PUXIN Biogas PlantPUXIN Biogas Plant
4, 6 and 10 m3 family-size 4, 6 and 10 m3 family-size
(1) Introduction of PUXIN Biogas Plant (1) Introduction of PUXIN Biogas Plant technologytechnology
To renovate the traditional fixed dome biogas To renovate the traditional fixed dome biogas plant, Shenzhen Puxin Science& Technology plant, Shenzhen Puxin Science& Technology Co., Ltd, through many year’s study developed Co., Ltd, through many year’s study developed a new generational hydraulic biogas Plant-the a new generational hydraulic biogas Plant-the PUXIN Biogas Plant that has carried on almost PUXIN Biogas Plant that has carried on almost all the advantages of the traditional fixed dome all the advantages of the traditional fixed dome biogas plant, and overcome its main biogas plant, and overcome its main disadvantages.disadvantages.
By the end of 2012, PUXIN biogas plant has By the end of 2012, PUXIN biogas plant has been extended to over 50 countries.been extended to over 50 countries.
6m3 PUXIN biogas system 6m3 PUXIN biogas system
10m3 PUXIN biogas system 10m3 PUXIN biogas system
Family size PUXIN biogas plants built in KenyaFamily size PUXIN biogas plants built in Kenya
Family size PUXIN biogas plants built in GhanaFamily size PUXIN biogas plants built in Ghana
Family size PUXIN biogas plants in construction SpainFamily size PUXIN biogas plants in construction Spain
Family size PUXIN biogas plants in Family size PUXIN biogas plants in construction in South Africaconstruction in South Africa
A.A. The structure:The structure: PUXIN Biogas Plant is mainly composed of a concrete digester and a glass
fibre reinforced plastic gas-holder.
The digester is 2.4m deep, 2.8m in diameter and 6m3 of capacity. The
gas-holder is 1.6 m in diameter, 0.6 m high and 1 m3 of capacity.
B. Main advantagesB. Main advantages Comparing with the fixed dome biogas
plant, the PUXIN biogas plant has the following distinct advantages:
Easy and quick to be built High gas production rate Easy to maintain Durable
1. Easy and quick to be built1. Easy and quick to be built Any working mason through one day’s Any working mason through one day’s
study is able to build the PUXIN Biogas study is able to build the PUXIN Biogas Plant with 100% success rate. Plant with 100% success rate.
The construction of a PUXIN Biogas The construction of a PUXIN Biogas Plant can be completed within 48 hours. Plant can be completed within 48 hours.
The process to build PUXIN biogas plantThe process to build PUXIN biogas plant
1.Dig a hole in the grand 2. Cast the basement and assemble the stomach mould
3.Assemble the vault mould 4.Cast the digester stomach
5.Assemble the neck mould. 6.Cast the digester neck
7.disassemble the neck mould. 8.disassemble the vault and stomach mould
9.Build the inlet and outlet 10.Install the gas holder
11.Install the gas pipe system and the appliances
Contrast of the technical requirements for the builders
ItemsTraditional fixed dome biogas plant PUXIN Biogas plant
Airtight craft Highly required Not required
Ability to understand blueprints
Highly required ( build by hand depending on the blueprints) Not required (cast by
mould)
Ability to build the arch
Highly required (build by hand) Not required (cast by mould)
To judge and deal with gas leaking
Highly required. Lowly required.
To judge and deal with water leaking
Highly required. Required.
Training period About 3 month 1-5 days
Period to become a proficient builder
1 - 2 years About one month
Requirement of the people to be trained
Medium educated, strong ability to master skills
Not Educated ,medium ability to master skills
Success rate Not 100 % guaranteed 100 % guaranteed
Contrast of the construction period
ItemTraditional fixed
dome biogas plant
PUXIN Biogas plant
Construction of the concrete digester
4 days 2 days
Airtight working procedure
10 days 0 days ( not required)
The airtight testworking procedure
4 days 0 days (notrequired)
Total 18 days 2 days
2. High gas production rate It has been proved that the gas production
rate of PUXIN biogas plant is over 50% higher than that of the traditional fixed dome biogas plant in average under the same conditions.
In TIMOR LESTE a 10m3 PUXIN biogas plant with three 1.2m3 gasholders can produce enough gas for three families.
The president of TIMOR LESTE is visiting a The president of TIMOR LESTE is visiting a
PUXIN biogas plant built in TIMOR LESTEPUXIN biogas plant built in TIMOR LESTE
3. Easy to maintain3. Easy to maintainThe leak of the gas-holder can be found immediately, and can be The leak of the gas-holder can be found immediately, and can be
repaired on groundrepaired on ground
Contrast of the maintenance Items
Traditional fixed dome biogas plant
PUXIN Biogas plant
To mend the gas leak of gas-holder
Dangerous and difficultThe job is done inside
the biogas digester, there is a possibility of poisoning.
The leak can not be found.
Safe and easyThe job is done on ground, there is
no possibility of poisoning. The leak can be seen, and can be mended directly.
To mend the water leak of the digester
DangerousThe digester’ outlet is
too small that the air circulation in the digester is bad. So, there is a possibility of poisoning.
SafeThe digester’s outlet is large
enough that the air circulation in the digester is good. So, there is no possibility of poisoning.
4. Durable4. Durable The concrete digester can last over thirty The concrete digester can last over thirty
years. The glass fibre reinforced plastic years. The glass fibre reinforced plastic gas-holder can last over ten years. When gas-holder can last over ten years. When the gas-holder is worn-out, a new one the gas-holder is worn-out, a new one can replace. So the PUXIN biogas plant can replace. So the PUXIN biogas plant can last over thirty years.can last over thirty years.
(2) Cost analyze of a 6m3 PUXIN biogas plant(2) Cost analyze of a 6m3 PUXIN biogas plant(the earth work is not included)(the earth work is not included)
Material (manpower) quantity Unit price(USD)
Price (USD)
Glass fibre reinforced plastic Gasholder
1
Smashed stone 2.4 m3
Sand 2.0 m3
cement 850 kg
Brick ( 60×120×240mm) 100
Plastic pipe ( Φ150×1800mm)
2
concrete bar (Φ6) 8kg
manpower 6 man day in total:4 man×1 day (install the mould and cast)+2 man×1 day (disassemble the mould, build inlet, outlet and install pipe and appliances)
Total price
Products related to PUXIN family size Products related to PUXIN family size biogas systembiogas system
Steel mould Steel mould Glass fibre reinforced plastic gas-holder Glass fibre reinforced plastic gas-holder Biogas appliances Biogas appliances
1. Steel mould1. Steel mould The 10m3 steel mould can build 4, 6 and 10m3 PUXIN family size biogas plants.The 10m3 steel mould can build 4, 6 and 10m3 PUXIN family size biogas plants.
2. The gas-holder2. The gas-holder This product is one of the main components of This product is one of the main components of
PUXIN Biogas Plants. PUXIN Biogas Plants. On the top of the gas –holder there is a valve On the top of the gas –holder there is a valve
that can eliminate the atmospheric pressure. that can eliminate the atmospheric pressure. When there is a need to replace solid When there is a need to replace solid
fermentation material like straw in the digester fermentation material like straw in the digester or to repair the digester, the gas-holder can be or to repair the digester, the gas-holder can be taken out from the digester easily. taken out from the digester easily.
Gas-holderGas-holder
3. Biogas appliances3. Biogas appliances biogas stove biogas stove biogas water heater biogas water heater biogas rice cooker biogas rice cooker Biogas lamp Biogas lamp Biogas pipe & fittingsBiogas pipe & fittings Biogas generatorBiogas generator
Biogas stove (double burners)Biogas stove (double burners)
Biogas water heater (7L)Biogas water heater (7L)
Biogas rice cooker (2L)Biogas rice cooker (2L)
Biogas lampBiogas lamp
Biogas pipe & fittingsBiogas pipe & fittings
biogas pressure agebiogas pressure age biogas desulfurizer biogas desulfurizer biogas pipe fittingsbiogas pipe fittings biogas pipe biogas pipe biogas flow meterbiogas flow meter
Biogas generator (1-5kw)Biogas generator (1-5kw)
(4) References(4) References
1. East Timor1. East Timor In East Timor the biogas system composed of 10m3 Puxin family size biogas plant and two In East Timor the biogas system composed of 10m3 Puxin family size biogas plant and two
extra gasholders is a very popular biogas system that provide enough biogas for three extra gasholders is a very popular biogas system that provide enough biogas for three families for their daily cooking and water boiling.families for their daily cooking and water boiling.
Contact:Contact: Mr. Aries Eddie de AlmeidaMr. Aries Eddie de Almeida Phone: +670-7242748Phone: +670-7242748 E-mail: E-mail: [email protected]@gmail.com
2. Ghana2. GhanaMany biogas systems composed of numbers of 10m3 PUXIN biogas plant are built for schools and Many biogas systems composed of numbers of 10m3 PUXIN biogas plant are built for schools and hotels to treat the sewage water and food waste. hotels to treat the sewage water and food waste.
ContactContact BETA CONSTRUCTION ENGINEERS LIMITEDBETA CONSTRUCTION ENGINEERS LIMITED P. O. BOX K.I.A. 9329 ACCRA- GHANAP. O. BOX K.I.A. 9329 ACCRA- GHANA Contact person: Mr. Kofi AhenkorahContact person: Mr. Kofi Ahenkorah Phone: 233-21-404186, 233-24-6865689/4239539Phone: 233-21-404186, 233-24-6865689/4239539 FAX: 233-21-404186FAX: 233-21-404186 E-MAIL: [email protected]: [email protected]
3.Nicaragua3.Nicaragua
Puxin biogas system built inPuxin biogas system built in Polytechnic University of Nicaragua Polytechnic University of Nicaragua to treat the food waste, the biogas for cooking. to treat the food waste, the biogas for cooking.
A 50M3 Puxin biogas systems built in Juigalpa Nicaragua to A 50M3 Puxin biogas systems built in Juigalpa Nicaragua to treat the slaughterhouse waste,treat the slaughterhouse waste, The biogas used in a water The biogas used in a water heater using in slaughter pigs process, the Project support by UNIDO. heater using in slaughter pigs process, the Project support by UNIDO.
ContactContact Polytechnic University of NicaraguaPolytechnic University of Nicaragua Contact person: Dr. Roberto A. GonzálezContact person: Dr. Roberto A. González Phone: 2249-4529, Fax 2249-9232Phone: 2249-4529, Fax 2249-9232 E-mail: E-mail: [email protected]@upoli.edu.ni [email protected][email protected] [email protected]@tmail.com
4.Kenya4.Kenya
Puxin biogas system built in KenyaPuxin biogas system built in Kenya ContactContact Kenya Puxin Renewable Energy Co. Ltd.Kenya Puxin Renewable Energy Co. Ltd. Nairobi office: Veteran hse, 8th floor, suite 807. Along moi avenue.Nairobi office: Veteran hse, 8th floor, suite 807. Along moi avenue. Branch office: Jopa hse, suite 2. P.O BOX 1051, 20300. Nyahururu.Branch office: Jopa hse, suite 2. P.O BOX 1051, 20300. Nyahururu. Contact person: Ms.Contact person: Ms. Martha kagiriMartha kagiri Phone: +254727980192, Mobile: +254703632974Phone: +254727980192, Mobile: +254703632974 E-mail: E-mail: [email protected]@yahoo.se [email protected]@gmail.com [email protected]@yahoo.com http://www.puxinbiogaskenya.kbo.co.kehttp://www.puxinbiogaskenya.kbo.co.ke
5.South Africa5.South Africa
Puxin biogas system built Puxin biogas system built in South Africain South Africa
Biogas SABiogas SA PO Box 864 Muldersdrift Johannesburg 1747 South AfricaPO Box 864 Muldersdrift Johannesburg 1747 South Africa Contact person: Mark TiepeltContact person: Mark Tiepelt Phone: +27 72 445 4739Phone: +27 72 445 4739 http://www.biogassa.co.zahttp://www.biogassa.co.za
6. Israel6. Israel
Puxin biogas system built in IsraelPuxin biogas system built in Israel
ContactContact Ecogas IsraelEcogas Israel Derech hayam 10, Michmoret, Israel, 40297Derech hayam 10, Michmoret, Israel, 40297 Contact person: Oshik Efrati Contact person: Oshik Efrati Phone: +972-(0)52-3221554 Fax: +972-(0)57-9557509Phone: +972-(0)52-3221554 Fax: +972-(0)57-9557509 E-Mail: E-Mail: [email protected]@ecogas.co.il http://www.ecogas.co.ilhttp://www.ecogas.co.il
7. Senegal7. Senegal
Puxin biogas system built in SenegalPuxin biogas system built in Senegal
ContactContact BIOECOBIOECO St. Louis 221, SenegalSt. Louis 221, Senegal Contact person: Christophe ChesneauContact person: Christophe Chesneau Phone: +221-773381210Phone: +221-773381210 E-mail: [email protected]: [email protected]
8.WFP8.WFP 400 sets of PUXIN family size (10m3) biogas plants were purchased by WFP for Sudan in 400 sets of PUXIN family size (10m3) biogas plants were purchased by WFP for Sudan in
2011. 2011.
Contact: Contact: Hamed Adlan, Procurement Unit, WFP Khartoum, SudanHamed Adlan, Procurement Unit, WFP Khartoum, Sudan Email: Email: [email protected]@wfp.org, tele: +249912153007, tele: +249912153007 Firas Dabbagh, Procurement Officer, WFP-Sudan RO, VSAT: 2231Firas Dabbagh, Procurement Officer, WFP-Sudan RO, VSAT: 2231 Email: Email: [email protected]@wfp.org , tele: +249 9121 77319 , tele: +249 9121 77319 Mr. Amit Kumar Singh , Programme Officer , United Nations World Food Programme Mr. Amit Kumar Singh , Programme Officer , United Nations World Food Programme North Darfur Area Office, North Darfur,Sudan , Mobile- 00249 912317841North Darfur Area Office, North Darfur,Sudan , Mobile- 00249 912317841 Email: Email: [email protected]@wfp.org
9. UNIDO9. UNIDO 2 family size biogas system formed by 2 sets of 10m3 biogas plant and 2 extra gas holders 2 family size biogas system formed by 2 sets of 10m3 biogas plant and 2 extra gas holders
were purchased by UNIDO for Armenia in 2012 were purchased by UNIDO for Armenia in 2012
Contact : Contact :
Dr. Victor Afyan, Apt.16,Charents, Block,15, Avan, Yerevan, 0060, ArmeniaDr. Victor Afyan, Apt.16,Charents, Block,15, Avan, Yerevan, 0060, Armenia Email: [email protected]: [email protected] Tel: (374)-98-411-453Tel: (374)-98-411-453
Ms. Gillian OCAMPO-GOETZLINGERMs. Gillian OCAMPO-GOETZLINGER<[email protected]><[email protected]>;; 'DRAECK, Mark''DRAECK, Mark'<[email protected]><[email protected]>;; ORLOV, AlexanderORLOV, Alexander<[email protected]><[email protected]>;; SIMONYAN, AnahitSIMONYAN, Anahit<[email protected]><[email protected]>;;
Contact usContact us
If you have the interest please contact: Shenzhen Puxin Technology Co.LtdShenzhen Puxin Technology Co.Ltd
Add: 2nd floor, Bldg 4, 49 Jiaoyu North Rd, Gaoqiao Add: 2nd floor, Bldg 4, 49 Jiaoyu North Rd, Gaoqiao District, Pingdi Street, Longgang, Shenzhen, P. R. District, Pingdi Street, Longgang, Shenzhen, P. R. ChinaChina
Postal Code: 518117Postal Code: 518117 Tel: 86-755-28938251 86-755-28938252Tel: 86-755-28938251 86-755-28938252
Fax: 86-755-89323983 Fax: 86-755-89323983 E-mail: [email protected]: [email protected]
Website: www.puxintech.com Website: www.puxintech.com
Thanks!Thanks!