ACER Opinion 08-2014Document title:
Publishing date: 09/04/2014
We appreciate your feedback
Please click on the icon to take a 5’ online surveyand provide your feedback about this document
ACERAgency for the Cooperationof Energy Regulators
OPINION OF THE AGENCY FOR THE COOPERATION OF ENERGYREGULATORS No 08/2014
of 4 April 2014
ON THE NATIONAL TEN-YEAR ELECTRICITY NETWORK DEVELOPMENTPLANS PURSUANT TO ARTICLE 8(1 1) OF REGULATION (EC) NO 714/2009
THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS,
HAViNG REGARD to Regulation (EC) No 7 1 4/2009 of the European Parliament and of theCouncil of 1 3 July 2009 on conditions for access to the network for cross-border exchanges inelectricity and repealing Regulation (EC) No 1228/2003 ‘, and, in particular, Article 8(1 1) thereof,
WHEREAS:
(1) Article 8(1 1) of Regulation (EC) No 714/2009 tasks the Agency for the Cooperation of EnergyRegulators (“Agency”) with providing an opinion on the national ten-year networkdevelopment plans to assess their consistency with the Community-wide ten-year networkdevelopment plan (“EU TYNDP”).
(2) On 5 July 2012 the European Network of Transmission System Operators for Electricity(“ENTSO-E”) published the first EU TYNDP pursuant to Regulation (EC) No 714/20092. TheAgency issued an Opinion on this EU TYNDP 2012 on 5 September 2Ol2. That Opinion couldnot include a consistency assessment of the national ten-year network development plans withthe EU TYNDP 2012 because, at that time, the relevant national ten-year network developmentplans were still being developed in most Member States. Since then many national plans havebeen finalised.
(3) Regulation (EC) No 714/2009 does not define the term “national ten-year network developmentplan”. Yet, Article 8(1 1) of Regulation (EC) No 714/2009 clarifies the meaning of “nationalten-year network development plan” when it considers “if such national ten-year networkdevelopment plan is elaborated in accordance with Article 22 of Directive 2009/72/EC”. Thisspecific reference to Article 22 of Directive 2009/72/EC of the European Parliament and of theCouncil of 1 3 July 2009 concerning common rules for the internal market in electricity andrepealing Directive 2003/54/EC4 implies that “national ten-year network development plans”,
‘OJL211, l4.8.2009,p. 15.2 ENTSO-E, “10-Year Network Development Plan 2012”, 5 July 2012.https://www.entsoe.eulfileadrni&useruploadllibrary/SDC/TYNDP/20 I 2/TYNDP_2012_report.pdf3 Opinion ofthe Agency for the Cooperation ofEnergy Regulators No 06/2012 of5 September 2012 on the EuropeanTen-Year Network Development Plan,http://www.acer.europa.eulOfficial documents/Acts of the Agency/Opinions/Opinions/ACER%200pinion%2006-2012pdf4 oi L 21 1, 14.8.2009, p. 55.
Page 1 of3O
ACERAgency for the Cooperationof Energy Regulators
pursuant to Article 8(1 1) of Regulation (EC) No 714/2009, cover not only the national ten-yearnetwork development plans elaborated by independent transmission operators in accordancewith Article 22 of Directive 2009/72/EC, but also other network development plans adopted atnational level, including those prepared by independent system operators or transmissionsystem operators. It is clear from Article 22 of Directive 2009/72/EC that the national ten-yearnetwork development plans of independent transmission operators shall indicate transmissioninfrastructure which needs to be built or to be upgraded over the next ten years to guarantee theadequacy of the system and the security of supply. A similar clarification by the legislator ismissing for other national ten-year network development plans. However, the Agency believesthat the aforementioned main purpose and key elements of national network development plansin Article 22 of Directive 2009/72/EC are of such an essential nature that they shall beconsidered as characteristic of any national ten-year network development plan within themeaning of Regulation (EC) No 714/2009. Accordingly, the Agency, for this Opinion, focusedits assessment on national instruments concerning the planning of new transmissioninfrastructures, and as such on the substance and not on the form of the national networkdevelopment plans. Thus, the Agency considered in this Opinion all relevant national planninginstruments, even if they were referred to with a different title, e.g. investment plan5, as“national ten-year network development plans” pursuant to Article 8(1 1) of Regulation (EC) No714/2009 (hereinafter altogether “national development plans”).
(4) National regulatory authorities (“NRAs”) have provided essential information for this Opinionby submitting information on national components of transmission investments6 to the Agencythrough an online data collection (completed on 14 February 2014) and by identifying some keyfeatures of their national development plans in responses to a questionnaire (completed on 26February 2014). This information is summarised in Annex I and in Annex II to this Opinion,respectively,
HAS ADOPTED THIS OPINION:
1. Introduction
In the Agency’ s view, the assessment of consistency of national development plans with the EUTYNDP may cover in principle three fundamental aspects:
. consistency of inputs;
. consistency of analytical methodology;
. consistency of outputs.
5 The Agency took also into account that in the European Commission “Proposal for a Regulation of the EuropeanParliament and of the Council Amending Regulation (EC) No 1228/2003 on conditions for access to the network forcross-border exchanges in electricity”, Brussels, 19.9.2007, COM(2007) 53 1 fmal, 2007/0198 (COD), it was proposedthat ‘The European Network of Transmission System Operators for Electricity shall adopt (...) a 10-year investmentplan’, with the same features that the EU TYNDP has, pursuant to the adopted Regulation (EC) No 714/2009.6 In this Opinion, “national component” means a national part of a transmission investment item (part of a line or cableinterconnecting two or more countries or a line or substation or other equipment geographically located in one country).
Page2of3ON5
ACERAgency for the Cooperationof Energy Regulators
The first two aspects are still under development at European level7 and therefore methodologiesfor the consistent elaboration of network development plans are not yet available. In the Agency’sview, without such EU-wide methodologies it is not ensured that the national development plansand the EU TYNDP 2012 have a common input basis and a common analytical methodology whichwould allow a reliable assessment of consistency of outputs.
Therefore, in this Opinion the Agency compares the national development plans with the EUTYNDP 2012 and outlines relevant (matches and) differences, but deems it appropriate to refrainfrom qualifying the differences as inconsistencies pursuant to Article 8(1 1) of Regulation (EC) No714/2009. In particular, the Agency has decided to focus this Opinion on the comparison of outputsof national development plans with:
. the main output ofthe EU TYNDP 2012, i.e. the list ofprojects ofpan-European significance inAppendix 1 of the EU TYNDP 2012 (and its further disaggregation into investment items8)(Section 3 ofthis Opinion);
. the further outputs of the EU TYNDP 2012, i.e. the features which are presented for eachproject or investment item ofpan-European significance (Section 4 ofthis Opinion).
The interaction between the national development plans and the EU TYNDP is relevant for thecomparison of outputs of national development plans with regard to those of the EU TYNDP 2012.Therefore, as a preparatory step for this comparison, the Agency first analyses this interaction(Section 2 ofthis Opinion).
2. The interaction between the national development plans and the EU TYNUP
With regard to the relationship between national development plans and the EU TYNDP, theAgency took into account:
. the process of interaction between the national development plans and the EU TYNDP, takinginto account the provisions of Articles 8(10) and (11) of Regulation (EC) No 714/2009 and ofArticle 37(1)(g) ofDirective 2009/72/EC, and
. the timing of preparation of the national development plans and the timing of preparation of theEU TYNDP 2012.
7 Such activities are ongoing, see ENTSO-E “Guideline to Cost Benefit Analysis of Grid Development Projects”, 14November 2013 and ENTSO-E activity (scenarios and visions) to prepare input data for the TYNDP 2014,https://www.entsoe.eulfileadmim’userupload/library/events/Workshops/CBA!l3 1 1 14_ENISO-E_CBA_Methodology.pdf.8 The comparison with regard to the TYNDP has been performed with reference to investment items, as disaggregatedin the ENTSO-E “2013 Monitoring update ofthe TYNDP 2012 Table ofprojects”, 1 July 2013, Annex 1 — Monitoringupdate TYNDP 2012 Table of Projects,https://www.entsoe.eulflleadminluseruploadllibrary/SDC/TYNDP/2012/1 3070 l_Monitoring_update_TYNDP_2012_Table_of_projects FINAL.pdf.
Page 3 of 30
ACER— Agency for the Cooperation— of Energy Regulators
The process of interaction is graphically depicted in Figure 1 : the national development plans (inparticular, their “cross-border” part, coloured in light-blue in Figure 1) contribute as building blocksof the EU TYNDP, together with the regional investment plans and the regional and Europeanstudies performed in the EU TYNDP framework. The regional and European studies areparticularly focused on the investments which have a cross-border nature (interconnectors orinternal network elements which affect cross-border transfer capacities) and can identify improvedplanning solutions, to be included in the next national development plans (or in amended plans,coloured in green in Figure 1). The “internal” part of national development plans is updated overtime without interactions with other national development plans and the EU TYNDP (horizontaldashed blue lines in Figure 1).
After the preparation of the EU TYNDP, in the drafting phase of national development plans“succeeding” the EU TYNDP, the Agency and NRAs — according to their respective competencesand duties - assess the consistency of the national development plans with the EU TYNDP.Furthermore, the Agency and NRAs — again, according to their respective competences and duties -
can recommend amending the plans9.
9 iiis may recommend to amend (only) national plans.
Page 4 of 30
‘N
Figure 1 : The process of interaction between the national development plans and the EU TYNDP
NationalPlan
ACEROpinion on
draft TYNDP
. _iNational
Plan
ACERAgency for the Cooperationof Energy Regulators
While the process of interaction in Figure 1 is relatively simple, the assessment of the Agencyrevealed significant complexities due to the widely different timing of preparation of nationaldevelopment plans across the European countries.
Figure 2 displays the timing of publication of a (usually draft) national development plan by a ISOand of its submission to the national competent authority(ies)’°. When applicable, the nationaldevelopment plan “preceding” the EU IYNDP 2012 (coloured in blue) and the (first) nationaldevelopment plan “succeeding” the EU TYNDP 20 12 (coloured in green) are presented. The orangevertical lines correspond to the main milestones ofthe EU TYNDP 2012:
. publication of the draft EU TYNDP 2012 by ENTSO-E and its submission to the Agency for itsopinion (5 and 6 July 2012);
. publication of the Agency’ s Opinion, which did not recommend any amendments of the draftEU TYNDP 2012 (5 September 2012).
Considering that, currently, the very large majority of countries publish national development plans,the Agency deems that it is good practice to publish a national development plan”.
10 Publication and submission are in many cases at the same point in time. for a few countries, there is no submission toNRAs. In such cases, the date ofpublication is indicated.11 This is without prejudice to submission of any confidential additional information from a ISO to its NRA, pursuantto national legislations or regulations.
Page 5 of 30
0
ACERAgency for the Cooperation
— of Energy Regulators
Figure 2: The timing of preparation of national development plans and of the EU TYNDP 2012
Country Frequency Plan Year2Oll Year2Ol2 Year2Ol3 2014
ofplan ‘preceding’ i F M A M i i A S 0 N 0 i F M A M i JA SO N D J F M A M i J A S 0 N 0 JIM
Austria 1-year
Croatia 1-year 2
Cyprus 1-year . 3
Czech Republic 1-year — mFrance 1-year
Germany 1-year •Great Britain 1-year •Greece 1-year Dec D9
Lithuama
EEE:EEREE!EE
Slovak Republic 1-year 6
Denmark 2-year Nov-09 •Finland 2-year 4
The Netherlands 2-year
Norway 2-year
Portugal 2-year Jul08Romania 2-year 5
Slovenia 2-year
Sweden 2-year 8
Poland 3-year - — —
Belgium 4-year
Spain 4-year Jul 07 ______________ • 7
Estonia np.
‘.uxembourg np.
Malta: no transmission plan (as there exists no transmission system operator)1 - Belgium: the process for the national plan after ENTSO-E TYNDP 2012 has not started yet2- Croatia: before TYNDP 2012, there was a 3-years investment plan of Croatian TSO approved by NRA
3- Cyprus: the process forthe national plan after ENTSO-ETYNDP 2012 is not available
4- Finland: the TSO published a presentation ‘National ten-yeargrid development plan for Finland, 12/2012”
5 - Romania: the process for the national plan after ENTSO-E WNDP 2012 is ongoing (consultation phase in Feb 2014)
6- Slovak Republic: publication expected in Q120147- Spain: 1st submission to the NRA in September 2013, 2nd submission expected in March 2014
8- Sweden: Svenska kraftnät published no dedicated Swedish plan before July 2012
Figure 2 also identifies different frequencies in preparing national development plans (see Annex IIto this Opinion for more details), with the large majority of countries having either a yearly or abiennial frequency.
The Agency deems it necessary that national development plans are prepared at least every twoyears, in order to allow for consistency ofnational development plans with the EU TYNDP.
Furthermore, the Agency finds that about half of the 1 3 countries with a yearly frequency encounterdelays or difficulties in fulfilling the different steps of the process of preparation of the nationaldevelopment plan’2.
If difficulties are encountered with an annual frequency, the Agency recommends the relevantNRAs to examine the possibility to shift to a biennial frequency and to advise Member States about
12 The preparation of the national development plan can include: analysis and drafting by the ISO, consultation fromTSO and/or from NRA (when applicable), approval or opinion from NRA (as applicable), approval from Ministry(when applicable).
Page 6 of 30
ACERAgency for the Cooperation
— of Energy Regulators
this possibility, according to the results of the NRA assessment. National development plans with abiennial frequency could be usefully accompanied by a monitoring update in the years when theplan is not prepared (similarly to the practice ofENT$O-E in 2013).
3. Comparison of investments listed in national development plans and in EU TYNUP 2012
3 . 1 Investment items in the EU TYNDP 2012 package (including Regional Investment Plans 2012)which are not included in national development plans
Based on the online data submissions by NRAs’3, the Agency identifies 5 1 national components’4of transmission investments in the ENT$O-E TYNDP 2012, which are not included in nationaldevelopment plans (see Table 1 in Annex I to this Opinion).
The reasons for non-inclusion are summarised by Figure 3 in Annex I to this Opinion. In general,the following (actual or potential) reasons have been detected:
. the investment is not included because the national development plan was prepared beforeENTSO-E TYNDP 2012;
. the investment is no longer included because it has been meanwhile commissioned;
. the investment is no longer included because it has been meanwhile cancelled;
. the (very long term) investment is not included because the timespan of the nationaldevelopment plan is shorter than the one of ENT$O-E TYNDP 2012;
. the investment is not included because its voltage level is not considered in the nationaldevelopment plan;
. the investment is not included because it does not fulfil another criterion for inclusion in theplan;
. the third party projects (TPPs) are normally not included in the national development plan’5;
. the investment is not carried out by the TSO and it relates to a non-T$O network;
. there is no agreement on the investment among neighbouring TSOs;
. the initiative under consideration did not (yet) become a planned investment;
. the investment is likely to be part of a wider reinforcement project, but it is not explicitlymentioned in the national development plan.
Furthermore, the Agency identifies 24 national components’6 of transmission investments in theENT$O-E Regional Investment Plans 2012, which are not included in national development plans(see Table 2 in Annex I to this Opinion).
13 When possible, the comparison has been performed between the EU TYNDP 2012 and a national development plan“succeeding” EU TYNDP 2012.14 This figure includes 8 investments in Germany which have been proposed in the draft plan of 2013, but were notapproved by the German NRA.15 This is the case for one investment included in the EU TYNDP (as TSO project), currently being considered as thirdparty project.16 Also the previous 5 1 national components of the EU TYNDP are included in the ENTSO-E Regional InvestmentPlans 2012. The additional 24 national components are investments which are not included in the EU TYNDP 2012.
Page 7 of 30
ACERAgency For the Cooperationof Energy Regulators
The reasons for these differences are summarised by Figure 4 in Annex I to this Opinion.
The Agency considers it as important that ENTSO-E and its TSO members take into account thefindings presented above in their upcoming preparation of the draft EU TYNDP 2014. In particular,considering the diverging or missing information in the NRA assessment of interconnection lines,ENTSO-E should carefully study the following investments:
. 1 6.3 8 Gatica (ES) - Aquitaine (FR);
. 23 .60 under consideration (FR) - under consideration (BE), updated in 201 3 as AvelinlMastaing(FR) - Horta (BE);
. 26.66 Prati di Vizze (IT) - Steinach (AT);
. 27.A96 New interconnection between Italy and Slovenia, updated in 2013 as Slovenia (SI) —
Salgareda (IT);. 3 5 . 1 3 8 tbd (CZ) - South-Eastern 50 Hertz (DE);. 381 Visaginas (LT) - Liksna (LV).
Out of the 75 (5 1 and 24) national components identified above, 24 were not included in nationaldevelopment plans because of cancellation and 12 were not included because of commissioning.Further analysis reveals that only about half of the national development plans list investmentswhich were present in the previous national development plan and are commissioned or cancelledbefore issuing the next national development plan (see Annex II to this Opinion for more details).
In line with its Opinion on the EU TYNDP 2012 and the remarks on cancelled projects providedtherein’7, the Agency considers that full transparency on the evolution of investments should beprovided in national development plans, especially on cancelled investments. It is thereforeimportant to keep the commissioned and cancelled investments in the national development plan
(for one subsequent edition) too. The reason for cancellation should be displayed for eachinvestment.
Finally, the Agency observes that in a few cases - in particular for investments under consideration -
the EU TYNDP 2012 did not provide details or sufficient clarity in investment descriptions, forexample substations t.b.d. (to be defined).
This is acceptable when studies for the investment are still ongoing. However, this approach cancreate difficulties in assessing the consistency of investments and in future monitoring of theirimplementation.
Therefore, the Agency believes it is important that, as soon as an investment under considerationdevelops, complete descriptions are provided in the concerned national development plan(s) and inthe EU TYNDP.
‘7 Agency Opinion on the ENTSO-E TYNDP 2012, p. 16.
Page8of3O
N
ACER— Agency for the Cooperation— of Energy Regulators
3 .2 Investments in national development plans which are not included in the EU TYNDP 20
In the EU TYNDP 2012, none of the 5 TPPs having applied for inclusion met the criteria set out byENT$O-E, thus none of these TPPs has been taken into account during the development of the EUTYNDP and has been included in the table of projects’8.
Based on the online data submissions by NRAs, the Agency identifies 1 0 TPPs which are included(or at least referred to) in national development plans. These TPPs are listed in Table 3 in Annex Ito this Opinion.
Further analysis reveals that only few national development plans occasionally present TPPs (seeAnnex II to this Opinion for more details). In its Opinion on the EU TYNDP 2O12’, the Agencyemphasised the importance of ensuring equal treatment of TSOs’ projects and TPPs and, inparticular, recommended ENT$O-E to add in an appendix of future EU TYNDPs all the TPPswhich have applied for inclusion and to explain how they are treated in the EU TYNDP.
Similarly, the Agency deems it as useful that appendices are included in national development plansto provide information to stakeholders about non-TSO projects (as long as they had at least oneinteraction, for instance for connection, with the relevant TSOs). This inclusion would also allowimplementing the provision of Article 3(6) of Regulation (EU) No 347/2013 of the EuropeanParliament and of the Council of 1 7 April 2013 on guidelines for trans-European energyinfrastructure and repealing Decision No 1 364/2006/EC and amending Regulations (EC) No7 1 3/2009, (EC) No 714/2009 and (EC) No 7 1 5/200920, which requires proj ects of common interest
(including non-TSO projects) to become an integral part of national network development plans andother national infrastructure plans concerned, as appropriate.
furthermore, the Agency identifies 5 national components2’ planned by T50s22 that are notincluded in the EU TYNDP 2012 (see Table 4 in Annex I to this Opinion).The Agency deems it as critical that ENTSO-E and its TSO members consider these investments intheir upcoming preparation ofthe drafi EU TYNDP 2014.
4. Consistency of investment descriptions in national development plans
The EU TYNDP 2012 makes use of a project number (for each project of pan-Europeansignificance) and of an investment number (for each investment item).
The Agency believes that such practice can facilitate the assessment of consistency and themonitoring of investment implementation. Therefore, the Agency believes it is appropriate that a
1$ Annex I to ENTSO-E TYNDP 2012.19 Agency Opinion on the ENTSO-E TYNDP 2012, p. 8.20 o.i L 115, 25.4.2013, p. 39.21 This assessment is targeted to interconnection lines and to national investments affecting the cross-border transfercapacities.22 One of the national components (Italy - Malta interconnection) is not actually planned by a ISO, because Malta hasno transmission system operator. The investment interconnects the distribution system of Malta with Sicily region ofItaly.
Page 9 of 30
ACERAgency For the Cooperationof Energy Regulators
coding system (unique for each investment) is adopted in each national development plan.Furthermore, it is appropriate that each national development plan includes a mapping presenting,for those investments that feature also in the EU TYNDP or in Regional Investment Plans, a cross-reference between their codes in the different plans.
The EU TYNDP 2012 presents a summary table with project-by-project information, including23:
. expected commissioning date;
. present investment status;
. grid transfer capability increase;
. project costs.
The analysis of the Agency revealed that the large majority of national development plans provideinformation on commissioning date and on investment status. The majority of national developmentplans provide information on net transfer capacity (“NTC”) increase resulting from an investmentand on investment costs (see Annex II to this Opinion for more details).
The Agency therefore deems the systematic publication of the following information for eachinvestment item in the national development plans as a good, TYNDP-consistent practice:
. commissioning date;
. investment status;
. increase of net transfer capacity (only for investment with cross-border nature, i.e.interconnectors or internal network elements which affect cross-border transfer capacities);
. cost.
Done at Ljubljana on 4 April 2014.
For the Agency:
Iio PototschnigDirector
23 The presentation ofbenefits ofeach project is not discussed here, because it is subject to modifications with theforthcoming approval and application of the ENTSO-E cost benefit analysis methodology.
Page 10 of 30
Annex
I—
Co
mparison
of
investm
ents
in
natio
nal
dev
elo
pm
en
tplans
an
din
the
EN
T$O
-E
TY
ND
P2012
28
Nati
onal
Regula
tory
Auth
ori
ties
(AT
,B
E,
BG
,C
Y,
CZ
,D
E,
DK
,E
E,
EL
,E
S,
Fl,
FR
,G
B,
HR
,R
U,
IT,
IE,
LT
,L
U,
MT
,N
L,
NO
24
,P
L,
PT
,R
O,
SE
,S
I,5K
)part
icip
ate
din
the
pro
cess
,pro
vid
ing
their
inp
uts
on
nati
on
al
com
ponents
of
tran
smis
sio
nin
vest
men
tsb
y14
Feb
ruary
2014,
eit
her
for
all
com
pone
nts
(15
NR
As)
orfo
ra
part
oft
hem
(13
NR
As)
.N
oco
ntri
buti
onw
asre
ceiv
edfr
omL
Van
dN
I.
Tab
le1
:N
ati
onal
com
ponents
of
transm
issi
on
invest
ments
inth
eE
NT
SO
-ET
YN
DP
2012,
whic
hare
no
tin
clu
ded
inn
ati
on
al
dev
elo
pm
en
tpl
ans
Countr
yT
YN
DP
Sub
stat
ion
1S
ubst
atio
n2
Pro
ject
Des
crip
tion
Rea
son
for
abse
nce
2012
Cod
eN
ewdo
uble
circ
uit
400k
Vin
terc
onne
ctio
nth
roug
hth
epi
lott
unne
lo
fth
epl
anne
dB
renn
erB
ase
Tim
nel.
Tot
allin
ele
ngth
:65
km.
AT2
526
.66
Bor
der
wit
hIt
aly
(Pra
tiS
tein
ach
(AT
)U
pgra
deo
fth
eex
isti
ng44
kmP
rati
diV
izze
Non
-IS
Opr
ojec
tsar
eno
tin
the
nati
onal
diV
izze
)(I
T)
—S
tein
ach
(AT
)si
ngle
circ
uit
I10/
132k
VT
YN
DP
.O
HL
,cu
rren
tly
oper
ated
atm
ediu
mvo
ltag
e.
BE2
623
.60
Bor
der
wit
hF
ranc
eH
orta
(new
400-
kyF
ranc
e-B
elgi
umT
hein
vest
men
tis
not
incl
uded
beca
use
the
(Ave
linl
Mas
tain
g)su
bsta
tion
)(B
E)
nati
onal
deve
lopm
ent
plan
was
prep
ared
earl
ier
than
EN
TS
O-E
TY
ND
P20
12.
Itis
only
unde
rco
nsid
erat
ion
inan
earl
yph
ase
and
the
tech
nica
las
pect
sar
est
illto
bede
term
ined
.
BE
24.A
26H
orta
(BE
)D
oel/
Mer
cato
r(B
E)
Upg
rade
wit
hhi
ghpe
rfor
man
ceco
nduc
tors
.T
hein
vest
men
tis
not
incl
uded
beca
use
the
nati
onal
deve
lopm
ent
plan
was
prep
ared
earl
ier
than
EN
TS
O-E
TY
ND
P20
12.
cz35
.137
Vit
kov
(CZ
)B
orde
rw
ith
Ger
man
yN
ew40
0kV
sing
leci
rcui
ttie
-lin
ebe
twee
nC
urre
ntna
tion
alde
velo
pmen
tpl
anco
vers
(Mec
hlen
reut
h)ne
w(C
Z)
subs
tati
onan
dex
isti
ng(D
E)
proj
ects
upto
year
2023
with
som
eou
tloo
kto
subs
tati
on.
Len
gth:
70km
.ye
ar20
25.
Acc
ordi
ngto
info
rmat
ion
inT
YN
DP
abou
tex
pect
edco
mm
issi
onin
gye
ar(2
032)
this
proj
ect
isno
tre
leva
ntfo
rN
atio
nal
24T
heN
orw
egia
nN
RA
part
icip
ated
inth
efr
amew
ork
oft
he
Age
ncy
coop
erat
ion
wit
hN
RA
so
fEU
Mem
ber
Stat
es.
25T
he
inve
stm
ent
isin
clud
edin
the
Ital
ian
nati
onal
deve
lopm
entp
lan.
The
Ital
ian
nati
onal
deve
lopm
entp
lan
men
tion
sth
atno
wor
ksar
ene
eded
onth
eA
ustr
ian
side
.26
Th
ein
vest
men
tis
incl
uded
inth
eF
renc
hna
tion
alde
velo
pmen
tpl
an.
/P
ag
e11
of3O
/4/
AT
26.6
4B
orde
rw
ith
Ital
y(B
ress
anon
e)N
ewsu
bsta
tion
near
Inns
bruc
k(A
T)
Non
-TS
Opr
ojec
tsar
eno
tin
the
nati
onal
TY
ND
P.
Country
TY
ND
PS
ub
statio
n1
Substation
2P
ro
ject
Descrip
tio
nR
easo
nfor
ab
sen
ce
20
12
Code
deve
lopm
entp
lan.
cz27
35.
138
tbd
(CZ
)B
orde
rw
ith
Ger
man
yP
ossi
ble
incr
ease
of
inte
rcon
nect
ion
capa
city
Cur
rent
nati
onal
deve
lopm
ent
plan
cove
rs(S
outh
-Eas
tern
50H
ertz
)be
twee
nC
EP
San
d5O
Her
tzT
rans
mis
sion
ispr
ojec
tsup
toye
ar20
23w
ith
som
eou
tloo
kto
unde
rco
nsid
erat
ion:
eith
era
new
400k
Vti
e-ye
ar20
25.
Acc
ordi
ngto
info
rmat
ion
inlin
e(O
HL
onne
wro
ute)
ora
rein
forc
emen
to
fT
YN
DP
abou
tex
pect
edco
mm
issi
onin
gye
arth
eex
isti
ng40
0kV
tie-
line
Hra
dec
(CE
PS
)—
(203
2)th
ispr
ojec
tis
not
rele
vant
for
Nat
iona
lR
öhrs
dorf
(5O
Her
tzT
rans
mis
sion
).de
velo
pmen
tpla
n.cz
55.3
10
Vys
kov
(CZ
)R
epor
yje
(CZ
)N
ewco
nnec
tion
betw
een
2ex
isti
ngT
hein
vest
men
tha
sa
stat
usun
der
subs
tati
ons
line
sing
leci
rcui
tO
HL
1385
cons
ider
atio
nin
TY
ND
P20
12.
Due
toth
eM
VA
.re
sult
sof
feas
ibil
ity
stud
y(c
ross
ing
prot
ecte
dar
ea)
the
proj
ect
was
canc
elle
d.
DE
35.1
37B
orde
rw
ith
the
Cze
chM
echi
enre
uth
(DE
)N
ew40
0kV
sing
leci
rcui
ttie
-lin
ebe
twee
nT
his
proj
ect
does
not
appe
arin
the
nati
onal
Rep
ubli
c(V
itko
v)ne
w(C
Z)
subs
tati
onan
dex
isti
ng(D
E)
grid
deve
lopm
entp
lan.
Stat
usin
TY
ND
Pha
ssu
bsta
tion
.L
engt
h:70
km.
been
“und
erco
nsid
erat
ion”
.A
ccor
ding
to5O
Her
tzth
ispr
ojec
tis
not
yet
conc
rete
enou
ghto
ente
rin
the
nati
onal
grid
deve
lopm
ent
plan
.
DE
40.A
30B
orde
rw
ith
Lux
embo
urg
Nie
ders
tede
m(D
E)
ortb
dU
pgra
ding
and
new
cons
truc
tion
ofan
Thi
spr
ojec
tdo
esno
tap
pear
inth
ena
tion
al
(Bas
char
age)
(DE
)in
terc
onne
ctor
toD
E,
inco
njun
ctio
nw
ith
the
grid
deve
lopm
entp
lan,
neit
her
in20
12no
rin
inte
rcon
nect
orin
the
sout
hof
LU
;P
arti
al20
13.
Stat
usin
TY
ND
P20
12“u
nder
upgr
adin
gof
exis
ting
220k
Vlin
esan
dpa
rtia
lco
nsid
erat
ion”
.P
roje
ctis
noty
etco
ncre
tene
wco
nstr
ucti
ono
flin
es;
Wit
hpo
wer
enou
ghto
ente
rin
the
nati
onal
grid
tran
sfor
mer
stat
ion
inL
Ude
velo
pmen
tpla
n.
DE
42.1
61O
ffsh
ore-
Win
dpa
rkG
Ohi
(DE
)N
ewA
C-c
able
conn
ecti
onw
ith
ato
tal
leng
thT
his
proj
ect
does
not
appe
arin
the
nati
onal
GE
OF
reE
(DE
)o
f32
km.
grid
deve
lopm
ent
plan
.T
heco
nnec
tion
oft
his
offs
hore
win
d-fa
rmis
plan
ned
afte
r20
23,
i.e.
the
tim
eho
rizo
no
fth
ena
tion
alde
velo
pmen
tpl
an.
27T
hein
vest
men
tis
incl
uded
inth
eG
erm
anna
tion
alpl
an.
,‘P
age
12o
f30
few
Imes
inH
VD
Cte
cim
olog
yfr
omth
ere
gion
of
Low
erS
axon
yto
Nor
thB
aden
Wti
rtte
mbe
rgto
inte
grat
ene
ww
ind
gene
rati
ones
peci
ally
from
Nor
thSe
ato
war
dsC
entr
al-
Sou
thE
urop
efo
rco
nsum
ptio
nan
dst
orag
e.T
hein
vest
men
tis
part
oft
he
tran
smis
sion
corr
idor
Clo
ppen
burg
-N
orth
Bad
enW
tirt
tem
berg
.
DE
43.A
153
Weh
rend
orf(
DE
)U
rber
ach
(DE
)
Cou
ntry
2O
l2C
ode
Subst
atio
nl
Subst
atio
n2
Rea
son
for
abse
nce
Thi
spr
ojec
tw
asin
clud
edin
the
prop
osed
grid
deve
lopm
ent
plan
2012
byth
eT
SO
,bu
tit
was
not
appr
oved
byth
eN
RA
.
DE
44.1
71H
Uff
enha
rdt
(DE
)N
euro
tt(D
E)
Upg
rade
oft
he
line
from
220k
Vto
380k
V.
Thi
spr
ojec
tdo
esno
tap
pear
hi
the
nati
onal
Len
gth:
11km
.In
clud
edw
ithth
ein
vest
men
t:
grid
deve
lopm
entp
lan,
beca
use
itha
s1
new
380k
Vsu
bsta
tion
.m
eanw
hile
been
canc
elle
dby
the
TS
O.
DE
44. 1
82K
rift
el(D
E)
Obe
rerl
enba
ch(D
E)
New
400
kVdo
uble
circ
uit
OH
LK
rffl
el-
Thi
spr
ojec
tw
asin
clud
edhi
the
prop
osed
grid
Obe
rerl
eben
bach
inex
isti
ngO
HL
corr
idor
.de
velo
pmen
tpla
n20
12an
dw
asap
prov
edby
the
NR
A.
Thi
spr
ojec
tw
asag
ain
incl
uded
inth
epr
opos
edgr
idde
velo
pmen
tpla
n20
13an
dw
asno
tap
prov
edby
the
NR
A.
DE
44.A
155
Con
nefo
rde
(DE
)U
nter
wes
er(D
E)
Upg
rade
of23
0-kV
-cir
cuit
Unt
erw
eser
-T
his
proj
ect
was
incl
uded
inth
epr
opos
edgr
id
Con
nefo
rde
to40
0kV
,L
ine
leng
th:
32km
.de
velo
pmen
tpla
n20
12by
the
TSO
,bu
tit
was
not
appr
oved
byth
eN
RA
.
DE
44.A
159
Ph
Bla
tzhe
im(D
E)
Obe
rzie
r(D
E)
New
400
kVdo
uble
circ
uit
OH
LPk
t.T
his
proj
ect
was
incl
uded
inth
epr
opos
edgr
id
Bla
tzhe
im-
Obe
rzie
rin
clud
ing
exte
nsio
nof
deve
lopm
entp
lan
2012
byth
eT
SO,
but
itw
as
exis
ting
subs
tati
ons.
not
appr
oved
byth
eN
RA
.
DE
44.A
162
Gro
Bga
rtac
h(D
E)
End
ersb
ach
(DE
)E
xten
sion
ofex
isti
ng38
0kV
line
Thi
spr
ojec
tw
asin
clud
edin
the
prop
osed
grid
Gro
l3ga
rtac
h-E
nder
sbac
h.(L
engt
h:32
km)
deve
lopm
entp
lan
2012
byth
eT
SO
and
itw
asap
prov
edby
the
NR
A.
itw
asin
clud
edin
the
prop
osed
grid
deve
lopm
entp
lan
2013
byth
eT
SO,
but
itw
asno
tap
prov
edby
the
NR
A.
DE
45.4
7.15
8ir
schi
ng(D
E)
Ott
enho
fen
(DE
)U
pgra
deof
23O
kVco
nnec
tion
Irsc
hing
-T
his
proj
ect
was
incl
uded
inth
epr
opos
edgr
id
Ott
enho
fen
to40
0kV
,in
clud
ing
new
400k
Vde
velo
pmen
tpl
an20
12by
the
TS
O,
but
itw
as
swit
chge
arZ
olli
ng.
Len
gth
76km
.no
tap
prov
edby
the
NR
A.
DE
45.A
166
Sch
alka
uI
area
of
area
ofG
rafe
nrhe
infe
ldN
ewdo
uble
circ
uit
OH
L40
0-kV
-lin
e(1
30T
his
proj
ect
was
incl
uded
inth
epr
opos
edgr
id
Alt
enfe
ld(D
E)
(DE
)km
)de
velo
pmen
tpl
an20
12by
the
TSO
,bu
tit
was
not
appr
oved
byth
eN
RA
.
Pag
e13
of
30
Country
TY
ND
PS
ub
statio
n1
Substation
2P
ro
ject
Descrip
tio
nR
easo
nfor
ab
sen
ce
__
________
20
12
Co
de
Isar
(DE
)
NR
A.
EL
49.2
52M
elli
ti(E
L)
Kar
dia
(EL
)N
ew40
0kV
doub
leci
rcui
tO
HL
.T
hein
vest
men
tis
nolo
nger
incl
uded
beca
use
____
_______
Len
gth:
4Okm
.it
has
been
mea
nwhi
leca
ncel
led.
EL
49.2
53K
ardi
a(E
L)
Tri
lcal
a(E
L)
New
400k
Vdo
uble
circ
uit
OH
L.
The
inve
stm
ent
isno
long
erin
clud
edbe
caus
eL
engt
h:8O
km.
itha
sbe
enm
eanw
hile
canc
elle
d.
EL
49.2
54L
aris
sa(E
L)
Tri
lcal
a(E
L)
New
400k
Vdo
uble
circ
uit
OH
L.
The
inve
stm
ent
isno
long
erin
clud
edbe
caus
eL
engt
h:57
km.
itha
sbe
enm
eanw
hile
canc
elle
d.
ES28
16.3
8G
atic
a(E
S)
Bor
der
wit
hF
ranc
eN
ewH
VD
Cin
terc
onne
ctio
nin
the
wes
tern
The
tim
espa
no
fth
ena
tion
alde
velo
pmen
t(A
quit
aine
)pa
rto
fth
ebo
rder
via
DC
subs
eaca
ble
inth
epl
anis
shor
ter
than
the
one
oft
he
EN
TS
O-E
Bis
cay
Gul
f.T
YN
DP
2012
.
GB
74.4
49R
ichb
orou
gh(G
B)
Can
terb
ury
(GB
)N
ew40
0kV
doub
leci
rcui
tO
HL
and
new
Thi
sis
not
expl
icit
lyid
enti
fied
inth
e40
0kV
subs
tati
onin
Ric
hbor
ough
.E
lect
rici
tyT
enY
ear
Sta
tem
ent
(ET
YS
)as
itdo
esno
tad
dN
atio
nal
Ele
ctri
city
Tra
nsm
issi
onS
yste
m(N
ET
S)
capa
city
inE
ngla
ndan
dW
ales
.It
ises
sent
iall
yal
lab
out
alo
cal
conn
ecti
onin
term
so
fth
eU
KN
ET
S.
GB
76.A
44H
ackn
ey(G
B)
St.
John
’sW
ood
(GB
)N
ewH
ackn
ey-
St.
John
’sW
ood
400k
Vdo
uble
Thi
spr
ojec
tis
driv
enby
and
SoS
/Ass
etci
rcui
t.R
epla
cem
entr
equi
rem
ent.
Itdo
esno
tad
dan
ytr
ansm
issi
onco
nnec
tion
capa
city
toth
eG
Bne
twor
kor
boun
dari
es,
and
ther
efor
eit
isun
like
lyto
bese
enor
util
ised
bycu
stom
ers
and
asa
cons
eque
nce
itis
not
incl
uded
inth
eE
TY
S.
GB
76.A
46St
.Jo
hns
Woo
d(G
B)
Wim
bled
on(G
B)
New
St.
John
’sW
ood-
Wim
bled
on40
0kV
Thi
spr
ojec
tis
driv
enby
and
SoS
/Ass
etdo
uble
circ
uit.
Rep
lace
men
tre
quir
emen
t.It
does
not
add
any
tran
smis
sion
conn
ecti
onca
paci
tyto
the
GB
netw
ork
orbo
unda
ries
,an
dth
eref
ore
itis
unli
kely
tobe
seen
orut
ilis
edby
cust
omer
s
28T
hein
vest
men
tis
incl
uded
inth
eF
renc
hna
tion
alde
velo
pmen
tpl
an.
I)P
age
14of 3
0‘7
DE
45.A
168
Rai
ters
aich
(DE
)N
ew40
0kV
line
inex
isti
ngO
HL
corr
idor
Rai
ters
aich
-L
uder
shei
m-
Siff
ling-
Isar
orA
lthe
im(1
60km
)
Thi
spr
ojec
tw
asin
clud
edin
the
prop
osed
grid
deve
lopm
ent
plan
2012
&20
13by
the
TS
O,
but
inbo
thca
ses
itw
asno
tap
prov
edby
the
.7
fC
ountr
yT
YN
DP
Sub
stat
ion
1S
ubst
atio
n2
Pro
ject
Des
crip
tion
Rea
son
for
abse
nce
20
12
Co
de
and
asa
cons
eque
nce
itis
no
tin
clu
ded
inth
eE
TY
S.
GB
77.4
52D
eesi
de(G
B)
-N
ew40
0kV
subs
tati
onin
Dee
side
.P
art
oft
he
Thi
spr
ojec
tis
part
oft
he
Wes
tern
HV
DC
wor
ksre
quir
edfo
rth
eW
este
rnH
VD
CL
ink.
Lin
kan
dal
thou
ghit
isno
tex
plic
itly
men
tion
edit
isth
ela
ndin
gpo
int
oft
heW
este
rnL
ink
inE
ngla
nd.
Wit
ho
ut
this
subs
tati
onth
eW
este
rnL
ink
proj
ect
isno
tco
mpl
eted
.T
here
fore
for
the
purp
oses
of t
heE
TY
Sb
oth
Dee
sid
ean
dH
unte
rsto
n(S
cott
ish
end)
are
cons
ider
edto
bein
tegr
alpa
rts
oft
heW
este
rnL
ink
proj
ect.
GB
77.4
54H
awth
orn
Pit
(GB
)N
orto
n(G
B)
Upr
ate
Haw
thor
nPi
t-N
orto
nto
400k
V.
Sinc
eth
esu
bmis
sion
oft
he
proj
ect
toth
eT
YN
DP
last
year
,a
deci
sion
has
been
mad
eth
atth
epro
ject
isn
ot
requir
edat
this
tim
eso
itha
sbe
enex
clud
edfr
omth
eE
TY
S.
HR
292
7.2
23
Exis
ting
line
from
bord
erE
xis
ting
line
toerj
av
inec
The
exis
tin
gsu
bst
atio
no
fC
irko
vce(
S1)
wil
lT
hein
ves
tmen
tha
sin
the
mea
nti
me
bee
nw
ith
Slo
ven
ia(C
irko
vce
)(H
R)
beco
nnec
ted
toon
eci
rcu
itof
the
exis
tin
gco
mm
issi
on
ed.
Hev
iz(H
U)-
Zer
javi
nec(
HR
)do
uble
circ
uit
400kV
OH
Lb
yer
ecti
ng
anew
80km
double
circ
uit
400k
VO
HL
inS
love
nia.
The
proj
ect
wil
lre
sult
intw
on
ewcr
oss
-bo
rder
circ
uits
:H
eviz
(HU
)-C
irk
ov
ce(S
I)an
dC
irkovce
(SI)
-Z
erja
vine
c(H
R).
1T3°
21.5
4B
ord
erw
ith
Fra
nce
Pio
ssas
co(i
T)
Rep
lace
men
tof
conduct
ors
(by
AC
CS
)on
The
inv
estm
ent
has
inth
em
ean
tim
eb
een
(Corn
ier)
Alb
ertv
ille
(FR
)-M
onta
gn
y(F
R)-
Co
rnie
rco
mm
issi
on
ed.
(FR
)an
dA
lber
tvil
le(F
R)-
La
Coch
e(F
R)-
La
Pra
z(F
R)-
Vil
laro
din
(FR
)-V
enau
s(I
T)-
Pio
ssas
co(i
T)
sing
leci
rcui
t400
kVO
HL
s.In
add
itio
n,
chan
ge
of
conduct
ors
and
op
erat
ion
at400kV
of
anex
isti
ng
single
circ
uit
OH
Lbe
twee
nG
rand
eIl
ean
dA
lber
tvil
le(F
R)
29T
he
inves
tmen
tis
incl
uded
inth
eH
ungar
ian
and
Slo
ven
ian
nat
ional
dev
elo
pm
ent
pla
ns.
30T
he
inves
tmen
tis
incl
uded
inth
eF
rench
nat
ion
ald
evel
op
men
tpla
n.
1Pag
e15
of3
0
/1
Country
TY
ND
PS
ub
statio
n1
Substation
2P
ro
ject
Descrip
tio
nR
easo
nfor
ab
sen
ce
20
12
Co
de
curr
entl
yop
erat
edat
low
ervo
ltag
e,an
das
soci
ated
wor
ksin
Alb
ertv
ille
(FR
)40
0kV
subs
tati
on.
(Tot
alle
ngth
ofli
nes
:257
km)
IT26
.64
Bre
ssan
one
(IT
)B
orde
rw
ith
Aus
tria
New
doub
leci
rcui
t40
0kV
inte
rcon
nect
ion
The
Stu
dydi
dno
tbe
com
ean
inve
stm
ent.
(Inn
sbru
ck)
thro
ugh
the
pilo
ttu
nnel
oft
he
plan
ned
Bre
nner
Bas
eT
unne
l.T
otal
line
leng
th:
65km
.
IT28
.86
Vil
lano
va(I
T)
-A
PS
Tw
ill b
ein
stal
led
onth
ene
w40
0kV
line
The
inve
stm
ent
has
inth
em
eant
ime
been
Fog
gia-
Vil
lano
vaco
mm
issi
oned
.
IT29
.73
Bor
der
wit
hT
unis
ia(E
lP
arta
nna
(IT
)N
ew35
0km
1000
MW
HV
DC
line
betw
een
The
thir
dpa
rty
proj
ects
are
norm
ally
not
Aou
aria
)T
unis
iaan
dIt
aly
via
Sici
lyw
ith
400k
VD
Cin
clud
edin
the
nati
onal
deve
lopm
entp
lan.
subs
eaca
ble
and
conv
erte
rsst
atio
nsat
both
ends
.L
U40
.A30
Bas
char
age
(LU
)B
orde
rw
ith
Ger
man
yU
pgra
ding
and
new
cons
truc
tion
ofan
Not
inna
tion
alde
velo
pmen
tpl
an.
Too
earl
y(N
iede
rste
dem
)in
terc
onne
ctor
toD
E,
inco
njun
ctio
nw
ith
the
tobe
fman
cial
lyev
alua
ted
and
thus
put
inth
ein
terc
onne
ctor
inth
eso
uth
ofL
U;
Par
tial
nati
onal
deve
lopm
ent
plan
:st
udie
san
dup
grad
ing
of
exis
ting
220k
Vlin
esan
dpa
rtia
lap
proa
ches
repo
rted
afte
r20
23.
new
cons
truc
tion
of
lines
;W
ith
pow
ertr
ansf
orm
erst
atio
nin
LU
NL
38.4
25B
orde
rw
ith
Nor
way
Eem
shav
en(N
L)
Nor
Ned
2:a
seco
ndH
VD
Cco
nnec
tion
The
inve
stm
ent
isno
long
erin
clud
edbe
caus
e
(fed
a)be
twee
nN
orw
ayan
dT
heN
ethe
rlan
dsvi
ait
has
been
mea
nwhi
leca
ncel
led.
570k
m45
0kV
DC
subs
eaca
ble
wit
h70
0-14
00M
Wca
paci
ty.
NO
37.4
08K
rist
ians
and,
Fed
a(N
O)
-R
eact
ive
com
pens
atio
ndu
eto
HV
DC
link
sT
hein
vest
men
tis
nolo
nger
incl
uded
beca
use
Nor
Ned
and
Ska
gera
k4.
Rea
ctiv
epo
wer
itha
sbe
enm
eanw
hile
com
mis
sion
ed.
devi
ces
in40
0kV
subs
tati
ons.
NO
38.4
25fe
da
(NO
)B
orde
rw
ithth
eN
orN
ed2:
ase
cond
HV
DC
conn
ecti
onT
hein
vest
men
tis
nolo
nger
incl
uded
beca
use
Net
herl
ands
(Eem
shav
en)
betw
een
Nor
way
and
The
Net
herl
ands
via
itha
sbe
enm
eanw
hile
canc
elle
d.57
0km
450k
VD
Csu
bsea
cabl
ew
ith
700-
/7 Pag
e16
of
30
Countr
yT
YN
DP
Sub
stat
ion
1S
ubst
atio
n2
Pro
ject
Des
crip
tion
Rea
son
for
abse
nce
2012
Cod
e14
00M
Wca
paci
ty.
NO
67.4
02B
orde
rw
ith
Sw
eden
Tve
iten
(NO
)‘S
outh
Wes
tlth
k’co
nsis
ting
ofth
ree
mai
nT
hein
vest
men
tis
canc
elle
dby
the
TS
Os
in(B
arke
ryd)
part
s:3)
New
doub
leH
VD
CV
SClin
eN
orw
ayan
dSw
eden
beca
use
anal
yses
show
betw
een
Bar
kery
d(S
E)
and
Tve
iten
(NO
).-
that
the
bene
fits
dono
tex
ceed
the
cost
s.T
hein
vest
men
tsre
late
dal
soin
clud
ene
wsu
bsta
tions
and
conv
erte
rst
atio
nsin
the
conn
ecti
onpo
ints
line.
NO
67.4
11
Rød
(NO
)S
ylli
ng(N
O)
Vol
tage
upgr
adin
go
fex
isti
ngsi
ngle
circ
uit
The
inve
stm
ent
isno
long
erin
clud
edbe
caus
e30
0kV
OH
LR
ød-T
veit
en-F
lesa
ker-
Syl
ling
init
has
been
mea
nwhi
leca
ncel
led.
conn
ecti
onw
ith
the
new
HV
DC
line
toS
wed
en,
the
Syd
Ves
tlin
k.
NO
104.
A51
Sva
rtis
en(N
O)
Ned
reR
øssä
ga(N
O)
New
116k
m40
0kV
OH
LT
hein
vest
men
tis
nolo
nger
incl
uded
beca
use
itha
sbe
enm
eanw
hile
canc
elle
d.
PL
57.3
20D
argo
leza
(PL
)-
Ane
wA
C40
0/1
10kV
subs
tati
onbe
twee
nIn
vest
men
tca
ncel
led.
TS
Oha
sch
ange
dth
eex
isti
ngsu
bsta
tion
sS
lups
kan
dZ
amow
iec
inco
ncep
tof
netw
ork
deve
lopm
ent
inth
efi
eld
Nor
ther
nPo
land
.N
ewsu
bsta
tion
Dar
gole
zais
ofw
ind
pow
erpl
ants
.co
nnec
ted
bysp
litt
ing
and
exte
ndin
gof
exis
ting
400k
Vlin
eS
lups
k-ar
now
iec.
PT
1.5
Mac
edo
deC
aval
eiro
sV
ila
Pou
cade
Agu
iar
(By
New
83km
doub
leci
rcui
t40
0+22
0kV
OH
LIn
vest
men
tw
ill
beco
mm
issi
oned
byth
een
d(B
yV
alpa
cos)
Val
paco
s)M
aced
ode
Cav
alef
ros
(PT
)-V
alpa
cos
(PT
)-of2
014
and
isno
long
erin
the
nati
onal
Vil
aP
ouca
deA
guia
r(P
T).
TY
ND
P.
PT
1A1
Rib
eira
deP
ena
(PT
)G
uard
a(P
T)
New
192k
mdo
uble
/sin
gle-
circ
uit
400k
VO
HL
Inve
stm
ent
isno
tin
Nat
iona
lD
evel
opm
ent
Rib
eira
deP
ena
(PT
)-G
uard
a(P
T).
Plan
beca
use
“tim
espa
nof
nati
onal
inve
stm
ent
Ina
firs
tst
ep,
only
75km
will
beco
nstr
ucte
dpl
anis
shor
ter
(202
3vs
.20
25co
mm
issi
onin
gan
dop
erat
edat
220
kVbe
twee
nV
ila
Pou
cada
te).
deA
guia
ran
dM
aced
ode
Cav
alei
ros,
ina
seco
ndst
epon
eci
rcui
to
fthis
line
will
beop
erat
edat
400
kV.
Asi
ngle
line
will
beco
nstr
ucte
dbe
twee
nM
aced
ode
Cav
alef
ros
zone
and
Poci
nho
zone
also
betw
een
Poc
inho
zone
and
Cha
fari
zzo
nea
doub
leci
rcui
t40
0kV
OH
Lw
ill
beco
nstr
ucte
d(o
nly
one
circ
uit
inst
alle
din
afi
rst
step
),th
isla
stlin
ew
ill
use
one
circ
uit
oft
he
line
Seia
-G
uard
ato
1fP
age
17of 3
0
//
Country
TY
ND
PS
ub
statio
n1
Substation
2P
ro
ject
Descrip
tio
nR
easo
nfor
ab
sen
ce
20
12
Co
de
pP
T2.8
Arg
anil
lGO
is(P
T)
-N
ew40
0/60
kVsu
bsta
tion
atA
rgan
illG
Ois
.In
vest
men
tno
tin
nati
onal
TY
ND
Pdu
eto
itssh
orte
rti
mes
pan
(202
3vs
.th
esc
hedu
led
2025
com
mis
sion
ing
date
).
esta
blis
hth
eli
neR
ibef
rade
Pen
a(P
T)
Gua
rda
(PT
).
PT
2.A
2S
eia
(PT
)G
uard
a(P
T)
New
doub
leci
rcui
t40
0kV
OH
L$e
ia-G
uard
aIn
vest
men
tit
emis
not
inna
tion
alT
YN
DP
due
(55k
m)
toits
shor
ter
tim
espa
n(2
023
vs.
the
expe
cted
2025
com
mis
sion
ing
date
).
PT
3.14
‘Mar
atec
a”F
anhö
esN
ew95
kmdo
uble
-cir
cuit
400k
VO
HL
.T
his
Inve
stm
ent
item
isno
tin
the
nati
onal
TY
ND
P
new
line
wil
lbe
conn
ecte
dto
the
exis
ting
line
beca
use
itw
asaf
read
yco
mm
issi
oned
in20
12.
Pal
mel
a(P
T)-
Sin
es2
(PT
),m
akin
ga
lhflc
Sin
es-P
alm
ela/
Fan
höes
.
PT
4.16
Lag
oaça
(PT
)(B
yR
ecar
ei(P
T)
(By
New
line
Lag
oaca
-Arm
amar
-Rec
arei
400
kVL
agoa
ca-A
rmam
arw
asaf
read
yco
mm
issi
oned
Arm
amar
)A
rmam
ar)
inP
T.
in20
10.
The
sect
ion
betw
een
Arm
amar
and
Rec
arei
isex
pect
edto
beco
mm
issi
oned
duri
ng20
14.
PT3’
4.17
Bor
der
wit
hS
pain
Tav
ira
(PT
)N
ewso
uthe
rnin
terc
onne
ctio
n.N
ew40
0kV
Por
tugu
ese
sect
ion
was
conc
lude
din
2011
.
(Pue
bla
deG
uzm
an)
OH
Lsi
ngle
-cir
cuit
line
betw
een
Pue
bla
deN
otin
nati
onal
TY
ND
Pbe
caus
eit
isex
pect
ed
Guz
man
(ES
)-
Tav
fra
(PT
).to
beco
mm
issi
oned
duri
ng20
14.
RO
53.A
133
Fan
tane
le(R
O)
Ung
heni
(RO
)22
0S
tudi
espe
rfor
med
conf
irm
edth
ein
vest
men
tas
nece
ssar
yon
lyun
der
spec
ific
syst
emev
olut
ion
scen
ario
s.it
stay
sun
der
cons
ider
atio
nan
dw
ill
bein
clud
edin
TY
ND
Pif
futu
reev
olut
ions
wil
lco
nfir
mth
ene
cess
ity
SE
67.4
02B
arke
ryd
(SE
)B
orde
rw
ith
Nor
way
The
inve
stm
ent
isno
long
erin
clud
edbe
caus
e
(Tve
iten
)it
has
been
mea
nwhi
leca
ncel
led.
Si32
27.A
96S
love
nia
(SI)
Bor
der
wit
hIt
aly
The
proj
ect
incl
udes
ane
wH
VD
Cli
nkT
his
proj
ect
isno
tin
clud
edin
the
conf
irm
ed
(Sal
gare
da)
betw
een
Ital
yan
dS
love
nia.
The
new
HV
DC
TS
Ona
tion
alde
velo
pmen
tpl
anfr
om20
11.
line
betw
een
Slo
veni
aan
dit
aly
wil
l
31T
hein
vest
men
tis
incl
uded
inth
eS
pani
shna
tion
alde
velo
pmen
tpl
an.
32T
hein
vest
men
tis
incl
uded
inth
eIt
alia
nna
tion
alde
velo
pmen
tpl
an.
Pag
e18
of
30
c
CD
C
©
CD
0
z
Fig
ure
3: R
easo
nsfo
rab
senc
eof t
rans
mis
sion
inve
stm
ents
from
the
EU
TY
ND
P20
12in
the
nati
onal
deve
lopm
ent p
ians
Rea
sons
for
abse
nce
ofT
YN
DP
Inve
stm
ents
inN
atio
nal
Dev
elop
men
tP
lans
SP
roje
ctca
ncel
led
SPr
ojec
tco
mm
issi
oned
SN
otap
pmve
dby
Gem
anN
RA
duri
ngap
prov
alof
2013
draf
tpl
an
ST
imes
panofT
shor
ter
than
EN
TSO
-Epl
an
SN
Ppr
epar
edbe
fore
EN
TSO
-Epl
an
ST
PPs
are
nonn
allv
not
incl
uded
inth
epl
an
RSt
udy
did
nor
turn
into
apr
ojec
t
aT
hein
vest
men
tdo
esno
tfu
lfil
one
crite
rion
from
the
plan
Not
expl
icitl
ym
enti
oned
inth
ena
tiona
lde
velo
pmen
tpla
n
:fPa
ge20
of
30
Tab
le
2:
Natio
nal
com
ponents
of
transm
ission
investm
ents
in
the
EN
TS
O-E
Reg
io
nal
In
vestm
en
tP
lans
2012
(R
EG
),
wh
ich
are
no
tin
clu
ded
in
national
develo
pm
ent
plans
RO
Un
try
EN
TS
O-E
Su
bstatio
n1
Substation
2P
roject
Description
.R
easo
nfor
ab
sen
ce
•.
RE
G2O
12
i,..
.:•
•
Code
—-
—.
-.=
t—
-
CL
A15
0H
rade
c(C
Z)
Chr
ast
(CZ
)N
ewse
cond
circ
uit t
oex
isti
ngsi
ngle
circ
uit
OH
L,
The
very
long
-ter
min
vest
men
tis
not
incl
uded
upgr
ade
inle
ngth
of82
.4km
.T
arge
tca
paci
tybe
caus
eth
eti
mes
pan
oft
he
nati
onal
deve
lopm
ent
2x17
3OM
VA
.pl
anis
shor
ter
than
the
one
ofE
NT
SO
-ET
YN
DP
2012
.
czA
l 51
Pre
stic
e(C
Z)
Chr
ast
(CZ
)N
ewse
cond
circ
uit
toex
isti
ngsi
ngle
circ
uit
OH
L,
The
very
long
-ter
min
vest
men
tis
not
incl
uded
upgr
ade
inle
ngth
of3
28
km
.T
arge
tca
paci
tybe
caus
eth
eti
mes
pan
oft
he
nati
onal
deve
lopm
ent
2x17
3OM
VA
.pl
anis
shor
ter
than
the
one
ofE
NT
SO
-ET
YN
DP
2012
.
EL
72A
etos
(EL
)B
orde
rw
ith
Ital
yS
econ
d50
0MW
HV
DC
link
betw
een
Gre
ece
and
The
inve
stm
ent
isno
long
erin
clud
edbe
caus
eit
has
(Gal
atin
a)It
aly
via
316
km40
0kV
DC
subs
eaca
ble
and
been
mea
nwhi
leca
ncel
led.
conv
erte
rsst
atio
nsat
both
ends
.
EL
255
Lam
ia(E
L)
-C
onst
ruct
ion
ofa
new
400k
VE
HV
SSin
Lam
iaT
hein
vest
men
tis
nolo
nger
incl
uded
beca
use
itha
san
dco
nnec
tion
toth
etw
oci
rcui
tso
fth
eex
isti
ngbe
enm
eanw
hile
canc
elle
d.40
0kV
lines
Tri
kala
-Dis
tom
oan
dL
aris
aL
arym
na.
ES
35tb
d(E
S)
tbd
(ES
)R
einf
orce
men
tsin
the
220k
Vne
twor
kov
eral
lth
eT
heti
mes
pan
oft
he
nati
onal
deve
lopm
ent
plan
is
coun
try,
inad
diti
onto
upgr
adin
go
f30
0km
ofsh
orte
rth
anth
eon
eoft
he
EN
TS
O-E
TY
ND
P
220k
Vne
twor
k,du
eto
win
dpo
wer
evac
uati
on.
2012
.
Fl
397
Bor
der
wit
hN
orw
ayP
irtt
ikos
kior
New
sing
leci
rcui
t38
0-40
0kV
OH
L(5
00km
).T
hein
vest
men
tis
nolo
nger
incl
uded
beca
use
itha
s
(Var
ange
rbot
n)P
etäj
asko
ski
(Fl)
been
mea
nwhi
leca
ncel
led.
HR
69B
orde
rw
ith
Ital
yK
onjs
ko(H
R)
New
1000
MW
HV
DC
inte
rcon
nect
ion
line
The
thir
dpa
rty
proj
ects
are
norm
ally
not
incl
uded
(Can
dia)
betw
een
Ital
yan
dC
roat
iavi
a28
0km
500k
VD
Cin
the
nati
onal
deve
lopm
ent
plan
.su
bsea
cabl
ean
dco
nver
ters
stat
ions
atbo
then
ding
poin
ts.
HU
282
Saj
oszo
ged
IG
odD
etk
(HU
)N
ewsu
bsta
tion
Kãp
ona
(Det
kar
ea)
with
2*25
0T
hein
vest
men
tis
nolo
nger
incl
uded
beca
use
itha
s
(HU
)M
VA
400/
120k
Vtr
ansf
orm
atio
nis
conn
ecte
dby
been
mea
nwhi
leca
ncel
led.
spli
ttin
gan
dex
tend
ing
exis
ting
line
Saj
oszo
ged
God
.
/7P
age
21of
30
/1/a
--i
Sub
stat
ion
2P
roje
ctD
escr
ipti
onR
easo
nfo
rab
senc
eR
EG
2O
I2[
Cod
e.._
.-
__
_
..,
--
.:_“
HU
Deb
rece
n(H
U)
New
subs
tati
onD
ebre
cen
wit
h2*
250
MV
AT
hein
vest
men
tis
nolo
nger
incl
uded
beca
use
itha
s40
0/12
0kV
tran
sfor
mat
ion
isco
nnec
ted
bybe
enm
eanw
hile
com
mis
sion
ed.
chan
ging
the
oper
atin
gvo
ltag
eof
line
Saj
oszo
ged-
Deb
rece
nfr
om22
0kV
to40
0kV
,th
islin
ebe
ing
afre
ady
desi
gned
for
400k
V.
HU
288
Alb
erti
rsa
IS
zazh
alom
batt
a(H
U)
New
subs
tati
onS
zazh
alom
batt
ais
conn
ecte
dby
The
inve
stm
ent
isno
long
erin
clud
edbe
caus
eit
has
Mar
tonv
asar
(HU
)sp
litt
ing
and
exte
ndin
gex
isti
nglin
eA
lber
tfrs
a-be
enm
eanw
hile
canc
elle
d.M
arto
nvas
ar.
HU
292
Deb
rece
n(H
U)
-R
econ
stru
ctio
no
f75
0kV
subs
tati
on.
The
inve
stm
ent
isno
long
erin
clud
edbe
caus
eit
has
been
mea
nwhi
leca
ncel
led.
IT56
Cam
poro
sso
(IT
)-
New
450
MV
AP
ST
inC
ampo
ross
o(I
T)
220k
VT
hein
vest
men
tha
sbe
enm
eanw
hile
com
mis
sion
ed.
subs
tati
onon
Cam
poro
sso
(IT
)-M
ento
n(F
R)
Tri
nité
-Vic
tor
(FR
)O
HL
.
IT69
Can
dia
(IT
)B
orde
rw
ith
Cro
atia
New
1000
MW
HV
DC
inte
rcon
nect
ion
line
The
thir
dpa
rty
proj
ects
are
norm
ally
not
incl
uded
(Kon
jsko
)be
twee
nIt
aly
and
Cro
atia
via
280k
m50
0kV
DC
inth
ena
tion
alde
velo
pmen
tpl
an.
subs
eaca
ble
and
conv
erte
rsst
atio
nsat
both
endi
ngpo
ints
.
IT71
Bri
ndis
i(I
T)
Bor
der
wit
hA
lban
ia50
0MW
sing
lepo
leH
VD
CM
erch
ant
Lin
eT
heth
ird
part
ypr
ojec
tsar
eno
rmal
lyno
tin
clud
ed(B
abic
a)be
twee
nIt
aly
and
Alb
ania
via
290k
m40
0kV
DC
inth
ena
tion
alde
velo
pmen
tpl
an.
subs
eaca
ble
and
conv
erte
rst
atio
nsat
both
ends
.O
nth
eIt
alia
nsi
de,
the
new
line
will
beco
nnec
ted
toth
eex
isti
ngsu
bsta
tion
ofB
rind
isi
Sout
h.
IT72
Bor
der
with
Gre
ece
Gal
atin
a(i
T)
Seco
nd50
0MW
HV
DC
link
betw
een
Gre
ece
and
The
stud
yun
der
cons
ider
atio
ndi
dno
t(y
et)
beco
me
(Aet
os)
Ital
yvi
a3
16km
400k
VD
Csu
bsea
cabl
ean
da
plan
ned
inve
stm
ent.
conv
erte
rsst
atio
nsat
both
ends
.
22o
f30
‘V
Countr
yE
NT
SO
-E
Su
bsta
tio
n1
Substa
tion
2P
roje
ct
Descri
pti
on
1R
easo
nfo
rab
senc
eI
RE
G2O
12
.---
Code
.—
-.,.-..-.
LI
381
Vis
agin
as(L
I)B
ord
erw
ith
Lat
via
Up
gra
de
single
circ
uit
OH
L(9
43
MV
A,
50km
).N
ot
inn
atio
nal
dev
elo
pm
ent
plan
,b
ecau
seth
etw
o
(Lik
sna)
par
ties
(LT
and
LV
)do
no
tag
ree
wit
hth
is
inves
tmen
t.A
dec
isio
nw
ill
be
acce
pte
din
the
futu
re.
iu34
61B
ord
erw
ith
Fra
nce
Bel
val
(LU
)C
onnec
tion
of
SO
TE
L(i
ndust
rial
gri
din
LU
)to
Itre
fers
toan
ind
ust
rial
net
wo
rk,
and
no
tto
aIS
O
(Moula
ine)
RT
Enet
work
by
mix
ed(u
nd
erg
rou
nd
cable
&net
work
.
OH
L)
single
circ
uit
220kV
line.
Par
tsoft
he
new
line
use
exis
tin
go
nes
.
NO
397
Var
anger
both
(NO
)B
ord
erw
ith
Fin
lan
dN
ewsi
ngle
circ
uit
380-
40
0k
VO
HL
(500km
).T
he
inv
estm
ent
isno
lon
ger
incl
ud
edb
ecau
seit
has
(Pir
ttik
osk
ior
bee
nm
ean
wh
ile
cance
lled
.
Pet
äjäs
ko
ski)
NO
40
9F
eda,
Tonst
ad(N
O)
-R
eact
ive
pow
er
dev
ices
in400
kV
subst
atio
ns.
The
inv
estm
ent
isno
lon
ger
incl
ud
edb
ecau
seit
has
This
inv
estm
ent
pro
pose
das
stan
d-a
lone
inth
eb
een
mea
nw
hil
eco
mm
issi
on
ed.
TY
ND
P2010
isn
ow
mer
ged
into
inv
estm
ent
37.4
06
NO
41
0K
rist
iansa
nd
(NO
)-
Spar
etr
ansf
orm
erfo
rth
eH
VD
CS
kag
erak
Th
ein
ves
tmen
tis
no
lon
ger
incl
ud
edb
ecau
seit
has
inte
rco
nn
ecti
on
tran
sform
er.
bee
nm
ean
wh
ile
com
mis
sio
ned
.
PL
323
War
szaw
aS
ieki
erki
Pia
secz
no(P
L)
Ane
wA
C22
0/1
10kV
subs
tati
on(w
ith
The
inve
stm
ent
has
been
canc
elle
ddu
eto
(PL
)tr
ansf
orm
atio
n22
0/1
10kV
2x27
5MV
A)
inpr
omot
er’s
wit
hdra
wal
from
cons
truc
tion
oft
heW
arsa
wA
gglo
mer
atio
nA
rea
conn
ecte
dby
ane
wpo
wer
plan
t.20
km22
0kV
333
MV
Aca
ble/
OH
Llin
eW
arsz
awa
Sie
kie
rki-
Pia
secz
no
.
PL
359
Morz
ycz
yn
(PL
)P
om
orz
any
/G
linki
The
inve
stm
ent
isno
long
erin
clud
edbe
caus
eit
has
(PL
)be
enm
eanw
hile
canc
elle
d.T
heal
tern
ativ
elin
eP
om
orz
any-K
rajn
ilc
repla
ced
the
inv
estm
ent.
PL
360
Mil
osna
(PL
)S
ieki
erki
(PL
)N
ewca
ble
conn
ecti
on22
0kV
Mil
osna
-W
arsz
awa
The
inve
stm
ent
was
canc
elle
ddu
eto
prom
oter
’s
Sie
kier
ki(3
33M
VA
,10
km).
wit
hdra
wal
from
cons
truc
tion
oft
he
pow
erpl
ant.
PL
714
Wie
lopo
le(P
L)
Mos
zcze
nica
(PL
)R
epla
cem
ent
of
cond
ucto
rs(h
igh
tem
pera
ture
The
inve
stm
ent
was
canc
elle
d.P
rom
oter
sw
ithd
rew
cond
ucto
rs).
(new
capa
city
461
MV
A).
cons
truc
tion
ofth
epo
wer
plan
t.
33N
oin
form
atio
nab
out
Lat
via
nnat
ional
dev
elopm
ent
pla
n.
34T
hein
vest
men
tis
incl
uded
inth
eF
renc
hna
tion
alde
velo
pmen
tpla
n.‘1
7i’
/Pag
e23
of
30
Fig
ure
4:R
easo
nsfo
rab
senc
eof
RE
Gin
vest
men
tsfr
omth
eE
UT
YN
DP
2012
inth
ena
tion
alde
velo
pmen
tpla
ns
Rea
son
sfo
rab
senc
eofR
EG
Inve
stm
ents
inN
atio
nal
Dev
elop
men
tP
lans
ST
PPs
are
norm
ally
not
incl
uded
inth
epl
an
ST
irne
span
ofN
Psh
ort
erth
anE
NIS
O-E
plan
SS
tudy
did
not
turn
into
apr
ojec
t
SP
roje
ctno
tca
rrie
dout
byIS
O
aP
roje
ctca
ncel
led
aP
roje
ctco
mm
issi
oned
SN
oag
reem
ent
amon
gIS
Os
P’ag
e24
of
30
;1/
Tab
le3
:Thi
rd-p
arty
-pro
j ect
s.w
hich
are
incl
uded
inth
ena
tiona
lde
velo
pmen
tpla
ns
The
thir
dpa
rty
proj
ects
are
incl
uded
(or
men
tione
d)in
the
natio
nal
deve
lopm
ent
plan
ofth
eco
untr
yin
dica
ted
inth
efi
rst
colu
mn
and
are
not
inth
ena
tion
alde
velo
pmen
tpla
nof
the
othe
rco
untr
y(e
xclu
ding
the
Ele
clin
kpr
ojec
t).
FR
Cal
ais
(FR
)B
orde
rw
ith
Uni
ted
Ele
clin
k.50
0M
W(p
oten
tial
lyex
pand
able
toT
PP
appe
ars
inth
ena
tion
alde
velo
pmen
tpl
an.
The
Kin
gdom
(Fol
kest
one)
1000
MW
)m
erch
ant
inte
rcon
nect
orpa
ssin
gcu
rren
tca
paci
tyis
1000
MW
.th
roug
hth
eS
ervi
ceT
unne
loft
he
Cha
nnel
Tun
nel
toli
nkth
e40
0kV
grid
sin
Eng
land
and
Fra
nce.
FR
Cot
enti
n(F
R)
Vic
init
yof
Exe
ter
(GB
)FA
Bpr
ojec
tT
PP
appe
ars
inth
ena
tion
alde
velo
pmen
tpl
anas
onth
eF
renc
hsi
deth
epr
ojec
tis
deve
lope
dby
the
Fre
nch
TSO
.G
BB
orde
rw
ith
Fra
nce
Fol
kest
one
(GB
)E
lecl
ink.
500
MW
(pot
enti
ally
expa
ndab
leto
TP
Pap
pear
sin
the
nati
onal
deve
lopm
ent
plan
,(C
alai
s)10
00M
W)
mer
chan
tin
terc
onne
ctor
pass
ing
2016
.th
roug
hth
eS
ervi
ceT
uim
eloft
he
Cha
nnel
Tun
nel
toli
nkth
e40
0kV
grid
sin
Eng
land
and
Fra
nce.
GB
Bor
der
wit
hir
elan
d(i
rish
Pem
brok
ean
dA
lver
disc
ott
Ene
rgy
Bri
dge
(EB
)is
apr
ojec
tw
hich
will
rout
eT
PP
appe
ars
inth
ena
tion
alde
velo
pmen
tpl
an,
Mid
land
s)(G
B)
larg
eam
ount
sof
rene
wab
leel
ectr
icit
yge
nera
ted
2018
(fir
stof
thre
eco
nnec
tion
date
s).
ina
seri
eso
fin
terc
onne
cted
Iris
hw
ind
farm
sdi
rect
lyin
toth
eU
Km
arke
t.T
hew
hole
proj
ect
has
the
pote
ntia
lto
deli
ver
5GW
ofb
oth
onsh
ore
and
offs
hore
ener
gyby
2020
wit
hfi
rst
gene
rati
onpl
anne
dfo
r20
17.
GB
Bor
der
wit
hIr
elan
dP
embr
oke
(GB
)M
AR
EX
(Org
anic
Pow
er).
Com
bine
d19
00M
WT
PP
appe
ars
inth
ena
tion
alde
velo
pmen
tpl
an,
35S
ome
proj
ect
desc
ript
ions
are
deri
ved
from
Eur
opea
nC
omm
issi
on,
“Lis
tof
proj
ects
subm
itte
dto
beco
nsid
ered
aspo
tent
ial
Pro
ject
sof
Com
mon
Inte
rest
inen
ergy
infr
astr
uctu
reE
lect
rici
ty”,
27Ju
ly20
12.
hftp
://e
c.eu
ropa
.eul
ener
gy/i
nfra
stru
ctur
e/co
nsul
tati
ons/
doc/
pci_
list
elec
tric
ity.
Page
25of
30
/1/
-
Par
to
fEur
oasi
aIn
terc
onne
ctor
appe
ars
inth
ena
tion
alde
velo
pmen
tpl
an.
GB
Bor
der
wit
hIr
elan
dC
o.P
embr
oke
and
Pen
tir
(GB
)G
reen
wfr
e3G
Wof
onsh
ore
win
din
Irel
and
toT
PP
appe
ars
inth
ena
tion
alde
velo
pmen
tpl
an,
Off
aly
bedi
rect
lyco
nnec
ted
usin
g25
0km
HV
DC
2017
.ca
bles
toth
eU
Kpo
wer
syst
emin
Wal
esG
BP
eter
head
(GB
)B
orde
rw
ith
Nor
way
Nor
thC
onne
ctis
ajo
int
vent
ure
proj
ect t
ore
alis
eT
PP
appe
ars
inth
ena
tion
alde
velo
pmen
tpl
an,
(Sam
nang
er)
anH
VD
Cel
ectr
icit
yin
terc
onne
ctor
betw
een
2021
.N
orw
ayan
dth
eU
K.
GB
Bor
der
wit
hS
pain
(Gat
ica)
Indi
anQ
ueen
s(G
B)
BR
ITIB
.A
nH
VD
Csu
bmar
ine
inte
rcon
riec
tor
TP
Pap
pear
sin
the
nati
onal
deve
lopm
entp
lan,
betw
een
Spai
n,F
ranc
ean
dth
eU
KE
TY
S20
17.
GB
Bor
der
wit
hF
ranc
e-
Cha
nnel
Cab
leIn
terc
onne
ctor
.D
irec
tC
urre
ntT
PP
appe
ars
inth
ena
tion
alde
velo
pmen
t pla
n,(D
C)
bipo
lar
inte
rcon
nect
or,w
hich
cons
ists
of
ET
YS
2016
two
bund
led
high
-vol
tage
cabl
es.
The
Cha
nnel
Cab
lew
ill
have
aca
paci
tyof
1100
Meg
awat
tsan
da
tota
lle
ngth
of
130
kilo
met
ers.
26of
30
win
dge
nera
tion
,w
ith
6.vv
hst
orag
ein
May
o2
Irel
and,
conn
ecte
dto
UK
atP
embr
oke
via
1300
MW
HV
DC
VSC
cabl
e
Tab
le4:
Nat
iona
lco
mpo
nent
spl
anne
dby
TS
Os
that
are
not
incl
uded
inth
eE
NT
SO
-ET
YN
DP
2012
Countr
y:
Sub
stat
ion
1S
ubst
atio
n2
Not
e.
.
I
BG
Vet
ren
(BG
)B
lago
evgr
ad(B
G)
The
Clu
ster
BG
Nor
th-S
outh
Gri
dE
nhan
cem
ent
cons
ists
cons
truc
tion
oft
wo
new
high
-vol
tage
tran
smis
sion
lines
,as
foll
ows
1)O
HL
400k
Vs/
s“V
etre
n”—
s/s
“Bla
goev
grad
”,10
0km
.2)
OH
L40
0kV
s/s
“Tsa
reve
ts”
—
s/s
“Plo
vdiv
”,1 5
0km
.T
heco
nstr
ucti
ono
fbo
thlin
esw
ill
sign
ific
antl
yin
crea
sein
tero
pera
bili
tyan
dse
cure
oper
atio
nof
Bul
gari
an40
0kV
netw
ork
unde
rno
rmal
and
repa
irco
ndit
ions
.
BG
Tsa
reve
ts(B
G)
Plo
vdiv
(BG
)T
heC
lust
erB
GN
orth
-Sou
thG
rid
Enh
ance
men
tco
nsis
tsco
nstr
ucti
onoft
wo
new
high
-vol
tage
tran
smis
sion
lines
,as
foll
ows
1)O
HL
400k
Vs/
s“V
etre
n”—
s/s
“Bla
goev
grad
”,10
0km
.2)
OH
L40
0kV
s/s
“Tsa
reve
ts”
—
s/s
“Plo
vdiv
”,15
0km
.T
heco
nstr
ucti
onofb
oth
lines
wil
lsi
gnif
ican
tly
incr
ease
inte
rope
rabi
lity
and
secu
reop
erat
ion
ofB
ulga
rian
400k
Vne
twor
kun
der
norm
alan
dre
pair
cond
itio
ns.
GB
36B
orde
rw
ith
Spa
inIn
dian
Que
ens
(GB
)In
terc
onne
ctio
nS
pain
-Uni
ted
Kin
gdom
ES
-UK
.C
urre
ntly
noco
ntra
ct.
ET
YS
in20
25.
(Gat
ica)
IT37
Rag
usa
(IT
)B
orde
rw
ith
Mal
taT
hepr
ojec
tw
illal
low
the
conn
ecti
onoft
he
Mal
tese
elec
tric
ity
dist
ribu
tion
syst
emto
the
Eur
opea
n(I
T)
tran
smis
sion
grid
inS
icil
yan
dit
wil
lco
nsis
to
fon
e22
0kV
HV
AC
cabl
ebe
twee
nM
alta
Isla
ndan
dS
icil
yIs
land
(Rag
usa
subs
tati
on).
LT38
Mar
ijam
polé
(LT
)B
orde
rw
ith
Pol
and
Lit
Pol
Lin
k2
is40
0kV
AC
over
head
line
betw
een
Lit
huan
iaan
dP
olan
d.T
hepr
ojec
tis
supp
osed
tobe
(Mat
ki)
bene
fici
alac
cord
ing
toM
arke
tin
tegr
atio
nan
dS
ecur
ity
ofsu
pply
crit
eria
.L
itP
olL
ink
2w
ill
prov
ide
the
conv
erge
nce
ofm
arke
tpr
ices
and
wou
ldbe
bene
fici
alfo
rth
eE
Uel
ectr
icit
ym
arke
t.A
lso
Lit
Pol
Lin
k2
will
incr
ease
inte
rope
rabi
lity
and
secu
resy
stem
oper
atio
n.T
his
proj
ect
appe
ars
inth
ena
tion
alde
velo
pmen
tpla
n,bu
tnot
inth
eE
NT
SO
-ET
YN
DP
.
36T
hein
vest
men
tis
not
inth
eS
pani
shna
tion
alde
velo
pmen
tpla
n.37
Mal
taha
sno
nati
onal
deve
lopm
ent
plan
(no
TSO
).38
The
inve
stm
ent
isno
tin
the
Pol
ish
nati
onal
deve
lopm
ent
plan
.
,/%P
age2
7of3
O
Annex II — Summary of NRA responses on national development plans
Responses
28 responses (AT, BE, CY, CZ, DE, DK, EE, EL, ES, Fl, FR, GB, HR, RU, IT, IE, LI, LV, LU,MT39, NL, NO40, PL, PT, RO, SE, SI, 5K) were received by NRAs.
No response was received from BG and NI.
Frequency of publishing the national development plan
14 countries publish the national development plan on a yearly basis, while 8 countries do it on abiennial basis (see table below).
AT DK BE(4years)cy Fl ES (4 years)cz NL PL(3years)DE NO EE (no pubi.)EL PT LU (no pubi.)FR RO MT (no TSO)
GB SE
HR SI
RUIEITLTLV5K
__________ ___________
However, in several cases the collected responses exhibit delays or difficulties in the stages ofpublication and approval of the national development plan, thus causing a deviation compared tothe declared (annual or biennial) frequency of publication of the national development plan.
Time horizon of national development plans
The time horizon of national development plans is 1 0 years for the large maj ority of countries (24out of 27). Some of these national development plans (CZ, FR, IE, SI) include, as an exception, fewinvestments with a commissioning date beyond the time horizon. This may be the case for projectswhose construction start during the time horizon and whose commissioning is shortly after the lastyear covered by the national development plan. Other practices were reported in Denmark (20years), Norway (20 years, with more details for the 1 0 year period) and Spain (6-1 0 years).
Status of investments in national development plans
for the large majority of countries, the national development plan includes investments which are:
39 Malta has no ISO and no national development plan.40 The Norwegian NRA participated in the framework ofthe Agency cooperation with NRAs ofEU Member States.
Page 28 of 30
Every year Every 2 years Other
. under construction;
. planned;
. under consideration (under study).
However, in three countries investments under consideration are not included in the nationaldevelopment plans.
Approximately a half of the national development plans (AT, BE, DK, ES, FR, HR, HU, IE, IT,NL, PL, PT, RO) list investments which were present in the previous national development planand are commissioned or cancelled before issuing the national development plan. The other nationaldevelopment plans do not.
Third party projects in the national development plan
9 national development plans (EL, Fl, FR, GB, IT, LV, NO, SE, SI) include or refer to third-partyprojects, either on ad-hoc or on systematic basis.
Commissioning date and status
26 (out of 27) national development plans provide the commissioning date and 23 provide the statusof the investment (exceptions: LU for ‘commissioning date’ and HU, LU and PT for ‘status’information; ES provides progress status through biennial monitoring documents).
Increase of net transfer capacity
The majority of national development plans (14 out of 26) provide information on NTC increaseresulting from an investment (see table).
Yes No Ad-hoc n aDK BE AT CY
ES (only total NTC increase cz EL MTis provided) DE FlFR(onlyfor EE
interconnections) G BHR (only for interconnection IE
lines) LUHU (per border only) NOIT (per border only) SK
LTLVNL
PL (only forinterconnections)
PT (but not necessarilyrelated to a single proj ect)
ROSI (only for
interconnections)SE
Page 29 of 30
Estimated cost
In 14 cases out of 27, the published national development plan includes cost information per project(see table).
Yes 1 No Ad-hoccyczEE
EL (costs only for the first
DKFl
AT (confidential)BE
DE (total cost of planis published)
ES (total cost of planis published)
FR (total cost of planis published)
RU (confidential)IE
NL (confidential)PT
RO (confidential)5K
3 years are provided)GBHR
IT (mature projects only)LILVLUNOPLSISE
Page 30 of 30