QA in and Agile World

Tom Churchwell

[email protected]

Agenda

2

Survey

Exercise 1

Agile vs. Traditional

Effect of Test Driving

Testing Pyramid

Exercise 2

Q&A

Quick Survey

3

How many QA folks are focused on testing?

Who owns Quality?

Who owns improvement?

What is different?

4

Old Focus

No Defects

◦ By Requirements

Comprehensive

Testing

◦ Slow

◦ Manual

Integration at the

End of Dev

Quality Tested In

No Defects

◦ By PO Demo

Fast

◦ Automated Testing

◦ Continuous

Integration

Clean Code

◦ Modular

Quality Built In

Manifesto for Agile Software

Development

We are uncovering better ways of developing

software by doing it and helping others do it.

Through this work we have come to value:

• Individuals and interactions over processes and tools

• Working software over comprehensive documentation

• Customer collaboration over contract negotiation

• Responding to change over following a plan

That is, while there is value in the items on the right, we value the

items on the left more.

Working Software

6

Quality Assurance is all about working

software.

Quality Standards

Confidence in the codebase is the key to

sente; having choices, momentum,

velocity, autonomy, adaptability,

competitive advantage and the inherent

propensity for innovation and luck.

Exercise 1

7

What does a traditional QA do that an Agile QA

does not do?

What skills does an agile QA need that a

traditional QA does not?

Report Outs…

Cultural

Environmental Practical

Collaborative

Big & Visible

Perpetual Buzz

Food

Thorough

Courageous

Adaptable

Forthright

FUN

TDD

Quality Standards

Iterative Development

Business Verification

Whole Team Ownership Quality as a fundamental ongoing concern for the

team◦ Not just at the end of a release

◦ Meeting quality standards has become a part of the “Definition of Done” for the whole team

An Integrated Team Focus◦ QA throughout development

Elimination of QA as a sequential process

◦ Whole Team collaboration from beginning to end

◦ Teams take ownership Definition of Done

Quality Standards

Level of quality being produced every day

Business Verification◦ Weekly verification demo

◦ Product Owner Drives the Demo

Tasting after baking

Bake Quality In…

We Cannot Improve Our Recipe’s By Eating More

Cookies…

We Must Bake, Rather Than Try To Test Quality In!

Whole Team Ownership of

Quality

Historically QA has been:◦ An event that occurs after development is

done Point in time validation rather than an ongoing

standard for quality

Verification before production launch

◦ Held by QA

Not part of “Definition of Done” for the team

Not part of what every member of the team was committed to uphold.

◦ Part of a rigid sequential process At the end of development

An event rather than an ongoing concern

Definition Of Done

14

Build it RIGHT -- “Done”

• Quality Metrics Passed• Unit test coverage at or above 80% overall

• Cyclomatic Complexity 1-3

• Fewer Than 10 Statements per Method

• Integration tests created and successfully passed for each

external dependency (minimum one per dependency)

• Deploy scripts updated for deployment to DevInt and QA.

• Functional tests pass in DevInt or preferably QA

• Functional tests automated (Selenium, Fitnesse or other)

• Single user execution against functional timing SLA passed

for each story.

• Business verified by product owner OR technical

lead/architect if technical card.

• Exploratory Testing Complete

Definition Of Done

15

“Production Ready” -- “Done” – Done

• Performance testing executed and passed.

• Production-level content successfully

integrated and tested

• Accessibility & Usability Tested

• Full browser testing for all specified browsers

and versions

Traditional Development

16

Specify

Design

Code

Test

Deploy

Sustain

Test Driving

17

Test Driving

18

Specify

Design

Code

Test

Deploy

Sustain

Working Software Environment

19

Source Code

Management

Environment

20

Source Code

Management

Continuous Integration

Environment

21

Pairing Stations

Source Code

Management

Continuous Integration

Environment

22

Pairing Stations

Source Code

Management

Continuous Integration

Building Work Software

23

Code Check Out

Source Code

Management

Building Work Software

24

Code

Development

Source Code

Management

Building Work Software

25

Coding Pair

Source Code

Management

Code Check-In

Continuous Integration

Iterative Development

26

Spike - End-to-End

What’s

needed

end to

end?

Travel

Light

Iterative Growth

What’s

needed

end to

end?

• Project Concerns– Tight Schedules

– Maintaining “High Quality” despite changes

– Responsiveness to customer needs

• Project Situations – Don’t know all of what is needed at onset of project

• ONLY Commit for the “Known's”

– Requirements Change During the Project• Accommodate change with later releases

• Value to the Customer– Give customers regular functionality reviews

– Realizing Value often rather than “big bang”

Accommodates Multiple Challenges

• Project Concerns– Burn-Down Chart

– Burn-Up Charts

• Practices – Consistency Allows Ease of Spool Up

– Allows Migration of Team Members

• Tools– Consistency Allows Ease Migration of Team Members

• Quality– Defects

– Components

Big Visible Charts

Burnup Charts

7/6/2011

25

Electronic Task Wall

Burning Up Tasks Burnup

0

20

40

60

80

100

120

140

160

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20En

d

Working Days

Task Hours

Burnup Total Linear (Burnup) Linear (Total)

Collaboration / Validation

Story Tests Define Done

31

32

1026 1013982

951 924 913879

847798

742695

16 1331

3127 32

3445

16

23

34

40 43 5362

66 90

7261

7093

120

53 62 6267

90102

138 173

189200 223

150 160 180 190 198198

143 150

180 184196.5

050

100150200250300350400450500550600650700750800850900950

1000105011001150120012501300135014001450

2/3

2/1

0

2/1

7

2/2

4

3/3

3/1

0

3/1

7

3/2

4

3/3

1

4/7

4/1

4

4/2

1

4/2

8

5/5

5/1

2

5/1

9

5/2

6

6/2

6/9

6/1

6

6/2

3

6/3

0

7/7

7/1

4

7/2

1

7/2

8

Te

am

Po

ints

Sprint Iteration

K12 Burndown

Content Verified / DONE QA Verified Complete / Business Verified Active Remaining

Release 1 Release 2 & 3

BVC’s

BVC’s

BVC’s

BVC’s

Working Software

Questions?