 0 1

100-year floodplain fill (acres) 0 4.78 0 0 0 0 0 0 0.14

Farmland (acres) 0 9.6 0 0 0 0 0 0 0

Threatened/endangered species (potential for impacts) No Yes5 Yes5 Yes5 Yes5 Yes5 Yes5 Yes5 Yes5

Historic structures/properties (North Shore Water Treatment Plant) 0 1 0 0 0 0 0 0 0

Archaeological sites 0 0 0 0 0 0 0 0 0

Public use facilities (Craig Counsell Park, Nicolet High School land) 0 2 0 0 0 0 0 0 0

Noise receptors impacted (design year 2040) N/A

• 290 residences• 2 school athletic

fields• 1 place of

worship• 1 day care center

• 290 residences• 2 school athletic

fields• 1 place of

worship• 1 day care center

• 290 residences• 2 school athletic

fields• 1 place of

worship• 1 day care center

• 280 residences• 2 school athletic

fields• 1 place of

worship• 2 day care

centers

• 279-280 residences5

• 2 school athletic fields

• 1 place of worship

• 1 day care center

• 280 residences• 2 school athletic

fields• 1 place of

worship• 2 day care

centers

• 290 residences• 2 school athletic

fields• 1 place of

worship• 1 day care center

• 290 residences• 2 school athletic

fields• 1 place of

worship• 1 day care center

Notes:

1. The build alternative includes the preferred I-43 mainline Modernization – 6 Lanes alternatives for the South and North segments, and preferred alternatives for the interchanges at Good Hope Road, Mequon Road and County C.

2. Preferred alternative.

3. Includes theSplit Diamond Hybrid grade separation/without grade separation subalternatives.

4. Stream crossings include Fish Creek, its tributaries and tributaries to the Milwaukee River, including Ulao Creek and Indian Creek. All existing structures are either concrete box culverts or pipe culverts.

5. Potential habitat for the seaside crowfoot (Ranunculus cymbalaria), a state-listed threatened species, observed in the study corridor. Impacts to other threatened and endangered species and their habitat in the study corridor can be avoided.

6. Residential noise receptors impacted: 279 with Split Diamond Hybrid (without Grade Separation); 280 with Split Diamond Hybrid (Grade Separation).

Environmental Impacts Summary

I-43 North-South FreewayCorridor Study

Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties Public Hearing - April 30, 2014 & May 1, 2014

Executive SummaryI-43 North-South Freeway Corridor Study Draft EIS

ES-12

Environmental Factors

Alternatives

No-Build Build1

Brown Deer Road Interchange County Line Road Interchange Highland Road Interchange

DiamondDiverging Diamond2 No Access

Split Diamond Hybrid2, 3 Partial Diamond No Access Tight Diamond2

Potential contaminated sites (recommended for further investigation) N/A 30

Part of corridorwide analysis; no difference among interchange alternatives

Part of corridorwide analysis; no difference among interchange alternatives

Part of corridorwide analysis; no difference among interchange alternatives

Part of corridorwide analysis; no difference among interchange alternatives

Part of corridorwide analysis; no difference among interchange alternatives

Part of corridorwide analysis; no difference among interchange alternatives

Part of corridorwide analysis; no difference among interchange alternatives

Air quality concerns No No No No No No No No No

Indirect effects anticipated?

Land use effect: Increasing congestion could cause development to shift away from primary study area (and to a lesser extent within secondary study area) to locations within the region that have less congestion

Land use effect: Facilitates planned redevelopment and development within primary study area (and to a lesser extent within the secondary study area)

Limited land use effect: Maintains existing access; supports existing businesses and neighborhoods and planned redevelopment within Milwaukee County primary study area

Limited land use effect: Maintains existing access; supports existing businesses and neighborhoods and planned redevelopment within Milwaukee County primary study area

Limited land use effect: Established land uses minimize effect; changed travel patterns; access available from nearby interchanges

Limited land use effect: Established land uses minimize effect. Some local concerns about traffic impacts and travel indirection of the “Grade Separation” subalternative; the “without Grade Separation” subalternative minimizes indirection. Supports Port Washington Road business corridors in Mequon, Bayside and Fox Point.

No change from existing conditions

Limited land use effect: Planned land uses likely to occur regardless of interchange alternative; nearby freeway access is already available.

Improved access and local implementation of the Mequon East Growth Area Plan would facilitate planned land uses.

Cumulative effects anticipated? NoLimited effect: Mitigation measures minimize effects

Limited effect: Mitigation measures minimize effects

Limited effect: Mitigation measures minimize effects

Limited effect: Mitigation measures minimize effects

Limited effect: Mitigation measures minimize effects

No change from existing conditions

Limited effect: Mitigation measures minimize effects

Limited effect: Mitigation measures minimize effects

Environmental justice effects anticipated? No

Build alternative’s indirect and cumulative land use effects could facilitate employment land uses in areas that are not accessible by transit.

Part of corridorwide analysis; no difference among interchange alternatives

Part of corridorwide analysis; no difference among interchange alternatives

Part of corridorwide analysis; no difference among interchange alternatives

Part of corridorwide analysis; no difference among interchange alternatives

Part of corridorwide analysis; no difference among interchange alternatives

Part of corridorwide analysis; no difference among interchange alternatives

Part of corridorwide analysis; no difference among interchange alternatives

Notes:

1. The build alternative includes the preferred I-43 mainline Modernization – 6 Lanes alternatives for the South and North segments, and preferred alternatives for the interchanges at Good Hope Road, Mequon Road and County C.

2. Preferred alternative.

3. Includes theSplit Diamond Hybrid grade separation/without grade separation subalternatives.

4. Stream crossings include Fish Creek, its tributaries and tributaries to the Milwaukee River, including Ulao Creek and Indian Creek. All existing structures are either concrete box culverts or pipe culverts.

5. Potential habitat for the seaside crowfoot (Ranunculus cymbalaria), a state-listed threatened species, observed in the study corridor. Impacts to other threatened and endangered species and their habitat in the study corridor can be avoided.

6. Residential noise receptors impacted: 279 with Split Diamond Hybrid (without Grade Separation); 280 with Split Diamond Hybrid (Grade Separation).

Environmental Impacts Summary

Public Hearing - April 30, 2014 & May 1, 2014 Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties

I-43 North-South FreewayCorridor Study

Stable Flow (Moderate volumes & little congestion)

TB042007005MKE 1.4_Level_of_Service_Examples_v2.ai 06.19.07 cae

Level of Service A

Level of Service C

Level of Service B

Level of Service D

Level of Service E

Level of Service F

EXHIBIT 1-4 Levels of Service Examples

Reasonably Free Flow (Light volume, very little congestion)

TB042007005MKE 1.4_Level_of_Service_Examples_v2.ai 06.19.07 cae

Level of Service A

Level of Service C

Level of Service B

Level of Service D

Level of Service E

Level of Service F

EXHIBIT 1-4 Levels of Service Examples

Level of Service (LOS)

TB042007005MKE 1.4_Level_of_Service_Examples_v2.ai 06.19.07 cae

Level of Service A

Level of Service C

Level of Service B

Level of Service D

Level of Service E

Level of Service F

EXHIBIT 1-4 Levels of Service Examples

TB042007005MKE 1.4_Level_of_Service_Examples_v2.ai 06.19.07 cae

Level of Service A

Level of Service C

Level of Service B

Level of Service D

Level of Service E

Level of Service F

EXHIBIT 1-4 Levels of Service Examples

TB042007005MKE 1.4_Level_of_Service_Examples_v2.ai 06.19.07 cae

Level of Service A

Level of Service C

Level of Service B

Level of Service D

Level of Service E

Level of Service F

EXHIBIT 1-4 Levels of Service Examples

Free Flow (Light volume, no congestion)

Approaching Unstable Flow (Moderate volumes & congestion)

Unstable Flow (Moderate to heavy volumes & significant congestion) Forced or Breakdown Flow (Heavy volumes, very significant congestion)

TB042007005MKE 1.4_Level_of_Service_Examples_v2.ai 06.19.07 cae

Level of Service A

Level of Service C

Level of Service B

Level of Service D

Level of Service E

Level of Service F

EXHIBIT 1-4 Levels of Service Examples

Public Hearing - April 30, 2014 & May 1, 2014 Project ID: 1229-04-01 - Silver Spring Drive to WIS 60 - Milwaukee and Ozaukee Counties

I-43 North-South FreewayCorridor Study

Testimony

Options and Instructions for Providing TestimonyWisDOT and FHWA will review and consider your testimony as part of the process for choosing the preferred alternative. Testimony should be limited to tonight’s public hearing aspects, and statements or opinions about the project. Provide comments on the alternative(s) you support, or oppose, and your reasons. Questions related to the project can be directed to WisDOT staff during informal discussions and will not be recorded by the court reporter or included in the public hearing record.

Private verbal testimonyThis option may be preferred if you wish to make your statement privately to the court reporter rather than in front of the audience:

• Available during the entire public hearing• Follow the signs or ask directions to the location for private testimony• Complete a registration slip• Wait for an opening• Give the court reporter your comments

Public verbal testimonyFollowing the WisDOT presentation until the hearing closes, public verbal testimony will take place:

• Complete a Registration Slip for Public Verbal Testimony (included in the handout packet and on table in commons area)

• Give it to the WisDOT staff at the designated table any time before, during, or immediately following the presentation

• Your name will be called in the order registration slips are received• When you are called to the microphone to provide testimony, please state your name,

address, and if applicable, the group organization, or business you are representing• Please limit your testimony to 3 minutes

Written testimonyYou may provide written testimony in addition to, or in place of, verbal testimony. Complete the Written Testimony Form (included at the back of this handout packet and on the comment tables near the exhibits). You may also use your own stationery. Include your name, address, and if applicable, the group, organization, or business you are representing. If you have prepared written comments prior to the public hearing, you may also submit those. There are two options for submitting your written testimony as described below:

Submit tonight: Complete the written testimony form and place in comment box located on table in commons areaORMail in*: You may prefer this option if you would like additional time to organize your thoughts/comments. The Written Testimony Form is pre-addressed and does not require postage. You may also send written comments via e-mail to [email protected]*Mailed or emailed comments must be postmarked no later than May 12, 2014 to be included in the official public hearing record.