qc competency
TRANSCRIPT
-
8/10/2019 QC Competency
1/24
Set - I
1. Consider that you want to smoke test the login functionality of an online application. You build a test set to include teststhat validate the login functionality. You build another test set to include tests that verify the login functionality in a particularwindows environment. This test set includes tests that validate the login functionality on different windows OS. Do you thinkthis approach is right and it tests all aspects of the online application?
A.No
B.Sometimes
C.Yes
2. Consider a test and its instance. A defect is associated with the test instance. During the testing process, the associationbetween the test instance and the defect is removed. Does any association still exist between the test and the defect?
A.Yes
B.No
1417063 3 2 1 Consider a test a
3. Why do you create a release tree?
A.To define the framework of releases
B.To define the workflow for the project
C.To define the requirements hierarchy
D.To define the test plan for the release
1417064 3 3 1 Why do you crea
4. In designing a test, where can you specify parameters? (Select two)
A. Call to testB. Test NameC. Step NameD. DescriptionE. Expected Result
A.B,C
B.A,D
C.A,E
D.D,E
1417065 3 4 1 In designing a tes
5. As the project administrator of a project that is linked to a template project, what can you do? Same as 541
A.Synchronize project customizations with the linked template project on demand
-
8/10/2019 QC Competency
2/24
B.Roll back project customizations if problems are detected
C.Request suspension of template customizations being applied
D.Run verification prior to synchronization with the template project
1417066 3 5 1 As the project ad
6. You are the QA manager and your team found many defects in the asset management application. There was inconsistencyin the defects management process. Hence, you created following rules to track defects raised by your team in quality center:
A.Only the QA manager can set defects to CLOSED
B.All defects in your project should start with a NEW status.
C.Defects cannot be closed without first being verified/fixed
D.All the above
E.None of the above
1417067 3 6 1 You are the QA
7. In the Requirements module, you create _______ by selecting tests to link to a requirement
A.RTM
B.Requirements coverage
C.Test coverage
D.SRS
1417068 3 7 1 In the Requireme
8. A project manager can generate a defect report to collate information regarding the new, open and re-open defects logged inquality center. Similarly QC graphs help us to analyze the progress of the project. Which graph shows the history of changes tospecific fields over a specific period?
A.Progress
B.Trend
C.Summary
9. Which statements about linking defects are true? Select two.
A. Linking defects enables you to link only one entity of any type to one defect.
B. Linking defects enables you to use History to search for defects with no known links.C. Linking defects enables you to link multiple entities of the same type to the same defect.D. Linking defects enables you to search defects that are related to specific Quality Center entities.
A.A,D
B.B,C
-
8/10/2019 QC Competency
3/24
C.C,D
D.A,B
1417070 3 9 1 Which statement
10. The software development team has developed Release 4.0 of the online banking application. They haveenhanced the functionality of the Transfer funds. There is a necessity to test the existing functionality of theTransfer funds to ensure that it continues to function as before. While analyzing the impact of a changeproposed in a specific requirement. Which option present in Quality center helps you to identify the otherrequirements that the change might affect?
A.Relationships
B.Traceability
C.Impact analysis
D.None of the above
1417071 3 10 1 The softw are de
11. The Online banking application requires that users must be able to access the application for at least 23hours a day. If the application stops working, it has a negative impact on your business. The availability of theonline banking application is a highly critical requirement. Which process is involved here?
A.Failure probability
B.Impact analysis
C.Establish business Criticality
D.None of the above.
1417072 3 11 1 The Online banki
12. When should you use a private favorite view for defects?
A.Need one more
B.Use for private sessions of Quality Center
C.Use for data on which only you are working
D. Use for data on which your group is working
1417073 3 12 1 When should you
!ldcConnNull! 1 !ldcConnNull! 49852 516900 66914
57C90B78-4852- 0 QA.Testing Proc 30 4 3
30 43:50 45 7A73DBB5-A990 43:43 0
-
8/10/2019 QC Competency
4/24
True 4624,4608,4273, 1 False
1
0
1 False
13. A defect D1 has linked to a requirement R1, R1 has two child requirements. Will the D1 be inherited by the childrequirements of R1?
A.Yes
B.Sometimes
C.No
1417074 3 13 1 A defect D1 has14. What is required to create a Baseline Report?
A.The baseline must support the history template.
B.All report sections must support test configurations.
C.All report sections must support baselines.
D.The baseline must support the standard template.
1417075 3 14 1 What is required
15. Your project manager wants you to use an existing set of requirements and tests across five projects in your organization.Which function should you use to accomplish this?
A.Baseline
B.Template
C.Component
D.Version
1417076 3 15 1 Your project man
16. What is the test type that is not listed by default when planning your tests in adding a test in the Test Plan module?
A.Manual
B.Business process
C.LR-Scenario
-
8/10/2019 QC Competency
5/24
D.WR-Automated
E.System-test
F.Exploratory
1417077 3 16 1 What is the test t
17. In Quality Center, Folders can contain subfolders, and each subfolders can contain further subfolders. How many maximumsubfolders can a folder contain?
A.476
B.676
C.None of the above
1417078 3 17 1 In Quality Center,
18. After you install the Excel add-in, what is the first step that you need to perform to export data from excel to quality center?
A.Format the data in excel.
B.Highlight the data in excel.
C.Review the exported data in QC and make the necessary additions and adjustments.
D.From the excel menu bar, select tools->export to quality center.
1417079 3 18 1 After you install t
19. How can you verify that the Excel add-in is successfully installed?
A.Quality Center-> Tools -> Export to Quality Center
B.Excel Spreadsheet -> Tools -> Export to Quality Center
C.Quality Center -> Tools -> Import to Duality Center
D.Excel Spreadsheet -> Tools -> Import to Quality Center
1417080 3 19 1 How can you ve
20. What happens if a user tries to delete a representative requirement?
A.The deletion succeeds. The requirement coverage of the model entity is lost .
B.The deletion fails. The representative requirements are read-only and are therefore protected from deletion.
C. The deletion fails. The representative requirement is automatically made read-only, and an alert is optionallytriggered.
-
8/10/2019 QC Competency
6/24
D.The deletion succeeds. The representative requirement is moved to the obsolete folder
21. The software development team has developed Release 4.0 of the online banking application. Theyhave enhanced the functionality of the Transfer funds in the release 4.0. There is a necessity to test theexisting functionality of the Transfer funds to ensure that it continues to function as before. Your managerwants you to test the functionality to ensure that the process meets all the quality requirements defined forit. What will be your first step to test the Transfer fund functionality?
A.Create requirements that specify the functional and performance metrics of the functionality.
B. Add traceability links between requirements to ensure that any changes to a requirement areupdated in the related requirements.
C. Create a release tree that includes testing cycles for testing the new features, existing featuresand performance metrics of the functionality.
1417082 3 21 1 The softw are de
22. There might be situations when you want to add attachments to a cycle. For e.g. you use MS Excel to plan
the time and resource estimates for a release and you want to attach this spreadsheet to a cycle within therelease for developers to track time. What are the default types of attachments that you can add?
A.Snapshot, Clipboard image, URL, File and System properties
B.Test plans, URL, File, System properties and Release versions
C.Clipboard image, Snapshot, File, Linked requirements and Test plans
1417083 3 22 1 There might be si
23. While reviewing new defects, if duplicate defects appear in the project, change their status to either ____,or delete them from the project.
A.Closed
B.Rejected
C.Duplicate
D.Both A & B
1417084 3 23 1 While review ing
24. Consider a test with the name test_01. Let us assume that requirement R_01 is associated with test_01. Adefect_01 is linked to R_01 is now associated with test_01. Now there are three instances of test_01 in threedifferent test sets. When an instance of this test is executed in any of the three test sets, will the defect_01 be
directly linked to that particular test instance?
A.Yes
B.Sometimes
C.No
-
8/10/2019 QC Competency
7/24
1417085 3 24 1 Consider a test
!ldcConnNull! 1 !ldcConnNull! 49852 516900 66914
57C90B78-4852- 0 QA.Testing Proc 30 4 6
30 42:01 45 7A73DBB5-A990 41:53 0
True 4624,4608,4273, 1 False
1
0
1 False
25. What are the default mandatory fields present while specifying the Cycle details in the releases module?
A.Start date, end date and description
B.Start date, Duration and Target Cycle
C.Target Cycle and Cycle description
1417086 3 25 1 What are the def
-
8/10/2019 QC Competency
8/24
26. Which feature determines the good, bad, or warning level for a KPI?
A.Milestone
B.Scope item
C.Threshold
D.KPI type
1417087 3 26 1 Which feature de
27. You need to generate a report to monitor requirements and test coverage. Which report type should you use to accomplishthis? (Select two.)
A. StandardB. PredefinedC. Non-standardD. Non-customizedE. Custom
A.B,D
B.B,E
C.A,D
D.C,E
1417088 3 27 1 You need to gen
28. Once you have created a test plan tree containing the main test subjects, you are ready to create ____.
A. Tests
B.Modules
C.Sub Modules
D.Sub Plans
29. Select from below an example of set additional test set properties
A.Schedule execution date and time
B. Define rules that specify the number of test re-runs and cleanup tasks that need to be performed when anautomated test fails
C.Both A & B
D.None of the above
1417090 3 29 1 Select from belo
-
8/10/2019 QC Competency
9/24
30. Which view of the requirements module enables you to edit multiple requirements?
A.Requirement Grid view
B.Requirement detail view
C.Both A & B
1417091 3 30 1 Which view of th
Set- III
1.Each Quality Center module, except releases module, has an analysis menu
A.True
B.False
1417425 3 1 1 Each Quality Cen
2. Consider that the online banking application has an existing feature to print the savings account statement. To test thisexisting functionality, you assign a requirement to a cycle that tests the overall functionality of the online banking application. Dowe need to assign requirements to a cycle that tests only new features?
A.Yes
B.No
1417428 3 2 1 Consider that the
3. You can automatically create tests based directly on your requirements in the Requirements module.
A.True
B.False
1417411 3 3 1 You can automat
4. In Quality center, you know that a test in your test plan might fail, but you want to ensure that the other tests still continue toexecute, you should:
A.Disconnect the test from the flow
B.Ensure that the execution condition running into the test is set to FINISHED
C.Ensure that the execution condition running into the test is set to PASSED
5. Your project manager wants to see a list of test instances and the results. Which type of report should you create to
-
8/10/2019 QC Competency
10/24
accomplish this?
A.Cross Test Set
B.Execution
C.Test Plan
D.Execution Status
1417417 3 5 1 Your project man
6. Quality center consists of the following test execution elements, which you use to provide information about test sets:
A.Execution grid, Execution flow and Linked defects
B.Live analysis, Execution grid, Graph of selected and Linked requirements
C. Execution Grid, Execution flow and Linked defects
D.Linked defects, Execution grid, Execution flow, Test set properties and live analysis
1417432 3 6 1 Quality center co
7. As the project administrator of a project that is linked to a template project, what can you do?
A.Synchronize project customizations with the linked template project on demand
B.Roll back project customizations if problems are detected
C. Request suspension of template customizations being applied
D.Run verification prior to synchronization with the template project
1417408 3 7 1 As the project ad
8. While reviewing new defects, if duplicate defects appear in the project, change their status to either ____, or delete them fromthe project.
A.Closed
B.Rejected
C.Duplicate
D.Both A & B
9. What are the two different ways in which grid filter helps us to organize the defect grid?
A. Use entry boxes under each field heading in grid filter to select the criteria for filtering the data in the defects gridB. Use the Clear Filter/Sort button to first clear the default settings and then use the Filter dialog box to set a filter condition
-
8/10/2019 QC Competency
11/24
C.Use the Filter dialog box to set a filter condition
A.A, C
B.A, B
C.B, C
1417420 3 9 1 What are the tw o
10. Consider a test and its instance. A defect is associated with the test instance. During the testing process, the associationbetween the test instance and the defect is removed. Does any association still exist between the test and the defect?
A.Yes
B.No
1417421 3 10 1 Consider a test a
11. The software development team has developed Release 4.0 of the online banking application. They have enhanced thefunctionality of the Transfer funds. There is a necessity to test the existing functionality of the Transfer funds to ensure that itcontinues to function as before. While analyzing the impact of a change proposed in a specific requirement. Which optionpresent in Quality center helps you to identify the other requirements that the change might affect?
A.Relationships
B.Traceability
C.Impact analysis
D.
None of the above1417429 3 11 1 The softw are de
12. Which statement is true about the important guidelines for running automated tests?
A.Run a test concurrently on multiple hosts; dont add multiple instances of the test to your test set.
B.Run the same test set concurrently on multiple hosts, set and execute an individual test run for each test set
C.You can set a test to run on a remote host group to ensure that the test runs on every host in the group.
D.
None of the above.13. A project manager can generate a defect report to collate information regarding the new, open and re-open defects logged inquality center. Similarly QC graphs help us to analyze the progress of the project. Which graph shows the history of changes tospecific fields over a specific period?
A.Progress
B.Trend
-
8/10/2019 QC Competency
12/24
C.Summary
1417436 3 13 1 A project manag
14. What is the relationship between requirements, releases, and cycles?
A.Requirements, releases, and cycles can be assigned to libraries.
B.Libraries can be assigned to requirements, releases, and cycles.
C.Releases and cycles are used for version control of requirements.
D.Requirements can be assigned to releases and cycles.
1417415 3 14 1 What is the relati
15. A manual test started but did not complete the test run. Which feature will allow you to proceed with the test run?
A.Cancel Run
B.Run Manually
C.Repeat Begin Run
D.Continue Manual Run
1417414 3 15 1 A manual test sta
16. Which view of the requirements module enables you to edit multiple requirements?
A.Requirement Grid view
B.Requirement detail view
C.Both A & B
17. You need to generate a report to monitor requirements and test coverage. Which report type should you use to accomplishthis? (Select two.)
A. StandardB. PredefinedC. Non-standardD. Non-customizedE. Custom
A.B,D
B.B,E
C.A,D
-
8/10/2019 QC Competency
13/24
D.C,E
1417418 3 17 1 You need to gen
18. In Quality Center, Folders can contain subfolders, and each subfolders can contain further subfolders. How many maximumsubfolders can a folder contain?
A.476
B.676
C.None of the above
1417431 3 18 1 In Quality Center,
19. What is the best practice for running an automated test simultaneously on multiple remote hosts?
A.Adding multiple instances of the test, selecting a host for each instance
B.Running a test separately on each of the multiple remote hosts
C.Running a test set sequentially on each of the multiple remote hosts
D.Using the Host Manager Wizard to configure hosts and run tests and test sets
1417407 3 19 1 What is the best
20. What are the default mandatory fields present while specifying the Cycle details in the releases module?
A.Start date, end date and description
B.Start date, Duration and Target Cycle
C.Target Cycle and Cycle description
17. You need to generate a report to monitor requirements and test coverage. Which report type should you use to accomplishthis? (Select two.)
A. StandardB. PredefinedC. Non-standardD. Non-customizedE.Custom
A.B,D
B.B,E
C.A,D
D.C,E
-
8/10/2019 QC Competency
14/24
-
8/10/2019 QC Competency
15/24
C.To define the requirements hierarchy
D.To define the test plan for the release
1417419 3 22 1 Why do you crea
23. Consider that the software development line of business (LOB) of an organization is developing version 10.5 of the onlinebanking application for a specified bank. Version 10.0 of the same software already exists and enables a user to perform basiconline banking transactions. In Version 10.5 of the banking application, new functionality such as linking savings and sharetrading accounts is provided. In Quality Center, a version of an application is referred to?
A.Test set Instance
B.Release
C.Cycle
D.None of the above
1417423 3 23 1 Consider that the
24. Which statements about linking defects are true? Select two.
A. Linking defects enables you to link only one entity of any type to one defect.B. Linking defects enables you to use History to search for defects with no known links.C. Linking defects enables you to link multiple entities of the same type to the same defect.D. Linking defects enables you to search defects that are related to specific Quality Center entities .
A.A,D
B.B,C
C.C,D
D.A,B
25. Your project manager wants you to use an existing set of requirements and tests across five projects in your organization.Which function should you use to accomplish this?
A.Baseline
B.Template
C.Component
D.Version
1417416 3 25 1 Your project man
26. Select from below an example of set additional test set properties
A.Schedule execution date and time
-
8/10/2019 QC Competency
16/24
B. Define rules that specify the number of test re-runs and cleanup tasks that need to be performed when an automatedtest fails
C.Both A & B
D.None of the above
1417430 3 26 1 Select from belo
27. Which feature determines the good, bad, or warning level for a KPI?
A.Milestone
B.Scope item
C.Threshold
D.KPI type
1417409 3 27 1 Which feature de
28. The software development team has developed Release 4.0 of the online banking application. They have enhanced thefunctionality of the Transfer funds in the release 4.0. There is a necessity to test the existing functionality of the Transfer funds toensure that it continues to function as before. Your manager wants you to test the functionality to ensure that the process meetsall the quality requirements defined for it. What will be your first step to test the Transfer fund functionality?
A.Create requirements that specify the functional and performance metrics of the functionality.
B. Add traceability links between requirements to ensure that any changes to a requirement are updated in the relatedrequirements.
C. Create a release tree that includes testing cycles for testing the new features, existing features and performancemetrics of the functionality.
29. While testing the online banking application, you wanted to schedule few tests to be run based on the execution completionstatus of other tests and also want to schedule regression tests to run after office hours. Which feature from below best fit toaccomplish this task?
A.Test plan module
B.Execution Grid tab
C.Execution flow tab
1417433 3 29 1 While testing the
30. In the Online banking application, Funds Transfer involves transferring money from one account to another and paying bills.What kind of requirements you need to create from following:1. Business Requirement2. Functional Requirement3. Testing Requirement4. Performance Requirement
-
8/10/2019 QC Competency
17/24
A.1 & 2
B.1, 2 & 3
C.1, 3 & 4
D.1 & 3
SetII
1. In designing a test, where can you specify parameters? (Select two)
A. Call to testB. Test NameC. Step NameD. DescriptionE. Expected Result
A.B,C
B.A,D
C.A,E
D.D,E
1417448 3 1 1 In designing a tes
2. Consider that you want to smoke test the login functionality of an online application. You build a test set to include tests thatvalidate the login functionality. You build another test set to include tests that verify the login functionality in a particular windowsenvironment. This test set includes tests that validate the login functionality on different windows OS. Do you think this approachis right and it tests all aspects of the online application?
A.No
B.Sometimes
C.Yes
1417461 3 2 1 Consider that yo
3. Your project manager wants to see a list of test instances and the results. Which type of report should you create toaccomplish this?
A.Cross Test Set
-
8/10/2019 QC Competency
18/24
B.Execution
C.Test Plan
D.Execution Status
1417447 3 3 1 Your project man
4. In the Online banking application, Funds Transfer involves transferring money from one account to another and paying bills.What kind of requirements you need to create from following:1. Business Requirement2. Functional Requirement3. Testing Requirement4. Performance Requirement
A.1 & 2
B.1, 2 & 3
C.
1, 3 & 4
D.1 & 3
1417454 3 4 1 In the Online ban
5. Consider that the software development line of business (LOB) of an organization is developing version 10.5 of the onlinebanking application for a specified bank. Version 10.0 of the same software already exists and enables a user to perform basiconline banking transactions. In Version 10.5 of the banking application, new functionality such as linking savings and sharetrading accounts is provided. In Quality Center, a version of an application is referred to?
A.Test set Instance
B.Release
C.Cycle
D.None of the above
1417451 3 5 1 Consider that the
6. ____ enables you to analyze the progress of defect repairs, and view how long defects have been residing in a project.
A.Reports
B.Graphs
C.Analyzers
D.Both A & B
1417444 3 6 1 ____ enables yo
7. The ____ feature enables you to calculate at which level to test each requirement,based on the importance of the requirementand the resources you have available
-
8/10/2019 QC Competency
19/24
A.Level-based quality management
B.Calculate-based quality management
C.Risk-based quality management
D.None of above
1417442 3 7 1 The ____ feature
8. Consider a test with the name test_01. Let us assume that requirement R_01 is associated with test_01. A defect_01 is linkedto R_01 is now associated with test_01. Now there are three instances of test_01 in three different test sets. When an instanceof this test is executed in any of the three test sets, will the defect_01 be directly linked to that particular test instance?
A.Yes
B.Sometimes
C. No
9. While testing the online banking application, you wanted to schedule few tests to be run based on the execution completionstatus of other tests and also want to schedule regression tests to run after office hours. Which feature from below best fit toaccomplish this task?
A.Test plan module
B.Execution Grid tab
C.Execution flow tab
1417462 3 9 1 While testing the
10. What choices are available in Test Set Properties if any test fails?
A.Rerun the test up to 5 times
B.Run the next Test Set, Do Nothing
C.Run cleanup test before each rerun of the test
D.Do Nothing, Stop the Test Run, Rerun the Test Set
1417441 3 10 1 What choices ar
11. What are the default mandatory fields present while specifying the Cycle details in the releases module?
A.Start date, end date and description
B.Start date, Duration and Target Cycle
C.Target Cycle and Cycle description
-
8/10/2019 QC Competency
20/24
1417452 3 11 1 What are the def
12. Which type of data can be added to a Dashboard page?
A.Releases
B.Requirements
C.Plan
D.Graphs
13. As the project administrator of a project that is linked to a template project, what can you do?
A.Synchronize project customizations with the linked template project on demand
B.Roll back project customizations if problems are detected
C.Request suspension of template customizations being applied
D.Run verification prior to synchronization with the template project
1417438 3 13 1 As the project ad
14. When should you use a private favorite view for defects?
A.Need one more
B.Use for private sessions of Quality Center
C. Use for data on which only you are working
D.Use for data on which your group is working
1417449 3 14 1 When should you
15. After you install the Excel add-in, what is the first step that you need to perform to export data from excel to quality center?
A.Format the data in excel.
B. Highlight the data in excel.
C.Review the exported data in QC and make the necessary additions and adjustments.
D.From the excel menu bar, select tools->export to quality center.
1417466 3 15 1 After you install t
16. Which statements about linking defects are true? Select two.
-
8/10/2019 QC Competency
21/24
-
8/10/2019 QC Competency
22/24
B.Business process
C.LR-Scenario
D.WR-Automated
E.System-test
F.Exploratory
21. What happens if a user tries to delete a representative requirement?
A.The deletion succeeds. The requirement coverage of the model entity is lost.
B.The deletion fails. The representative requirements are read-only and are therefore protected from deletion.
C. The deletion fails. The representative requirement is automatically made read-only, and an alert is optionallytriggered.
D.The deletion succeeds. The representative requirement is moved to the obsolete folder.
1417437 3 21 1 What happens if
22. You can automatically create tests based directly on your requirements in the Requirements module.
A.True
B.False
1417443 3 22 1 You can automat
23. During which step of the risk based testing process do you determine the time needed for testing a requirement in QC?
A.Establish business Criticality
B.Perform risk analysis
C.Establish failure probability
D.View analysis results
1417458 3 23 1 During w hich ste
24. What is required to create a Baseline Report?
A.The baseline must support the history template.
B.All report sections must support test configurations.
C.All report sections must support baselines.
-
8/10/2019 QC Competency
23/24
D.The baseline must support the standard template.
25. Which view of the requirements module enables you to edit multiple requirements?
A.Requirement Grid view
B.Requirement detail view
C.Both A & B
1417455 3 25 1 Which view of th
26. A manual test started but did not complete the test run. Which feature will allow you to proceed with the test run?
A.Cancel Run
B.Run Manually
C.Repeat Begin Run
D.Continue Manual Run
1417446 3 26 1 A manual test sta
27. The Online banking application requires that users must be able to access the application for at least 23 hours a day. If theapplication stops working, it has a negative impact on your business. The availability of the online banking application is a highlycritical requirement. Which process is involved here?
A.Failure probability
B.Impact analysis
C.Establish business Criticality
D.None of the above.
1417459 3 27 1 The Online banki
28. The software development team has developed Release 4.0 of the online banking application. They have enhanced thefunctionality of the Transfer funds. There is a necessity to test the existing functionality of the Transfer funds to ensure that itcontinues to function as before. While analyzing the impact of a change proposed in a specific requirement. Which optionpresent in Quality center helps you to identify the other requirements that the change might affect?
A.Relationships
B.Traceability
C.Impact analysis
D.None of the above
-
8/10/2019 QC Competency
24/24
29. You are the QA manager and your team found many defects in the asset management application. There wasinconsistency in the defects management process. Hence, you created following rules to track defects raised by your teamin quality center:
A.Only the QA manager can set defects to CLOSED
B.All defects in your project should start with a NEW status.
C.Defects cannot be closed without first being verified/fixed
D.All the above
E.None of the above
1417464 3 29 1 You are the QA
30. What are the two different ways in which grid filter helps us to organize the defect grid?
A. Use entry boxes under each field heading in grid filter to select the criteria for filtering the data in the defects grid B. Use the Clear Filter/Sort button to first clear the default settings and then use the Filter dialog box to set a filter conditionC. Use the Filter dialog box to set a filter condition
A.A, C
B.A, B
C.B, C