quality manual of confidence steel limited · pdf filefabrication 40-44 galvanization 45-48...
TRANSCRIPT
QUALITY MANUAL
OF
CONFIDENCE STEEL LIMITED
Confidence Steel Limited
Page 2 of 81
TABLE OF CONTENTS
Chapter Title Page
Quality Policy & Objectives 4-5
Cahpter-1 Quality Management System
Endorsement of the QMS 6-6
List of Abbreviations 7-7
Distribution 8-8
Quality Management System 9-12
Management Responsibility 13-18
Resources Management 19-22
Product Realization 23-29
Measurement, Analysis & Improvement 30-32
Chapter-2 Raw Material
Structural Steel ( Angle Sections & Plates) 33-37
Zinc 38-38
Chapter-3 Fabrication & Galvanization
Fabrication 40-44
Galvanization 45-48
Final Acceptance and Testing of Fabricated and Galvanized product 49-50
Final Acceptance and Testing of Bolt, Nut & Washer. 51-72
Cahpter-4 Delivery
Packaging Requirement 74-79
Loading Requirement 80-81
Quality Manual
Page 3 of 81
CAHPTER-1 QUALITY
MANAGEMENT SYSTEM
Confidence Steel Limited
Page 4 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-01
Revision No.: 0
QUALITY POLICY & OBJECTIVES Effective Date: 01 Apr, 07
Page No.:
QUALITY POLICY OF CONFIDENCE STEEL LTD
Confidence Steel Limited is committed to build and sustain itself as an organization where quality shall be the hallmark of every activity. Confidence Steel Limited will continuously strive to upgrade the work skill, manufacturing facilities and systems to achieve consistent product quality, global competitiveness and customer satisfaction.
It is the policy of CONFIDENCE STEEL LTD to—
1. a. Establish Quality Management Systems within CSL to identify and control processes to assure the quality of products.
b. Implement within CSL a Quality Management System in accordance with the
International Organization for Standardization's ISO 9001: 2008 Quality Management System Standards.
c. Obtain and maintain third-party certification to the ISO 9001 standard for all key
processes at.
2. Increase customer satisfaction by,
a. Decreasing the customer complains b. Increasing the volume of product delivery on time
3. Increase on-the-job training of the total work force
4. Increase the sales growth of the organization
This policy will be reviewed at least once in a year for its continuing suitability.
Quality Manual
Page 5 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-01
Revision No.: 0
QUALITY POLICY & OBJECTIVES Effective Date: 01 Apr, 07
Page No.:
QUALITY OBJECTIVES OF CONFIDENCE STEEL LTD Confidence Steel Ltd. has taken up following quality objectives for the next three years time period: 1. It will implement Quality Management System in accordance with ISO 9001:2000 standard
and obtain third-party certification by June 2007 and maintain the same.
2. Present market share will be improved continuously by increasing the sales value .
3. It will adopt appropriate system to improve production volume
4. It will adopt appropriate system to minimize wastage by at least 0.5% per year
5. It will target for minimum break-down
.
6. It will train 15% of its people every year to improve skill.
Confidence Steel Limited
Page 6 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-02
Revision No.: 0
ENDORSEMENT OF THE QMS Effective Date: 01 Apr, 07
Page No.: 1 of 1
CONFIDENCE STEEL LTD (CSL) has established a Quality Management System incorporating the
requirements of ISO 9001: 2008. This Quality Manual (QM) is an overview of the Quality Management System
(QMS) of CSL. Details of inside view of the quality system and commitment, which (CSL) have been pursuing,
are shown in this manual. The quality manual (QM) is the sole property of CSL. Updating of the manual is done
as per the Document and Data Control procedure of the Quality Management System. Customer who has been
provided with controlled copies of this manual will be informed whenever an amendment in the Quality Manual
is made.
Distribution of the CONTROLLED copies of this manual is limited within the List of Controlled Copy Holders
of the Quality Manual. CONTROLLED/UNCONTROLLED copy of the manual can be made available to the
Customers and any distinguished personality with the written permission of the Managing Director.
Quality Manual
Page 7 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-03
Revision No.: 0
TABLE OF CONTENTS, LIST OF ABBREVIATIONS, & DISTRIBUTION
Effective Date: 01 Apr, 07
Page No.: 2 of 3
LIST OF ABBREVIATIONS
Dir : Director
IC : Incharge
MD : Managing Director
CSL : Confidence Steel Ltd
MR : Management Representative
PO : Purchase Order
QF : Quality Forms
QM : Quality Manual
QMS : Quality Management System
QP : Quality Policy
QPr : Procedures
QWI : Work Instruction
Confidence Steel Limited
Page 8 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-03
Revision No.: 0
TABLE OF CONTENTS, LIST OF ABBREVIATIONS, & DISTRIBUTION
Effective Date: 01 Apr, 07
Page No.: 3 of 3
LIST OF DISTRIBUTION
Followings are the controlled copyholders:
1st Copy Managing Director
2nd Copy CEO
3rd Copy Head of Operation
4th Copy Marketing
5th Copy Procurement
6th Copy Production
7th Copy Quality
8th Copy Maintenance
9th Copy Fabrication In-charge
10th Copy Customer Services In-charge
11th Copy Galvanizing In-charge
12th Copy Delivery In-charge
13th Copy Store In-charge
14th Copy Management Representative (MR)
15th Copy Reserved for Auditors
NB: Whenever any revision takes place in this Quality Manual, a record of revision is maintained under Last Change Record. This is done as per Procedure Document and Data Control No. QP-DCL-1
and as per Form No. QF-DCL-06. Please refer to the above for future reference.
Quality Manual
Page 9 of 81
1. Introduction
CONFIDENCE STEEL LTD (CSL) is one of the most modern steel fabrication company in our country
established on 30th July in 2005 , started to function and have grown and diversified into a multifaceted
Steel Engineering organization. It is equipped to manufacture Galvanized Telescopic Poles, Machineries,
Gear-Box for water pumps, Screws & Fasteneres, Telecommunication & Transmission Towers, Portable
Steel Bridges, Pole Fittings & Hardware etc. It has its registered office address as follows:
Noor Tower (10th Floor), 110, Bir uttam C.R Dutta Road (Sonargaon Road)
Dhaka-1205, Bangladesh
Telephone no. 88-02-9666395,9666396
Fax No. 88-02-9673864
E-mail:[email protected] Factory Address:
Nayapur, Barabo, Sonargaon,
Narayanganj,Bangladesh
Telephone no. 7617704
Fax No.-88-02-7817704
2. Scope
This document outlines the Quality System that is followed by the personnel of the Confidence Steel
Ltd throughout its all functions. This Quality System is designed to comply with the requirements of
ISO: 9001:2008.
The Quality Manual includes the quality policy and the quality objectives of Confidence Steel Ltd and
describes the organizational structure, identifies management responsibilities, and references the
processes and procedures and supporting Quality System documents and records.
Quality Manual has been organized so that the section titles correspond to those of the clauses/elements
of ISO: 9001:2008. Where appropriate, procedures are referenced that provide more detailed
information.
The CSL Quality Manual provides general policies & procedures for the purchasing, design,
manufacturing, testing, storage and selling of CSL products including its compliance to ISO9001:2000.
The scope of the activity of the company covers the following activities:
Manufacturing & supply of Telecom Towers, Transmission Towers, Steel Pole, Portable Steel Bridge,
Water Distribution Steel Pipe, Hardware, screws & fasteners etc for international & local market.
3 Application: All the clauses of ISO9001:2008 except Design & development (7.3), Validation of
processes for production and service provision (7.5.2) and customer property (7.5.4).
4. Normative references: ISO9001:2008 Quality system- Model for quality assurance in Production &
Marketing.
Manufacturing standards are: BS8110 & BS829
5. Quality Management System of Confidence Steel Ltd
Confidence Steel Ltd is responsible to manufacture Telecom Towers, Transmission Towers, Steel Pole, Portable Steel Bridge, Water Distribution Steel Pipe, Hardware complying with the
requirements stipulated by customer and delivers the same in accordance to the agreed schedule.
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-04
Revision No.: 0
QUALITY MANAGEMENT SYSTEM-REQUIREMENTS
Effective Date: 01 Apr, 07
Page No.: 1 of 4
Confidence Steel Limited
Page 10 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-04
Revision No.: 0
QUALITY MANAGEMENT SYSTEM-REQUIREMENTS
Effective Date: 01 Apr, 07
Page No.: 2 of 4
Accordingly, Confidence Steel Ltd has planned, mobilized human and material resources and established
the sequence of processes to realize the product. It also established and maintains a Quality Management
System and continually improves its effectiveness in accordance with the requirements of ISO-9001: 2008
standard. The Quality Manual includes the details of QMS, references to documented procedures and a
description of the interactions between the following processes.
a. Commercial: dealing with purchase and procurement
b. Marketing dealing with sales, shipping and transportation
c. Stores: dealing with storage, handling and safekeeping of materials and products
d. Product Development
e. Production process involves the following,
f. Human Resources Management
g. Maintenance Management.
These are included in the QMS. The Quality Manual of Confidence Steel Ltd is a direct collection of
QMS documents with references to documented procedures.
A mapping of the quality management system involving the major processes has been given in the next
page.
a.) Fabrication, Trial assembly
b.) Testing for different stages on
different criteria
c.) Galvanizing
d.) Final Inspection
e.) Storage & Dispatch
Quality Manual
Page 11 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-04
Revision No.: 0
QUALITY MANAGEMENT SYSTEM Effective Date: 01 Apr, 07
Page No.: 3 of 4
QUALITY MANAGEMENT SYSTEM MAPPING
CUSTOMERS R EQU I R EME N T
S
CUSTOMERS
SAT ISFACT IONS
Continual improvement of The Quality Management System
Product realisation Purchasing, Product Development, Production, Preservation of Product, Identification and Traceability, Inspection & Test Status, Maintenance
Resource management
Provisions for Manpower, Equipment and Working Space, Training, Control of Safe and Suitable Working Conditions
Measuring, analysis & improvement
Internal Audit, Inspection & Testing, Control of Non-Conforming Product, Statistical Technique Corrective Action, Preventive Action,
Management responsibility
Quality Policy, Quality Objectives, Quality Planning, Customer Focus, Organogram, Job Description, MR deployment, Management Review
Product Input
Process materials, component parts, packing materials etc.
Fabrication &
hardware items
Value-adding activities
Information Flow
Confidence Steel Limited
Page 12 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-04
Revision No.: 0
QUALITY MANAGEMENT SYSTEM Effective Date: 01 Apr, 07
Page No.: 4 of 4
The QMS is reviewed from time to time to ensure suitability and continual improvement by the
Management Representative (MR) and Review Committee.
Accordingly, corrective and preventive actions are adopted to improve the system. Customer is
informed whenever any modification in the QMS takes place.
All documents of Confidence Steel Ltd are controlled in accordance with the Procedure for Document
Control (QP-DCL-1).
CSL established documented procedure for the identification, storage, protection, retrieval, retention
time and disposition of quality records.
6. Quality Manual
This Quality Manual applies to whole of Confidence Steel Ltd and includes all functions that affect
quality of product. This manual specifies the Quality Management System of CSL and defines the
interactions between the processes. It defines the scope of QMS including details of and justification
for any exclusions.
7. Control of Documents
Confidence Steel Ltd has established procedure to control Quality documents (QP-DCL-1). Documents
defined as quality records will be controlled according to procedure for Control of Quality Records.
Procedure no. QP-DCL-1 gives details of the Control of Quality Documents.
8.Control of Quality Records
A Master List of Quality Records, which contains Document no, retention period, responsibility and
document name is maintained by CSL.
CSL allows customers to refer to the Quality Records if they require it during the retention period.
Procedure no. QP-DCL-2 gives details of the Control of Quality Records.
Quality Manual
Page 13 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-05
Revision No.: 01
MANAGEMENT RESPONSIBILITY Effective Date: 01 Apr, 07
Page No.: 1 Of 6
1. Management Commitment
It is the policy of Confidence Steel Ltd (CSL) to meticulously implement the QMS. The QMS will be
developed and continually improved. Following measures are taken to improve the effectiveness of the
QMS.
The organisation now produces Telecom Towers, Transmission Towers, Steel Pole, Portable Steel Bridge, Water Distribution Steel Pipe, Hardware etc as given in para 1. Introduction (QM-
04) of the manual, complying with the requirements stipulated by customer and delivers the same in
accordance to the agreed schedule The QM demonstrates the commitment of CSL in developing and implementing QMS, meeting all the
customer needs, the statuary & regulatory requirements where applicable, establishing and
implementing quality policy and quality objective, conducting regular management review meeting &
providing required resources.
2. Customer Focus:
Top priority is given to customer requirement and customer satisfaction. All the requirements of the customer
regarding product sale and after sales service (where applicable) is documented and implemented.
3. Quality Policy
The Quality Policy of Confidence Steel Ltd has been established (Ref: QM-01, page 1 of 2). Quality
Policy (QP) embraces all functions of CSL. QP reflects the commitment of CSL in meeting the
requirements of the customer. The Quality Objectives consistent to QP has been defined (Ref: QP-01).
The QMS includes commitment to review the policies and objectives for continuing suitability and
improvement. CSL ensures that Quality Policies are understood at all levels through briefing sessions,
training and on job performance. This policy should be reviewed at least once in a year for its
continuing suitability.
4. Planning
a. Quality Objectives
Ref: QM-01 (page 2 of 2)
b. Quality Planning
Confidence Steel Ltd (CSL) has identified the resources needed to achieve the Quality Objectives.
Accordingly planning has been established. Output of planning is documented.
Interlink of responsibilities between different functions in relation to different activities of Quality
Management System has been shown in the next page.
To explain the requirements of quality and how it is met with the Quality System, quality planning is
made. The planning process takes care of the various activities that are essential to meet the specified
requirements for products manufactured by CSL and to ensure customer satisfaction. The quality-
planning format is available in the following pages:
Confidence Steel Limited
Page 14 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-05
Revision No.: 0
MANAGEMENT RESPONSIBILITY Effective Date: 01 Apr, 07
Page No.: 2 of 6
Quality Planning Format
Activity Procedure
Reference
Responsibility Reference Document Quality Records
Document Control QP-DCL-1 Management
Representative
List of Procedures/ Work
Instructions/
Formats/Tags/Register/
Specifications
Control of Quality
Records
QP-DCL-2 Do All Quality Records as
per List: QF-DCL-03
Management
Review
QP-MNG-1 Do Internal Audit Summary,
Customer Complaints
Summary, Corrective and
Preventive Action Summary
Records in minutes of
meeting of Management
Review
Training Administration
Incharge
Appraisals, Evaluation
Reports
Training Records QF-
HRD-06
Suitable and Safe
Working Conditions
All Incharges Check Lists, Fire Drill
Records
Fire Drill Records,
Record of working
condition QF-HRD-01
Contract Review Technical
Incharge,
Director (Sales),
MD
Limits of Authority, Price
Approval, Product
Brochures, Stock Reports
Contract Review and
Amendment Records.
Invoices.
QF-CUS-01
Procurement QP-PRO-1 Procurement
Incharge
Specifications of Raw
Material, Limits of
Authority, Purchase Manual
Vendor Approval
Records, Purchase
Orders QF-PRO-01,02,
03,07,05,06,07
Process Control QP-PRN-1 Production &
Technical
Manager
Budget, Production Plan,
Stock Report of Raw
Materials.
Record Register for
production, Batch No
Register.
Maintenance Incharges of
Maintenance
Annual Maintenance Plans,
Monthly Preventive
Maintenance Plan, Machine
History Card
Break Down Record,
Annual Maint. Plan,
Machine History Card
QF-MNT-01,02,03,07
Product
Identification and
Traceability
QP-PRN-2 All Incharges Raw Materials /Finished
product Identification
Cards/Papers.
Tag Numbers, Urgent
Permission Tags,
Documents,
Inspection and
Testing
QP–QIN-1 do Raw Material Specification,
Standards for Testing and
Inspection.
Receiving Inspection
Report, Final Inspection
Report, In-Process
Inspection Reports.
Control of
Nonconforming
Products
QP–QIN-2 Production &
Technical
Manager
Inspection and Testing
Procedure, Raw Material
and Product Specification
Monthly Analysis of
Product Non-conformity
QF-QIN-07
Quality Manual
Page 15 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-05
Revision No.: 01
MANAGEMENT RESPONSIBILITY Effective Date: 01 Apr, 07
Page No.: 3 Of 6
Quality Planning Format (Cont’d)
Activity Procedure
Reference
Responsibility Reference
Document
Quality Records
Inspection & Test
Status
All Incharges Manual and Procedure
Formats & Tags
Preservation of
Products
QP-PRN-3 Incharges of
Store and Sales
Material Receipt
Memo, Material
Transfer or Issue
advices, Store Manual
Stock Ledger, Bin
Cards, Dispatch
advices, Material
Receiving Notes.
Control of
Inspection,
Measuring and Test
Equipment
Fabrication In
charge
Manual and Procedure Calibration Records
QF-QIN –08
Internal Quality
Audits QP–IQA-1 MR Nonconformity Reports Audit Analysis
FM/AUD/555
Corrective Actions QP–CAC-1 All Functional
Heads of the
Quality System
Monthly Analysis of
Nonconforming
Products, Internal Audit
Reports Summary,
Customer Complaints,
Statistical Analysis
Reports.
Preventive Actions QP–PAC-1 -do- Monthly Analysis of
Nonconforming
Products, Internal Audit
Reports Summary,
Customer Complaints,
Statistical Analysis
Reports.
Confidence Steel Limited
Page 16 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-05
Revision No.: 0
MANAGEMENT RESPONSIBILITY Effective Date: 01 Apr, 07
Page No.: 4 of 6
5. Responsibility, Authority and Communication
Top management of the company ensures that responsibility and authority has been given to particular personals
in the organization. Job description of employees is maintained and organogram shows the inter-relationship
and authority to perform a job.
Please see the job descriptions & organogram.
Responsibility Matrix
Clause
No. Title of requirement MD DIR
(Prdn)
Incharges
MR Prdn Contr.
Tech. Admn. Sales Servc
Procr Store
4 Quality Management
System ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
4.2.3 Procedure for
Document Control ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
4.2.4 Procedure for Control
of Quality Records ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
5.6 Management Review
Procedure ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
6.2.2 Provision of Training ■ ■ ■ ■ ■ ■
6.4 Assessment of Suitable
and Safe Working
Environment □ ■ ■ ■ ■ ■ ■ ■
7.2.2 Contract Review ■ ■ ■ ■
7.3 Design Control NOT APPLICABLE 7.4 Purchasing Process ■ ■ ■ ■ □ ■ ■
7.5.1 Process Control ■ ■ ■ □ ■ ■
Maintenance Process ■ ■ ■ ■
7.5.3 Identification and
Traceability Process ■ ■ ■ □ ■ ■ ■
7.5.4 Customer Supplied
Product □ ■ ■ ■ □ ■ ■
7.5.5 Handling, Storage,
Packaging, Preservation
and Delivery
□ ■ ■ ■ ■ ■
7.6 Control of Inspection,
Measuring and Test
Equipment
■ ■ ■ ■ ■
8.2.2 Internal Audits Process □ □ ■ ■ ■ ■ ■ ■ ■ ■ ■
8.2.3 Inspection and Testing ■ ■ ■ ■ □ ■
8.2.3
8.2.4
Inspection and Test
Status ■ ■ ■ ■ □ ■ ■
8.3 Control of
Nonconforming Product ■ ■ ■ □ ■ ■
8.4 Corrective Action □ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Preventive Action ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
8.5 Statistical Technique ■ ■ ■ ■ ■
Definitions: Prdn: Production Contr: Contracting Tech.: Technical
Admin: Administration Servc: Servicing MR: Management Representative
Procr: Procurement
■: Direct Responsibility □: Indirect Responsibility
Quality Manual
Page 17 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-05
Revision No.: 0
MANAGEMENT RESPONSIBILITY Effective Date: 01 Apr, 07
Page No.: 5 of 6
a. Management Representative
Mr. Shahidul Islam, Manager (Production & Technical) is the Management Representative of
Confidence Steel Ltd He will do the work of Management Representative in addition to his present
responsibility. MR will be specifically responsible for the following.
1. Reporting to the Director & Managing Director on the performance of the QMS.
2. Needs of improvement in QMS.
3. Promoting awareness about customer requirements throughout the organisation.
4. Where relevant communication with external parties on matters related to QMS.
b. Internal Communication
It is a policy of Confidence Steel Ltd to ensure communication between various levels and functions
regarding the process of QMS and their effectiveness through teams, committees and meetings,
telephone, & PABX services, Notice board, Office Memo/Register.
Confidence Steel Limited
Page 18 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-05
Revision No.: 0
MANAGEMENT RESPONSIBILITY Effective Date: 01 Apr, 07
Page No.: 6 of 6
6. Management Review
a. Introduction
Confidence Steel Limited evaluates the need for change in QMS including Quality Policy and
Objectives. The review ensures continuing suitability, adequacy and effectiveness of QMS. Confidence Steel Ltd established documented procedures for management review.
Procedure no. QP-MNG-1 gives details of the Management Review.
b. Review Input
Input of management review includes at least the following
1. Matters arising
2. Product Nonconformities
3. Internal Audit Results
4. Corrective and Preventive Actions
5. Customer Complaints
6. Progress Review of the Previous decisions /Action plans
7. Quality Objective points
8. Any other business
c. Review Output
Output from management review includes actions related to
1. improvement of the QMS and its processes
2. improvement of product related to customer requirements
3. resource needs
Results of management reviews are recorded in the Minutes of Management Review Committee
Meeting.
Quality Manual
Page 19 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-06
Revision No.: 01
RESOURCE MANAGEMENT Effective Date: 01 Apr, 07
Page No.: 1 Of 4
1. Provision of Resources
Confidence Steel Ltd has identified human, physical resources and environmental conditions to
establish and maintain QMS and improve its effectiveness and to enhance customer satisfaction.
CSL identifies the various requirements of resources and provides them for carrying out the activities
efficiently. All functional heads in consultation with Directors and MD review the requirements and
when identified provides necessary resources depending on needs. These resources include all types of
management, implementation and Internal Quality Audits. It has trained manpower in all its
departments. CSL has trained Internal Quality Auditors to check the Quality Management System as per
ISO 9001: 2000. MR maintains a list of Trained Internal Quality Auditor.
Trained personnel are provided whenever needed and training requirements are taken care depending on
needs. Functional Heads and selected Management Staff have been trained on awareness and
documentation of Quality System to ISO 9001: 2000 to implement and verify their work as desired by
the Quality System.
Adequate plant, machinery and instruments are available to manufacture the products as per required
specifications. Care is taken to assess the needs of the facility and technology from time to time to cope
with the changing needs of the customers and accordingly plans are made to include those.
Functional heads review the requirements and when identified provides necessary resources depending
on needs. These resources include all types of management, implementation and Internal Quality
Audits.
Confidence Steel Ltd also has the system of imparting on-the job training to improve the skill level of
the people. Employees in CSL are skilled enough to carry out the work and verify quality as per
procedure.
2. Human Resources
The manpower strength of CSL is as shown below:
Sl.
No. Department Officer Staff
Technician
Total Skilled
Semi-
skilled
Un-
skilled
1 Production 30 - 100 200 200 500
2 Customer
Services 5 - - - - 5
3 Marketing 5 - - - - 5
4 Technical 3 - - - - 3
5 Finance &
Accounts 5 - - - - 5
6 Administration 5 10 - - - 15
7 Purchase 2 - - - - 2
8 Store 2 4 - - - 6
Total 57 14 100 200 200 533
Confidence Steel Ltd develops its Human Resources through training.
Confidence Steel Limited
Page 20 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-06
Revision No.: 01
RESOURCE MANAGEMENT Effective Date: 01 Apr, 07
Page No.: 2 Of 4
CSL makes yearly assessment of all its employees. To improve the skill for covering shortcomings,
transfer to the new jobs and developing skill of prospective future leaders, training needs are identified
by the superiors. Depending on needs `peoples are selected for imparting training. In case when a
program is declared by any training institute and nomination is requested, the organization selects
people on the conditions given by training institute with due consideration to Need Assessment. On-
the-job trainings are organized as and when necessary for the production and quality control people.
Training on Quality System implementation is organized and conducted whenever there is amendment,
updating or necessity to clear the confusion.
Personnel responsible for testing are posted depending on training records and experience. For all the
jobs, there are set qualification criteria for the employment.
Trained personnel are provided whenever needed and training requirements are taken care depending on
needs. Functional Heads and selected Management Staff have been trained on awareness and
documentation of Quality System to ISO 9001: 2008 to implement and verify their work as desired by
the Quality System.
Quality Manual
Page 21 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-06
Revision No.: 0
RESOURCE MANAGEMENT Effective Date: 01 Apr, 07
Page No.: 3 of 4
CSL also have the system of imparting on-the job training to improve the skill level of the people.
Employees in the Confidence Steel Limited are skilled enough to carry out the work and verify quality
as per procedure.
a. Confidence Steel Limited maintains records of education, experience, training and qualification
of its human resources .
b. CSL identified the competence necessary for its personnel for performing work affecting quality .
c. CSL has trained Internal Quality Auditor to check the Quality Management System. Trained
personnel are provided whenever needed and training requirements are taken care depending on
needs.
d. CSL provides training to satisfy the competence needs. e. It has trained manpower in all its departments. Functional Heads and selected Management Staff
have been trained on awareness and documentation of Quality System to ISO 9001: 2000 to
implement and verify their work as desired by the Quality System.
f. CSL evaluates the effectiveness of these actions
g. CSL ensures that the members are aware of the relevance and importance of their activities and
their relationship to QP and objectives.
These activities are performed accordingly and records are maintained.
3. Infrastructure/ Facilities
Confidence Steel Ltd has identified and established required facilities to achieve conformity of the
product. Adequate plant, machinery and instruments are available to manufacture the products as per
required specification. Care is taken to assess the needs of the facility and technology from time to time
to cope with the changing need of the customer and accordingly plans are made to include those.
These are
a. Work Space and associated facilities b. Equipment and Machinery (Appendix-C)
4. Work Environment
a. Confidence Steel Ltd has established physical factors and work environment needed to achieve
product conformity. These include
I. Physical factors
1. Heat Excluding areas where necessary to maintain a temperature of 25±50C
is required, e.g. testing laboratory, work areas are kept within a
temperature range of 30±50C.
2. Light level 300~500 lumen (where actual work is performed)
3. Cleanliness Total cleanliness in work area
4. Air flow Well ventilation are provided at the work area.
Confidence Steel Limited
Page 22 of 81
Quality
Management
System
CONFIDENCE STEEL LTD Document No.: QM-06
Revision No.: 01
RESOURCE MANAGEMENT Effective Date: 01 Apr, 07
Page No.: 4 Of 4
5. Hygiene: Cleanliness is maintained through out the work area as it is the prime object
for a Good hygiene practice, first-aid boxes are available at appropriate
locations of work areas, safe drinking water is supplied, good number of
clean toilets are made available at appropriate locations.
II. Human factors
6. Posture Where applicable, the gap between sitting tool and work table/standing
position are set for checking fatigue ness. Working and sitting arrangements
are provided where required.
7. Safety All working places have safe walking passage, all moving parts are covered
with safety covers, all protruding edges etc. are marked for safety first. All
the gates are kept clean for emergency exits. Regular fire drills are
maintained. Sufficient number of fire extinguishers is available inside the
building in addition water hydrant. Safe drinking water is available in all
sections. First aid boxes are supplied in all sections.
a. These are monitored and recorded once every month .
Quality Manual
Page 23 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-07
Revision No.: 0
PRODUCT REALIZATION Effective Date: 01 Apr, 07
Page No.: 1 of 7
7.1 Planning of Realization Process
Confidence Steel Limited has a three-tier Quality System with Quality Policy and Objective at the tip.
Quality Manual, which is the highest level or Apex Manual, is at the Tier –1. Quality Assurance Procedures
are at the Tier-2. Tier-3 contains Work Instructions, Formats, Charts, drawings, and reference
manuals/documents.
The documentation is used to ensure that:
- the product conforms to specified requirements
- customer satisfaction is achieved as per Quality Policy
- all the works at all the areas are done to achieve Quality Objectives
Quality Policy and Objectives
TIER 1: Quality Manual
TIER 2: Quality Assurance Procedures
TIER 3: Work Instructions, Formats
Charts, Drawings, Reference
Manuals
Please see the quality plans (describing process flow, records & responsibilities)of different products.
2. Quality System Procedures
The Quality System described is supported by Quality Procedures and Work Instructions.
These Procedures and Work Instructions are applicable to the various departments. Procedures are
supported by Work Instructions, which give detailed work steps for implementing the procedural
requirements. Formats, Charts, Registers, and Drawings again support procedures and Work Instructions in
use.
MR maintains a list of Document, Procedures, Work Instructions and Forms.
Realization of Product in Confidence Steel Limited starts from Sales section. After realization of the
product, it is kept in the custody of section concerned or sent to the store. At all the stages required checking
and testing is ensured including final testing. Necessary checking is done before final release of the product.
Confidence Steel Limited has established procedure for the above activities where required. The works are
performed in the appropriate equipment with due care of the safe and suitable working environment.
Confidence Steel Limited
Page 24 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-07
Revision No.: 0
PRODUCT REALIZATION Effective Date: 01 Apr, 07
Page No.: 2 of 7
During all the process using, maintaining and controlling of parameters are ensured to get expected quality.
Some of the important steps are given approval by the authority. For all the steps of production, acceptable
quality standards/specimens are made available near the workstations and employees with appropriate
knowledge are used to perform the operation.
Equipment are suitably maintained to ensure the process capability.
Refer Procedure no.: QP-PRN-1 may be referred for details on Process Control.
Receiving Inspection and Testing
All type of raw materials and all the procured materials undergo receiving inspection for quality as well as
quantity (QF-QIN-01. Materials are issued only when receiving inspection passes it. Any material rejected
or kept pending during receiving inspection is stored in a segregated area for further actions on this.
In the case of urgency if any material is needed to be issued before completion of the receiving inspection, it
is marked by appropriate means to track it for immediate call. The marking is withdrawn when evidence of
conformity for all the checks arrives. Record of the urgent permission and clearings are maintained as per
procedure for Control of Quality Records.
In-process Inspection and Testing
In process inspection and testing of the work or product is done as per the established procedure. Works or
products are not allowed to pass the steps until specified inspection/testing is not completed. Unacceptable
works/products are either corrected or scrapped as per the procedure.
Final Inspection and testing
Confidence Steel Limited has established quality plan to check the products at the final stages. No product
is allowed to enter the finished goods area or store until final inspection is done. Products, which cannot
pass the final inspection, are corrected to make it suitable for re-inspection and decision is taken as per
procedure.
Records of inspections and testing are maintained for all the steps. Authorities responsible for inspection
and testing are identifiable from the inspection notes at all stages.
CSL uses required material handling equipment where it is applicable. Other than trolley, manual handling
is also used where appropriate.
Storing of products are done with due care to protect them from damage or deterioration.
Packing and packaging of the product is done as per established procedures of the factory and as per
instruction of the customers.
Where required, the product is installed/commissioned at the premise of Factory.
Confidence Steel Limited also ensures preservation of the raw materials or items as per necessity.
Care is taken to deliver the product to the customer premises to ensure that product is not damaged during
transit.
CSL follows procedure no. QP–QIN-1 for Inspection and Testing.
Quality Manual
Page 25 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-07
Revision No.: 01
PRODUCT REALIZATION Effective Date: 01 Apr, 07
Page No.: 3 Of 7
7.2 Customer Related Processes
7.2.1: Determination requirements related to the products
Confidence Steel Limited has identified customer requirement described in QM-05 . Besides CSL reviews
identified customer requirements together with additional requirements determined by CSL. Requirements
of Customer are documented in their PO sheet. Reviews are conducted to have a thorough understanding of
customer requirement.
The company communicates with different institutions and wholesalers to get requirement from them
through physical contact or advised by tender calls or query. The customer gives their choice and a price
quotation is offered accordingly. If the customer is convinced a written work (sometimes verbal over
phone) order is placed. The company itself determines the statutory and regulatory requirements.
In case of screws, fasteners & other hardware items the company manufactures as per its own standard. Any
modification request is received from the market by the marketing personnel AGM plant implements the
same and again comment from customer is collected.
7.2.2: Review of requirements related to the product:
The company discusses all the customer requirements in detail in meeting or phone, faxes, e-mails prior to the
execution of any contract. The review discusses the company's ability to supply the product in accordance with
the customer requirement. The review is held between the customer's representative, dealers and organizations
nominated person like Director, Marketing Manager and AGM (Factory), Production & Technical Manager.
The review of requirements is as follows:
Necessary details about the product like complete technical data and commercial information shall be
provided and or briefed by Marketing Manager. The shall be recorded in the order sheet prior to
submission of offer as and where required, duly approved by the Managing Director keeping in view
the plant capacity, stock at hand and availability of resources.
The delivery schedule shall be assessed keeping in view the plant capacity, stock at hand and
availability of resources to confirm delivery schedules.
It shall be ensured by Marketing Manager that the purchase order and / or related documents
forwarded by the customer on receipt of quotation if any, or the noted down specifications in the order
form contains complete technical and commercial data covering delivery schedule, packing and
forwarding details, mode of transport and other conditions as and where applicable.
Sometimes buyers are called for pre-delivery inspection. The products which satisfy the buyer
requirements are taken to delivery yard.
Please see the work order sheets.
7.2.3:Customer communication
The company has latest communication facility to support its operational network. The entire product related
information e.g. enquiries are received on phone, fax, e-mails. Customer complaints are received in a
documented way and the records of customer complaints/suggestion are maintained by marketing personnel.
Amendment in any agreement is communicated to the company who re-approves the amendment. Delivery
order is collected from the dealers or customers.
Please see Customer Feedback Form.
7.3: Design and Development
CSL has no design and development activity. Products are realized as per specification/ drawing/sample of
customers. Hence all functions involving design & development of the product (clause 7.3) is outside the
scope of the QMS.
Confidence Steel Limited
Page 26 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-07
Revision No.: 01
PRODUCT REALIZATION Effective Date: 01 Apr, 07
Page No.: 4 Of 7
7.4 Purchasing
Confidence Steel Limited has a documented Procurement Procedure to ensure that purchased products
conform to the specified requirements.
Purchasing control
CSL maintains approved suppliers list for its major purchases on Raw Materials/components etc. CSL
selects supplier on the basis of their ability to supply identified through evaluation. The criteria of
evaluation explained in the procurement procedure. Results of evaluation and follow up are recorded.
Suppliers are evaluated depending on:
– Past performance
– Reputation in national and international market
– Result of the assessment format as used by CSL
– Certification by third party on international Quality Standards
Standard Hardware, stationary and some urgent items are managed by emergency purchases as per
instruction of Director (Service, Sales & Procurement).
Procurement department maintains List of approved suppliers for local and imported items. The authorized
persons update the lists. Suppliers for purchasing of imported items are selected by Incharge Procurement
with consultation of Director (Service, Sales &Procurement) as outlined in procedure. The authorized
persons update the lists.
Purchasing Information
Purchase orders are issued mentioning specifications and other necessary information as per procurement
procedure.
Materials to be procured depend on the order placed by Customer and the concerned department engaged
with realization of the product prepares the materials requisition accordingly. Materials Requisition
Document contains information describing the product to be purchased including requirements for approval
and QMS requirement.
Quality Manual
Page 27 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-07
Revision No.: 01
PRODUCT REALIZATION Effective Date: 01 Apr, 07
Page No.: 5 Of 7
Verification of Purchased Product
The authorized person of the concerned department verifies products and items purchased at the receiving
point for conformance with the specified requirements.
Records of Suppliers evaluation are maintained as quality record. Records of Suppliers performance are
maintained for important Raw Materials for future decision in relation to the continuation of the suppliers.
All purchases are done as per Quality Procedure no. QP-PRO-1
7.5: Production and Service Provision
Process Control in Confidence Steel Limited starts from sales/service department. After receiving enquiry
from the customer by Sales department, it is sent to Technical department. It is the reviewed and final offer
is sent by Sales department. After receiving the job order by Sales department it is sent to Technical
department who then gives a job no. and the concerned departments are informed who proceeds for
production as per procedure for process control. A quality plan is made by the Technical department, which
is then forwarded to concerned departments for realizing the products. At all the stages required checking at
appropriate stages and planned testing is ensured including final testing to meet the customers’
requirements.
CSL has established procedure for all the above activities. The works are performed in the appropriate
equipment with due care of the safe and suitable working environment.
During all the processes using, maintaining and controlling of parameters are ensured to get expected
quality. Some of the important steps are given approval by the authority after setting of the parameters. For
all the steps of production, acceptable quality standards/specimens are made available near the workstations
and employees with appropriate knowledge are used to perform the operations.
Equipment are suitably maintained to ensure the process capability.
Procedure no.: QPr-PRN-1 may be referred for details on Process Control.
a. Control of Production and Service Provision
Confidence Steel Limited controls production according to procedure QP-PRN-1 under stated controlled
conditions.
Confidence Steel Limited provides the service of installation/commissioning as required by the customers.
b. Validation of process for production and service provision
Process Control in Confidence Steel Limited starts from sales department with the receipt of PO sheet. PO
sheet is analyzed to plan different stages of operation. At all the stages required checking and testing is
ensured including final checking.
Confidence Steel Limited has established procedure for all the above activities. The works are performed
in the appropriate equipment with due care of the safe and suitable working environment.
During all the processes using, maintaining and controlling of parameters are ensured to get expected
quality.
Confidence Steel Limited
Page 28 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-07
Revision No.: 01
PRODUCT REALIZATION Effective Date: 01 Apr, 07
Page No.: 6 Of 7
c. Identification and Traceability
All products at Confidence Steel Limited factory and stores are maintained in a clearly identifiable way
to ensure using of right product in manufacturing of different products. CSL uses the specific number
for specific customer like GP, Motorolla etc assigned for each PO are maintained throughout the
process of product realization as identification number for identification and traceability. The raw
materials/components and supplies are identified from receiving point to usage with printing/markings
on the package or tags attached. In process materials are marked with tags, stands with labels. The
members in tower production is identified by suitable numbering method.
Confidence Steel Limited follows procedure no. QP-PRN-2 for Product Identification and
Traceability.
All the Products of the Confidence Steel Limited either on the Factory Floor or in Stores are identifiable
with its status of quality. The products carry following tags or mark:
– Suitable for use
– Not acceptable
– Hold
– Not suitable for use
– Waiting to be inspected/sorted
Etc.,
In addition to these, storage locations with marking also declare inspection and test status. Only the
acceptable products are stored in the Raw Materials and Finished Goods Stores. Unacceptable and Hold
items are kept at designated spaces.
In the case when any product or item is used in the production pending some decision under urgent
permission, such item is marked for ready traceability. Record for such traceability is maintained. Job
number of product is maintained for traceability of finished products.
d. Customer Property
Not Applicable.
e. Preservation of Product
Confidence Steel Limited uses required material handling equipment where it is available. Other
equipment like pallet trucks and vehicles, manual handling is also used where appropriate.
Storing of products are done with due care to protect them from damage or deterioration.
Packing and packaging of the product, where required, is done as per established procedures of the
factory and following instruction given by Customer.
Confidence Steel Limited also ensures preservation of the raw materials or items as per necessity.
Care is taken to deliver the product to the customer premises to ensure that product is not damaged
during transit. Care is also taken during installation period, where required by the customer, to preserve
the quality of product. BIN CARD is used for identification & stock information.
Confidence Steel Limited maintains Procedure no. QP-PRN-3 for Preservation of product at all
stages.
Quality Manual
Page 29 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-07
Revision No.: 0
PRODUCT REALIZATION Effective Date: 01 Apr, 07
Page No.: 7 of 7
7.6: Control of Measuring, Inspection and Test equipment
Confidence Steel Limited maintains a list of all Inspection, Measuring, and Test Equipment which contains
following Information:
Id number of the instrument
Name and specification of the Instrument
Location for use
Range of use
Least count necessary for use
Calibration interval
The list includes the Instruments identified to be necessary for ensuring product quality. Instruments are
selected for use only when they are found to be suitable for performing the inspection, measurement or
testing at specified locations in terms of accuracy, measurement range and precision requirement.
All the instruments are considered to be at calibration stages at all times. Instruments carry tags/stickers
with them to indicate the status of calibration. Calibrations of the user instruments are carried out by
comparing the measurements with those of Master Instrument’s. Master instruments are calibrated at
specified intervals from the organizations, which have nationally or internationally traceable code.
Only the Trained personnel calibrate instrument in the suitable environment to ensure accuracy of the
calibration. Qualified persons carefully perform the maintenance and adjustments of the instruments.
When any instrument is found to give wrong measurements, are replaced immediately. And all the
measurements completed by the faulty instrument are called back and rechecked.
Confidence Steel Limited
Page 30 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-08
Revision No.: 0
MEASUREMENT, ANALYSIS AND IMPROVEMENT
Effective Date: 01 Apr, 07
Page No.: 1 of 3
1. Introduction
To demonstrate conformance of the product, ensure conformity of the QMS and continually improve
its effectiveness, Confidence Steel Limited utilizes statistical techniques.
2. Monitoring and Measurement
a. Customer Satisfaction
Confidence Steel Limited analyses the requirement of Customers, which is an integral part of
its system. Quality Parameters, which will satisfy Customer, are outlined in QM-05 item 2.
Requirements of Customer are reviewed after receiving a PO Sheet to deepen the understanding
about product, coordination and communication.
Confidence Steel Limited organizes briefing and training to its members to fully realize the
requirements of Customer.
CSL will monitor whether it has met the requirements of Customers. After every consignment Customer
is requested to provide a information stating the extent to which the product and
services satisfy them (Ref: QF-CUS-03). This is taken as an assessment of customer satisfaction.
b. Internal Audit
Confidence Steel Limited conduct internal audit to determine whether the QMS conforms to
the requirements of ISO-9001: 2K effectively implemented and maintained. Documented
Procedure QP–IQA-1 is followed for internal audits. Records for conducting the audit and its
results are maintained (Ref: QF-IQA-01, 03, 07, 05).
c. Monitoring and Measurement of Process
Confidence Steel Limited has established monitoring and measurement of processes at
different stages of product realization (QF-QIN-02. 03, 07, 05), where applicable, necessary to
meet the requirement of Customer. In cases where desired results are not obtained,
nonconformity of product is raised (QF-QIN-07). and corrective (QP–CAC-1) action is taken to
ensure conformity of product. This is established in CSL after going through long experience of product
realization.
d. Monitoring and Measurement of Product
Receiving Inspection and Testing Except minor materials like: cleaning waste cotton, kerosene oils, old pipes etc. Mostly row
materials, all the procured materials undergo receiving inspection for quality as well as quantity.
Materials are issued only when receiving inspection passes it. Any material rejected or kept
pending during receiving inspection is stored in a segregated area for further actions on this.
In the case of urgency if any material is needed to be issued before completion of the receiving
Inspection, it is marked by appropriate means to track it for immediate call. The marking is
withdrawn when evidence of conformity for all the checks arrives. Record of the urgent
permission and clearings are maintained as per procedure for Control of Quality Records.
Quality Manual
Page 31 of 81
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-08
Revision No.: 0
MEASUREMENT, ANALYSIS AND IMPROVEMENT
Effective Date: 01 Apr, 07
Page No.: 2 of 3
In-process Inspection and Testing In process inspection and testing of the work or product is done as per the established procedure. Works
or products are not allowed to pass the steps until specified testing is not completed. Unacceptable
works/products are either corrected or scrapped.
Final Inspection and testing Confidence Steel Limited has established quality plan to check the products at the final stages. No
product is allowed to enter the finished goods store until final inspection is done. Products that cannot
pass the final inspection are corrected to make it suitable for re-inspection and decision is taken as per
procedure.
Records of inspections and testing are maintained for all the steps. Authorities responsible for
inspection and testing are identifiable from the inspection notes at all stages.
Releasing Product
In Confidence Steel Limited all operators check the quality of the previous process. Besides, in-
process and final inspection is carried out. The operator of the end process, after being satisfied through
checking ,deliver the product to customer.
CONFIDENCE STEEL LIMITED follows procedure no. QP-QIN-1 for In-Process Inspection
and Testing.
3. Control of Nonconforming Product
Nonconforming products are segregated. A document is raised in relation to the Nonconforming case
detailing cause of nonconformance and all other details like : stage, location, batch number/identity etc.
Nonconforming product is segregated to ensure that this does not mix with the conforming products and
dispatched to the point of use or to customers.
The segregated nonconforming product along with the document is then referred to the appropriate
authority to decide whether to be reworked/accepted by concession /considered for alternative
applications or to be rejected or scrapped.
In case of reworking and repairing of the product it is re-inspected as per inspection plan for
compliance. The Nonconformity and all the decisions in relation to this are recorded and record is
maintained as per procedure for Control of Nonconforming Product (QP–QIN-2).
Procedure no. QP–QIN-2 may be referred for details on the Control of Nonconforming Product.
4. Analysis of Data
Confidence Steel Limited collects applicable data to evaluate the following.
a. Report of all tests done by Customer to ascertain the extent of customer satisfaction,
b. A conformity report from Customer on completion of an assignment to ascertain the
conformity to product requirement,
c. Data reflecting characteristics and trend of processes,
d. Data reflecting characteristics of product including opportunities for preventive action,
e. Data on suppliers, etc.
Confidence Steel Limited
Page 32 of 81
Confidence Steel Limited analyses these data to determine the suitability and effectiveness of the QMS and
to identify where improvements can be made. Statistical techniques, where appropriate, are applied to
decide and implement preventive measures.
Procedures no. QP–IQA-1, QP–QIN-1, 2, may be referred for Analysis of data.
5. Improvement
5.1 Continual Improvement
Confidence Steel Limited will evaluate quality objectives and quality management system planning
as an effort to align the management approach to continual improvement as an inherent element in the
QMS.
5.1.a
Improvement is a continuous process and with the view of that target CSL developed Q.C team
comprising of some dedicated members responsible for different job. The main task of these team is to
think about up gradation and quality improvement of job. Any renovative/new idea regarding quality
control or product improvement is always rewarded by the management.
5.2 Corrective Action
Confidence Steel Limited established and maintains standard procedures for corrective and
preventive action for any non-conformity encountered at any stage. The procedure for corrective action
includes:
– Effective handling of customer complains,
– Report of product non-conformities,
– Analyze data and process,
– Investigate causes
– Implement solutions
– Verify if correction is effective and
– Document necessary changes in procedures and quality manual
Depending on the information gathered, detailed analysis is made in relation to above cases to find out
the actual causes. The information gathered from investigations, results of analysis and subsequent
decisions are maintained as quality records.
Procedure no. QP–CAC-1 is referred on the details of the activities in relation to Corrective
Action.
5.3 Preventive Action
Preventive steps are initiated against all the nonconformity and customer complains after proper
investigation, study and analysis. The preventive steps are taken to remove potential cause for the faults
from which the nonconformance and customer dissatisfaction developed. After implementing the
preventing steps it is studied to find out whether the preventive actions are effective or not.
Product Nonconformity, Customer Complaints, Audit Results, their analysis, Corrective and preventive
Actions are referred for Management Review.
Preventive actions are also taken to improve operations and various works of the organizations. Any
such preventive actions are also referred to Management Review.
Procedure no. QP–PAC-1 is referred on the details of the activities in relation to Preventive
Action.
Quality Management
System
CONFIDENCE STEEL LTD Document No.: QM-08
Revision No.: 0
MEASUREMENT, ANALYSIS AND IMPROVEMENT
Effective Date: 01 Apr, 07
Page No.: 3 of 3
Quality Manual
Page 33 of 81
CHAPTER-2 RAW MATERIAL
Confidence Steel Limited
Page 34 of 81
SR.
NO.
COMPONENT
/OPERATION
AND
DESCRIPTION
OF TEST
SAMPLING
PLAN WITH
BASIS
REFERANCE
DOCUMENT&
ACCEPTANCE NORM
TESTING
AGENCY /
FORMAT OF
RECORD
REMARKS
1.0
1.1
1.1.1
RAW
MATERIALS
PROCUREMEN
T
STRUCTURAL
STEEL (ANGLE
SECTIONS &
PLATES)
PHYSICAL
PROPERTIES
A) TEST FOR
ULTIMATE
TENSILE
STRENGTH
B) TEST FOR
YIELD STRESS
One sample for
20MT/Lot or
part thereof
One sample for
20MT/Lot or
part thereof
a) Mild Steel
BS EN 10025 -2:2004
(Gr. S-275 JR I JO)
or equivalent
410 – 560 N/mm2
b) High Tensile Steel
BS EN 10025 -2:2004
(Gr. S-355 JR IJO)
470 - 630 N I mm2
or equivalent
a) Mild Steel
BS EN 10025 -2:2004(Gr.
S-275 JR IJO)or equivalent
-275 N I mm2
(min.)(upto 16 mm thick)
-265 N I mm2
(min.)(above 16 mm thick)
CONFIDENC
E
STEEL
LTD/TPL
CONFIDENC
E
STEEL
LTD/TPL
Raw materials to be
procured from reputed
vendors from
China/India/Turkey/Ukr
aine
CWP (Customer
Witness Point)
Verification of
manufacturer's
Test
Certificates &
CONFIDENCE
Record, duly correlated
at the time of
Final Inspection.
Verification of
manufacturer's
Test
Certificates &
CONFIDENCE
Records, duly correlated
at the time of
Final Inspection.
C)PERCENTAG
E
ELONGATION
TEST
One sample for
20MT/Lot or
part thereof
b) High Tensile Steel BS
EN 10025-2:2004
(Gr. S-355 JR IJO
-355 N I mm2
(min.)(upto 16 mm thick)
-345 N Imm2(min.)
(Above 16 mm thick) or
equivalent.
a) BS EN 10025 -2:2004
(Gr. S-275 JR IJO
or equivalent
23 % min.
for 3< t < 40 mm
b) BS EN 10025 -2:2004
(Gr.- S355 JR/JO
CONFIDENC
E
STEEL
LTD/TPL
Verification of
manufacture’s Test
Certificates &
CONFIDENCE
Records, duly correlated
at the time of
Final Inspection.
Quality Manual
Page 35 of 81
D) IMPACT
TEST (CHARPY
‘V’ Notch)
One sample for
20MT/Lot or
part thereof
for 3< t < 40 mm
Of equivalent
22 % min.
BS EN 10025-2:2004
(Gr.S355 JR/JO) or
equivalent
Minimum Energy for
S275JR/S355JR=27Joules at
200C for Thickness 6mm &
above
And
Minimum Energy for
S275JO/S355JO=27Joules at
00C for Thickness 6mm &
above
CONFIDENC
E
STEEL
LTD/TPL
Verification of
manufacturer's
Test
Certificates &
CONFIDENCE
Records, duly correlated
at the time of
Final Inspection.
1.1.2
1.1.3
1.1.4
CHEMICAL
COMPOSITION
VISUAL
CHECKS FOR
SURFACE
FINISH
DIMENSIONAL
CHECKS
One sample for
20MT/Lot or
part thereof
One sample for
20MT/Lot or
part thereof
One sample for
20MT/Lot or
part thereof
BS EN 10025-2 : 2004
(Gr. S-355 JR / JO) OR
(Gr. S-275 JR / JO)
Table-4 (Annexure-V)
Material to be free
from the lot surface defects
like
Laminations. rough I
jagged and imperfect
edges, cracks, rounded
apex. deep roll marks,
pipy and any harmful
defects (Removal of
minor surface defects
as per BS EN 10025-2:2004
clause 7.5.2/7.5.3 acceptable)
BS EN 10163 P-1 & P-3
BS EN 10056-2:1993
CSL/ TPL
CONFIDENC
E
STEEL LTD
CONFIDENC
E
STEEL LTD
Verification of
manufacturer's
Test
Certificates &
CONFIDENCE
Records, duly
correlated
at the time of
Final Inspection.
Record Review at
the time of Final
Inspection, duly
correlated
at the time of
Final Inspection.
Record Review at
the time of Final
Inspection, duly
correlated
at the time of
Final Inspection.
Confidence Steel Limited
Page 36 of 81
SR.
NO.
COMPONE
NT
/OPERATIO
N AND
DESCRIPTI
ON OF
TEST
SAMPLIN
G PLAN
WITH
BASIS
REFERANCE
DOCUMENT &
ACCEPTANCE
NORM
TESTING
AGENCY /
FORMAT
OF
RECORD
REMARKS
1.1.4
(A)
1.1.4
(B)
TOLERANC
ES FOR
LEG
LENGTH
OF ANGLES
(a) EQUAL
ANGLES
1) Upto 50
mm Leg
Length
2) Over 50 to
100 mm
3) Over 100
to 150 mm
4) Over 150
to 200 mm
5) Over 200
mm
(b)
UNEQUAL
ANGLES
TOLERANC
ES FOR
THICKNES
S
(a) Section
Thickness
1)t ≤ 5mm
2)
5<t≤10mm
3)10<t≤15m
m
4) 15 ≤t mm
One sample
for
20MT/Lot
or part
thereof
One sample
for
20MT/Lot
or part
thereof
One sample
for
20MT/Lot
or part
thereof
BS EN 10056-2:1993
± 1.0 mm
± 2.0 mm
± 3.0 mm
± 4.0 mm
+6mm, -4mm
For unequal angles
take the longer leg
length as the reference
as per BS EN 10056-
2:1993
BS EN 10056-2:1993
± 0.5 mm
± 0.75 mm
±1.0 mm
±1.2 mm
CONFIDE
NCE
STEEL
LTD
CONFIDE
NCE
STEEL
LTD
CONFIDE
NCE
STEEL
LTD
Record Review at
the time of Final
Inspection, duly correlated
at the time of
Final Inspection.
Record Review at
the time of Final
Inspection, duly correlated
at the time of
Final Inspection.
Record Review at
the time of Final
Inspection, duly correlated
at the time of
Final Inspection.
Quality Manual
Page 37 of 81
SR.
NO.
COMPONE
NT
/OPERATIO
N AND
DESCRIPTI
ON OF
TEST
SAMPLIN
G PLAN
WITH
BASIS
REFERANCE
DOCUMENT &
ACCEPTANCE
NORM
TESTING
AGENCY /
FORMAT
OF
RECORD
REMARKS
1.1.4
(C)
1.1.4
(D)
1.1.4
(E)
1.1.4
(F)
1.1.4
(G)
OUT OF
SQUARENE
SS
1) Upto100
mm Leg
Length
2) Over 100
to 150 mm
3) Over 150
to 200 mm
4) Over
200mm
CAMBER
for full bar
length (For
Leg Length)
1) Up to 150
mm
2) Over 150
to 200 mm
3) Over 200
mm WEIGHT
TOLERANCE
FOR ANGLE
SECTIONS
1) Over 4 mm
Thickness
2) for t≤ 4 mm
WEIGHT
TOLERANCE
FOR PLATES
THICKNESS
TOLERANCE
FOR PLATES
1) ≥ 3 < 5
2) ≥ 5 < 8
3) ≥ 8 < 15
4) ≥ 15 < 25
5) ≥ 25 < 40
One sample
for
20MT/Lot
or part
thereof
One sample
for
20MT/Lot
or part
thereof
One sample
for
20MT/Lot
or part
thereof
BS EN 10056-2:1993
Table 1 Deviation in
mm (max.)
± 1.0 mm
± 1.5 mm
± 2.0 mm
± 3.0 mm
BS EN 10056-2:1993
0.4% of length
0.2% of length
0.1% of length
BS EN 10056-2:1993
±4%
±6%
BS EN 10029:1991
(Maxm Thickness
difference shall be as per
Table-1)
±0.6mm
±0.75mm
±0.85mm
±0.95mm
±1.1mm
CONFIDE
NCE
STEEL
LTD
CONFIDE
NCE
STEEL
LTD
CONFIDE
NCE
STEEL
LTD
CONFIDE
NCE
STEEL
LTD
CONFIDE
NCE
STEEL
LTD
Record Review at
the time of Final
Inspection, duly correlated
at the time of
Final Inspection.
Record Review at
the time of Final
Inspection, duly correlated
at the time of
Final Inspection.
Record Review at
the time of Final
Inspection, duly correlated
at the time of
Final Inspection.
Record Review at
the time of Final
Inspection, duly correlated
at the time of
Final Inspection.
Confidence Steel Limited
Page 38 of 81
SR.
NO.
COMPONE
NT
/OPERATIO
N AND
DESCRIPTI
ON OF
TEST
SAMPLIN
G PLAN
WITH
BASIS
REFERANCE
DOCUMENT &
ACCEPTANCE
NORM
TESTING
AGENCY /
FORMAT
OF
RECORD
REMARKS
1.2
1.2.1
ZINC
CHEMICAL
COMPOSIT
ON
One sample
for
50 MT or
part thereof
One sample
from
Galvanizing
bath once in
a month.
ISO 752:1981 (E)
a) Gr.Zn 99.99%
b) Gr. Zn 99.95%
The molten metal in
the
Galvanizing bath shall
not contain less than
98.5% by mass of
Zinc.
CSL/ Third
party
Independen
t Certified
lab
To be procured from
Abroad (Imported from
Korea/Japan/Australia/Indi
a/ Iran)
Verification of
manufacturer's
Test
Certificates &CSL
Third party Records.
Quality Manual
Page 39 of 81
CHAPTER-3 FABRICATION & GALVANIZATION
Confidence Steel Limited
Page 40 of 81
A) FABRICATION
SR.
NO.
COMPONENT
OPERATIONAND
DESCRIPTION
OFTEST
WITH
BASIS
SAMPLING
PLAN
REFERANCE
DOC. &
ACCEPTANCE
NORM
TESTING
AGENCY /
FORMAT OF
RECORD
REMARKS
2.0
2.1
2.2
2.2.1
2.3
IN PROCESS
INSPECTION
FABRICATION
OF
TOWERPARTS
STRAIGHTENING
CUTTING
(CROPPING
Length)
a) up to 16 mm
thick angle/Plate
b) above 16 mm
thick angle/Plate
STAMPING
Within 600mm of
the end but clear of
holes
One sample
for
20MT/Lot
or part
thereof
One sample
for
20MT/Lot
or part
thereof
One sample
for
20MT/Lot
or part
thereof
Approved Drag.,
Shop Sketches
BSEN 10056-2 :
1993
Cutting Length
Tolerances
± 2.0 mm
Shearing cutting
Hack-saw cutting
(The cut surface to
be clear square and
free from distortion)
Letter size as per
CSL specification.
(Letter height-
12mm) Visually
Legible
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
Record review
at the time of
Final
Inspection.
Record review
at the time of
Final
Inspection.
Record review
at the time of
Final
Inspection.
Record review
at the time of
Final
Inspection.
Quality Manual
Page 41 of 81
SR.
NO.
COMPONENT
OPERATIONAND
DESCRIPTION
OFTEST
WITH
BASIS
SAMPLING
PLAN
REFERANCE DOC.
& ACCEPTANCE
NORM
TESTING
AGENCY /
FORMAT OF
RECORD
REMARKS
2.4 PUNCHING I
DRILLING
Punching of full
sized holes will be
permitted up to and
including the
thickness and
Material quality
specified.
A) i) Hole
Diameter
ii) Taper on
punched hole
B) Hole to Hole
Dimension
(Punching/
drilling)
C) Edge Security
For 13.5 mm dia.
hole
For 17.5 mm dia.
hole
For 21.5 mm dia.
hole
For 25.5 mm dia.
hole
D) Back Mark
One sample
for
20MT/Lot or
part thereof
Quality- Thickness
275 JR- 16mm
355 JO 20mm
(No hole to be
punched
where the thickness
of
the material exceeds
the finished dia. of
the hole)
+ 0.5 mm, - 0.0 mm
+ 1.00 mm (on die
side)
Dimensional
Tolerances
± 2.0 mm for long
distance holes
± 1.0 mm for
consecutive
Holes
Sheared 20 mm Min.
Rolled 16 mm Min
Sheared 23 mm Min.
Rolled 20 mm Min.
Sheared 28 mm Min.
Rolled 25 mm Min.
Sheared 35 mm Min.
Rolled 35 mm Min.
± 1.0 mm
CONFIDENC
E STEEL
LTD.
Record review
at the time of
Final
Inspection.
Confidence Steel Limited
Page 42 of 81
SR.
NO.
COMPONENT
OPERATIONAND
DESCRIPTION
OFTEST
WITH BASIS
SAMPLING
PLAN
REFERANCE
DOC. &
ACCEPTANCE
NORM
TESTING
AGENCY /
FORMAT OF
RECORD
REMARKS
2.5
2.6
2.7
NOTCHING
( Flange Cut I
Corner Cut/ Bevel
Cut)
HEEL GRINDING
BENDING
i)HT sections
(Angles/Plates)
ii) MS Sections
(Angles)
iii) MS Plates
iv) Temperature
Range for Hot
Bending
One sample for
20MT/Lot or
part thereof
One sample for
20MT/Lot or
part thereof
100 %
PROCESS
Cold
Cold
Hot
Hot
PROCESS
Cold
Hot
+ 5 mm on
specified
Length of cut.
a) Operation by
shearing
up to 12 mm or
less thick
b) by gas cutting
for
material 12 mm
or larger thick
For Notching by
gas cutting,
cut edges to be
cut oversize&
ground smooth
to remove
notches
Approved drags.
I Shop Sketches
>8 mm gas
cutting to be
adopted
followed by
grinding/
machine cutting.
Tolerance on
heel cutting. -0,
+10 on length &
-0, +2 on depth.
All Sections &
plates
to be hot bent.
SECTION
upto75 x6
upto100x8
above 75 x 6
above 100 x 8
SECTION
up to 10 mm
thick
Above 10 mm
thick
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
ANGLE
up to 100
up to 50
above100
above 50
ANGLE
up to 150
above 150
Record review
at the time of
Final
Inspection.
Record review
at the time of
Final
Inspection.
Record review
at the time of
Final
Inspection.
Quality Manual
Page 43 of 81
850 - 1000°C
Confidence Steel Limited
Page 44 of 81
2.8
3.0
FINAL
INSPECTION OF
FABRICATED
PARTS
PROTO MODEL
ASSEMBLY
To be assembled
and
checked for
(dimensions, angle
size, by this, to
verify
interchangeability
Of members etc.
One sample for
20MT/Lot or
part thereof
One structure of
each type of all
tower/extensions
All parameters
from
pt 2.1 to 2.7
above are
checked and
records
maintained
before
releasing the
materials
for galvanizing
Approved
structure
Assembly
drawings
a) Determine if
error
fabrication or
work ·
shop drawing
b) List all
conforming
Items
c) Present
information to
Design for
action,
Assembly,
work-shop
Drawing
revision etc.
CONFIDENCE
STEEL LTD
CONFIDENCE
STEEL LTD
Record review
at the time of
Final
Inspection.
CWP(Customer
Witness Point)
CWP(Customer
Witness Point)
CHP(Customer
Hold Point)
Quality Manual
Page 45 of 81
B) GALVANIZATION
SR.
NO.
COMPONENT
OPERATIONAND
DESCRIPTION
OFTEST
WITH
BASIS
SAMPLING
PLAN
REFERANCE
DOC. &
ACCEPTANCE
NORM
TESTING
AGENCY /
FORMAT OF
RECORD
REMARKS
4.0
4.1
GALVANIZING
PROCESS
CONTROL
A) DEGREASING
Alkali based
Degreasing
to be followed by
rinsing of water
B) PICKLING
( HCl Acid)
i)Specific Gravity
ii)Acid Content
iii) Iron Content
iv) Inhibitor to be
added to prevent over
pickling
C) RINSING
(in continuous tap
water)
D) PRE FLUXING
In Zinc Chloride and
Ammonium Chloride
Soln.
i) Temp
ii)Specific Gravity
iii) pH Value
iv) Iron Content
One sample
daily
One sample
daily
One sample
daily
One sample
daily
One sample
daily
One sample
daily
BSEN ISO
1461:2009
a) Sp. Gravity
1.01 ~ 1.03 b) PH 10 ~ 12
1.07 to 1.26
180 gm/ Lit to
60gm/ Lit
120 gm/Lit
(Maxm)
PH value 4 to 7
Vendor Norms
Room to 80oC
1.08 ~ 1.16
4 to 5.5 pH
Maximum 5
gm/Ltr
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
Record review
at the time of
Final
Inspection.
Record review
at the time of
Final
Inspection.
Rinsing with
water
Record review
at the time of
Final
Inspection.
Confidence Steel Limited
Page 46 of 81
4.2
DIPPING
(GALVANIZATION)
A) Zinc bath
temperature is
continuously recorded
and auto controllers
are set so as to
receive the desired
Temp. range
B) Immersion time
and withdrawal Time
C) Quenching in
Running
Water
D) Dichromating
Hourly
checks
Once daily
BSEN ISO
1461:2009
Range:
i) At Idle -
4350C to 4400C
ji) At working -
4500C to 4600C
Articles to be
immersed
till reaction takes
place which is
indicated by
Stoppage of
bubbling.
Withdrawal to be
Controlled so that
Zinc drains
freely.
(BS EN ISO
1461:2009
Prepare the
solution by
adding 1%
Sodium
Dichromate and
0.5%
Sulphuric Acid in
Water.
Keep strength of
the
solution in
between
1% to 0.2% at
temperature less
than 65oC
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
Record review
at the time of
Final
Inspection.
Record review
at the time of
Final
Inspection.
Record review
at the time of
Final
Inspection.
Record review
at the time of
Final
Inspection.
Record review
at the time of
Final
Inspection.
4.3
4.3.1
GALVANIZING
CHECKING
VISUAL
CHECKING
100 %
BSEN ISO
1461:2009
Surface to be free
from defects like
Bare/ Black spots
CONFIDENCE
STEEL LTD.
Record review
at the time
of Final
Inspection
Quality Manual
Page 47 of 81
4.3.2
GALVANIZING
TESTING
A) Thickness of Zinc
Coating (For Member
Thickness)
T > 6mm
6mm≥ T >3mm
B) Weight of Zinc
Coating
T > 6mm
6mm≥ T >3mm
C) Uniformity of
Zinc Coating
Immersion of test
specimen in the
Copper Sulphate
solution
(Sp. Gr. 1.186) at a
temperature of 160 to
200
D) ADHESION
TEST
(Pivoted Hammer
Test I
Knife Test)
8
sample/shift
3
sample/shift
3
sample/shift
3
sample/shift
(except when
small & suitable
for patching)
heavy ash/ flux
inclusions/
lumps/ pimples/
Drips & Runs
etc.
BS EN ISO
1461:2009
Mean coating
thickness (µm)
min.
85
70
Mean coating
mass (g/m²) min.
610
505
BS EN ISO
1461:2009
Material to
withstand
4 dips of one
minute
each without
showing
Signs of Copper
deposits.
BS EN ISO
1461:2009
No removal of
lifting
of coating in
areas
between hammer
impressions I
coating
should not peel
off.
CONFIDENCE
STEEL LTD.
Record review
at the time of
Final
Inspection.
Confidence Steel Limited
Page 48 of 81
SR.
NO.
COMPONENT
OPERATIONAND
DESCRIPTION
OFTEST
WITH
BASIS
SAMPLING
PLAN
REFERANCE
DOC. &
ACCEPTANCE
NORM
TESTING
AGENCY /
FORMAT OF
RECORD
REMARKS
5.0
PACKING,
STORING,
BUNDLING,
HANDLING
100%
Bundling to
be carried
out as per
customer’s
requirement
(BS 1133
Section 1 to 3-
1989)
Bundle. Weight
as per
Customer's
requirement.
Packing List to
be
submitted along
with
Dispatch
documents.
CONFIDENCE
STEEL LTD.
Plates and
small
parts to be
packed
Into boxes.
All sections to
be
securely
bundled.
Stacking to
have
Proper
ventilation and
kept inclined.
Damage to
Galvanization
coating to be
avoided while
handling.
CONFIDENCE
STEEL LTD to
ensure
Sequential
supplies.
Quality Manual
Page 49 of 81
C) FINAL ACCEPTANCE AND TESTING OF FABRICATED AND GALVANIZED PRODUCT
(CUSTOMER WITNESS POINT)
SR.
NO.
COMPONENT
OPERATIONAND
DESCRIPTION
OFTEST
WITH
BASIS
SAMPLING
PLAN
ACCEPTANCE
DOC. &
REFERANCE
NORM
TESTING
AGENCY /
FORMAT OF
RECORD
REMARKS
6.0
6.1
6.2
6.3
FINAL
INSPECTION
AND TESTING
(Inspection
Engineer to
Check I ensure
compliance
to notes I General
Requirement given
in this
Plan)
PHYSICAL
PROPERTIES
i) UTS TEST
II) YIELD
STRESS TEST
III)
PERCENTAGE
ELONGATION
TEST
IV) IMPACT
TEST
CHEMICAL
COMPOSITION
VISUAL
INSPECTION
For Fabrication and
Galvanization
One sample
for
50MT/Lot or
part thereof
One sample
for
50MT/Lot or
part thereof
One sample
for
50MT/Lot or
part thereof
Please Refer
Clauses
No. 1.1.1(A),
1.1.1(B),
1.1.1(C)
Please Refer
1.1.1(D)
BS EN
10025:2004
Table-
4(Annexure-V)
BS EN
10025:2004
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
CONFIDENCE
STEEL LTD.
Customer Witness
Point
Customer Witness
Point
Customer Witness
Point
Customer Witness
Point
Confidence Steel Limited
Page 50 of 81
6.4
GALVANIZING
TESTS
i) Thickness of
Zinc coating
ii) Weight of Zinc
coating
iii) Uniformity of
Zinc coating
iv) Adhesion of Zn
coating
One sample
for
50MT/Lot or
part thereof
BSEN ISO
1461:2009
CONFIDENCE
STEEL LTD.
Customer Witness
Point
Quality Manual
Page 51 of 81
D) FINAL ACCEPTANCE AND TESTING OF BOLT,NUT & WASHER
SRL
NO.
COMPONENT/OPERATIO
N AND DESCRIPTION OF
LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE
NORM
TESTING AGENCY REMARKS
1.0
2.0
2.1
2.2
2.3
2.4
MATERIALS
Batch Certificates for Bolts
& Nuts , Spring Washers,
Step Bolts from approved
Sub contractors to be
supplied.
M12 Bolts (4.6
Grade) VISUAL
DIMENSIONAL
a) Bolt Length
b) Body Diameter (Ds)
c) Width across flats (s)
d) Width across corners ( . e)
e) Height of Head (k)
f) Pitch (p)
g) Thread Length (b)
PHYSICAL PROPERTIES
a) Tensile strength under
wedge (Minimum
ultimate tensile load)
b)Proof load
Test c)Hardness
Test
Vickers Hardness
OR Brinnel Hardness
OR Rockwell Hardness
GALVANIZING TEST
a) Zinc Coating Thickness
b) Uniformity of Zinc Coating
c) Adhesion of Zinc Coating
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 898-1:2009 ( . E)
ISO 6157-1
Bolts shall be cleanly finished ,
sound and free from surface
defects
DIN 7990
as specified
11.3-12.7 mm
17.57/18 mm
19.85 mm min.
7.55- 8.45 mm
1.75 mm
17.75/23 mm
24.75/30 mm (For Anti-theft
Bolt)
ISO 898-1:2009 ( . E)
33700 N (3438
kg) (Table 4)
19000N (1938
kg) (Table 5)
120 HV to 220 HV
114 HB to 209 HB
67 HRB to 95 HRB
BSEN ISO 1461: 2009, Table 4
50 microns min. I.e. 360
g/m² Should withstand 6 dips
of 1
minute duration in Copper
Sulphate
The coating shall be
sufficiently adherent to
withstand normal handling
condition without peeling.
CSL/Supplier T.C./
CSL/Supplier T.C./ Third
Party Certified Lab
CSL/Supplier T.C./ Third
Party Certified Lab
CSL/Supplier T.C.
To be procured from
reputed vendor of
China/India.
CWP (Customer
witness point)
CWP (Customer
witness point)
CWP (Customer
witness point)
CWP (Customer
witness point)
CWP (Customer
witness point)
Confidence Steel Limited
Page 52 of 81
3.0
3.1
3.2
3.3
3.4
12 mm NUTS (Grade 4)
VISUAL
DIMENSIONAL
a) Height of Nut (m)
b) Width across flats (s)
c) Width across corners ( . e)
d) Diameter of Bearing Face
(Dw)
e) Pitch
PHYSICAL PROPERTIES
b)Hardness
c)Proof Load
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 6157-2, Nuts
shall be cleanly finished , sound
and free from surface defects
ISO 4034
10.4/12.20 mm
17.57/18 mm
19.85 mm min.
16.47 mm min.
1.75 mm
ISO 898- Part II:2012 ( . E)
. -
. -
BSEN ISO 1461: 2009,Refer Point
no. 2.4
CSL/Supplier T.C./
CSL/Supplier T.C.
CSL/Supplier T.C.
Third Party Certified
Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Quality Manual
Page 53 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
4.0
4.1
4.2
4.3
4.4
SPRING WASHER (M12)
VISUAL
DIMENSIONAL
a) Inside Dia (D1)
a) Outside Dia (D2)
a) Section width (b)
b) Section Thickness (s)
PHYSICAL PROPERTIES
a)Hardness
b) Twist Test
c) Permanent Set Test
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
DIN 127
Surface shall be free from cracks
, burrs pits and loose scale.
The flat face shall be free from
knurling, scratches, die marks
etc.
DIN 127
Table 1
12.2 to 12.7 mm max.
21.1 mm (max.)
3.8/4.2
2.35/2.65 mm
BS 4464
440 / 550 HV or
45/52 HRC
Washer should not be cracked or
broken after twisting through
90°.
Washer shall be completely
closed between hardened and
ground plates . After releasing,
free height of the washer should
not be less than 1.66 times
sectional thickness.
BSEN ISO 1461: 2009,Refer Point
no. 2.4
CSL/Supplier T.C./
CSL/Supplier T.C.
CSL/Supplier T.C./Third
Party Certified Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Confidence Steel Limited
Page 54 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
5.0
5.1 5.2
5.3
PACK WASHER (For M12
Bolts)
VISUAL
DIMENSIONAL
a) Inside Diameter
a) Outside Diameter
a) Thickness
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
Free from cracks, bun pits, no
sharp edges and other defects.
As per approved drawing
13.5 mm to 13.93 mm
22.7 to 24 mm
As per Specification
5 mm thick
6 mm thick
8 mm thick
BSEN ISO 1461: 2009,Refer Point
no. 2.4
CSL
CSL
CSL
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Quality Manual
Page 55 of 81
SRL
NO.
COMPONENT/OPERATIO
N AND DESCRIPTION OF
LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC.
& ACCEPTANCE
NORM
TESTING AGENCY REMARKS
6.0
6.1
6.2
6.3
6.4
M16 Bolts (5.6
Grade) VISUAL
DIMENSIONAL
a) Bolt Length
b) Body Diameter (Ds)
c) Width across flats (s)
d) Width across corners (.e)
e) Height of Head (k)
f) Pitch (p)
g) Thread Length (b)
PHYSICAL PROPERTIES
a) Tensile strength under
wedge (Minimum
ultimate tensile load)
b)Proof load
Test c)Hardness
Test
Vickers Hardness
OR Brinnel Hardness
OR Rockwell Hardness
GALVANIZING TEST
a) Zinc Coating Thickness
b) Uniformity of Zinc Coating
c) Adhesion of Zinc Coating
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 898-1:2009 ( . E)
ISO 6157-1,
Bolts shall be cleanly finished
, sound and free from surface
defects
DIN 7990
as specified
15.3-16.7 mm
23.16/24 mm
26.17 mm min.
9.25- 10.75 mm
2 mm
21/27 mm 28/34 mm (For Anti-theft
Bolt) ISO 898-1:2009 (.E)
78500 N (8010
kg) (Table 4)
44000N (4490
kg) (Table 5)
155 HV to 220 HV
147 HB to 209 HB
79 HRB to 95 HRB
BSEN ISO 1461: 2009,Table 4
50 microns min. I.e. 360
g/m² Should withstand 6
dips of 1
minute duration in Copper
Sulphate
The coating shall be
sufficiently adherent to
withstand normal handling
condition without peeling.
CSL/Supplier T.C./
CSL/Supplier T.C./ Third
Party Certified Lab
CSL/Supplier T.C./ Third
Party Certified Lab
CSL/Supplier T.C.
CWP (Customer
witness point)
CWP (Customer
witness point)
CWP (Customer
witness point)
CWP (Customer
witness point)
CWP (Customer
witness point)
Confidence Steel Limited
Page 56 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
7.0
7.1
7.2
7.3
7.4
16 mm NUTS (Grade 5)
VISUAL
DIMENSIONAL
a) Height of Nut (m)
b) Width across flats (s)
c) Width across corners ( . e)
d) Diameter of bearing face
(Dw)
e) Pitch
PHYSICAL PROPERTIES
b)Hardness
c)Proof Load
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 4034
ISO 6157-2,
Nuts shall be cleanly finished ,
sound and free from surface
defects.
ISO 4034
14.1/15.90 mm
23.16/24 mm
26.17 mm min.
22 mm min.
2 mm
ISO 898- Part II
130-302 HV
95800N (9775 Kg)
BSEN ISO 1461: 2009,Refer Point
no. 6.4
CSL/Supplier T.C./
CSL/Supplier T.C.
CSL/Supplier T.C.
Third Party Certified
Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Quality Manual
Page 57 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
8.0
8.1
8.2
8.3
8.4
M16 Bolts (8.8 Grade)
VISUAL
DIMENSIONAL
a) Bolt Length
b) Body Diameter (Ds)
c) Width across flats (s)
d) Width across corners (.e)
e) Height of Head (k)
f) Pitch (p)
g) Thread Length (lg)
PHYSICAL PROPERTIES
a) Tensile strength under
wedge (Minimum ultimate
tensile load)
b)Proof load Test
c)Hardness Test
Vickers Hardness
OR Brinnel Hardness
OR Rockwell Hardness
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 898-1:2009 ( . E)
ISO 6157-1,
Bolts shall be cleanly finished ,
sound and free from surface
defects
DIN 7990
as specified
15.3-16.7 mm
23.16/24 mm
26.17 mm min.
9.25- 10.75 mm
2 mm
21/27 mm
28/34 mm (For Anti-theft Bolt)
ISO 898-1:2009 (.E)
125000 N (12755 kg)
(Table 4)
91000N (9285 kg)
(Table 5)
255 HV to 355 HV
242 HBW to 318 HBW
23 HRC to 34 HRC
CSL/Supplier T.C./
CSL/Supplier T.C./ Third
Party Certified Lab
CSL/Supplier T.C./ Third
Party Certified Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
BSEN ISO 1461:2009 ( Table 4)
BS 729
50 microns min. I.e. 360 g/m²
Should withstand 6 dips of 1
minute duration in Copper
Sulphate The coating shall be sufficiently
adherent to withstand normal
handling condition without
peelin
a) Zinc Coating Thickness
(Mean)
b) Uniformity of Zinc Coating
c) Adhesion of Zinc Coating
Confidence Steel Limited
Page 58 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
9.0
9.1
9.2
9.3
9.4
16 mm NUTS (Grade 8)
VISUAL
DIMENSIONAL
a) Height of Nut (m)
b) Width across flats (s)
c) Width across corners ( . e)
d) Diameter of bearing face
(Dw)
e) Pitch
PHYSICAL PROPERTIES
a)Hardness
b)Proof Load
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 4034,
Nuts shall be cleanly finished ,
sound and free from surface
defects
ISO 4034
14.1/15.90 mm
23.16/24 mm
26.17 mm min.
22 mm min.
2 mm
CSL/Supplier T.C./
CSL/Supplier T.C.
CSL/Supplier T.C.
Third Party Certified
Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
ISO 898- Part II:2012
Maximum 30 HRC
138200N (14102 Kg)
BSEN ISO 1461,BS 729 Refer
Point no. 2.4
Quality Manual
Page 59 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
10.0
10.1 10.2
10.3
10.4
SPRING WASHER (M16)
VISUAL DIMENSIONAL
a) Inside Dia (D1)
a) Outside Dia (D2)
a) Section width (b)
b) Section Thickness (s)
PHYSICAL PROPERTIES
a)Hardness
b) Twist Test
c) Permanent Set Test
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
DIN 127
Surface shall be free from cracks
, burrs pits and loose scale.
The flat face shall be free from
knurling, scratches, die marks
etc.
DIN 127
Table 1
16.2 to 17 mm
27.4 mm (max.)
4.8-5.2 mm
3.3-3.7 mm
BS- 4464
440 / 550 HV or
45/52 HRC
Washer should not be cracked or
broken after twisting through
90◦
Washer shall be completely
closed between hardened and
ground plates . After releasing,
free height of the washer should
not be less than 1.66 times
sectional thickness.
BSEN ISO 1461: 2009, Refer Point
no. 6.4
CSL/Supplier T.C./
CSL/Supplier T.C.
CSL/Supplier T.C./Third
Party Certified Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Confidence Steel Limited
Page 60 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
11.0
11.1 11.2
11.3
PACK WASHER (For M16
Bolts)
VISUAL
DIMENSIONAL
a) Inside Diameter
a) Outside Diameter
a) Thickness
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
Free from cracks, bun pits, no
sharp edges and other defects.
As per approved drawing
17.50 to 17.93 mm 28.7 to 30 mm
As per specification
5 mm thick
6 mm thick
8 mm thick
10 mm thick
BSEN ISO 1461: 2009, Refer Point
no. 6.4
CSL
CSL
CSL
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Quality Manual
Page 61 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
12.0
12.1
12.2
12.3
12.4
M20 Bolts (5.6 Grade)
VISUAL
DIMENSIONAL
a) Bolt Length
b) Body Diameter (Ds)
c) Width across flats (s)
d) Width across corners (.e)
e) Height of Head (k)
f) Pitch (p)
g) Thread Length (b)
PHYSICAL PROPERTIES
a) Tensile strength under
wedge (Minimum ultimate
tensile load)
b)Proof load Test
c)Hardness Test
Vickers Hardness
OR Brinnel Hardness
OR Rockwell Hardness
GALVANIZING TEST
a) Zinc Coating Thickness
b) Uniformity of Zinc Coating
c) Adhesion of Zinc Coating
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 898-1:1999 ( . E)
ISO 6157-1,
Bolts shall be cleanly finished ,
sound and free from surface
defects
DIN 7990
as specified
19.16/20.84 mm
29.16/30 mm
32.95 mm min.
11.6/13.4 mm
2.5 mm
23.5/31 mm
32.5/40 mm (For Anti-theft Bolt) ISO 898-1:1999 (.E)
122000 N (12448 kg)
(Table 4)
68600N (7000 kg)
(Table 5)
155 HV to 220 HV
147 HB to 209 HB
79 HRB to 95 HRB
BSEN ISO 1461: 2009, Table 4
50 microns min. I.e. 360 g/m²
Should withstand 6 dips of 1
minute duration in Copper
Sulphate The coating shall be sufficiently
adherent to withstand normal
handling condition without
peeling.
CSL/Supplier T.C./
CSL/Supplier T.C./ Third
Party Certified Lab
CSL/Supplier T.C./ Third
Party Certified Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Confidence Steel Limited
Page 62 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
13.0
13.1
13.2
13.3
13.4
20 mm NUTS (Grade 5)
VISUAL
DIMENSIONAL
a) Height of Nut (m)
b) Width across flats (s)
c) Width across corners ( . e)
d) Diameter of Bearing face
(Dw)
e) Pitch
PHYSICAL PROPERTIES
b)Hardness
c)Proof Load
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 4034
ISO 6157-2,
Nuts shall be cleanly finished ,
sound and free from surface
defects
ISO 4034
16.90/19 mm
29.16/30 mm
32.95 mm min.
27.7 mm min.
2.5 mm
ISO 898- Part II:2012
146/302 HV
154400N (15755 Kg)
BSEN ISO 1461: 2009,
Refer Point no. 10.4
CSL/Supplier T.C./
CSL/Supplier T.C.
CSL/Supplier T.C.
Third Party Certified
Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Quality Manual
Page 63 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
14.0
14.1
14.2
14.3
14.4
M20 Bolts (8.8 Grade)
VISUAL
DIMENSIONAL
a) Bolt Length
b) Body Diameter (Ds)
c) Width across flats (s)
d) Width across corners (.e)
e) Height of Head (k)
f) Pitch (p)
g) Thread Length (b)
PHYSICAL PROPERTIES
a) Tensile strength under
wedge (Minimum ultimate
tensile load)
b)Proof load Test
c)Hardness Test
Vickers Hardness
OR Brinnel Hardness
OR Rockwell Hardness
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 898-1:1999 ( . E)
ISO 6157-1,
Bolts shall be cleanly finished ,
sound and free from surface
defects
DIN 7990
as specified
19.16/20.84 mm
29.16/30 mm
32.95 mm min.
12.1/13.9 mm
2.5 mm
23.5/31 mm
32.5/40 mm (For Anti-theft Bolt)
ISO 898-1:1999 (.E)
203000 N (20714 kg)
(Table 4)
147000 N (15000 kg)
(Table 5)
255 HV to 355 HV
242 HBW to 318 HBW
23 HRC to 34 HRC
CSL/Supplier T.C./
CSL/Supplier T.C./ Third
Party Certified Lab
CSL/Supplier T.C./ Third
Party Certified Lab CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
BSEN ISO 1461:2009 ( Table 4)
BS 729
50 microns min. I.e. 360 g/m²
Should withstand 6 dips of 1
minute duration in Copper
Sulphate
The coating shall be sufficiently
adherent to withstand normal
handling condition without
peeling.
a) Zinc Coating Thickness
(Mean)
b) Uniformity of Zinc Coating
c) Adhesion of Zinc Coating
Confidence Steel Limited
Page 64 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
15.0
15.1
15.2
15.3
15.4
20 mm NUTS (Grade 8)
VISUAL
DIMENSIONAL
a) Height of Nut (m)
b) Width across flats (s)
c) Width across corners ( . e)
d) Diameter of Bearing face
(Dw)
e) Pitch
PHYSICAL PROPERTIES
b)Hardness
c)Proof Load
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 4034
ISO 6157-2,
Nuts shall be cleanly finished ,
sound and free from surface
defects
ISO 4034
16.90/19 mm
29.16/30 mm
32.95 mm min.
27.7 mm min.
2.5 mm
ISO 898- Part II:2012
233/353 HV
225400N (23000 Kg)
BSEN ISO 1461: 2009, Refer
Point no. 10.4
CSL/Supplier T.C./
CSL/Supplier T.C.
CSL/Supplier T.C.
Third Party Certified
Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Quality Manual
Page 65 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
16.0
16.1 16.2
16.3
16.4
SPRING WASHER (M20)
VISUAL DIMENSIONAL
a) Inside Dia (D1)
a) Outside Dia (D2)
a) Section width (b)
b) Section Thickness (s)
PHYSICAL PROPERTIES
a)Hardness
b) Twist Test
c) Permanent Set Test
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
DIN 127
Surface shall be free from cracks
, burrs, pits and loose scale.
The flat face shall be free from
knurling, scratches, die marks
etc.
DIN 127
Table 1
20.2/21.2 mm
33.6 mm max.
5.8/6.2 mm
3.8/4.2 mm
BS 4464
440 / 550 HV or
45/52 HRC
Washer should not be cracked or
broken after twisting through
90◦
Washer shall be completely
closed between hardened and
ground plates . After releasing,
free height of the washer should
not be less than 1.66 times
sectional thickness
BSEN ISO 1461: 2009,Refer Point
no. 10.4
CSL/Supplier T.C./
CSL/Supplier T.C.
CSL/Supplier T.C./Third
Party Certified Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Confidence Steel Limited
Page 66 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
17.0
17.1 17.2
17.3
PACK WASHER (For M20
Bolts)
VISUAL
DIMENSIONAL
a) Inside Diameter
a) Outside Diameter
a) Thickness
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
Free from cracks, bun pits, no
sharp edges and other defects.
As per approved drawing
22 mm (+0.5 mm) 37 mm (± 0.5 mm)
As per Specification
5 mm thick
6 mm thick
8 mm thick
10 mm thick
BSEN ISO 1461: 2009,Refer Point
no. 10.4
CSL
CSL
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Quality Manual
Page 67 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF
LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE
NORM
TESTING AGENCY REMARKS
18.0
18.1
18.2
18.3
18.4
M24 Bolts (5.6 Grade)
VISUAL
DIMENSIONAL
a) Bolt Length
b) Body Diameter (Ds)
c) Width across flats (s)
d) Width across corners (.e)
e) Height of Head (k)
f) Pitch (p)
g) Thread Length (b)
PHYSICAL PROPERTIES
a) Tensile strength under
wedge (Minimum ultimate
tensile load)
b)Proof load Test
c)Hardness Test
Vickers Hardness
OR Brinnel Hardness
OR Rockwell Hardness
GALVANIZING TEST
a) Zinc Coating Thickness
b) Uniformity of Zinc Coating
c) Adhesion of Zinc Coating
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 898-1:1999 ( . E)
ISO 6157-1,
Bolts shall be cleanly finished ,
sound and free from surface
defects
DIN 7990
as specified
23.16/24.84 mm
35/36 mm
39.55 mm min.
14.1-15.9 mm
3 mm
26/36 mm
35/45 mm (For Anti-theft
Bolt) ISO 898-1:1999 (.E)
176000 N (17960
kg) (Table 4)
98800N (10082
kg) (Table 5)
155 HV to 220 HV
147 HB to 209 HB
79 HRB to 95 HRB
BSEN ISO 1461: 2009, Table 4
50 microns min. I.e. 360 g/m²
Should withstand 6 dips of 1
minute duration in Copper
Sulphate
The coating shall be
sufficiently adherent to
withstand normal handling
condition without peeling.
CSL/Supplier T.C./
CSL/Supplier T.C./ Third
Party Certified Lab
CSL/Supplier T.C./ Third
Party Certified Lab
CSL/Supplier T.C.
CWP (Customer
witness point)
CWP (Customer
witness point)
CWP (Customer
witness point)
CWP (Customer
witness point)
CWP (Customer
witness point)
Confidence Steel Limited
Page 68 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
19.0
19.1
19.2
19.3
19.4
24 mm NUTS (Grade 5)
VISUAL
DIMENSIONAL
a) Height of Nut (m)
b) Width across flats (s)
c) Width across corners ( . e)
d) Diameter of Bearing face
(Dw)
e) Pitch
PHYSICAL PROPERTIES
b)Hardness
c)Proof Load
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 4034
ISO 6157-2,
Nuts shall be cleanly finished ,
sound and free from surface
defects
ISO 4034
20.2/22.3 mm
35/36 mm
39.55 mm min.
33 mm min.
3 mm
ISO 898- Part II:2012
146 HV to 302 HV
222400N (22693 Kg)
BSEN ISO 1461: 2009, Refer Point
no. 14.4
CSL/Supplier T.C./
CSL/Supplier T.C.
CSL/Supplier T.C.
Third Party Certified
Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Quality Manual
Page 69 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
20.0
20.1
20.2
20.3
20.4
M24 Bolts (8.8 Grade)
VISUAL
DIMENSIONAL
a) Bolt Length
b) Body Diameter (Ds)
c) Width across flats (s)
d) Width across corners (.e)
e) Height of Head (k)
f) Pitch (p)
g) Thread Length (b)
PHYSICAL PROPERTIES
a) Tensile strength under
wedge (Minimum ultimate
tensile load)
b)Proof load Test
c)Hardness Test
Vickers Hardness
OR Brinnel Hardness
OR Rockwell Hardness
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 898-1:1999 ( . E)
ISO 6157-1,
Bolts shall be cleanly finished ,
sound and free from surface
defects
DIN 7990
as specified
23.16/24.84 mm
35/36 mm
39.55 mm min.
14.1-15.9 mm
3 mm
26/36 mm 35/45 mm (For Anti-theft Bolt)
ISO 898-1:1999 (.E)
293000 N (29897 kg)
(Table 4)
212000N (21632 kg)
(Table 5)
255 HV to 335 HV
242 HB to 318 HB
23 HRC to 34 HRC
CSL/Supplier T.C./
CSL/Supplier T.C./ Third
Party Certified Lab CSL/Supplier T.C./ Third
Party Certified Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
BSEN ISO 1461:2009 ( Table 4)
BS 729
50 microns min. I.e. 360 g/m²
Should withstand 6 dips of 1
minute duration in Copper
Sulphate The coating shall be sufficiently
adherent to withstand normal
handling condition without
peelin
a) Zinc Coating Thickness
(Mean)
b) Uniformity of Zinc Coating
c) Adhesion of Zinc Coating
Confidence Steel Limited
Page 70 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
21.0
21.1
21.2
21.3
21.4
24 mm NUTS (Grade 8)
VISUAL
DIMENSIONAL
a) Height of Nut (m)
b) Width across flats (s)
c) Width across corners ( . e)
d) Diameter of Bearing face
(Dw)
e) Pitch
PHYSICAL PROPERTIES
a)Hardness
b)Proof Load
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
ISO 4034
ISO 6157-2,
Nuts shall be cleanly finished ,
sound and free from surface
defects
ISO 4034
20.2/22.3 mm
35/36 mm
39.55 mm min.
33 mm min.
3 mm
CSL/Supplier T.C./
CSL/Supplier T.C.
CSL/Supplier T.C.
Third Party Certified
Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
ISO 898- Part II:2012
Maximum 36 HRC
324800N (33142 Kg)
BSEN ISO 1461: 2009, Refer
Point no. 18.4
Quality Manual
Page 71 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
22.0
22.1 22.2
22.3
22.4
SPRING WASHER (M24)
VISUAL DIMENSIONAL
a) Inside Dia (D1)
a) Outside Dia (D2)
a) Section width (b)
b) Section Thickness (s)
PHYSICAL PROPERTIES
a)Hardness
b) Twist Test
c) Permanent Set Test
GALVANIZING TEST
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
DIN 127
Surface shall be free from cracks
, burrs, pits and loose scale.
The flat face shall be free from
knurling, scratches, die marks
etc.
DIN 127
Table 1
24.5/25.5 mm
40 mm max.
6.75/7.25 mm
4.8/5 mm
BS 4464
440 / 550 HV or
45/52 HRC
Washer should not be cracked or
broken after twisting through
90◦
Washer shall be completely
closed between hardened and
ground plates . After releasing,
free height of the washer should
not be less than 1.66 times
sectional thickness
BSEN ISO 1461: 2009, Refer Point
no. 14.4
CSL/Supplier T.C./
CSL/Supplier T.C.
CSL/Supplier T.C./Third
Party Certified Lab
CSL/Supplier T.C.
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Confidence Steel Limited
Page 72 of 81
SRL
NO.
COMPONENT/OPERATION
AND DESCRIPTION OF LIST
SAMPLING PLAN WITH BASIS REFERANCE DOC. &
ACCEPTANCE NORM
TESTING AGENCY REMARKS
23.0
23.1 23.2
23.3
24.0
24.1
24.2
24.3
25
PACK WASHER (For M24
Bolts)
VISUAL
DIMENSIONAL
a) Inside Diameter
a) Outside Diameter
a) Thickness
GALVANIZING TEST
STEP BOLT
(As Per Approved Drawing)
DIMENSIONAL
PHYSICAL PROPERTIES
(Cantilever Test)
GALVANIZING
D-SHACKLES & FLAT LINKS
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
P=4; n<500
P=4+1.5n/1000;
n>500,maximum 50 pieces
DIN 126A
Free from cracks, bun pits, no
sharp edges and other defects.
As per approved drawing
26 mm (+0.5 mm) 40 mm (± 0.5 mm)
As per Specification
5 mm thick
6 mm thick
8 mm thick
10 mm thick
BSEN ISO 1461: 2009, Refer Point
no. 14.4
Customers Drawing
Refer Point no. 2.4
Customers Drawing
CSL
CSL
CSL
CSL/Supplier T.C./
Third Party Certified
Lab
CSL/ Supplier T.C.
Third Party Certified
Lab
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
CWP (Customer witness
point)
Quality Manual
Page 73 of 81
CAHPTER-4 DELIVERY
Confidence Steel Limited
Page 74 of 81
A) Packaging Requirement
1. Tower Overview
As shown in the following figure, a Telecommunication consists functionally of tower body,
aircraft warning light, lightning protection grounding system, and accessories:
Figure 1
2. Technical Specifications of the Tower Body
2.1 All materials must be packed according to each tower. Only the materials of the some tower
can be packed together.
2.2 The packages (packing rules and packing box specifications) of the same supplier and the same
product (or product set) must be strictly kept consistent. Ensure that the package with the same
box No. can be interchanged.
2.3 All products must be separately packed. Then, they should be collectively packed in wooden
cases according to the site configuration and actual conditions.
2.4 Inside each packing box, there must be a packing list of the box. In addition, items on the
packing list and real objects in the box must be in one-to-one mapping.
2.5 A mark label that is used for goods separation must be attached to each packing box. In
addition, the words on the label should be eye-catching.
2.6 The package of a packing box should facilitate secondary suite and goods separation.
2.7 As long as a single package does not exceed its weight limit, each tower should have as few
packages as possible.
2.8 tower poles should be bundled. Fragile, or small and irregular accessories should be packed in
wooden cases.
3. Tower Body Packing
3.1 Tower materials should be bundled as follows: big ones wrap small ones; the upper and lower
layers are bigger angle steel while the middle layer is smaller angle steel. Foe a single-base
tower, multiple packages should be bundled.
Quality Manual
Page 75 of 81
3.2 It is recommended to use steel strips to bundle tower and the thickness of steel strip must
ensure the wraps of the tower bundles to be firmer (steel strip: width is bigger than 3mm, and
the thickness is thicker than 0.8mm)
3.3 there shall have underlay for protecting galvanization from damage.
3.4 Starting to pack at a distance about 0.5 meter from the package tip (as the figure 1); Bundling
one point by using two strips with a distance about 10 centimeters on underlay, at intervals of 2
meters ( as the figure 1);
Figure 1 Strip rule
Package length Point number Strips number
3.0M 2 4
>3.0M ; 5.0M 3 6
>5.0M 4 8
3.7 Tower materials with an equal or a similar length should be bundled together. In addition,
ensure that a whole bundle of tower materials should be strong enough lest they should deform
when handled.
3.8 Tower materials should be packed in the order in which a tower is erected. The same bundle of
tower parts should be packed together according to adjacent segments of the tower.
3.9 The maximum weight of a single bundle should not exceed 1,000KG. Tower boots (tower
feet), climbing ladders, fences for climbing ladders, and fusser plates should be bundled as
shown in the following figures. The pole parts unable to be well poled up, such as working
platforms and half spaces should be separately packed and fastened.
Figure 2 Bundling of tower foots Figure 3 bundling of climbing ladders
Confidence Steel Limited
Page 76 of 81
Note: Every two tower foots should be bundled together. The tower foot accessories of the
same tower should be bundled and fastened.
Climbing ladders should be bundled together by the site. Longitudinal fence connection straps
should be bundled together with climbing ladders. Angle steel should be buckled inside.
Figure 4 Bundling of fences for climbing ladders Figure 5 bundling of gusset plates
Note: As shown in Figure, fences must be bundled as a plane. They should not be disordered or
loose.
Gusset plates should not be bunched by iron wire and loosely packed. They must be bunched
and then fastened. It is recommended to bundle them with screw rods or iron wires.
4. Embedded Parts
4.1 Anchor bolts should be packed by the single-base tower. All the anchor bolts of a tower should
be packed as one piece. It is recommended that they should be backed with angle steel + screw
rod framework or steel die sleeve, as shown in Figure 6 and Figure 7.
Figure 6 bundling of anchor bolts (steel die sleeve)
Figure 7 bundling of anchor bolts (steel die sleeve)
4.2 Anchor bolt washers should be packed together with tower body instead of with anchor bolts.
Quality Manual
Page 77 of 81
4.3. Orientation templates should be packed by the single-base tower. All the orientation template
angle steel of a tower should be packed as one piece.
44. Orientation templates (including those at both ends of anchor bolts) should be packed as one
piece ( the connecting bolts on orientation templates are first packed in a firm sack and then
clamped in between orientation templates or firmly bound onto orientation templates). Cable
racks should meet load-bearing requirements.
5. Accessories
5.1 According to the shape of their components, antenna supports and microwave supports should
be packed as two pieces (or fewer) by the single-base tower. As shown in Figure 9, the bolts of
antenna supports and microwave supports should be packed together with those of tower body.
Figure 9 bundling of antenna supports
5.2 According to the shape of their components, horizontal cable racks and support posts should be
packed as one to two pieces by the single-base tower. The mounting bolts of accessories should
be packed together with the bolts of tower body.
5.3 Aircraft warning light supports should be packed by the single-base tower. Their mounting
bolts should be packed together with the bolts of tower body.
5.4 Small parts, such as fasteners, copper grounding clips, and wiring terminals, should be
separately packed in a sack and then put into an iron drum. Or they may be first packed in a sack
and then put into a braided bag, finally put into a wooden case.
5.5 The mounting bolts of horizontal cable racks, support posts, bogies, antenna supports, and
aircraft warning lights should be packed together with those of tower body.
5.6 If there are other custom-made accessories or some accessories that are not mentioned above,
suppliers should provide a packing plan, which must be confirmed by Huawei.
5.7 The above tower parts to be bundled must be firmly bound. Bundling tapes should be enwound
with buffer (pearl cotton or strip of cloth) lest the surfaces of the parts should be damaged. It is
recommended that they should be bundled with steel strips.
6. Requirements for the packing list 6.1 Tower suppliers should make a detailed description of ex-factory towers, part numbers, and
packing rules so that procurement personnel can inspect goods and warehouse management
personnel can conduct secondary goods separation.
6.2 For delivered towers, tower suppliers must provide a detailed packing list, including but not
limited to tower No., part No., quantity, and weight. Cases must indicate their volumes for the
sake of goods search and goods separation. The packing list should be prepared and provided by
suppliers and must be confirmed by Huawei.
Confidence Steel Limited
Page 78 of 81
6.3 A container list should keep a detailed record of tower parts in each container, including but not
limited to packing list No., contract No., tower type, quantity of towers, name of tower part,
quantity of tower packages, package No., gross weight, net weight, dimensions, and volume.
6.4 In small part (fasteners, copper grounding clips, and wiring terminals) packages, there must be a
descriptive label in each sack, which indicates names, models, quantity, and weight of these
small parts. On each braided bag, there should be a piece of plasticized label paper, which
indicates model, quantity, and weight. Inside and outside an iron drum or a wooden case, there
must be a packing list respectively. The materials inside the case must be kept consistent with
the packing list. The packing list includes, but is not limited to product name, specification,
model, quantity, and weight. The packing list is first put into a plastic bag and then into the
uppermost layer of the packing box so that it can be seen upon unpacking. Outside the wooden
case, the packing list must be strikingly pasted onto one side of the case.
Figure 10 Packing in a wooden case
6.5 For each tower, there should be a detailed tower part packing list, including but not limited to
tower part name, quantity of packages, and package No., together with the No., specification,
length, quantity, and remarks of various parts in each package.
7. Requirements for Packing Identification
7.1 Color marks: In the same container, all bundles of the same tower should be marked in the
same eye-catching color on both side of the bundle other than the strips. Thus, all packages of
the same tower inside the container can are separated in turn by using eye-catching color
marks.
7.2 Steel impression marks of tower parts: If any bundle comes loose, you must first restore the
bundle according to the tower packing list (attached to the container) and container list,
together with the steel impression marks on the parts. Then, you should in turn separate all the
bundles of the same tower.
7.3 All bundles of the same tower with the same bold color marking must have the same packing
identification numbers on the bold color markings.
7.4 For zinc-coated tower parts, you should write down a package No. on the eye-catching position
of each package (including small packages inside big packages) with non-fading paint. Ensure
that your handwriting is neat and legible.
7.5 For non-galvanized tower parts, you should write down a package No. on them with non-fading
paint In addition, you need to print the package No. on plasticized paper labels and attach the
labels to the parts.
7.6 In the case of packing with a wooden case, you should attach a label to each separate part
according to the packing lit. The label includes part No. and part description. The label should
be in English and its size can be adjusted as require. For the label template, you may refer to
Figure 21.
Quality Manual
Page 79 of 81
PART NO. 38
PART DESCRIPTION ST5. 5*20
Tapping screw by drill
Figure 21 Label template
7.7 A cargo label should be respectively attached to both the inner and outer packing boxes. Thus,
we can know about what is inside according to the label.
7.8 An apparent identifier must be pasted on each uppermost layer packing. It includes storage and
transportation sign, size and weight of the packing box, material information sigs, mark label,
and environmental protection sign.
8. Requirements for Packing Material
8.1 A wooden case must be strong enough so that it will not deform or break even in a complex
circulation environment.
8.2 The wooden case must be waterproof, moisture-proof, rustproof, and shake-proof. It must
provide buffers.
8.3 The wooden case should be made of real wood board or plywood. Teal wood must be
fumigated. Plywood should be thick enough in its load-bearing direction. The wooden case
must be firm enough and enclosure-type. In addition, the wooden case should have iron sheet
wrapping and there should be no mould on the surface of the board.
8.4 The water ration of plywood should be less than or equal to 18% the water ratio of real wood
should be less than or equal to 20%
8.5 The plate thickness of the wooden cade should be no less than 9 mm.
8.6 The wooden cade may be a framework wooden cade or an assembled wooden case. The latter
is recommended because its cover is simply connected with the cade body, which facilitates
unpacking and packing.
Confidence Steel Limited
Page 80 of 81
B) Loading Requirement
1 Loading principle
The tower is loaded by tower wise, according to the container list.
2 Loading manners
For making full use of the container, we shall properly choose the following loading manners:
1) Loading some complete sets of towers in one container;
2) Loading some complete sets of towers and a half set of tower in one container.
For example:
If the container can contain more than one tower but cannot contain two towers, we can load
one tower and part of another towers in one container;
3 Loading Requirement
3.1 If the container contains more than one complete tower, the tower in this container shall be
easily distinguished by using the different colors painting on the tip of the package or on the
first steel strip, and remarked in the container list (referring to the figure 12
Figure 32 Container loading rule 1
3.2 If the container contains some complete sets of towers and a half set of tower in one container,
it is not to do referring to the point 1), but also to make sure all the packages of the tower that
divides to load in two containers pained with the same color (referring to figure 13), and
remarked as” the other parts of the tower is in ** container” in the container list;
Quality Manual
Page 81 of 81
Figure 43 container loading rule 2
3.3 It is not permitted to put one tower into three containers.
3.4 The different type towers can be put into one container to make full use of the container
(referring to the following picture);
3.5 Putting the light, small and brittle packages above; putting the heavy, big and stiff packages
under;
3.6 The wood blocks shall be put under the tower packages at each floor to make sure the package
easily download;
3.7 Assigning one person to instruct the loading and record the loaded packages in the container
list.
[The remaining part of this page is intentionally left blank]