quantity survey report - home - blacktown city · 2018-01-29 · construction consultants (qs)...
TRANSCRIPT
QUANTITY SURVEY REPORT
Not for Bank Use
Source: Google Maps
Project: Proposed Subdivision Works (3 Super Lots) At No. 172 Guntawong Road Rouse Hill NSW 2155
Applicant: Guntawong Estate Pty Ltd C/- Design Cubicle Pty Ltd
Builder: Developer Managed
Report Date: 19 December 2017
Construction Consultants (QS) Quantity Survey Report - DA Council Submission only (Not for Bank Use) 172 Guntawong Rd, Rouse Hill
2 | P a g e
Table of Contents 1. Instruction ................................................................................................................... 3
2. Brief Development Description .................................................................................. 3
3. Construction Cost Estimate ........................................................................................ 3
4. Exclusions .................................................................................................................... 4
5. Documentation ........................................................................................................... 4
6. Design Assumptions / Parameters .............................................................................. 4
7. Disclaimer .................................................................................................................... 5
Appendix A Council Schedule Appendix B Elemental Cost Estimate Summary Appendix C Reduced Drawings
Construction Consultants (QS) Quantity Survey Report - DA Council Submission only (Not for Bank Use) 172 Guntawong Rd, Rouse Hill
3 | P a g e
1. Instruction We have undertaken a study of the probable cost of construction for the above project, based on the supplied drawings and other information provided. We have also taken into consideration the proposed method of procurement (Developer Managed). 2. Brief Development Description
The proposal includes the subdivision, roadworks and associated utility services of the site, located at No. 172 Guntawong Rd, Rouse Hill, to create three (3) super lots ranging between 4,234 m2 and 6,236 m2 in size. 3. Construction Cost Estimate
Description Amount ($)
Total incl. Builder's Margin (excl. GST) 2,073,736
Add Consultants Fees 41,475
Total (incl. Consultants Fee, excl. GST) 2,115,211
Add GST 211,521
Total (incl. GST) 2,326,732
The required Council Schedule, titled “Registered Quantity Surveyor’s Detailed Cost Report” is attached in Appendix A. Also, please refer to Appendix B for an Elemental Cost Estimate Summary prepared in accordance with the Environmental Planning and Assessment Regulation 2000 (Reg 25J) - Section 94A Levy - Determination of proposed cost of Development. A detailed report may be obtained upon request. Our Construction Cost Estimate may be considered as reasonable, in the absence of the Structural and Services drawings, the Contract Documents and DA Conditions.
Construction Consultants (QS) Quantity Survey Report - DA Council Submission only (Not for Bank Use) 172 Guntawong Rd, Rouse Hill
4 | P a g e
4. Exclusions Our Cost Estimate does not include the following:
- Land Acquisition; - Marketing and financing; - Legal costs; - Project Management; - Building insurance costs; - Amplification / amendment to existing services; - Relocation and/or improvement and/or upgrading of any existing external
service other than indicated; - Amendments to plans, incomplete documentation; - Taxes, levies and charges; - Disabled access; - Energy and water efficiency; - External road works other than indicated; - NBN and other Telecommunication wiring; - Hydrants; - Gas pipes; - Decontamination works (asbestos removal, etc); - Rehabilitation of dam/pond; - Rock excavation / Soft Spots; - Excess fill; - Dewatering; - Authorities Fees (S94 Contribution and the like); - Contingency allowance.
5. Documentation Our Cost Estimate was based on the Subdivision plans prepared by LTS Lockley, Reference No. 50200001PSUB1, Sheet No. 1 of 1, Date 14/12/2017. Please refer to Appendix C for a copy of these drawings. 6. Design Assumptions / Parameters
This Cost Estimate may provide no more than a rough guide to the probable cost of the proposed development. Costs may vary considerably, due to a range of variables:
- Further Geotechnical investigation; - Structural and services documentation; - Contract conditions; - Provisional Allowances; - DA Conditions.
Construction Consultants (QS) Quantity Survey Report - DA Council Submission only (Not for Bank Use) 172 Guntawong Rd, Rouse Hill
5 | P a g e
7. Disclaimer This Certificate has been prepared for the sole purpose of providing an Initial Cost Plan for DA Council Submission only (not for bank use). This Quantity Survey Certificate is not to be used for any other purpose. This Report is confidential to the developer. The Writer does not accept any contractual, tortuous or other form of liability for any consequences, loss or damage which may arise as a result of any other person acting upon or using this report. Report and estimate prepared by
Michael M. Dakhoul B. Build (Hons. 1) AAIQS MAIB MCIOB ICECA AAIQS Reg. No. 3618
Indicative Cost Plan (Elemental Summary)
172 Guntawong Rd, Rouse Hill
Proposed Subdivision Works (incl. roadworks and associated utility services)
Item % Total Cost ($)
Preliminaries 5.22 101,152
Earthworks (incl. Demolition) 8.98 173,981
Road Works
Road pavement 63.67 1,234,054
Pedestrian pavement 4.18 80,922
Subdivision Works
Drainage 7.41 143,636
Sewer Reticulation 2.92 56,645
Electrical and Telecommunication conduits only 3.34 64,737
Water Reticulation 2.19 42,484
Landscaping/Signage and other external works 2.09 40,461
Sub-total (excl. GST) 100 1,938,071
Add Builder's Margin 135,665
Total incl. Builder's Margin (excl. GST) 2,073,736
Add Consultants Fee 41,475
Total (incl. Consultants Fee, excl. GST) 2,115,211
Add GST 211,521
Total (incl. GST) 2,326,732
Construction Consultants (QS)
18-12-17
1 of 1
GU
NT
AW
ON
G R
OA
D
PROPOSED ROAD (9 WIDE)
(18 W
ID
E)
PR
OP
OS
ED
R
OA
D
PR
OP
OS
ED
R
OA
D
(9 W
ID
E)
(1
8 W
ID
E)
PR
OP
OS
ED
R
OA
D
PROPOSED
5213m²
LOT 3
PROPOSED
4234m²
LOT 1
PROPOSED
6236m²
LOT 2
PR
OP
OS
ED
R
OA
D
(9
W
ID
E)
PR
OP
OS
ED
R
OA
D
(1
6 W
ID
E)
PROPOSED ROAD (9 WIDE)
[R2]
[R2]
[R3]
1:1000
1DateRevision Description Reference00/00/00A - 0000/00/00B - 0000/00/00C - 0000/00/00D - 00
PLAN OF PROPOSED SUBDIVISION OF LOT 48 DP 30186BEING No.172 GUNTAWONG ROAD, ROUSE HILL
THIS IS THE PLAN REFERRED TOIN MY LETTER DATED:
Registered Surveyor NSW
Drawing title
Client STATEWIDE CIVIL PTY LTD 50200 001PSUB1
SHEET
site AreaAS SHOWN
datumN/A
date of survey14/12/17
scale@A3
LGABLACKTOWN OF 1
-
Registered Surveyors NSWLOCKLEY
www.ltsl.com.au
Suite 1, Level 1810 Pacific HighwayGordon NSW 2072Locked Bag 5Gordon NSW 2072P 1300 587 000F 02 9499 7760
referencenumber