public review documents index - arlispublic review documents index last updated october 18, 2019 ......
TRANSCRIPT
Updated on 10/18/2019 12:42 PM 1
Public Review Documents Index Last Updated October 18, 2019
Public Review Documents are available at ARLIS during the hours when the Consortium
Library building is open. The Public Review Documents are located in the Special Collections
section of ARLIS, adjacent to the sign for the nearby Circulating Collection. Public Review
Documents are not available for download.
A
Adak
Draft Damage Assessment and Restoration Plan and Environmental Assessment for the
January 11, 2010 Adak Petroleum Diesel Spill.
ADEC Source Water Assessments (set shelved at the end of the Public Review Documents)
ADNR Division of Oil and Gas – Public Notices
Akutan
Navigation Improvements, Draft Feasibility Report and Environmental Impact Statement
Navigation Improvements, Appendices
Proposed Plan for Akutan Naval Station Akutan Island, Alaska – April, 2006
2006 Akutan Naval Station Remedial Action – Akutan Island - Final – May 2007
Work Plan: Visual Inspection and Monitoring – Final – May 2007
Alaska
Alaska Groundfish Fisheries: Draft Programmatic Supplemental Environmental Impact
Statement
Alaska Clean Seas Technical Manual. See Pipeline Contingency Plans (BP Exploration
Alaska Greater Prudhoe Bay)
Alaska Department of Environmental Conservation Source Water Assessments. See
ADEC Source Water Assessments
Alaska Pipeline. See Pipeline Contingency Plans and Trans-Alaska Pipeline
Alaska Railroad Corporation. See Anchorage: Ship Creek
Alaska Tanker Co. See Tanker Contingency Plans
Alyeska Pipeline Service Co., See Pipeline Contingency Plans
Alaska Stand Alone Pipeline Project
Updated on 10/18/2019 12:42 PM 2
Draft Supplemental Environmental Impact Statement – Volumes 1-7 and CD-
ROM – June 2017
Draft Supplemental Environmental Impact Statement – Volumes 1-8 and
CD-ROM – June 208
Alaska Peninsula
Alaska Peninsula Areawide 2018 Competitive Oil and Gas Lease Sale
Alaska – South Central
Fact Sheets
Alpine Satellite Development Project. See National Petroleum Reserve – Alaska
Amaknak and Unalaska Islands
Appendix C: Site Safety and Health Plan Addendum: Site Investigation: Chernofski
Harbor, Fort Glenn, Eider Point Umnak and Unalaska Island
Appendix C: Site Safety and Health Plan Addendum: Dutch Harbor
Formerly Unused Defense Sites: 2000 Field Activities
Comprehensive Remedial Investigation Report
Formerly Used Defense Sites Project Management Plan: 1999 Update
Interim Removal Action Thermal Soil Treatment at the Pre-WW II Tank Farm
1998 SI/RI/IRA Report
1999 Report: Pre-World War II Tank Farm Interim Removal Action Addendum
Pre-World War II Tank Farm Groundwater Monitoring
Unalaska Navigation Improvements (2 vols.)
Work Plan Addendum, 2005, Island-Wide, Amaknak, Unalaska Islands, Alaska – Final
Well Decommissioning and Repair Report Pre-World War Two Tank Farm FUDS NO.
F10AK0841-03 Amaknak Island, Alaska – Final November 2006
Proposed Plan for Fort Learnard, Unalaska, Alaska – November 2006
Little South America (LSA) Proposed Harbor
Work Plan Remedial Action Pre-World War II Tank Farm – Final – August 2007
Site Inspection Report – Former Fort Glenn, Umnak and Unalaska Islands – Draft Final -
September 2007
Remedial Action Report Pre-World War II Tank Farm – Final – May 2008
Work Plan Addendum – Soil Sampling and Statistical Analysis for Background
Concentrations and Alternative Cleanup Levels – Final – December 2008
Soil Sampling and Statistical Analysis for Background Concentrations and Alternative
Cleanup Levels – Final August 2009
Unalaska Airport Safety Improvements – Draft Environmental Assessment and Draft
Section 4(f) Individual Evaluation – October 2014
Amchitka Island
Amchitka (set – 8 boxes of files on lower shelves)
Engineering Evaluation? Cost Analysis, Amchitka Island, Alaska
Updated on 10/18/2019 12:42 PM 3
American River
American River Information Repository
Community Relations Plan
Final Engineering Evaluation and Cost Analysis
Final Site Investigation Report
Final Site Investigation Work Plan
Investigation, Community Relations and Removal Design
Removal Action 100 Percent Design
Anchorage
Anchorage International Airport
Final Project Description: Preferred Alternative: New Jet Fuel Pipeline to
Supply Anchorage International Airport
Potential Construction and Operations Impact: Impact Analysis of Fuel
Supply Alternatives for Anchorage International Airport
Anchorage Terminal Reserve
Draft RCRA Facility Assessment Report, Alaska Railroad Corporation, DCN:
RZ3-SAI-R10009-01-TR-00712, January 1996 (2 copies)
RCRA Facility Assessment, Alaska Railroad Corporation, March 29, 2002 (2
copies)
Map: “Permits and Leases in Anchorage Reserve”, May 15, 2003
Draft Administrative Order on Consent, May 17, 2004
Statement of Work, Anchorage Terminal Reserve, May 17, 2004
Environmental Fact Sheet, Public Comments Invited on an Environmental
Agreement between EPA and the Alaska Railroad Corporation, May 2004 (2
copies)
Newspaper Display Ad: Public Invited to Comment on an Environmental
Agreement between EPA and Alaska Railroad Corporation (photocopy, May 20,
2004)
Comment Period Extended for EPA and Alaska Railroad Environmental
Agreement (text of display ad)
Anchorage Daily News Article: EPA Denies Accord with Railroad, May 17, 2004
Anchorage Daily News Article: Alaska Railroad Agrees to Pollution Cleanup
Plan, May 17, 2004
KTVA.com News Article: Ship Creek Under EPA’s Microscope, May 17, 2004
Remedial Administrative Record, CD and Instructions
Remedial Investigation, Alaska Railroad Corporation, Anchorage Terminal
Reserve, U.S. EPA Docket No. CERCLA 10-2004-0065 – Revision 2, May 12,
2008 – Vols. 1-5
Remedial Investigation/Feasibility Study Work Plan, Alaska Railroad
Corporation, Revision 1 – Vols. 1-2
Ship Creek Preliminary Habitat Survey, Alaska Railroad Corporation, Anchorage
Terminal Reserve, U.S. EPA Docket No. CERCLA 10-2004-0065 – December 3,
2004 (rev. 7/1/2005)
EPA Alaska Railroad Anchorage Terminal Reserve, Remedial
Investigation/Feasibility Study (RI/FS) Fact Sheets
Updated on 10/18/2019 12:42 PM 4
Coastal Trail
Planning Trails With Wildlife in Mind: A Handbook for Trail Planners
Potential Adverse Effects of the South Coastal Trail Extension and Associated
Human Activity on Birds Nesting, Brood-rearing, and
Staging in the Anchorage Coastal Wildlife Refuge: An Annotated
Bibliography
South Extension of the Coastal Trail Draft Environmental Impact Statement and
Appendices
South Extension of the Coastal Trail Key Map
Defense Fuel Support Point
Anchorage Fuel Support Point
Risk Assessment: Defense Fuel Support Point
Hazardous Waste Management
Public Notice Documentation for the Alaska Industrial Super Critical Water
Oxidation (iSCWO) Treatment Storage & Disposal Facility (TSDF) – June 8,
2007
Tier 1 Human Health Risk Assessment Prepared For: Pacific Environmental
Corporation – September 2007
Seward Highway
Seward Highway Milepost 75 to 90 Road and Bridge Rehabilitation Project –
Environmental Assessment – November 2016
Ship Creek
Public Review Draft: Ship Creek Development Master Plan
Standard Steel
Standard Steel and Metals Explanation of Significant Difference
(SSEAR) (Set – 3 boxes of files on lower shelves)
Standard Steel and Metals Deletion Docket (SSMDD) (1 box of files on lower
shelf)
Standard Steel Superfund Site
UMED (University and Medical)
Annette Island
Annette Island Coordinated Cleanup (set)
B
Beaufort Sea
Exploration Plan, McCovey #1 Well
Beaufort Sea, North Slope, and North Slope Foothills Areawide 2012 Competitive
Oil and Gas Lease Sales – Public Notice, and Tract Maps.
Beaufort Sea, North Slope, and North Slope Foothills Areawide 2014 Competitive
Oil and Gas Lease Sales – October 2014 (shelved under North Slope)
Beaufort Sea, North Slope, and North Slope Foothills Areawide 2015 Competitive
Oil and Gas Lease Sales – September 2015 and November 2015 Supplemental
Notice (shelved under North Slope)
Updated on 10/18/2019 12:42 PM 5
Decision on No Substantial New Information 2017 Beaufort Sea, North Slope,
and North Slope Foothills Areawide Lease Sales
Bering Sea and Aleutian Islands
Bering Sea – Western Interior Resource Management Plan Newsletter #1 – May 2014
Big Mountain
Big Mountain Radio Play Relay Station (RRS) Remedial Investigation/
Feasibility Study (RI/FS)
Final Community Relations Plan For Big Mountain Radio Relay Station
Final Work Plans: Final Site Safety and Health Plan: Remedial
Investigation /Feasibility Study
BP Oil Shipping Co. See Tanker Contingency Plans
Bristol Bay (area):
See also Big Mountain, Egegik.
See also Lake and Peninsula Borough
Bay Resource Management Plan
C
Camden Bay
2010 Outer Continental Shelf Lease Exploration Plan – Camden Bay, AK – June 2009
Cape Lisburne
Final Proposed Plan for Site CS544 – Trichloroethylene Spill Area Near Service Building
151 Cape Lisburne Long Range Radar Station, Alaska
Chugach State Park
Chugach State Park Access Inventory – Analysis and Recommendations – October 2002
(removed from Public Review for cataloging)
Chukchi Sea
Draft Supplemental Environmental Impact Statement for Chukchi Sea Lease Sale 193 –
CD-ROM
See also Cape Lisburne
Coastal Trail. See Anchorage
Cold Bay
Cold Bay – Fact sheets/Newsletters
Colville River. See North Slope
Cook Inlet
Cook Inlet Area-Wide 2000 Competitive Oil and Gas Lease Sale
Decision to Supplement Area-Wide Oil and Gas Lease Sale
Draft Environment Impact Statement: Cook Inlet Planning Area Oil & Gas
Lease Sales 191 and 199
Mt. Spurr & Augustine Island Proposed Geothermal Exploration Area – Call For
Applications and Comments-
Cook Inlet Areawide 2018W Competitive Oil and Gas Lease Sale
Cordova
Newsletters
Updated on 10/18/2019 12:42 PM 6
Final Environmental Impacts Statement for the Cordova Oil Spill Response Facility.
(Corrected drawings only, we do not have original )
Crooked Creek. See Donlin Gold Project
D
Davidson’s Landing
Chemical Contamination Report
Community Relations Plan
Final Engineering Evaluation and Cost Analysis
Final Field Investigation Report
Final Remedial Action Report
Removal Action 100 Percent Design
Denali National Park and Preserve
Environmental Assessment for the Geophysical Institute Seismic Station Upgrade and
Repeater Installation at Several Locations in Denali National Park and Preserve, Alaska
Environmental Assessment for the Hazardous Vegetative Fuel Treatment Plan in Denali
National Park and Preserve, Alaska
Dillingham
Engineering Documentation Report Environmental Assessment and Finding of No
Significant Impact – City Shoreline Emergency Bank Stabilization, Dillingham, Alaska –
May 2009
Donlin Gold Project
Draft Environmental Impact Statement – (Executive Summary and 10 Vols. w/CD-ROM)
– November 2015
Drury Gulch
Post Field Work Technical Memorandum: June 1999 Site Investigation Technical
Memorandum: 1999 Site Investigation
E
Egegik
Environmental Assessment: Egegik Road Improvements Project: Priority 1A, Priority 2,
Priority 3
Eider
FOIA Documents on Steller’s and Spectacled Eiders (set – 3 boxes of files on lower
shelves)
Eielson Air Force Base (AFB)
U.S. Air Force F-35A Operational Beddown – Pacific Final Supplemental Environmental
Impact Statement. + Executive Summary. September 2017
Elmendorf Air Force Base
See Joint Base Elmendorf-Richardson Alaska (JBER)
Updated on 10/18/2019 12:42 PM 7
F
Fairbanks
Final Supplemental Programmatic Environmental Impact Statement Army Growth and
Force Structure Realignment to Support Operations in the Pacific Theater – July 2008
(Shelved with Fort Richardson Public Review Docs)
Federal Government. See United States
Fort Greely
Fort Richardson
See Joint Base Elmendorf-Richardson Alaska (JBER)
G
Gambell. See Saint Lawrence Island.
Glennallen, Alaska Natural Gas Development Authority, Pipeline to Palmer
Greater Kurparuk Area
Greens Creek Trailing Disposal
Supplemental Environmental Assessment and Draft Finding of No Significant Impact
H
Hatcher Pass
Hatcher Pass Management Plan – Public Review Draft – March 2010
Draft Environmental Impact Statement – Hatcher Pass Recreational Area Access, Trails,
and Transit Facilities + Appendices vol.1 & 2 – May 2010
Final Environmental Impact Statement – Hatcher Pass Recreational Area Access, Trails,
and Transit Facilities + Appendices vol.1 & 2 – November 2010
Homer
Draft Environmental Assessment – Homer Beluga Lake Floatplane Facilities
Improvements – January 2016
Hooper Bay
Hooper Bay Airport Improvements Draft Environmental Assessment – May 2014
Hawaii
Final Supplemental Programmatic Environmental Impact Statement Army Growth and
Force Structure Realignment to Support Operations in the Pacific Theater – July 2008
(Shelved with Fort Richardson Public Review Docs)
J
Joint Base Elmendorf-Richardson Alaska (JBER)
Environmental Restoration Program (set)
Updated on 10/18/2019 12:42 PM 8
Administrative Record USAF Elmendorf AFB DRM Facility
Environmental Restoration Program (set)
RCRA (Resource Conservation and Recovery Act) Part B Permit Renewal
Application – draft
RCRA Hazardous Waste Permit Application (Vols. I & II)
RCRA Hazardous Waste Storage Permit
Spill Response Operations Plan 19-1
Environmental Assessment June, July (04) C-17 Beddown
Integrated Natural Resources Management Plan For Elmendorf Air Force Base 2006 -
2011 – Draft
Management Action Plan Elmendorf AFB, AK – December 2006
Public Health Assessment for Elmendorf Air Force Base Anchorage, Alaska – December
21, 2006
Final Decision Plan for ST68 Environmental Restoration Program – January 2007
Environmental Assessment (EA) for the Relocation of the Alaska Air National Guard
176th Wing to Elmendorf Air Force Base (AFB) – CD-ROM - October 2007
Site Inspection Report Susitna Gunnery Range – South Central Alaska – Draft Final -
November 2007
Gravel Pit Expansion Environmental Assessment – Draft – February 2008
Zone 2 & 3 2007 Phase I Remedial Process Optimization Report – Final – (w/CD-ROM)
February 2008
Five Year Review Report – Second Five-Year Review Report for Fort Richardson,
Alaska – February 2008. Also available at
https://quicksilver.epa.gov/work/10/1269077.pdf
2007 Zone 2 Management Area Annual Report – Final – March 2008
2007 Zone 1 Field Activities Report with Remedial Process Optimization – Final – June
2008 – CD ROM
2008 Zone 3 Management Area Work Plan – Final – May 2008
Final Supplemental Programmatic Environmental Impact Statement Army Growth and
Force Structure Realignment to Support Operations in the Pacific Theater – July 2008
Site SS83 Soil Cleanup and Zone 2 Treatment System (SD15 and ST32) Removal Work
Plan (Hard Copy and CD-ROM) – Final – September 2008
Final Supplemental Comprehensive Site Evaluation (CSE) Phase 1 Findings Report –
Revision 02 – (w/CD-ROM) October 2008
Evaluation/Compilation of Groundwater Data at Site DP98 – Final (CD-ROM) - October
2008
Charting of the Delta Military Operations Area Complex Environmental Assessment –
Draft – November 2008
Charting of the Delta Military Operations Area Complex Environmental Assessment –
Executive Summary – Draft – November 2008
F-22 Infrastructure and Taxiway Time Critical Removal Action – Work Plan Revision 1
– CD-ROM - October 2008
Management Plan for the Remedial Investigation/Feasibility Study SS22 (Former DRMO
Storage Yard) – Final – September 2008
2008 Zone 1 Field Activities Report – Final – February 2009
Updated on 10/18/2019 12:42 PM 9
Treatability Study for Enhanced Natural Attenuation at the Slammer Avenue Plume,
Operable Unit 5 – Final – March 2009
Treatability Study for Enhanced Bioremediation at the Kenney Avenue Plume, Operable
Unit 5 – Final – March 2009
Study Findings and Technical Report - Alaska Baseline Erosion Assessment – March
2009
Environmental Restoration Program Five-Year Review – Third Five-Year Review Report
– Final – December 2008, and April 2009 Five-Year Review Fact Sheet – Findings
(+CD-ROMS)
SS83 Soil Cleanup Report (CD-ROM) – Final – April 2009
SD15 and ST32 Tank 2 Treatment System Removal (CD-ROM) – Final – April 2009
Final Work Plan MMRP CSE Phase II (Print and CD-ROM) – March 2009
2009 Zone 2 and Zone 3 Management Areas – Work Plan – Final - June 2009
Management Plan for the Remedial Investigation/Feasibility Study, SS22 (Former
DRMO Storage Yard) Addendum – Soil Gas Investigations – Final – May 2009
2008 Zone 2 and Zone 3 Management Area Annual Report (Print and CD-ROM) – Final
– July and August 2009
Joint Base Elmendorf-Richardson Interim Community Involvement Plan – Draft Final –
November 2009
DP98 Remedial Action Report – Final – September 2009
Joint Base Elmendorf-Richardson Interim Community Involvement Plan – Final –
January 2010
Draft Environmental Impact Statement for Resumption of Year-Round Firing
Opportunities at Fort Richardson, Alaska – January 2010
Zone 3 Management Area Wetland Remediation System Optimization Study – Final –
March & July 2010 (Print and CD-ROM)
Environmental Restoration Program Information Repository, Electronic Document
Archive and User Interface – DVD – 31 March 2010
2009 Zone 1 Field Activities Report – Final – May 2010
2009 Zone 2 Management Area Annual Report – Final – June 2010
2009 Zone 3 Management Area – Annual Report – Final – May 2010
2010 Zone 2 and Zone 3 Management Areas – Work Plan – Final – May 2010
Hazardous Waste Management Permit Modification Request – July 2010
Site LF59 Field Investigation and Conceptual Site Model Update – Final Report – July
2010
OT092 Fuel Pipeline and SS43/ST68 Bioventing Systems Decommissioning – Final –
September 2009 + Letter Report for the Excavation and Disposal of Contaminated Soil at
Site SD15 (March 24, 2010)
Final CSE Phase II Report (MMRP) – Revision 3 – June 2010
Environmental Assessment for Military Housing Privatization, Joint Base Elmendorf-
Richardson, Alaska – September 2010
2011 Engineering Evaluation/Cost Analysis. F-22 Weapons Release Shop – Draft –
February 2011
F-22 Plus-Up Environmental Assessment Joint Base Elmendorf-Richardson, AK – Draft
– April & June 2011
Updated on 10/18/2019 12:42 PM 10
2010 Zone 2 & 3 Management Area Annual Report – Final, dtd. March 2011
Letter Report for the Excavation and Disposal of Contaminated Soil at Site SD15 – Final
– April 2011
Letter Report for the Treatment System Removal at SS43, ST32 Tank 7, and ST68 –
Final – April 2011
OT092 Fuel Pipeline Decommissioning Report – Final – April 2011
2010 Zone 1 Field Activities Report – Final – April 2011
Project Summary Report ST32 Pipeline Demolition – CD-ROM
Work Plan/Quality Assurance Program Plan and Health and Safety Plan for the SD15
Limited Site Assessment – Final – April 2011
Memorandum to the Site File – Elmendorf Air Force Base Operable Unit 2 – ST41
Joint Base Elmendorf-Richardson Community Environmental Board Meeting – Agenda -
Spring 2011
Engineering Evaluation/Cost Analysis Small Arms Range (MRA 2001/MRS SR001) and
Suspected (sic) Skeet Range (MRA 2003/MRS TS003) – Revised Draft Final – March
2012
LF04 Debris Survey Database (Updated Fall 2010)
Final Letter Work Plan Operable Unit 5 Engineered Wetland Remediation System
Quarterly Monitoring, and Operation and Maintenance – June 2011
Quality Program Plan for Evaluating Ship Creek Hydrology Near Site LF59 and
Optimizing Early Warning/Sentry Well (+ CD-ROM) – Final – August 2011
Work Plan Environmental Remedial Action – Operations and Long-Term Monitoring and
Maintenance (+ CD-ROM) – Final – August 2011
Work Plan Addendum for a Field Verification Test of Enhanced Natural Attenuation at
the DP98 Site (+ CD-ROM) – August 2011
Joint Base Elmendorf-Richardson Community Involvement Plan – Final – September
2011
2011 Drilling in the WP14 OU6MW-46 Plume – Final October 2011
Site Closure Report ST69 (CD-ROM) Final – March 2012
Nike Site Summit – Remedial Field Investigation Report – 3 Volumes – May 2012
Five Year Review and Land-Use Control Compliance Reports Technical Memorandum –
673d CES Environmental Restoration Program Sites – Final – June 2012
Preliminary Assessment/Site Investigation Report – AT032 Airborne Training Facility
(FTR255) – Final – April 2013
Site Closure Report TU046 – Building 750 (FTRS-46) Final – April 2013
Proposal to Relocate the 18th Aggressor Squadron (18AGRS) from Eielson Air Force
Base (EAFB), Alaska to Joint Base Elmendorf-Richardson (JBER), Alaska and to Right-
Size the Remaining Wing Overhead/Base Operating Support at EAFB, Alaska – Draft
Environmental Impact Statement – May 2013
SS047 Nike Site Summit Administrative Record and Proposed Plan for Remedial Action
handouts – July 2013
Third CERCLA Five-Year Review for JBER – Elmendorf – February 2013
Fourth CERCLA Five-Year Review for JBER – Elmendorf – March 2014
Five-Year Review Findings Environmental Restoration Program Joint Base Elmendorf-
Richardson, Alaska – June 2014
Updated on 10/18/2019 12:42 PM 11
Military Munitions Response Program – Site Closure Report JBER-Elmendorf MMRP –
Final March 2014
SS047 Nike Site Summit – Supplemental Feasibility Study – Draft – February 2015
SS047 Nike Site Summit – Supplemental Feasibility Study – Final – May 2015
Proposed Plan for SS090 – Barracks Construction Dieldrin Spill Site, JBER – CD-ROM
– July 2016
Proposed Plan for Remedial Action Nike Site Summit (SS047) – October 2016
Record of Decision SS047 (Nike Sit Summit) Joint Base Elmendorf-Richardson, Alaska
– Draft – February 2017
Community Environmental Board & Nike Site Summit Public Meeting Transcript –
SS047 (Nike Site Summit) – Final – February 2017
Record of Decision SS047 (Nike Site Summit) Joint Base-Elmendorf-Richardson, Alaska
– Draft – May 2017
Proposal to Improve F-22 Operational Efficiency at Joint Base Elmendorf-Richardson,
Alaska – Draft Environmental Impact Statement – Executive Summary – July 2017
Environmental Restoration Program – Record of Decision SS090 – Barracks
Construction Dieldrin Spill Site – Final – April 2017
Environmental Restoration Program – Interim Remedial Action Completion Report Site
LF059 – Final – January 2017
Environmental Restoration Program – AT035 Remedial Investigation / Feasibility Study
Management Plan – Final – September 2017
Proposal to Improve F-22 Operational Efficiency at Joint Base Elmendorf-Richardson,
Alaska – Final Environmental Impact Statement – February 2018 – Executive Summary
Environmental Restoration Program – Explanation of Significant Differences SD025 –
Final – March 2017
Decision Document – SS047 (Nike Site Summit) Joint Base Elmendorf-Richardson,
Alaska – Final – September 2017
Record of Decision – SS047 (Nike Site Summit) Joint Base Elmendorf-Richardson,
Alaska – Final – July 2017
Draft Final Supplemental Comprehensive Site Evaluation (CSE) Phase II Report Davis
Range A (FR006), Anti-Aircraft Range – TD (FR014), and Anti-Aircraft Range No. 1
(FR015) Munitions Response Areas – May 2018
Environmental Restoration Program – Preliminary Source Evaluation 2 Report SS120 –
Final – April 2019
Environmental Restoration Program – DP009 – Building 986 Dry Well Supplemental
remedial Investigation Report – Final – September 2019
Environmental Restoration Program – AT029 – Ruff Road Fire Training Area
Supplemental Remedial Investigation Report – Final – July 2019
Environmental Restoration Program – SS019 – Building 755 Remedial Investigation
Report – Final – September 2019
Environmental Restoration Program – Feasibility Study SS109 – F-22 Weapons Release
Shop – Final – September 2019
Updated on 10/18/2019 12:42 PM 12
Joint Pacific Alaska Range Complex
Joint Pacific Alaska Range Complex EIS. Vols. 1-2, Executive Summary, and CD-
ROMS – Draft – March 2012
K
Katmai National Park and Preserve
Hunting Guide Concessions Environmental Assessment (to be removed from shelves July
24th, 2012)
Wildland Fire Management Plan Environmental Assessment – November 2012
Kenai Peninsula Borough
See also: Lake and Peninsula Borough
Sterling Highway Milepost 45-60 Draft Supplemental Environmental Impact Statement
and Draft Section 4(f) Evaluation Appendices – Vols. 1-2 – March 2015
Seward Highway Milepost 75 to 90 Road and Bridge Rehabilitation Project –
Environmental Assessment – November 2016 (Shelved under Anchorage)
Sterling Highway Milepost 45-60 Final Environmental Impact Statement and Final
Section 4(f) Evaluation – March 2018
King Cove
King Salmon Air Station
Fact Sheets/Newsletters
Kodiak
Area Plan for State Lands – November 2003
See also Drury Gulch
Koliganek
Koliganek Airport Reconstruction – Draft Environmental Assessment – November 2012
Keystone Shipping Co., See Tanker Contingency Plans
Knik Arm
Knik Arm Bridge and Toll Authority Historic Preservation Plan – August 2007
Knik Arm Crossing – Final Environmental Impact Statement and Final Section 4(f)
Evaluation (4 binder set of; Chapters 1-3 + CD-ROM, 4-8, and two volumes of
appendices) December 18, 2007
Knik River Public Use Area Management Plan – Public Review Draft – March 2008
Kwigillingok
Kwigillingok Airport Improvements – Environmental Assessment - Draft – October 2014
Kuskokwim River. See Donlin Gold Project
L
Lake and Peninsula Borough
Public Notice of Application for Permit – Pebble Limited Partnership
Updated on 10/18/2019 12:42 PM 13
M
Marine Transport Lines, Inc., See Tanker Contingency plans
Missile defense system. See United States
Moses Point
Chemical Contamination Report
Draft Remedial Investigation
Draft Remedial Investigation Report Addendum
Final Remedial Investigation/Feasibility Study
Final Work Plan Remedial Investigation
Moses Point: A Summary of the 1999 Remedial Investigation
Moses Point Environmental Updates
N
National Petroleum Reserve – Alaska
Alpine Satellite Development Project
Public Notice Future Release of Exploration Data and Information (shelved under North
Slope)
Nelson Island
Draft Environmental Assessment Tununak Airport Improvements – June 2011
Joint Notice of Public Hearing and 45-Day Public Comment Period for the Modification
of FAA’s Preferred Airport Alternative and related actions for the 2018 Final
Environmental Impact Statement – June 2019
North Pole Area
Evaluation of Ground-Water Flooding Problems and Mitigation Alternatives for the
North Pole Area of Alaska
North Slope/ Outer Continental Shelf (OCS)
Colville River Unit Satellite Development Environmental Evaluation Document
OCS Preconstruction Air Quality Permit Package
Beaufort Sea, North Slope, and North Slope Foothills Areawide 2014 Competitive Oil
and Gas Lease Sales + Supplemental Public Notice Pursuant– October 2014
Decision on No Substantial New Information 2017 Beaufort Sea, North Slope, and North
Slope Foothills Areawide Lease Sales
Public Notice Future Release of Exploration Data and Information
Beaufort Sea Areawide 2017W, North Slope Areawide 2017W, and North Slope
Foothills Areawide 2017 Competitive Oil and Gas Lease Sales
Nuiqsut
Nanushuk Project – Final Environmental Impact Statement
Updated on 10/18/2019 12:42 PM 14
Northwest Area
Northwest Area Plan – Public Review Draft – April 2008
O
Oberon Fisheries
OPA Vessel Response Plan, See Tanker Contingency Plans
Oplan 19.1. See Elmendorf Air Force Base: Spill Response Operations Plan 19-1
Outer Continental Shelf (OCS). See also North Slope/Outer Continental Shelf (OCS)
Outer Continental Shelf Oil and Gas Leasing Program 2012-2017 – Draft Programmatic
Environmental Impact Statement – November 2011 – Vols. 1-3 + CD-ROM
P
Pebble Mine. See Lake and Peninsula Borough
Pipeline Contingency Plans (set – located at the end of the Public Review Documents Section)
Alyeska Pipeline Service Co.
o Trans-Alaska Pipeline System
BP Exploration Alaska
o Endicott Operations
o Greater Prudhoe Bay (incl. Alaska Clean Seas Technical Manual)
o Milne Point Operations
o Northstar Operations
See also Tanker Contingency Plans and Valdez Marine Terminal Plan
Pogo Gold Mine Draft Environmental Impact Statement (DEIS) Reviewers [Note 60-day
comment period. Remove from shelves May, 2003.]
Point Thomson
Point Thomson Project EIS - Draft Environmental Impact Statement Vols. 1-8, Executive
Summary, and CD-ROM in 2 parts. – November 2011
Poker Flat
Draft Environmental Impact Statement – Sounding Rockets Program at Poker Flat
Research Range – Vols. 1-2 – September 2012
Final Environmental Impact Statement – Sounding Rockets Program at Poker Flat
Research Range – Vols. 1-2 – July 2013
Polar Tankers, Inc., See Tanker Contingency Plans
Port Etches. See Prince William Sound
Pribilof Islands
ADEC/NOAA Pribilof Restoration Project (set)
Final Corrective Action Report, School UST Site (TPA 22-1)
Final Field Investigation Report St. Paul Island, Alaska Pribilof Islands Environmental
Restoration Project St. Paul Island, Alaska – June 23, 2005
Final Field Investigation Report St. Paul Island, Alaska – Appendix H
Final Field Investigation Report St. George Island, Alaska – June 23, 2005
Final Field Investigation Report St. George Island, Alaska – Appendix E
Updated on 10/18/2019 12:42 PM 15
Final Corrective Action Report Site 33/TPA Site 12c – Lukanin Bay PCS Site St. Paul
Island, Alaska – April 18, 2005
Final Site Characterization Plan Site 21, Two-Party Agreement Site 9f Cascade Building
(Old Coal Shed) Cascade Building Interior Characterization St. Paul Island, Alaska –
August 11, 2004
Prince William Sound
Prince William Sound Tanker Contingency Plan Review Process (ADEC) (Large set—
located after the Valdez Marine Terminal Plans)
Port Etches Barge Documents
Tanker Oil Discharge Prevention and Contingency Plan + SERVS Technical Manual SV-
140 + Revision 2 – November 2009
Tanker Oil Discharge Prevention and Contingency Plan + SERVS Technical Manual SV-
140 + Revision 3-4 – June 2011
Amendment 3 to the PWS Tanker ODPCP – June 2011
Amendment 4 to the PWS Tanker ODPCP and Revised Update Packet – August 2011
S
Saint George Island. See Pribilof Islands
Saint Lawrence Island
Saint Lawrence Island Cleanup (set)
St. Lawrence Island Tank Closure July 04
St. Lawrence Island Removal Action Report July 04
St. Lawrence Island Restoration Advisory Board Meeting Minutes – January 25, 2006
July 2006 Groundwater Sampling Report Revision 1 December 2006 - Gambell, Alaska
August 2006 Groundwater Sampling Report - Revision 1 - March 2007 –Gambell,
Alaska
August 2006 Groundwater Sampling Report – Final July 2007
Soil and Debris Removal Action Report – Draft-Final - March 2007
Soil and Debris Removal Action Report – Final May 2007
Soil and Debris Removal Action Report – Revised Final September 2007
Northeast Cape FUDS Final Feasibility Study - Volume 1 – March 2007
Response to Comments – May 2007
Geophysical Survey Work Plan Northeast Cape FUDS – June 2007
Proposed Plan Northeast Cape Air Force Station Formerly Used Defense Site – July 2007
Meeting Minutes - Public Meeting Notes
Geophysical Survey Northeast Cape FUDS #F10AK096905 – Draft Submittal – October
2007
Northeast Cape Responsiveness Summary HTRW Proposed Plan – February 2008
ADEC Comments on the Northeast Cape Proposed Plan – October 2007
Northeast Cape Proposed Plan Comment Meeting Held September 19, 2007 in Savoonga,
AK and September 19 & 20, 2007 in Gambell, Alaska
Updated on 10/18/2019 12:42 PM 16
Site 5 Decision Document FUDS – Project#: F10AK069603 - September 2007
Technical Memorandum - FUDS, June 20th and September 5th 2008
Project Closeout Report – Military Munitions Response Program (MMRP) – June 2008
Project Closeout Report – Hazardous, Toxic, and Radioactive Waste (HTRW) –
September 2008, January 2009
In-Situ Chemical Oxidation (Phase I) and Intrusive Drum Removal/Landfill Cap –
Sampling and Analysis Plan and Work Plan - Revision 1 – July 2009
Responsiveness Summary for the Site 7 Cargo Beach Road Landfill Proposed Plan,
Northeast Cape FUDS – May 2008
Proposed Plan – Northeast Cape – Site 7 Cargo Beach Road Landfill – May 2008
Decision Document - Site 7 Cargo Beach Road Landfill Contained Hazardous, Toxic,
and Radioactive Waste (FUDS) – June 2009
Site 7 Landfill Cap Construction Completion Report – Final – May 2010
Northwest Cape HTRW Remedial Actions – Work Plan & Sampling and Analysis Plan –
Revision 1 – June 2010
Main Operation Complex Area Phase I In-situ Chemical Oxidation – Summary Report –
Final – August 2010
Northeast Cape HTRW Remedial Actions Contract No. W911KB-06-D-0007 FUDS No.
F10AK096903 – Work Plan – Revision 0 – May 2011
Northeast Cape HTRW Remedial Actions – Final Report July 2011
Northeast Cape HTRW Remedial Actions – Work Plan Revision 0-1 July 2011, July
2012
Northeast Cape HTRW Remedial Actions – Site 28 Technical Memorandum Revisions 0,
1 – October 2011, February 2012
Northeast Cape HTRW Remedial Actions – Final Removal Action Report – February
2012 & June 2012
Northeast Cape HTRW Remedial Actions Contract No. W911KB-12-C-0003 – Work
Plan – Revision 0 – May 2012
Trip Report – Northeast Cape Formerly Used Defense Site – December 12-14, 2011
Northeast Cape HTRW Remedial Actions – Site 28 Phase I Sediment Removal Report –
Revision 0 – December 2012
Northeast Cape HTRW Remedial Actions – Draft Removal Action Report – Revision 0 –
February 2013
Northeast Cape HTRW Remedial Actions Work Plan – Revision 0 – March 2013
Final Site 28 Technical Memorandum Addendum – Revision 1 – January 2013
Northeast Cape HTRW Remedial Actions – Site 28 Phase I Sediment Removal Report –
Revision 2 – May 2013
Northeast Cape HTRW Remedial Actions – Remedial Action Report – Vols. 1-2 –
Revision 1 – May 2013
Northeast Cape HTRW Remedial Actions Work Plan – Vols. 1-2 – Revision 1 – June
2013
Revision 0 Northeast Cape HTRW Remedial Actions Report – Vols.1-2 – January 2014
Revision 0 Northeast Cape HTRW Remedial Actions Work Plan – Vols. 1-2 – March
2014
Revision 1 Northeast Cape HTRW Remedial Actions Work Plan – December 2014
Updated on 10/18/2019 12:42 PM 17
Revision 1 Northeast Cape HTRW Remedial Actions Report – January 2015
First Five-Year Review Report Northeast Cape FUDS – Final – February 2015
First Periodic Review Report – Site 7 Cargo Beach Road Landfill Northeast Cape FUDS
– Final – February 2015
2014 Remedial Action Report – Revision 1 – April 2015
Northeast Cape FUDS 2016 Groundwater Monitoring at the Main Operations Complex
and Other Field Activities Work Plan – Draft – June 2016
Northeast Cape FUDS Long Term Management Plan – Draft Final – June 2016
Northeast Cape Re-Evaluation of Human Health Risk at Sites 21 and 28 Northwest Cape
FUDS – Final – June 2016
2015 Landfill Periodic Visual Inspection Report – Final – April 2016
2015 Annual Groundwater Sampling Report – Final – April 2016
2014 Remedial Action Report – Final – May 2016
2016 Groundwater Monitoring at the Main Operations Complex and Other Field
Activities Work Plan – Final – August 2016
Long-Term Management Plan Northeast Cape FUDS – Final – September 2016
2016 Site 8 and Suqi River Surface Water and Sediment Sampling Report – Draft –
April 2017
2016 Monitored Natural Attenuation Groundwater Annual Sampling Report at the Main
Operations Complex at Northeast Cape – Draft – April 2017
2016 Monitored Natural Attenuation Groundwater Annual Sampling Report at the Main
Operations Complex at Northeast Cape – Final – August 2017
2016 Site 8 and Suqitughneq River Surface Water and Sediment Sampling Report – Final
– September 2017
Saint Paul Island. See Pribilof Islands
Sand Point
Harbor Improvements: Final Interim Feasibility Report and Environmental Assessment
SeaRiver Maritime, Inc., See Tanker Contingency Plans
Seward Peninsula. See also American River, Davidson’s Landing, Moses Point.
Seward Peninsula Federal Subsistence Regional Advisory Council – Meeting Materials
March 9-10, 2010, Nome
Source Water Assessments. See ADEC Source Water Assessments.
Spectacled eider. See Eider
St. George Island. See Pribilof Islands
St Lawrence Island. See Saint Lawrence Island
Stony River
Draft Environmental Assessment Stone River Airport Improvements Project No. 51797 –
February 2003 (removed from Public Review for cataloging)
St. Paul Island. See Pribilof Islands
Standard Steel. See Anchorage
Steller’s eider. See Eider
Susitna Area
Updated on 10/18/2019 12:42 PM 18
Southeast Susitna Area Plan (Revising the entire Willow Sub-Basin Area Plan and a
Portion of the South Parks Highway Subregion of the Susitna Area Plan.) Public Review
Draft – January 2008
Site Inspection Report Susitna Gunnery Range (FUDS) – Final – March 2008
Munitions and Explosives of Concern (MEC Support During Hazardous, Toxic, and
Radioactive Waste (HTRW) and Construction Activities – August 2004
Former Susitna Gunnery Range Public Involvement Plan - South-Central Alaska – Final
– December 2008
Susitna Gunnery Range FUDS Public Meeting Wasilla, Alaska February 18, 2010
Susitna Matanuska Area Plan – Draft – February 2010
Approved Revisions and Issue Response Summary – Susitna Matanuska Area Plan -
2011
Final Remedial Investigation – Feasibility Study (RI/FS) Work Plans. Former Susitna
Gunnery Range FUDS Project #: F10AK022506 March 30, 2011
Remedial Investigation (RI) Report – Former Susitna Gunnery Range FUDS – July 12,
2012
Feasibility Study (FS) Report – Former Susitna Gunnery Range FUDS Project Number:
F10AK022506 April 24, 2013
Draft Final Proposed Plan Former Susitna Gunnery Range FUDS Southcentral Alaska –
February 2014
Susitna Gunnery Range Public Meeting – February 26, 2014
Proposed Plan Former Susitna Gunnery Range FUDS Southcentral Alaska – March 24,
2014
T
Tanker Contingency Plans (set located at the end of the Public Review Documents section).
See also Pipeline Contingency Plans, Prince William Sound, Valdez Marine Terminal Plan
Note: This set is currently unavailable (an astrix* indicates that the item is still on the shelf).
Alaska Tanker Co.
o Integrated Vessel Response Plan (Version 5) Update.
o Integrated Vessel Response Plan (Version 4) Update
o *Integrated Vessel Response Plan, Amendment Version 15 – November, 2007
BP Oil Shipping Co.
Keystone Shipping Co.
Marine Transport Lines, Inc.
OPA Vessel Response Plan
Polar Tankers, Inc.
o *Conoco Philips Marine Vessel Response Plan/Shipboard Pollution
Emergency Plan (3 Volumes)
◦ *Vessel Response Plan & Shipboard Oil Pollution Emergency Plan Revisions 22-25,
27-37 with CD-ROMs
Updated on 10/18/2019 12:42 PM 19
o *Vol. 1 & 2 Vessel Response Plan Updates
o *Vol. 1 & 2 Vessel & Shoreside Personnel
o Field Digest of Vessel Response Plan and Pre-fire Plan – Revisions 32, 34-37
Seariver Maritime, Inc.
Tesoro Alaska Petroleum Co.
Tesoro Alaska Petroleum Co., See Tanker Contingency Plans
Tony Knowles Coastal Trail. See Anchorage
Trans-Alaska Pipeline. See also Pipeline Contingency Plans (Alyeska Pipeline Service Co.)
Trans-Alaska Pipeline System (TAPS) Right-of-Way Renewal Documents,
Environmental Impact Statement, and Newsletter (set)
Trans-Alaska Pipeline System: A Comprehensive Monitoring Program Report Examining
Grand and Lease Compliance
Joint Pipeline Office Comprehensive Monitoring Program: Taps Maintenance &
Sustained Useful Life January 2001-May 2002
Trans Alaska Pipeline System Pipeline Oil Discharge Prevention and Contingency Plan
Region 5 PLMP 647.8 to PLMP 800.0 CP-35-1 Region 5
Trans Alaska Pipeline System Pipeline Oil Discharge Prevention and Contingency Plan –
CP-35-1 Edition 1 Revision 0 – Vols.1-4
Trans Alaska Pipeline System Pipeline Oil Discharge Prevention and Contingency Plan –
CP-35-1 Edition 1 Revision 4 – December 2007
Gulkana Areas of Opportunity Amendment to the TAPS Pipeline Oil Discharge and
Prevention Plan
Copper River Areas Amendment to the TAPS Pipeline Oil Discharge and Prevention
Plan
Pump Station 03 Post SR Amendment to the TAPS Pipeline Oil Discharge and
Prevention Plan.
Field Digest of Vessel Response Plan – March 2008
Oil Spill Response Exercise Program for the Trans Alaska Pipeline System – January 1,
2007 - December 31, 2011
Trans Alaska Pipeline System Pipeline Oil Discharge Prevention and Contingency Plan –
CP-35-1 Public Review Draft 2011 – Vols. 1-4
Oil Spill Response Exercise Program for the Trans Alaska Pipeline System – January 1,
2012 to December 31, 2016
Trans Alaska Pipeline System Pipeline Oil Discharge Prevention and Contingency Plan –
CP-35-1 Request for Additional Information – Response to Public Review Draft - #1 &
#2 October and September 2011
Field Digest of Vessel Response Plan and Pre-Fire Plan – December 2011
CP-35-2 Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan –
Edition 5, Revision 4 (July 13, 2012)
Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan Draft B – Vols.
1-3 (March 2013), and SERVS Technical Manual (November 2012)
Trans Alaska Pipeline System Pipeline Oil Discharge Prevention and Contingency Plan –
CP-35-1, Public Review Draft 2016 (CD-ROM)
Updated on 10/18/2019 12:42 PM 20
Proposed amendment to CP-35-1, Trans Alaska Pipeline System Oil Discharge
Prevention and Contingency Plan, State Contingency Plan Number 11-CP-4071 –
November/December 2016
U
Umiat
Nuiqsuit Restoration Advisory Board (RAB) Meeting Notes and Presentation July 9,
2002
Restoration Advisory Board (RAB) Meeting Notes and Presentation April 8, 2003
Umiat Cleanup (Set)
Umnak Island
Public Involvement Plan Remedial Investigation/Feasibility Study - Former Fort Glenn,
Umnak Island, AK FUDS#: F10AK029805 – Final (Redacted) - April 2011
Work Plan Remedial Investigation/Feasibility Study - Former Fort Glenn, Umnak Island,
AK FUDS#: F10AK029805 – Final (Redacted) - May 2011
Remedial Investigation of OB/OD Area. Former Fort Glenn. Final – March 2012
Feasibility Study of OB/OD Area. Former Fort Glenn. Final – March 2012
Fort Glenn Formerly Used Defense Site Military Munitions Site Prioritization Protocol –
September – 2013
Feasibility Study of OB/OD Area at the Former Fort Glenn – January 2014
Proposed Plan OB/OD (MRS-04) Area and Remaining OB/OD Area (MRS-14) Military
Munitions Response Program, Former Fort Glenn – April 2014
Unalaska Island. See Amaknak and Unalaska Islands
United States
Emergency Watershed Protection Program: Draft Programmatic Environmental Impact
Statement
Ground-based Midcourse Defense Validation of Operational Concept
Supplemental Environmental Assessment
National Missile Defense Deployment
Non-Stockpile Chemical Material Information Repository Products
North Pacific Targets Program: Environmental Assessment
Transportable Treatment Systems for Non-Stockpile Chemical Warfare Material
United States Air Force: Elmendorf Air force Base. See Joint Base Elmendorf-Richardson.
United States Army, Alaska
Stationing and Training of Increased Aviation Assets within U.S. Army Alaska
Environmental Impact Statement – Draft – April 2009
United States Army: Fort Richardson. See Fort Richardson
V
Valdez
Valdez Marine Terminal Plan (1997) (large set located after the Tanker Contingency
Plans)
Updated on 10/18/2019 12:42 PM 21
Valdez Marine Terminal Plan (1999) (Located after the Tanker Contingency Plans)
Valdez Marine Terminal Plan (2001) (Located after the Tanker Contingency Plans)
Valdez Marine Terminal Plan (2007) (Located after the Tanker Contingency Plans)
Valdez Marine Terminal Plan - Oil Discharge Prevention and Contingency Plan – CP-35-
2 – 5th Edition. May 2008
Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan – CP-35-2 –
Edition 4, Revision 14 (amendment)
Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan – CP-35-2
– RFAI Response #2 – February 2008
Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan – CP-35-2
Update for Edition 5, Revisions: 1 (July 16, 2008), 2 (February 24, 2010), 3 (June 13,
2011)
Valdez Maritime Terminal Settlement Pond Tactical Guide (October 2001)
Navigation Improvements Valdez, Alaska – January 2010
Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan – CP-35-2 –
Draft C – Revision 0 – Vols. 1-3 (Redline and Clean Copy for each volume), RFAI
Responses & CD- ROM - July 2014
Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan (ODPCP)
ADEC Plan Number 14-AP-4057 – Amendment 2015-1 – July 2015
Port Valdez Sensitive Areas Tactical Guide (September 2002)
Y
Yukon
Proposed Land Exchange Yukon Flats National Wildlife Refuge Draft Environmental
Impact Statement – CD-ROM - DOI DES 97-62 – January 2008
Yukon Tanana Area Plan – Public Review Draft – July 2012