ACER Opinion 08-2014 Document title: Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback about this document

Upload: others

Post on 03-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

ACER Opinion 08-2014Document title:

Publishing date: 09/04/2014

We appreciate your feedback

Please click on the icon to take a 5’ online surveyand provide your feedback about this document

Page 2: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

ACERAgency for the Cooperationof Energy Regulators

OPINION OF THE AGENCY FOR THE COOPERATION OF ENERGYREGULATORS No 08/2014

of 4 April 2014

ON THE NATIONAL TEN-YEAR ELECTRICITY NETWORK DEVELOPMENTPLANS PURSUANT TO ARTICLE 8(1 1) OF REGULATION (EC) NO 714/2009

THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS,

HAViNG REGARD to Regulation (EC) No 7 1 4/2009 of the European Parliament and of theCouncil of 1 3 July 2009 on conditions for access to the network for cross-border exchanges inelectricity and repealing Regulation (EC) No 1228/2003 ‘, and, in particular, Article 8(1 1) thereof,

WHEREAS:

(1) Article 8(1 1) of Regulation (EC) No 714/2009 tasks the Agency for the Cooperation of EnergyRegulators (“Agency”) with providing an opinion on the national ten-year networkdevelopment plans to assess their consistency with the Community-wide ten-year networkdevelopment plan (“EU TYNDP”).

(2) On 5 July 2012 the European Network of Transmission System Operators for Electricity(“ENTSO-E”) published the first EU TYNDP pursuant to Regulation (EC) No 714/20092. TheAgency issued an Opinion on this EU TYNDP 2012 on 5 September 2Ol2. That Opinion couldnot include a consistency assessment of the national ten-year network development plans withthe EU TYNDP 2012 because, at that time, the relevant national ten-year network developmentplans were still being developed in most Member States. Since then many national plans havebeen finalised.

(3) Regulation (EC) No 714/2009 does not define the term “national ten-year network developmentplan”. Yet, Article 8(1 1) of Regulation (EC) No 714/2009 clarifies the meaning of “nationalten-year network development plan” when it considers “if such national ten-year networkdevelopment plan is elaborated in accordance with Article 22 of Directive 2009/72/EC”. Thisspecific reference to Article 22 of Directive 2009/72/EC of the European Parliament and of theCouncil of 1 3 July 2009 concerning common rules for the internal market in electricity andrepealing Directive 2003/54/EC4 implies that “national ten-year network development plans”,

‘OJL211, l4.8.2009,p. 15.2 ENTSO-E, “10-Year Network Development Plan 2012”, 5 July 2012.https://www.entsoe.eulfileadrni&useruploadllibrary/SDC/TYNDP/20 I 2/TYNDP_2012_report.pdf3 Opinion ofthe Agency for the Cooperation ofEnergy Regulators No 06/2012 of5 September 2012 on the EuropeanTen-Year Network Development Plan,http://www.acer.europa.eulOfficial documents/Acts of the Agency/Opinions/Opinions/ACER%200pinion%2006-2012pdf4 oi L 21 1, 14.8.2009, p. 55.

Page 1 of3O

Page 3: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

ACERAgency for the Cooperationof Energy Regulators

pursuant to Article 8(1 1) of Regulation (EC) No 714/2009, cover not only the national ten-yearnetwork development plans elaborated by independent transmission operators in accordancewith Article 22 of Directive 2009/72/EC, but also other network development plans adopted atnational level, including those prepared by independent system operators or transmissionsystem operators. It is clear from Article 22 of Directive 2009/72/EC that the national ten-yearnetwork development plans of independent transmission operators shall indicate transmissioninfrastructure which needs to be built or to be upgraded over the next ten years to guarantee theadequacy of the system and the security of supply. A similar clarification by the legislator ismissing for other national ten-year network development plans. However, the Agency believesthat the aforementioned main purpose and key elements of national network development plansin Article 22 of Directive 2009/72/EC are of such an essential nature that they shall beconsidered as characteristic of any national ten-year network development plan within themeaning of Regulation (EC) No 714/2009. Accordingly, the Agency, for this Opinion, focusedits assessment on national instruments concerning the planning of new transmissioninfrastructures, and as such on the substance and not on the form of the national networkdevelopment plans. Thus, the Agency considered in this Opinion all relevant national planninginstruments, even if they were referred to with a different title, e.g. investment plan5, as“national ten-year network development plans” pursuant to Article 8(1 1) of Regulation (EC) No714/2009 (hereinafter altogether “national development plans”).

(4) National regulatory authorities (“NRAs”) have provided essential information for this Opinionby submitting information on national components of transmission investments6 to the Agencythrough an online data collection (completed on 14 February 2014) and by identifying some keyfeatures of their national development plans in responses to a questionnaire (completed on 26February 2014). This information is summarised in Annex I and in Annex II to this Opinion,respectively,

HAS ADOPTED THIS OPINION:

1. Introduction

In the Agency’ s view, the assessment of consistency of national development plans with the EUTYNDP may cover in principle three fundamental aspects:

. consistency of inputs;

. consistency of analytical methodology;

. consistency of outputs.

5 The Agency took also into account that in the European Commission “Proposal for a Regulation of the EuropeanParliament and of the Council Amending Regulation (EC) No 1228/2003 on conditions for access to the network forcross-border exchanges in electricity”, Brussels, 19.9.2007, COM(2007) 53 1 fmal, 2007/0198 (COD), it was proposedthat ‘The European Network of Transmission System Operators for Electricity shall adopt (...) a 10-year investmentplan’, with the same features that the EU TYNDP has, pursuant to the adopted Regulation (EC) No 714/2009.6 In this Opinion, “national component” means a national part of a transmission investment item (part of a line or cableinterconnecting two or more countries or a line or substation or other equipment geographically located in one country).

Page2of3ON5

Page 4: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

ACERAgency for the Cooperationof Energy Regulators

The first two aspects are still under development at European level7 and therefore methodologiesfor the consistent elaboration of network development plans are not yet available. In the Agency’sview, without such EU-wide methodologies it is not ensured that the national development plansand the EU TYNDP 2012 have a common input basis and a common analytical methodology whichwould allow a reliable assessment of consistency of outputs.

Therefore, in this Opinion the Agency compares the national development plans with the EUTYNDP 2012 and outlines relevant (matches and) differences, but deems it appropriate to refrainfrom qualifying the differences as inconsistencies pursuant to Article 8(1 1) of Regulation (EC) No714/2009. In particular, the Agency has decided to focus this Opinion on the comparison of outputsof national development plans with:

. the main output ofthe EU TYNDP 2012, i.e. the list ofprojects ofpan-European significance inAppendix 1 of the EU TYNDP 2012 (and its further disaggregation into investment items8)(Section 3 ofthis Opinion);

. the further outputs of the EU TYNDP 2012, i.e. the features which are presented for eachproject or investment item ofpan-European significance (Section 4 ofthis Opinion).

The interaction between the national development plans and the EU TYNDP is relevant for thecomparison of outputs of national development plans with regard to those of the EU TYNDP 2012.Therefore, as a preparatory step for this comparison, the Agency first analyses this interaction(Section 2 ofthis Opinion).

2. The interaction between the national development plans and the EU TYNUP

With regard to the relationship between national development plans and the EU TYNDP, theAgency took into account:

. the process of interaction between the national development plans and the EU TYNDP, takinginto account the provisions of Articles 8(10) and (11) of Regulation (EC) No 714/2009 and ofArticle 37(1)(g) ofDirective 2009/72/EC, and

. the timing of preparation of the national development plans and the timing of preparation of theEU TYNDP 2012.

7 Such activities are ongoing, see ENTSO-E “Guideline to Cost Benefit Analysis of Grid Development Projects”, 14November 2013 and ENTSO-E activity (scenarios and visions) to prepare input data for the TYNDP 2014,https://www.entsoe.eulfileadmim’userupload/library/events/Workshops/CBA!l3 1 1 14_ENISO-E_CBA_Methodology.pdf.8 The comparison with regard to the TYNDP has been performed with reference to investment items, as disaggregatedin the ENTSO-E “2013 Monitoring update ofthe TYNDP 2012 Table ofprojects”, 1 July 2013, Annex 1 — Monitoringupdate TYNDP 2012 Table of Projects,https://www.entsoe.eulflleadminluseruploadllibrary/SDC/TYNDP/2012/1 3070 l_Monitoring_update_TYNDP_2012_Table_of_projects FINAL.pdf.

Page 3 of 30

Page 5: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

ACER— Agency for the Cooperation— of Energy Regulators

The process of interaction is graphically depicted in Figure 1 : the national development plans (inparticular, their “cross-border” part, coloured in light-blue in Figure 1) contribute as building blocksof the EU TYNDP, together with the regional investment plans and the regional and Europeanstudies performed in the EU TYNDP framework. The regional and European studies areparticularly focused on the investments which have a cross-border nature (interconnectors orinternal network elements which affect cross-border transfer capacities) and can identify improvedplanning solutions, to be included in the next national development plans (or in amended plans,coloured in green in Figure 1). The “internal” part of national development plans is updated overtime without interactions with other national development plans and the EU TYNDP (horizontaldashed blue lines in Figure 1).

After the preparation of the EU TYNDP, in the drafting phase of national development plans“succeeding” the EU TYNDP, the Agency and NRAs — according to their respective competencesand duties - assess the consistency of the national development plans with the EU TYNDP.Furthermore, the Agency and NRAs — again, according to their respective competences and duties -

can recommend amending the plans9.

9 iiis may recommend to amend (only) national plans.

Page 4 of 30

‘N

Figure 1 : The process of interaction between the national development plans and the EU TYNDP

NationalPlan

ACEROpinion on

draft TYNDP

. _iNational

Plan

Page 6: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

ACERAgency for the Cooperationof Energy Regulators

While the process of interaction in Figure 1 is relatively simple, the assessment of the Agencyrevealed significant complexities due to the widely different timing of preparation of nationaldevelopment plans across the European countries.

Figure 2 displays the timing of publication of a (usually draft) national development plan by a ISOand of its submission to the national competent authority(ies)’°. When applicable, the nationaldevelopment plan “preceding” the EU IYNDP 2012 (coloured in blue) and the (first) nationaldevelopment plan “succeeding” the EU TYNDP 20 12 (coloured in green) are presented. The orangevertical lines correspond to the main milestones ofthe EU TYNDP 2012:

. publication of the draft EU TYNDP 2012 by ENTSO-E and its submission to the Agency for itsopinion (5 and 6 July 2012);

. publication of the Agency’ s Opinion, which did not recommend any amendments of the draftEU TYNDP 2012 (5 September 2012).

Considering that, currently, the very large majority of countries publish national development plans,the Agency deems that it is good practice to publish a national development plan”.

10 Publication and submission are in many cases at the same point in time. for a few countries, there is no submission toNRAs. In such cases, the date ofpublication is indicated.11 This is without prejudice to submission of any confidential additional information from a ISO to its NRA, pursuantto national legislations or regulations.

Page 5 of 30

0

Page 7: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

ACERAgency for the Cooperation

— of Energy Regulators

Figure 2: The timing of preparation of national development plans and of the EU TYNDP 2012

Country Frequency Plan Year2Oll Year2Ol2 Year2Ol3 2014

ofplan ‘preceding’ i F M A M i i A S 0 N 0 i F M A M i JA SO N D J F M A M i J A S 0 N 0 JIM

Austria 1-year

Croatia 1-year 2

Cyprus 1-year . 3

Czech Republic 1-year — mFrance 1-year

Germany 1-year •Great Britain 1-year •Greece 1-year Dec D9

Lithuama

EEE:EEREE!EE

Slovak Republic 1-year 6

Denmark 2-year Nov-09 •Finland 2-year 4

The Netherlands 2-year

Norway 2-year

Portugal 2-year Jul08Romania 2-year 5

Slovenia 2-year

Sweden 2-year 8

Poland 3-year - — —

Belgium 4-year

Spain 4-year Jul 07 ______________ • 7

Estonia np.

‘.uxembourg np.

Malta: no transmission plan (as there exists no transmission system operator)1 - Belgium: the process for the national plan after ENTSO-E TYNDP 2012 has not started yet2- Croatia: before TYNDP 2012, there was a 3-years investment plan of Croatian TSO approved by NRA

3- Cyprus: the process forthe national plan after ENTSO-ETYNDP 2012 is not available

4- Finland: the TSO published a presentation ‘National ten-yeargrid development plan for Finland, 12/2012”

5 - Romania: the process for the national plan after ENTSO-E WNDP 2012 is ongoing (consultation phase in Feb 2014)

6- Slovak Republic: publication expected in Q120147- Spain: 1st submission to the NRA in September 2013, 2nd submission expected in March 2014

8- Sweden: Svenska kraftnät published no dedicated Swedish plan before July 2012

Figure 2 also identifies different frequencies in preparing national development plans (see Annex IIto this Opinion for more details), with the large majority of countries having either a yearly or abiennial frequency.

The Agency deems it necessary that national development plans are prepared at least every twoyears, in order to allow for consistency ofnational development plans with the EU TYNDP.

Furthermore, the Agency finds that about half of the 1 3 countries with a yearly frequency encounterdelays or difficulties in fulfilling the different steps of the process of preparation of the nationaldevelopment plan’2.

If difficulties are encountered with an annual frequency, the Agency recommends the relevantNRAs to examine the possibility to shift to a biennial frequency and to advise Member States about

12 The preparation of the national development plan can include: analysis and drafting by the ISO, consultation fromTSO and/or from NRA (when applicable), approval or opinion from NRA (as applicable), approval from Ministry(when applicable).

Page 6 of 30

Page 8: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

ACERAgency for the Cooperation

— of Energy Regulators

this possibility, according to the results of the NRA assessment. National development plans with abiennial frequency could be usefully accompanied by a monitoring update in the years when theplan is not prepared (similarly to the practice ofENT$O-E in 2013).

3. Comparison of investments listed in national development plans and in EU TYNUP 2012

3 . 1 Investment items in the EU TYNDP 2012 package (including Regional Investment Plans 2012)which are not included in national development plans

Based on the online data submissions by NRAs’3, the Agency identifies 5 1 national components’4of transmission investments in the ENT$O-E TYNDP 2012, which are not included in nationaldevelopment plans (see Table 1 in Annex I to this Opinion).

The reasons for non-inclusion are summarised by Figure 3 in Annex I to this Opinion. In general,the following (actual or potential) reasons have been detected:

. the investment is not included because the national development plan was prepared beforeENTSO-E TYNDP 2012;

. the investment is no longer included because it has been meanwhile commissioned;

. the investment is no longer included because it has been meanwhile cancelled;

. the (very long term) investment is not included because the timespan of the nationaldevelopment plan is shorter than the one of ENT$O-E TYNDP 2012;

. the investment is not included because its voltage level is not considered in the nationaldevelopment plan;

. the investment is not included because it does not fulfil another criterion for inclusion in theplan;

. the third party projects (TPPs) are normally not included in the national development plan’5;

. the investment is not carried out by the TSO and it relates to a non-T$O network;

. there is no agreement on the investment among neighbouring TSOs;

. the initiative under consideration did not (yet) become a planned investment;

. the investment is likely to be part of a wider reinforcement project, but it is not explicitlymentioned in the national development plan.

Furthermore, the Agency identifies 24 national components’6 of transmission investments in theENT$O-E Regional Investment Plans 2012, which are not included in national development plans(see Table 2 in Annex I to this Opinion).

13 When possible, the comparison has been performed between the EU TYNDP 2012 and a national development plan“succeeding” EU TYNDP 2012.14 This figure includes 8 investments in Germany which have been proposed in the draft plan of 2013, but were notapproved by the German NRA.15 This is the case for one investment included in the EU TYNDP (as TSO project), currently being considered as thirdparty project.16 Also the previous 5 1 national components of the EU TYNDP are included in the ENTSO-E Regional InvestmentPlans 2012. The additional 24 national components are investments which are not included in the EU TYNDP 2012.

Page 7 of 30

Page 9: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

ACERAgency For the Cooperationof Energy Regulators

The reasons for these differences are summarised by Figure 4 in Annex I to this Opinion.

The Agency considers it as important that ENTSO-E and its TSO members take into account thefindings presented above in their upcoming preparation of the draft EU TYNDP 2014. In particular,considering the diverging or missing information in the NRA assessment of interconnection lines,ENTSO-E should carefully study the following investments:

. 1 6.3 8 Gatica (ES) - Aquitaine (FR);

. 23 .60 under consideration (FR) - under consideration (BE), updated in 201 3 as AvelinlMastaing(FR) - Horta (BE);

. 26.66 Prati di Vizze (IT) - Steinach (AT);

. 27.A96 New interconnection between Italy and Slovenia, updated in 2013 as Slovenia (SI) —

Salgareda (IT);. 3 5 . 1 3 8 tbd (CZ) - South-Eastern 50 Hertz (DE);. 381 Visaginas (LT) - Liksna (LV).

Out of the 75 (5 1 and 24) national components identified above, 24 were not included in nationaldevelopment plans because of cancellation and 12 were not included because of commissioning.Further analysis reveals that only about half of the national development plans list investmentswhich were present in the previous national development plan and are commissioned or cancelledbefore issuing the next national development plan (see Annex II to this Opinion for more details).

In line with its Opinion on the EU TYNDP 2012 and the remarks on cancelled projects providedtherein’7, the Agency considers that full transparency on the evolution of investments should beprovided in national development plans, especially on cancelled investments. It is thereforeimportant to keep the commissioned and cancelled investments in the national development plan

(for one subsequent edition) too. The reason for cancellation should be displayed for eachinvestment.

Finally, the Agency observes that in a few cases - in particular for investments under consideration -

the EU TYNDP 2012 did not provide details or sufficient clarity in investment descriptions, forexample substations t.b.d. (to be defined).

This is acceptable when studies for the investment are still ongoing. However, this approach cancreate difficulties in assessing the consistency of investments and in future monitoring of theirimplementation.

Therefore, the Agency believes it is important that, as soon as an investment under considerationdevelops, complete descriptions are provided in the concerned national development plan(s) and inthe EU TYNDP.

‘7 Agency Opinion on the ENTSO-E TYNDP 2012, p. 16.

Page8of3O

N

Page 10: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

ACER— Agency for the Cooperation— of Energy Regulators

3 .2 Investments in national development plans which are not included in the EU TYNDP 20

In the EU TYNDP 2012, none of the 5 TPPs having applied for inclusion met the criteria set out byENT$O-E, thus none of these TPPs has been taken into account during the development of the EUTYNDP and has been included in the table of projects’8.

Based on the online data submissions by NRAs, the Agency identifies 1 0 TPPs which are included(or at least referred to) in national development plans. These TPPs are listed in Table 3 in Annex Ito this Opinion.

Further analysis reveals that only few national development plans occasionally present TPPs (seeAnnex II to this Opinion for more details). In its Opinion on the EU TYNDP 2O12’, the Agencyemphasised the importance of ensuring equal treatment of TSOs’ projects and TPPs and, inparticular, recommended ENT$O-E to add in an appendix of future EU TYNDPs all the TPPswhich have applied for inclusion and to explain how they are treated in the EU TYNDP.

Similarly, the Agency deems it as useful that appendices are included in national development plansto provide information to stakeholders about non-TSO projects (as long as they had at least oneinteraction, for instance for connection, with the relevant TSOs). This inclusion would also allowimplementing the provision of Article 3(6) of Regulation (EU) No 347/2013 of the EuropeanParliament and of the Council of 1 7 April 2013 on guidelines for trans-European energyinfrastructure and repealing Decision No 1 364/2006/EC and amending Regulations (EC) No7 1 3/2009, (EC) No 714/2009 and (EC) No 7 1 5/200920, which requires proj ects of common interest

(including non-TSO projects) to become an integral part of national network development plans andother national infrastructure plans concerned, as appropriate.

furthermore, the Agency identifies 5 national components2’ planned by T50s22 that are notincluded in the EU TYNDP 2012 (see Table 4 in Annex I to this Opinion).The Agency deems it as critical that ENTSO-E and its TSO members consider these investments intheir upcoming preparation ofthe drafi EU TYNDP 2014.

4. Consistency of investment descriptions in national development plans

The EU TYNDP 2012 makes use of a project number (for each project of pan-Europeansignificance) and of an investment number (for each investment item).

The Agency believes that such practice can facilitate the assessment of consistency and themonitoring of investment implementation. Therefore, the Agency believes it is appropriate that a

1$ Annex I to ENTSO-E TYNDP 2012.19 Agency Opinion on the ENTSO-E TYNDP 2012, p. 8.20 o.i L 115, 25.4.2013, p. 39.21 This assessment is targeted to interconnection lines and to national investments affecting the cross-border transfercapacities.22 One of the national components (Italy - Malta interconnection) is not actually planned by a ISO, because Malta hasno transmission system operator. The investment interconnects the distribution system of Malta with Sicily region ofItaly.

Page 9 of 30

Page 11: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

ACERAgency For the Cooperationof Energy Regulators

coding system (unique for each investment) is adopted in each national development plan.Furthermore, it is appropriate that each national development plan includes a mapping presenting,for those investments that feature also in the EU TYNDP or in Regional Investment Plans, a cross-reference between their codes in the different plans.

The EU TYNDP 2012 presents a summary table with project-by-project information, including23:

. expected commissioning date;

. present investment status;

. grid transfer capability increase;

. project costs.

The analysis of the Agency revealed that the large majority of national development plans provideinformation on commissioning date and on investment status. The majority of national developmentplans provide information on net transfer capacity (“NTC”) increase resulting from an investmentand on investment costs (see Annex II to this Opinion for more details).

The Agency therefore deems the systematic publication of the following information for eachinvestment item in the national development plans as a good, TYNDP-consistent practice:

. commissioning date;

. investment status;

. increase of net transfer capacity (only for investment with cross-border nature, i.e.interconnectors or internal network elements which affect cross-border transfer capacities);

. cost.

Done at Ljubljana on 4 April 2014.

For the Agency:

Iio PototschnigDirector

23 The presentation ofbenefits ofeach project is not discussed here, because it is subject to modifications with theforthcoming approval and application of the ENTSO-E cost benefit analysis methodology.

Page 10 of 30

Page 12: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Annex

I—

Co

mparison

of

investm

ents

in

natio

nal

dev

elo

pm

en

tplans

an

din

the

EN

T$O

-E

TY

ND

P2012

28

Nati

onal

Regula

tory

Auth

ori

ties

(AT

,B

E,

BG

,C

Y,

CZ

,D

E,

DK

,E

E,

EL

,E

S,

Fl,

FR

,G

B,

HR

,R

U,

IT,

IE,

LT

,L

U,

MT

,N

L,

NO

24

,P

L,

PT

,R

O,

SE

,S

I,5K

)part

icip

ate

din

the

pro

cess

,pro

vid

ing

their

inp

uts

on

nati

on

al

com

ponents

of

tran

smis

sio

nin

vest

men

tsb

y14

Feb

ruary

2014,

eit

her

for

all

com

pone

nts

(15

NR

As)

orfo

ra

part

oft

hem

(13

NR

As)

.N

oco

ntri

buti

onw

asre

ceiv

edfr

omL

Van

dN

I.

Tab

le1

:N

ati

onal

com

ponents

of

transm

issi

on

invest

ments

inth

eE

NT

SO

-ET

YN

DP

2012,

whic

hare

no

tin

clu

ded

inn

ati

on

al

dev

elo

pm

en

tpl

ans

Countr

yT

YN

DP

Sub

stat

ion

1S

ubst

atio

n2

Pro

ject

Des

crip

tion

Rea

son

for

abse

nce

2012

Cod

eN

ewdo

uble

circ

uit

400k

Vin

terc

onne

ctio

nth

roug

hth

epi

lott

unne

lo

fth

epl

anne

dB

renn

erB

ase

Tim

nel.

Tot

allin

ele

ngth

:65

km.

AT2

526

.66

Bor

der

wit

hIt

aly

(Pra

tiS

tein

ach

(AT

)U

pgra

deo

fth

eex

isti

ng44

kmP

rati

diV

izze

Non

-IS

Opr

ojec

tsar

eno

tin

the

nati

onal

diV

izze

)(I

T)

—S

tein

ach

(AT

)si

ngle

circ

uit

I10/

132k

VT

YN

DP

.O

HL

,cu

rren

tly

oper

ated

atm

ediu

mvo

ltag

e.

BE2

623

.60

Bor

der

wit

hF

ranc

eH

orta

(new

400-

kyF

ranc

e-B

elgi

umT

hein

vest

men

tis

not

incl

uded

beca

use

the

(Ave

linl

Mas

tain

g)su

bsta

tion

)(B

E)

nati

onal

deve

lopm

ent

plan

was

prep

ared

earl

ier

than

EN

TS

O-E

TY

ND

P20

12.

Itis

only

unde

rco

nsid

erat

ion

inan

earl

yph

ase

and

the

tech

nica

las

pect

sar

est

illto

bede

term

ined

.

BE

24.A

26H

orta

(BE

)D

oel/

Mer

cato

r(B

E)

Upg

rade

wit

hhi

ghpe

rfor

man

ceco

nduc

tors

.T

hein

vest

men

tis

not

incl

uded

beca

use

the

nati

onal

deve

lopm

ent

plan

was

prep

ared

earl

ier

than

EN

TS

O-E

TY

ND

P20

12.

cz35

.137

Vit

kov

(CZ

)B

orde

rw

ith

Ger

man

yN

ew40

0kV

sing

leci

rcui

ttie

-lin

ebe

twee

nC

urre

ntna

tion

alde

velo

pmen

tpl

anco

vers

(Mec

hlen

reut

h)ne

w(C

Z)

subs

tati

onan

dex

isti

ng(D

E)

proj

ects

upto

year

2023

with

som

eou

tloo

kto

subs

tati

on.

Len

gth:

70km

.ye

ar20

25.

Acc

ordi

ngto

info

rmat

ion

inT

YN

DP

abou

tex

pect

edco

mm

issi

onin

gye

ar(2

032)

this

proj

ect

isno

tre

leva

ntfo

rN

atio

nal

24T

heN

orw

egia

nN

RA

part

icip

ated

inth

efr

amew

ork

oft

he

Age

ncy

coop

erat

ion

wit

hN

RA

so

fEU

Mem

ber

Stat

es.

25T

he

inve

stm

ent

isin

clud

edin

the

Ital

ian

nati

onal

deve

lopm

entp

lan.

The

Ital

ian

nati

onal

deve

lopm

entp

lan

men

tion

sth

atno

wor

ksar

ene

eded

onth

eA

ustr

ian

side

.26

Th

ein

vest

men

tis

incl

uded

inth

eF

renc

hna

tion

alde

velo

pmen

tpl

an.

/P

ag

e11

of3O

/4/

AT

26.6

4B

orde

rw

ith

Ital

y(B

ress

anon

e)N

ewsu

bsta

tion

near

Inns

bruc

k(A

T)

Non

-TS

Opr

ojec

tsar

eno

tin

the

nati

onal

TY

ND

P.

Page 13: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Country

TY

ND

PS

ub

statio

n1

Substation

2P

ro

ject

Descrip

tio

nR

easo

nfor

ab

sen

ce

20

12

Code

deve

lopm

entp

lan.

cz27

35.

138

tbd

(CZ

)B

orde

rw

ith

Ger

man

yP

ossi

ble

incr

ease

of

inte

rcon

nect

ion

capa

city

Cur

rent

nati

onal

deve

lopm

ent

plan

cove

rs(S

outh

-Eas

tern

50H

ertz

)be

twee

nC

EP

San

d5O

Her

tzT

rans

mis

sion

ispr

ojec

tsup

toye

ar20

23w

ith

som

eou

tloo

kto

unde

rco

nsid

erat

ion:

eith

era

new

400k

Vti

e-ye

ar20

25.

Acc

ordi

ngto

info

rmat

ion

inlin

e(O

HL

onne

wro

ute)

ora

rein

forc

emen

to

fT

YN

DP

abou

tex

pect

edco

mm

issi

onin

gye

arth

eex

isti

ng40

0kV

tie-

line

Hra

dec

(CE

PS

)—

(203

2)th

ispr

ojec

tis

not

rele

vant

for

Nat

iona

lR

öhrs

dorf

(5O

Her

tzT

rans

mis

sion

).de

velo

pmen

tpla

n.cz

55.3

10

Vys

kov

(CZ

)R

epor

yje

(CZ

)N

ewco

nnec

tion

betw

een

2ex

isti

ngT

hein

vest

men

tha

sa

stat

usun

der

subs

tati

ons

line

sing

leci

rcui

tO

HL

1385

cons

ider

atio

nin

TY

ND

P20

12.

Due

toth

eM

VA

.re

sult

sof

feas

ibil

ity

stud

y(c

ross

ing

prot

ecte

dar

ea)

the

proj

ect

was

canc

elle

d.

DE

35.1

37B

orde

rw

ith

the

Cze

chM

echi

enre

uth

(DE

)N

ew40

0kV

sing

leci

rcui

ttie

-lin

ebe

twee

nT

his

proj

ect

does

not

appe

arin

the

nati

onal

Rep

ubli

c(V

itko

v)ne

w(C

Z)

subs

tati

onan

dex

isti

ng(D

E)

grid

deve

lopm

entp

lan.

Stat

usin

TY

ND

Pha

ssu

bsta

tion

.L

engt

h:70

km.

been

“und

erco

nsid

erat

ion”

.A

ccor

ding

to5O

Her

tzth

ispr

ojec

tis

not

yet

conc

rete

enou

ghto

ente

rin

the

nati

onal

grid

deve

lopm

ent

plan

.

DE

40.A

30B

orde

rw

ith

Lux

embo

urg

Nie

ders

tede

m(D

E)

ortb

dU

pgra

ding

and

new

cons

truc

tion

ofan

Thi

spr

ojec

tdo

esno

tap

pear

inth

ena

tion

al

(Bas

char

age)

(DE

)in

terc

onne

ctor

toD

E,

inco

njun

ctio

nw

ith

the

grid

deve

lopm

entp

lan,

neit

her

in20

12no

rin

inte

rcon

nect

orin

the

sout

hof

LU

;P

arti

al20

13.

Stat

usin

TY

ND

P20

12“u

nder

upgr

adin

gof

exis

ting

220k

Vlin

esan

dpa

rtia

lco

nsid

erat

ion”

.P

roje

ctis

noty

etco

ncre

tene

wco

nstr

ucti

ono

flin

es;

Wit

hpo

wer

enou

ghto

ente

rin

the

nati

onal

grid

tran

sfor

mer

stat

ion

inL

Ude

velo

pmen

tpla

n.

DE

42.1

61O

ffsh

ore-

Win

dpa

rkG

Ohi

(DE

)N

ewA

C-c

able

conn

ecti

onw

ith

ato

tal

leng

thT

his

proj

ect

does

not

appe

arin

the

nati

onal

GE

OF

reE

(DE

)o

f32

km.

grid

deve

lopm

ent

plan

.T

heco

nnec

tion

oft

his

offs

hore

win

d-fa

rmis

plan

ned

afte

r20

23,

i.e.

the

tim

eho

rizo

no

fth

ena

tion

alde

velo

pmen

tpl

an.

27T

hein

vest

men

tis

incl

uded

inth

eG

erm

anna

tion

alpl

an.

,‘P

age

12o

f30

Page 14: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

few

Imes

inH

VD

Cte

cim

olog

yfr

omth

ere

gion

of

Low

erS

axon

yto

Nor

thB

aden

Wti

rtte

mbe

rgto

inte

grat

ene

ww

ind

gene

rati

ones

peci

ally

from

Nor

thSe

ato

war

dsC

entr

al-

Sou

thE

urop

efo

rco

nsum

ptio

nan

dst

orag

e.T

hein

vest

men

tis

part

oft

he

tran

smis

sion

corr

idor

Clo

ppen

burg

-N

orth

Bad

enW

tirt

tem

berg

.

DE

43.A

153

Weh

rend

orf(

DE

)U

rber

ach

(DE

)

Cou

ntry

2O

l2C

ode

Subst

atio

nl

Subst

atio

n2

Rea

son

for

abse

nce

Thi

spr

ojec

tw

asin

clud

edin

the

prop

osed

grid

deve

lopm

ent

plan

2012

byth

eT

SO

,bu

tit

was

not

appr

oved

byth

eN

RA

.

DE

44.1

71H

Uff

enha

rdt

(DE

)N

euro

tt(D

E)

Upg

rade

oft

he

line

from

220k

Vto

380k

V.

Thi

spr

ojec

tdo

esno

tap

pear

hi

the

nati

onal

Len

gth:

11km

.In

clud

edw

ithth

ein

vest

men

t:

grid

deve

lopm

entp

lan,

beca

use

itha

s1

new

380k

Vsu

bsta

tion

.m

eanw

hile

been

canc

elle

dby

the

TS

O.

DE

44. 1

82K

rift

el(D

E)

Obe

rerl

enba

ch(D

E)

New

400

kVdo

uble

circ

uit

OH

LK

rffl

el-

Thi

spr

ojec

tw

asin

clud

edhi

the

prop

osed

grid

Obe

rerl

eben

bach

inex

isti

ngO

HL

corr

idor

.de

velo

pmen

tpla

n20

12an

dw

asap

prov

edby

the

NR

A.

Thi

spr

ojec

tw

asag

ain

incl

uded

inth

epr

opos

edgr

idde

velo

pmen

tpla

n20

13an

dw

asno

tap

prov

edby

the

NR

A.

DE

44.A

155

Con

nefo

rde

(DE

)U

nter

wes

er(D

E)

Upg

rade

of23

0-kV

-cir

cuit

Unt

erw

eser

-T

his

proj

ect

was

incl

uded

inth

epr

opos

edgr

id

Con

nefo

rde

to40

0kV

,L

ine

leng

th:

32km

.de

velo

pmen

tpla

n20

12by

the

TSO

,bu

tit

was

not

appr

oved

byth

eN

RA

.

DE

44.A

159

Ph

Bla

tzhe

im(D

E)

Obe

rzie

r(D

E)

New

400

kVdo

uble

circ

uit

OH

LPk

t.T

his

proj

ect

was

incl

uded

inth

epr

opos

edgr

id

Bla

tzhe

im-

Obe

rzie

rin

clud

ing

exte

nsio

nof

deve

lopm

entp

lan

2012

byth

eT

SO,

but

itw

as

exis

ting

subs

tati

ons.

not

appr

oved

byth

eN

RA

.

DE

44.A

162

Gro

Bga

rtac

h(D

E)

End

ersb

ach

(DE

)E

xten

sion

ofex

isti

ng38

0kV

line

Thi

spr

ojec

tw

asin

clud

edin

the

prop

osed

grid

Gro

l3ga

rtac

h-E

nder

sbac

h.(L

engt

h:32

km)

deve

lopm

entp

lan

2012

byth

eT

SO

and

itw

asap

prov

edby

the

NR

A.

itw

asin

clud

edin

the

prop

osed

grid

deve

lopm

entp

lan

2013

byth

eT

SO,

but

itw

asno

tap

prov

edby

the

NR

A.

DE

45.4

7.15

8ir

schi

ng(D

E)

Ott

enho

fen

(DE

)U

pgra

deof

23O

kVco

nnec

tion

Irsc

hing

-T

his

proj

ect

was

incl

uded

inth

epr

opos

edgr

id

Ott

enho

fen

to40

0kV

,in

clud

ing

new

400k

Vde

velo

pmen

tpl

an20

12by

the

TS

O,

but

itw

as

swit

chge

arZ

olli

ng.

Len

gth

76km

.no

tap

prov

edby

the

NR

A.

DE

45.A

166

Sch

alka

uI

area

of

area

ofG

rafe

nrhe

infe

ldN

ewdo

uble

circ

uit

OH

L40

0-kV

-lin

e(1

30T

his

proj

ect

was

incl

uded

inth

epr

opos

edgr

id

Alt

enfe

ld(D

E)

(DE

)km

)de

velo

pmen

tpl

an20

12by

the

TSO

,bu

tit

was

not

appr

oved

byth

eN

RA

.

Pag

e13

of

30

Page 15: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Country

TY

ND

PS

ub

statio

n1

Substation

2P

ro

ject

Descrip

tio

nR

easo

nfor

ab

sen

ce

__

________

20

12

Co

de

Isar

(DE

)

NR

A.

EL

49.2

52M

elli

ti(E

L)

Kar

dia

(EL

)N

ew40

0kV

doub

leci

rcui

tO

HL

.T

hein

vest

men

tis

nolo

nger

incl

uded

beca

use

____

_______

Len

gth:

4Okm

.it

has

been

mea

nwhi

leca

ncel

led.

EL

49.2

53K

ardi

a(E

L)

Tri

lcal

a(E

L)

New

400k

Vdo

uble

circ

uit

OH

L.

The

inve

stm

ent

isno

long

erin

clud

edbe

caus

eL

engt

h:8O

km.

itha

sbe

enm

eanw

hile

canc

elle

d.

EL

49.2

54L

aris

sa(E

L)

Tri

lcal

a(E

L)

New

400k

Vdo

uble

circ

uit

OH

L.

The

inve

stm

ent

isno

long

erin

clud

edbe

caus

eL

engt

h:57

km.

itha

sbe

enm

eanw

hile

canc

elle

d.

ES28

16.3

8G

atic

a(E

S)

Bor

der

wit

hF

ranc

eN

ewH

VD

Cin

terc

onne

ctio

nin

the

wes

tern

The

tim

espa

no

fth

ena

tion

alde

velo

pmen

t(A

quit

aine

)pa

rto

fth

ebo

rder

via

DC

subs

eaca

ble

inth

epl

anis

shor

ter

than

the

one

oft

he

EN

TS

O-E

Bis

cay

Gul

f.T

YN

DP

2012

.

GB

74.4

49R

ichb

orou

gh(G

B)

Can

terb

ury

(GB

)N

ew40

0kV

doub

leci

rcui

tO

HL

and

new

Thi

sis

not

expl

icit

lyid

enti

fied

inth

e40

0kV

subs

tati

onin

Ric

hbor

ough

.E

lect

rici

tyT

enY

ear

Sta

tem

ent

(ET

YS

)as

itdo

esno

tad

dN

atio

nal

Ele

ctri

city

Tra

nsm

issi

onS

yste

m(N

ET

S)

capa

city

inE

ngla

ndan

dW

ales

.It

ises

sent

iall

yal

lab

out

alo

cal

conn

ecti

onin

term

so

fth

eU

KN

ET

S.

GB

76.A

44H

ackn

ey(G

B)

St.

John

’sW

ood

(GB

)N

ewH

ackn

ey-

St.

John

’sW

ood

400k

Vdo

uble

Thi

spr

ojec

tis

driv

enby

and

SoS

/Ass

etci

rcui

t.R

epla

cem

entr

equi

rem

ent.

Itdo

esno

tad

dan

ytr

ansm

issi

onco

nnec

tion

capa

city

toth

eG

Bne

twor

kor

boun

dari

es,

and

ther

efor

eit

isun

like

lyto

bese

enor

util

ised

bycu

stom

ers

and

asa

cons

eque

nce

itis

not

incl

uded

inth

eE

TY

S.

GB

76.A

46St

.Jo

hns

Woo

d(G

B)

Wim

bled

on(G

B)

New

St.

John

’sW

ood-

Wim

bled

on40

0kV

Thi

spr

ojec

tis

driv

enby

and

SoS

/Ass

etdo

uble

circ

uit.

Rep

lace

men

tre

quir

emen

t.It

does

not

add

any

tran

smis

sion

conn

ecti

onca

paci

tyto

the

GB

netw

ork

orbo

unda

ries

,an

dth

eref

ore

itis

unli

kely

tobe

seen

orut

ilis

edby

cust

omer

s

28T

hein

vest

men

tis

incl

uded

inth

eF

renc

hna

tion

alde

velo

pmen

tpl

an.

I)P

age

14of 3

0‘7

DE

45.A

168

Rai

ters

aich

(DE

)N

ew40

0kV

line

inex

isti

ngO

HL

corr

idor

Rai

ters

aich

-L

uder

shei

m-

Siff

ling-

Isar

orA

lthe

im(1

60km

)

Thi

spr

ojec

tw

asin

clud

edin

the

prop

osed

grid

deve

lopm

ent

plan

2012

&20

13by

the

TS

O,

but

inbo

thca

ses

itw

asno

tap

prov

edby

the

.7

Page 16: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

fC

ountr

yT

YN

DP

Sub

stat

ion

1S

ubst

atio

n2

Pro

ject

Des

crip

tion

Rea

son

for

abse

nce

20

12

Co

de

and

asa

cons

eque

nce

itis

no

tin

clu

ded

inth

eE

TY

S.

GB

77.4

52D

eesi

de(G

B)

-N

ew40

0kV

subs

tati

onin

Dee

side

.P

art

oft

he

Thi

spr

ojec

tis

part

oft

he

Wes

tern

HV

DC

wor

ksre

quir

edfo

rth

eW

este

rnH

VD

CL

ink.

Lin

kan

dal

thou

ghit

isno

tex

plic

itly

men

tion

edit

isth

ela

ndin

gpo

int

oft

heW

este

rnL

ink

inE

ngla

nd.

Wit

ho

ut

this

subs

tati

onth

eW

este

rnL

ink

proj

ect

isno

tco

mpl

eted

.T

here

fore

for

the

purp

oses

of t

heE

TY

Sb

oth

Dee

sid

ean

dH

unte

rsto

n(S

cott

ish

end)

are

cons

ider

edto

bein

tegr

alpa

rts

oft

heW

este

rnL

ink

proj

ect.

GB

77.4

54H

awth

orn

Pit

(GB

)N

orto

n(G

B)

Upr

ate

Haw

thor

nPi

t-N

orto

nto

400k

V.

Sinc

eth

esu

bmis

sion

oft

he

proj

ect

toth

eT

YN

DP

last

year

,a

deci

sion

has

been

mad

eth

atth

epro

ject

isn

ot

requir

edat

this

tim

eso

itha

sbe

enex

clud

edfr

omth

eE

TY

S.

HR

292

7.2

23

Exis

ting

line

from

bord

erE

xis

ting

line

toerj

av

inec

The

exis

tin

gsu

bst

atio

no

fC

irko

vce(

S1)

wil

lT

hein

ves

tmen

tha

sin

the

mea

nti

me

bee

nw

ith

Slo

ven

ia(C

irko

vce

)(H

R)

beco

nnec

ted

toon

eci

rcu

itof

the

exis

tin

gco

mm

issi

on

ed.

Hev

iz(H

U)-

Zer

javi

nec(

HR

)do

uble

circ

uit

400kV

OH

Lb

yer

ecti

ng

anew

80km

double

circ

uit

400k

VO

HL

inS

love

nia.

The

proj

ect

wil

lre

sult

intw

on

ewcr

oss

-bo

rder

circ

uits

:H

eviz

(HU

)-C

irk

ov

ce(S

I)an

dC

irkovce

(SI)

-Z

erja

vine

c(H

R).

1T3°

21.5

4B

ord

erw

ith

Fra

nce

Pio

ssas

co(i

T)

Rep

lace

men

tof

conduct

ors

(by

AC

CS

)on

The

inv

estm

ent

has

inth

em

ean

tim

eb

een

(Corn

ier)

Alb

ertv

ille

(FR

)-M

onta

gn

y(F

R)-

Co

rnie

rco

mm

issi

on

ed.

(FR

)an

dA

lber

tvil

le(F

R)-

La

Coch

e(F

R)-

La

Pra

z(F

R)-

Vil

laro

din

(FR

)-V

enau

s(I

T)-

Pio

ssas

co(i

T)

sing

leci

rcui

t400

kVO

HL

s.In

add

itio

n,

chan

ge

of

conduct

ors

and

op

erat

ion

at400kV

of

anex

isti

ng

single

circ

uit

OH

Lbe

twee

nG

rand

eIl

ean

dA

lber

tvil

le(F

R)

29T

he

inves

tmen

tis

incl

uded

inth

eH

ungar

ian

and

Slo

ven

ian

nat

ional

dev

elo

pm

ent

pla

ns.

30T

he

inves

tmen

tis

incl

uded

inth

eF

rench

nat

ion

ald

evel

op

men

tpla

n.

1Pag

e15

of3

0

/1

Page 17: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Country

TY

ND

PS

ub

statio

n1

Substation

2P

ro

ject

Descrip

tio

nR

easo

nfor

ab

sen

ce

20

12

Co

de

curr

entl

yop

erat

edat

low

ervo

ltag

e,an

das

soci

ated

wor

ksin

Alb

ertv

ille

(FR

)40

0kV

subs

tati

on.

(Tot

alle

ngth

ofli

nes

:257

km)

IT26

.64

Bre

ssan

one

(IT

)B

orde

rw

ith

Aus

tria

New

doub

leci

rcui

t40

0kV

inte

rcon

nect

ion

The

Stu

dydi

dno

tbe

com

ean

inve

stm

ent.

(Inn

sbru

ck)

thro

ugh

the

pilo

ttu

nnel

oft

he

plan

ned

Bre

nner

Bas

eT

unne

l.T

otal

line

leng

th:

65km

.

IT28

.86

Vil

lano

va(I

T)

-A

PS

Tw

ill b

ein

stal

led

onth

ene

w40

0kV

line

The

inve

stm

ent

has

inth

em

eant

ime

been

Fog

gia-

Vil

lano

vaco

mm

issi

oned

.

IT29

.73

Bor

der

wit

hT

unis

ia(E

lP

arta

nna

(IT

)N

ew35

0km

1000

MW

HV

DC

line

betw

een

The

thir

dpa

rty

proj

ects

are

norm

ally

not

Aou

aria

)T

unis

iaan

dIt

aly

via

Sici

lyw

ith

400k

VD

Cin

clud

edin

the

nati

onal

deve

lopm

entp

lan.

subs

eaca

ble

and

conv

erte

rsst

atio

nsat

both

ends

.L

U40

.A30

Bas

char

age

(LU

)B

orde

rw

ith

Ger

man

yU

pgra

ding

and

new

cons

truc

tion

ofan

Not

inna

tion

alde

velo

pmen

tpl

an.

Too

earl

y(N

iede

rste

dem

)in

terc

onne

ctor

toD

E,

inco

njun

ctio

nw

ith

the

tobe

fman

cial

lyev

alua

ted

and

thus

put

inth

ein

terc

onne

ctor

inth

eso

uth

ofL

U;

Par

tial

nati

onal

deve

lopm

ent

plan

:st

udie

san

dup

grad

ing

of

exis

ting

220k

Vlin

esan

dpa

rtia

lap

proa

ches

repo

rted

afte

r20

23.

new

cons

truc

tion

of

lines

;W

ith

pow

ertr

ansf

orm

erst

atio

nin

LU

NL

38.4

25B

orde

rw

ith

Nor

way

Eem

shav

en(N

L)

Nor

Ned

2:a

seco

ndH

VD

Cco

nnec

tion

The

inve

stm

ent

isno

long

erin

clud

edbe

caus

e

(fed

a)be

twee

nN

orw

ayan

dT

heN

ethe

rlan

dsvi

ait

has

been

mea

nwhi

leca

ncel

led.

570k

m45

0kV

DC

subs

eaca

ble

wit

h70

0-14

00M

Wca

paci

ty.

NO

37.4

08K

rist

ians

and,

Fed

a(N

O)

-R

eact

ive

com

pens

atio

ndu

eto

HV

DC

link

sT

hein

vest

men

tis

nolo

nger

incl

uded

beca

use

Nor

Ned

and

Ska

gera

k4.

Rea

ctiv

epo

wer

itha

sbe

enm

eanw

hile

com

mis

sion

ed.

devi

ces

in40

0kV

subs

tati

ons.

NO

38.4

25fe

da

(NO

)B

orde

rw

ithth

eN

orN

ed2:

ase

cond

HV

DC

conn

ecti

onT

hein

vest

men

tis

nolo

nger

incl

uded

beca

use

Net

herl

ands

(Eem

shav

en)

betw

een

Nor

way

and

The

Net

herl

ands

via

itha

sbe

enm

eanw

hile

canc

elle

d.57

0km

450k

VD

Csu

bsea

cabl

ew

ith

700-

/7 Pag

e16

of

30

Page 18: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Countr

yT

YN

DP

Sub

stat

ion

1S

ubst

atio

n2

Pro

ject

Des

crip

tion

Rea

son

for

abse

nce

2012

Cod

e14

00M

Wca

paci

ty.

NO

67.4

02B

orde

rw

ith

Sw

eden

Tve

iten

(NO

)‘S

outh

Wes

tlth

k’co

nsis

ting

ofth

ree

mai

nT

hein

vest

men

tis

canc

elle

dby

the

TS

Os

in(B

arke

ryd)

part

s:3)

New

doub

leH

VD

CV

SClin

eN

orw

ayan

dSw

eden

beca

use

anal

yses

show

betw

een

Bar

kery

d(S

E)

and

Tve

iten

(NO

).-

that

the

bene

fits

dono

tex

ceed

the

cost

s.T

hein

vest

men

tsre

late

dal

soin

clud

ene

wsu

bsta

tions

and

conv

erte

rst

atio

nsin

the

conn

ecti

onpo

ints

line.

NO

67.4

11

Rød

(NO

)S

ylli

ng(N

O)

Vol

tage

upgr

adin

go

fex

isti

ngsi

ngle

circ

uit

The

inve

stm

ent

isno

long

erin

clud

edbe

caus

e30

0kV

OH

LR

ød-T

veit

en-F

lesa

ker-

Syl

ling

init

has

been

mea

nwhi

leca

ncel

led.

conn

ecti

onw

ith

the

new

HV

DC

line

toS

wed

en,

the

Syd

Ves

tlin

k.

NO

104.

A51

Sva

rtis

en(N

O)

Ned

reR

øssä

ga(N

O)

New

116k

m40

0kV

OH

LT

hein

vest

men

tis

nolo

nger

incl

uded

beca

use

itha

sbe

enm

eanw

hile

canc

elle

d.

PL

57.3

20D

argo

leza

(PL

)-

Ane

wA

C40

0/1

10kV

subs

tati

onbe

twee

nIn

vest

men

tca

ncel

led.

TS

Oha

sch

ange

dth

eex

isti

ngsu

bsta

tion

sS

lups

kan

dZ

amow

iec

inco

ncep

tof

netw

ork

deve

lopm

ent

inth

efi

eld

Nor

ther

nPo

land

.N

ewsu

bsta

tion

Dar

gole

zais

ofw

ind

pow

erpl

ants

.co

nnec

ted

bysp

litt

ing

and

exte

ndin

gof

exis

ting

400k

Vlin

eS

lups

k-ar

now

iec.

PT

1.5

Mac

edo

deC

aval

eiro

sV

ila

Pou

cade

Agu

iar

(By

New

83km

doub

leci

rcui

t40

0+22

0kV

OH

LIn

vest

men

tw

ill

beco

mm

issi

oned

byth

een

d(B

yV

alpa

cos)

Val

paco

s)M

aced

ode

Cav

alef

ros

(PT

)-V

alpa

cos

(PT

)-of2

014

and

isno

long

erin

the

nati

onal

Vil

aP

ouca

deA

guia

r(P

T).

TY

ND

P.

PT

1A1

Rib

eira

deP

ena

(PT

)G

uard

a(P

T)

New

192k

mdo

uble

/sin

gle-

circ

uit

400k

VO

HL

Inve

stm

ent

isno

tin

Nat

iona

lD

evel

opm

ent

Rib

eira

deP

ena

(PT

)-G

uard

a(P

T).

Plan

beca

use

“tim

espa

nof

nati

onal

inve

stm

ent

Ina

firs

tst

ep,

only

75km

will

beco

nstr

ucte

dpl

anis

shor

ter

(202

3vs

.20

25co

mm

issi

onin

gan

dop

erat

edat

220

kVbe

twee

nV

ila

Pou

cada

te).

deA

guia

ran

dM

aced

ode

Cav

alei

ros,

ina

seco

ndst

epon

eci

rcui

to

fthis

line

will

beop

erat

edat

400

kV.

Asi

ngle

line

will

beco

nstr

ucte

dbe

twee

nM

aced

ode

Cav

alef

ros

zone

and

Poci

nho

zone

also

betw

een

Poc

inho

zone

and

Cha

fari

zzo

nea

doub

leci

rcui

t40

0kV

OH

Lw

ill

beco

nstr

ucte

d(o

nly

one

circ

uit

inst

alle

din

afi

rst

step

),th

isla

stlin

ew

ill

use

one

circ

uit

oft

he

line

Seia

-G

uard

ato

1fP

age

17of 3

0

//

Page 19: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Country

TY

ND

PS

ub

statio

n1

Substation

2P

ro

ject

Descrip

tio

nR

easo

nfor

ab

sen

ce

20

12

Co

de

pP

T2.8

Arg

anil

lGO

is(P

T)

-N

ew40

0/60

kVsu

bsta

tion

atA

rgan

illG

Ois

.In

vest

men

tno

tin

nati

onal

TY

ND

Pdu

eto

itssh

orte

rti

mes

pan

(202

3vs

.th

esc

hedu

led

2025

com

mis

sion

ing

date

).

esta

blis

hth

eli

neR

ibef

rade

Pen

a(P

T)

Gua

rda

(PT

).

PT

2.A

2S

eia

(PT

)G

uard

a(P

T)

New

doub

leci

rcui

t40

0kV

OH

L$e

ia-G

uard

aIn

vest

men

tit

emis

not

inna

tion

alT

YN

DP

due

(55k

m)

toits

shor

ter

tim

espa

n(2

023

vs.

the

expe

cted

2025

com

mis

sion

ing

date

).

PT

3.14

‘Mar

atec

a”F

anhö

esN

ew95

kmdo

uble

-cir

cuit

400k

VO

HL

.T

his

Inve

stm

ent

item

isno

tin

the

nati

onal

TY

ND

P

new

line

wil

lbe

conn

ecte

dto

the

exis

ting

line

beca

use

itw

asaf

read

yco

mm

issi

oned

in20

12.

Pal

mel

a(P

T)-

Sin

es2

(PT

),m

akin

ga

lhflc

Sin

es-P

alm

ela/

Fan

höes

.

PT

4.16

Lag

oaça

(PT

)(B

yR

ecar

ei(P

T)

(By

New

line

Lag

oaca

-Arm

amar

-Rec

arei

400

kVL

agoa

ca-A

rmam

arw

asaf

read

yco

mm

issi

oned

Arm

amar

)A

rmam

ar)

inP

T.

in20

10.

The

sect

ion

betw

een

Arm

amar

and

Rec

arei

isex

pect

edto

beco

mm

issi

oned

duri

ng20

14.

PT3’

4.17

Bor

der

wit

hS

pain

Tav

ira

(PT

)N

ewso

uthe

rnin

terc

onne

ctio

n.N

ew40

0kV

Por

tugu

ese

sect

ion

was

conc

lude

din

2011

.

(Pue

bla

deG

uzm

an)

OH

Lsi

ngle

-cir

cuit

line

betw

een

Pue

bla

deN

otin

nati

onal

TY

ND

Pbe

caus

eit

isex

pect

ed

Guz

man

(ES

)-

Tav

fra

(PT

).to

beco

mm

issi

oned

duri

ng20

14.

RO

53.A

133

Fan

tane

le(R

O)

Ung

heni

(RO

)22

0S

tudi

espe

rfor

med

conf

irm

edth

ein

vest

men

tas

nece

ssar

yon

lyun

der

spec

ific

syst

emev

olut

ion

scen

ario

s.it

stay

sun

der

cons

ider

atio

nan

dw

ill

bein

clud

edin

TY

ND

Pif

futu

reev

olut

ions

wil

lco

nfir

mth

ene

cess

ity

SE

67.4

02B

arke

ryd

(SE

)B

orde

rw

ith

Nor

way

The

inve

stm

ent

isno

long

erin

clud

edbe

caus

e

(Tve

iten

)it

has

been

mea

nwhi

leca

ncel

led.

Si32

27.A

96S

love

nia

(SI)

Bor

der

wit

hIt

aly

The

proj

ect

incl

udes

ane

wH

VD

Cli

nkT

his

proj

ect

isno

tin

clud

edin

the

conf

irm

ed

(Sal

gare

da)

betw

een

Ital

yan

dS

love

nia.

The

new

HV

DC

TS

Ona

tion

alde

velo

pmen

tpl

anfr

om20

11.

line

betw

een

Slo

veni

aan

dit

aly

wil

l

31T

hein

vest

men

tis

incl

uded

inth

eS

pani

shna

tion

alde

velo

pmen

tpl

an.

32T

hein

vest

men

tis

incl

uded

inth

eIt

alia

nna

tion

alde

velo

pmen

tpl

an.

Pag

e18

of

30

Page 20: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

c

CD

C

©

CD

0

z

Page 21: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Fig

ure

3: R

easo

nsfo

rab

senc

eof t

rans

mis

sion

inve

stm

ents

from

the

EU

TY

ND

P20

12in

the

nati

onal

deve

lopm

ent p

ians

Rea

sons

for

abse

nce

ofT

YN

DP

Inve

stm

ents

inN

atio

nal

Dev

elop

men

tP

lans

SP

roje

ctca

ncel

led

SPr

ojec

tco

mm

issi

oned

SN

otap

pmve

dby

Gem

anN

RA

duri

ngap

prov

alof

2013

draf

tpl

an

ST

imes

panofT

shor

ter

than

EN

TSO

-Epl

an

SN

Ppr

epar

edbe

fore

EN

TSO

-Epl

an

ST

PPs

are

nonn

allv

not

incl

uded

inth

epl

an

RSt

udy

did

nor

turn

into

apr

ojec

t

aT

hein

vest

men

tdo

esno

tfu

lfil

one

crite

rion

from

the

plan

Not

expl

icitl

ym

enti

oned

inth

ena

tiona

lde

velo

pmen

tpla

n

:fPa

ge20

of

30

Page 22: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Tab

le

2:

Natio

nal

com

ponents

of

transm

ission

investm

ents

in

the

EN

TS

O-E

Reg

io

nal

In

vestm

en

tP

lans

2012

(R

EG

),

wh

ich

are

no

tin

clu

ded

in

national

develo

pm

ent

plans

RO

Un

try

EN

TS

O-E

Su

bstatio

n1

Substation

2P

roject

Description

.R

easo

nfor

ab

sen

ce

•.

RE

G2O

12

i,..

.:•

Code

—-

—.

-.=

t—

-

CL

A15

0H

rade

c(C

Z)

Chr

ast

(CZ

)N

ewse

cond

circ

uit t

oex

isti

ngsi

ngle

circ

uit

OH

L,

The

very

long

-ter

min

vest

men

tis

not

incl

uded

upgr

ade

inle

ngth

of82

.4km

.T

arge

tca

paci

tybe

caus

eth

eti

mes

pan

oft

he

nati

onal

deve

lopm

ent

2x17

3OM

VA

.pl

anis

shor

ter

than

the

one

ofE

NT

SO

-ET

YN

DP

2012

.

czA

l 51

Pre

stic

e(C

Z)

Chr

ast

(CZ

)N

ewse

cond

circ

uit

toex

isti

ngsi

ngle

circ

uit

OH

L,

The

very

long

-ter

min

vest

men

tis

not

incl

uded

upgr

ade

inle

ngth

of3

28

km

.T

arge

tca

paci

tybe

caus

eth

eti

mes

pan

oft

he

nati

onal

deve

lopm

ent

2x17

3OM

VA

.pl

anis

shor

ter

than

the

one

ofE

NT

SO

-ET

YN

DP

2012

.

EL

72A

etos

(EL

)B

orde

rw

ith

Ital

yS

econ

d50

0MW

HV

DC

link

betw

een

Gre

ece

and

The

inve

stm

ent

isno

long

erin

clud

edbe

caus

eit

has

(Gal

atin

a)It

aly

via

316

km40

0kV

DC

subs

eaca

ble

and

been

mea

nwhi

leca

ncel

led.

conv

erte

rsst

atio

nsat

both

ends

.

EL

255

Lam

ia(E

L)

-C

onst

ruct

ion

ofa

new

400k

VE

HV

SSin

Lam

iaT

hein

vest

men

tis

nolo

nger

incl

uded

beca

use

itha

san

dco

nnec

tion

toth

etw

oci

rcui

tso

fth

eex

isti

ngbe

enm

eanw

hile

canc

elle

d.40

0kV

lines

Tri

kala

-Dis

tom

oan

dL

aris

aL

arym

na.

ES

35tb

d(E

S)

tbd

(ES

)R

einf

orce

men

tsin

the

220k

Vne

twor

kov

eral

lth

eT

heti

mes

pan

oft

he

nati

onal

deve

lopm

ent

plan

is

coun

try,

inad

diti

onto

upgr

adin

go

f30

0km

ofsh

orte

rth

anth

eon

eoft

he

EN

TS

O-E

TY

ND

P

220k

Vne

twor

k,du

eto

win

dpo

wer

evac

uati

on.

2012

.

Fl

397

Bor

der

wit

hN

orw

ayP

irtt

ikos

kior

New

sing

leci

rcui

t38

0-40

0kV

OH

L(5

00km

).T

hein

vest

men

tis

nolo

nger

incl

uded

beca

use

itha

s

(Var

ange

rbot

n)P

etäj

asko

ski

(Fl)

been

mea

nwhi

leca

ncel

led.

HR

69B

orde

rw

ith

Ital

yK

onjs

ko(H

R)

New

1000

MW

HV

DC

inte

rcon

nect

ion

line

The

thir

dpa

rty

proj

ects

are

norm

ally

not

incl

uded

(Can

dia)

betw

een

Ital

yan

dC

roat

iavi

a28

0km

500k

VD

Cin

the

nati

onal

deve

lopm

ent

plan

.su

bsea

cabl

ean

dco

nver

ters

stat

ions

atbo

then

ding

poin

ts.

HU

282

Saj

oszo

ged

IG

odD

etk

(HU

)N

ewsu

bsta

tion

Kãp

ona

(Det

kar

ea)

with

2*25

0T

hein

vest

men

tis

nolo

nger

incl

uded

beca

use

itha

s

(HU

)M

VA

400/

120k

Vtr

ansf

orm

atio

nis

conn

ecte

dby

been

mea

nwhi

leca

ncel

led.

spli

ttin

gan

dex

tend

ing

exis

ting

line

Saj

oszo

ged

God

.

/7P

age

21of

30

/1/a

Page 23: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

--i

Sub

stat

ion

2P

roje

ctD

escr

ipti

onR

easo

nfo

rab

senc

eR

EG

2O

I2[

Cod

e.._

.-

__

_

..,

--

.:_“

HU

Deb

rece

n(H

U)

New

subs

tati

onD

ebre

cen

wit

h2*

250

MV

AT

hein

vest

men

tis

nolo

nger

incl

uded

beca

use

itha

s40

0/12

0kV

tran

sfor

mat

ion

isco

nnec

ted

bybe

enm

eanw

hile

com

mis

sion

ed.

chan

ging

the

oper

atin

gvo

ltag

eof

line

Saj

oszo

ged-

Deb

rece

nfr

om22

0kV

to40

0kV

,th

islin

ebe

ing

afre

ady

desi

gned

for

400k

V.

HU

288

Alb

erti

rsa

IS

zazh

alom

batt

a(H

U)

New

subs

tati

onS

zazh

alom

batt

ais

conn

ecte

dby

The

inve

stm

ent

isno

long

erin

clud

edbe

caus

eit

has

Mar

tonv

asar

(HU

)sp

litt

ing

and

exte

ndin

gex

isti

nglin

eA

lber

tfrs

a-be

enm

eanw

hile

canc

elle

d.M

arto

nvas

ar.

HU

292

Deb

rece

n(H

U)

-R

econ

stru

ctio

no

f75

0kV

subs

tati

on.

The

inve

stm

ent

isno

long

erin

clud

edbe

caus

eit

has

been

mea

nwhi

leca

ncel

led.

IT56

Cam

poro

sso

(IT

)-

New

450

MV

AP

ST

inC

ampo

ross

o(I

T)

220k

VT

hein

vest

men

tha

sbe

enm

eanw

hile

com

mis

sion

ed.

subs

tati

onon

Cam

poro

sso

(IT

)-M

ento

n(F

R)

Tri

nité

-Vic

tor

(FR

)O

HL

.

IT69

Can

dia

(IT

)B

orde

rw

ith

Cro

atia

New

1000

MW

HV

DC

inte

rcon

nect

ion

line

The

thir

dpa

rty

proj

ects

are

norm

ally

not

incl

uded

(Kon

jsko

)be

twee

nIt

aly

and

Cro

atia

via

280k

m50

0kV

DC

inth

ena

tion

alde

velo

pmen

tpl

an.

subs

eaca

ble

and

conv

erte

rsst

atio

nsat

both

endi

ngpo

ints

.

IT71

Bri

ndis

i(I

T)

Bor

der

wit

hA

lban

ia50

0MW

sing

lepo

leH

VD

CM

erch

ant

Lin

eT

heth

ird

part

ypr

ojec

tsar

eno

rmal

lyno

tin

clud

ed(B

abic

a)be

twee

nIt

aly

and

Alb

ania

via

290k

m40

0kV

DC

inth

ena

tion

alde

velo

pmen

tpl

an.

subs

eaca

ble

and

conv

erte

rst

atio

nsat

both

ends

.O

nth

eIt

alia

nsi

de,

the

new

line

will

beco

nnec

ted

toth

eex

isti

ngsu

bsta

tion

ofB

rind

isi

Sout

h.

IT72

Bor

der

with

Gre

ece

Gal

atin

a(i

T)

Seco

nd50

0MW

HV

DC

link

betw

een

Gre

ece

and

The

stud

yun

der

cons

ider

atio

ndi

dno

t(y

et)

beco

me

(Aet

os)

Ital

yvi

a3

16km

400k

VD

Csu

bsea

cabl

ean

da

plan

ned

inve

stm

ent.

conv

erte

rsst

atio

nsat

both

ends

.

22o

f30

‘V

Page 24: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Countr

yE

NT

SO

-E

Su

bsta

tio

n1

Substa

tion

2P

roje

ct

Descri

pti

on

1R

easo

nfo

rab

senc

eI

RE

G2O

12

.---

Code

.—

-.,.-..-.

LI

381

Vis

agin

as(L

I)B

ord

erw

ith

Lat

via

Up

gra

de

single

circ

uit

OH

L(9

43

MV

A,

50km

).N

ot

inn

atio

nal

dev

elo

pm

ent

plan

,b

ecau

seth

etw

o

(Lik

sna)

par

ties

(LT

and

LV

)do

no

tag

ree

wit

hth

is

inves

tmen

t.A

dec

isio

nw

ill

be

acce

pte

din

the

futu

re.

iu34

61B

ord

erw

ith

Fra

nce

Bel

val

(LU

)C

onnec

tion

of

SO

TE

L(i

ndust

rial

gri

din

LU

)to

Itre

fers

toan

ind

ust

rial

net

wo

rk,

and

no

tto

aIS

O

(Moula

ine)

RT

Enet

work

by

mix

ed(u

nd

erg

rou

nd

cable

&net

work

.

OH

L)

single

circ

uit

220kV

line.

Par

tsoft

he

new

line

use

exis

tin

go

nes

.

NO

397

Var

anger

both

(NO

)B

ord

erw

ith

Fin

lan

dN

ewsi

ngle

circ

uit

380-

40

0k

VO

HL

(500km

).T

he

inv

estm

ent

isno

lon

ger

incl

ud

edb

ecau

seit

has

(Pir

ttik

osk

ior

bee

nm

ean

wh

ile

cance

lled

.

Pet

äjäs

ko

ski)

NO

40

9F

eda,

Tonst

ad(N

O)

-R

eact

ive

pow

er

dev

ices

in400

kV

subst

atio

ns.

The

inv

estm

ent

isno

lon

ger

incl

ud

edb

ecau

seit

has

This

inv

estm

ent

pro

pose

das

stan

d-a

lone

inth

eb

een

mea

nw

hil

eco

mm

issi

on

ed.

TY

ND

P2010

isn

ow

mer

ged

into

inv

estm

ent

37.4

06

NO

41

0K

rist

iansa

nd

(NO

)-

Spar

etr

ansf

orm

erfo

rth

eH

VD

CS

kag

erak

Th

ein

ves

tmen

tis

no

lon

ger

incl

ud

edb

ecau

seit

has

inte

rco

nn

ecti

on

tran

sform

er.

bee

nm

ean

wh

ile

com

mis

sio

ned

.

PL

323

War

szaw

aS

ieki

erki

Pia

secz

no(P

L)

Ane

wA

C22

0/1

10kV

subs

tati

on(w

ith

The

inve

stm

ent

has

been

canc

elle

ddu

eto

(PL

)tr

ansf

orm

atio

n22

0/1

10kV

2x27

5MV

A)

inpr

omot

er’s

wit

hdra

wal

from

cons

truc

tion

oft

heW

arsa

wA

gglo

mer

atio

nA

rea

conn

ecte

dby

ane

wpo

wer

plan

t.20

km22

0kV

333

MV

Aca

ble/

OH

Llin

eW

arsz

awa

Sie

kie

rki-

Pia

secz

no

.

PL

359

Morz

ycz

yn

(PL

)P

om

orz

any

/G

linki

The

inve

stm

ent

isno

long

erin

clud

edbe

caus

eit

has

(PL

)be

enm

eanw

hile

canc

elle

d.T

heal

tern

ativ

elin

eP

om

orz

any-K

rajn

ilc

repla

ced

the

inv

estm

ent.

PL

360

Mil

osna

(PL

)S

ieki

erki

(PL

)N

ewca

ble

conn

ecti

on22

0kV

Mil

osna

-W

arsz

awa

The

inve

stm

ent

was

canc

elle

ddu

eto

prom

oter

’s

Sie

kier

ki(3

33M

VA

,10

km).

wit

hdra

wal

from

cons

truc

tion

oft

he

pow

erpl

ant.

PL

714

Wie

lopo

le(P

L)

Mos

zcze

nica

(PL

)R

epla

cem

ent

of

cond

ucto

rs(h

igh

tem

pera

ture

The

inve

stm

ent

was

canc

elle

d.P

rom

oter

sw

ithd

rew

cond

ucto

rs).

(new

capa

city

461

MV

A).

cons

truc

tion

ofth

epo

wer

plan

t.

33N

oin

form

atio

nab

out

Lat

via

nnat

ional

dev

elopm

ent

pla

n.

34T

hein

vest

men

tis

incl

uded

inth

eF

renc

hna

tion

alde

velo

pmen

tpla

n.‘1

7i’

/Pag

e23

of

30

Page 25: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Fig

ure

4:R

easo

nsfo

rab

senc

eof

RE

Gin

vest

men

tsfr

omth

eE

UT

YN

DP

2012

inth

ena

tion

alde

velo

pmen

tpla

ns

Rea

son

sfo

rab

senc

eofR

EG

Inve

stm

ents

inN

atio

nal

Dev

elop

men

tP

lans

ST

PPs

are

norm

ally

not

incl

uded

inth

epl

an

ST

irne

span

ofN

Psh

ort

erth

anE

NIS

O-E

plan

SS

tudy

did

not

turn

into

apr

ojec

t

SP

roje

ctno

tca

rrie

dout

byIS

O

aP

roje

ctca

ncel

led

aP

roje

ctco

mm

issi

oned

SN

oag

reem

ent

amon

gIS

Os

P’ag

e24

of

30

;1/

Page 26: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Tab

le3

:Thi

rd-p

arty

-pro

j ect

s.w

hich

are

incl

uded

inth

ena

tiona

lde

velo

pmen

tpla

ns

The

thir

dpa

rty

proj

ects

are

incl

uded

(or

men

tione

d)in

the

natio

nal

deve

lopm

ent

plan

ofth

eco

untr

yin

dica

ted

inth

efi

rst

colu

mn

and

are

not

inth

ena

tion

alde

velo

pmen

tpla

nof

the

othe

rco

untr

y(e

xclu

ding

the

Ele

clin

kpr

ojec

t).

FR

Cal

ais

(FR

)B

orde

rw

ith

Uni

ted

Ele

clin

k.50

0M

W(p

oten

tial

lyex

pand

able

toT

PP

appe

ars

inth

ena

tion

alde

velo

pmen

tpl

an.

The

Kin

gdom

(Fol

kest

one)

1000

MW

)m

erch

ant

inte

rcon

nect

orpa

ssin

gcu

rren

tca

paci

tyis

1000

MW

.th

roug

hth

eS

ervi

ceT

unne

loft

he

Cha

nnel

Tun

nel

toli

nkth

e40

0kV

grid

sin

Eng

land

and

Fra

nce.

FR

Cot

enti

n(F

R)

Vic

init

yof

Exe

ter

(GB

)FA

Bpr

ojec

tT

PP

appe

ars

inth

ena

tion

alde

velo

pmen

tpl

anas

onth

eF

renc

hsi

deth

epr

ojec

tis

deve

lope

dby

the

Fre

nch

TSO

.G

BB

orde

rw

ith

Fra

nce

Fol

kest

one

(GB

)E

lecl

ink.

500

MW

(pot

enti

ally

expa

ndab

leto

TP

Pap

pear

sin

the

nati

onal

deve

lopm

ent

plan

,(C

alai

s)10

00M

W)

mer

chan

tin

terc

onne

ctor

pass

ing

2016

.th

roug

hth

eS

ervi

ceT

uim

eloft

he

Cha

nnel

Tun

nel

toli

nkth

e40

0kV

grid

sin

Eng

land

and

Fra

nce.

GB

Bor

der

wit

hir

elan

d(i

rish

Pem

brok

ean

dA

lver

disc

ott

Ene

rgy

Bri

dge

(EB

)is

apr

ojec

tw

hich

will

rout

eT

PP

appe

ars

inth

ena

tion

alde

velo

pmen

tpl

an,

Mid

land

s)(G

B)

larg

eam

ount

sof

rene

wab

leel

ectr

icit

yge

nera

ted

2018

(fir

stof

thre

eco

nnec

tion

date

s).

ina

seri

eso

fin

terc

onne

cted

Iris

hw

ind

farm

sdi

rect

lyin

toth

eU

Km

arke

t.T

hew

hole

proj

ect

has

the

pote

ntia

lto

deli

ver

5GW

ofb

oth

onsh

ore

and

offs

hore

ener

gyby

2020

wit

hfi

rst

gene

rati

onpl

anne

dfo

r20

17.

GB

Bor

der

wit

hIr

elan

dP

embr

oke

(GB

)M

AR

EX

(Org

anic

Pow

er).

Com

bine

d19

00M

WT

PP

appe

ars

inth

ena

tion

alde

velo

pmen

tpl

an,

35S

ome

proj

ect

desc

ript

ions

are

deri

ved

from

Eur

opea

nC

omm

issi

on,

“Lis

tof

proj

ects

subm

itte

dto

beco

nsid

ered

aspo

tent

ial

Pro

ject

sof

Com

mon

Inte

rest

inen

ergy

infr

astr

uctu

reE

lect

rici

ty”,

27Ju

ly20

12.

hftp

://e

c.eu

ropa

.eul

ener

gy/i

nfra

stru

ctur

e/co

nsul

tati

ons/

doc/

pci_

list

elec

tric

ity.

pdf

Page

25of

30

/1/

-

Par

to

fEur

oasi

aIn

terc

onne

ctor

appe

ars

inth

ena

tion

alde

velo

pmen

tpl

an.

Page 27: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

GB

Bor

der

wit

hIr

elan

dC

o.P

embr

oke

and

Pen

tir

(GB

)G

reen

wfr

e3G

Wof

onsh

ore

win

din

Irel

and

toT

PP

appe

ars

inth

ena

tion

alde

velo

pmen

tpl

an,

Off

aly

bedi

rect

lyco

nnec

ted

usin

g25

0km

HV

DC

2017

.ca

bles

toth

eU

Kpo

wer

syst

emin

Wal

esG

BP

eter

head

(GB

)B

orde

rw

ith

Nor

way

Nor

thC

onne

ctis

ajo

int

vent

ure

proj

ect t

ore

alis

eT

PP

appe

ars

inth

ena

tion

alde

velo

pmen

tpl

an,

(Sam

nang

er)

anH

VD

Cel

ectr

icit

yin

terc

onne

ctor

betw

een

2021

.N

orw

ayan

dth

eU

K.

GB

Bor

der

wit

hS

pain

(Gat

ica)

Indi

anQ

ueen

s(G

B)

BR

ITIB

.A

nH

VD

Csu

bmar

ine

inte

rcon

riec

tor

TP

Pap

pear

sin

the

nati

onal

deve

lopm

entp

lan,

betw

een

Spai

n,F

ranc

ean

dth

eU

KE

TY

S20

17.

GB

Bor

der

wit

hF

ranc

e-

Cha

nnel

Cab

leIn

terc

onne

ctor

.D

irec

tC

urre

ntT

PP

appe

ars

inth

ena

tion

alde

velo

pmen

t pla

n,(D

C)

bipo

lar

inte

rcon

nect

or,w

hich

cons

ists

of

ET

YS

2016

two

bund

led

high

-vol

tage

cabl

es.

The

Cha

nnel

Cab

lew

ill

have

aca

paci

tyof

1100

Meg

awat

tsan

da

tota

lle

ngth

of

130

kilo

met

ers.

26of

30

win

dge

nera

tion

,w

ith

6.vv

hst

orag

ein

May

o2

Irel

and,

conn

ecte

dto

UK

atP

embr

oke

via

1300

MW

HV

DC

VSC

cabl

e

Page 28: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Tab

le4:

Nat

iona

lco

mpo

nent

spl

anne

dby

TS

Os

that

are

not

incl

uded

inth

eE

NT

SO

-ET

YN

DP

2012

Countr

y:

Sub

stat

ion

1S

ubst

atio

n2

Not

e.

.

I

BG

Vet

ren

(BG

)B

lago

evgr

ad(B

G)

The

Clu

ster

BG

Nor

th-S

outh

Gri

dE

nhan

cem

ent

cons

ists

cons

truc

tion

oft

wo

new

high

-vol

tage

tran

smis

sion

lines

,as

foll

ows

1)O

HL

400k

Vs/

s“V

etre

n”—

s/s

“Bla

goev

grad

”,10

0km

.2)

OH

L40

0kV

s/s

“Tsa

reve

ts”

s/s

“Plo

vdiv

”,1 5

0km

.T

heco

nstr

ucti

ono

fbo

thlin

esw

ill

sign

ific

antl

yin

crea

sein

tero

pera

bili

tyan

dse

cure

oper

atio

nof

Bul

gari

an40

0kV

netw

ork

unde

rno

rmal

and

repa

irco

ndit

ions

.

BG

Tsa

reve

ts(B

G)

Plo

vdiv

(BG

)T

heC

lust

erB

GN

orth

-Sou

thG

rid

Enh

ance

men

tco

nsis

tsco

nstr

ucti

onoft

wo

new

high

-vol

tage

tran

smis

sion

lines

,as

foll

ows

1)O

HL

400k

Vs/

s“V

etre

n”—

s/s

“Bla

goev

grad

”,10

0km

.2)

OH

L40

0kV

s/s

“Tsa

reve

ts”

s/s

“Plo

vdiv

”,15

0km

.T

heco

nstr

ucti

onofb

oth

lines

wil

lsi

gnif

ican

tly

incr

ease

inte

rope

rabi

lity

and

secu

reop

erat

ion

ofB

ulga

rian

400k

Vne

twor

kun

der

norm

alan

dre

pair

cond

itio

ns.

GB

36B

orde

rw

ith

Spa

inIn

dian

Que

ens

(GB

)In

terc

onne

ctio

nS

pain

-Uni

ted

Kin

gdom

ES

-UK

.C

urre

ntly

noco

ntra

ct.

ET

YS

in20

25.

(Gat

ica)

IT37

Rag

usa

(IT

)B

orde

rw

ith

Mal

taT

hepr

ojec

tw

illal

low

the

conn

ecti

onoft

he

Mal

tese

elec

tric

ity

dist

ribu

tion

syst

emto

the

Eur

opea

n(I

T)

tran

smis

sion

grid

inS

icil

yan

dit

wil

lco

nsis

to

fon

e22

0kV

HV

AC

cabl

ebe

twee

nM

alta

Isla

ndan

dS

icil

yIs

land

(Rag

usa

subs

tati

on).

LT38

Mar

ijam

polé

(LT

)B

orde

rw

ith

Pol

and

Lit

Pol

Lin

k2

is40

0kV

AC

over

head

line

betw

een

Lit

huan

iaan

dP

olan

d.T

hepr

ojec

tis

supp

osed

tobe

(Mat

ki)

bene

fici

alac

cord

ing

toM

arke

tin

tegr

atio

nan

dS

ecur

ity

ofsu

pply

crit

eria

.L

itP

olL

ink

2w

ill

prov

ide

the

conv

erge

nce

ofm

arke

tpr

ices

and

wou

ldbe

bene

fici

alfo

rth

eE

Uel

ectr

icit

ym

arke

t.A

lso

Lit

Pol

Lin

k2

will

incr

ease

inte

rope

rabi

lity

and

secu

resy

stem

oper

atio

n.T

his

proj

ect

appe

ars

inth

ena

tion

alde

velo

pmen

tpla

n,bu

tnot

inth

eE

NT

SO

-ET

YN

DP

.

36T

hein

vest

men

tis

not

inth

eS

pani

shna

tion

alde

velo

pmen

tpla

n.37

Mal

taha

sno

nati

onal

deve

lopm

ent

plan

(no

TSO

).38

The

inve

stm

ent

isno

tin

the

Pol

ish

nati

onal

deve

lopm

ent

plan

.

,/%P

age2

7of3

O

Page 29: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Annex II — Summary of NRA responses on national development plans

Responses

28 responses (AT, BE, CY, CZ, DE, DK, EE, EL, ES, Fl, FR, GB, HR, RU, IT, IE, LI, LV, LU,MT39, NL, NO40, PL, PT, RO, SE, SI, 5K) were received by NRAs.

No response was received from BG and NI.

Frequency of publishing the national development plan

14 countries publish the national development plan on a yearly basis, while 8 countries do it on abiennial basis (see table below).

AT DK BE(4years)cy Fl ES (4 years)cz NL PL(3years)DE NO EE (no pubi.)EL PT LU (no pubi.)FR RO MT (no TSO)

GB SE

HR SI

RUIEITLTLV5K

__________ ___________

However, in several cases the collected responses exhibit delays or difficulties in the stages ofpublication and approval of the national development plan, thus causing a deviation compared tothe declared (annual or biennial) frequency of publication of the national development plan.

Time horizon of national development plans

The time horizon of national development plans is 1 0 years for the large maj ority of countries (24out of 27). Some of these national development plans (CZ, FR, IE, SI) include, as an exception, fewinvestments with a commissioning date beyond the time horizon. This may be the case for projectswhose construction start during the time horizon and whose commissioning is shortly after the lastyear covered by the national development plan. Other practices were reported in Denmark (20years), Norway (20 years, with more details for the 1 0 year period) and Spain (6-1 0 years).

Status of investments in national development plans

for the large majority of countries, the national development plan includes investments which are:

39 Malta has no ISO and no national development plan.40 The Norwegian NRA participated in the framework ofthe Agency cooperation with NRAs ofEU Member States.

Page 28 of 30

Every year Every 2 years Other

Page 30: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

. under construction;

. planned;

. under consideration (under study).

However, in three countries investments under consideration are not included in the nationaldevelopment plans.

Approximately a half of the national development plans (AT, BE, DK, ES, FR, HR, HU, IE, IT,NL, PL, PT, RO) list investments which were present in the previous national development planand are commissioned or cancelled before issuing the national development plan. The other nationaldevelopment plans do not.

Third party projects in the national development plan

9 national development plans (EL, Fl, FR, GB, IT, LV, NO, SE, SI) include or refer to third-partyprojects, either on ad-hoc or on systematic basis.

Commissioning date and status

26 (out of 27) national development plans provide the commissioning date and 23 provide the statusof the investment (exceptions: LU for ‘commissioning date’ and HU, LU and PT for ‘status’information; ES provides progress status through biennial monitoring documents).

Increase of net transfer capacity

The majority of national development plans (14 out of 26) provide information on NTC increaseresulting from an investment (see table).

Yes No Ad-hoc n aDK BE AT CY

ES (only total NTC increase cz EL MTis provided) DE FlFR(onlyfor EE

interconnections) G BHR (only for interconnection IE

lines) LUHU (per border only) NOIT (per border only) SK

LTLVNL

PL (only forinterconnections)

PT (but not necessarilyrelated to a single proj ect)

ROSI (only for

interconnections)SE

Page 29 of 30

Page 31: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

Estimated cost

In 14 cases out of 27, the published national development plan includes cost information per project(see table).

Yes 1 No Ad-hoccyczEE

EL (costs only for the first

DKFl

AT (confidential)BE

DE (total cost of planis published)

ES (total cost of planis published)

FR (total cost of planis published)

RU (confidential)IE

NL (confidential)PT

RO (confidential)5K

3 years are provided)GBHR

IT (mature projects only)LILVLUNOPLSISE

Page 30 of 30

Page 32: Publishing date: 09/04/2014 · 2016-06-22 · Publishing date: 09/04/2014 We appreciate your feedback Please click on the icon to take a 5’ online survey and provide your feedback

ACER Opinion 08-2014Document title:

Publishing date: 09/04/2014

We appreciate your feedback

Please click on the icon to take a 5’ online surveyand provide your feedback about this document