quetta electric supply company ltd fy 2017-18.pdf · length of high voltage transmission lines (132...

178
C.. QUETTA ELECTRIC SUPPLY COMPANY LTD FINANCE DIRECTORATE, QESCO, ZARGHOON ROAD QUETTA. Dated 02 - 05 - 2014 .S/S - -CA T-1 Ve /me tyl Reply on the Observations on Tariff Petitions 2017 — 18 . - tric i / NEPRA / R / TRF — 100 / QESCO / 4632 dated April, 4 2017. n ' ( With reference to above, the para wise reply on the observations is as under .fr NO. 7168 / FD / QESCO / COMP The Registrar, NEPRA, NEPRA Tower, G-5/1 Islamabad. Subject: Reference: Observation i) The Petitioner has not submitted the following Forms as required under Part 3 of the guide lines: a) Form 27, Forms PPP1- PPP9 H) The Petitioner has submitted the following forms incomplete as required under Part 3 of the Guidelines: a) Form-1 b) Form-2 Hi) Integrated Transmission Generation and Distribution Plan (IGTDP) has not been submitted Reply Form 27 has already been attached with Tariff Petition, However, PPP1-PPP-9 cannot be submitted due to availability of data constrains. Complete Form-1 & Form-2 is attached at Annex-A Integrated Transmission Generation and Distribution Plan (IGTDP) is attached at Annex-B. iv) Justifications and cost benefit analysis of investment have not been provided. v) Data regarding Power Purchase Price has not been submitted. The justification of Investment is given in Table 21-B of Tariff Petition, where as Cost Benefits analysis of Investment is given in sheet FIRR of IGTDP (Annex-B). The information depends upon CPPA five

Upload: others

Post on 10-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

C..

QUETTA ELECTRIC SUPPLY COMPANY LTD FINANCE DIRECTORATE,

QESCO, ZARGHOON ROAD QUETTA.

Dated 02 - 05 - 2014

.S/S-

-CA T-1 Ve /me tyl Reply on the Observations on Tariff Petitions 2017 — 18 . - tric i

/

NEPRA / R / TRF — 100 / QESCO / 4632 dated April, 4 2017. n' (

With reference to above, the para wise reply on the observations is as under

.fr

NO. 7168 / FD / QESCO / COMP

The Registrar, NEPRA, NEPRA Tower, G-5/1 Islamabad.

Subject:

Reference:

Observation

i) The Petitioner has not submitted the following Forms as required under Part 3 of the guide lines: a) Form 27, Forms PPP1-

PPP9

H) The Petitioner has submitted the following forms incomplete as required under Part 3 of the Guidelines: a) Form-1 b) Form-2

Hi) Integrated Transmission Generation and Distribution Plan (IGTDP) has not been submitted

Reply

Form 27 has already been attached with Tariff Petition, However, PPP1-PPP-9 cannot be submitted due to availability of data constrains.

Complete Form-1 & Form-2 is attached at Annex-A

Integrated Transmission Generation and Distribution Plan (IGTDP) is attached at Annex-B.

iv) Justifications and cost benefit analysis of investment have not been provided.

v) Data regarding Power Purchase Price has not been submitted.

The justification of Investment is given in Table 21-B of Tariff Petition, where as Cost Benefits analysis of Investment is given in sheet FIRR of IGTDP (Annex-B).

The information depends upon CPPA five

Page 2: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

year generation plan, which has not yet been provided by CPPA

vi) The information as to cost of Power purchased from CPPA/NTDC, its successor or through other bilateral contract duly approved by NEPRA has not been submitted as required under clause 13(c), part 3 of the Guidelines..

vii) Details of Pass through Item as required under clause 13 (e), Part 3 of the Guidelines have not been submitted.

viii)The justifications (e.g. cost /benefit analysis and payback periods) for each of the costs recorded in the prescribed formats have not been submitted as required under clause 13 (f), Part 3 of the Guidelines.

Bilateral contract with CPPA is attached at Annex-C.

Detail of pass through items is given in pare-12 on page-7 of this Petition, which also elaborated in relief or determination sort.

Cost Benefits analysis & Pay Back Period of Investment is given in sheet FIRR of IGTDP (Annex-B).

ix) The Petitioner has not submitted the Average reference monthly fuel cost component, variable O&M component, capacity charge per unit purchased and sold based on a forwarded rolling 5-year generation plan that is derived from the for.•.—rd-1 —rolling- 5 year integrated generation, transmission and distribution expansion plan as required under clause 13 (1), Part 3 of the Guidelines.

x) The Petitioner has not submitted the details of the immediately prior year's monthly and accumulated distribution losses along with breakup of technical and administrative losses as required under clause 13(o), Part of the Guidelines.

Detail of power purchase components is given in Form-9 (A) of this Petition.

Detail of T&D losses along with breakup of Losses of the immediately prior year is given in Form-7 of this Petition.

Page 3: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

xi) The Petitioner has not submitted its 5-years Investment Plans as per required under Para 23 of the Guidelines.

5-years Investment Plan is given in sheet investment of IGTDP (Annex B)

Rehmat U aloch Chief Execu e Officer

Page 4: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

R-A n —

FORM - 1

QESCO Company Statistics

Actual Projected

Peak demand 1,839 2,127

Number of Consumers 588,688 601,154

Area 43% of Pakistan 43% of Pakistan

Circles 6.00 6.00

Divisions 13.00 13.00

Sub Divisions 57.00 60.00

Length of Feeders 35,363.00 35,863.00

Average Length of Feeders 55.00 51.00 Maximum Length of Feeder 160.00 140.00

Minimum Length of Feeder 7.00 6.00

Target for new connections

Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00

Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length of Low Voltage Distribution lines (400 V) 15,159.00 15,209.00

Number of HV transformers Number of burned down HV transformers Number of STG transformers 144.00 161.00

Number of burned down STG transformers 0 0

Number of LV transformers 55,363.00 55,863.00 Number of burned down LV transformers 0 0

Strength Cost

Number of Employees

30.6.2017 Actual

30.06.2018 Projected

30.6.2017 Actual

30.06.2018 Projected

A Officers 295 300 130 144

Staff 6440 6490 2847 3124

Total 67351 6790 2977 3268

1

Page 5: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 2

QESCO Profit & Loss Statement

Power Balances

2, 44 Determined Projected

4"

Projected

Units Received [MkWh] 5,125 6,844 10,995

Units Lost [MkWh] 763 1,554 2,474

Units Lost [%age] 17.50% 0 22.50%

Units Sold [MkWh] 4,362 5,290 8,521

Revenue

Sales Revenue [wn Rs] 61,200 58,365 93,620

Subsidy [Mtn Rs] 0 16,004 24,447

Total Sales Revenue [Min Rs] 61,200 74,369 118,066

Amortization of Def Credits [Mln Rs] 0 477 571

Other Income [Mln Rs] 1,267 343 361

Total Revenue [Mln Rs] 62,467 75,189 118,998

Operating Cost

Power Purchase Cost [Mln Rs] 47,289 58,636 98,917

O&M Expenses [Mln Rs] 4,379 4,249 4,659

Depreciation [Mln Rs] 916 2,584 2,855

Total Operating Cost [Mln Rs] 52,584 65,469 106,431

EBIT [Mtn Rs] 9,883 9,720 12,566

Financial Charges [min Rs] 0 3,135 3,135

EBT [Non Rs] 9,883 6,585 9,431 Tax [Mln Rs] 0 2,305 1,739

EAT [Mln Rs] 9,883 4,280 7,693 Profit for the period [Min Rs] 9,883 4,280 7,693

2

Page 6: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Pc-nne"--- 8

QUETTA ELECTRIC SUPPLY COMPANY

IGTDP

FROM 2016-17 TO 2020-21

Page 7: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Investment and Financing plan

Investment Plan Achievable

Rs in Million

2016-17 2017-18 2018-19 2019-20 2020-21 Total

DOP 157.00 231.37 227.73 254.93 328.23 1,199.26

ELR 472.30 598.39 682.47 693.55 872.60 3,319.31

STG (WITHOUT ADB) 1,746.00 6,288.00 4,633.00 5,017.00 3,808.00 21,492.00

ADB 1,358.70 3,381.70 4,740.40

Village Electrification 2,240.00 2,850.00 3,598.00 4,224.00 4,811.00 17,723.00

Meters 42.16 48.69 56.24 64.96 75.03 287.07

MIS hardware/software 30.91 35.64 14.96 15.60 16.78 113.89

Vehicles 209.50 17.16 17.10 62.12 305.88

Other plant & Equip 53.87 125.68 82.87 93.06 86.94 442.42

Total 6,310.44 13,576.64 9,295.27 10,380.19 10,060.70 49,623.24

Financing Achievables Rs in Million

2016-17 12017-18 2018-19 2019-20 2020-21 Total

Tariff financing 2,601.04 I 7,222.90 5,562.73 6,007.85 5,086.15 26,480.67

Loan 1,358.70 I 3,381.70 4,740.40

Grant 2,240.00 2,850.00 3,598.00 4,224.00 4,811.00 17,723.00

Consumer contribution 110.69 122.04 134.55 148.34 163.54 679.17

Total 6,310.44 13,576.64 9,295.27 10,380.19 10,060.70 49,623.24

Page 8: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

• 'A.

Vehicles Nos

Make & Model 2016-17 2017-18 2018-19 2019-20 2020-21 Total

Heavy Vehicles 16 0 0 0 7 23

Light Vehicles 5 3 0 8 4 20

Bucket Mounted Trucks 12 0 0 0 0 12

Jeep/Cars 0 6 0 0 0 6

Total 33 9 8 11 61

Rs /vehicle

Make & Model 2016-17 2017-18 2018-19 2019-20 2020-21 Total

Heavy Vehicles 6,500,000 6,760,000 7,030,400 7,311,616 7,604,081

Light Vehicles 1,900,000 1,976,000 2,055,040 2,137,242 2,222,731

Bucket Mounted Trucks 8,000,000 8,320,000 8,652,800 8,998,912 9,358,868

Jeep/Cars 1,800,000 1,872,000 1,946,880 2,024,755 2,105,745

Total

Rs in Million

Make & Model 2016-17 2017-18 2018-19 2019-20 2020-21 Total

Heavy Vehicles 104 53 157

Light Vehicles 10 6 17 9 41 Bucket Mounted Trucks 96 96

Jeep/Cars 11 11

Total 210 17 17 62 306

Page 9: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

e„.

Meters & Capital Contribution

No of Meters

Meters type 2016-17 2017-18 2018-19 2019-20 2020-21 Total

Single phase 7,860 8.253 8,665 9,099 9,554 43,430

Three phase 3,693 3,878 4,072 4,275 4,489 20,408

TOU LT 254 267 280 294 309 1,404

TOU FIT 65 68 72 75 79 359

Total 11,872 12,466 13,089 13,743 14,430 65,600

Cost per meter

Meters type 2016-17 2017-18 12018-19 12019-20 2020-21 Total

Single phase 1,650 1,815 I 1,997 1 2,196 2,416 10,073

Three phase 6,900 7,590 I 8,349 1 9,184 10,102 42,125

TOU LT 11390 12,529 1 13,782 1 15,160 16,676 69,537

TOU HT 12500 13,750 I 15,125 1 16,638 . 18,301 76,314

1

1 Total 32,440 35,684 39,252 1 43,178 47,495 198,049

Cost of meters

Rs in Million

Meters type 2016-17 2017-18 2018-19 2019-20 2020-21 Total

Single phase 12.97 14.98 17.30 19.98 23.08 88

Three phase 25.48 29.43 34.00 39.27 45.35 174

IOU LT 2.89 3.34 3.86 4.46 5.15 20

TOU I IT 0.81 0.94 1.08 1.25 1.45 6

Total 42 49 56 65 75 287

Capital contribution

Categories

per consumer

2016-17 2017-18

Nos

2018-19 12019-20 2020-21 'Total

1 1

Domestic 5100 5355 56231 5904 61991

Commercial 15000 15750 165381 17364 182331

Industrial 113000 118650 1245831 130812 1373521

Bulk 0 • 0 1 0 01

Agriculture 65000 68250 716631 75246 790081

Others 65000 68250 716631 75246 790081

Total

Capital contribution Rs in Millie

Categories 2016-17 2017-18 2018-19 2019-20 2020-21 Total

Domestic 44.54 49.10 54.14 59.69 65 80 273 27

Commercial 42.30 46.64 51.42 56.69 62.50 259.53

Industrial 7.35 8 10 8 93 9 84 10.85 45.07

Sulk

Agriculture 16.32 17.99 19.83 21.86 24 10 100 10

Others 0.20 0.21 0.24 0.26 0.29 1 20

Total 110.69 122.04 134.55 148.34 163.54 679.17

Page 10: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Computer Equipments Hard Ware

Nos

Type 2016-17 2017-18 2018-19 2019-20 2020-21 Total

Desk top 100 10 2 10 20 142

Lap top 20 20 1 10 10 61

Servers 2 1 1 0 0 4

Modems 0

Routers 0 3 1 1 5

printer 100 10 2 10 20 142

UPS 750 VA 100 10 2 10 20 142

UPS Server 2 1 1 0 0 4

Software 9 4 4 3 20

Mobile

total

540 105 15 23 106

Hard Ware

Nos

(Type

a

2016-17 2017-18 2018-19 2019-20 2020-21 Total

Wsk top 8.00 0.88 0.18 0.97 2.04 12.07

I a p top 2.36 2.60 0.14 1.43 1.50 8.03

Servers 2.20 1.21 1.27 - . 4.68

Modems

Routers 0.02 0.01 0.01 0.03

punter 3.30 0.36 0.08 0.40 0.84 4.98

UPS 750 VA 1.40 0.15 0.03 0.17 0.36 2.1]

UPS Server 1.50 0.83 0.87 3.19

Software 27.00 12.00 12.00 9.00 60.00

Mobile 12.15 2.60 0.39 0.63 3.04 18.80

1 otal 30.91 35.64 14.96 15.60 16.78 113.89

'Unit Rate

Desk top 80,000 88,000 92,400 97,020 101,871

top 118,000 129,800 136,290 143,105 150,260

rverS 1,100,000 1,210,000 1,270,500 1,334,025 1,400,726

Modems

Routers 5,000 5,500 5,775 6,064 6,367

printer 33,000 36,300 38,115 40,021 42,022

UPS 750 VA 14,000 15,400 16,170 16,979 17,827

UPS Server 750,000 825,000 866,250 909,563 955,041

Software 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000

Mobile 22,500 24,750 25,988 27,287 28,651

Other Plant & Equipments

!Type 12016-17 12017-18 12018-19 12019-20 12020-21 'Total 1

'Distribution Equip 1 5,387 1 12,568 1 8,287 1 9,306 1 8,694 1 44,242 1

% 4p,e of allocation 1 1%1 1%1 1%I 1%1 1%1 1%

Other Plant & Equipment 1 54 1 126' 83 1 93 1 87 1 442'

Page 11: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Grid Staion & Tranmission Lines & Distribution Net WorK

Grid Stations & Transmission Lines

Description

Land (In Acre)

2016-17

8x4=32

2017-18

8x7=56

2018-19

8x6=48

No

2019-20

4x7=56

2020-21

8x4=32

I Building 04 07 06 07 04

New 04 07 06 07 04

G/S in no Aug 01 01 01 04 03

Extension 04 10 10 04 16

1T/L in KM K.M. 50 401 248 267 137

(Total

Description 2016-17 2017-18 2018-19 2019-20

Rs in Million

2020-21 Total

Land 16 28 24 28 16 112

Building 240 427 378 455 264 1,764

G/S Equipment-New 720 1,281 1,110 1,316 760 5,187

G/S Equipment-Aug 60 62 65 260 198 645

6/S Equipment-Ext 260 680 700 288 1,200 3,128

T/L Equipment 450 3,810 2,356 2,670 1,370 10,656

Total 1,746 6,288 4,633 5,017 3,808 21,492

Rs in Million

Description 2016-17 2017-18 2018-19 2019-20 2020-21 Total

Independent Feeders 48 79 95 141 186 549

Villages 2,192 2,771 3,503 4,083 4,625 17,174

Total 2,240 2,850 3,598 4,224 4,811 17,723

Page 12: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Addition In Consumers

[

Addition

[

Domestic commercia l

' Industrial Bulk Agriculzure Others Iota!

Incremental Sales

r tagones

Domestic

Incremental Sales

ratacories

[ Domestic Commercial Industnal

are

nge

Incremental Sales

Cat

Donn.st Commercial Industnal Bulls Agriculture Others I oral Curnmulanve Sale

Savings In MkWh

Commercial Industrial Bulk Agriculture Others total

I tummulative Sale

incremental O&M

Salaries 6 Wages Maintananee Vehicle espenses Travelms Admen expense Miscellaneous

Ilmal

R5 in Million 2019-70 2020-21 luta!

75% 69.24 7201 74.95 77 93 87 49 381.69

14% 1290 1342 13.96 14 53 1610 71.11

4% 3.83 3.98 1 4 15 4.31 4.84 I 21.11

3% 3.02 3 14 1 3.26 340 3.311 16.62 I

2% 1.39 1.441 150 1.56 1.75 I 734 I 3% 2.31 2 40 1 2.50 1.60 292 I 17.73 1

92.36 96 09 1 99 97 104.01 116.70 1 509.14 1

Allocation %

2016-17 2017-18 12013-19

Sales Mn Cosumer Mix

Benefits and

2016-17

Cost

2017-13 2018.19 2019-20 Nos 2020-21 I t

74% 8733 9170 9623 10110 -106151 482551 24% 2820 2961 3109 3265 34791 155321

1% 65 68 72 75 0% 0 0

350

70 1 1

2% 251 264 277 ° 291 3051 11871 0% 3 3 3 4 1 12 [

100% 11872 12466 13089 13743 144161 656001

Mkrih

Sales Mi. Sales in Ml(wls 2016-17 2017-18 12018-19 12019-20 2020-21 1101,1

1 1 15% 19 07 19.45 19.34 1 20.74 22 26 1 100.88

3% 3.34 341 3 43 3.55 3.90 17 69

3% 4.06 4.15 423 4.31 4.74 21 50

2% 2.69 2.74 2.80 2.65 3 14 14.21

77% 96.03 93.01 99.91 101.97 112.16 s0819 1

0% 0.07 0.07 0 07 0.07 0.08 0.36 1

125.32 127.83 130.33 132.99 146.29 667.3] 1 125.32 153.15 383.53 516 52 662.31

Rs/kWh

Sales Ml. Sales In MICsvh 2016-17 2017-13 1201819 2019-20 2020-21 [Total

15% 13.41 I 13.60 13.95 14.23 14.52

3% 14.54 1 1.1.53 15.13 1543 15.74 3% 12 13 I 12.37 12.62 12 87 13.13

24 11.87 12 11 12 35 17.60

77% 11.6H 15.21 15.51 15 B2 16.14 16 46 1

0% 11.731 11.961 12.20 12.45 12.70 1

14.74 I 15.03 I 15 34 15.64 15.95 I

Rs In Million

a le Sales in MIO.vh 2016-17 2017-113 2013-19 201920 12010.21 Total I

1 1 15% 256 266 277 2831 373 1.4101

3% 49 51 53 55 I 61 268 I

3% 49 51 53 56 67 272

1% 31 33 34 35 40 172

0 1,461 1,520 1,582 1.616 1,5-1/ I

1 8,056 77%1

% 1 1 1 1 4

I 1,847 I 1972 I 1,999 I 7,090 I 2,334 10,133

I 1,347.20 I 3,805.97 15,881.56 3,07944 I 10,575.07 J

12016-17 12017-13 12013-19 12019-20 12020-21 (Total I DOP 1 696 1 8.97 I 9.03 1 9.15 I 11.00 1 45.11 1

I18 1 16 BO I 21.86 I 25.63 I 21.00 I 29.00 I 114.34 I 10141 23.76I 30.831 34.711 30.15 I 40.001 159.451

Savings Rs in Million

12016-17 1 3 5 382017-1113 12018-119 1 432019-2 10 12020-71 178 1ptal

248 1 379 1 390 I 378 1 463 1 1,761 I

350 I 464 I 532 1 472 1 638 I 2,4 51 J

Incremental PPP

2016-17 2017-18 12018-19

162 75 166 01 1 169.33

8.94 9 12 1 9.30 1,455.01 1,513.811 1,574.95

162 75 3287'6 493 09

1,455.01 2,997.91 1 4,632.82

2019-20 2020-21 Total I

172 72 189.99 8611

9.49 9.63 I

1,633.53 133549 4,0711

670.31 360.79

6,364.06 8,37981 I

Units purchase PPP/kWh PPP Cummulauve unit8 Commutative PPP

Page 13: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Cash Stream

Year Investment

Cunrndially einvestment

6.310 44

Additional

benefits Rs Million

2,19742

Additional PPP (Rs Million)

Gross Profit O&M Expenses Rs In Million

92.36

Depnciatio n 3 5%

Total Expenses

Net Profit

Net Inflow

2016-17 6,31044 1,455.1 1 742.41 271.89 1,819.27 378.15 650.05

2017-18 13,576.64 19,887.08 4.269.49 2,997 11 1,271.58 96.09 396.86 3.490.86 778.63 1,175.49

2018-19 9,295.27 29,182.35 6,413.85 4,632.12 1,781.03 99.97 582.29 5,315.08 1,098.77 1,681.06

2019-20 10,380 19 39,562.54 8 551 05 6,364 ( 6 2,186.99 104.01 1,455.22 7,923.30 627.75 2,082.98

2020-21 10,060 70 49,623 24 11 213.27 8,329.13 2,88343 116.70 1,825.44 10 271 98 941 29 2 766 73

Total 49,623.24 32,645.08 23,77944 8,865.44 509.14 4,531.71 28,820.49 3,824.59 8,356.30

Depreciation

Cost Accumulated Cost Depreciation

2016.17 201718 2018-19 2019-20 2020-21 2016-17 2017-18 2018-19 2019-20 202021 2016-17 2017-18 2018-19 2019-20 2020-21 Dep rate

Building 240 427 378 455 264 240.00 667.00 1045.00 1,500.00 1 764 00 4.80 13.34 20.90 30.00 35.28 2%

Dist Equipment 5.760.16 12,943 15 8.79544 9 771 44 9,614.86 5 760 16 18 703 31 27 498 75 37 270 19 46 885 04 201.61 374.07 549.97 1 304 46 1.640.98 3.50%

Other plant & Equip 53.67 125.68 0217 93 06 86.94 53.67 179.55 262.42 355.56 442.42 5.391 3.59 5.25 35.55 44 24 10%

Computers 30.91 35 64 14.18 15.60 18.76 30 91 66.55 81.52 97.11 113.89 7.73 1.33 1.63 24.28 28.47 25%

Vehicles 209.50 17.16 17.10 62 12 209.50 226.66 226.66 243.76 305E18 52.38 4.53 4.53 60.94 76.47 25%

Total 6,294.44 13,548.64 9 271.: 7 10,352.19 10,044.70 6 294.44 19 843.08 29 114.35 39 466.54 49,511.24 271.89 396.86 582.29 1,455.22 1,825.44

Page 14: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Cash Flow

Benefits

2,197 42

PPP

45501

Gross Profit

742 41

OM

92.36

Cash stream

650 05

Pay Back Period

2 4,269.49 2,997 91 1,271 58 96.09 1.175 49 Investment 49.623

3 6413 85 4.632 82 1781 03 99.97 1,681 06 Consumer Share 18,402

4 8.551 05 6.364 06 2,186 99 104 01 208298 Net Investment 31.221

5 11,213 27 8329 03 2,863 43 116 70 Z766.73 Avg Profit 2.936

6 11,549.66 8,496 43 3053 235075 116 82 2936 41644 Pay flack Period 1 I vows

7 11,896 15 8.666 36 3229 796414 116 94 3112 860961

6 12,253 04 8.839.68 3413 353879 117 05 3298 30149

9 12.620 63 9,016 413 3604 151339 11.17 3486 981890

10 12,999 25 9.196131 3802 44066 117 29 3685 15405

11 13,389 23 9.380 74 4008 401956 117.40 3891.070059

12 13,790.90 9.568 36 4222;543853 117.52 4105.022552

13 14,204 63 9759.73 4444 903755 117 66 4327.264933

14 14.630 77 9,954 92 4675 548126 117.76 4558.091666

15 15 069 69 10.154.02 4915 672774 117 87 4797.798557

16 15.521 78 10,357 10 5164 663145 117 99 5046 691053

17 15,987.44 10,564 74 5423 19463 118 11 5305 064547

10 16467.06 10,775 53 5691 532881 110 23 5573 304667

19 16.961 07 10,991 04 5970 034127 110 35 5051.657705

20 17,469 90 11,210 66 6259 045515 11046 6140.580747

21 1]99400 11.435 07 6558.925453 118 58 6440 34222

lL 10,0Si PC 11.000 10 IX 1 I U WIJY° I le w o751 4au44

23 19.089 83 11.897.05 7192 763037 118.82 7073 962519

24 19 662 53 12,134 99 7527.537041 110 94 740059770'.

25 20,252 41 12 377 69 7874 713076 119.06 7755.654791

26 20,059 98 12.625 25 8234 731391 119 18 13115.55405

27 21 485 75 12 877 75 8608 025793 119 30 8488.72921

28 72,130 35 13,135 31 6995 044077 119.4] 8875.62826

29 22.794 26 13.395 01 93% 240459 119 54 9276 71323

30 23,478 09 13 665.97 9812.116034 119 65 9692 46127

Year

Page 15: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FINANCIAL INTERNAL RATE OF RETURN IF Benefits Decreased by 10%

51111AL PRLSENT 0401411$ COST Al S0N1 W08716119097110 AT - NET leirrEPENT KATES 01179140N1 RA 9E5 PTITSLI41 6014111 NLT

6E917115 Al a1 F94/597460115

C. COS I LIENEFITS

TOTAL FROM

CAPITAL CON-49W NET TOTAL

0E71E0115 SAVING OF

COST 1108 U7 CAPITAL COST COST POVILR

CONSUME 74A

COST (M11144) 0% '0% 12% 0% 10% 17% BV. 10% 17%

701512017 6310 44 235069 3950 74 1547 37 5507 12 197768 -3570441 5507 1171 5507.117191 6507 11719 1077.67835 1077 57036 1977 07835 -3529 030 0529435 .3529 4391 701712118 13576 64 2677 04 10604 60 3094 00 1369060 3542.54 -065606112603 NI 37730 695 3567 00980 3493 22061 1110 04107 9125 E37 .0980.054 0900 053 201817016 9295 27 3732.55 5455273 4732 40 10295.52 5772 47 -4523 051 119213 751

12455 2749i

P1500 5961)3 9207.52725 4948 9604 077061172 4601 77568 187709 .3710062 3505 752

701912020 1038019 4172 34 6007 05 6458 07 12475 93 7595 55 4779 961 9903.7941 9373 345031 8890 11581 5309 26943 5782 07754 5477 67179 -3794 504 -1591271 -2402297

202012021 10260 70 4974.54 5066 15 8446 53 1353268 10091 94 -3440751 9946.9271 9243.605761 8600 25570 75117 67059 6892 93026 5413.60961 2425 051 2350 075 .71880%. 702111 2027 4313.25 8813 25 1039470 176,451 5862 0311 5340 148971 4907.36704 7074 45637 6454 29575 5898 21045 1312475 110614 10108)36 02212023 1378229 470329 10759 54 1923 25 5534 0841 4057 936751 4449 68043 6746 93524 8043 56175 5434 7655 1211 077 1085827 574 3;007

707312024 055674 8958 74 17027 73 2071.00 5228.17 4596 2771 5658 97146 4985.30702 1258 4372 1067 149 938 81417

207412025 0122 65 91]]65 11358 57 2224 9) 4934 525 4760 9135

4051 57701 5434.57712

3605 92705 6134 58063 5258 85509 4507 5345 1202 0545 1017 941 55960745

702512026 921409 9314 09 11699 32 238573 4559 365 3950 0851 ]15075576 5452 574140 406165572 421E159333 1191. 20115 1011 57 860 13757

___13021312027 049615 9499 15 12050 30 2552.16 429948 31361 64711 3052149)5 5581.02196 1162 1415 10304204 871 72575

217 21179 900506 958596 12411 61 2725 03 4159 106 1394 04194 2711185904 5323 21354

48459135]1 39/9 87512

4350 2644E1 3565 99574 7/091055 9554 770 .999474

02812029 0877 36 9877 26 12754 17 790600 2922 437 3147.23276 2535 77390 5076 768.47 407)429.17 3251 37716 1754 1311 976 1457 In 035: 02912030 10072 66 10072 68 13157 59 3095.01 3703 702 2917 56589 2308.39755 4041 73255 3014211231 3017 59507 1 138 0305 89E5155 709 79751

0)017031 10271 89 1027109 1356272 329083 3497 179 2704 91085 3101.03207 461757E155 35714007 1 2775 20171 1720 3992 505 5187 673 3699

203112032 10475 09 15475 59 1395960 1154 54 1302.196 2507 85356 1913 70001 440] 11018 3344 212151 2552 14443 1101 5157 835 5566 676 4344) 24 32 1 za 33 1062235 10682 35 1430009 3708 14 3110 070 2374 724006 1742 52798 4199 92705 3131.396651 2347 10730 1%1 9454 806 5070 604 5E145

02312024 10853 75 10893 75 14020 35 3926.90 2944 244 2155 27118 1566131364 4055.49125 2932.12783 2154 50054 16E1 2377 774 5554 571 411680

7034 2035 11109 28 11109 36 15254 96 4155.58 2750 112 199E117016 14446596 3670.04231 2745.53742 19950496 1 03593 747 4 177 540 39

2035 2016 1137537 11329 32 15772 91 4393.59 2025 541 1652.43407 1315 41106 X43.16849 25/082102 Ian 53659 1018 047c, 7163872 50117553

ZH 703617037 11553 66 11553 58 16192 60 4040.94 2415 817 1717 37758 1197 73031 3474 52236 2407224 07 167154177 995 70584 ,o39 7.603 1 51

21 203717638 1170744 1178248 48690 44 4897 96 2340 057 15921729] 1590 58156 3313 55494 2754 0270 1543 91105 973 0074. 11572 4+3 31179

. H701512(3.15 12015 67 120158'7 17100.05 5164.98 7210.706 1474 101411 993021916 3100 25443 211059830 14198X85 957 0459 434 4459 4-.0 57484

23 703917040 177539] 12251 93 1769620 5442.34 7097 037 1368 49852 984 192571 3013 540375 1976 29756 1]0577707 9269745 791 401 575,9

24 1204012541 124%75 13495 75 18227 15 5730.41 1070 725 1208 74007 023 212202 7874 41161 1850 52313 1200114395 90]-0751 1017837 37 7 53175

75 1704112047 12744 47 1774442 18773 99 002950 1800.914 7741 337 10 17327632 1104.34755 087 1711 5511 5039 7S3 671144

217041 12997 05 1295705 19331 20 6340.15 1757.224

1170 259251 749.569125

1000.52316 683.615455 2614 42)43 1622 49645 1015 50535 957 1si6 53 1 9731 472 05999 H04

27 254)12044 13754 72 1325472 6662 5. 1519 24E67 913 944205 838 5540 558 7077 1743255

20 1204412045 13517 55 13517 5 160"" 75514 03 0997 2

1559 3111

1506 865

1011. 019491

937 152011

OD 561351 2493 3953

505 969609. 2377 9508 1472 56734 459.941059 911 08159 495 2153 7'1'977177

75 1704512045 1378503 1376553 21130 291 7)44 1479 5771 8E9 0377521 515 351987 1 2257 WOO 1332 040131 709 919040 788 25111 28/00251 274 56714

1 1 1 43823.241 184024 31271 07 709387 77 330608 7 4011153 591 77754.8 11418001141 107]70751 117197 541 130102 05 104141.051 66261 74 31511 40 7529 041 .5535 00 1

5419111e66 VNue 315819 Brent 7007 596 104 1

2679 54i .0535 87 0 971 0 911

IFIRP

Page 16: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FINANCIAL INTERNAL RATE OF RETURN IF Benefits Decreased 8 Cost increased by 10%

SERIAL EARS 11110‘11K WORT11 COOT AT PRESENT W014111 LIENEFTIS AT PHLSLIJI WONIII NET 51DIFITERENT RATES DIFFERENT RATES 1411411115 AT 0161 [BENI HA MS

BENEFITS

C:051 TOTAL PROM

CAPITAL coal

0511141038 11014137 0345335E

NET CAPITAL

COST 3:;49

TOTAL COSI

RESIEFITS SAVING OF POWER IM.124)

R5 5% 10% 1255 8% 10% 12% 8% 107. 17%

20181201 094140 2574 59 430030 1547 37 5914.14 W77135 .3938 441 5914.16 5014 1609 5214 113083 W77 07038 /977625361 192]62535 -3936.407 393E 49 3933 407

201712010 14934.30 3257 04 1107720 3094,00 14771 27 3842 55 -10920 771 13977.1 13421 424 12158 4307 3557 005188 3430 84157 .101W 19 -9536 203 5757 785

701817015 Iona so 409235 013145 973200 1080515 5772 4 -9011701 91152 5979 54511 5661.71044 45409614

3491 720611

47]0 61422 4601 775513 -4366.34 .4309 94 -1059935

201012070 1141071 4794 74 057347 845007 1319155 7095 9 55395001 10397,5 9035 87293 9315 35447 01179 25943 5782 07754 5477 82170 4253703 1053755 .1440413

202012021 11065 75 5455.54 58412 84465] 14057 65 10091 9 -3955721 10332 9601567 8933 116341 7417 87659 80%03026 13.1 13 609.81 2314019 7705 517 -2570294

202112022 001]35 001325 10394 70 1751A51 5562.03 5340 1459 4591]8784 7074_45537 6454 2092 5698 23045 1212 475 1100 14 1010 I■426

202212023 078].29 13703.29 10705 54 1973 251 5534.98 4957,93975 4449135943 5745 93524 6043.56175 5474 7655 1211 971 7055 577 574 37507

702312024 095674 8950 74 1107773 2071 001 5220 17 4596 2221 4051 57255 6434 57713 555897148 4990 38702 12004072 1057 745 916 51417

202412025 913365 9133 65 11350 52 7724 921 4934 53 4250 91398 3605 02705 0136 68004 5298.6559 4587 5345 17020545 1037.941 490 60745

702512028 931409 951400 11599 32 2305.211 40593 395000510 3350 75575 51153 57445 486105522 4218 85333 1193.2065 1011 57 B00 13757

70262027 949515 049915 12050.30 2551101 43913443 3561 94711 3093 14035 5581 6219B 4845 013531 3579 57512 1182.1410 5515054 527 72576

2027 20213 9085.08 940580 941151 77159314154.11 3394 64104 2754 45904 5323 71354 4350 25440 3568 09944 1159 1055 5554226 7538494

07812075 907738 9877,30 12784 17 296501392244 314773270 25352%]49 5070 76047 4073 473471 ]25137716 4543371 926 7937 746 103E7

02912030 1007280 1007260 131137.89 1395 011 3703 2917 69565 2300 39755 4091 73759 3114 211231 3017 69507 1136 0305 5565155 709 29751

203012031 1027189 1027105 1156272 2101 83282 461757059 3571 45571 2775 70171 1320 3592 1306 5707 VI 3669

03117037 10475 29 10475 09 13969 60

3290 831 3497.101 2704 91046

3194 51 330219 2507 55355 1913 75001 4433 5018 3344 71715 2552 19443 11015162 BSA 5550 638 43443

01712033 10602 35 1950735 14]8009 3700.341 311505 2124 79088 1747 57255 e1N 92209 3131 39655 2347 10734 1081 5450 8064618 604 5045

703312034 1089375 10093 75 14070 35 3975 501 3044.24 2155 27118 1586 01364 400546135 2937 17787 2158 50054 4051 7377 775 0700 5 79

203412035 11100.38 11109 30 625406 4155 581 2750 11 .70a9 1 0144586 MX 04731 2745 53787 1085 0493 1039 53 741 4171 94.0 35

03512036 11329 32 11319 32 15722 91 4393 591 782514 165241107 1315 41106 3643/5549 7570 821E2 1525 53669 1015 0479 715 3877 5. 6553

20 703512017 1155366 11553 60 1619460 4040 941 247682 41337750 1197 73031 3474 52216 2407 22407 18/054177 595 70507 0846465 461111E7

203712036 1170240 198240 16650 44 4597 961 2340_68 1597.17293 1090.58150 3313 5048 27`5403709 1543 93485 973 00794 6616047 45735373

22 203812039 1701507 1201507 17180 85 5154 501 7210 21 1476 10146 993 071816 3160 25441 7110 59835 1619 861365 950 04027 634433 42600564

73 203912040 12252 03 1225393 1769620 5442.341 2007,03 1364 49552 004 192571 3013 94635 7305 77707 925945 en: 797 401 07949

24 254012041 12496 75 17495 75 15227 16 57E1411 1970 73 1258 74007 923 312705 387441181

19719 757581

10505235 1700 54395 901 55253 5917037 Er 57173

25 204112042 12744 42 17144 42 1577 3 95 602.551 1800 91 1170 75920 749 569125 2791 33715 1732 7532 1104]4755 00642316 565039 731 67844

75 1709205 1250.05 1933710 8340 151 1757 22 1060 53316 652 515455 7814 42343 1522 456451 1015.80535 557.16960 5319%33 137 58985

77

170471264

204] 7044 1375472 13754 72 19017 32 80.92 591 1659 32 1011 03549 571504'6 7493 1853 1510 245671 931594E75 83406085 505 2072 317 43255

21_1704412N 1351255 1]51755 20514 03 89.9121 1590 57 937 352011 585 959009 23779590 1477 657311 855 941099 1311 09159 4 SE 7157 292 97179

463 0075 774 91119 29 1204511204 1378583 137954] 2113070 7344 651 47955 869 037702 51535/807 2267 86045 1332 040331 799919040 WO-41 745 211317 .

1 1 54545.56 30174.41 34411.10 299307 72 031795 07 408303.39 74551 711 11044.40 95350.3 13010205 101741 1181 95251.74 395.141 -5303.51 9176 511

1 No PPICIOani Value So Benign Cos Sabo WEN 0.125-

Page 17: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FINANCIAL INTERNAL RATE OF RETURN IF Cost increased by 25%

SERIAL YEARS ARCSENT 7131491 COST AT 0085E91 WORT11 BENEFITS AT MASI NI 700X)11 NI T Nil 0111-ERENT RAILS

17 EFIE01mIT DIFCER1.141 RATES NL111S 1 Ull FFM NI idAlLS

CAPITAL COST

C.COST CONTHIUU

TION 057 CONSUME

NEI CAN FAL

COST

OBM COST

TOTAL COOT

10IAL UENE3 ITS SAVING OF

POWER 50. 0,7

88 0% 90% 17% 5% 1074 1271 554 10% 12%

,02:17 1 2200

708805 281000 4977,35 1547 37 052473 2197 42 4327 311 8524 7203 0539]%30 21972704 2197 4204 7157 4704 4127 306/ 9727 306 -4377 105 2 M 1807080 4600,05 13286 26 3094,50 103130 79 4289 40 -15110.1x1 157E1 91 108911/75

1462]2039

14625 23,7 3952 2331 3301 3562. 3812 0463 -1131160 .11009 ;5 10513 19 1201017019 1161800 090704 4733.00 1171994 541385 )5305 991 10047 874 968511107 9342 98574 54 95 84489 5300 754139 5113 08408 -539029.410514 4235901 1701017020 1297524 617013 7546 90 646907 14014 08 855105 -542.611 0/175 54 10573 0558 03x558292 0780 0933/ 6474 5305 13013 413555 -331.. .2105128 '3805111 1207012021 17575 87 00328 13305 5 0488 53 14945.11 )1213 27 /1131641 10911 590 10139 4060 9434 33404 8247 00509 71350 B1141 713/23313 7960 513 7.180 597 2305 102 1207117072 8613 75 6017 25 1154905 2038 421 5862 0714 5140 14002 4557 30704 7550 50708 7171 4325 0557 55930 1059 4757 1673 2134 M66 2015 12012212077 878329 078329 11078.15 3117 801 5574 9643 4957 03975 4449 58943 7996 59472 8715 05881 8076 90)67 1951 5304 1757 129

1202312024 8956 74 0958 7 12753 On 7796 301 5226 1659 459/72219 4051 57250 7149 53015 0707 74555 5542 55725 1973 3603 1811 074

1537 07721

1591 0794

)

702417025 9133 65 913305 12820103 9186 981 4034 6255 5200 91398 36136 92705 5518 57735 5807 61077 5097 26055 153 9075 1320 703 14083325 202512026 9314 00 0314 09 1209075 3605151 4059 368 3950.05519 3358 75576 0502 56054 551205075 4557 65976 1847 4915 1567 565 1321 9035

20227M 049815

9685 00

9490 15

960500

1310923

13790 90

]89108 433111031 7861 94711 MS5149751

299 45904

8201 63219

5991 65171

5157 121914

4533 675

4310 97735

3364 55403

1682 2-27

1750 5793

1 ;00 170 9157 071

I 1/n. 795 II NO 0554 4195 07 4154 1079 1394 BA 184

1 170252F129 0877,36 0677 16 14704 03 4327 211 3M 4374 3147 23775 7535 77149 5540 55155 45319 03775 7645 97457 1710 419 1378 /1 1111 7011 I 1202612030 9007208 10072 013 14571) 77 4558 091 3707 7024 7917 89565 2101 30;55 5379 70321 4730 01245 3352 99452 1576 091

I._1703012031 1027109 10]7158 15069 09 4797 801 3497 1704 070491040 2101 53782 5130 847511 3960 32070 31301 55789 1617 453n '25581 961177.5-:

203117032 1917509 10475 00 15521 78 5046 691 3207 1555 2507 65356 1013 26001 4093 11311 3715 70177 2E135 77159 MO 9275 1309 198 972 01+39

1 2032 7033 10682 3 10007 75 15057 44 5305081 3118 0765 727379 1747 52788 8686 5601 3479 33113 2607 59709 1548 5536 1159 57 165 37421 2034 1069375 10503 75 '5467 05 5573 101 7048 2435 21552716 1505 61364 4450 53477 3257 9110 119.8 33393 1505 219 1102444 6 , 1 77123

1 20312035 11109 75 11109]8 1898107 5351 601 7750 1123 1990120/0 148405'96 4244.85145 3150.50763 720511 567 7934 7709

1 2035 2036 11329 3 11329 32 17409 90 13140 581 7825 1406 58574146) 1315 41106 4047 50727 7550478 7075 3781 142- 8460 1011 03 55 7772 50310097 20 1203612037 1155300 11553 86 17904 00 6440 341 7478 5165 1717 37758 1197 73031 1850.58541 2674 9934.1 1805 37575 13131 7139 957 3155 36704594

2 2037120313 I- 1178240 1170248 15531 02 5751 341 7340 8560 1552/7291 1090 55156 3081040831 2504 .8565 /71580110 1341/929 9121107 594 90151

27 1703512079 1701587 1701567 19009 83 7073951 2210 7555 1476 1014.9 993 071016 7511 391137 01 2145 129 157; 63168 1/8/ 1013 005 09/11 584 51017 n 120391290 1725393 172539] 19152 53 7408 601 2007 0319 136040/52 504 107571 13/007971 7195 87508 1450 55785 1,317978 127 3705 59836579 24 1291017041 12896 75 12496 75 27252 41 1755 651 1370 7293 1265 74007 97131775- 3193 790891 7056 13756 1 723 0515 %, 5575 710 95885 75 1705117042 177444 12744 47 2085990 9115 551 13301,14 1925 20294 1727 0528 145 1162 745 0337 477 35377 26 1204212043 17007 05 17997 05 21485 713 5455 731 1757 2237

Ilia 25921 745 6691751

109052316 812 815455

3045 930211

7904 91997 )802 77151 1179 45010 n7 5513 112 7,31 485. 8:1191 2? 204312034 13254 72 13754 72 27130 35 5215511561 2t75 42017 180805157E 1737 77134 )111 1117 071 51' 1 /05307955

26 1204420F1,5 13517 55 13517 55 22704 26

5875 571 M59 31551 1011 03949

9370 711 151513650 93:35:011 155.9655011 29215756 1546 63031 958 175951 15752'1511 .131 31047..15

79 1204517046 1370583 17785 63 2].17809 0691 461 771713 57771 1369 537752 515 3516171 2510 13143171 1410 34716 en 687029 10411 99/8. 7119i% 967 11%1

1 1 6702905 87532.02 3919013 799387./1 135583 05 45373732 175153 471 133351 ell 114050071 59774.481 144557 131 510171 95 05845 30 10700 01 2377x91 1450 101

411 P•esani. Vous Saner/ Eusi 0.59;

10'9 91 7377 551 -175 101

"1°2 5010 11170 77%

L

Page 18: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Calculation for Operation & Maintainance Expenses

Description

Provisional

2015-16 2016-17 2017218

Projected

2018-19 20219-20 2020-21 Total

Sa!cries 2,702 2,977 3,268 3,707 4,067 4,463 18,482

Admin 137 144 151 159 167 175 796

Repair & Maintainance 523 597 683 809 939 1,078 4,106

Traveling 194 208 219 230 241 253 1,152

Vehicle 237 259 272 286 300 315 1,431

Other 60 63 66 69 73 77 348

Total 3,852 4,249 4,659 5,260 5,787 6,361 26,316

979

Other Income 4,831 Provisional Projected

Description 2015-16 2016.17 12017-18 12018-19 120219-20 12020-21 Total

Other Income 327.00 343.351 360.521 • 378.541 397.471 417.34 1,897

1945

Units To be Sold

1618

327

Description

-nits Sold

TT& D Losses

'Units to be purchased

1 Provisional I Projected I 12015-16 12016-17 12017-18 12018-19 120219-20 12020-21 1

I 1 5,290.12 1 8,521.28 1 11,005.10 1 12,054.34 1 14,165.96 1

I 1 22.70%1 22.50%1 22.30%1 22.10%1 21.90%1

I 1 6843.62651 10995.2021 14163.581 15474.1161 18138.2351

Total

51,037

22.30%

65,615

calculation for Power Purchase

Provisional

Description 2015-16

Generation country wide

Efficiency factor

De-rated capacity

Demand of QESCO

Quota

Quota reserve for QESCO

QESCO drawl

QESCO drawl Units purchases (MkWh)

T&D Losses

Ailiniits Sale (MkWh)

V

MW

Projected

2016-17 2017-18 2018-19 20219-20 2020-21

23574 31191 40179 41458 46038

80% 80% 80% 80% 80%

18,859 24,953 32,143 33,166 36,830

1,735 1,839 1,949 2,066 2,190 2,322_

6% 6% 6% 6% 6% 6%

900 1,132 1,497 1,929 1,990 2,210

70% 70% 85% 85% 90% 95%

630 792 1,273 1,639 1,791 2,099

5547 6,844 10,995 14,164 15,474 18,138

23.93% 22.70% 22.50% 22.30% 22.10% 21.90%

4,220 5,290 8,521 11,005 12,054 14,166

Total

Page 19: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

CPPA

Central Power Purchasing Agency Guarantee Limited A Company of Government of Pakistan

CPPA-G/2Q15/QESCO/169

Dated: August 20, 2015

Chief Executive Officer,

Quetta Electric Supply Company Limited,

Headquarter Zarghoon Road,

Quetta.

Subject: Power Procurement Agency Agreement

Enclose is'the Power Procurement Agency Agreement in Original signed between Quetta

Electric Supply Company Limited and Central Power Purchasing Agency Guarantee Limited on June 3,

2015 for your record.

Muham Amjad

Chief Executive Officer

CC

joint (pone... Fi

Qh Floor, Shaheed-e-M Mat Secretariat, Jinnah Avenue, Blue Area, Islamabad. Phone: 051-9213616 Fax: 051-9213617.

www.cppa.gov.pk

Page 20: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

The Registrar NEPRA, NEPRA Tower Islamabad.

r CrY v

_ -7/0" evi

Phone # 081 9203308 Fax # 081 9202912 E.MaiI [email protected]

No. 4997/ CEO / FD / QESCO / Comp

Subject: Tariff Petition For The Year 2017-18.

1

1

Find enclosed herewith the consolidated Tariff Petition for Financial

+-e-t 91- (1, •

Year 2017-18 in respect of QESCO.

Rehmat Ulla och Chief Executive • fficer

11 ri? gER 1

FINANCE DIRECTORATE QESCO ZARGHOON ROAD QU ETTA

Dated: 16-03-2017

1

Page 21: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

SP*

041 wan

mited, Pakistan

Cheque No . 767.26244

Date D UETIA-COMPLEX 402-A GUTMAN RD. QUETTA RANH.

° - - 11` ri,t,;'‘rAt Ill: 'both 42 :ter

Sian r or orate A mozn, t Ant IP 76 7 262640051, 1649617101A141a000311,0110000/

Page 22: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

ORATE ACCOUNTING QESCO LIMITED QUETTA.

frvt Lx‘c

OUETTA ELECTRIC SUPPLY COMPANY LIMITED

FINANCE DIRECTORATE

OESCO COMPLEX ZARGHOON

ROAD OUETTA.

NO._-1-Aj S /FD/OESCO/: DATED: a'a - 0; - 11

To,

The Director Finance A laturk Avenue (East),

G-5/1,

"\\J`‘ (NEPRA) Islamabad.

Tel: 051-1013200

A4t

;,.\\ Fax:051-2600028

Subject: - PAYMENT OF TARIFF PETITION FILING FEE.

Enclosed find a cross cheque bearing No 76716164 dated: 12-03-2017 for

Rs. 881,184/- (Rupees: - Eight hundred eighty one thousand one hundred eighty four

k only) on account of NEPRA Tariff Petition Fee for the financial Year 2017-18.

Page 23: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

thirty six (36) months from the date of such termination or expiry.

15.6 COUNTERPARTS

15.6.1 This Agreement may be executed in two (2) or more original copies and each such copy

may be executed by each of the Parties in separate counterparts, each of which copies

when executed and delivered by the Parties shall be an original, but all of which shall

together constitute one and the same instrument.

15.7 SEVERABILITY

15.7.1 If any term or provision of this Agreement is determined by a court or other authority of

competent jurisdiction to be invalid, void, illegal, unenforceable or against public policy,

the remaining provisions of this Agreement shall remain in full force and effect and will

not be affected by such determination in any way.

15.8 PARTIAL INVALIDITY

15.8.1 The illegality, invalidity or unenforceability of any provision of this Agreement in whole

or in part shall not affect the legality of any other provision or part thereof

IN WITNESS WHEREOF, the Parties have executed and delivered this Agreement in

Islamabad, Pakistan as of the date first above written.

r1

Central Power Purchasing Agency

(Guarantee) Limited

By 4,00440 ZAW‘Ii4-4 .4‘,40961 ith/IN

Title: Chief Executive Officer

bek—i VUZWIVOCII By:

Title: Ak0 6'4,5e7.°

Witness

Name: in0H1X1,1/1 • Pri fC

Witness

Name:

38

Page 24: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

)vi

Syed Ah dr All Company S cretary

QUETTA ELECTRIC SUPPLY COMPANY LIMITED

Phone # Fax #

081 — 9203313 081— 2832794

Office of Company Secretary QESCO, Zarghoon Road Quetta

Dated: 15th March, 2017

Board of Directors of Quetta Electric Supply Company Limited through circular resolution

authorized Chief Executive Officer QESCO to file Tariff Petition for financial years 2016-17 &

2017-18, Sign all necessary documents, appear before NEPRA Authority along-with his team as

needed and do all necessary acts for completion.

Page 25: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

AT ESTED MAR 2017

ssloner KAKAR

------..Adv°oc Le High Cowl clumps

AFFIDAVIT

1, Rehmat Ullah Baloch , Chief Executive Officer, Quetta Electric Supply Company

Limited (Distribution License # 08 / DL / 2001) being duly authorized representative /

attorney of Quetta Electric Supply Company Limited, hereby by solemnly affirm and

declared that the contents ohhe accompanying petition / application No. 4997 / CEO

/ QESCO /COMP Dated: 16-03-2017, including all supporting documents are true and

correct to the best of my knowledge and belief and that nothing has been concealed. 1

also affirm that all further documentations to be provided by me in connection with

the accompanying petition shall be true to the best of-my knowledge and belief.

Verified on oath this 16-03-2017that the contents hereof are true and correct to the

best of my knowledge aid belief and nothing has been concealed.

DEPONENT

Rehmat F 1 Baloch CHIEF EXE E OFFICER

Page 26: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

QUETTA ELECTRIC SUPPLY COMPANY LIMITED

TARIFF PETITION (2016 - 17)

DISTRIBUTION LICENCE No. 08 / DL / 2001

Page 27: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

QESCO Single year tariff petition 2017-18

TABLE OF CONTENTS

S.NO. HEADING PAGE NO. 1. Petition Summary 2

1.1 Details of the Petitioner 2

1.1.i Name & Address 2

1.1.i Representatives of QESCO 2

2. Grounds for Petitioner's interest 2

3. Grounds and Facts forming Basis of the Petition 3

3.1 Facts 3

3.2 Grounds and Basis 3

4 Key Aims and Features of the Petition 3

4.1 Aims of the Petition 3

4.2. Features of the Petition 4

5 Structure of the Petition 4

6. Tariff Review Formula and Process 4

7. Tariff Methodology 4

7.1. QESCO's Margin 4

7.1.1 Power Purchase Price (PPP) 5

7.1.2 Distribution Margin Formula 5

7.1.3 Interest charged on Load 6

7.1.4 Prior Year Adjustment

7.1.5 Consumers-end Tariff-Setting 6

8 Calculating QESCO's Revenue Requirement 7

R.1 Trends in Consumption 7

8.2 QESCO's Revenue Requirement 7

9. Pray 9

10. Relief or determination sought 10-11

11. Summary of evidence 12

13. Standard formats

J 1

1

1

1

1 1

Page 28: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

I QESI.10 Single year tariff petition 2017-18

QUETTA ELELCTRIC SUPPLY COMPANY LIMITED

Consolidated Petition for Fixation of Consumers End Tariff For the Year 2017-18

Before The Honorable National Electric Power Regulatory Authority

1. PETITION SUMMARY

1.1 DETAILS OF THE PETITIONER:

NAME AND ADDRESS:

Quetta Electric Supply Company Limited. QESCO Headquarters, Zarghoon Road, Quetta.

Distribution License No. 08/DL/2001

ii. REPRESENTATIVES OF QESCO:

a) b) c) d) e) f)

Rehmat Ullah Baloch, Attiq-ur-Rehman Asghar Ali Mengal, Muhammad Khalid, Shafqat Ali, Yasir Faheem,

Chief Executive Officer. Chief Engineer/OD Finance Director. Director Commercial. Addl: Manager GSO. Dy Manager Finance.

2. GROUNDS FOR PETITIONER'S INTEREST

Petitioner being a Power Distribution Company is a bonafide power distribution licensee. In order to perform its obligatory duties prescribed by the Authority (NEPRA) as per NEPRA Performance Standards (Distribution) Rules 2005, the petitioner needs adequate funding. There are three main sources of funding available with petitioner, (i) internal efficiency improvements, (H) borrowings and (iii) adequate revenue through tariff. While the petitioner is already a highly motivated entity towards continuous internal efficiency improvements; yet such improvement measures require commensurate financial resources either through borrowings or adequate tariff. As per general principles of banking industry, international or local, the financial viability of borrowing organization is always taken as fundamental for lending decisions. In short, internal financial viability of a utility is the basic to embark upon and explore other resources of funding; which can only be ensured through adequate consumers end tariff.

QESCO, in its status as power distribution licensee, earnestly feels that the existing tariff does not fulfills its liquidity and financial viability requirements and therefore, is interested in adequate consumers-end tariff applicable to its licen jurisdiction area.

2

Page 29: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

I QESCO Single year tariff petition 2017-18 '

3. GROUNDS AND FACTS FORMING BASIS OF THE PETITION:

3.1 FACTS

1 Under the 1997 NEPRA Act, NEPRA is responsible for determining tariffs and other terms and conditions for the supply of electricity by the generation, transmission and distribution companies and to recommend these to the Federal Government, subject to the need to comply with guidelines, not inconsistent with the provisions of the NEPRA Act, laid down by the Federal Government. NEPRA is also responsible for determining the process and procedures for reviewing tariffs and recommending tariff adjustments.

2 This petition is being filed in Pursuant to the NEPRA tariff standards and procedure Rules, 1998 part-II section 16 sub-clause 6.

3.2 GROUNDS AND BASIS

1 Establishment of end-user rates across consumer categories and potential risk for QESCO.

2 Adjustment of Distribution Margin in tariff to meet with operational expenses.

3 Adjustment of realistic Transmission and Distribution losses in the end user tariffs. Authority allowed 17.5% target losses which cannot be achieved because of low voltage profile, only one source of double circuit 220 KV transmission line, scattered and lengthy network and majority of the consumers are at tail end i-e far away from generation units, independent study of transmission and distribution losses is attached with summery of evidence.

4 Prior year adjustment in end user tariff.

5 Interest on loan allocated to QESCO,

6 To make consumers discipline and minimize cross subsidy.

4. Key Aims and Features of the Petition

4.1 Aims of the Petition

This tariff petition sets out the tariff methodology, required revenues and timetable for rebalancing tariffs in QESCO's distribution area for the year tariff FY 2017-18. The aim of this petition is to obtain approval for the immediate implementation of cost reflective tariffs to yield QESCO's required revenues and rebalancing of tariffs so that the implementation of cost reflective tariffs will benefit consumers and QESCO as it will;

1. Provide signals for efficient usage of, and investment in, QESCO's distribution network.

2. Promote the financial sustainability of QESCO.

3

Page 30: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Single year tariff petition 2017-18 QESCO

4.2 Features of the Petition

This petition proposes the following:

1 A transparent and predictable formula for setting and revising tariffs in QESCO's licensed jurisdiction area.

2 Sufficient average tariff enables QESCO to recover prudently incurred operating costs.

3 Incentives for QESCO to make operating efficiencies and reduce commercial losses.

5. Structure of the Petition

This petition has two distinct components. The first part deals with the tariff methodology. This is the formula that will be used to determine QESCO's distribution margin within control, proposed for the period. The second part covers the calculation of QESCO's required revenue during the revenue control period and also it explains the different components of required revenue including operating costs, investment costs and rate of return.

6. Tariff Review Formula and Process

The tariff formula provides a transparent and predictable way of determining QESCO's distribution margin within the period of control. A formula is advantageous as it reduces uncertainty for the utility and for consumers. It also provides a simple way for NEPRA to incentivize the company to reduce losses and/or make operating efficiencies as required.

7. Tariff Methodology

7.1 QESCO's Margin

The formula calculates QESCO's distribution margin based on forecast unit sales, operating expenses, depreciation, investment and return on investment. Transmission costs are treated as pass-through. The formula determines revenues for the period. Revisions may be made to revenues within that period if actual inflation is different from forecast. The profits or losses that arise from changes in efficiency or demand would, however, are retained by QESCO for the duration of the revenue control period.

Under the proposed tariff-setting methodology, the average retail tariff would consists of (i) the Power Purchase Price (PPP), which would be passed through to the end users in the retail tariff, and (H) the average distribution margin, which would be set, based on the formula-based methodology (iii) Interest on loan allocated to QESCO (iv) Prior year adjustment.

4

Page 31: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Total Unit Sales

2 O&Mt is the expected operating and maintenance cost per kWh (for year t), which includes the estimated cost of technical service and repair, necessary materials for operation, salary, mandatory social insurance payments, administration, management and other operating costs related to QESCO's distribution and supply business. The O&M component would be established on the basis of forecast demand and inflation.

1 Where:

1

S QESCO Single year tariff petition 2017-18 '

7.1.1 Power Purchase Price (PPP)

1 QESCO will pay a Power Purchase Price (in Rs/kWh) for the electricity, it procures from CPPA, which would include the generation and transmission charges (regulated by NEPRA and distributed by QESCO). This Power Purchase Price, adjusted for QESCO's distribution losses, would then be simply added to QESCO's overall distribution margin to work out the retail tariffs. Thus, the cost of the purchased electricity would be "passed through" to consumers through the retail tariff, without affecting QESCO's distribution margin.

While passing through the PPP, it is recognized that all distribution companies experience some level of distribution losses, defined as the percentage of the difference between the units received by the company and the units invoiced to the consumers. The PPP should thus be adjusted such that QESCO would be compensated for losses,

1 without hindering the incentive to eliminate the total losses.

PPP = Unadjusted PPP 1 - Li

1 Where;

4 Unadjusted PPP is the cost of electricity supply charged by CPPA at any given time;

5 Lt is the target losses at year t, defined as a percentage of purchased units, in accordance with a schedule established for the control period.

Based on the above formula, the compensation for distribution losses would be automatically adjusted for any changes in the power purchase cost. The schedule of target losses, however, would be maintained throughout the control period, regardless of the actual distribution losses incurred by QESCO. Thus, if QESCO were not able to meet the target loss reduction, it would be penalized by not being able to recover the

1 cost of extra units lost from the retail tariffs. If, on the other hand, QESCO's actual loss reduction outperformed the target level, it would be able to gain extra revenue from the loss adjustments to the PPP.

( 7.1.2 Distribution Margin Formula The average distribution margin for the year 2017-18 would be set in accordance with

1

QESCO's expected revenue requirements, based on the following formula:

Avg. Margins = O&Mi + Depreciation + RORB — Other Income

5

Page 32: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

QESCO Single year tariff petition 2017-18

Depreciation: The depreciation (for year t) will be calculated based on; (i) the value of assets existing, set at a fixed amount (Old Asset Base); plus (H) new assets invested by QESCO.

Total Unit Sales: A schedule of the total unit sales (in kWh) of QESCO across all consumer categories is forecast for the period 2017-18. This forecast will be used to determine the average distribution margin per unit (Rs/kWh) needed to cover the revenue requirement.

7.1.3 Interest charged on loan

A company with the name Power Holding (Pvt) limited (PHPL) has been established by the Ministry of Water and Power(GOP), who borrowed Rs. 136.454 billion to pay-off the liabilities of CPPA on behalf of distribution companies. Out of Rs. 136 billion, Rs. 21 billion has been allocated to QESCO. Term of interest is KIBOR plus 1 and in case of default KIBOR plus 1. Interest charges for FY 2017-18 have been submitted for approval. As QESCO is facing severe financial crunch and have no other source except to recover through tariff, for debt services. So it is submitted that aforementioned interest charges may please be allowed in tariff.

7.1.4 Prior Year Adjustment

Prior year adjustment for the period is calculated on the basis of loss incurred on account of non issuance of tariff notification for determination of 2015-16 & 2016-17 and sales mix.

7.1.5 Consumers-end Tariff-Setting

During the period of the price control, QESCO's tariffs will be rebalanced so that QESCO's total margin is recovered from consumers in accordance with the costs of serving different categories of consumers.

8 CALCULATING QESCO'S REVENUE REQUIREMENT

8.1 Trends in Consumption

Form 27 provides information about demand in the QESCO's service area.

8.2 QESCO'S Revenue Requirement

Based on the tariff methodology described in the previous section, the average tariffs for the period 2017 —18 have been calculated using the following parameters:

1. Total Unit Sales: Starting with unit sales of MkWh as projected increased by the annual demand growth and power availability. The annual rate of demand growth has been set at 5% for different consumer categories.

6

Page 33: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

QESCO Single year tariff petition 2017-18 •

2. Target Distribution & Transmission Losses: The allowed levels of losses are set at 22.5% for the FY 2017-18.

3. Power Purchase Price is weighted average cost of purchases from CPPA per unit for presentation purposes. Power Purchase Price Rs. 9.00 / kWh for the year 2017-18 are weighted average cost of purchases from CPPA taking into account 5% impact of inflation.

4. Purchase Costs: The cost of electricity purchased by QESCO has been calculated as the PPP (unadjusted for distribution losses) times the units of electricity purchased. This is also the equivalent of the units of electricity sold times the PPP adjusted for distribution losses (PPP divided by 1 minus the percentage of allowed losses).

5. O&Mt: Based on inflation adjustments to QESCO's operating expenses from the latest available data, the O&M per unit has been projected at around Rs 0.55 per kWh for the year 2017-18.

6. ROR: Considering recent inflation / price hike; ROR is calculated at 12.28%.

7. New Investments: New investments will be made as per the Investment Plan provided in Form 21 & 21 A.

8. Depreciation: The depreciation has been calculated on the basis of present depreciation rates of different assets categories and relevant assets value.

9. Interest on loan: for power purchase has been calculated @ KIBOR plus 1.

10. Prior year adjustment: The prior year adjustment has been calculated by dividing loss due to non issuance of tariff notification for 2015-16 & 2016-17 by total units to be sold.

11. Distribution Cost: The sum of rate of return on profit rate base, O&M, depreciation, and RORB less other income result in QESCO's distribution cost. Dividing this by the total units sold yields the average distribution margin (per kWh).

12.Revenue requirement for FY-2017-18 is as under.

(Rs. In Mill)

Power purchase cost 98,917

O&M 4,659 Depreciation 2,855 RORB 4,967 Gross Distribution Margin 12,481

7

Page 34: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

I clisco Single year tariff petition 2017-18

Less: Other Income (931) Net Distribution Margin 11,550 Interest on loan 3,135 Prior Year Adjustment 4,464 Revenue Requirement 118,066

Projected units sale is 8,521 Mill for the year 2017-18. Required DM and tariff is Rs. 1.36 /kWh and Rs. 13.86/kWh respectively.

J J J 8

1

1 1

1 1 1

I

Page 35: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

I QESCO Single year tariff petition 2017-18 '

9. PRAY

We shall be grateful if the Authority shall give due consideration to our petition to allow the following:

1 The tariff may please be adjusted as per proposed schedule of Electricity Tariff (Form 27).

2 Prior year adjustment may allow due to non issuance of notification for tariff determination for 2015-16 & 2016-17.

3 Distribution margin of Rs.1.36/kWh may be allowed in tariff.

4 T&D losses may be increased from 17.50% to 22.50%

5 An amount of Rs. 118,066 Million in aggregate, which may be passed on by way off Rs. 13.86 per unit for the year 2017-18.

Rehmat U :aloch Chief Exec ye Officer

9

Page 36: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

I Q.E. St 0

1

Single year tariff petition 2017-18

RELIEF OR DETERMINATION SOUGHT

(Million) Total units Sale

31,029

12.28% Calculated on the base of WACC.

Estimated

Projected

J 10

Justification

Units sale calculated by considering country vide generation plan, 6% quota reserve for QESCO and expansion plan of QESCO.

NEPRA Allowed Line Losses 17.5% which cannot be achived detail is given in Para 2 of 1.1.3A

Actual PPP was 8.57 with 5% impact of inflation projected avg PPP work out as 9.00/kWh for 2017-18.

1 1 iliPP (Rs/kwh-adjusted for losses)

1 2 Operating Fixed Assets in Operation (Million Rs.)

Transferred during the year (Million Rs.)

Clossing Fixed Assets(2+3) (Million Rs.)

Less Cumulative Depreciation (Million Rs.)

Less Revaluation reserve (Million Rs.)

Net Fixed Asstes(4-5) (Million Rs.)

7 Glossing Work in Progress

9 Total Assets

JOiless Defered Credit

117 Regulatory Rate Base

112 Avg Regulatory Rate Base

Distribution Cost

(Million Rs.)

(Million Rs.)

(Million Rs.)

(Million Rs.)

(Million Rs.)

2017-18

1 PPP (Rs/kwh-unadjusted) 9.00

4

1 5

1 6

Adjusted to losses 11.61

Actual

Taking into account as per historical trand of conversion of WIP into fixed assets

Projected

Projected

Projected

WIP may allowed in tariff due to heavy investment involved

Projected

Projected

Projected

Projected

81,355

7,523

88,878

21,072

36,777

20,669

;7446

12,148

45,298

40,453

4,968

2,855 Depriciation

Allowed Losses

8,521

22.50%

13 RORB

RORB

1 5

(Million Rs.)

(Million Rs.)

Page 37: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

I QESCO Single year tariff petition 2017-18

1 '

116 O&M (Million Rs.) 4,659

Projections are made by considering increase i salaries and pension announced in federal budget 2017-18, inflation of fuel prices and other establishment & maintenance expenses. Basis of projection attached with summery of evidence.

19

ko

Lr

Other Income

Distribution Margin

PPP (Rs/Kwh)

Distribution Margin/Kwh

(931)

11,550

11.61

1.36

excluding late payment surcharge

Adjusted to losses

desired margin for 2016-17

22 billion out of 136 billion has been prorarated taken by power holding company to pay o liability against power purchase. Mark up 111111

0.37 KIBOR plus 1% and in case of default KIBOR plus 2%

12 Interest on loan

1 23

L 4

Avg Tariff rate

Prior year adjustment Rs/kWh

Distribution Margin/Sales Tariff

13.33

0.52

before prior year adjustment

Prior year adjustment. Calculation is attached with summery of evidence.

9.78%

11

Page 38: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

QESCO Single year tariff petition 2017-18

Summary of Evidence

1. Final report of T&D Losses. 2. Country vide Generation plan. 3. Calculation for Prior year adjustment. 4. Calculation for O&M Cost and other income. 5. Calculation for RORB.

12

Page 39: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Best Regards,

,\31 11

Wats_ Ca--) (Hassan jafar Zaidi)

Chief Executive Officer Power Planrp rs International

g l Address: 64-F1, Wapda Town, Lahore. Ph. +92 (042) 35182834, 5182835, 35968118 Fax +92 (042) 35183166

POWER PLANNERS INTERNATIONAL E-mail: [email protected] Website: www.powerplonnersint.com

1 QESCO/LOSSES/764

Dated: 22-01-2016

Chief Engineer/ Technical Director QESCO, Zargoon Road Quetta. Ph: 081-9202292

Sub: - Final Report of T&D Losses of QESCO Network.

Dear Sir;

We submit herewith Final Report of Distribution Losses of QESCO in duplicate after incorporating your comments sent vide memo No. CEO/QESCO/CE Planning 41434-36 dated 14-10-2015. Soft copy is also being E-Mailed. As regards T&T losses the same have been sent vide this office memo No. 724 Dated 29-09-2015 and agreed by QESCO may be considered as Final Report.

We welcome your queries/Comments thereof.

Page 40: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Miscellaneous Expenses 17.85 9.33 18.66 19.59 20.57 S.00% On the basis of CPI 5%

Total Expenses 4,221.95 592.66 3,837.77 4,248.85 4,658.93 10.7%

8 Other Income

Actual 1

Provisional 1

Actual %age

I Projected inc/(dec)

Description 2013 -14 I 12 - 2015 I 2015 -16 I 2016 -17 I 2017-18

Surcharge on late parents 2,363.92 1,610.03 1 - 1 01 0

Profit on bank deposits 96.41 11.03 22.07 96.41 101.23

Sale of scrap 28.98 1.79 3.59 31.87 33.47

Miscellaneous 629.69 131.71 661.18 215.07 225.82

Amortization

(Total 3,119.00 1 1,754.56 686.83 343.35 360.52

Page 41: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

INDEX

FORM NO.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

DESCRIPTION

Company Statistics

Profit & Loss Statement

Profit & Loss Statement ( Month wise )

Balance Sheet

Cash Flow Statement

Power Purchase

Line Losses Statement

DISCO load factors

Average Rate per Unit Purchased and Sold

Demand

Sold Energy Evaluation and Setting up Sold Energy Average

Load Growth Evaluation and Setting up Load Average

Asset Register

Aging of Accounts Receivables

Sales Growth with Distribution losses

Operating Cost

Distribution Margin Comparison

Financial Charges

RORB Calculation

Revenue Requirement

Investment

Interest on Development Loans

Development Loan

BONDS

Domestic Consumers Analysis

Provision for Tax

Existing & Proposed Tariff Statement

Revenue & Subsidy Statement

Proposed Revenue & Subsidy Statement

Page 42: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Officers Staff Total 6521 6751 2977 3268

1

FORM -1

QESCO Company Statistics

22i14. Actual Projected

Peak demand 1,839 2,127 Number of Consumers 588,688 601,154 Area 43% of Pakistan 43% of Pakistan Circles 6.00 6.00 Divisions 13.00 13.00 Sub Divisions 57.00 60.00 Length of Feeders 35,363.00 35,863.00 Average Length of Feeders 55.00 51.00 Maximum Length of Feeder 160.00 140.00 Minimum Length of Feeder 7.00 6.00 Target for new connections

Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of STG lines (66 and 11 kV) 35,865.00 35,965.00 Length of Low Voltage Distribution lines (400 V) 15,159.00 15,209.00

Number of HV transformers Number of burned down HV transformers Number of STG transformers 144.00 161.00 Number of burned down STG transformers Number of LV transformers 55,363.00 55,863.00 Number of burned down LV transformers

Strength 30.6.2017 30.06.2018

Actual Projected

Number of Employees A

Cost 30.6.2017

Actual 30.06.2018

Projected

Page 43: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 2

QESCO Profit & Loss Statement

747 Estimated Projected Projected

Power Balances

Units Received [MkWh] 5,125 5,547 6,844 10,995

Units Lost [MkWh] 763 1,327 1,554 2,474

Units Lost [%age] 17.50% 23.92% 0 22.50%

Units Sold [MkWh] 4,362 4,220 5,290 8,521

Revenue

Sales Revenue [Mth Rs] 61,200 48,804 58,365 93,620

Subsidy [Mln Rs] 13,383 16,004 24,447

Fuel Price Adjustment [Mln Rs]

Total Sales Revenue [Mln Rs] 61,200 62,187 74,369 118,066

Rental & Service Income [Mln Rs]

Amortization of Def Credits [Mtn Rs] 403 477 571

Other Income [Mln Rs] 1,267 1,945 343 361

Total Revenue [Min Rs] 62,467 64,535 75,189 118,998

Operating Cost

Power Purchase Cost [Mln Rs] 47,289 48,804 58,636 98,917

Own Generation

O&M Expenses [Mln Rs] 4,379 4,831 4,249 4,659

Agriculture Subsidy

Depreciation [Min Rs] 916 2,366 2,584 2,855

Amortization [Mln Rs]

Provision for Bad Debt [MM Rs] 16,750

Total Operating Cost [Mln Rs] 52,584 72,752 65,469 106,431

EBIT [Mtn Rs] 9,883 (8,217) 9,720 12,566

Financial Charges [Mln Rs] 3,230 3,135 3,135

EBT [Min Rs] 9,883 (11,447) 6,585 9,431

Tax [Mln Rs] - - 2,305 1,739

EAT [Min Rs] 9,883 (11,447) 4,280 7,693

WPPF [Mln Rs]

Profit for the period [MTh Rs] 9,883 (11,447) 4,280 7,693

2

Page 44: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 3

QESCO Profit & Loss Statement 2015-16

,1711KREMS21107540140WWWYWARAWOXEAROWWWW

et$:r1 r

Actual Actual noised Actual Actual Actual Actual Adua Aaiun

Power Balances

Units Received

Units Lost

Units Lost

Units Sold

Revenue

sto9lfls( 491

[PAWN 133

rage] 27.06%

Aims] 358

494

120

24.31%

374

4!.9

1(16

23 111%

312

1.443

359

24.89%

1,084

433

92

21 27%

341

416

88

21.11%

328

440

101

23.04%

339

1,289

281

21.82%

1,005

446

99

22.27%

346

437

97

22 18%

340

418

101

24.21%

317

1,301

297

22.86%

1,004

467

117

25.14%

350

525

139

26.52%

355

522

133

25.41%

389

1.514

389

25.71%

1.124

5,547

1,327

23.92%

4,220

Sales Revenue [Min Rs 4,180 4.428 4.194 12,742 3.876 3,604 3.960 11,439 4,057 3,917 3.611 11,586 4,013 4,507 4,517 13.037 43,804

Subsidy (Ian Rs 1,112 1,183 1,1 3 3,407 1.092 1,052 1,078 3.221 1.100 1.084 1.012 3.196 1,116 1,224 1,219 3.559 13,383

Fuel Pitt Adjustment Min its - - -

Total Sales Revenue pon its 5,291 5,611 5,217 16,149 4,967 4,656 5,037 14,661 5,157 5,002 4,624 14,782 5,129 5,731 5,736 16,596 62,187

Rental & Service Income DMIng - - , •

Amortization of Def Credits Min Rs 34 34 A 101 34 34 34 101 34 34 34 101 34 34 34 101 403

Other Income Dwiln Rs 162 162 1(2 486 162 162 162 486 162 162 162 486 162 162 162 486 1,945

Total Revenue Min Ru 5,487 5,806 5,4.3 16,736 5,163 4,852 5,233 15,248 5,352 5,197 4,819 15,369 5,324 5,927 5,931 17,183 64,535

Operating Cost

Power Purchase Cost pan Ra 4,180 4,428 4,1:4 12.742 3.876 3,604 3,960 11,439 4.057 3,917 3,611 11,586 4,013 4,507 4.517 13.037 43,804

Own Generation Min R -

O&M Expenses Bhp Ra 403 403 4( 3 1,208 403 403 403 1.208 403 403 403 1.208 403 403 403 1.208 4,831

AgdailtUre Subsidy Ifien its -

Depredation Mln Rs 197 197 1(7 592 197 197 197 592 197 197 197 592 197 197 197 592 2,366

Amortization Min ms -

Provisionfor Bad Debt Mm ea 1,396 1,396 1,3£6 4.188 1,396 1,396 1,396 4,188 1.396 1,396 1,396 4,188 1,396 1,396 1,396 4,188 16,750

Total Operating Cost WM its 6,175 6,424 6,110 18,729 5,871 5,600 5,955 17,426 6,053 5,913 5,607 17,573 6,008 8,503 6,513 19,024 72,752

EB1T Min its (688) (617) (V 7) (1,993) (708) (748) (722) (2,179) (700) (716) (787) (2,204) (884) (576) (581) (1,841) (8,217)

Financial Charges min Rs 269 269 2f 9 808 269 269 269 808 269 269 269 808 269 289 269 608 3,230

EBT Min R (958) (666) (Of 7) (2,801) (977) (1,017) (992) (2,986) (970) (985) (1057) (3.011) (953) (845) (850) (2,649) (11.447)

Tax MIA Rs - - - EAT (Min R (958) (886) (917) (2,801) (977) (1,017) (992) (2,986) (970) (985) (1,057) (3,011) (953) (845) (850) (2,649) (11,447)

WPPF 641413

Profit for the period Mln Re (958) (886) (917) (2,801) (977) (1,017) (992) (2,986) (970) (985) (1,057) (3,011) (953) (845) (850) (2,649) (11,447)

3

Page 45: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

QESCO

Profit & Loss Statement 2016-17

Power Balances

Units Received

Units Lost

Units Lost

(PAWN

(MkWhj

Maga!

605

137

22.70%

609

138

22.70%

5( 6

1:8

22.7[%

1,780

404

22.70%

534

121

22.70%

513

117

22.70%

543

123

22.70%

1.591

361

22.70%

550

125

22.70%

540

123

22.70%

516

117

22.70%

1.605

364

22.70%

577

131

22.70%

647

147

22.70%

644

146

22.70%

1,867

424

22 70%

6,844

1,554

22.70% Units Sold 111kWhI 468 471 427 1.376 413 397 420 1,230 425 417 398 1,241 446 500 498 1,444 5,290

Revenue

Sales Revenue (Min R 5,196 5,224 4,845 15,265 4,529 4,318 4,641 13.487 4.702 4,594 4,375 13,671 4,902 5,531 5,509 15,941 58,365 Subsidy rMln R 1,382 1.395 1,3(4 4,081 1,276 1,260 1.263 3,799 1,274 1,271 1,227 3,772 1,363 1.502 1,486 4,351 16,004 Fuel Price Adjustment (Mtn R

Total Sales Revenue (Min R 6,578 6.619 6,149 19,346 5,804 5,578 5,904 17,286 5,976 5,665 5,602 17,443 6,265 7,033 6,995 20,293 74,369 Rental 8 Service Income IM1n R - - - - .

Amortization of Def Credits [Mln Ri 40 40 40 119 40 40 40 119 40 40 40 119 40 40 40 119 477 Other Income [Min R 29 29 i9 86 29 29 29 86 29 29 29 86 29 29 29 86 343 Total Revenue MIn R 6,646 6,688 6,217 19,552 5,873 5,646 5,972 17,491 6,045 5,934 5,670 17,648 6,334 7,101 7,063 20.498 75,189

Operating Cost

Power Purchase. Cost Win Rs] 5.187 5,219 4,848 15,254 4,577 4.398 4.655 13,629 4,712 4,624 4,417 13.753 4.940 5,545 5,515 16,000 58,636 Own Generation Ran Rai

O&M Expenses [Min Rs] 354 354 324 1.062 354 354 354 1,062 354 354 354 1,062 354 354 354 1,662 4,249 Agriculture Subsidy !Min Rs)

Depreciation Ms Raj 215 215 215 646 215 215 215 646 215 215 215 646 215 215 215 646 2,584 Amortization [Min Rat -

Provision for Bad Debt Min Ral

Total Operating Cost (Mtn Raj 5,756 5,789 5,418 16,962 5,146 4,967 5,224 15,337 5,281 5,194 4,986 15,461 5,509 6,114 6,085 17,708 65,469

EBIT [Min Rs] 891 899 880 2,590 727 679 748 2,154 763 740 684 2,187 624 987 979 2,790 9,720 Financial Charges Nis Rs] 261 261 261 784 261 261 261 784 261 261 261 784 261 261 261 764 3,135 EBT Main Rai 629 638 528 1,808 466 418 487 1.370 502 478 423 1.403 563 725 717 2,006 6,585 Tax Win As) 220 223 168 632 163 146 170 479 176 167 148 491 197 254 251 702 2,305 EAT /Min Rs) 409 415 350 1,174 303 272 316 890 326 311 275 912 366 472 466 1,304 4,280 WPPF (Min Raj - • - - - - - - - - - Profit for the period rMln Rs) 409 415 350 1,174 303 272 316 890 326 311 275 912 366 472 466 1,304 4,280

4

Page 46: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 3

QESCO Profit & Loss Statement 2017-18

anwrars Power Balances

Units Received

Units Lost

Units Lost

Units Sold

Revenue

[MkW11

[4kWel

Nagel [PAW1(

itasnostaanzT Actual Actual Ado&

973 979 9119

219 220 2115

22.50% 22.50% 22.511%

754 758 7115

Adult

2,860

644

22.50%

2,217

j".%. "Vim Adual Actual

858 825

193 186

22.50% 22.50%

665 639

Actual

873

196

22.50%

676

Actual

2.556

575

2250%

1,981

Actual

864

192

22.50%

685

Actual

867

195

22.50%

672

paa tfifes.s. Actual

828

186

22.50%

642

Actual

2,579

580

22.50%

1,999

Adual

926

208

22.50%

718

Actual

1.040

234

22.50%

806

Actual

1.034

233

22.50%

801

Actual

3,000

675

22.50%

2 325

Actual

10,995

2,474

22.50%

8,521

Sales Revenue gain As 8,332 8.378 7.7"0 24,480 7,266 6.930 7.444 21,640 7,541 7,369 7.020 21,930 7.864 8.671 8.835 25,570 93,620

Subsidy win RS 2.111 2.131 1.9112 6,234 1,949 1,925 1.929 5.803 1.947 1,942 1.874 5,762 2082 2.294 2.270 6,647 24,447

Fuel Price Adjustment [Min At . -

Total Sales Revenue [Min RS 10,443 10,509 9,71 2 30,714 9,215 8,855 9,373 27,443 9,488 9,311 8,594 27,693 9,947 11,165 11,105 32,216 118,066

Rental 8 Service Income IMln Rs

Amortization of Del Credits [Min As 48 48 ,18 143 48 48 48 143 48 48 4B 143 48 48 48 143 571

Other Income pain as 30 30 :10 90 30 30 30 90 30 30 30 90 30 30 30 90 361

Total Revenue [Min As 10,521 10,587 9,8:19 30,947 9,293 8,933 9,450 27,676 9,565 9,389 8,971 27,925 10,024 11,243 11,183 32,449 118,998

Operating Cost

Power Purchase Cost pain RSj 8,749 8,805 13.1"9 25,733 7.721 7.419 7,853 22,992 7,949 7,801 7,451 23,201 8,333 9,354 9.304 26,991 98,917

Own Generation [Mln Rs]

O&M Expenses Ben Rs/ 388 388 3118 1,165 388 388 388 1.165 388 388 388 1,165 388 388 388 1,165 4,659

Aglicullure Subsidy pan nal -

Depredation Ben Ral 238 238 Z NI 714 238 238 238 714 238 238 238 714 238 238 238 714 2,855

Amortization [min Rai

Provision for Bad Debt pan Rat - - •

Total Operating Cost [Min Rsl 9,376 9,431 6,815 27,611 8,347 8,045 5,479 24,871 8,575 8,427 5,077 25,080 8,960 9,980 9,930 28,570 106,431

EBIT IMIn Rs] 1,145 1,156 1,0:15 3,335 946 886 972 2,805 990 962 894 2,846 1,065 1,262 1,253 3,579 12,566

Financial Charges [Min Rs/ 261 261 211 784 261 261 261 764 261 261 261 784 261 261 261 764 3,135

EBT [Min RS] 884 895 77 '3 2552 685 626 710 2.022 729 700 633 2,062 803 1.001 991 2,796 9431

Tax Van Rs] 171 174 142 487 119 102 125 344 130 122 104 355 150 203 200 552 1,739

EAT (Min ad 713 721 6:12 2,065 567 524 586 1,677 599 578 529 1,707 654 798 791 2,244 7,693

WPPF [Min Rs/ - - - - -

Profrt for the period pen Rs] 713 721 6:12 2,065 567 524 586 1,677 599 575 529 1,707 654 798 791 2,244 7,693

5

Page 47: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 4

Balance Sheet fin million Ruoeesl

Description

Intangible Fixed Assets Net Fixed Assets in Operations Total Net Fixed Assets In Operations

Capital Work in Progress Long Term Loans to Employees Deferred Cost & Long Term Deposits

Current Assets Stores & Spares Trade Debts Advances, Prepayments, Other Receivables Tanff Subsidy (Receivable from GoP) Receivable from Associated Companies Cash & Bank Balances

Total Current Assets Total Assets

Subscribed Equity Unappropnated Profit Revaluation Reserve Total Equity

Long Term Liability Security Deposits Employee Retirement Benefits TFCs & SUKUK Deferred Credits Total Long Term Loan

Total Long Term Liability

Current Liability Current Maturity on Long Term Loans Subsidy Received in Advance from GoP Provision for Taxation Payable to CPPA Creditors, Accrued and Other Liabilities

1

Total Current Liability

Total Liabilities and Equity

Total Liabilities and Commitments

Previous FY

as on 304-15

Current FY

as on 30-6-16

57,714 60,300 57,714 60,300

12,116 13,727 48 49

1 22 1.26 12.165 13.777

3.382 2,059 76.916 80,915 29,414 29,708 4,625 3,559 4,857 4,906 4,352 3,180

123,546 124,327 193,425 198,403

54,461 54,461 (81,908) (93,355) 34,248 33,175 6,801 (5,719)

728 735 7,658 8,637

7,757 8,405 26,964 31,294 43,107 49,071

1,235 1,247 -

550 553 122,818 134,148

18,914 19,103 143,517 155,051

186.624 204.122

193,425 198,403 0 0

Projected Projected FY FY

as on 30-06-17 as on 3046-18

63,138 67,806

63,138 67,806

14,615 20,669

50 51

1 30 1 34

14,6661 20.721

2,192 3.100

80.858 I 90,420

30,005 30.305

4,351 I 6,647

4,955 5,004

2,103 I 3.703

124,464 139,179 202,269 227,706

54,461 54,461

(89,074) (81,382)

32,102 31,029

(2,511) 4,108

I

743 750

9,745 10,955

10,044 12,148 I

32,640 35,970

53,171 59,823

1,260 1,312

556 558

135,499 144,752

14,294 17,153

151,608 163,775

204.779 223.598

202,268 227,707

0 (0)

5

Page 48: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 5

Cash Flow Statement [in million RuWeal

Description Previous I

30-6-15

Average Monthly Demand Index (MDI) [MW] 935 Units Purchased [GWh] 5,186 Transmission Losses (132 kV) [GWhI 311 Distribution Losses [GWhl 882 Units Sold to Customers [GWh] 3,993

Average Tariff Required [Rs/unit] 15.570 Average Tariff Existing [Rs/unit] 14.710

Tariff Difference ps/unitj 0.860

Revenue from Sales Collection from Required

[%] 19,383 33.0%

Inflows from Operations Collection from Current Sales 15,027 Prior Year Recovery 4,356 Total Inflows from Operations 19,383

Outflow from Operations Payment for electricity (to CPPA) -13,049 Distribution Service Cost (=DMC) -4,171 Total Outflow from Operations -17,220

Surplus/Deficit from Operations

2,163

Inflows from Other Sources Capital Contributions 2,696 Consumer Security Deposits 63 Other Incomes 387 GOP Subsidy (Actual and Estimated) 0 Long Term Loan / Redeemable Capital 1,449 Total Inflows from Other Sources 4,595

Outflow Others Financial Charges 0 Repayment of Long Term Loans -3 Investment Program -4,145 Working Capital/other Changes (1,231) Total Outflow Others -5,379

Surplus/Deficit Others (784)

Total Inflows (Operations + Others) 23,978

Total Outflows (Operations + Others) (22,599)

Opening Balance 2,973 Surplus/Deficit for Fiscal Year 1,379 Deficit from Financing/Loans 0 Closing Balance 4,352

0

Current 30-6-16

Projected 30-6-17

Projected 30-6-18

1,166 1,839 1,949 5,547 6,844 10,995 305 376 605

1,022 1,177 1,869 4,220 5,290 8,521

17.34 13.60 13.33 14.74 14.74 14.74 2.601 -1.134 -1.405

62,187 77,960 125,578 77.0% 100.0% 100.0%

28,822 5,679 34,501

56,525 5,432 61,957

95,971 5,160

101,131

-54,905 -63,860 -100,556 -4,832 -4,249 -4,659

-59,737 -68,109 -105,215

(25,236) (6,152) (4,084)

648 1,639 2.104 7 7 7

120 343 361 13,383 11,652 17,800 2,971 1,359 3,382

17,129 15,000 23,654

0 -3,135 -3.135 0 0 0

7,723 -6,310 -13,577 -788 -479 -1,258

6,934 -9,925 -17,969

24,063 5,076 5,685

51,630 76,957 124,785

(52,803) (78,034) (123,184)

4,352 3,180 2.103 (1,173) (1,077) 1,600

3,180 2,103 3,703 (0) 0 0

6

Page 49: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 6 1 A)

OESCO Power Purchase 2016-17

Demand II Emmy

Una* Received 51155 l 605 605 555 534 513 543 550 540 516 577 647 644

MO/ 946 1.980 1604 1,805 1.627 0.830 3.000 1941 1873 1896 1,879 1.022 1.790 1539

Envoy Purtham Price 10. '9099 599 5.06 5.06 596 5.06 5.08 5.00 5.06 503 5.08 503 5.00 500

Capeelly Purchase Pk* MOM MI 331 321 321 3 21 321 321 321 321 321 321 171 321 3.21

rmmailuke Chary Ow In III 090 030 0.m 030 030 030 0m 0.30 030 0.30 0.30 0m 030

Power Purchaa Can

Energy cherge 96 54 3.030 3080 7.861 2.701 3585 7.747 2.780 2,739 3803 7 915 3.277 3.254 34.597

Capacity Charge 9.49/11 1943 1955 1.8113 1.714 1647 1.743 1.785 1.732 1.854 1.850 2.077 2.050 21.402

Tranamlnlen Cherge 944 oil 184 185 172 102 156 155 107 164 159 175 195 11311 7.071

Adjusrment - 15886

7001 OperMing Cosl 919 RN 5.180 5.219 42340 4.677 4.390 4,855 4.712 4.624 4.414 4,540 6.545 5.5111 55536

FORM • 6 1 A)

OESCO Power Purchase 2017-18

pmowl6 Energy

Units Received 11694 073 570 500 658 825 873 pay 867 529 928 1040 1.031 10.995

MDI pm 2.078 1912 7.914 1.937 1949 2.127 3.064 1,773 1914 1,991 1.839 1.888 1.949

Emmy Curtness Price 00/34 91 5 31 531 5.31 531 531 5 31 531 5.31 531 5.31 531 531 5 31

Capacmy Purchase Price P.M 351 Ml 337 3.37 337 337 3.37 310 337 337 337 3.37 337 337 337

Trantunleska Charm 186/145 10 032 0.32 0.32 0.32 0.31 037 0.32 032 0.32 0.32 032 032 072

Pewit Purchme Cost

E^4491 Chew 96 84 5.163 5 105 4,525 4.550 4978 4,634 4.690 4.503 4304 4.907 5,520 5.450 68.385

Capacity Charge 944 94 3.277 9.298 3,063 7.802 2.779 2,941 7.977 2.932 2.701 3,121 3.503 3,485 37.049

TransmIsslon Chug& 88 814 310 312 290 273 203 278 281 270 254 205 331 322 3.503

915184 -

749M 0P5/4090 Cal 9694 8.748 8.805 8.179 7.721 7.419 7.853 7.949 7,051 7.445 8.333 0.307 85.917

Page 50: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM -S I

Yearly adjustments - Qrt

EPP Adjul talent EPP - for tre Mar 2015-16

Refers& e - 031 ACILIBi 030 Mane ed Fuel Pdle Adjoin (0.031

EPP. lot as year 2010-17 Reference. 0.30 Pckaa 0.26 °Mellow d Fuel PM* Adjust02—

EPP. 3rd malt of the Or( Relsvain Adual °aldor 41 Fuel Pill 4 Adjustment Allowed

Target Lome i for the year 1800%

Fey the year 2015-111 Units Rooth(nt (MkWh1 5.547 Unite to MI s Id (M101.11) 4,540 lint( without Life line /AO consume( IMIngh) 4.475 AdloemeM 4 rows/ from (Mln RM Ad(wanwra I wt Mould hone been with anows(1 costs only (Mln Rs) (10)1 impact of Oh elkmed gags IMIn Rs) Remaining 4 djurlmont wen Wong cosi only IMin Ra1 (103) Remaining 4 cljuvtrowit with allowed end disallowed oast (Mtn Rs) 111731

For the year Foe 2010-17 16 00M Units Raoto d (MaWh) 3.451 Unite to be I( 4d (MYNA) 200 MSS without Ills line (1.11(Whl 1013 Ad)usbrewil I (reedy &win DAM Psi AdlaIntenl t Iai &WOW UM IXell with Named teals only (OMn ml (Ni Impact of c17 &POWS Coals (Mln Rs1 Rntminlnd idiuMment with 'Rowel =Monty IMM Rai elt Remaining r djurtment with allowed and ells•llimed oast (Min Re)

Page 51: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

CPP AOJ JSTMENT Ref ler 2015-15 2 77

For the ye. 201515 Ads& CPI. oaf kWe

107 Della CPP per kWh Adjustmen Required for the Month (Min Re)

1,875

Ref. for 2015.17

Aden' CPP or kWh

3 34 Delia CPP pm kWh

002 Admit ment Required Mr the Month (Min Rel

2.824

Ref for 2015-18

Actual CPP ter kWh 0.A Delta CPPPx kWh 10 091 Rellutemeni Required for the Month 0.1in Rel OW%

Ref for 2018.17 032

Achal CPP ter kWh Dena CPP p sr kWh Aolustmeni Required for Ihe Month IMIn Rs)

0 30 (0 02) 11111

Total MO Imam for ihe quarter allowed awls only (Min Re) Teal Adiu tment for the quarter allowed .% Disallowed costa only (Min RIO

3.32 3.523

Impact of Tatra or Less Purchases

Ref Unlit Pu chased I MkWh I For the year 201518 5.287

Actual Unit purchased ( MitWh 1 5.547

Difference ( MkWh l 200

PPP Rai P n kWh 1040

Impact of E Ara Purchases 2.703 08 Ref PPP I p kWh)

Re Unit Pu chased l MkWII For the veer 7010-17 3,213

Actual used %caused ( MkWh l 3.451 M1l month of he on 2n0 month 0 Me On 374 month of the On

Difference ( AlkW71 I 238 1st month of he Ort 2nd month 0 the art 3rd month of the On

PPP Ref ( Pt r kWh I 000

Impact et Use Purchases Ref PPP p r Owl.I lei month of ne Ori 2nd month o the On 3rd month of the On

Page 52: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 7 (A)

QESCO Line Losses 2016-17 :ITINM:7trErn Firlith:11 tE3

Power Balances Units Received [MkWh] 605 609 566 534 513 543 550 540 516 577 647 644 6,844

Units Sold [MkVVIII 468 471 437 413 397 420 425 417 398 446 500 498 5,290

Units Lost [1■AkVVIII 137 138 128 121 117 123 125 123 117 131 147 146 1,554

Units Lost [5‘agei 22.70% 21.70% 2270% 22.70% 22.70% 22.70% 22.70% 22.70% 22.70% 22.70% 22.70% 22.70% 22.70%

Technical Losses Map] 20.20% 2C 20% 20.20% 20.20% 20.20% 20.20% 20:20% 20.20% 20.20% 20.20% 20.20% 20.20% 20.20%

Administrative Losses [%age] 2.50% 1.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50%

Technical Losses at Different Levels Transmission Losses 132 kV (*Asset 6.43% f..91% 5.15% 5.20% 5.66% 5.73% 6.46% 5.57% 5.65% 5.24% 4.31% 4.53% 5.51%

11 kV Losses Nagel 11.47% 11.99% 12.75% 12.70% 12.24% 12.17% 11.44% 12.33% 12.25% 12.66% 13.59% 13.37% 12.39%

LT Losses [%aga] 2.30% 5.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30%

Total Technical Losses rMagel 20.20% 2C20% 20.20% 20.20% 20.20% 20.20% 20.20% 20.20% 20.20% 20.20% 20.20% 20.20% 20.20%

FORM - 7 (A)

QESCO Line Losses 2017-18

Balances Power Balances Units Received [MkWhl 973 979 909 858 825 873 884 867 828 926 1,040 1,034 10,995

Units Sold inixwm 754 758 705 665 639 676 685 672 642 718 806 801 8,521

Units Lost pirkwni 219 220 205 193 186 196 199 195 186 208 234 233 2,474 Units Lost Magel 22.50% 22.50% 22.50% 22.50% 22.50% 22.50% 22.50% 22.50% 22.50% 22.50% 22.50% 22.50% 22.50%

Technical Losses [%age] 20.00% 2( .00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00%

Administrative Losses [%age] 2.50% 5.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50% 2.50%

Technical Losses at Different Levels Transmission Losses 132 kV maga] 6.43% f..91% 5.15% 5.20% 5.66% 5.73% 6.46% 5.57% 5.65% 5.24% 4.31% 4.53% 5.51% 11 kV Losses mace] 11.27% 11.79% 12.55% 12.50% 12.04% 11.97% 11.24% 12.13% 12.05% 12.46% 13.39% 13.17% 12.19%

LT Losses i%agei 2.30% 1.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 2.30%

Total Technical Losses [%age] 20.00% 2( .00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00% 20.00%

10

Page 53: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 3

Operational and Technical Information 2017-18

DISCO load factors on yearly basis 80%

NTDC7DISCO Delivery Points metering accuracy 100%

DISCO melerino accuracy For all customers (residential, commercial. industrial, etc.) 100%

Estimated High Voltage Transmission lines losses (132 kV) 531%

11

Page 54: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

10.22 ESLIMated Revenue I rom Energy Sold

10 23 Prim Parted AdjusLeMent (Uncovered Coetel

10. 24 Required Estimated Revenue from Energy Sold

113.602152.685 80

4.463,730100.00

Iikoetaamasso

12

FROM y 9

10 01

Average Role per Unit Purchased and Sold

-weighted Average Cost per Unit sold to Customers

2017.18

Use et Seaters Chimes 0.7001

10.02 Estimates Average Rale RnAWI Rene 11 .11 lel 158.372

10 03 Ettmated Minimum Demand inalemor chiC/11. (Table 11. 11.171 19.94 400

10.04 Number al months 11

10135 Eallated Os. el System Cremes Rs 37,046104.004.10

1005 CaoacItv hamster Charnel

1007 Estimated Average Rate RsAW11 (7081011 .11331 14 Of

10.05 Estmete01.101 inn Form SCA) IS 49.4 400

1009 Number el Months 12

10.113 Estimated Cepecily Charge • (10 07 • 10.08 • 10 NI 3503,136.94859 59

loll Ep93pr Chem,

10 12

W 13

1014

10.15

10 16

10.9

10 le

10 19

10.20

10 21

Estimates Average Energy Charge RsIONS

Estimated Energy PurChese

Eslirnelee Energy Chute

Et! illUfto Power Purchase Price

Average Rae ;au Unit Purchased

Estimated Erergy Sold

Average Energy Rate per WM Sold Rs/kWh

Olatribettea Margin

pistnpution Margin pen Unit Sold RIMIVVh

Interest on leen

memo On loan per Unit Sold RetkVill

Total Cost per Unit Sold to Customer@ RealNti

(Table 11 • 11 131 5-31

10,995201.713

816319.492.44.8

152121113113

1181

113504190$4

1.35

3135000000

0.37

13.33

Page 55: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM-01A)

Table 11 - CPPA Charges: Use 9F system, Capacity and Energy

11 01 Use of System Charon INTDC1 Variable Use of

Fixed Use of Fared Use of Sysiem Variable Use or Sum Use of Demand System Rale System Charges Energy Rale System Charges System Chatgea

11.02 Month taper NM 1[06/041 ] 1 Rs) ]kWh] [Re/kWh] [ Ps] 1 PSI 11 .03 1 3 1 5.3.4 6 7 6.5,7

04 11 05 Aug Aug

]070097047 19124433 75

157 70 172.43

3277,033.135 3292671.930

972.550.561 975.675.656

3,277.033 135 3.297,6721330

1106 Sep 1913661834 16007 3.063.232.917 900.090.410 3.043,132917 107 Oct 1936515296 14937 2,59 2652,303 652178.100

108 Nov 106871936 142.59 2718745,978 824.870.310 2.776.746.976 11 09 Dec 21268153.33 138.79 ?941100.136 572.855.769 2.641.109.138 11 10 Jan 20841110 56 144.23 2.977,102.749 683.564.802 2,977.102,749 II II Fab 17730858117 164 79 2.021.673,580 667,146.301 2.921.570.860 II 12 Mar 19140745/7 145.80 2,790.737245 1128.228.755 2.799.737.265 /1 13 AP, 19018948 69 156.59 3.121,182485 925187.850 3,121.183.465 11.1a May 18381073 65 I W 61 2503,490.346 1,039259.025 2503,492348 11 15 Jun 16978470.56 183 01 3.404,562.899 1034.176.393 3464.882899 11 16 233.933 520 158.37 3.687.383.667 10,995.201,792 37,048,804.004 11 17 Avg pat monlh [RAW 12.404.460 Avg Per monlhIMWhi 516.256.614

1.16 cipaoltv and Enemy

Capacity

Capacity Energy Sum of all Use Dl System Pale per Energy Final Rate Charge Charge Charges Rale per kWh kWh Rate per kWh Per 1 M

[Rs/kWh 17 19 Month Year psi [Raj ]1,151 r RS/kWh i 1 r Rs/kWh I I Rs.P4Wh 1

15 • 11 /

1 ] 11

12 13 • 9 lllll 2 14 • 9 / 6 8 16 • 1218 17 • 13 / 8

11.21 Jul 309.555,059 5.162,625270 8,749.453,864 3.37 0.32 5.31 9.06

11.22 Aug 311.544.893 5,195,341.210 8,504.558,033 3.37 5.31 900

11 23 Sep 289.398,456 4.825.092.562 827E1671,035 337 0.32 5 31

11.24 Oct 273.166.517 4.555.874.637 7.720,513.458 3.37 0.32 5 31 9.06

11.25 Nov 262,519.877 4277.797,122 7.419063,975 3.37 0.32 531 9.30

11 20 Dec 277.555.011 4.633.591,765 7,552559817 3.37 0.32 5 31 9.00

11.77 Jan 281.267.881 4,690.630.955 3.37 0.32 5.31 9.06

II 29 Feb 278.041.392 7,801.194,987 3.37 032 5.31 900

17.79 Mar 263.652.646 4.393.657.275 7.446,077.168 3.37 0.32 5.30 5.99

11.30 Apr 294,571290 4217.291.204 8.333,345.980 3.37 0.32 5.31 906

1131 May 330.959.422 5.519.599.328 9.354.070.096 337 0.32 5.31 900

11.32 Jon 332212.803 33/ 0 32 531 9.00

11.33 3,5021313.950 59,365.407.448 98.917.233.402 3.37 5.31 8.04 11 34 Avg Cap. Charge • 14 07

281528079

Page 56: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

QUETTA ELECTRIC SUPPLY COMPANY LIMITED

Table 12 - DEMAND (Actual and Calculated) and Number of Customers

A. Actuals for Demands and Number of Customers B Forecasted Demands and Number of Customers using regresion analysis

Fiscal

Demand Actual

/Forecast

Demand Calculated /Forecast

Number of

Customers Year [,000 kW ] change [,000 kW ] change [ ,000 ] change

12.01 2001-02 12.02 2002-03 #DIV/0! #DIV/0! #DIV/0! 12.03 2003-04 #DIV/0! #DIV/01 #DIV/0! 12.04 2004-05 #01V/0! #DIV/0! #DIV/0! 12.05 2005-06 #DIV/01 #DIV/0! #DIV/0! 12.06 2006-07 #DIV/0! #DIV/0! #DIV/01 12.07 2008-09 810 #DIV/O! 810 #DIV/0! 477 #DIV/0! 12.08 2009-10 875 8.0% 963 18.8% 496 4.0% 12.09 2010-11 945 8.0% 1,040 8.0% 511 3.0% 12.10 2011-12 1,020 7.9% 1,122 7.9% 526 2.9% 12.11 2012-13 1,102 8.0% 1,212 8.0% 542 3.0% 12.12 2013-14 1,560 41.6% 1,716 41.6% 558 3.0% 12.13 2014-15 1,600 2.6% 1,760 2.6% 564 1.1% 12.14 2015-16 1,640 2.5% 1,804 2.5% 576 2.1% 12.15 2016-17 1,735 5.8% 1,909 5.8% 588 2.1% 12.16 2017-18 1,949 12.4% 2,144 12.4% 601 2.2%

[MW; Nu000 of Customers]

3,000

2,500 ---

2,000

1,500

1,000 ---

500

Demand Actual/Forecasted and # of Customers

.55 8 8

A A R R

k R k R

R

Mina ACtilab anc• m -a- Numb. of C twist -s- Coruna w wia M ...mod by DOM/

Page 57: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

)c> 9 .;

-n

7co

ED.

800.00 -

700.00 -

600.00 —

500.00 -

400.00 -

300.00 -

200.00

100.00 -

0 z o o o m

9 7-.1 .7,1

QUETTA ELECTRIC SUPPLY COMPANY LIMITED

Table/Graph 14 - Sold Energy Evaluation and Setting up Sold Energy Average

[Sales in MWh]

900.00 DISCO Evaluation of Sold Energy to Customers by using 12 month moving average

i•Serles1 ••■■■Ser1es2

Page 58: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

QUETTA ELECTRIC SUPPLY COMPANY LIMITED

Table/Graph 13 - Load Growth Evaluation and Setting up Load Average

[Sales In MIA

1,200.00

1,150.00 -

1,100.00 -

1,050.00 -

1,000.00

950.00

900.00

850.00

800.00 -

750.00 -

700.00 - -

650.00 -

600.00 -

550.00 -

500.00 -

450.00 -

400.00 -

DISCO Evaluation of Load Growth by using 12 month moving average

0 w

03

a; 8

8 -4 •∎Serlesl —6—Sarles2

Page 59: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Asset register as the year ended at date

Description

As at July 01,2017

Cost

Addition/ deletions

As at June

30,2018

As at July 01,2017

Accumulated

Charge during the year

Depreciation

Adjustments

As at June 30,2018

Book Value As at June 30,2018

LAND 9,927 28 9,056 0 0 9,955

BUILDING 3,283 427 3,710 1.191 74 1.265 2,445

Dist. Equip. 85,923 6,890 72,813 15,370 2,548 17,927 54.886

Generation 948 0 948 771 33 805 143

Others off eq 328 126 454 149 45 195 259

Computers 9 36 13 67 24 92 44

Vehicle 84 17 88 660 130 790 73

'Grand Total 81,35 7,523 88,878 18,217 2,855 21,072 87,805

Page 60: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 14 Projected Projected 81

Aging of Accounts Receivables as on 30th June kl for FY ending 30-06-17lIor FY ending 30-06-1

Outstanding for current year Rs In Million 38,074 42,480

Outstanding for more than 1 year Rs In Million 22,551 25,162

Outstanding for more than 2 years Rs In Million

Outstanding for more than 3 years Rs In Million 101,148 112,855

Outstanding for more than 4 years Rs In Million

Outstanding for more than 5 years Rs In Million

Total Receivables as on June 30, Rs In Million 161,773 180,497

18

Page 61: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

1 1

1 1

1

1 1 1 1 1

Projected Energy Sales by Tariffs

Category

FROM

Voltage

- 15

Energy

Purchased Energy Sales

Distribution

Losses Sales Growth

rate

Projection Sales

Growth Projection

Level 2015.16 2015.16 2016-17 rate 2017.18

Residential

Up to 50 Units LV 29 18 22.20 23.92% 14.7% 25.47 61.1% 41.02

For peak load requirement up to 5 kW LV •

01-100 Units LV 303.95 231.24 23.92% 4.9% 242.55 611% 390.71

101-200 Units LV 120.63 91.77 23.92% -39.2% 55 79 611% 89.86

201-300 LV 95.41 72.58 23.92% 5.3% 76.40 611% 123.07

301•700Units LV 75.08 57.12 23.92% 35.9% 77.62 611% 125 03

Above 700 Units LV 106.93 81.35 80.04 61.1% 128.93

For peak load requirement exceeding 5 kW LV

Time of Use (TOU) Peak 744 5.66 23.92% 28.5% 7.28 61.1% 11.72

Time of Use (TOU) - 011-Peak 41.61 31.66 149% 36.38 611% 58 61

Total Residential 780.23 593.60 23.92% 1.3% 601.54 611% 968.95

Commercial - A2 LV

For peat load requirement up to 5 kW LV 73.53 55.94 23.92% 23.6% 69.13 611% 111.35

Commercial (<100) LV 0 34 0 26 23 92% 60914 8% 158 87 61.1% 255 91

For peak load requirement eKceeOing 5 kW LV •

Regular

Time of Use (IOU) Peak (A-21 16.35 12.44 23 92% 26.8% 15.77 61.1% 25.40

Time of Use (TOU) - Off-Peak (Temp) LV 60.62 46.12 23 92% 26.2% 58.21 61 1% 93.77

Total Commercial LV 150.84 114.76 23.92% 163.1% 301.98 611% 486.43 LV

General Service LV

Industrial

B1 1.03 0.78 23.92% 55.4% 1.21 61.1% 1 95

_ 51 (Peak) __ HV 3.26 2.48 23.92% 46.5% 3 64 61.1% 5.86

BI - Peak) HV 16.89 12.85 23.92% 32.1% 16.98 611% 27.35

B2 - STG 1.21 1.95

B2 - TOU (Peak) STG 0.02 0.02 23.92% 102729.8% 18.19 61.1% 29 30

B2 • TOU (01f-peak) 13 70 10 42 23 92% 598.1% 72.77 611% 117 21

3

B3- 11r33 NV ( of Peak) LV 77.71 59.12 23.92% 3 64 61.1% 5 86

LV 66 26 50 41 23.92% 37.1% 69.13 61.1% 111.35

Total Industrie HV 178.37 136.09 23.92% 186.77 61.1% 300.84

Bulk STG

01(a) Supply at 400 Volts up Io 5 kW STG 0.47 0.36 23.92% -100.0% #01V/01

01(b) Supply at 400 Volts •exceeding 5 kW STG 1 09 0.83 23.92% 46.0% 1.21 61 1% 1.95

Time of Use (TOU) - Peak HV 4.67 3.55 23.92% 2.4% 3 64 61.1% 5.86

Time of Use ITOU) • Off-Peak HV 19 28 14.67 23.92% 24 0% 18.19 61.1% 29.30

C2 Supply at 11 kV STG 9.70 7.38 23 92% 31.4% 9.70 61.1% 15.63

Time of Use (TOU) - Peak HV 20.73 15.77 23 92% 23.0% 19.40 61.1% 31.26

rime of Use (TOU) - Off-Peak 86.15 65.54 23.92% 82 47 611% 132.84

03 Supply above II kV

Time of Use (IOU) - Peak LV

Time of Use (TOU) - Off-Peak LV •

Total Single Point Supply LV 142.10 108.11 23.92% 134.62 61.1% 216.84 Agricultural Tube-wells - Tariff D LV

01 CHina 15.37 11.69 23.92% 14.1% 13 34 61.1% 21.49

Time of Use (TOU) 12.13 19.54

Time of Use (TOUT LV 71.55 115 26

02 Agricultual Tube-wells LV 4,137.09 3,147.50 23 92% 3.914.84 61.1% 6,30598

Agncultual Tube-wells D-2 Oil

Tone of Use (IOU) - Peek 0-2(1)

Time of Use (TOU) - Peak 0-2 20.62 15.68 6.06 61.1% 9 77

rime of Use (TOU)- Off-Peak 02 116.32 88 50 23.92% -50.7% 43.66 61.1% 70 33

Total Agriculture LV 4,289.39 3,263.37 23.92% 24 5% 4,061.58 6,542.36

Public Lighting G LV 5.05 3.84 23.92% -5.2% 3.64 61 1% 5.86 ResioentiM Colonies H HV 0 09 0.07 23 92% -33.9% 0.05 611% 0 08 Special Contracts - Tarifl K (AJK) HV

Time of Use (TOU) • Peak HV

Time of Use (TOU) - Off-Peak HV

Railway TractionTraction - I

Grand Total 5,546.57 4,219.83 23.92% 25.4% 5,290.17 61.1% 8,521.36

19

Page 62: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 16

QESCO

Operating Cost

A Power Purchase Cost

Projected Projected

Energy Charge pin Rs) 34,597 58,365

Capacity Charge [Min Rs] 21,962 37,049

Transmission Charge [Min Rs] 2,078 3,503

Adjustment' [min Rs]

Total Power Purchase Cost [Min Rs] 58,636 98,917

• Provide the detail of adjustment

B Operation & Maintenance '

Employees Costs

Salaries, Wages & Benefits [Min Rs] 2,977 3,268

Retirement Benefits Paid [min Rs( -

Total Employees Cost [on Rs] 2,977 3,268

Admin Expenses [Min Rs] 207 218

Repair & Maintenance [Min Rs) 597 683

Travelling [Min Rs] 208 219

Transportation [Min Rs] 259 272

Management Fee [Min Rs]

Miscellaneous Expenses [MM Rs)

Total O&M [Min Rs] 4,248 4,660

C Depreciation & Amortization

Depreciation [rimn Rs] 2,584 2,855

Amortization of Leased Assets [Min Rs] 0 0

Total [Min Rs] 2,584 2,855

D Provision for Bad Debts

Provision for bad debts •

[Min Rs]

Bad debts written off

[Min Rs]

20

Page 63: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 17 Distribution Margin Comparison:

2017 2018 O&M Expenses 4,248 4,660 Increase in % -12.09% 9.69% Depreciation 2,584 2,855 RORB 4,179 4,968 Provision for baddebts Other Income (820) (931) Distribution Margin 10,191 11,551 Energy Sold 5,290 8,521 DM per unit 1.93 1.36 DM per unit increase -18.45% -29.63%

21

Page 64: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM -18

QESCO Financial Charges

Projected Projected

A Long Term Loans

GOP loans

Foreign Loans

Bonds

TFCs

Kuwait Fund 3,135 3,135

Total 3,135 3,135

B Short Term Loan

Running Finance

Short Term Loan

Others

Total

C Total Financial Charges (MB) 3,135 3,135

22

Page 65: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

1

1

FORM - 19

QESCO RORB Calculation

44 Projected Projected

A Gross Fixed Assets in Operation - Opening Bal [Mln Rs] 75,933 81,355

B Addition in Fixed Assets [min Rs] 5,422 7,523

C Gross Fixed Assets in Operation - Closing Bal [Min Rs] 81,355 88,878

D Less: Accumulated Depreciation [Min Rs] 18,217 21,072

E Less : Revaluation Reserve 32,102 31,029

F Net Fixed Assets in Operation [Mln Rs] 31,036 36,777

G Add: Capital Work In Progress - Closing Bal [Min Rs] 14,615 20,669

H Investment in Fixed Assets [Mln Rs]

I Less: Deferred Credits [Mln Rs] 10,044 12,148

J Regulatory Assets Base [Mln Rs] 35,607 45,298

K Average Regulatory Assets Base [Mln Rs] 34,027 40,453

Rate of Return [%age] 12.28% 12.28%

Return on Rate Base [Mln Rs] 4,179 4,968 Return on Rate Base for the Year 4,179 4,968

1 1

I

23

Page 66: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 20

QESCO Revenue Requirement

Projected Projected

A Power Purchase Price [Min Rs] 58,636 98,917

B DM

O&M win Rs] 4,248 4,660

Provision for baddebts [Min Rs] -

Depreciation win Rs] 2,584 2,855

RORB [Min Rs] 4,179 4,968

Other Income (Min Rs] (820) (931)

Impact of Disallowed Losses [Min Rs]

Total DM (Min Rs] 10,190 11,551

Interest on loan for power purchase [min Rs] 3,135 3,135

C Revenue Requirement (A+B) (Min Rs] 71,961 113,603

13 Less/ (Excess) Recovery [Min Rs] 2,407 4,464

E Total Revenue Requirement (C+D) Win Rs] 74,368 118,067

FORM -20 ( A )

Distribution Company

Revenue Requirement (per unit sold)

Projected Projected

A Power Purchase Price [Rs/ kWh] 11.08 11.61

B DM

O&M [Rs/ kWh] 0.80 0.55

Depreciation [Rs/ kWh] 0.49 0.34

Provision for bad-debts [Rs/ kWh] -

RORB [Rs/ kWh] 0.79 0.58

Other Income [Rs/ kWh] (0.16) (0.11)

Impact of Disallowed Losses [Rs/ kWh]

Total DM (Rs/ kWh] 1.93 1.36

Interest on loan for power purchase 0.59 0.37

C Revenue Requirement (A+B) (Rs/ kVA] 13.60 13.33

D Less/ (Excess) Recovery [Rs/ kVVII] 0.45 0.52

E Total Revenue Requirement (C+D) psi kWh] 14.06 13.86

Page 67: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

}ORM - 21 (A)

Distribution Company ^investment

1 A Investment Plan DOP

ELR

i

STG

2nd Ruraral Electrification (KFP)

Power Distribution Enhancement Project

Deposit Works

Construction of G/S & T/L

Computer software & Hardware

Vehicles

Other office equipments

Total

B Financing Arrangement Cash Development Loan

Kuwait Fund

1

PSDP / Own Resources

Grant

Consumer Contribution

Asian Development Bank

Total

_I

J

J

J

Projected Projected

inius Rsl 157 23

[MTh Rs1 472 591

[MTh Rs] 1,746 6,281

[MTh Rsl

[Min Rs] 1,359 3,382

[MTh Rs] 2,282 2,899

(MTh Rsl

[MTh Rsl 31 30

[Min Rs] 210

IMIn Rsl 54 120

(MTh Rs] 6,310 13,57

[MTh Rsl

NH Rs]

pH Rs] 2,601 221

[MTh Rs] 2,240 2,851

(Min Rs] 111 122

[MTh Rsl 1,359 3,38

[Min Rs] 6,310 13,577

Page 68: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

New

14%

263

26

14

Extannon New

13% 15%

i1;771121

195 244

26

10

NevatExtentIon

11% 12%

70 60

13 13

31•

62

66

00

210

101

5

3492

13

13 11.5

FORM - 21 ( ) Energy Lou ReduclIon 301647

Investment Requested for the yen

Objective

Projected braes lot the control pelt,

FORM - 2I 3

Distribution of Power 20111-17

Inveetrnent Requested lo• the yew

Ohjecilve

Projected beam tor Ore control peEd

FORM - 21 I B ) SIG 2016-17

Invesiment Request°, Mt the year

baiting level of WA

00110001Addillon h1 ANA

41

Re-conducirMg Re-conduclAng

113%

New

Edengen

17%

244

26

30

37

35 40

21)

136

044

Re-conduclAn 2

130.11044011 BburcetIon Nun:6W

1311urcenen Augmentation

11%

14% 13% 12%

23% 19%

14%

FOAM -21IBI ROM 2014-17

investment Roque:Sled kW the year

Eating Level of WA

Objective Addition In WA

1.350

25

Page 69: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

-

maw

Page 70: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 22

QESCO Interest on Development Loans

Rs. Million P

Sr. No. i ...— _.

Loans 1 Interest 1

Rate % I— 1st Orr FY

2nd Girt 784 ;

3rd Girt

– ....,....._..---„

firth Ott — 784 1

Total ---, i 12017-18 I 11.003f4 784 784 31351

26

Page 71: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

QESCO DevO/OpMent Loan

FORM • 23

tlaeresi Remaining

Rate Tows

it%

c/Bal Wind

0,544 0,04

21,129 0.200 1.310

First

0119a/ Dialmisement Repaymenl

9.170 : 670 2.3,31 1.210

21.129 000

FY

Fourth 0i0 of FY

OlsOursemem Repayment flat OMB :Disbursement ; Repaymeni : C/Bai O/Bal OlsbUrsemeni : Repayment: RPM 416i

— . ..-- 1?/?"4-,.„...- 13,e9.1: ' ' . eft i ,551 42 53' . - 2,391 2,391 . 2.3er 2,301 • 2301

1210 1,210 1,210 • 1.210 : 1

• , , ,

21,129 21.129

loan

Asian Davelopmanc Bane 2016716 cliii Development LOW

KUnlit FUlld PHPL 1.129 21.129 • 21,129

24,370 2,703 3. ,5531° F.c?!!.

Page 72: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 24

DISTRIBUTION COMPANY

BONDS

Interest Oct-Dec 10

Opening Closing Interest Redemption

Rate Balance Balance Charges Particulars

Nil Nil

28

Page 73: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Slabs

No. of Customers 0 - 50 - 200 1 201-300 1

Domestic Consumers

301.700 1 Above 700 Peak 1 Off Peak 1

FORM - 25

Average Rate Rs./kWh

Revenue Rs.MIIIIon 1 • 10( 101

0 - 50 138,490 22 88.81 4 00

1 - 100 161.528 231 2,543 69 11.00

101 - 200 74,443 92 1,284 84 14.00

210-300 30.389 73 1.161.36 16.00

301-700 19.168 57 1,028.11 18.00

Above 700 5,621 81 1.458.00 18.00

Time of Use (IOU) - Peek 6 108.00 18.00

Time of Use (TOU) - 011-Peak 2,620 32 400.00 12 50

Tempprary 3

Total 432,262 22 251 92 73 57 81 6 32 13,073 13.60

29

Page 74: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Sr. No. Provision for Tax allowed

:12017-18

FORM - 26

QESCO Provision for Tax

Rs. Million

2nd CM ir-3r-d OeFt Total 344 t 355 552 1,739

30

Page 75: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

"1

IReAWI (8r5)41% 18 V1Wb)

]

I

1 4001-

-I

12 50

15.00

15 00

17.00

19.00

H I

19 00 I_

1300

I 19 00

13 OD

I I 1 1

1900

400 00 15 00 400.00

400.00

19 00 400 00

I 400 00 1

13.00 400 00 1

1

12.50

15 00

15.00

1100

19.00

19 00

1

400 CO

400.00

400 00

38000

380.00

1

15 00

1 400.00 14.50

1 40000 19.00

400 OD 13 00

380.00 14 30

380 00 19 00

380.00 12 80

, 1500,

400.00 14.50

400.00 19.00

400 00 13.00

380.00 14.30

380.00 19 00

380.00 1 12 80 I

- 1

1

14.50

19 00

14.50

19 00

13 00

14 00 1

19.00 I

12.80

1900

1270 1

1

• 13.00

14.00 I 19.00

12.80

19 00

12 70

1

400.00 1

400 00

400 00

380 00

380 00

1520 15.20

17155 17 85

11.76 11.75

14.70 200.00 13 38 200.00

NMI

(1 32)

200.00

200.00

200 00

19,00 200.00 19.00

200.00

12.70 200 00 12.70

1 1 1 1

14.00 14.00

14.00 14.00

12 25

I

1

FORM • 27

QESCO

Existing & Proposed Tariff Statement July 2017

kvm

Residential

owes)

Am 50 Units 3.63

For peek load reAL_Arenerrp±7 5 kW

048% 124,575

-

168.082

-

102,652

it 01-100 Units -I

101.300 unds

34 56

7.95

10.89

4 59%

1.05%

144% 201-300 units

301-70001e5 1106 147% 29.592

Above 700 Units 11.40_ 1,51% 5,859

-

2. 649

Far peak lead requirement excess:mg 5 kW •

14% 1 04 0.14% Time or Use (TO). Peak L)

Time of Use (101.9 • Off-Peak

Total Reeldentlall

5 18 0 69% 1

85.71 I 1

17,663 I

451,023 I

Commercial - A2

Commercial For peak load requirement up to 5 kw 9.85 1.31% 104,620

Commerciai H100) 22 64 3.00% 34

Commercial (<20 KW) For peak load requirement exceeding 5 kW

Regular •

Time of Use (TOU)- Peak (A-2) 225 0.30% 2,618

Time or use (TOO -Off-Peek (Temp) 1 829 1.10% 371

Total Commercial! 43.03 I 000%1 107,308

Industrial

0.17 002% 131 -

BI (Peak) 0.52 0.07% 1.084

L31,011 Peak) 242 0.32% 14521

82. 0.17 002% 104

132 • TOU (Peak) 2 59 0 34% 1,009

B7. IOU (Off-peak) 10 37 1.38%1 1

83- 11(3310/2eak) 0 52 0.07% 16

8 84 9 85 1 31% 3

Total Industrial 27 1 1 3,670

Bulk

CI(a) Supply at 400 Volts • up to 5 kW 11

01(tetpEty al 400 Volts •exceedirON 0 17 0.02% 78

Time of Use (TOU) • Peak 0.52 0.07% 105

Time at use U) • 011•Peak 259 0.34% 12

C2 Supply at 1 1 kv 1.38 D_18%

Time of Use (TOU) • Peak 2.76 0.37% 25

25 Time of use (TOU) . ON-Peak 11 251 156%

C3 Supply above 11 kv

H

Tone of Use (TOU) • Peak

Time of Use (TOU) - Ofl-Peak

i I

Total Single Point Supply 19 / 256

Agricultural Tube-wells • Tann D

DI Scarp 1.90 0.25% 294

Time of Use (TOU) 1 73 0 23% -

Time at Use (TOU) 10.19 1.35%

02 Agncultual Tube-wells 557 78 7400% 22.494

Agncultual Tube-wells Elnil • I

Time of Use (TOU) . Peak 0-2(0 - 3,139

Time of Use (TOU) • Peak D-2 0.86 0.11% 521 1

Time of Use (TOU) • 08-Peak 02 6 22 0 83%

Total Aaricuiturall 579 1 1 26,448 1

publicl±trirg G 0.52 007% 260

Residential Colonies H 001 000%

Special Conlrects Tariff N 1A IN)

Time of UsigiU) • Peak

Time of Use (TOO) -011"Pea1 RalwayirechonTraclion 1

Co-Genrabo17-7

General Service

Grand Total 754 1100.00%1 5116,965

J

1

1

1

1

1

1 1

1

1 1

_1

.1

Page 76: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

1 3 63 048%I 124.575

• 000% -

34 56 459% 168.082

7.95 -

10,89 144% 102.652

11.05 1 47% 29_542I

11.40 1.51% 5,859

- 0.00% -

104 0 14% 2.849

5.18 089% 17.863

05.71 I 0.00% 451.023

0.00% •

FORM. 27 ( A)

QESCO

Existing & Proposed Tariff Statement July 2017

IM

Residential

Up W50 Units

For peek load requirement up to 5 kW

01.100 Units

01-300 units

101-300 Units

301.7000Mts

Above 700 Units

For peak load requirement exceeding 5 kW

Time of Use (YOU)-Peak

lime of Use (TOU) Crif.Peat

Total Residential

Commercial-A2

For peak load requirement up to 5 kW 9.65 1.31% 104,620

Commermal (4180) 22.64 _ 300% 34

Commercial (<20 KW) For peak load requirement exceeding 5 kW - 0 CO% -

Regular • 0.00% -

Time ol Use_ROU) - Peek (A-2) 2.25 1 0.301 2.618

Time of Use (TOO) - Off-Peak (Temp) I 8.29 I 1.10% 37

1 Total Commercial 43.03 I 0 00% 107.308

Industrial L - 0.00%

131 0.17 0.02%

61 (Peak) 0 52 0.07% 1.084

13,13, f1Peaki_ 2.42 0.32% 1,452

62. 0 17 I_ 002% 104

82 - TOU (Peak) 259 034% 1.009

82 - TOU (00-peak) 10 37 1.36% 1

153- 11/36 icy (Peakt 0 52 1 007% 18

64 985 I 1 31%1 3 1

Total industrial 27 I 00016 3,670

Bulk - I -

Cl(el Supply at 400 Vas - up to 5 kW • 0.00% 11

C 1 (17) Supply al 400 Vas uxceedma 5 kW 0 17 0.02% 78

llme of Use (TOU) - Peak 0.52 0.07% 105

_ Time of us. (TOU) -09-9en 2.59 034% 12

zryrl 11 kV

1.38 ale% True of Use (TOO - Pea

2,75 037% 25

_ Time of Use (TOU) 011-Peak

11.75 1.55% 25

C3 amply above II kV

Time of Use ROUT - Peek

1 Time of use (f OU) • Off-Peak

Tout single Point supply

18 I 256

Agricultural Tube-wet - Tariff D

Cnyarp

1.90 025% 294

Tlme of Use 6339 nave of Use ROU)

ox Apnalt1.181 Tuba-webs

Agncullua Tube-wells 0-2 08

(TimeMUse (70U) -Peak 629)

IT Time of Use (T131./) - Peak 0-2

I Time of use ROU) Off-Peak 02

Total AgrICUIRAIII

IP tic Ugnang G

Residential Calcores K

Special Contracts Tariff K (A)()

Tame of UfaOU)- Peak

row of Use (TOU)- Of We as

Rafivets TeschonTranion - 1

Co-Genration4

General service

1 73 023%

10.19 135%

557 7B 74 OD% 22.494

3.139

0.88 0 11% 521

622 093%

679 26,448

0.52 007% 260 _

0.01 0.00%

167 14

009 339.54

14.51

431.98

119 23

163.29

188.00

216.68

19.70

87 39

122179

H 0.09

19 51

431 98

119.23

163.29

188.00

218.68

19.70

67.39

1.220.79

187.14

339 54

0.95

5 74

13.771

42 68

107.82

877.18

0 95 I 5.74 I

8.77

42 88

107.82 I

677.10

H

136.31

115 99

18.23

3.09

001

1.76

12.15

0 65

4/9

79.37

0.66

0.21

1.44

1 02

0 70

3.57

7.62 I

26.89

30.84

119 79

8,19934 114.19

• 16.23

18.42 3.09

79.00

13,47438 133.61

7.26

0.09

2.51

9 85

31.45

2.42

49 25

132.71

985

125.09 I

363.11

2.51 068

B.85 0.21

33.69 1.44

19 77 1.02

52 53 0 70

150.40 3.52

258.75 I 7.62

0.01

1.76

12 15

0155

4.79

19.37 I

2.51

9 85

33.69

1977

52 53

150 40

288.76

28 89

30.84

119 79

7.453 66

16.42

79 03

73311.80

7 26

009

251

9.85

31 45

2.42

49 25

132 71

9.85

125.09 1

383.11 I

(1.80)

(1.80) (735.49)j

Grand Total 754 100.00% 513E1.955 I (1.5011 (735.49) 189.07 11,011.48 187.27 10,275.97

Page 77: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Commercial - A2

Commercial - For peak load regulremenl up to 5 kW

9.91 1.31% 104.520

Commercial (41001_ 32.78 300% 34

Commercial (420 ice) For peak load requirement exceeding 5 kW

Regina,

Time of Use (T01.6 • Peak (4.2)

2161 0.30% 2.618

Time of Use (10U) - Of F.Peak (Temp) 1

8.35 1 10% 37

Total commercial!

43.30 I 0.00%! 107,308

Industrial

i31

130 (Peak)

el Oil Peak)

82

82 TOUjPeak)

02- TOU plf-peak)

0111/33 KV_(Peak)

e4

Total Industrial

0x17 0.02% -

0.52 0.07% 1,084

2.43 032% 1,452

0 17 0.02% 104

261 034% 1,009

10.43 1 38% 1

052 007% 16

991 t 131% 31

27 1 I 3,670 1

19.00 400.00 19.00

13.00 400 00 1 13.00

14 50 14 50

19.00 - 19.00

13.00 - 1700

14 00 400.00 14 00

19.00 400.00 1900

12.80 400.00 12 80

1900 380.00 19.00

12.70 380.00 12 70

k

I

-11 I

0.17 0.02% 78 1 1

0.52 0.07% 105

2 61 0.34% 12

1.39 0 18% -

2.78 0 37% 25

11.82 1.56% 25

256

3,139

087 011% 521

626 0.83%

582 I 28,448

0.52_ 007% 260

0 01 000%

FORM -27

QESCO

Existing & Proposed Tariff Statement Aug 2017

%ago I 1RVaWhl

Residential

liplo 50 Units

For peak load requirement op to 5 kW

01.100 Units

101-300 Units

701.300 Units

301-700UnIts

Above 700 Unto

For peak load requirement exceeding 5 kW

Time of Use (IOU) - Peak

Time or Use (TOtn • Off-Peak

Total Residential

3.65 048% 124.575

34.78 4.59% 168.082

8.00 105% -

10.95 1.44% 102,652

11.13 1.47% 29,542

11.48 51% 5.859

1.04 0.14% 2.649

5 22 0.69% 17.663

86.25 I I 451,023 I

4.00 4.00

12.50 12.50

15.00 15 00

15.00 15.00

17 00 17.00

19.00 19 00

19.00 19.00

13 00 13.00

400 00

400 00

400 00 I

40000

400 00

400.00

380 00

380 00

19.00 191x0

15.00 400.00 15.00

Bulk

Cue? Supply al 400 Volts • up lo 5 kW

Cl(b) Sume st 400 Voris -exceeding 5 liBf

Time of Use (TIA. Peak

Time of Use (TOU) - Off-Peak

03 supply at It kV

Time of Use (TOU) Peak

Time of Use (IOU) • Off-Peak

C35upply ore I I kV

T11118 of UsecOu) • Peak

Time of Use (TOU) • Olf.Peak

Total Single Point Supply)

Agricultural Tube-wells - Tariff DI

DI Scam 1 91 0.25% 294

Time of Use (TOU)

1.74 023%

Time of Use (TOU) 10.26 1.35%

02 Agncultual Tube-wells 561 29 7400% 22.494

41gncuituai Tuba-wells 0-2 lit)

Time of Use (TOW - Peak D.20L

Time of Use (IOU) - Peak 0-2

Time of Use (TOU)• Ott-Peak D2

Total Apdculturall

Public Lighting G

Residential Colonies H

Special Contracts • Tariff to (Ade)

Time 01 Use (TOU). Peak

Time al Use (TOU) - Off-Peak

nanny TraclionTraciian - 1

Co-Genration-J -0000

General Service

Grand Total

15.00 H 15.00

40000 14.50 400.00 14.50

400.00 19.00 400 00 19.00

40000 1300 400.00 13 00

380.00 14.30 380.00 14.30

380 00 19.00 380 00 19.00

380.00 I 12 80 380.00 12.80

-I I

15.20

I 17.85 17.85

200.00

11 75 11

14 70 200 00

75

200

13 38 11111

L.32)

- -

200.00 200 00 -

200 00 19 00 200 00 19 00 I

200 00 1 12 70 200 00 1 12 70 1

I 1 I

14.00 14.00

14 00 14.00

15.20

12.25

758 1 100 00%I 588.965 1

Page 78: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 27 ( A )

QESCO

Existing & Proposed Tariff Statement Aug 2017

Residential

Up to 50 Units 3 65 0.48% 124.575

for or ak load requiremeni up lo 5 kW - 000%

Units 3,1 78 4.69% 188.082

01.300 Units 8.00

101.300 Units 10.95 1 44% 102,652

301.700Unes 11.13 1.47% 29.542

Above 700 Una 1141 1.51% 5,859

For peak load reoteramen1 exceeding 5 kW • 0.00% -

lime of Use (TOU) • Peak 109 0 14% 2.649

TIme of Use (TOU) - Off-Peek 5.22 069% 17.663 I Total ReeldeMlet 66.25 I 0.00% 451 023

IComm:dal - A2 • 000% •

Commercial - For peek Mad requirement up to 5 kW 991 1.31% 104.620 _

C-ornmerual (41120) 22.78 3.00% 34

Comment al (<20 KW) For peat load requirement exceeding 5 kW - 000% -

Reimer • 0.00% -

Time of Use (TOU) • Peak (A.2) 2.26 0.30% 2,618

1 Tana of Use (TOU) - O11-Peak (Temp) 835 1.10% 37

1 Total Commercial 43.30 I 000%1 107.308 I

Indullbial - 000%

_ B1 I 0.17 002%

1:11Peaki_____ 0.52 0.07% 1,084

EH - (Off Peak) 2.43 0.32% 1.452

_ER - 0.17 I 0.02% 104

B2 • TOU (Peak) I 2.61 034% 1,009

132 - TOU (On-Peek) 10.43 1.38% 1

83-11(33 KV (Peak) 0.52 0.07% 16

84 9.91 1 31% 3

I Total Industrial 27 I 0 00% 3.670

Bulk

11 (1 id_Su eas • up la 5 kW

C1(b) Supply a1400 Voile -exceeding 5 kW 0 17 0.02% 78

Time of Use (TOU) • Peak 0.52 007% 105

111% of Use (TOU1- Off-Peak I 2 61 0 34% 12

C2 Sows et ll kV 1.39

2.78

0.181,

0 37% 25 line of Use (TOU) Peak

Rate or Use (TOU) • Off-Peek 11.82 1.56% 25

C3 Supp6 above 11 kV -

Time of Use (TOLD -Peak -

Time of Use (TOU)• Off-Peak •

Total Single Point Supply 19 I 256

Agricultural Tuba-wells - Tariff 0 -

Di Scarp 1.91 025% 294

Time of Use (TOU) 1 74 023%

Time of Use (70%) 10 28 1.35%

02 Amy-OMR Tube-wells

H

561.29 74.00% 22,494

AgOcuftwaTutta-wells D-2 09 -

Time 01 use (TOUT - Peak 0-20 • 3,139

Time or Use (TOU) - Peak 0-2 0.87 0.11% 521

Time of Use (T01.1) -Off-Peak 02 628 053%

Total AgrIcunural 682 26.441

P0%146189 G 0.52 I 0.07% 260

Residential Colonies H 0.01 0 00%

Spam' Contracts . TarM K (MK)

Time of llitLEOU). Peak • •

Time of Use (TOU) - Off-Peak

Re , TrecilonTraction •

Ca-Genrationst

;emend Service

Grand Total 751 100 00% 5130.955

115 99

135.31

169.07

0 01

1.78

12.15

0.65

479

19.37

16.23

0 09

0.95 I 42.95 0.95 42.95

5.74 108.50 5.74 10850

6.77 691.44 6.77 681.44

0.66

0.21

1.44

1.02

0.70

3.57

7.62

3.09

I I

I 1

11.090.81 I 168.32 I 10.340.55 I (0.76)1 (740.1211

14.61 14.61

434.71 934.71

11988 119 98

169.32 164.32

189 18 189.18

218.05 218.05

19 82 19.82

67 61 67.81

1,228.49 1.228.48

188.31 188 31

341.68 0.09 341.68

29.07

3109

120.54

8.250 98

16 52

79 50

5.527.86

7.30

0 10

252 2.52

9.91 9.91

31.65 31 65

2.43 0 01 2.43

49.56 1.76 49.56

133.54 12.15 133.54

9 91 0.65 _ 991

125.87 4.79 125.87

366.40 19.37 365.40

2.52 068 2.52

9.91 0.21 9.91

33.91 1.44 33.91

19.69 1.02 19 89

52.66 0 70 52.86

151.35 357 151,35

270.44 7.62 270.44

29.07

31 04

120 54

115.24 7,510.86

16 23

3 09 16.52

79 50

134 56 7787.54

7.30

I 010

(0.75)

(0.75)

(740 12)

(740.12)

Page 79: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

1

1 1

1

1

I

J J

FORM - 27

QESCO

Existing & Proposed Tariff Statement Sept 2017

Industrial

131

0.16 002%

B1 (

0.48 007%

131 . (Off Peak)

2.26 032%

62 -

0.16 002%

B2- TOU (Peak)

242 034%

62 TOU (011-peak)

989 138%

133- 113 KV (Peak)

04B 0.07%

54 921 1 31%

Total Industrial' 25 1

Cl(a) Supply a1400 Volts • up to 5 kW 11

Bulk .

ClpSy at 400 Volts -exceeding 5 kW 0 16 002% 78

Time 01 Use (TOU). Peak 0.48 0.07% 105

Time of Use a0121,011-Peak 2.42 12

C2 Supply at 11 kv 1.29 0.18% -

Time of Use)TOU)• Peak 08 0.37% 25

Tune of Use (TOU) - Off•Peak 10 98 1 56% 25

C3 Supply above 11 kV -

Tuba of Use ITOla7 Peak - I

I Time or Use (IOU) - Off-Peek I • 1

I Total Single Point Supply! 16 1 1 266 1 1

Arcicultural Tube-wells - Tadff D

Cl Scarp 176 0.25% 294

Time of use (TOO) 162 0 23% -

limo ol Use (TOO) ) 9.53 1 35% -

02 Agncullual lube-werls 521.39 7400% 22.494

Agricullual Tube-wells 0-2 0) -

Time of Use (TOU) • Peak 0-2 1 0 Ell 0 011% 521

me of Use (IOU). Peak 0-2(1) 3,139 Ti

Time of Use (TOU)- cm-Peak D2 1 5 81 0.83% - I I

I Total Agricultural! 541 I I 26,448 I 1

Public IS:TAG 1 0 48 0 07% 260 1 I Residential Colonies H 0 01 000

Special Contracts • rang K (449 -

Time of Use (Tall - Peak

Time of Use JTOU) • OR Peak

Railway TramioIlTramion • I

Co-Genration4

General Service

Grand Total! 706 1 100 00%1

588.956 I

se) IY

Residential

Up 10 50 Units 3.39 048% 124.575

For peak load requirement up to 5 kW

01.100 Units 32.30 4.59% 168.082

101-300 uses 743 1 05%

201-300 units 10.18 1.44% 102,652

- 301 7000nhs 10.34 1.47% 29,542

Above 700 Uses 10 66 151% 5.859

Foriseak load requirement exceeding 5 kW -

Time of Use CLOTIJ - Peak 0.97 0.14% 2,649

Time of Use (70U). ofl-Peak I 405 069% 1]6631

1 Total Residential' 80.11 1 1 451,023 1

Commercial - A2

Commercial - For peak load requirement up to 5 kW 921 I 31% 104,620

Commercial (<100) 21.16 3.00% 34

Commercial 140 (WI For peak load require roast exceeding 5 kW

Regular

Time of UseITOU)• Peak (A-2) 2 10 0.30% 2 618

Time of Use (TOU). Ofl-Peak (Tempt 1 7 75 110% 37

Total Commercial I 40.22 0 00%1 107,308

1,084

1 452

104

1,009

1

16

3

3,570 I

15 00

15.00

17 00

19 00

19 00

13 00

400 00

14.50 14.50

19.00 19 00

13 00 - 13.00

400 CIO _ 14.00 _ 400.00 14 CO

400.00 19 00 400.00 19.00

400.00 12 BO 400.00 12.80

380 00 19.00 360.00 19.00

380 00 12 70 380 00 12 70

1

I

15 DO - 15.00

400 00 14 50 400 00 14 50

400.00 19.00 400 00 19.00

400.00 13.00 400.00 13 00

380 00 14 30 380.00 14 30

380 00 19 00 38000 1900

380.00 12 80 38000 12 BO

400 00

400 00

19.00 400 DO 19 00

13 00 400 00 13 00

210.00

200.00

200 DO

I 200 00

15 20

17 85

11 75

14 70

19.00

12 70

14.00

14 00

12 25

200.00 13 38 • 1132)

200 00

200.00 19 00

200 OD 12.70

- 1 14 00 I

14 00

15 20

1785

11 75

Page 80: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

(1271)1

(1271)

(587 50)

(697.50)

FORM 27 ( A)

QESCO Existing & Proposed Tariff Statement Sept 2017

Residential

1.) to 50 Units

For peak load requirement up to 5 kW

01400 Units

101-300 Units

101-300 Untls

301•700Unrls

Above 700 Units

1 Far peak load requitement exceeding 5 kW

Time at Use (TOU) - Peek

Time of Use (IOU) - O8-Peak

Total Residential

Commercial • AZ 000%

Commerde1- Forpeakloadrequirementupto5kW 9.21 1 31% 104.620

Commercial (.100) . 21.16 3.00% 34 009

Commercial 1020 KW) For peak load requitement exceeding 5 kW • 0.00% - I -

Papuan - 0.00% • • I -

Time al Use (IOU) - Peak (44) 2.10 0 30% 2616 095 I 39.901 0.95 39.93

Time of Use (70U) - Off-Peak(Temp) 775 110%1 371 5.741 100.791 574 100.79

Total Commercial 40.22 0.00%1 107,308 6.77 I 633.00 I 6.77 633.00 I

0.00%

0.16 002%

0.48 007%

226 032%

0.16 002%

2 42 1 0.34% 9 69 1 1.38%

0481 0 07%

9.211 131%

251 0.00%

0.00%

002%

007%

0 34%

0,18%

0.37%

1.56%

256 1

78

105

12

25

25

Grand Total 706 1 100.011%1 588,965 1

ndustrial _

Ell

61 Peak)

B1- (Off Peat)

02 -

132 - TOU (Peak)

62. TOU (00-peek)

133. tid331.0(Peek)

94

1 Total Indust-1M

I Bulk

ciliallup462 at 400 volts- up to 5 kW

Cl 119 Supper as 400 Volts -exceeding 5 kW

Gme of Use (TOU) • Peak

Time of Use (TOU) • Off-Peak

C2 Supply at 11 kV

Time of Use (TOU) - Peek

Time of Use (Tan - Off-Peek

C] Supply above II kV

Time of Use (TOU) - Peek

Time of Use ROUT - 00-Peat

I Total Single Point supple

FD9A ciculturel Tube-wells - Tariff D

I SCUP

Time of Use (TOU)

Time of Usa (TOU)

02 Aprlcutwat Tube-eels

Nncuitual Tuba-wads 0-2 (iff

Time or Use (rou). Peek 0-2()

Time of Use (70U) - Peat 0-2 Time of Use (TOt/I - OR-Peak 02

1 Tetra! AgrIcutture

Public L1011142 G

Resmenuel Colonies H

Special Connecta - Tents K (AD()

Time or Use Rilffril'ealt

lime of Use (TOU) - 06•Peat

18eileray TrectionTraceon -1

h

o-Genrsuon-.1

General Service

1

2.34 t 234

921 921

29 40 29.40

2.26 0 01 2.26

46 03 1.76 46 03

124 05 12.15 124 05

9.21 0.85 9 21

116.92 4.79 116.92

339.42 19.37 339.42

• •

2.34 0.68 234

9.21 0.21 921

31 50 1.44 31.50

18 48 1.02 1648

49 10 0.70 49.10

140.59 3.57 140 59

7.82

251.21 7.62 251.21

27.01 27.01

26.83 28.83

111.97 111.97

115 99

7,664 40 103.28 6976 90

16 23

15.34 3.09 15.34

73.65 73 85

7.921.41 122.60 7.23190

678 676

0.09 009

168.34 1 9,505.55

0 16

0.481 2.42

1 29 1

258

10 98 1

14

1 78

162

953

521.39

0.81

581

541

0.48

0.01

0 25%

0.23%

195%

74 00%

0 It%

083%

007%

000%

294

22.494

3,139

521

26448

260

1,084

1,452

104

1,009

1

16

3

3.670

11

135.31

169.07 1 10.293.05

0.01

1.76

12.15

065

4.79

19.37

0.68

0.21

1.44

1.02

0.70

3 57

16 23

309

(1.271) 1687.50d

3 39 0.48%

0.03%

4.59%

1.44%

1.47%

1.51%

0.00%

014%

069%

0.00%

124,575

32 30

7.43

10 18

10.34

10 66

0 97

4.85

80.11

168,082

102.652

29,542

5,859

2,649

17,663

451,023

18.41 18 41

62 99 6299

1141.14 1.14114

174.93 174 93

317391 0.09 317.39

13 57 13.57

403.80 403 80

111.45 111 45

152.64 152.64

175 73 175.73

202.55 202 55

Page 81: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

1 1

1400 '

1

1- 15.20 I

17 85

11.75

13.38

19.00

12 70

14.00

14.00

a I _IMP

(1 32)

Residential

Up to 50 Units 10.67 0 48% 122,042

For peak load requirement up to 5 kW -

01-100 Units 101 64 4.59% 65,866

101-300 Lints 23.38 1.05% 96799

201-300 Uniis 32 02 1 44% 100.565

301-700Units

33 54

32.52 1 1.

1 51%

47% 28.941

5,740 Above 700 Units

For peak load requirement exceeding 5 kW - -

Time of Use aota - Peak 3.05 0 14% 2.596

Time of Use (TOU). Off-Peak 15.25 069% 17,304

I Total Residential I 252.07 I I 441,853 I

Commercial -A2

Commercial - For peak load requeemeni up to 5 kW 28.97 1.31% 101.733

Commercial (v•A10) 66.57 3.00% 33

Commercial it 20 (WI For peak load requirement exceeding 5 kW -

Regular

Time of Use (TOU) • Peak (A.2) 6.61 0.309E-3 2,545

Time of use /Tow - Off-Peak (TemP) 24 39 1.10% as Total Commercial 126.54 I 0 009k1 104.347

1 1401,510M

0 51 0.02% 01

B1 (Peak) 152 0.07% 1,064

B1- (Off Peak) 7.11 0.32% 1.425

B2 0.51 002% 103

132 T011 Peak) 7.62 0.34% 991

02- TOLCIper 30.49 1.30%

B3-11/33 IV (Peak) 1.52 0.07% 16

Be 28 97 31% 3

Total Industrial' 78 I 3,602

Bulk

S(100.01-100 Volts - up to 5 kW 11

CI(b) Supply at 400 %rolls -exceedirALkW 0 51 0.02% 78

Time Cl Use (TOU)-Peak 1.52 007% 105

Time of Use110L11.1 - 011•Peak 7.62 034% 12

02 Supply at it kV 4.07 0.18%

Time of Use ffOlt) • Peak 813 0.37% 25

Time el Use (TOW -Off-Peak 34.56 1.56% 25

C3 Supply above 11 kV

-

Time of Use (TOLL • Peak

Time of Use (IOU) Off-Peak

Total Single Point Supply) 56 I I 256

Agricultural Tube-wells - Tariff D

Dt Scarp 5 59 0.25% 92

Time of Userall 5.08 0.23% 99 Time of Use (IOU) 29.98 1.35% 101

022kffincullual Tube-wells 1640.46 74 00% 22,270

.alricuftual Tube-wells 0-2 0

Time of Use JTOU) • Peak 0-210

Time of Line ROUT- Peak 0-2 2.54 0.11% 515

Time of Use crOu)- Off-Peak D2 18 30 083% 3,107 I

Total Agricultural 1,702 I 26,184 I

IPublic Lighting G 1.52 007% 257

Rowena! Colon■es H 0.02 0.00%

Special Connects Tariff K (MK)

Tame of Use (TOU) - Peat

Time of Use (TOU) - Off-Peak

Railway TractonTradion -1

Co-Genrahon-J

General Service

1 Grand Total 2.217 100.00% 575,499 I

H 400.00

400.00 19 00 400 00 19 00

400 00 13 00 400 00 1 13 00

11 75

200.00 14 70 200.00

200.00 200 00

200 00 19 00 200.00

200.00 12 70 200.00

400 00 14.00

400.00 19 00

400 00 12.80

380 00 19.00

I I 380 00 12.70

1 I I

14 50

19 00

1300 13.00

400.00 14.00

400 00 19 00

400.00 12.80

380 00 19.00

380.00 12 70 I

I

15.00

400.00 14.50

400.00 19.00

400.00 13.00

380 00 14.30

380 00 19.00

380.00 12 80 1

14.50

• 900

12 25

14.00

13 00

19.00 H

15.00 400.00

15 00

400 00 14.50

400.00 19 00

400.3 13.00

380 OD 14 30

380.00 19.00

380.00 12.80

15.20

17.85

FORM - 27

QESCO

Existing & Proposed Tariff Statement July-Sept 2017

Page 82: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 27 ( A)

QESCO

Existing & Proposed Tariff Statement July-Sept 2017

Residential

Up 10 50 unite 10.67 0.413% 122.042 42.69 42 69

Fis• peek load requirement up to 5 kW 0.00%

01.100 Unns 101.64 4.50% 85,668 1,270.49 1270.49

101-300 Urine 23.38 96.799 350.66 350.66

101-300 Uncle 32.02 144% 100.555 480.25 480.25

301.700Units 32.52 147% 28,941 552.92 552.92

Above MO units 33.54 1 51% 5.740 637.28 637 20

For peek bed requirement exceeding 5 kW 0.00%

Tune dl Use (TOU) - Peek 105 0.14% 2,596 57.93 57.93

Time of use (TOU) 041Phiek 15 25 0.69% 17.304 1943.20 1913 20

Total Residential 262.07 0.00% 441,853 3690.41 3,690.41

1Commercial A2 • 000% 1

• !Commercial For peek load requilemeni up to 5 kW 28.97 1.31% 101 733 550.38 • 550.38

Commerdel (<100) 88.57 3.00% 33 026 99861 0261 998 61 1

Commercith (420 KW) Far peek loan regutrement exceeding 5 kW 0.00%

Regular • 0.00% -

Tine of use (TOU) - Peak (AZ) 6.61 0.30% 2.545 2.15 125.52 I 2.65 I 125 52 I

I Time of use (TOU) - Off-Peak (Temp) 24 39 1.10% 36 17.22 317.11 I 17.22 I 317.11 I

I Total Commercial 128.54 0.00% 104,347 20.32 1,991.12 I 20.32 I 1,991.82 I I

Indust/101 • 000% - I I

91 0.51 002% 7.37 7.37 I

91 (Peek) 1 52 0.07% 1.064 - 28.97 29.97I

DI - (011 Peak) 7.11 0.32% 1425 - 92 49 - 92 49 1

52. 0.51 002% 103 0.02 7.11 0.02 7.11

92- TOLleeki_ 7.82 0.34% 991 5.28 1.84 44

5 2a 144.84

92- TOU (On-peak) 30.49 1 38% 1 36.46 390.29 36.46 I 390.29 -

131 urn KV (Peak) 1 52 0.07% 16 195 28 97 1.95 28.971

94 28.97 1.31%1 3 14.38 367.98 14 38 367.138

1 Total IndusMal 78 0 00% 1602 68.10 1,067.92 68.10 1.067.92

Bulk -

GliitSay at 400 Volts- up Co 55W 0.00% 11 . - -

C1(0) Supply a1400 Vote -exceeding 5 kW 0.51 0 02% 78 2.03 7.37 2.03 7.37

Time of Use (TOU) - Peak 1 52 007% 105 0.136 26 97 0.63 28 97

Time of Use (TOU) • Off-Peek 762 034% 12 4.33 99 10 4.33 99 10

02 Supply en 11 kV 4.07 018% 3.05 58 14 305 58.14

Time 01 Use (TOU) - Peek 6 13 037% 25 2.09 154.49 2.09 154.49

Time of Use (TOU) - OX-Peek 34.56 1.58% 25 10 71 442.33 10 71 442.33

C3 Sepal above 11 kV • • - • -

Time of Use crow - Peek • • - -

Time of Use (TOUT - Off-Peak • - • -

Total Single Point Supply 66 256 22.96 790.40 22.66 790.40

Amicultural Tube-wells - Tariff D

DI Scam 5.59 0.25% 92 84 97 84 97

Time of Use (IOU) 5.08 0.23% 90 71 90.71

Time of use Cr OU) 29.98 1.35% 101 352.31 • 352.31

02 AVICUltUal Tube-wells 1940.48 7400% 22.270 347 97 24.114.73 332.72 21,951.62 (15 25 (2.163 11)

Agncultuai Tube-pens D-2 (10 • •

Time or Use (TOUT. Peak 0-20) • 48.70 • 48 70

Tent of Use (TOM - Pen 514 2.54 0.11% 515 9 27 413.28 9.27 46 28

Time of Use (TOU) - Off-Peak 02 18 30 0.63% 3 107 232 35 232.35

Taal Agriculture 1,702 1 26 184 406.94 24,923.36 390.69 22.78124 (15.25) (2,183.11)1

Public lighling G 1.52 007% 257 21 34 21.34

Residential coton4es H 0 02 0.00% 0.28 • 0.28

Special Contracts - Tariff K (MIS) • •

Time of Use (TM) - Peak • •

Time of Use (TOU) • Off-Peak

Palmer nactionTraction 1 •

co-Genrason-J •

General Service •

1 Grand Total 2.217 100 00%1 576,409 I 607.21 32.385.32 491.96 31222.21 (15.251I (2.163.111 •

Page 83: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

1,084

1.452

104

1.009

9 15 t.38% 1

0 45 007%

069 1 31%

16

3

23 I 1 3,670

015 0.02%

0.46 007%

213 0 32%

0 15 0.02%

2 29 034%

400 00 15.00 400.00 15 00

I 400 00

400 DO

- I

19 00 I 400.00 19.00

13 00 ; 400 00 13.00

1

14 50 14.50

19.00 19.00

13.00 • 13.00

14.00 400.00 14.00

19.00 400.00 19.00

1900 19.00 _

400 00 12 80 400 00 12 80

380 00 19 00 380.00 19 00

380 00 12.70 380.00 12 70

400.00

400 OD

11 15.00 - 1500

0 15 002% 78 40000 14.50 400 00 14 50

0.46 007% 105 400 00 19.00 40000 19.00

2 29 0.34% 12 400.00 13.00 400 DO 13.00

1.22 0 18% - 380.00 14 30 380.00 14.30

2.44 0.37% 25 380.00 19.00 380.00 19.00

10 37 1.56% 25I 380.00 12 80 380.00 1280

-7

• I I -

171 1 256

I I 168 025% 294

1.52 0.23%

9.00 1,35% - 492.1B 7400% 22,494

3.139

0761 0.1 1% 521_

5491 0 93%

511 I I 26.446

0.46 I 007%I 260

0 01 0.00%

200000

200 00

200.00

200.00

15 20 15 20 a

17.85 17.85

11.75 11 75

14.70 200.00 13.38 (1.32)

- - -

200 DO I i

19 00 200 DO 19 0

12 70 200 00 1270

14 DO 14.00

14.00 14.00

J

I

FORM - 27

QESCO

Existing & Proposed Tariff Statement Oct 2017

IMVWp 9.

I lieS!deridel

Up 1050 Units 3.20 0.45% 124,575

For peak load requirement up to 5 kW

01-100 Units 30 49 4.59% 168,082

101-300 Units 7.01 1.05%

201.300 Unis 9.61 144% 102.652

301•7000nits 9.76 1.47% 213,542

Above 700 Unes 10.06 1.51% 5.859

For peak load requirement exceeding 5 kW

Time 01 Use (TOUT • Peak 0.91 0.14% 2,649

I Time of Use (TOUT • On-Peak 4 57 019%1 17,663 I

Total Residential 75.63 1 451,023 I

Commercial -

Commercial - For Peak load requiremeni up lo 5 hW 8.69 1.31%

104.520

Commercal (4100) 19 97 3.00%

541 Commercial (420 KW) Fur peak load requirement exceeding 5 kW

Regular

Time 01 Use (IOU). Peak 14-2) 1.98 0.30% 2.618 ;

Time cil Use (TOU)• Off•Peas (Temp) 1 7 32 1 10% 37

Total Commercial 37.97 0 00% 107.308

Industrial

B1

131 Speak)

B1 -108 Peak)

B2

82 • TOO (Pear)

82. TOI.L(011-ipitak)

03- 11(33 KV (Peak)

84

Total Industrial

Bulk

C1(a) Supply at 400 Veils • up lo 5 kW

C 1(b) Supply al 400 Vona -exceeding 5 kW

Time of Use (TOO) • Peek

Time of Use (TOO) • Off-Peak

C2 Suppitei 11 kV

Time of Use (TOUT - Peak

Time of UsegOLOff•Peak

C3 Supply above 11 kV

Time of Use (TOO) - Peak

Time of Use (T010- Off-Peak

1 Total Single Point Supply

Agricultural Tube-wells • Tariff 0

DI Scarp

Time of Use (70U)

Time or Use ROIL)

D2 iSincultual Tube-wells

Agncultual Tube-wells 0-2 00

Time of Use (TOU) • Peak D-2(i)

Time of Use (701_1:peak 0-2

Time of Use (IOU) - Off-Peek 02

1 Total Agricultural

Punk Lignling G

Residential Colonies H

Special Contracts. Tariff K (NR)

Time of Usr±DU). Peak

Time of Use (TOU) • Off-Peak

Reiff TraclionTraction . I

CoGenralion-J

General Service

1 Grand Total

R✓kwn) IR ft 141

12.50

15 00

1500

17 00

19 00

19 00

13 00

4 DO 4 00

12 50

15.0D

15 00

17 00

19 00

19.00

13 00

12 25

665 I 100 00% 588,9651

Page 84: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 27 ( A)

QESCO Existing & Proposed Tariff Statement Oct 2017

Residential

p to 50 UNts 3.20 048% 124.575

For peak load requeomeni up to 5 kW - 0.00%

01.100 units 30.49 4.59% 168082

tot-ma units h 7 01

101.303 units 9.61 141% 102,652

3ot•nounits 9.76 1.47% 29,542

Above 700 Unite 10.06 1.51% 5.659

For peak load requirement exceeding 5 kW - 0.00%

Time or Use (TOU). Peak 0.91 0 14% 2.649

Time of Use (70U) - Off-Peak 457 099% 17,663

Total Reeldentiel 76.63 0.00% 4513323

Commercial • A2

0.00%

omma vial For peak bed requirement up to 5 kW

869 131% 104.620

Commercial (4100)

19.97 3.00% 34

Commercial (420 AR For peat load requeemers exceeding 5 kW

Regular

Time of Use (7018 • Peak (A-2)

lima of Use (IOU) • Off-Peak (Tame)

Tmal Commercial

000% •

0.00%

1.96 0.30% 2,618

7.32 1.10% 37

37.97 0.00% 107,303

009

12.81 12.81

381.18 381.18

105.21 105.21

144 09 144.09

165.89 165 89

191.20 191.20

17.38 17.38

59.46 59 46

1,077.22 1,07712

165,13 165 13

299.61 009 299.61

- -

- -

0.95 37.66 0 95 37.60

5.74 95.14 5 74 95.14

6.77 597.54 517 697.54

Industrial - 000% -

B1 0.15 0.02% -

Ell (Pan) 046 007% 1,084

B1d0ff Peak) 2 13 0.32% 1,452

82. 0 15 002% 104

B2 . TOU (Peak) 2.29 0.34% 1.009

82 - TOU (OR-peek) 9 15 1.38% 1

__83- 11/33 KV (Peak)

84

046 007%

8.69 1.31%

16

3

Total Industrial 23 0.00% 3,670 I

Bulk - •

0109 8upp0 el 400 Voila - up lo 5 kW - 0.00%1 11

C1(b) Supply al 400 Valls -exceeding 5 kW 0.15 002% 78

lane or Use (TOU) - Peek 0.46 007% 1051

ryes or Use (YOU) . 011-Peak 2.29 0.34% 12

G2 Sue919 m 11 k3/ - 1.22 0 la% -

Time of Use (70U) • Peak 2,44 0.37% 25

Tame of Use (701) - Off-Peak 10.37 1.58% 25

G3 Sap* above 11 kV -

Time of Use (TOU)- Peak • •

Time of Use (TOU) - Off-Peak • -

Total Mole Pelm Supply 17 I 256

Agricuftural Tube-wells Tariff 0

DI Scarp 198 0.25% 294

rime of Use (YOU)

1.52 023% -

Time of Use (IOU)

900 1.35%

02 AgnaiRual TLibeAvells

492 18 74.00% 22,494

',Paint. rube-walls 0-2 (l11

Time of Use ROUT - Peak 0-20)

3,139

Time of Use (TOU) - Peak 0-2

0.76 0.11% 521

rime of Use ((0U) • 00-Peak D2

5.49 0.03% •

Tau! AgrIcuitural

611 26,4413

Public Ugrdng G

046 007% 280

Resmenim Colonies II

0.01 0.00% •

Spectel Gomrems - Tariff K ( 4.1k) •

Tome of Use ((OU)- Peak

TIme el Use (Toll) - Or-Peek

Railway TmotionTroction - 1

Co-Genration-J

General Service

Grand Torn

665 100.00%

2.21 2.21

609 869

27.75 27 75

0.01 2 13 0.01 2.13

HHI3 43.45 1 76 4345

12.15 117.10 12 15 117.10

0.65 8.69 0.65 8.69

4 713 1 110.38 4.79 110.38

19.37 320.41 19.37 320.41

068

2.21 0.68 2.21

0.21

8.89 0.21 8.69

1.44

29.73 1.44 29 73

1 02

17.44 102 17 44

0.70

46.35 0.70 48.35

3.57

132 71 3.57 132 71

7.62

237.14 792 237.14

25 49 I 25.49

27.22 I 27 22 I

105.70 I 105.70

7,235.101 94.52 13 5136 10 (21.47) (64699)

18.23

14.48 3.09 14.48

69.71 69 71

7477.70 113.84 6,828.71 (21.47) 0545.9911

8.40 6.40

0.08 008

H

9,116.51 147.60 9,047.61 i (21.47) (648.991]

115 99

18 23

3.09

568,965 - I 169.07

136.31

Page 85: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

19 00 - 19 00

15.00 400.00 15 00

1

19.00 I 400.00 I 19.00 1 I

13 00 400 00 13 00 1 1

1 1

14.50 14.50 -11111

400.00

400.00

I 400 00

380 00

1 380.00

19.00 19.00

13.00 - 13. 00

14 00 400.00 14.00

19.00 400.00 19 00

12.80 400.00 12.801

19 00 380 00 19.00

12.70 380.00 12.701

1

400 00

400.00

400 00

• 14.00

14 00

14 00

14.00

12.25

15.00

14.50

19 00

13.00

14 30 _

19.00

12 80

15.20

17 85

11.75

13 38

4100.00

400 00

400.00

380 00

380 00

380 00

15 00

14 50

19.00

13.00

14 30

1900

12 80

400 00

400.00

400.00

380 00

360 00

3E10 00

1175 250 8

11.75

14.70

19 00]

12.70

200 00 200 00

200 00

200.00

200 00

200 00

200.00 19 DO

200 00 12.70 1

(1.321

FORM • 27

QESCO

Existing & Proposed Tariff Statement Nov 2017

Residential

Up lo 50 Units

For peek load requirement uRio 5 kW

01-100 Units

29 30 4.59% 1613.082

101-300 Units 674

923

105%

1 44%

-

201-300 Units 102.652

29,542 301-700Units 9.38 1 47%

Above 700 Units 9.67 1,51% 5,859

2.649

For peek load requirement exceeding 5 kW

0.14% Time of Use (TOU) - Peak 0.88

Time of Use (IOU) - Off-Peak 4.40 0 89% 17 863

Total Residenuai 72.67 I I 451,023 I

Commercial - A2

Commercial - For peak load requirement 51° lo 5 kW 6.35 1.31% 104.620

Commercial (0100) 19.19 300% 34

CommeroM (420 KW) For peak load requirement exceeding 5 kW - -

Re puler - -

Time of U OUi - Peak (A-21 1 90 0.30%

37 1

2.61

Time

Time of Use (TOW - Off-Peak (Tema) 7.03 I 10%

1 Total Commercial 36,46 1 0 00%1 107,308 1

Ilndustrial - I I

B1 0.15 0.02% •

Ell (Peak) 0.44 0.07% 1.0134

Al .loll Peak) 205 0.32% 1.452

B2- 0 15 002% 104

82 - IOU (Peak) 2.20 0.34% 1.009

82 - IOU (Off-peak) 8 79 1.38% 1

03- 11/33sle (Peak) 0.44 0 07% 16

64 8.35 1 31% 3 1

Bulk

Total Industrial 33 1 1

1

3,6701

I

11 I

781

105 I

12

6)Supply 400 Volls • up to 5 kW

C10 Supply at 400 Volts -exceeding 5 kW 0.15 0.02%

0.07% Time of Us_efr00) • Peak 044

Time of Use (TOU)- 011-Peak 2.20 0.34%

02 Supply at 11 kV 1.17 0.18% -

Time of Use (70U) - Peak 2.34 037% 25

Time on Use - Off -Peak 996 1.56% 25

C3 Supply above 1110/ -

Time of Use (TOU) • Peak

rime al Use (IOU). Off-Peak 1 -

Total Single Point Supplyl 16 1 1 256 1

Agricultural Tube•wells - Tariff D -

01 Scarp 1.61 0.25% 294

Time of UseiTOU) 1.47 0.23%

lbw of Use (TOU) 8.64 1 35%

..

02 Anculteal Tube-wells 472 97 74.00% 22.494

Apdcullual Tube-wells D-2 (ii) .

Time of Use (IOU) - Peak 0-2(1) i 3.139

Time of 0(TO_I) • Peak 0-2 0.73 0.11% 521 1

Time of use (IOU)- Off-Peek 02 5 27 0 83%

I Total Agriculturad 491 I I 26,448 I

Paling G 1 044 1 0 07%1 260

ResideMiel Colonies H O 01 000% -

Special Contracts - Tariff K (AUK)

H

Time of Use (IOU) - Peak

Time of Use afiAA - °8-Peak Railvyra TraolionTraction • 1

Co-Genralion-J

General Service - Grand Total' 639 I 100 00%1 588,969

3.08 048% 124.575

12.50

15.00

15 00

17.00

19 00

19.00

13 DO

4.00

12.50

15 00

1500

17 00

19 00

19.00

13 00

H

Page 86: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM- 27 (A)

QESCO

Existing 8 Proposed Tariff Statement Nov 2017

Residential

Up M 50 Units 3.08 0.48% 124,575 12.31 12.31

For peak toedjJm ulremerrt up lo 5 kW • 0.00% •

01-100 units 29.30 4.59% 168.082 386 30 366.30

101-300 Unite 6 74 101 10 101.10

101-300 Units 9.23 144% 102.652 136.46 138.46

301-700Ungs 9.36 1.47% 29,542 150.41 159 41

Above TOO Una. 9.57 1 51% 5,859 183 74 183.74

For peak load requirement exceeding 5 kW 0.00%

Time of Use (IOU) Pea 0.88 0.14% 2.849 16.70 16 70

Ir Time of Use (Tool• Off-Peak 4 40 0.69% 17,663 57.14 57.14

Total Residential 72.67 0.00% 451.023 1,035.16 1.036.16

Commercial • A2 0.00%

Commercial - For peak load requirement up to 5 kW 8.35 131% 104,620 159 85 158.68

Cornmercsel (n100) 19.19 • 300% 341 0.09 287.91 I 0.09 287.91

Commercial (C20 KVV) For peek load requirement exceeding 5 kW 0.00%

!Soar _ 0.00%

Time of Use (TOU)- Peak (A.2) 1.90 030% 2,616 0.95 36 19 1 0.95 I 36 19

little of Use 47010 041-Peek (Temp/ 7.03 • 110% 37 574 91,431 5 74 1 91.43 1

Total Commercial 38.48 0.00% 107,306 6.77 I 674.21 I 6.77 674.21 1

Industrial • 000% • _

Bi 0 15 0.02% - 2.12 2 12

El (Peek) 0.44 0.07% 1,064 8.35 8 35

131 - (Off Peak) 2.05 032% 1,452 2667 26.67

02 • 0 15 0.02%' 104 0.01 2 05 0 01 2.05

B2- TOU (Peek) 2.20 0.34% 1,009 1.713 41.76 1.76 41.75

B2' 10U (011-peek) 879 1.39% 1 12.15 112 53 12 15 112.53

63. 11133 Ky2ealt) 0.44 _ 0.01% 16 0 65 8.35 065 8 35

8.351 131%1 3 4.79 1136.07 4.79 106 07

Teed Inchlindel 23 0.00% 3,670 19.37 307.90 19.37 307.90

Bulk

11 • (4_)_Supp1y at 400 Volts • up to 5 kW 0.00% •

01(b)SoPPIT at act Volts -exceeding 5 kW 0.15 0.02% 78 0.68 212 0 68 2 12

Time(TOU) • Peal, 0.44 0.07% 105 0.21 8.35 021 8.35

Time of Use (TOU) - OR-Peak 220 0.34% 12 1.44 28 57 1.44 28 57

C2 Supply al 11 kV 1.17 0.16%1 1.02 16.76 1.02 16.16

Tines of Use Roo - Peak 2 34 0 37%1 25 070 44 54 0.70 44 54

Time of Use (IOU) - 0114•eak 9.96 1.56% 25 3.57 127.53 3.57 127.53

03 Supply above 1 t kV - I •

Time al use (TOO) - Peak

Time 01 Use (TOO) - OR.Peak •

Toml Single Point Supply 16 256 1 7.92 227.88 7.62 227.88

&rice Buse I Tube-wells - Tariff D

01 Scarp 1.51 0.25% 294 24 50 24.50

Time of use (TOU) 1 47 0.23% - 26 15 26.15

Time of Use ou)_ 864 1.35% 101.57 101.57

D2 Agricubual Tebe.eells 472.97 7400% 22.494 115.99 6952 60 88.75 8,328.95 (27.24 (62385)

Nhaienal Tube-wells 112 OD

Time of Use (1018 Peak 0-2(0 • 3,139 16 23 16 23

Time of use (TOO) • Peek 0-2 073 011% 521 3.09 13.92 309 13 92 •

Tine of use (TOO • Off•Peek 02 5.27 0.53%1 66 99 66.99

Total Agricultural 491 28,448 135.31 7,185.74 108.07 6,662.08 (27.24 (623.85)

Public Lighan9 G 0.44 0.07% 260 6 15 6.15

Residential Colonies H 001 0.00% 008 0.08

Special Conlmas • Tariff 11 (MK) •

Time of Use (TOU) • Peak • •

Time OSTeen • CM•PeeS

Railway TraCliontraMlon - 1 •

Co-Genrellon-J

General service

Grand Total1 639 1100.00%1 588,965 I 1 169.07 9,337.12 141.83 8.713.47 (27.24) (623.65)

Page 87: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

I tweet (Rotwx) IR s AWN I

12.50

1500

1500

17.00

1900

15.00 - 15.00

400 00

14.50 400.00 14.50 -

400 00

1900 400.00 19 00

400.00

13.00 400 00 13.00 -

380.00

14 30 380 00 14.30 -

380.00

19.00 380.00 19.00

380 00

12 80 380 00 12 80

200.00

200 00

200 00

200 00

1520 15.20

17.85 17.85

11.75 11 75

14.70 200 00 13 38 I

200 00

19.00 200 00 19.00

12.70 200.00 12 70

1

14 00 1 14.00

14.00 14.00

12.25

FORM • 27

QESCO Existing & Proposed Tariff Statement Dec 2017

Residential

Up to 50 Unils 3.26 048% 124,575

For load requirement up to 5 kW

01-100 Units 31.02 4.59% 168,082

101.300 Units 7.13 1 05%

201.300 Units 9.77 1.44% 102.652

29,542

Above 700 Undo _ 10 24 1.51% 5,859

For peak lead requirement exceeding 5 kW

Time of Use (TOU)- Peak 0.93 0.14% 2 649

Time of Use (IOU) • Oft-Peak 4.65 069% 17.663 1

Total Residential 76.92 1 1 451,023 1

Commercial • 42

commercial • For peak load requirement up to 5 kW 8.84 31% 104.620

Commercial (<100) 20.32 3.00% 34

Commercial (<20 KW) For peak load requirement exceeding 5 kW

Regular •

Time of Use_ (1C..1)_peak (A-2) 2.02 0.30%

Time of Use (IOLA • Off-Peak (Temp) 7 44 1.10%

2.618

37

Total Commercial 1 38.62 0 00%1 107,306

19.00

13 00

19.00

19 00

400.00

15 00

400 00 15.00

400 00

400 00

1900] 400.00 19 00

13.00 400.00 13.00

14.50

19 00

13 00

400.00 14.00

400.00 1900

400.00 12.80

380.00 19.00

380 00 1270

301.700Um1s 9.93 I47%

400

12.50

15.00

15 00

1

17.00

DO

1300

13 00

Industrial

81

CIL/Peak)

131 • (Oft Peak

82

82 TOU (Peak)

02 - TOU (011-peak)

83- 11/33 kV (Peak)

84

Total Industrial

0 16 0.02% - 047 0.07% 1,084

2 17 032% 1,452

0 16 0.02% 104

2.33 034% 1,009

9.30 1.35% 1

0.47 0.07% 16

884 131% 3

24 I 1 3,670

400.00

400 DO

400 00

380 00

380.00

14.50

19 00

1300

14.00

19.00

12.80

19.00

1270

Bulk

1(51 Supply at 400 Voss • up io 5 kVV 11

026flptplyt100 Volts .exceefing5 kW 0.16 0.02% 78

Time of Use (70U) Peak 0. 47 0.07% 105

Time et Use (TOO • 01I-Peak 2 33 0 34% 12

C251p.rply al 11 kv 1 24 0 18%

Time of Use (701.,2eak 2.48 0.37% 25

Time of Use crow . Off-Peak I 10.55 1.56%1 25

C3 Sup_plbove 11 W

Time of use0±cilpu • Peak

Time of Use (TOU) • off-Peak

1 Total Single Point Supply) 17 1 1 256

Agricultural Tube-welts • Tariff D

DI Scary 1 71 025% 294

Gme of Use6TOU) 1.55 0 23%

Time el Use (TOU) 9.15 1 35%

Dgadtual Tube-wells 500.60 74.00% 22,494

Agncutlual Tube-wells 0.20)

Time of Use (TOU) - Peak 1}20) 1 • 3,139

Tillie of UsaaJLPeak D-2 0.78 0.11% 521 1

Time of Use (701.11- Off-Peak D2 I 5 58 0.83%

619 1 I 26.448 I

047 0.07% 260

0.01 0.00%

100.00%1 588,965 1 676 1

Total 4orlculturail

Public Ligniing_G

Residential Colonies m

Celal Contracts - Tariff K 0-1141

Time el Use (70U) • Peal(

Time of ust1tUt. cm-Peak

Railway TramionTraction • 1

Co-Demotion-7

General Service

Grand Total

Page 88: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

13 03

387.70

107.01

146.55

168 73

194 47

17 88

8048

1.095.66

167.95

304.73

38.31

96.77 I

607.76

2.25

984

28.22

2 17

44 20

119 10

8.134

112.28

325.69

2.25

884

30.24

17.74

4714

134.96

241.20

25 93

27.68

107.51

6.698 75

14.73

70 90

6,946.10

6.51

009

(1695)

(18.93)

(680 09)

(660.09)

9,222.60 11986) (980.09)1

FORM 27 ( A)

QESCO

Existing & Proposed Tariff Statement Dec 2017

Residential

Up to 50 Unds 3 26 048% 124.575 13 03 For peak load requimmen1 up to 5 kW 0.00%

01.100 Units 31.02 4.59% 1138.082 387.70 101-300 Units 7.13 107.01

101-300 Unto 9 77 1 44% 102,652 146 55 301.7000nas 993 29.542 188 73

10.24 5,859 194 47 Above 700 Units 471: 151% For peek load requiremerd exceeding 5 kW • 0.00%

Time of Use (TOU) Peak 0.93 0.14% 2.649 17.88 Time of Use crow Off-Peak 4 65 0 89% 17,663 60.48

Tots! Residential 76.92 0.00% 451,023 1.096.65 Commercial AZ 0.00% Commercial - For peak load requirement up to 5 kW 664 1 31% 104,620 167.95 Commercial (4100) 20 32 3.00% 34 009 304.73 009 Com134rtia11<2D KW) For peek load iequinonem exceeding 5 kW

Regular

• 0.00% 0 00% H•

I Time of Use (TOO)-Peak (A-2) 2 02 0.30% 2,6113 0.95 35.31 0 95 I Time of Use (TOU) • Off-Peak (Temp) 744 1.10% 37 5 74 I 96.77 5.74

Total Commercial 113.62 000% 107,308 5.77 607.76 9.77 Industrial 000% •

01 0.15 002% 1.C18-14

2 25 01 (Peek) 0.47 0.01% 8.84 131 - Cruaseak) 217 0.32% 1.452 28.22 02 - 0.16 0.02% 104 I 0.01 2.17 0.01 62 TOU (Peak) 213 0.34% 1.009 1.76 44.20 1.76

I 62 - TOU (Off-peek) 930 1.33% 1 12.15 119 10 12 15 I B3-11/33 KV (Peek) 047 0.07% 16 0.65 864 065 1 B. 8,84 1.31% 31 4.79 112.26 4 79

Total Industrial 34 000% 3,670 13,37 326.89 19.37 BUlk - 1 •

1()6g:tog at 4130 Vohs. 1. - fflio 5 kW 0.00% 11 try) Sepia- al 400 Von -exceeding 5 kW 016 0.02% 78 0.613 2.25 0.68

Time el use (10I0 - Peak 0.47 0.07% 105 0.21 8.84 021 Timed Use BOLO - CM-Peak 2.33 034% 12 1 44 30.24 1.44

gAigg&m 11 kV 124 0.18% - 1 02 17.74 1.02 Time 44 Use (TOU) Peak 2 48 0.37% 25 0 70 97 14 070 Time of Uss (TOU) Off-Peak 10 55 1.58% 25 3.57 134.98 3.57

C3 Supply above 11 101 • Time of Use (TON- Peak •

I Time of Use (rOU)- Off-Peak Total Single Point Supply 17 256 7.62 241.20 7.62

Agricultural Tuba-wells - Tariff 13 • - D1 Scarp 171 025% 294 25.93 Time of Use (TOU) 1.55 0.23% - 27.88 Time of Use (TOU) 9.15 1 35% - 107,51 07miicuiinel Tute-welis 500.60 74.00% 22,494 115.99 7,358.84 97.04 Agriculival Tube-sells 0-2 (II) r- - - Time of use (TOO) - Peak 020) - 3,139 16 23 • 16.23

Time of Use (TOU) • Peak 0-2 0,78 011% 521 3.09 14.73 3.09 Time of use (701) • Off-Peak D2 5.58 0.33% - 70.90

TotalAgncultural 619 26,448 136.31 7,601.60 116.36 Public Ogrinng G 047 0 07% 260 6.51 Residential Colonies H 0 01 000% - 0.09 Special Convene • Tenn K 0.00 - -

Time of Use (TOU) - Peak - Time of Use (TOU) - Off-Peak • • H

Penny TraclienTracnon . Co-Serration-4

General Service Grand Total 678 100.00% 588,965 9.882.59 169.07 160.12

Page 89: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

H 400 00 -

400 00

14.50 14.50

19 00 - 19.00

13.00 - 13.00 1

400.00 14.00 400.00 14.00 I_

400 00 19.00 400.00 19 00

400.00 12.80 400 00 12.80 1

3E10 00 19.00 I 380.00 19 00

380.00 12 70 380 00 12 70

1

15 00 15.00

400.00

14.501 400 00 _ 14.50

400 00

19.00 400 00 19.00

400.00

13.00 400.00 13.00

380.00

14.30 380.00 14 . 30

380 00

19 00 380.00 19.00

380.00

12.80 380 00 1280

1

15 20 1

17 85 I

11 75

14.70 200 00

19.00

12 70 I

14.00

14.00

15 20

1785

11.75

1338

200 00

200.00 19.00

200 00 12 70

14.00

14.00

200 00

200.00

200.00

I

200.00

FORM - 27

QESCO

Existing & Proposed Tariff Statement Oct-Dec 2017

imEw %Awn talwww)

Residential

Up m50 Units 954 048% 124.575

For peak loci) regulremenl up to 5 kW

01-100 Units 90 81 4.59% 168,082

101-300 Units 20.89 1.05%

201.300 Units 28 61 1 44% 102,652

301.7000/1m 29 06 147% 29.542

Above 700 Undo 2997 1.51% 5.859

For peak load requimment exceeding 5 kW

Time of UscL(TOU) • Peak ___2.72 0.14% 2,649

Time of Use (TOLtt• OH-Peak 1162 069% 17,663

Total Residential' 225.22 1 451,023

Commercial - A2 _

Commercial • For peak load requirement uoto 5 kW i 25.88 1.31% 104,620

Commercia1t4100) 59.48 3.00% 34

Commercial (120 KW) For peak load requirement exceeding 5 kW -

Regular

Time of Use (TOU) • Peak (A-2) , 590 0.30% 2618

Time of Use (TOU) • Off-Peak FremP) 21.80 1 10% 37

Total Commercial 113.06 0 00%1 107,308

Industrial •

Si 045 0.02% •

81 (Peak) 1.36 0.07% 1.084

RI • (Off PeekT 6.36 0.32% 1,452

02

B2 - TOU (Peak) i6.81 0 34% 1,009

-

0 45 0.02% 104

92 • TOU t(71•ceaki 27 24 1.30% 1

83- 11/33 KV (Peak) 1 1.36 007% 16

ea 1 25 BB 1.31% 3

70 I 3,670

Bulk

(,aS1uksplyat MO Volts - up lo 5 kW - 11

Cl(b) Supply x1400 Volts -exceeding 5 kW 0.45 0.02% 78

Time of Use (TOU) - Peak 1.36 0.07% 105

Time of Use (TOO) - CHI-Peak 6 81 0.34% 12

C2 snooty at ii kV 3.63 011I%

Time ol Use (TOU)• Peak 7.27 0.37% 25

Time of Use (IOU) - Off-Peak 30 88 1 56% 25

C3 Supply above li kV -

Time of Ussi(Ou) • Peak -

Time of Use (TOU) • Ott-Peak •

I Total Single Polite Supply' 50 I

Agricultural Tube-wells • Tariff D I I

01 Scarp 4.99 0 25% 294

Time of Use (TOU) 4.54 023% -

Time of Use (10U) 26.79 1.35%

02 AgrIcultuai Tube-wells 1,465 75 7a 00% 22 494

Agnpulluat Tube-wells 0-2 Oil

Time of Use ROUT • Pea

Time of Use (TOU)-Peak D-2 2 27 0.11% 521

Peak 62(8 - 3.139

Time of Use (TOU) • Off-Peek 02 16 35 0.83%

Total Agdcultural 1,521 1 26,4413

Public krona G 1 36 0.07% 260

Residential colonies H 0.02 000%

special Contracts • Tend K (App -

Time of Use (TOU)- Peek

Time of Use (TOU) • OH-Peak

ripn-4

General Service

1

Railway TractonTraction • I

Co-Genra

Grand Total 1,981 i 10000%1 588,965

- 256 I

4.00 4.00

12.50 12.50

15 00 15.00

15 00 • 15.00

17.00 • 17.00

19 00 • 1900

19 00t 19 00

• •

13 00 I 13.00

19 00 19 00

15.00 400 00 15.00

• - _

19.00 1 4_00.00 19.00

13.00 I 400.00 13 00 •

12.25

1 1 1

Page 90: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 27 ( A)

QESCO Existing & Proposed Tariff Statement Oct-Dec 2017

PW) I I Mn Rs1 Ban Rs)

38 14

DAM Re) Min tel

38.14

I Win 411 (ken Rs)

1,135.18 1,135.18

313.31 313.31

429.10 429.10

494 03 49403

569.41 569.41

• •

51,76 51 76

177 09 177.09

3,208.03 3,208.03

491.76 491.76

0.26 892.26 I 0.26 I 892.26

• I 2.85 I 112 16 I 285 1 112 16

17.22 I 283.34 I 17 22 1 283.34

20.32 I 1.779.62 I 20.32 I 1.779.62

658 658

25.88 25 88

• 82.64 82 64

0,02 8.36 0.02 6.36

5.28 129 41 5 28 12941

36.46 348.73 36 46 348 73

1.95 25.88 1.95 25.68

14 38 326.70 14.38 328.70

68.10 9E4.19 5E110 934.19

• • •

2.03 6.58 2.03 6 58

0 63 25.88 0.63 25.88

4.33 88.54 4.33 68.54

3.05 51.95 3.05 51.95

2.09 138.04 2 09 138.04

10.71 395.23 10.71 395.23

• •

22.86 7124.22 22.86 706.22

75.92 I 75.92

81.05 I 81.05

314 79 I 314.79

347 97 21.546 54 I 280.32 19,613.60 187.85 (1,932.74)

48.70 48.70 •

9.27 43.14 9.27 43.14

207.60 207.60

406.59 22,269.09 338.29 20,338.30 167.65 (1,932.7411

19.07 19 07

0 25 0.25

607.21 28.936.32 439.56 27,003.58 (67.65) (1,932.74)

Residential

(PAM, 19tege) I

Up io 50 units 9.54 945%

For peek lOatlrequirernen1 up to 5 kW 000%

01-100 Units 90.81 4.59%

105-300 Urine 20.89

101-300 Units 26.61 1.44%

301.700Unlis 2906 147%

More 700 Unrls 1.51%

For peak load re9uireme4 exceeding 5 kW

29.971

0 00%

Time of Use (70M1- Peek 1721 0 14%

Time of Use (70U) - Off-Peak 13.62 059%

Total Residenilal 225.22 000%

Commercial - 42 - 000%

Commercial. For credit load requirement opio 5 kW 25.88 I 31%

Commercial (<100) 59.46 3.00%

Commercial (<20 KM For peak load requirement exceeding 5 kW - 0.00%

Roomer _ - 000%

Time of Use (MU) • Peas (A.2) 5.90 0.30%

Tittle of Use (TOO - Off-Peek (Temp) 21.80 I 10%

Total Commercial 113.04 0.00%

Industrial 0.00%

01 0 45 0.02%

B1 (Peek) 1.36 0.07%

61 - (on Peak) 6.36 0 32%

- 0.45 0.02%

B2. TOU (Peak) 6.81 034%

512 - TOO (Off-peak) 27.24 I _1 38%

83- 11(33 KV (Peak) 1.36 0.07%

B4 I 25 88 131%

Total industrial 70 I 0 0ES6

Bulk

C1(a) Supply et 400 Volts • up to 5 kW 000%

C1(bl Supply at 400 Mks -exceeding 5 kW 0.45 0.02%

Cole of Use (IOU). Peak 1.36 0.07%

Time of Ot8 - Off-Peek 6.81 0.34%

C2 Supply al 11 kV 3.63 0.10%

Time of Use (70U)- Peak 7.27 0.37%

Tine of Use (70U) - O6-Peek

al ply above 11 xV

30.88 1.56%

-J lime of Use (13A • Peak

Time of Use (TOO • Off-Peak

Total Single Point Supply

50

Agrkultural Tube-wells • TarIll 0 •

01 Scat' 4.99 0.25%

rime of Use JOU/ 4.54 0.23%

Time of use (TOO) 26.79 1.35%

D2 Agricusuel Tube-wells 1,485.75 I 7440%

Agncullual Tube-wells 0-2 (Ii) •

Time ol Use (TOO) - Peak 0-2(1

Timm oi11t. Eta 0.1). Peak 13.2 217 011%

Cms of Use (IOU). Off-Peek 02 16.35 083%

1 Total Agricultural 1,621

Mimic Waling G 1.36 0.07%

Residential Colonies Fl 002 0.00%

4-41Convacts - Tariff K DUN

Tine of Use (IOU). Pettit

Time of Use (TOO) - Off-Peak

RtIOWay TradionTractIon . 1

coanration-J

General Service

Grand Total 1,981 100 00% 588,965

102,652

20.542

5,1359

2,649

17,663

451.023

124.575

-

104.620

34

-

2.618 I

37 I

107,308 I

168,082

3,139

521

26.448

260

22.494

1,084

1.452

104

1.009

16

3

3.670

11

78

105

12

25

25

256

I

Page 91: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Off

14.50

1900 - 1300

400 00 19 00 400 00

19 00 12.60 I 400.00

I

380.00 12 70 1 380 00

15 00 14 50 400.00

400 00

400.00

380 OD

400 00

380.00

400.00

t

FORM • 17

QESCO

Existing & Proposed Tariff Statement Jan 2018

Residential

Up to 50 Links 330 048% 124.575

For peak load reuirement up to 5 kW

01-100 Unds 31 40 459% 168.082

101-300 Undo 7.22 105%

201-300 Unts 9 89 1.44% 102652

301.7000nris 1005 147% 29.542

Above 700 Units 10.36 1.51% 5,859

For peak load requirement exceeding 5 kW

rime of Use CIOLIt • Peak 0.94 014% 2.649

Time of Use (TOU) -011-Peak 4 71 0 65% 17.663

Total Residential! 77.36 I I 451,023 I

Commercial • A2

Commercial - For peak load requirement up lo 5 kW El 95 1.31% 101.620

Commercial (4100) 20.56 3 00% 34

Commercial 1470 KW) For peak road requirement exceeding 5 kW

- Regular _

Time of Use (TOU)• Peak (442) 2.04 030% 2.618

Time of Use (TOU) • Off.Peak (Temp) 7.54 1.10% 37

Total Commercial 39.09 I 0 00%1 107,308 I

19 DO

400.00 15.00

400 00

400 00

4.00

12.50

15.00

15.00

17 00

19 00

19.00

13 00

19.00 I 400 OD 19.00

13 00 I 400.00 13.00

1

19 00

400.00 15 00

Industrial__ -

131 0 16 0.02% .

___B1 (Peak) 0.47 0.07% 1.084

B1 - Kat Peakt_ 2.20 032% 1.452

B2 . 0 16 0.02% 104

52 • IOU (Peak) 2.35 034% 1,009

B2 • TOU (Offmeak) __942 1.38% 1

B3-11133 KV (Peak) 0.47 0.07% 16

94 8.95 131% 3

I Total Industrial' 24 I I 3,670

Bulk I I

01(a) Supply al 400 thurp, to 5 hVV 11

C1(0)54pply al 400 Valls -exceeding 5 kW 0.16 002% 78

Time &Use (TOUI• Peak 1 0.47 0.07% 105

Time of Use (MU) • 03-Peak 2.35 0.34% 12

02 Supply al / 1 kV 126 0.18% .

Time al Use crouj- Peek 2.51 0 37% 25

_Time of Use (TOU) • 03-Peak 10.67 1.56% 25

C3 Supply4bove 11 kV

Time of Use (TM) - Peak

Time or Use (IOU)- Off•Peak

Total Single Point Supply)

17 I 256

Agricultural Tube-wells - Tariff 0

pi Scarp 1 73 0.25% 294

rime of Use asu) _1.57 023%

Time of Use (TOU) 9.26 135%

02 Agnumuai Tube-wells 506.74 7400% 22.494

Avicuiitral Tube•Hells 0.2 (4) •

Time of Use (TOU) • Peak D-2 Si) 3.139

Time of Use (TOU) • Or-Peek 02

I

5.65 0 83%

0 78 0 11% 521 Time of Use (TOU)• Peak D-2

Total Agricuitured 526 I I 26,448 I I

Public LIgniing4G 1 047 007% 260

Residential Colonies H 001 0.00%

Special Convects - Tariff K (AJK) -

Sone crif Use (70U) . Peak

Time of Use (TOO • Olf•Peak

RarivrrachonTractron • 1

Co•Genration-J

General Service

-

Grand Total! 686 I 100 00%1 588,965 1 11

14.50

19 00

13.00

14 00

1900

12130

1900

1270

15.00

14.50

200 DO

200.00 19.00

200 00 12.70

400 00 19.00 400 00 19 00

400 00 13.00 40

380.00 14.30

0 00 1

380 00

3 00

14 30

380.00 1800 38000

380.00 12.80 380 00

15.20

17 85

11 75

14.70

200 00

200.00

200 DO

200 00

19 00

12 BO

15.20

1785

11.75

13.38

19 004

12.70

A1321

• 14 00 14.00

14.00 14 00

12 25

Page 92: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM 27 ( A)

QESCO

Existing & Proposed Tariff Statement Jan 2018

I

Residential

IUp to 50 Unite

I For peak load requirement up to 5 kW

01-100 Undo

101-300 Unds

101-300 Units

301.7000nils

Stove 700 Units

For peak load requirement take Wang 5 kW

Tone of Use mete - Peak

Time of Use (IOU) - Off-Peak

I Total Residendal

'Commercial • A2

Comreargal - For peak lead requirement up lo 5 kW

Commercial LuiC113)

Commercial (420 KW) For peak load requiremerl exceeding 5 kW

_Reptiles

Time of Use (TOU) • Peal (M4)

Time. or Use (7014 - Off-Peek (Tamp)

I Total Commercial

Ilndusttlal

131

_ St ( Peak)

Biltilluast

62-

82 • TOU (Peak

82 • TOU (Off-peek)

63. 11/33 KV (Peak)

ea

I Total inciusmai

Bulk

(isiBuppty al 400 Volts-up to 5 kW

C1l1)Supply at 400 Volts -exceeding 5 kW

Time of use (TOU) - Peak

Time or Use (TOU) Off•Peek

C2 Supply at 11 kV

Time of Use (TS/U) . Peak

Time of Use (TOU) 08-Peak

C3 Supply above it kV

I _ _Time of Use DOW • Peek

I Time of Use (TOO). Off-Peak

Total Single Point Supply

Agricultural Tube-wells • Tariff D

Onp.ce

Time of use (TOU)

rime of Use (TOU)

02 Agncultual Tube-wells

Nuloullual Tube-wells 0-2 OD

Time of Use (TOU) - Peek D-20.11

Time of Use (TOO) • Peak 0-2

Time of Use POLO • 017-Peak 02

Total Agricultural u h 1 g6

Residential Colonies H

Spinal Contracts • Tariff K 14..1K)

rime of Use FrOtriseak

Time of Use (TOU) • Off-Peak

RalMayirachonTractIon • 1

co-Ceara/Ion-3

General Service

Grand Total

(We Re I WiWM) 1%g% Mel (min RBI (mu Rat Ion Rs) (Min Ref

3.30 0.413% 124.575 13.19 13.19

• 000% •

31.40 4.59% 168.082 392.46 392.48

7.22 1013.32 108.32

989 1 44% 102,852 148 35 146.35

10.05 147% 29.542 170.80 170.80

10.38 1 51% 5,859 198.86 196.88

- 0.00% - -

094 0.14% 2.649 • 17.90 17.90

4 71 0.69% 17,663 - 81 22 6122

77.88 000% 451.023 - 1.109.09 1,109.09

• 0.00% •

8.95 1 31% 104.620 170 01 170 01

20.56 3.00% 34 • 0.09 308.47 I 0.09 308.47

• 0 00% • •

• 0.00% - • •

2.04 0.30%I 2,618 - 0.95 38.77 I 0.95 38 77

7.54 1.10%1 37 - 5.74 I 97 98 1 5.74 97961

39.09 000%I 107,308 - 6.77 615.22 I 6.77 816.22

- 0.00% -

0 16 0.02% • 2.281 2 28

047 0.07% 1,084 B.95 8 95

220 0.32% 1,452 28.57 I 28.57

0 18 0.02% 104 0.01 2201 0 01 2 20

2.35 034% 1.009 1.76 44.74 1.76 44 74

9 42 138% 1 12.15 120.56 12.15 120.56

0.47 0.07% 16 0.65 8.95 I 0.65 8.95

895 1.31% 3 4 79 113.64 I 4.79 113 64

241 000% 3.670 19.37 329.89 I 19.37 32919

0.00% 11

0 16 0.02% 70 0 613 226 0.68 2 28

047 0.07% 105 0.21 895 0 21 8 95

2.35 0.34% 12 1.44 30 81 1.44 30.61

1.28 0.18% 1.02 17% 1.02 17 96

2.51 0.37% 25 0.70 47.72 0.70

10.67 .58% 25 3.57 13864 3.57

47.71_

1313 64

17 256 7.62 244.16 7.62 244.16

• • •

173 0.25% 294 28.25 26 25

1.57 0.23% 28 02 28 02

928 1 35% 108 83 108 83

506.74 74 00% 22.494 115 99 7,449 12 98.88 6,780.93

• •

• 3.139 18.23 16 23 •

078 0.11% 521 3.09 14 91 3.09 14.91

5.85 0.83% 71 77 71 77

528 26.448 I 136.31 I 7898.91 I 118.20 7,030.72

0 47 0.07% 260 6.59 6 59

0.01 000% 0.09 0.09

H •

10.003.94 161.96 685 100.0016I 5138.965 169.07 I 9,336.75

(ken Ral

(17.11) (868.19)

(17.11) (668.19)

(868.19)

Page 93: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 27

QESCO

Existing & Proposed Tariff Statement Feb 2018

Residential

Up 10 50 Units 3.24 124,575

For peak load requirement up to 5 kW •

01.100 Units 30.81 4.59% 168.082

101.300 Uniis 7.09 I 05%

201-300 units 9.71 1.44% 102.652

301•7000niis 9.86 1 47% 29.542

Above 700 Units 10.17 1.51% 5.859

For peak load requirement exceeding 5 kW

Time of Use (TOU)- Peak 0.92 0.14% 2.649

Time of use (IOU) • Off-Peak 4 62 0 69% 17,663

Total Residential 76.42 I 1 451,023

Commercial r A2

Commercial. For peak load requirement up to 5 kW 8.78 1.31% 104,620

Commercial (01001 20.18 3.00% 34

Commercial (020 sW) For peak load requirement exceeding 5 kW

Regular

Time 01 Use (TOO' Peak (A.2) 2.00 0.30%

Time of Use (TOU) • Oft-Peak (Temp)

7 40 I 10%

2,

(T

2,618

37

Total commercial) 38.36 I 0 00%1 107,308 I

Industrial

01 0 15 002%

B (Peak) 0.46 0.07%

B I • (Off Peak) 2.16 0.32%

62 0.15 0.02%

82 • TOU (Peak) I 2 31 0.34%

02 - TOU (01I•peak) 9.24 1.38%

63-11133 KV (Ptah) 046 007%

64 8.78 1.31%

Total Industrial I 24 I 3,670 I

Bulk

C Ira) Supply at 400 Volts • up lo 5 kw - 11

C1(tjSuppy1at 400 volls -exceedintaW 0.15 0.02% 78I

Time of use (TOU) - Off-Peak 2.31 0 34% 12

105 I Time of Use crab - Peak 0 46 0.07%

02 Supply al 11 kV 1.23 0.18% -

Time of Ila0U) • Peak 2.47 0.37% 25

Time of Use (iota) - Off-Peak 10.48 1 56% 25

C3 SupAyabove 11 kV

Time of Use MGM • Peak -

Time of Use (TOU) • 011•Peak

I Total Single Point supply' 17 I I 256 l I

Agricultural Tube-wells - Tariff D I I DI Scarp 1.59 0.25% 294

Time of UsefOU) 1.54 0.23% •

Time of Use (TOU) 9.09 1 35%

02 Agricultual Tube-wells 49]33 74.00% 22,490

Agnculival Tube-wells 62 (1) •

Time of Use (Mu). Peak 0-2(i) 3,139

Time of use (TOU). Peak 02 077 0 1 1% 521

Time ol Use ITOU) - Off-Peak 02 5.55 I 0133%

Total Agricultural 516 I I 26,448 I Public ugnting G 0.46 0.07% 260

Residential Colonies H 0 01 0.00%

Special Contracts - Tang K (Ad()

Time of Use (TOU) • Peak

Time of Use (Tout- Off•Peall

Railway Teadi011ilaCti011 • 1

00-Gentation-4

General Service

Grand Total' 672 1 100.00%1 588,965 I

400.00

400.00

I 400.00

380 00

380 00

380.00

19.00 19.00

15.00 400.00 15.00

- •

- - I •

4000 13 00 400 00

400.00 1

13 00

19 00 400 00 19.00

I

1520 15.20

17.85 1285

11 75 11 75

200.00 14.70 200.00 13.381 (132)

12.25

200.00

200.00

200 00

380.00 19 00

380.00 12 70

400 00

200.00

19.00 200.00

12.70 200 00 I

a00

12 50

15 00

15.00_ 17.00

19 00

1900

13.00

15.00

14.50

19.00

13.00 I

14.30

19 00

12.80 -

--1 1

.

__14.50_ 19 00

- 13.00

400.00 14.00

400.00 1900

400.00 12 80

380.00

380 00 19 00_1 12 70

- 15.00 400.00 14.50 400 00 19.00 400 00 13 00 380.00 380 00 14.30

19 00 380 00 12 SO

• 12.50

15 00

15.00

17,00

19.00

19.00

1300

19 00 -

12.70 I

14 00 _ -

14 00 •

H

___1_4.50

1,084 19.00

1,452 13 00

104 400.00 14.00

1009 1 400.00 19.00

1 400 00 12.80

16 I

31

Page 94: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 271 A)

QESCO

Existing & Proposed Tariff Statement Feb 2018

Residential

Up le 50 Unit

For peak load requirement up lo 5 kW

01-100 Units

101.300 Units

101-300 Units

301-700WOU

Above 700 Units

For peak load requirement exceeding 5 kW

Time of Use (rout Peak

Time of Use (TOU) • Off-Peak

Total Residential

Commercial . A2

Commercial- For peek load requirement up to 5 kW

Commercial (4100)

Commercial (<20 K01

3.24 048%

• 000%

30 81 4.59%

7.09

971 1 44%

9.86 147%

10 17 151%

• 0.00%

092 014%

4.62 0.89%

76.42 I 0.00%

0.00%

876 I 31% 104.820

20 18 3.00% 34

124 575

168.082

102,852

29.542

5.859

2.649

17.663

451.023

For peak load requirement exceeding 5 kW - 0.00% -

- 0.00%

Use (TOLO - Off-Peak (TOMO)

Time of Use (TOU. Peak (A-2) 2.00 0.30%1 2.618

Time of 7 40 1.10% 37

Total Commercial 36.36 003% 107.308

Reeu

1:

1

1

1 1

Inclustilal

B1

Ell (Peak)

11(2.11 Pert]

82 - 7011 (Peak)

B2 TOU (Off-peak)

B3- 11/31KV Dana

134

015

046

2 16

0 15

2 31

9 24

046

8.78

Total Industrial 24

000%

0.02%

007%

0.32%

0.02%

0.34%

136%

0.07%

1.31%

000%

1.084

1.452

104

1,009

1

16

3

3670

Bulk

Cl(e) Sagely al 400 volts • up to 5 kW

C I (b) Supply at 400 Volts -exceeding 5 kW

Time of - Peek

Tone of Use (TOU) Off-Peat

C29eppy at ll kg_ _

time of Use (IOU) • Peak

Time of Use (1011) - Off-Peak

C3 Supply stove 11 CV

Time of Use (TOU)- Peek

Time of use (TOU) - Off-Peak

Total Single Point sum*

Agricultural Tube-wells • Tariff D

01 Scarp

Time of Use (IOU)

Tone of Usen_OUL

D2 ArcullGal Tuba-wale

Nncuitual Tube-wells 0-2 00

Time of UseRDt11 - Peak 0-2(0

Time of Use (TOU) Peak 0-2

Erne 01 Use (TOU) Off-Peak 02

Total Agriculture,

PublicLang G

ReeideMlal Colonies H

Special Contracts - Tariff K (AIM)

Time of Usiiiiii/Or Peak

Time of Use (1010-Off-Peak

RadnityTraclionTradlon • 1

Co.Genration-J

General sonic('

Grand Total

11

78

105

12

25 H

17 256

169 0.25% 294

1.54 0.23% -

909 135%

497.33 74.00% 22.494

• 3.139d

0.77 0 I I% 521

555 083%

416 26.446

0.46 0.01% 260

0.01 0.00%

672 1 100 00% 588,965

0 00%

0 02%

0.07%

034%

0.18%

037%

156%

0.15

0.46

2.31

1.23

2.47

10.48

0.951 38.05 I 095 38 05 I

5 74 1 96.14 1 5 74 96 14 I

6.77 I 603.79 1 6.77 603.79 I

12.94 12.94

31517 385 17

106.31 106.31

145.59 145.59

167.62 167.62

193.20 193 20

• •

1756 1756

60.09 60.09

1.083.48 1.088.46

168.85 166.85

0.09

302.741 0.09 302.74

223 223

878 8.78

26.04 28 04

216 0.01 216

43.91 1.76 43.91

118 32 12.15 118 32

6.76 085 878

111.53 4.79 111 53

323.76 19.37 323.76

0 01

1.78

12.15

0.65

4.79

19.37

- - o ea I 223 0.68 2.23

0211 8 7B 0.21 878

1.44 I 30.04 1.44 30.04

1.021 1763 1.02 17 63

0.70 46.84 0.70 46 84

3 57 1 134 10 3 57 134 10

• .

7.621 239.62 7.62 239.62

25.76 25 78

27.50 27.50

106.81 108.81

7,310.71 85.08 8,854 93

• 16.23

14.64 309 14 84

70 44 70 44

7.556.86 116.38 6,900.07

8.47 647

0.08 0.08

9.818.06

115.99

16.23

3.09

136.31

169.07

(19.93) (65578)

119.93) (665.78)

149.14. 9,162.27 1 119.93) 1665.7E0

Page 95: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

H

1900 19 00

15.00 400.00 15.00 40000

400.00

r- 400.00

19 00 400.00 19.00

13.00 400 00 13 00

200 00

200.00

200 00

15 20

17 85

11 75

14.70

19 DO

12.70

14.0

14.00

12 25

200.00

Residential

050 Units 3.09 0.48% 124,575

For peak load requirement up 10 5 kW •

01-100 Units 2943 4 59%

101-300 Units

201-300 Units

6 77

9.27

105%

144%

301-m0unns 942 1.47%

Above 700 Orris 971 1.51%

For peak load requirement exceeding 5 kW

Time of Use (TOU) • Peak 0.88 0.14%

Time al Use (700)-Oft-Peak 441 369%

Total Resldenlial 72.99

Commercial - 42

Commercial • For peak load requirement up to 5 kW 8.39 1.31%

CommerciaL(4109) 19.28 3.00%

Commercial (<20 4W) For peak load requirement exceeding 5 kW -

Rt:Sular

Time 01 Use (TOU) - Peak 14-2) 1.91 0.30%

Time of USe (IOU). Off-Peak (Temp) I 706 1.1D%

Total Commercial 36.64 I 0.00%I

Industrial

81 0.15 002%

01 (Peak) 0.44 0.07%

- (011 Peak) 206 0.32%

B2 • 0 15 002% lI

02 - TOO (Peak) 2 21 0.34% i

B2 TOO (off-peak) 8133 1.38%

11/33 KV (Peak) _B3- I 0.44 0 07%

Be I 839 1.31%

I

Total IndustrIad 23 I I

Bulk

CljaLSupoly al 400 Volts - up to 5 kW

01(b) Supply al 400 Volls -exceeding5 kW 015 002%

Time of Use (TOU) • Peak 0.44 0 07%

Time of Use (TOU) • Oil-Peak 2 21 0.34%

C2 Supply al 11 kV 1.18 0.16%

Time of Use (TOO) - Peak 2.35 0.37%

Time of Use (TOUID11-1,eak 10 01 1.56%

C3 Supply above 11 kV

Time of Use (TOU)- Peak

Time of Use (TOU) Off-Peak

Total Single Point Supply 16 I

Agricultural Tube-wells - Tariff 0

D1 Scarp 1 62 0.25%

Time of Use (IOU) 147 013%

Time al Use (TOU) 8 68 1.35%

D1 Agncultual Tube-wells 475 01 74.00%

Agricullual Tube-soils D-2 60

Time of Use (TOU) Peak D.210

Time of Use (TOUT- Peak 0-2 074 011%

Time 01 Use (IOU) - Off-Peak D2 5 30 0.63%

Total Aulcunurai 493

Public Lighting G 044 007%

Residermai Colonies H 0 01 0.00%

Special Comracts • Tang IC (WW1

Time of Use1701_1r Peak

Time of Use (ECU). 011-Peak

Railway TracsonTraclion 1

Co-Genration-J

General Service

Grand Total642 100 06%1

4 00 4.00

12 50 12.50

15 00 15.00

15 00 15.00

17.00 17.00

19.00 19.00

19.00 19.00

13.00 13.00

2.649

17.663

451,023

104,620

34

2.618

37

107,308

1,084

1,452

104 1

1009

16

3

26,448

260

588,965 I

158,082

102.652

29.542

5.859

14.50 • 14.50

1900 • 19.00 .

13 00 - 13.00 -

14.00 400.00 I 14 00

19.00 400 00 H 19.00 -

12.80 400.00 12.80 -

19.00 380.00 I 19.00

12 70 380.00 I 12.70

I

400.00

400 00

400 00

380 00

380 00

400.00

400.00

40.00

360.00

380.00

3130 00

15.00 - 1500

14.50 400.00 14.50

19 00 400.00 19.00

13.00 400.00 I 13 00

14.30 380.00 14 30

190 380.00 19.0 _

12.80 380.00 12.801

15.20

17 85

11.75

200 00 13.38

200.00

200.00 19.0 -

20000 1270

3,670

11

78

105

12

25

25

256

294

22,494

3.139

521

..t

14 00

14 00

Page 96: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 27( A)

QESCO

Existing & Proposed Tariff Statement March 2018

1

1

1

1

309 13.98

67 28

135.37 7,216.74 6.18 008

• 169.07 9,377.41

0.95 36.35

5 74 1 91.82

6.77 1 576.69

.13

1 26

639

1 76 41.94

2 06 0 01

12 15 113.01

0.65 8.39

4 79 106.52

19.37 309.23

12]6

36718

101 53

139 06

160 10

184 53

16.78

57 39

- I 1,039.83

159 37

0.09 289,15

018% -

037% 25

1.56% 25

1 -

1 -

256 1

0.68 2 13 021 6.39 1.44 2689

102 16.83

0.70 44 73

3.57 12808 I

-

7.62 228.87

Residential

Up to 50 unds

For peak load reouiremen1 up to 5 kW

01-100 Linn

101-300 units

101.300 Units

301 70ounes Above 700 Urals

For peak load requirement exceeding 5 kW

Time of Use (grin • Peak

Time of Use (TOU) • Off-Peek

Total Residential

ICommercial • A2 Commercial- For peak load requirement 0 10 510A

Commercial (4100)

Commercial (420 KW) For peak load requirement exceeding 5 kW

0.00%

FAgular

0.00%

lima of Use (TOU)- Peak (A-2)

1 91 0.30%

Time of Use (TOU) • Off-Peak (Temp)

7.06 1 10%

1 Total Commercial

36.64 1 0 00%

industrial

or

B1 (Peek)-

(On Peak)

B2 • IOU (Peak) 132.

02 • IOU (011-peek)

E13. 11/33 k■L(Fik)

134

Total Industrial

Bulk dal Supply ai 400 Volts • up to 5 kW

Cl(b) Supply 51400 Volts -exceeding 5 FW

Time or Like (TOU) • Peak Time of Use (TC.1 Off-Peak

02 Supply al 11 kV

Time of Usea2U). Peak

Time 01 Use (TOU) - Off-Peek

c3 sl.pplYmove 11 kV

Time of Use (TOU) - Peak

Time of Use (TOU) - °11-Peak Total Single Point Supply 16

Agricultural Tube-wells • Tariff D 01 Scarp

Time 01 Use (TOU)

Time of use (IOU)

02 Aglicullual Tuba-v(911S

Tube•wells 0-2111)

Time of Use (TOU)• Peak 0.2(1

Time of Use (IOU) - Peak 0-2

Time of Use (IOU) • Off-Paok 02

1 07 5 34 11 0 0 8311:1

493 Total Aerieulturali

044 0.07% Public Lighting G

001 000% Residenlial colonies Fl Special Connects • Tariff rc (...11(1

Time on use frog • Peak Time of Use (TOU) • off-Peak

RailwayTranionTraction • 1

General Service

Grand Islet 642 100 00% 588.965

367 BB

101 53

139 06

160.10 'IBA 53

16 75 57.391

1,039.63

159 37 0.09 289 15

0.95 36.35 574 91 02

2

6.77 576.69

213 8 39

78

2678 0.01 2.06

1.76 41.94

12.15 I 113.01

0.65 839 4 79 106 52

19.37 309.23

068 2 13 0.21 0.39 144 28 69 1 02 16.83 070 44 73 3.57 12608

J - _I .

7.62 228.87

24 60 26.27

102.01 89.37 6,356.26 (26.62) (626.34)

16 23 3 09 13 98

67 28 108.69 6.590.40 (26.62) (626.341

6.08 0.08

142.45 8.751.07 (26.62) (626.34)

24 60 26.27

102 01

115 99 6,98260

1623 • 1

3 09 0.48% 124,575

0.00%

29.43 4.59% 168.082

6.77 -

9.27 1.44% 102,652

9 42 1.47% 29.542

• 0.00%

0.15 002%

044_ 007%

206 0.32%

015 002%

2.21 034%

83 _1.38%

044 007%

8.39 1.31%1

23 0.00%1

• 000%

0.15 002%

044 007%

2 21 0.34% 12

1.18

235

10 01

971 151%

5.859

000%

0.88 0 14% 2.649 4 41 0.69% 17.653

72.98 0.00% 451 023

000%

8.39 1. 31% 104.620

19.28 300% 34

2 518 1

371

107.3013 1

1 084

1.452

104

1,009

15

3

3,670 1

11

78

105

1 62 0.25% 294

147 023%

8.68 1 35% -

47501 74.00% 22494

3 139 521

26,448 260

I

Page 97: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

400.00

400 00

400 00

400.00

400 00

400 00

380 00

380 DO

19 00

15.00 400 DO

19.00 400.00

13 00 1 400.00

14.50

19.00

13 00

14.00 400.00

19 00 400 00

12 80 400,00

19 00 380.00

12 70 380.00

19 00

15 00

1900

13.00

14 50

19.00

13.00

14.00

19 00

12 80

19.00 I

12.70

15 00 •

15.00

400.00

14 50 400.00

14.50

400 00

19 00 400.00

19 00

400 00

13.00 400.00

1300

380 00

14.30 380 00

14 30

380.00

19 00 380.00

19.00

3E10 00

12.80 380.00

12.60

200 00

200.00

20000

200 00

15 20 15 20

17 85 17. 65

11 75 11.75

1470 20000 13.38

200 00

19.00 200 00 19.00

12 70 200.00 12 70

Mir

. _il.1.32)

14 00

14 00

14.00

14.00

FORM • 27

QESCO

Existing & Proposed Tariff Statement Jan-March 2018

Residential

lip to 50 Units 9.62 0 48% 124.575 _

For peak load requiremenc up in 5 kW -

01-100 units 91.64 4.59% 168.062

101-300 Units 21.08 1 05% -

201.300 Units 28 87 1 44% 102.652

301-7000nits 29 32 1.47% 29.542

Above 700 Units 30.24 1 51% 5,859

For peak Iped requirement exceeding 5 kW -

Time or Use (TOU)• Peak 2 75 0.14% 2.649

Time of Use (rOU)- 011-Peak 13 75 OM% 17,663

Total Reeldentiel 227.27 I I 451,023 1

Commercial • A2

Commercial- For peak load requirement up lo 5 kW

Commercial ic100)

Commercial (20 KW) For Perk load requirement exceeding 5 kW

Regular

Time of Use (TOU)• Peak IA3) 596 030% 2.518

Time or Use (IOU) • Ofr-Peak (Temp) 21 99 I 1 10% 37

I Total Commercial 114.09 1 0.00%1 107,308

Industrial

- I I -

B1 048 002%

B1 (Peak) 137 0.07% 1,064

81 .1011 Peak) 6 41 0.32% 1,452

62- 046 0.02% 104

02 . TOu (O/Ppeek) 27.49 1.36%

6.87 0.34% 1.009

1

132 • TOUiPeek)

83- 11)33 BV (Peak) 1.37 0.07% 16

84 I 26 12 131% 3

I Total Industrial) 71 I I 3,670

Bulk

CyrSupply at 400 Volts up lo 5 kW 11

Cl(b) Supply at 400 Volts •exceeding 5 kW 0.46 0.02% 78

Time or Use (TOU) -Peak 1.37 0.07% 105

Time or Use (IOU) O9-Peek 6.97 0.04% 12

et I I RV 367 _014%

lime Of UsatPeak 7.33 0.37% 25 Ir

Time of Use (TOU) - Off-Peak 31.16 1.56% 25

C35unlyatio vs 11 kV

Time of Use (TOW ' Pea Time of Use (T0U) • Off-Peak

Total Single Point Supply' 51 I

Agricultural Tube wells • Tariff

81 scarp 5 04 0.25% 294

Time of Use (IOU) 4.58 0 23%

Time of Use (TOL) 27.03 1 35%

CAgflcunual Tube-wells 1.479 08 74.00%

adCullual Tube-wares 0-2 (i) •

Time of ilaC) Peak D-20)

__Time of Use (90U)- Peek 0-2

Time of USa (TOU) • Off-Peak D2

Total AVICUIILITH

I Public Lighting G

Residential Coionies H

Rectal Contracts - Terin K (AK)

Time of Use poll) - Peak

Time of use (IOU) • Off-Peak

Railway TractionTraction •

co-Genration-d

General Service

Grime Toted 1,999 1 100.00%1 588,965 I

26 12 T31% 104 620

60.02 300% 34

256 I

4 00

12 50

15.00

15 00

17 00

19.00

19 00

13.00

12 25

22.494 I_

3,139 1

2.29 0.11% 5211

16 50 003%

1,535 I I 26,448 I

1.37 007% 260

002 0.00%

Page 98: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Residential

Up to 50 Units

For peak load reAulrement up to 5 kW

01-100 Units

10).300 Unlis

101-300 Urals

301-700Unin

Above 700 kinds

for peak Gee requirement exceeding 5 kW

lime of Use (TOU)• Peak

Time of Use (IOU) Ott-Peak

Total Residential

Commercial - A2

Comma-oaf For peak load requirement up lo 5 kW

Commercial (4100)

Commercial R20 KM For peak load requirement exceeding 5 kW

Regular

Time of Use (TOIL) • Peak (4-2)

Time al use (IOU)- Off-Peek (Temp)

Total Commercial

Industrial

01

BI tiriak)

EICtfl Peak)

82 •

02- IOU (Peak)

ED - IOU (OfSpeak)

131 11/33 KV (Peat)

134

Total Ineusirleti

Bulk

G1(a) SIggply at 400 Volts - up to 5 kW

C116) Supply et 400 Volts -exceeding 5 kW

lime of Use (TOU) Peek

Time of Use if)Ut• Off-Peek

C2 Supply at 11 kV

1.084

1.452

104

1.009

1

16

3 - 1 3 670 1 - 1

11

78

105

12

25

.

25

256 - I

0 02

528

36 46

1 95

14 38

58.10 I

2 03

0 63

4 33

3 05

2.09

10 71

22.86 •

(6366) (1,950 31

FORM . 27 ( A )

QESCO Existing & Proposed Tariff Statement Jan-March 2018

%ace) %rye mlix RSI IMIn Rot IMIn PSI (min Rs)

962 048%

000%

91.64 4.55%

21.08

28.87 I 44%

29 32 1.47%

30.24 1.51%

000%

275 0.14%

13 75 069%

227.27 000%

0.00%

26 12 131%

60.02 3.D0%

• 000%

000%

5.96 0.30%

21.99 1 10%

114.09 000%

38.49 38.49

1,14551 1.145.51

316.16 316.16

433 00 433 00

496.52 498 52

574 59 574.59

52.24 52.24

178 70 178 70

3,237.20 3,237.20

496.23 496.23

900 37 0 26 900.37

- - . - -

2.618 I 2.85 113 1BH 2.85 113.18

37 1 I 17 22 285 92 I 17 22 265.92

107.308 I 1 20.321 1,795.139 20.32 1,795.691

124,575

1613.082

102.652

29.542

5.859

2,649

17,663

451,023

104,620 •

34

0 26

0.00%

0 46 002%

1.37 007%

641 032%

046 0.02%

6.87 0.34%

2749 136%

1.37 007%

2612 131%

71 I 0 Mid

. 1 - 0.00%

046 002%

1 37 0.07%

6.87 034%

367 010%

Time of Use (TOLn - Peak 7.33 0.37%

Time of Use (TOU)• Off-Peak

31 16_ 1 1.56%

C3 Supply above 11 kV

Time of Use (1-046 • Peak 1 I

Time Of Use (TOU) Off-Peak

Total Single Point SupplYl 61

Agricultural Tube-wells - Tariff 13

DI Scarp 5.04 0.25% 294

Time of Use (TOU) 4.58 023%

rime of Use (MU) 2703 1.35%

02 Agricugual Tube4vells 1479.08 74.00% 22.494

Agncultual Tube-wells 0-2 (I.)

Time of Lisa • Peek 0-2(1) 3 139

Time of 1.1)Kta0U) • Peak D-2 2.29 0.11% 521

Time Of Use (TOU)- Off-Peak 02 16 50 083%

Total Amicaiturai 1.635 26.448 I

Public Lighting 0

1 37 0.07% 26

Residential Coionies H 0 02 0 00%

01

- -

6.64 - 6.64

26 12 . 26.12

83 39 - 83 39

6.41 0.02 6 41

130.59 5.26 130.59

351.90 1 36.46 351.90

26 12 _ 195 26.12

331 69 I 14.38 331.69

982.87 68.10 962.87

_ . .

- - -

6.64 203 6.64

26 12 0.63 26.12

89.35 4.33 89.35

52 42 3.05 5242

139 29 2.09 139.29

398 82 10 71 1 3%132

. -

• . .

. - -

71264 22.85 712.64

76 61

•J 7661

81.79

81 79

317 65

317.65

34797 21,742 43

2134 31 19,792 12

4870

48 70

9.27 43.53

9.27

43.53

209 49

209.49 I

406.94 I 22,471.513

342.28 20,521.19 I

19.24

19 24

I 0.25

0 25

(83.66) (1,960.3111

'Special Contracts • Tanff K (/4

Time of Use (TOW • Peak

Time of Use (T00)- On-Peak

Railway TrachonTraction I

Co-Genration-2

General Service

Grand Total 1.999 100 00% 588,965 507.21 29,199.40 443.55 27,249.091 (83.661 (1.950.3111

Page 99: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

10 00

19 00

400 00 15 00

40000 15.00

400.00

19.00

400.001

1900

400 00

13.00

400.00

1300

1

400 00 I

400 DO

400 00 I

380.00

3E0 00

14.50

19.00

1300

14 DO

19.00

12 80

19.00

12.70

la 50

19 00

1300

400 00 14.00

400.00 19.00

400.00 12.80

380.00 19.00

380 00 12 70

15 00

400.00 14.50 400.00

400.00 19.00 400.00

400 00 13.00 400.00

360.00 14.30 380.00

380.00 19.00 380 00

380.00 12.80 380 00 I

I

1

I -

I

-

1

1

15.20

17.65

11 75

200.00 14.70

200 00 I

20000 19.00

200 00 I 12 70

14 00

14 00

12 25

1 1

200 00

200.00

200.00

200 00

15.00

14 50

1900

13 00

14.30 I

1900

12.80

15 20

17 85

11.75

13 38

19 00

12 70

a.

(1,321

14 00

14 00

FORM - 27

QESCO

Existing & Proposed Tariff Statement April 2018

l%age)

Reeldential

un l0 50 Units 3 46 0 4e% 124,575

For peak load requirement up lo 5 kW

I I

01-100 Unils 32 92 4.59% 168.082

101-300 Units 7.57 1 05%

201-300 Units 10.37 1.44% 102,652

301-7000nils 10.53 147% 29,542

_Above 700 Units 1086 1.51% 5,859

For peak load requirement exc._ etlii. -

Time of Use (TOU) • Peak 0.99 0.14% 2,649

Time of Use (TOU) - Ott-Peak 484 059% 17,663

1 Total Residential 1 81.63 I I 451,023

Commercial - 42 I I I Commercial - For peak load requirement up la 5 kW 938 1.31% 104.520

Commercial (MOO) 21 58 3.00% 34

Commercial (420 KW) For peak load requirement exceeding 5 kW

Regular

Time of Use goo - Peek (A-2) 2.14 0 30% 2.618

1.10% 37 Time of use /rola . 011-Peak (Temp) 7 90 1

Total commercial 40.98 I 0 00%I 107,309

Industrial

Bt 0 16 0.02%

w2 _13e 0.49 0.07% 1,094

BI ((pea!) 2.30 032% 1.452

El2 • 0 18 0.02% 104 I

02 • TOU (Peak) 2.47 034% 1.009

02 • TOU (011.peak) 1 9 87 1.38% 1

03- 1113310/peek) 1 0.49 0.07% 16

BA 1 9.38 131% 3

Total Industrssil 25 i 1 3,670

Bulk I

Ca/ Suitl400 Vohs-up to 5 kW

.

11

ClORSupply a1400 Volts -exceeding 5 kW 0 16 0.02% 78

Time of UseftOU) • Pera 049 0.07% 105

rime or Use (TOU) • OrlPeak 247 034% 12

02 Supply al 11 kV 1.32 0.16% -

Time or use 01/09

1

. Peak 2.63 037% 25

Time of Usenti • 011-Peak 11 19 1 55% 25

.ipc.Wal/wve 11 kV -

I

Time of Use (TOW - Peak

Time of Use (TOU)- oil-Peek

1 Total Single Point Stpler' 15 I I 256

Agricultural Tube-wells • Tariff D I 1 1

Ol SC4303 _1.61 0.25% 294

Time of use (TOU)

-

1 65 0.23%

Time or Use (TOU) 971 1.35%

Ciii4ristiil Tube:weirs 531.25 7400% 22,494

Agncultuai Tube-wells 0-2 (i)

limo 01 Use ITOLK - Peak 0-26) - 3.139

Time of use (Mu) • Peak EI-2 0.62 C 11% 521

Time o/ Use (TOU) - Off-Peak 02 1 5.92 063% •

I Total Aorloulturalt 651 I 1 Man 1

Putpc Llori G 0.49 007% 260

ResiOential Colonies tit 0 01 000%

Special Conliade - Tar% K (AJK)

Time of Use (T014- Peak

Time of Use (Tille - Oil-Peak

Railway TractionTiaction • 1

Ce-GenrelionJ

General Service I

Grand Toted 718 1 100.00%1 688.965 I

4 00 1

12 50 I

15,00

15.00

17 00

19 00

19.00

13 00 1

Page 100: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

QESCO

Existing & Proposed Tariff Statement April 2018

Rs R

7.62 255.971

239

938

32.09

18.63

50 03

143.25

266.97

068

0 21

144

1.02

0 70

57

2 39

9.36

32 09

18 83

50.03

193 25

Rs I in

1 1

1 1

1

FORM - 27 ( A )

)kwl lMapel

Residential

Up to 50 Units 3.46 0.46% 124575

For peak load requirement up to 5 kW - 000%

01-100 Units 32 92 4.58% 168,062

101-300 Units 7.57

101.300 Units 10.37 144% 102952

3047009nis 10 53 1.47% 29,542

Above 700 Unlis 1086 1.51% 5.659

For peak load requirement exceeding 5 kW 0.00%

lime of Use (TOU) - Peak 0.99 0.14% 2,649

Time of Use (TOW- Off-Peak 494 0 69% 17,663

81.63 0.00% 451,023

0.00%

9.38 131% 104.620

21.56 300% 34

049 0.07% 16

9 36 1 131% 3

1 Total Industrie

25 1 0 00%! 3,670 1

I Bulk

C1(a) Supply a1400 Volts uo la 5 kW

0.00% 11

G1(I)Nopnr at 400 Voila -exceeding Sew

0 18 802% 76

Time of Use (TOU). Peak

0.49 007% 105

C2 Supply at II kV

Time of Use rptli • 011-Peak

2471 0 34% 12

1 32 0 la%

263 0.37% 25 Time of Use (TOU) • Peak

Time 01 Use (10U)-Off-Peak 11.19 _ 1.56% 25

IG3 Supply above II kV

Time of Use (IOU)- Peek L - Time of Use (TOU) CM-Peak

1 Toul Single Point Supply 18 256

Agricultural Tube-wells • Tariff D

El 1 Scarp 1 81 025% 294

Time of Use ill) 1.65 0.23%

time of Use (IOU) 9.71 1.35%

02 Tube-wells 531 25 7400% 22,994

Agffoulluai Tube-cello 0-2 (i)

Time of Use (IOU) • Peak 0-20) 3,139

Time of Use (TO-U1• Peek 0-2 0.82 0 11% 521

Time of Use (TOU)-Off-Peak 02 5.92 063%

1 Total Agrloullurat 551 26.448

Pubic ugnung G 0.49 0.07% 260

Residential Goionas H 0 01 0.00%

SpectalGonhacts • Tariff I( (AM)

flint of Use (TOU)- Peak

Time of Use (TOU) Off-Peak

Ralway TrectionTracton • 1

L

o-Genrmion1

General Service

Grand Toted 718 1 100 00%! 588,965

131

DI (Peak)

01 - (Off Peace _

02 -

132 TOU (Peak)

02 • IOU (Off-peas)

83- 11133 NV (Peak)

Rd

1 Total Residential

Commercial - 42

Commercial. For peak loop requirement up to 5 kW

commercial 14100)

Commercial 1520 NW1 For peak load requirement exceeding 5 kW

Time of Use (70)4 Peak (A-2)

Time of Use (TOU) • Off-Peak (TernO) I

Total Commercial!

- 000%

- 0.00% - 2.14 0.30%I 2,618 -

7.90 I 1.10%1 37 -

40.98 1 000%! 107308 -

- 000%1 - -

0.16 002% . -

0.49 0 07% 1.084 •

2.30 032% 1,452 • I

0 16 0.02% 104

2.47 0.34% 1,009 - 9.87 135% 1

13 82 13 82

411.44 411 44

113 56 113.56

- -

155 52 155.52

179,0E1 179.06

206.38 208.38

6 8 1

146.716 18.76

64 16

1,162.73 1,162.73

176.24

009 323 39 0.09 323.39

I -

1 0.95 I 40.65

I 5 74 102 70

• 1 6.77 644.97

I 2.39

9 36

F__ 2.39

9.38

121 716

46 90

5

065

126 39 12.15 126.39

0.65 9.38

2.30

9.35

0 0 LI

1 76

29.95

46 90

29 95

0 01

I 4.79 119.14 479 119 14

- I 19.37 346.84 19.37 345.84

• I 7.62

0 68

0 21

1 44

1 02

0.70

_ 3 57

I 169.07

27.52 27.52

29.38 29 38

114.09 11409

115.99 7.609.40 106,23 7.108 89

16.23 16 23

309 1563 3.09 15.63

75 24 75.24

8,071.26 1 126.66 7370.76

6 91 6.91

0 09 I 0.09

10,487.77

135.31

169.31 '9,787.27

095 40 65 1

5.74 102 70 1

6.77 844.97 I

17824

(9.76)

I

(700.51

(SM) (70061)1

(9.76) (700.61❑1

Page 101: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

19.00 19.00

400 00 15.00 400.00 15.00

I I I

400.00 I 19 00 1

400 00 13 00 1

400.00

1901

400 00 I

13 00 I

14 50 14.50

19 00 1900

13.00 13 00

1 400 00 14.00 400 00 14.00

400 00 1900 40000 19 00 _

400.00 12 BO 400.00 12 80

380.00 19.00 380 DO 19.00

380 00 12 70 380 00 12.70

15 00 15 00

400.00 14 50 400.00 14 50

400.00 19.00 4100 00 1900

400 00 1300 400 00 1300

380.00 19 30 380.00 14.30

380 00 19.00 380 00 19.00

380.00 12 80 380.00 12 BO

15 20 15 20

17.85 17 85

11.75 11.75

200.00 14.70 20.00 13.38

200.00 200.00 H

200 19 00 200 00 19.00

1 200 00 1 12 70 200 DO 12 70

I 400 14.00 I

II

I 1400 14 00

111

12 25

AI (1 32)

FORM • 27

QESCO

Existing 8 Proposed Tariff Statement May 2018

Residential

lo 50 Units

fi0_4 peak load requirement up to 5 kW

01-100 Unas

101-300 Units

201-300 Unlls

301-700Unos

Above 700 Untls

For peak load requirement exceeding 5 kW

Time of Use (TOLL ak

lime of Use (r0t6 - On-peak

Total Residential

Commercial -A2

1 ma I I Pw1 Mega,

3.88 049% 124,575

36.95 4 59% 168,082

8.50 1.05%

11 64 1.44% 102.852

11.82 1.47% 29.542

12.19 151% 5,659

1.11 _014% 2.649

5.54 069% 17.6631

91.83 I 1 451,023

4

12 50

15.00

15.00

17.00

19 00

19 00

13 00

12 50

15.00

15 00

17 00

19.00

I 19 00

I 13 00

1

3.139

0.11% 521 1

1 083% - I

1 I 26,448 I

260 0.071

0.00% - _____

1 100.00%1 588.965 1

Commercial • For peak load requirement up to 5 kW 10.53 1.31% 104.620

Commercial (<100) 24 20 3.00% 34

Commercial (520 KW) For peak load requirement exceeding 5 kW

Sir

Time of Use (TOU)- Peak (A-2) 240 0.30% 2.6113

Time of Use (TOU)- 011-Peek (Temp) 1 8 87 1.10% 37

1 Total Commercial 46.00 I 0 00%1 107,308

Industrial

BI 0 18 0.02% -

en (Peak) 055 0 07% 1.084

131 - (Off Peak) 259 032% 1.452

B2- 0.18 0.02% 104

B2- TOUISrial 277 034% 1,009

02 • TOU (CU-peak) 11.08 136% 1

83- 1193 MI (Peak) 0 55 ( 0 07% 16

B4 10 53 131% 3

1 Tour Industrial 28 I I 3.670 I

Bulk 1 1

CS &what 400 Volts • ue lo 5 kW - 11

Cl(b) Supply at 400 Volts -exceec/1695 kW 0 18 002% 78

Time of use (TOU) - Peak 11 0.55 0.07% 105

Time of Use_JOLBSOI•Peak 277 0.34% 12

C2 SupplLlikV 1.40 0.18%

Time of use (TOU)• Peak 2.96 037% 25

Time of Use (IOU) - Off-Peak 12.56 1.56% 25 _••• Supply ply above 11 kV

Time of Use (TOU( • Peak

Time of Use (TOLD- 011.Peak -

I Total Single Point Supply 21 I 1 256

Agricultural Tube-wells • Tariff 0 I

of Scarp 2.03 0.25% 294

Time of Use (TOU) 1 85 0.23%

Time of Use (TOU) 10.90 135%

029kicultuai Tube-wells 596.32 74.00% 22,494

NffMullual Tuba wens 0-2 (0)

Time of use (TOLD' Peak 0-2(i)

Time of Use (TOU)• Peak 0-2 0.92

Time of Use (rOu) - Otl-Peal D2 6 65

I Total Agricultural 619

Public Ligtling G 055

Residential Colonies w 0.01

Special Contracts • Tariff 1( (i).%)

rime of Use (TOU) • Peak

Tome of Use 074.8 - off•Peak

Rav_Lay TractionTrachon .

co.cenrarion4

General Service

1 Grand Toter 806

Page 102: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

200.07

200 07

0 09

363 00 009

363 00

0.95

574

6.77

45.63

115 27

723.98

0.95

5 74

8.77

45.83

115 27

723.98

- 2.68

10 53

33 62

0 01

1 76 I 52.65

2.59 1

12.15 1 141 88

065 10.53

4 79 1 133.73

19.37 388.20

0.01

1.76

12.15

0.65

49I

19.37

0 68

021

144

1 02

0 70

3.57

7.62

2.68

10 53

33 62

2.59

52 65

141 88

10.53

133.73 I

388.20

268

10 53

36.02

21.13

56,16

160.79

287.32

068

021

1.44

1 02

0.70

3.57

2 68

10.53

36 02

21.13

5616

160.79

7.62 287.32 •

30 89

32.98

126 07

125 75 7.979 64

16 23 -

309 17.55

6446

146.07 6.27358

7 76

0.10

9 76 (786.31_)

9.78 (786.51)1

178.83 10,988.09 9.78 1 1786.31)1

• FORM - 27 ( A)

QESCO Existing & Proposed Tariff Statement May 2018

(kW) (%W(10

Residential

Upio 50 Units 3 BB 048% 124575

For peek loari requirement up to 5 kW • 0.00%

01-100 Unils 38.95 459% 158.062

101.300 Unite 8.50

101-300 Units 1164 I 144%I 102,652

301.7030nds 11 82 1.47%1 29,542

Above 700 Ungs 12.19 I 1.511 5,859

For peak toad requirement exceeding 5 SW

Time of Use OW Peek 1.11 I 0.14%1 2.649

Ti me of use (IOU) Off-Reek 554 0 69%I 17,663

1 Total Residential 91.63 I 0.00%1 451,023

Commercial A2 - 000%1

Commercial • For peat load requirement up to 5 kW 10.53 1.31% 104,620

Commercial (000) 24 20 3.00% 34

Commercial (<20 KW)

For peak load requirement exceeding 5 8W - 0.00%

Regular 0.00% •

lime of Use (TOU) - Peak (A-2) 240 0.30% 2,616

Time of Use (TOW-Off-Peek (Tempt 667 1.10% 37

1 Total Commercial 46.00 0.00% 107.308

000%

018 002%

0.55 0.07% 1.084

2.59 0.32% 1.452

0 18 002% 104

2.77 0.34% 1,009

11 08 1 36% 1

0 55 007% 1A

10 53 131%I 3

28 1 000%1 3,670

Bulk •

01(a) Supply al 400 Volts -up It 5 kW 000% 11

CThItaSueply al 400 Volts -exceeding 5 kW 0.18 0.02%1 78

Time of Use goy) - Peak 0.55 007%1 105

Time of Use (TOO - Off-Peak 2.77 034% 12

02 Supply at I 1 kv 148 0.18%

Time of UsrlIOU)- Peek 2.96 0.37% 25

Time of Use (IOU). Off-Peak 12.56 155% 25

C3 Suppove 11 kV •

lime of use (IOU) . Peak -

1 rime of Use (IOU). Off.Peeit • 1 -

I Teal Sinew Rant Supply 21 1 256

Agriculture) Tube-wells • Tariff 0

D1 Scarp 203 __ 0.25% 294

Time of Use (TOO 1.85 0.23% -

TimeolUse (TOU) __ 10.90 I 35%

D2 Agriougual Tube-wells 596.32_ 7400% 22,494

haicunuai Tube-wells Cip)

Time of Use (TOU) • Peak 0-20)

Time ci Use (70U)seek 0-2 0.

Time of Use (IOU) -Ott-Peek 02

92 i 0.11% 521

6.65 0 83%

1 Total Agricultural 619 1 26.448

Public Lightin 055 007% 260

Residential Colonies H 0,01 C00%

Special Contracts • Tenn i< (MO)

Time of Use (TOU) . Peak

Time of Useill) • Off-Peat

Railway TractionTramon • 1

Co-Genration-J

General Service

1 Grand Total

1 (We RIO (kiln Re)

Odle Rs) (Ike RI) lull Fat (Mtn Rs) 1

1552

461.84

127 47

174 57

200.99

231.66

2105

72 05

1,306.15

1 30 139

32 98

128.07

115.99 8.76595

16 23

3 09 17.55

ea 46

135.31 9.059.89

7 76

0 10

189.07 11,772.40

Inthatdal

Ell

13i (Beall)

_131 • (Ott Peak)

62 -

132 • TOU (Peak)

02 TOU (01I-peak)

133- 11/33 KV (Peak)

1

Be Total Industrial

3.139

806 1 100 00%I

588,965 I

15.52

461 84

127 47

174 57

200 99

231.66

21 013

72.05

1,305.15 I

Page 103: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 27

QESCO

Existing & Proposed Tariff Statement June 2018

Residential

(Pews) pisseel tkwl (%agei IRsilivefA) fRemws) insmvvem lRnAWh)

UO to 50 Units I 366_ 0.48% 124,575 4.00 I

For peak load requirement y lo 5 kW •

01-100 thins 36 75 4.59% 168.082 12 50 12.50

101-300 Units 8.45 1.05% 16.00 15.00 I

201-300 Unlis 11.58 144% 102,652 15 00 15 00

301-700Unds 11.76 147% 29,542 17.00 17 00

Above 700 Units 12 13 151% 5.859 19.00 19.00

For peak load requirement exceeding 5 kW

Time of Use (TOU) - Peak 110 0 14%1 2.649 19 00 I 19.00

Two of Use (TOU) • Off.Peat 551 069% 17.563 I 13 00 1 13 CP I

Total Residential 91.14 I 461,023 1

Commercial • A2

Commercial • For peak load requirement up to 5 kW 10.47 1.31% 104,620 19 00 19 00

Cornme510) 24.07 3.00% 34 400 00 15.00 400 DO 15 00

Commercial (t20 KW) For peek loaf] requiremsnl exceeding 5 kW •

Regular

Time of Use (TOW • Peak (A-2) 2.39 0.30% 2,618 400 OD 19.00 400100 19 00

❑rime of Use 1701.6 Off-Peak (Temp) 8.82 1.10% 37

I I

400 00 13 00 400 00 13.00

Total Gommerciell 46.75 I a 00%I 107,308

Industrial

B1 0.18 002% 14.50 14.50

61 Peek) 0.55 0 07% 1,084 19 00 _1900

13_0ry Peak) _ 2.57 1.452 _032% 13 00 13.00

B2. 018 002% 104 400.00 14 00 400 00 14 00

B2' IOU (Peak) 2.76 I 0.34% 1,009 400 00 19 00 400.00 19.00

82 • TOU (oir.peak) 11 02 I 38% 1 400 00 12.80 400 00 12 80

0111/33 KV (Peek) 055 0.07% 18 380.00 19 00 380 00 19.00

B4 10.47 1.31% 3 380.00 12 70 380.00 12.70

I Toter Industrial 28 I I 3,670

Bulk I I

cilia) Supply al 400 Vans-up to 5 kW - 11 15 00 15 00

C l (0) Supply el 400 Volts -exceeding 5 kW 0 18 002% 78 400 00 14.60 400 00 14.50

Time oflsejlTOU) • Peak 055 105 - 007% 400 00 19 00 400.00 19.00

_ Time or Use (TOU) -Oil-Peek 2.78 034% 12 400.00 13 00 400 00 13 00

02 Supply el 1l kV 1.47 0 16% 380.00 14.30 380 00 14 30

Time of Use (TOU)- Peak 2.94 0.37% 25 380.00 19 00 380 00 19 00

Time of Use (TOU) • Off-Peak 12 49 1.56% 25 380.00 12 BO 380 00 12 80

C3 Supply above 11 kV

Time of Use (TOO) • Peek -

Time of Use (MU) .011 -Peak

I Total Sive Point Supply 20 I I 256

Agricultural Tube-wells • Tariff D

00 Scarp 2.02 0.25% 294 15.20 15 20

Time 01 Use (TOU) 1.841 023%

1

17 85 • 17 85

Time of Use (TOU) 10.84 1 35% 11 75 11 75

LIVicultual Tube-wells 593 12 74.00% 22,494 200 00 14.70 200.00 13. 38

A nlual Tube-wells 02 (6)

Time of Use (IOU) Peak 0-2(1) 3.139 200.00 200.00

Time 01 Use (T0U) Peak 0-2 092 0 11% 521 200.00 19.00 200 00 19 00

Time of Una (TOO - Off-Peak D2 681 1 063% 200.00 12 70 200 00 12.70

Total Agricuhura 615 I 26.448

Public Lgtiling G 0 55 0.07% 260 14.00 14.00

Residential Colonies H 0 01 000% 14 00 14 00

Special Contracis Tann IsA.IID

Time of Use (TOW- Peak

Time of Use (TOU) • oal-Peak

Runway TractionTrection • I

Go-Genration-4

General Service 12 25 V

Grand Total 801 I 100 00%1 588.966

I

let%Wml I nemendu

Ha

(1.32)

Page 104: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM -27 ( A )

QESCO

Existing 8 Proposed Tariff Statement June 2018

BR ? 61 X

::.

1ntWYli1 (+came (kW( I (swigs] (Min RBI (Min Rs) (Min Rs( men Rs) (Mln Rs) (min Rs/

Residential

048% 124.575 15 43 15 43 -71 tin 50 units 3.86

For peak load requirement iiillY • 0.00% - - -

01.100 Units 38 75 4.59% 168.082 459.36 459 36

101300 units 845 - 126.78 126.78

101-300 Units 11.58 14a% 102,652 173 64 173.64

_ 301.7000nils 11 76 1 47% 29,542 199.91 199 91

Above 700 Units 12.13 151% 5.859 230 41 F 230 41

For peek load requirernenl exceeOing 5 kW - 0.00% - - -

Time of Use (T0U)- Peak 1.10 0.14% 2.649 - 20.95 20.95

lime of Use (TOO - Off-Peak 5.51 0139% 17,563 - 71 66 I 71 66

Total Residential 91.14 I 000% 451,023 - - 1.296.14 • 1.298.14 •

Commercial - A2 _ - 000% - • •

Commercial • For peak load requirement earn 5 kW 10.47 1.31% 104.620 . 198.99 198.99

Commercial (<100) 24 07 300% 34 009 361 05 009 361,05

Commeraet (420 ICW) For peak load requirement exceeding 5 kW • 0.00% - - -

Rsiular - _ 0.00% - - -

Time of Use (TOU) • Peek 1A-2) 2.39 0.30% 2,618 • 0.95 45 38 0.95 45.38

Time of Use (IOU) • on-Peak Creme/ B82 110% 37 - 574 114 66 5.74 114 66

Total commercial 45.75 0 00% 107,308 - 6.77 720.09 6.77 720.09 -

Industrial ___ - 000% - - -

Si 0.18 0.02% • 2.66 2.66 L. 131 (Peak) 0.55 ff 07% 1084 - 10 47 10.47

Br .10ff Peek) 2.57 0.32% 1.452 - 33.44 33.44 -

02- 0.1B 002% 104 I__ 0.01 2.57 0.01 2.57

02 - TOU (Pea% 2 76 0 34% 1,009 I 1 76 52.37 176 52.37 -

B2. TOU 100p±saisl_ 11.02 1.30% 1 12.15 141.11 12.15 141.11

83- 11/33 KV jPeall) 055 007% 16 •

1 I

065 10.47 0.65 10.47

1047 1.31% 3- 4 79 1 133 01 479 84 133 01

Total Industdal 28 000% 3.670 1 - • - 19.37 386.12 19.37 386.12

Bulk - - - -

C11 sySopply at 400 vels •iip to 5 kW . 000% 11 - -

(1_7).iapb, at 400 Volts -exceeding 5 kW 0 18 002% 78 068 2.66 068 266

Time of Use (TOU)- Peak 0.55 0 07% 105 0.21 10.47 0.21 10 47

Time of Use (TOU)- Off-Peak 276 034% 12 144 35 83 144 3583

I21 02 C2 Supply et 11 kV 1.47 0,18% • 1.02 21.02 1.02

Time of use (TOU). Peat 2.94 0.37% 25 0.70 55 86 0.70 55.06 -

lime of Use (TOU).011-Peek 12 49 1.58% 25 • 3.57 159.93 3 57 159 93

C35 above 11 CV - - - -

lime of Use (TOW • Peak - . ' - -

I Time of Use (TOD) ' Off-Peak - • - . I

1 Total Single Point Supply 20 256 - - L62 1 285.78 7.62 285.78 •

Agricultural Tube-walls- Tariff D - • - -

DI Scarp 202 025% 294 - 30 72 30 72

Time of Use (T0q 184 0.23% - 32.80 32,80

Time of Use FOCI 10.84 1 35% - 127.38 127.38

Crgrs ricuryual Tube-wells 22,494 - 115.99 8718_90 124 79 7,916.91 8 BO (782.09,)

AgnCultual Tube-wells D-311)

593.121 7400%

- - • - • -

Time of use (Toy) - Peek 0.2(i) • 3,139 - 16 23 • 16.23

Time el UseflpU)- Peak 0-2 0.92 0.11% 521 - 3.09 17 46 309 17 46 - _

lime of Use (TOLL - Off-Peak 02 6.61 0 53% • 84 01 84.01

I Total AgliCUitUrel 616 26448 - • - 135.31 9,011.26 144.11 8,229.17 8.80 (782.09)1

OuplicAMing G 0.55 0.07% 260 7.72 772 -

Residential Colonies H 001 000% • 0.10 am -

Special Coniracts - Tariff a (Ala) - - -

Time of USe (TOU)- Peak • -

Time of Use cram • Off-Peak - - - -

Railway TracbonTradiOn • 1 • _ •

Co-Gennnon-J - . .

General Service I I I -

I

[ Greed Toted 801 I 100.00%) 588.965 • • 169.07 11.709.20 177.87 10,927.11 I 8.80 (782.09)

1 -J

1 1

I

II

Page 105: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

H 400.00

400.00

400.00

380.00

380 00

400.00

400.00

400 00

380.00

I 380.00

I 380 00

19 00 400.00

1500

1x.50 400.00

19 00

14 50

15.00 -

13 00 400.00 13 00

la 30 380 00 14.30

19.00 380.00 19.00

12 80 380.00 12.80

14 50

19.00

13.00

14.00

19.00

12 80

1900

12.70

14 50

19 00 -

1300

400 00 14.00 -

40000 19 00 -

400.00 12.80 -

380.00 1900

380.00 12.70

15.20

17 85

11 75

14 70

19.00

12.70

15.20

17.85

11.75

13 38

19 00

12.70

200.00

200 00

200 00 1

200.00

200 00

200 00

200 00

200.00

(1.3k

14.00

1400

14.00

14 00

12.25

FORM - 27

QESCO

Existing & Proposed Tariff Statement April-June 2018

tee

age) I I Osage;

11 19 040% 124.575

illisAw/M) IR IfirAiw%) CROWN OlfuntWN) Macomb

Residential

Up lo 50 Links

For peak !pad requirement up lo 5 kW

01-100 Una

101-300 units

201-300 Uniis

301-700Unds

Above 700 Unhs

For peak load requirement exceeding 5

Time of Use (TOU) Peak

Time of Use (IOU) • Off-Peak

Total Residential

Commercial - A2

Commercial • For peak loargemenluP to 5 kW

Commercial (4100)

Commercial (<20 KW) For peak load requirement exceeding 5 kW

Ruler

I

r Time of Use (TOLO • Peak (4.21

Time of Use (TOU) - Off-Peak (Temp)

Total Commercial

Industrial

Bt

131 (Peak)

Bi- (Oil Peak)

137 -

B2 - TOU (Peak)

132 - TOusOff•peek) 31.98 138% 1

B3- 11/33 Kv (Peak) 1.60 007% 16

Ba 30.38 1.31% 3

[ Total industrial 82 I I 9,670

Bulk

Cl(a) Supply al 900 Volts • up lo 5 kW • 11

CHb)SuPPly al 400 Volts -exceeding 5 kW 0.53 0.02% 78

Time of Use (TOUIreek 160 0,07% 105

Time of Use (TOU) • 0.0.0eak 8 00 0.34% 12

B2 Si.Aatll kV 4.26 ID 18%

Time of Use (TOU) - Peak B.53 0.37% 25

Time or Use (TOU) • as0eak 36.25 1.56% 25

C3 Supply above 11 kV -

Time of Use (TOU) - Peak

Time Cd Use (IOU). Off-Peak I

I Total Single Point Supply) 69I I 256

pgdcullural Tube-wells - Tam 0 I

I _- DI Scare H 5.e6 025% 294

Time of Use (TOU) 5 33 0.23% -

Time of Use (TOU) 31.45 1.35%

I//gricultual Tube-wells 1.720 70 74.00% 22.494 I

Agncultual Tube.wells 0-2 (ice • -

Time of Use (TOLD • Peak 132(0 3,139

Time of Use (TOU)- Peak 0-2 267 0.11% 521 III Time of Use (TOW • Off-Peek 02 19 19 083%

Total AMICIMUrai 1 1,785 I 26,448 I

Public Lighting G 1 60 0.07% 260

Residenlial Colonies H 0 02 0.00%

CordracIs • Tariff K (MK)

Time DI Use (TOU) • Peak

Time 01 Use (TOU) - OMPeek

Railway TranionTrablion • I

Co•Genralion4

General Service

Grand Total 2825 100 DON,'

588.955 I

693 0.30% 2.618

25 59 110% 37

132.73 000%1 107,308 I

0 53 002%

1.80 0D7% 1,084

7.46 032% 1.452

0.53 0.02% 104

8 00 0.34% 1,009

400 00

400 00 19.00 400.00 1 19.00

400 00 13 00 1 400 00 13.00

4.00

4 00

12 50

12 50

15.00

15.00

15.00

15.00

17.00

1700

19 00

19.00

19.00

1900

13 00

13.00

1900 19.00

1500 400.00 15.00

106.61 4.59% 168.082

24 52 1.D5% -

33 58 1 44% 102.652

34.12 147% 29.542

35.18 I.51% 5,059

3.20 a.14%

15 99 059% 17.663

3649 I

%

264.39 I 451,023

30.38

1.31%

104,620

69.83

3,00%

34

Page 106: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

(2.268 91)

(2,268.91)

(2,288.91)

FORM - 27 ( A)

QESCO Existing & Proposed Tariff Statement April-June 2018

Residential

U0 50 Wens

For peak IoaO requirement up lo 5 YIN

Bulk

Ci (a) Supply at 400 Vohs-up to 5kW

01)516upp at 400 Volts -exceechng 5kW

Time of Use crow - Peak

Time of Use JOLI)- Off•Pealt

C2 Supply at II kV

Time of Use (rOU)- Peak

lime or Use (TOU) • Oft-Peak

C3 Supply above 15 kV

Time of use (TOO) • Peals_

I limo of Use (TOO • Ort-Peat

Total Single Point Supply

Above 700 Units 35 18 1.51%

For peak load requirement exceeding 5 kW - 000%

Time of Use (TOLO • Peek 3.201 0 la%

Time Of Use (IOU) • Off-Peak 15,99 0 89%

Total Residential 264.39 I 0 00%

Commercial - A2

Commercial • For peek iced requIremenl up to 5 kW 30 38 1 31%

Commercial tr100) 69.83 300%

Commercial (4201(W) For peak load requirement exceeding 5 kW - 00%

Regular - 000% •

lime of Use (TOO- Peak (A-2) 6.93 0.30%

Use

2.616H

Time of U (70U)- Off.Peak (Temp) 25 59 1 to% 37

Total Commercial 132.73 000% 107,308

Agricultural Tube-wells • Tariff 0

01 Scarp

Time of Use (TOU)

Time of Use_131.2)

02 Agncullual Tube-wells 172070 71.00% 22,494

• - Nincunual Tube-wells D-2 (I1)

Time of Use (YOU) • Peak D.20) - 3.139

Time of Use (TOU) • Peak 0-2 2.67 0.11% 521 1

Time of Use (TOU)- Off-Peak 02 19 19 0.83%

Total Agricultural 1,785 26,448 1

Public Lighting G 1.60 0.07% 2601

Residential Colonies H 002 000% -

61 (Pent

61- (00 Peak)

02

52 • TRU/Peak)

52- TOU (011.peek)

03 1103 KV (Peak)

64

Total Incluelhal

Grand Toted

000% 11

0.53 0.02% 78

1.60 0.07% 105

8.00 0.34% 12

4.26 0 16% •

8.53 0.37% 25

36.25 i 561 25

1

59 1 256

5.86 0.25% 294

533 0.23%

31.45 (.35%

(Mown) I Jesoel (%egel

11.19 046

- 0.00

106.61 4.59

24 52

33.58 144%

34 12 147%

0.00%

0 53 002% • -

1.60 007% 1.084 -

746 0 32% 1.452 -

0.53 002%I 104 1 -

8.00 034% 1.009 •

31.98 1.38% 1 -

1.60 0 07% 16 1_

3036 1.31% 3

82 0.00%1 3,6701 .

2,325 1 100 00%1 588,965

- I 000%

124.575

168,082

102.652

29,542

5.859

2,649

17,663

451,023

109 620

34

JAB Re)

44 78

iMin RH (Min Ri0

44 78

(Mln Rsr

1.332.63 1,332.63

367 81 367.81

503.74 503 79

579.96 579 96

668 45 668.45

60.77 60 77

207 89 207.89

3,788.02 3,766.02

577.30 577.30

0 26 1,047.45 0.26 1,047.45

285 131.66 285 13166

17 22 332 63 1 17.22 332.63

20.32 2,089.04 20.32 2,089.04

7 73 7.73

• 30.38 30 38

97 02 97.02

0.02 7.46 002 746

5 28 151 92 5213 151 92

36.46 40939 36.46 409.39

1 95 30 313 1.95 30.38

14.38 385 68 14.38 385.88

58.10 1,120.16 68.10 1,120.16

203 7.73 2.03 7 73

0.63 30 aa 063 30.38

4.33 10395 4 33 103 95

305 60 98 3.05 60 98

209 182 05 2 09 162 05

10 71 463.97 10 71 463.97

22.85 829.136 22.85 829.06

89.13 59 13

95 15 - 95 15

- 369.54 - 369 54

347.97 25,294.25 356.77 23.026.34 8130

- - •

4970 • 48.70 -

9.27 50.64 9 27 _ 50 64

- 243 71 - 243 71

406.94 28,142.42 419.74 23,873.51 8.80

- 22.39 22.39

- 019 029

. - -

507.21 33,969.38 516101 8.80 31,700.47

01.100 Units

101.300 Units

101-300 Units

301.700Units

Industrial

91

S,pecial Contracts • Tariff K NSJK)

lime of Use (70U) • Peek

Time of us.t 70U) • Off-Peak

Relsray TrachonTrectIon • 1

Co-Genrallop.

General Service

Jon Rs1

H

Page 107: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

1,452

104 1_

I 1,009

1

16

3 I

3,670 I

11

78

105

12 ,

25

25

256 I

1 1 294

22.494

3.139

521

26448 1

260

19 00 19.00

15.00 400.00 15.00

19 op I 400.00 119 00

13.00 400 00 13 00

400.00

400 00

400.00

FORM - 27

QESCO Existing & Proposed Tariff Statement 2017-18

Residential

Upa50 Linn

For peak load requirement up 10 5 kW 01.100 Units

01 1.95

Br (Peak) 5.86

0.02%

007%

B1 - (Off Peak) 27.35 0.32%

g2 . 1 95 002%

02 • 70U (Peaky 29 30 0.34%

B2 • TOu pil-peek1

B3- 11133 KV (Peak/

1

117 21 138%

556 0.07%

04 111.35 131%

I Total Industnall 301 1 1

Bulk

Via) Supply al 400 Vials • up to 5 kW

C1(b) Supply et 400 Vous -exceeding5 kW 1 95 0.02%

Time of Use (-1-01.1)• Peak 5.86 0.07%

Time of Use (IOU) -Off-Peak I 29.30 0.34%

C28(A pfri t w 15.63 0 18%

Time or Use (TOLI) • Peak 31 26 037%

Time of Use (TOU). off-Peek 132 84 1.56%

03 Supply above II kV

Time of Use (TOW • Peak

Time of Use (TOU) - Off-Peak •

1 Total Single Point Supply 217

Agricultural Tube-wells - Tariff D I

Di ScAp 21.49 025%

Ti me Of Use (TOUT 19.54 0 23%

Time of Usa (T01.5 115.26 1.35%

02 Agricenual 5305 98 74.00%

Agriculture Tebe-wellS 0-2 (i)

Time of Use (Too - Peak D-2(T)

Time al use glorq• Peek 0-2 9.77 0.11%

Time of Use (IOU)- ORPeak D2 70 33 0 53%

Total Aqdconeral 5542 I 1

Public Ugm g_i G 5 86 007%

Residential Colonies H 0.08_ 0.W%

Special Lanka= • Tariff (AJK)

Pone of Use (TOU)- Peak Time of Use (TOUT - on-Peek

Railway TiactionTraction • 1

Co-Genralion-J

General Service

Brand Total I 6,521 1 100.00%' 588,965 I

4.00 4.00

12 50 12 50

15 00 15.00

1500 15.00

17.001 17 00

19 00 19.00

19 00 19 DO

13 00 1 13 00

14.50 14.50

19.00 - 19.00

13 00 . 13 00

14 00 400001 14 00

19 00_1 400 00 1 19.00

12 80 400 DO I 12.80

19.00 380001 19 00

12.70 380 00 12 70

I

15 00 . 15.00

400 GO 14.50 400.00 14.50

400.00 19.00 400.00 __ 19.00

400.00 13 00 400.00 13 00

380.00 14 30 380.00 14.30

380.00 19.00 380.00 19 00

380.00 12.80 380 00 12.80

1-- I • •

I

15 20 i - 15.20

17 85 - 17.85 I a

11 75 I - 11 75 Ur

14.70 1 200.00 13.38 (1.32)

- - .

200 00

19 00 200.00 1 19.00

12 70 200 DO 12.70

I 14 00 14.00

14 00 14 00

12 25 I

101.300 Unix

301-700Unia

Above 700 un1s

Forpeak load requirement exceeding 5 kW

Time of Usa (rOU)• Peak

Time of Use (IOU) Off-Peek

Total Residential'

Commercial • A2

Commercial

201300 Undo

41.02 0.48% 124.575

390 71 4.59% 188,082

89.86 1.05%

123.07 1.44% 102.652

125.03 147% 29,542

128.93 1.51% 5,859

11.72 0,14% 2.649

58.61 0.89% 17.663

sum I 1 451,023 I

For peak load requirement up ro 5 kW 111.35 1.31% 104.620

Commercial (4100) 255 91 300% 34

Commutes' 140 8%) For peak load requirement exceeding 5 kW -

Regular -

Time of Use(TOU) • Peak (A4) 25.40 I 030% 2.618

Time al Use ROUT - Off-Peak (Temp) 93 77 1 10% 37

I Total Commercial 466.43 I 000%I 107.308

Induetrial -

-

1.084

400 CO

400.00

400 00

380 00

380 00

200.00

200 00

200 00

200 00

Page 108: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

• 1 2,028,83 124,490.41 1 taltbe 1118,175:344 --1137.7111 (8,318•0711

FORM • 27 ( )

QESCO

Existing & Proposed Tariff Statement 2017-18

r ,,vv, ,...., •

- I

Residential .

Up to 50 Units 41 02 0.48% 124.575

Forpeak load requirement up 10 5 kW - 0 00%1 -

4 59% 168,082 01.100 Units 390.71

i

101101) Units 89.56

101.300 Units 123 07 1.44% 102.652

301-MOUnfts 125.03 147%_ 29,542

Above 700 Units 128.93 1.51% 5,859

For peat load requirement exceeding 5 kW . 000% -

Time of useTTOtA • Peak 11.72 0.14% 2.649

rime of Use (TOU) • Off-Peak 58131 0.69% 17.663

Total Residential 968.95 0.00%1 451.023

Commercial • A2 0.00%

CommerOal • For peak load requirement up to 5 kW 11135 1.31% 104,620

Commercial (eon 255 91 300% 34

Commercial (<20 !CVO For peak load requirement exceeding 5 kW 0 00%

Regular • 080% •

Drne of Use (TOU) - Peat (A-2) 25 40 0.30% 2 618

Time of Use (TOU)- Off•Pealt (Temp) 93.77 1.10% 37

I Total Commercial 486.43 I 0 00% 107.308

Industrial - I 0.00% -

91 195 002% -

131 (Peak) 5.86 007% 1084

81 n(Off Peak) 2135 0.32% 1,452

B2 - 1 95 0.02% 104

132 • TOU (Peak) 29 30 0.34% 1,009

92 . TOU (Off-peak) 117.21 1.38% 1

1331133 NV (Peak) 5.86 007% 16

04 111 35 I 131% 3

I Total Industrial 301 I 0.00%I 3,670

Bulk • I

ctia) Supply al 400 Voss • up To 5 kW - I 0.00% 11

C?) Supply at 400 Volts -exceeding 5 kW 1.95 002% 78

Time of use (T08)- Peak 5861 I 0 07% 105

lime of Use /TM) • OIl-Peal 29.30 034% 12

C2 Supply at 11 IV 15,63 a 1 e%

Time of Use (TOU) • Peak 31.26 037% 25

mme el Use /row • 09-Peak 132.84 1.56% 25

C3 SupON above 11 kV Time of Use (IOU) • Peak •

Time of Use (TOO • OIl-Peak

Total Single Point Supply 217 258

11,09[898ra) Tube-wells - Tariff 0 - - 01 Scarp 21 49 0.25% 294

Time or Use (TOO 19.54 0.23%

Time al Use (T0k1) 115.26 1 35% -

02 Agdeulival Tuoe-walls 6,305.98 74.00% 22 494

Agncullual Tube-walls D-2 OS - •

Time of Use (TOU) • Peak 0-20) • 3,139

Time of Use (TOU) • Peak 0-2 9.77 0.10161 521

Time of Use (IOU) • Off Peak 02 70 33 0 83% -

I Total Arreculturai 6,542 I 26.448

Public Ogt_gdin G 5.86 0.07% 260

Residemial Colonies H 008 000% •

Special Contracis • Tariff K (A.W) -

Time cif Use (Toy) • Peak

Time of Use (T0)- 011-Peat

Railway TractionTractIon • 1

Co-Gerirmion•J

1 General Service 1

1 Grand Total' 8,521 1 100 00%1 588.965 1

2,11567

103 3,638 68

482.52

1,219 03

7,655.87

0.08

21 12

145_85

781

57 53

232.39

8 14

2.50

17.33

12.22

8 37

42 84

91.39

3,038.32

326 63 I . 326 63

348 70 - 348.70

1,354.25 - 1354.2B

139190 9269794 1,25413 84,362 68 (137 77) (8.315 07)

194.79 - 194.79 -

37.08 185 58 37.08 185.58

- 893 15 - 893 15 •

- 1,623.7716,806.30 1A96.00 87,491.23 (137.77) (8,315.07)1 id 82.05 • 82 05_ _ ___u•

1.07 _ 1.07

1 03

11 39

6866

81.28

4.883 82

1,347.93

1,646.08

2,12544

2.449,72

222.70

761 88

13,801.66

2,11567

3,636.68

28 33

111.35

355 54

27.35

556.75

1.500.31

111 35

1,414 16

4,106.14

28.13

111 as

380 94

223 48

593 87

1,700.35

11.39 482.52

6886 1,21900 1

81.28 7,655.87

111 35

28 33 • _1

• 355.54

008 2735

21 12 556 75

145.85 1,501) 31

7.81 111.35

57.53 141418

232.39 4,105.14

8.14 28.33

250 111.35

17 33 380 94

12 22 22348

8.37 593 87

42.84 1,700.35

91.39 3,038.32

16x.10

4,883.82

34793

1,846.08

2.125 44

2.44872

222 70

751 BB

13,801.66

H

Page 109: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

iRsAWIR, I riserMil I IRs/kWAll RO✓ W11) 1

2.25 030% 2,6181 629 I 1.10% 37

43.03 1 0.00%1 107,308 I

_I 017 0 02%

007% 0 52 Of 36 1,064 242 0.32% 1.452

0 17 0.02% 104

2.59 0.34% 1,009

10.37 1 1.38% 1

052 0.07% 16

9 85 1 131% 3

27 I 3,670

11 0 17 002% 78 052 0.07% 105 2.59 0.34%1 12

1:38 0.16%1

2 76 037% 25

11 75 1.56% 25

19 1 I 256

2.00

5.79

811

10.20

16.00

18.00

10.00

12,50

18 00 I

15.001

• I

18.00 1

12.50

2.00

6.71

6 89

H

1.00

1 00

0.50

1.00

0 50

100

0.51

1.00

0`50

oo 0-50

100

0.50

FORM - 28

QESCO

Revenue and Subsidy Statement July 2017

J

J

I 16°Wh) I 1%%00 I

I 1

3.63 I D.40%1 124,575 For peak load requirement up lo S kW - 1 I

01-100 Unds 1 34.56 I 4 59% 168,082

101-300 Units

7.95 1.05%

201-300 Wills

10.89 1.44% 102 652

301.700unils 11.06 1.47% 29.542

Above 700 Undo 11 40 1.51% 5,859 For peak load requirement exceeding 5 kW

ilme of Useillnl • Peak. 1.04 0.14% 2.649

Time or Use DOU) • 011-Frook

5 18 0 69% 17.663

1 Total Reeidential1 65.71 I 451.023

Commercial • A2

Commercial • For peak load requirement up la 5 kW 9.65 131% 104.620

Commercial (v100) 22.64 3.00% 34

Commercial 1120 KW) For peak load requirement exceeding 5 kW

Regular

Time of Use (TOUT . Peek (A-2)

Time of use ROW - Off Peak (Temp)

1 Totes Commercial

I lndustrial

131

81 (Peak)

131 - (01f Peak)

02 •

B2 TOU (Peak)

02- TOU (Off-peak)

83-11/33 KV (Peak)

1 04 1 Total Industrial

Bulk

CI (a) Supply al 400 Voris • up to 5 kW

C1(b) Supply a1400 Volts -exceeclIn 5 kW

Time of use (70t7( • Peak

Time of Use ,E0U)- Off-Peak

C2 Supply al 11 kV

Time of Use DIOULLosak

Time of Use (IOU) • 011-Pen

C3 Supply above 11 kV

Time of Use_g011) • Peak

Time of Use (TOU) • Off-Peek 1 Total Single Point SuPPIY1

Agricultural Tube-wells - Tariff D

Dl Scarp 1 90 025% 294

Time of Lt_21.9... 1.73 033% - Time of use (TOU) 1019 1_35%

102 AgncuPtual Tube-wells 557 78 74.00% 22,494 culled! Tuee•wells 0-2 (ii)

Time of use (TOU) • Peek 0-20 • 3.139 Time of Use (TOU)- Peak 0-2 1 0.86 1 0 I I% 521 Time of Use (T01.1)- 0ff-Peat 02 1 6.22 1 0.63%

1 Total Agricultural 579 I 26,445 Public Lighting G 052 0.07% 260

Residential Colonies H 0 01 0.00%

Speual contracts - Tariff K (A-1K) • Time or Use (T0u)- Peek

Time of Use (TOU) • Off-Peak

Refiway TracironTratl;0n 1

Co-German-J

General Service

Grand Total 754 I 1130 DO% 568,965

ri✓HV✓1)

4 00

12 50

15.00

15.00

17.00

1900

19 00

13 00

UUp 10 50 rinds

400 00

400 00

400.00

380.00

360 00

400.00 400 00

400.00

380 00

380 00

380.00

200.00

200 00

200 DO

200.00

19 00 I

400.00

15 00 1

400.00 I

400 00 I

1900 1

400.00 I

400 00 I

13.00 1

400 00 1

1

15.00 15.00

14.50 400.00 14.50

19.00 400.00 18.00 13 00 400.00 12.50

14 30 360 00 14 30

19.00 380.00 18 00

12. 60 MO 00 12.30

15 20

17.85

11.75

14.70 200 DO

200 00

19 00 200.00 12 70 200 DO

14.50 I

19 00 H

13.00

14.00

19,00

12.80

19.00

12 70

14 50

18 00

12.50

40000 1400

40000 1800

400 00 12 29

380 00 1800

380 00 12 20

• -I

1785

17 85

11.75

11.50 320

15.00 4.00

865 3.85

1400

14.00

14.001

14.00

12.251

Page 110: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

14 51

431.98

119 23

163.29

188 00

216.68

19 70

67.39

1,220.79

7.26

200 10

64.46

111 04

176.94

205 20

1866

64 BO

848.53

0 68

021

1 44

1 02

0.70

3 57

7.62

115.99

16.23

3.09

136.31

H

169.07

187.14 177 29

009 339.54 _ D.09 339 54

- _

42 68

0.95 40 43 2.25

10782

574 103.66 I 4.15

877.18

6.77 660.94 16.24

2 51

9 65

3145

001 242

0 01

1.76 49 25

1.76

12 15 132 71

12 15

065 985

0.65

79 125.09

4 79

19.37 363.11

19.37

251

068 2 51

9.85

0.21 9 33

33 69

1.44 3240

19 77

1.02 1977

52 53

0 70 49 76

150 40

357 14452

0 95

5.74

6.77

251

9 33

30.24

2.42

96.65

127.42

9.33

120 16

349.08

052

1.21

2 59

5 29

0 52

4.92

15.05 I

0.52

1 30

2761

5.87

268.75

28.89

3084I

119.79

13,199.39 1_

16 92

79.00

9479.28

7 26

0 09

7.62 I 269.29

22 81

30 84

119 79

115 38

64114 45

16 23

3.09

12 96

55 05

6,855.91

7 26

0 09

134.70

10.45 1

6.08

0 61

0.61

1,784.89

3 46

23.95

1,518.38

11,01146 ''168.46 071.08 0.61 2,232.38

54.77

52 25

11 06

11.40

1 04

2 59

372.26

726 231.8

9 85

FORM -28 I A)

1

QESCO Revenue and Subsidy Statement July 2017

124.575

168,082

-

102,852

29.542

5,859

2,649

17,663

951.023

-

104.620

34

)

(kW)

-

-

-

-

-

Residential

lo 501km

(14kwia Pane)

3.63 04e%

- 0.00%

3456 4.59%

795

1089 1 44%

11 06 1.47%

Fm peak load requirement up t05 kW

_01400 Units

101.300units

1N-300Units

301.700Units

Above 700 Unils

For peak load requirement exceeding 5 kW

lime or Use (TOU). Peak

Time of Use (IOU) - Off-Peak

Total Residential

Commercial - 42

Commercial - For peak load requiremerl up to 5 kW

Commercial l^100)

11 40 1 51%

• 000%

1 04 0 14%

51B 0.69%

85.71 0 00%

- 000%

9B5 1.31%

22.64 3.D0%

Commercial (<20 avii) For peak load requirement exceeding S kW - 0.00%

Regular _ • 0 00%

225 0.30% 2.618 Time 01 Use crO)- Peak (A3)

Time of use (TOU) • Off-Peak (Temp)

Total Commercial

Industrial

829 1.10% 37

43.03 0.00% 107.306

-F 0 00% -

017 0.02% -

052 0.07% 1.064

-

-

-

81

81 (Peak) _

131 - (0ff Peak)

242 0.32% 1,452

017 002% 104

2.59 034% 1,009

10 37 1.38% 1

052 007% 16

985 1.31% 3

27 0 00% 3.670

- -

• 000%_ 11

0 17 002% 78

052 0.07% 105

B2 -

fl2 - TOU (Peak)

____ 82 - TOP (011Reak)

133- 11/33 XV (Peak)

B4

I Total Industrial

Bulk

-

-

-

-

-

Cl(a) Supply al 400 Volta - up to 5 kW

01(b)Suppty al 400 Volts -exceeding 5 kW

Time of Use (TOO - Peal)

_lime of Use (TOU) - Off.Peek

Cltpu ply at I 1 kV

259 034% 12

1.36 0.18% -

Time of Use (TOU) • Peak

Time of Use (TOU)- Off -Peak

276 0 37% 25

11 75 1.56% 25

3 Su ly_above 11 kfl _ -

Time of use (Mu) - Peak

Time of Use (TOU) • Off-Peak

Total singla Point Supply

• rkuRuraI Tube-wells - Tariff 0

-

19 256

- •

1 90_ _ 0 25% 294

1 73 023% •

10.19 1.35% -

557 78 74_00%1 22.494

_ - -

3.139

Cil Scarp

Time of Use ROIL)

Time of use (TOU)

RIAgricuhual Tube-wells

Agricunual Tube-wells 0-2 CM

Time of ur±/JuJ, - Peek 0.2(1)

Time ol Use (TOU) - Peek D-2

Time of Use gou) - Off-Peek 02

Total Agricultural

Public 'Amino c__ .

Residential Colonies II

0.86

6 22

579

052

0 01

0.11% 521

0 e3% -

26.448

007% 260

• 000% -

Special Contrams - Tariff it (A4a)

Time of use (TOLI) - Peak

-

Time of Use (TOO- Off-Peek

Railway TrechonTraciion • 1

Co-Genration-u

General Service

I Grand Total

-

764 100 00% 588,965

-

1 1 1 - 1

1 I

1

Page 111: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Residential

lo 50 UnMs

For peak load requirement up to 5 kW

01-100 Units

101-300 Units

201-300 Units

1%ageff

3.65 048%

34.78 4.59%

8 OD 05%

10 95 144%

11-

15 00 15 00

14.50 400.00 14.50

19.00 400 00 1800

13.00 400.00 12.50

14.30 380.00 14.30

19.00 380.00 18 00

12.80 380 00 12 30

15.20 12 001

17 85 • 17 85

11.75 11 75

14 70 200 DO 11.50

200.00 -

19 00 200.00 15.00

12 70 200 00 885

14 00

14.00

14 00

14.00

12.25

a w

3.20

4.00

365

400

12.50

15 00

15 00

17.00

19.00

1900

13 00

2.00

5 79

B.11

10 20

18.00

18 00

18 00

12.50

2.00

6 71

4.80

100

1 00

1 00

0.50

19 00

18.00

1 00

1500

400 DO 15 00

• I

400.00

18.00

1 00

400.00

12 50

0 50

14.50

18 00

12 50

14 00

18 00

12 29

18 00

12 20

400 00

400 00

400.00

380 00

380.00

1.00

0.51

1 00

0.50

19 00

13.00

14 50

19 00

13 00

14 00

19.00

12 80

19.00

12 70

H 400.00

400.00

400 00

38000

380.00

400 00

400.00

400 00

380 00

380.00

380 00

400.00

400.00 I

400.00

200.00

200 00

200.00 _

200.00 I

1 1 1 1 1

FORM - 26

QESCO

Revenue and Subsidy Statement Aug 2017

301-7000nIts 11 13 1.47%

Above 700 Units 11.48 1.51%

For peak load requirement exceeding 5 kW •

Time of Use (IOU) Peak 1.04 0 14%

I Time of Use (TOU)- Oft-Peat 5 22 069%

Total ResIdentlei 86.25

Commercial - A2

Commercial For peak load requirement up lo 5 kW 9.91 1 31% 104,620

Commercial (<100) 22.78 300% 34

Commercial (.020 KW) For peak load requirement exceeding 5 kW

Regular

Time of Use (Iam . Peek (42) 2.26 0.30%1

Time of Use (TOO . Off-Peak (Temp) 835 110%

Total Commercial 43.30 0 00%I

2518

37

107,308

11

0.02% 78

007% 105

0.34% 12

0.18% •

0.37% 25

156% 25

23 Supply above 11 kV

Tare of Use (Mg • Peek

Time of Use (TOO) • Off-Peak

Tool Single Palm Supply

(Rs* hi OkkeWh) (R 1kW) I %FP}

124,575 1

168 082 1

102.652

29542

5 859

2,649

17.663

461,023

Industrial -

51 0.17 0.02%

Streak) 0.52 007% 1084

13I - (Oft Peak) 2.43 0.32% 1.452

0 17 0.02% 104

B2- TOU (Peak) 1 261 1 0.34% 1,009

B2- TOU (On-peak) 10.43 1.38% 1

1

0 52 1 0.07%

9.91 1.31%

16

3

Total Industrial' 27 I I 3,570

B3- 11/33 KV (Peak)

04

Bulk

Cit a) Supply et 400 Vans up to 5 kVV

CI(b) Supply el 400 Volts •exceeping 5 kW 0 17

Time of Use (TOUT- Peak 0.52

Time of Use (TOO • Off-Peak 2.61

G2 Supply at 11 kV 1.39

Time of Use (TOU)• Peak 278

Time of Use (TOU) • Off-Peak _ 11 82

19 I 256

Agricultural Tube-wells • Tariff D

Dt Scam

1.91 0.25% 294

Time of Use (TOU)

174 023%

1-me of use (TOU)

10 26 1.15%

ncuhual Tube-wells

561.29 74.00% 22,494

liCultual Tube-wells 0-2 01)

Hne of Use (TOU). Peak 0-20

Time of Use (IOU) • Peak 112

0.87 01 t% 521

3.139 1

Time of Use (IOU) - Off-Peak 02

626 0.83%

662 I 25,448 Tool Agricultural

052 007% 260 Peek LIpling G

001 000% Residential Colonies H

S lal Contracts - Tariff K Wig

7)me of UsITOLO - Peek

Time of Use (TOU) - off-Peek

Railway TreclionTreown.

Co-Genraton-J

General Service

Wand Toted 76B 100 00% 588,965

Page 112: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 28 ( A)

QESCO Revenue and Subsidy Statement Aug 2017

I peiviki New I0WI Nagel (MIn as) IMIn IMm RH (MIT RH

H

Realdential _ Up to 50 Uric I 365 65 048% 124 575

For peak load requirement up ba 5 kW - 0.00%

1 01-100 Unit 34.78 4.59% 166,082

101-300 UnlIs 6.00 1

101.300 Units 10 95 1.44% 102.652

301.7000nlis 11.13 147% 29,542

Move 700 Units 11 48 1 51% 5859

For peak load requirement exceeding 5 OW - 0.00% •

lime or Use Ft:An- Peak 1,04 014% 2649

Time of Use (TOO - Off-Peak 5 22 I 0 69%1 17.663 1

1 Total Realdentlel 56.25 I 0 00% 451,023

• I 0.00%

Commercial • For peek load requirement up to 5 kW 0.91 1.31% 104,620

Commenced WOO) 2278 3.00% 34

Commercial (o20 KW) For peak load requirement exceeding 5 kW - 0.00% -

Rogular - 000%

Time of Use (TOU) • Peak 16-2) 2.26 0.30% 2.61131

nine of Use (TOU)- Off-Peak (Temp) 835 1 10% 37

1 ToW Commercial 43.30 000%1 107,308

Industrial - 000%

01 0 17 002% -

91 (Peak) 0.52 0.07% 1,084

BI- (Off Peak) 243 0.32% 1,452

92. 017 0.02% 104

132- TOU (Peek) 261 034% 1,009

82 - TOU (Off-peak) 10 43 1.38% 1

03-11/33 KV (Peek) 0.52 0.07% 16

ea 9.91 1.31% 3

1 Toter industrial 27 000% 3.670

Bulk

1.6upp1y at 400 Volts . up to 5 kW - 000% 11

C1(0) Supply at 400 Volts •exceeding 5 kW 0.17 002% 78

Tone of use (IOU). Peek 0.52 0.07% 105

Time of Use (TOU) • Off-Peak 281 0.34% 12

C1 Supply al 11 kV 1 39 I 018% •

Time of Use (TOU) • Peak 2 78 0.37% 25

Time of Use (TOU) - Off-Peak 11.82 I I 58% 25

C3 Supply above I I kV - •

_ lima or Use (70U) - Peak -

1 lime of use (70U) - Off-Peak

1 Toter Single POInt supply 19 I 256

Agricultural Tube-wells • Tariff D

294

1.91 025%

1.74 033%

10.26 1 35%

561 29 7400%

22.494

• 3.139

0.87 1 0.11% 521

6 26 1 0.83%I

552 1 1 26.440

0.52 007%1 260

001 0.00%1

14 61 7.301 730

- . •

934.71 201.36 1 233.35

119 98 _ 64.67 I 55 11

164 32 111.74 1 52.58

189 18 178.06 11.13

218.05 206.57 1148

• - - _

19.02 16 78 104

67.81 65 21 261

1,226.48 863.88 374.60 1

I ___

188 31 178.40 991

0.09

341.68 0.09 341.68

0.95

42 95 0.95 40 69 2.26

5.74

108.50 5 74 104 33 4 17

6.77

681.44 6.77 665.10 16.341

2.52 252

-

991 9.39 0.52

31 65 30.43 1 22

001 243 001 243 -

1.76 49.56 1.76 46 95 2 61

12 15 133.54 12.15 128.22 5 32

0.65 9.91 065 9.39 0.52

4.79 126 87 4.79 120 92 4.96

19.37 365.40 19.37 350.25 15.151

0 BB 252 068 2.52

0 21 9 91 0.21 9 39 . 0.52

1.44 33 91 144 32.60 1 30

1.02 19.89 102 19.09 -

070 70 52 86 0.70 50.08 278

3.57 151355 3 57 145.43 5 91

- _

- - '

7.82 270.44 7.62 259.92 10.52 1

. I

290]

31 04 31 04

22.951 6 1 2

-

120.54 120 54

115.99 8,250 98 I 116 44 6.454 85 (0 45) 1.796 13

- -

16.23 1823 -

3.09 309 13 04 348 18 52

55 40 24 10 79.50

136.31 135.76 6,697.82 (0.45) 1,829.83 I 6,627.66

7.30

730

0 10 • 0.10

159.07 11.080.81 1

188.52 8,834.37

Commercial - A2

Time of Use (IOU)

Time of Use_DOU)

02 Agricuhual Tube-wells

Agncullual Tube-wells 0-2 (11

Time a1 Use (TOU) - Peak 0-29)

Time of Use (TOU) - Peak 0-2

Time of Use prom • Off-Peak 02

1 Total ISOffeuftura

Public LiaG

Residential Colonies H

Special Centred!! . Teen K (MK)

Time of Use (Tou) Peak

Time of Use (70U). Off-Peek Raiff TractionTreclion • 1

00-0enfarlan-,1

General service

1 Grand Teta! 765 1 100.00%1 588.965 1 (0.43) 2,248.44I

Page 113: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 28

QESCO

Revenue and Subsidy Statement Sep 2017

(mkwhi 1 (4440

Residential

(kW) raage) (FsftWrivli

O),10 50 units 3.39 0,48% 124,575

For peek load requirement up 5 kW I -

01-100 Units I 32 30 4.59% 168,082

101-100 units 743 1 05%

201-300 units 10.18 1.44% 102.652

101•7000nils 10.34 147% 29.542

Above 700 Units 10.66 161% 5,859

For peak load requirement exceeding 5 kW

Time of Use (7014 - Peak 0.97 0.14% 2.649

lime of use (70U)• Off-Pen 485 069% 17,663

I Total Roslciendei 80.11 I 451,023 •

Commercial - A2 -

Commercial • For peak load requirement up l05 kW 921 1.31% 104.620

Commercial (41001 21.16 3.00% 34 400 00

Commercial (20 KW) For peek load requiremenlexcateding 5 kW

Regular

Time of use (TOU). Peak (A-2) 2.10 0.30% 2,618 400 00

Time of Use (TOO • Off-Peak (Tema) 7 75 1 10% 37 I 400 00

Total commercial 40.22 000%I 107,308

Industrial

B1 0 18 0.02% - ____

01 (Peak) 0.48 0.07% 1,084

B1 • (Off Peak) 2.26 0.32% 1.452

82 • 0 16 0.02% 104 400.00

02 • TOU (Peals) I 2.42 0 34% 1,009 400 00

52- TOuj01±81188) 9.69 1.38% 1 400 09

83-11/33 KV (Peak) 048 0.07% 16 380 00

04 921 1 31% 3 380.00

Total Industrial 25 I 3,670

Bulk

01(11 Supply al 400 Vans • up la 5 kW 11

Cl(b) Supply al 400 Vohs •exaeWinal 0 16 0.02% 78 400 00

'rime or Use (TOU) • Peak 048 0.07% 105 400.00

Time c,..isell'Ou) • cni-Peai, 242 034% 12 400.00

C2 Supply al 11 kV 1 29 018% 380.00

Time of Use (70u)- Peak 258 0.37% 25 380.00

Time of Use (70U) -011-Peak 10.98 1.56% 25 380.00

03 Supply above II kV

Time of Use (TOU) - Peak

Time of Use (MU) -off-Peek

Total Single Poled Supply la 256 I

Agricultural Tube-wells - Tariff D

01 Scarp 1.78 025% 294

Time of Usy_s_g0U) 1 62 0.23%

Time of Use (TOU) 9.53 1.35%

02 Agricullual Tube-wens

ncultual Tube wells 0-2 PO

'he or Use gou) Peak 0-20)

521 39 7400% 22494 200 00

• 3,139 200.00

lime or Use (TOU) Peak 0-2 081 0.11% 521 200.00

Time of Use (TOU)- OR-Peak 02 581 083% 200 00

Total Agricultural 541 I 26,448

Public Lighling G 04B 007% 260

lieslaeniial Colonies 0 01 000%

Special Conirams • Tariff K 18.11 Time of Use (TOU). Peak

Time of Use (TOU) • on-Peek

Railway TractIonTramion . 1

o-Genralion-..1

General Service

Grand Total 706 10000% 688,965

H 4 DO 200

IRs/kWip (RarkWthri IRIAWM IRP14/4/59 I illsAWM

I

I

2 DO

12 50 • 579 671

15001 - 811 669

15.00 • 10.20 two

17 00 • 16.00 100

19.00 . 18.00 1.00

• . .

19.00 18.00 1.00

1300 12.50 050

1900 18.00 1.00

15 00 400.00 15.00

- - -

. • .

19.00 400.00 15 00 1 00

13.001 400 00 12 50 0.50

14 50 14.50 -I"

19.00 18.00 1.00

13 00 - 12.50 • 050

14.00 400 00 14.00 -

19 00 400.00 18 00 1.00

19 00 380.00 18.00

0.51 12.80 400 00 12 29

1.00

12 70 180.00 12.20 050

1500

14.50

1900

1300

14.30

1900

1280

14.00 • 14 00

14 00 - 14 00

15.20

17.85

1175

14 70

19.00 200.00

12 70 200 00

12 25

400.00

400.00

400 00

380.00

380 00

380 00

200 00

200 00

15 00

14.50

18.00

12 50

14.30

1800

12 10

12.00

17 85

11.75

11 50

15 00

8 85

1.00

0.50

1 00

0.50

3.20

4.00

3.85

3 20

Page 114: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

0.6e I 0.21

1 44

1 02

0 70

3.57

7.62

2.34

8 72

30 29

18 48

48.52

135 10

241.44

FORM • 26 ( A)

QESCO Revenue and Subsidy Statement Sep 2017

(kW) I Otago Vein Re) loin Re) (Min RU

678

Mrs R5) itorwin rouge)

124.575

168,082

102.652

29,542

5,659

216.76

51.19

48.84

10.34

10.66

0 97

142

• I 34i.97 I I _I

H •

6 78

187.04

60 26

103.79

155 40

191 89

17.44

60 57

793.17

IResidential

Uplo50 Units _ 339 048%

For peak load requirement up to 5 kW - 0 00%

01.100 Cells 32.30 4.59%

100300 Unite 7.43

_ 101.300 Units 10 18 1 44%

30140O0nns 10 34 1.47%

Above 700 Units 10.65] 1.51%

For peak load requirement exceeding 5 kW • 0-00%

Time of Use (TOU): Peak 097 0]4%

Time of Use (TOU) - Off Peal( 4.85 0139%

Total Realdemlal 8011 0.00%

2,649

17,663

451,023

165.72

009 31739

0.95 37 80

5.741 96 91

6.77 617.82

Commercial - A2 - 000%

Commercial - For peak load requirement up 105 kW 921 1 31% 104,620

Commercial (01001 21.16 3 00%I 34

comma,* 1420 KW) For peek load requirement exceeding 5 kW - 0 00%

Regular -0 00% . ____

Time of Use (TOU)- Peek (42) 2.10 0.30% 2818

I lime of Use (TOO). Off-peak (Temp) 7 75 1.10% 37

I Told Commercial 40.22 0.00%1 107,308

9 21

- _

2.10

3 88

15.18 I

1.084

1.452

104

1.009

1

16

3

3,670 I

InduatrIal

01 (Peek)

01- (311Peak)

82 .

132 • TOUJPeak)

B2 TOU (Orr-peak)

03- 11/33 KV (Peak)

I 151

Total Industrie

IBulk

0 00%

0 16

0.02%

0 48 007%

228 0.32%

0.16 002%

242 0.34%

969 138%

048 007%

9.21 1.31%

25 030%

0.01

1 76

12.15 119.11

0.65 1 8 72

4.79 112.32

19.37 325.35

0 48

113

242

4 94 _

0.48

4 80

14.07

2 34

6 72

2627

2 26

43 61

009

0.95

5 74

6.77

0 01

1 76

12 15

0.65

4 79

19.37

11

78

105

12

25

25

258

Gila) Supply at 400 Volts-up lc 5 kW 0.00%

psi Supply at 400 Volta -exceeding 5 kW 0 16 0 02%

lime of Use (TOU) • Peek 0.48 0.07%

Time of Use (10U) • 06-Pen 2 42 0.34%

C2 Supply et 11 kV 1.29 015%

Time of Use (TOU) • Peek 2.58 0 37%

Time or Use (TOU) - On .Peak 10 98 1 55%

I

C,3 Supply above 11 kV

744e of use (TOU)• Peak

I Time of Use (1010 -03-Peak

Total singie Point Supply 18

0.68

021

144

1 02

0 70

3 57

7.62

0.48

121

255

5 49

9.77

loin Rs)

13 57

403 BO

111.45

152 64

175 73

202.55

18 41

82 99

1041.14

174 93

317 39

39 90

100 79 I

833.00

234

9.21

29 40

2.26

46 03

124.05

921

116.92

339.42

2,34

9.21

31.50

18 413

49.10

140 59

251.21

iAgricultural Tube-wells - Tariff 0

01 Scarp I Time of Use (YOU)

I Time of Use (70U)

IDncullual Tube-wells

Ncicusual Tube-wells oq 66

Time of Use (TOU) - Peak 0411)

Time 01 Use (TOU). Peak 0.2

Time of Use (YOU) - Off-Peak 02

I Total Agriculture

I Public Lighting G

Resioemlei Colonies H

Special ContreCIS - Tann K (AJK)

Time of Use (YOU) • Peek

Time of Use (TOU) - Olt-Peak

Railway TramonTraGion . 1

Co-Genration-.1

General Service

I Grand Total

9.53 135%

521.39 7400%

3,139

081 011% 521

5 81 0.83%

541 1 26,448

048 0.07% 260

001 000%

1 78

1 62

706 100.00%

025% 294

0.23%

5043.965

22.494 115 99

135.31

169.07 10,293.05 167.47 8.206.31 11.80 2,086.74

1523

3 09

27 01

26.83

111 97

7,664 40

15.34

73 85

7,921.41 6.78

0 09

21 32

28 83

111 97

104.39 5.995 96

16.23

3 09 I 12 11

51 46

123.71 13.221.06

6.78

0 09

11.50

11 60

5 69

1 668.44

3.23

22 39

1,699.74

Page 115: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

400 00

1800 19.00

15.00 40000 15 00

19 00 1

13 00 I

400.00 1800

400 00 12 50

400 00

400 00

6.71_

8.69

4.80

oo

100

Meg.) ObikW(70 IR)!AWN (RuntWfm)

4.00 1

12 50

15 00

15.00

1700

19.00

19.00

13 00

(Renwel (Rsgrwo0)

200

5.79

811

10.20

18.00

18 00

1600

12 50

IRE/W,11

2.00

0.50

r- 1.00

1.00

1.00

0.50

Residential

la 50 Una

For peak Hed requirement up to 5 kW

01-100 Unhs

101-300 Units

201.3(0 Units

301•700Unris

10.67 0.48% 122.042

101 64 4 59% 65.685

23.38 105% 98,799

32 02 1.44% 100.565

32.52 147% 28,941

20000

200 00

200 00

200.00

15 20

17.85

11.75

14 70

19.00

12 70

12.00

17,85

11 75

200.00 11.50

200 00 •

200 00 15 00

200 00 8.85

120 a e

3.20

4 00

3.85

2.54 0.11% 515

18.30 0.83% 3,107

1.702 I I 28,184

1 52 0.07% 257

0.02 0 00%

2,217 100.00% 576,499

FORM - 26

QESCO

Revenue and Subsidy Statement July-Sep 2017

OHM% Osage)

Above 700 Units 33.54 1.51% 5.740

For peak load requirement exceeding 5 kW - -

Time of Use (IOU) - Peak 3.05 010% 2,596

Time of Use (TOU)-OR-Peek 15 25 0.69% 17,304

1 Total Residential' 252.07 I 441,853

Commercial • A2

Commercial • For peas load requirement up II 5 hVY

CoMmercial (<100)

Commercial •20 KW) For peak load requirement exceeding 5 kW

Regular

Time of Use (IOU) - Peak (A-2)

Time of Use (TOO) Off-Peak (Temp) I

Total Commercial

28.97

1 31%

101,733

55 57

3.00%

33

• •

661

0.30% 2,545

24 39

1 10% 36

126.64

0.00% 104.347

Or

81 (Peak)

81- (Off Peak)

B2 •

82 • TOLPeak)

B2 TOU (Off-peak)

83- 11r33 FOJA

84

Total Industrial

Sulk

Ctp inyit 400 Vohs • up to 5 kW

Crib) Supply at 400 Volts -exceeding 5 kW

'me 01 Use (TOU). Peak

Time of Use (TOU) Off-Peak

C2 Supply al 11 kV

lime of Use (TOU) - Peak

Time of Use (TOU)- Off-Peak

C3 Supply above 11 kV

Time of Use D010 - Peak

I Time of Use (TOU) • Off-Peak

Total Single Point Supply

Agricultural Tube-wells - Tariff D

01 Scarp

Time of Use (TOU)

Time of Use(TOU)

[Nricultual Tube-wets

Nricultual Tube-wells 0-2 (ii)

line of Use (IOU) - Peak 0-25)

lime of Use (TOU) - Peat 0-2

Time of Use (TOU) • Off-Peak 02

Total Agricuff ural

Public ()piing G

Resdiengal Colonies H

Special Contracts • Tariff If (4.1K)

Time of Use (TOU) • Peak

Time of Use (TOU) • ON-Peak

Railway Trash-oarsmen 1

Co.Genration-J

Genera I Service

Grand Total

0 51 002%

1 52 _0.07%

1.064

7.11 0.32%

1,425

0 51 0.02%

103

7.62 0 34%

991

30 49 139%

1

1.52 I 007%

16

28 97 I 1.31%

3

78 I

3,802

11

0 51 0.02% 78

1.52 0.07% 105

762 0.34% 12

4.07 015%

8.13 0.37% 25

34.56 1.56% 25

I

56 I I 256 1

559_ 0.25% 92

506 0.23% 99

29.913 1.35% 101

184046 7400% 22.270

14.50 - 14.50

19.00 - 18.00

1 00

13.00 I 12 50

050

400.00

10 00 400 DO 14.00

400.00

19 00 400.00 18.00

1 00

400 00

1280 400.00 1229

0.51

380 00

19.00 3130.00 18.00

1 co

380 00

12.70 I 380 00 1220

050

15 00

15 00

400.00

14 50 1 400 00

14 50

400.00

19.00 400.00

18 00

1.00

400.00

13.00 400 00

12 50

0.50

380 00

14 30 38000

14 30

380 00

19 00 380.00

18.00

1 00

380.00

12.80 380 00

12 30

05o

Page 116: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 28( A)

QESCO Revenue and Subsidy Statement July-Sep 2017

I

Residential

h)

12p:•50 Units 10.67

Fosfreek Wed rinuiremeni up to 5 kW -

01-100 Units 101.64

101.100 Unls 23.38

101-300 Unit 3202

301.71)00nns 32.52

Above 700 Units 33. 54

For peak load repuiremen1 exceeding 5 kW -

rine of Use (TOU) Peek 305

Time of Use (IOU) - Off-Peak 15.25

1 Total Residemlal 252.07

I Commercial A2 commerma■

-

For peak Wad (enurement Up lo 5 kW 26 97

commercia15e100) 66.57

Commercial (<20 19A) For peak load requirement exceeding 5 kW -

Spear - Time of Use (IOU) - Peak (A-2) 6 61

Time 01Use (TOU)- OR-Peek (Temp) 2439

Total Commercial 126.64 1

Industrial B1 . _ 0.51

81 (Peak 1,52

61- (Off Peak) 7 11

0.51

B2- TOU (Peak) 7.62

_ B2 • TOU (Off-peak) 30.49

03- 11733 KV (Peak)

5

BA 281 927 1

Crape)

046% 122.042

0 00% •

459% 65.1386

98.799

1.44% 100.565

1 47% 28.941

1.51% 5,740

0 00% •

0 14% 2.596

0139% 17,304

0.00% 441,853

0.00%

1.31% 101,733

3 OD% 33

000%

550 38 - 521 41 28.97

026 998.61 0.25 996 61 -

- ' . •

• - - - -

2 85 125.52 2.65 118.92 6.61

17.22 317 11 1 17 22 304 92 12.20

20.32 I 1,991.62 20.32 1.943.86 47.77 1

(min Re)

42.69 21 34

588 49

189 59

326 57

520 39

603.74

54,89

190.57

2,495.58

n 1%) (WISH I

21 29

682.00

161.07

153 68

32 52

3384_

305

7.62

1,094.83 I

0.10%I 2.545

1.10% 36

0 0091il 104,347

000% •

0.02% -

007% 1.064 -

0.32%1_ 1.425 •

0.02% 103

034% 991

1.38% 1

01 037% 3

16

i Total Industrie 76 I 0 00%1 3,602 I

Bulk - -

CI eLLSupply al 400 Voile • up to 5 kW 000% 11

C1K6upply al 400 Volts -exceeding 1 kW 051 002% 78

Time al Usei10.11peek 1.52 0 07% 105

lime of Use (TOW. off-Peak 7.62 0.34% 12

C2 Supply at 11 kV 4.07 0.11% •

Time of Use (TOU) - Peek 5 13 0.37% 25

time of Use (TOO) • OP-Peak 34.56 1.58% 25

C3 Supply above 11 kV - -

Time of Use (7OU) ••PPeek L - I. . I rime Of Use (TOU) - Off -Peak •

I Tow SInple Point Supply 66 1 256

Iftricultural Tube-wells - Tariff 0 ' 1 I - OIL 5.59 . 025% 92

Time of Use (T0U) 5.08 0 23% 99 _

time of use (IOU) 29.96 135% 101

li_ricullual Tube-welts 1,4046 74.00% 22.270

ispricullual Tube-wells 0-2 (k) - -

Lime of Use (TOUL. Peak 13-20) - .

Time of USe (TOU) • Peak 0-2 2 54 0.11% 515

1 Time of Use (TOO. 011-Peak D2 18 30 063% 3.107

1 Total AgrIcuttural 1,702 1 26.184

PublicLigLAitIn G 1.52 007% 257

ResOentalColonies H 002 0.00% -

SpeclalConiracts - Tadfcc A119.

Time of Use 71-0(B - Peek

Time of Use (TOCI) • off-Peek •

Co-Genralion-J

Raiway TraclionTraction • 1 - I

i I General Service 1 1 I Grand Tots11 2,217 1 100 00%1 576,499 1

1.27049

350.66

4130.25

552 92

637.28

57 93

198.20

3,590.41

347.97

48 70

9.27

405.94

607.21

7 37

28.97

92.49

002 7.11

5.28 144.84

36 46 390 29

1 95 28.97 14 38 367 88

68.10 I 1,087.92

2.03 7.37

0.63 28 97

4.33 99 10

3.05 58.14

209 154 49

10.71 442. 33

• •

22.85 790.40

22.86 759.66 30.751

I

1 - 90 71

84.91 - 157 08 _ 17 89

90.71

24,114 73

35231 -

336 22 16,865.26

352 31

11.75

- 48.70 -

48.28 927 38.11

232 35 - 161 91

24,923,35 394,19 19,575.39 11.75

21.34 21.34

028 028

32,385.32 , ' 495.46 25.819.76

7 37

27 44

68.93

002 7.11

5.28 _137.21

36 46 374 74

1.95 27.44

14 38 353 40

68.10 1,023,66

1 09

10.71

2.03 7 37

063 27.44

433 95 29

3.05 58 14

146 36

425 06

11.75 6,565.56 1

5249.46

10 16

70 40 6,347.95

262

15.55

1 52

1446

44.28 I

8,13

1728

1.52

3 56

1.52

381

Page 117: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Residential

p_ o 50 Units

5 kW F

01.100 UnIs

irr peak load requirement op to

101-300 Units

201-300 units

301.700Un4s

/Wove 700 Units

For peak load requirement exceeding 5 4W

Time of Use (TOU) - Peak

Time of Use (IOU). Oft-Peak

1 Total Residential

Commercial • A2

Commercial - For peak load requitement up to 5 kW

Commerce (4100)

Commercial N20 KM For peak loaa requirement exceeding 5 kW

Regular

Time of Use (TOU) • Peek (k2)

lime of Use (TOU). Off-Peak (TernP)

1 Total Commercial

Industrial

131

01 (Peak)

81 .105 Peat)

02.

02 TOU (Peak)

B2 - IOU (Rfak)

B3-1103 KV (Peak)

134

Total Industrial

Bulk

1(e) Supply el 400 Valls . up to 5 kW

01(3)5H/p1y at 400 Volis •exceeding 5 kW

Time of Use (700). Peak

Time of Use (TOU) • Off-Peak

C2 Supph al 11 kV

Time of Use (TOU) - Peak

Time of Use (TOU) • Off-Peak

03 Supply abase ii kV

Time of Use (TOU) • Peak

Time of Use (IOU) - Off-Peek

1 Total single Point Supply

NrIcultural Tube-wells • Tariff 0 1

DI Scarp

ins ciUse)70u) 1

Time of Use (IOU) 1

02 Agricullual Tube-wells 1

ric.ultual Tube-nulls D-2 (i1)

Time of Use pfOui . Peek D-2(0 I Time of Use (TC1Lpeak 0.2

Time of Use (TOU) - OffReak D2

Teul Aglculturad

Rubric tighlidgG 1

Resider/gal Colonies H

Special Canuacis Tenni( (Alp

Time of Use (IOU). Peak

Time of Use (TOU) - Off•Peak

RalkkaaonTracrion •

CpCenration-J

General Service

Grand retell

FORM - 28

QESCO

Revenue and Subsidy Statement Oct 2017

IndWo) 1 (%egel 1

1 OW) (Siegel (Promos) I mown) ilis&INIMI I %AWN 10VIONS41 (REAVOI

2001 320 048%1 124,575 4 00 2.00 •

671 30.49 4H59% 168,082 12 50 579 7 01 1.05% 15.00 8.11 6.89 9 61 7 44% 102,652 15 00 • 10 20 4.80 9.76 747% 29,542 17.00 - 16.00 1 00

10 06 1.51% 5.859 19 00 18 00 1.00

0.91 0 14%1 2,649 19.00 - 1800 'I 00 4.57 0.69%1 17.663 1300 12 50 050

76.63 I I 451,023

8.69 131% 104.620 19 00 18 00 1.00_ 19.97 3.00% 34 400.00 15.00 400.00 15 00

- - - . - •

1 98 0.30% Z818 400 00 19.00 400.00 1800 1.00 7 32 1 ID% 37 400 00 13 00 400 00 12.50 0 50

37.97 I 000% 107.308 • a

0 15 0.02% 14 50 14 50 046 007% 1,084 1900 18.00 1 00 2.13 0 324 1,452 13.00 12.50 0 50 015 0.02% 104 400.00 14 00 400.00 14 00 2 29 014% 1,009 400 00 19.00 400 00 18.00 100 9.15 1 38% 1 400 00 12.80 400.00 12.29 0 51 046 D D7% 16 380.00 19.00 380,00 1500 100 8 69 1 131% 3 380.00 12 70 1 380 00 12 20 0 50

23 1 3,670

11 15.00 15.00 0.15 0.02% 78 400 00 14.50 400 00 14.50 0.46 0.07% 105 400 00 19.001 400 00 18 00 109 2 201 034% 12 400 00 13.00 400.00 12 50 0.50 1.22 018% - 380.00 14.30 380 00 14.30 2.44 I 0.37% 25 380 00 19 00 380 00 18.00 1.00

10 37 I 56% 25 380 00 12.80 380.00 12 30 0.50 - - •

17 I I 256

1 68 0,25% 294 15 20 12 00 152 0.23% 17.85 17.05 9.00 1 35% 11 75 11.75

492.16 74.00% 22494 200.00 14 70 200.00 11 50 - - 1 3.139

• 200.00 200.00

0.76 0.111 521 200 00 19 00 200.00 15 00 5 49 0 53% 200.00 12 70 200.00 8 85 511 I 26,448

3 20

0 46 0.07% 260 14.00 14.00 0.01 0.00%

4 00

1400 14.00H-

3 85

12 25 H 665 190 00% 688,965 I

Page 118: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Rep rem Rat IMin ihs) (Min Ps (min Fir)

1 1

1

1 I

.1

J

N go

IResidential ___ Up io 50 Units 3.20 0.48% 124.575

For peak ioao requirement up to 5 kW - 090%

30.49 4 59% 168.082

701

101-300 Units 9.61 144% 102.652

301-700Unis 1.47% 29,542

Above 700 Units -J 10.06 1 51% 5,859

For peak load requirement exceeding 5 kW - 0 00%

Hi me of Use

L9

(IOU) • Peak

0 91 0.14% 2.649

Ti

(IOU)

me of Use (TO U) Off-Peak

4 57 0699% 17.653

Totes Residential 75.63 000% 451.023

Commercial - A2 - 000%

Commercial • For peak load requirement up to 5 kW 8.89 1.31% 104,620

Commercial (<100) 19,97 3.00% 34

Commercial (420 KVV) For peek load requirement eXCeeding 5 kW - 000% -

Regular • 0.00%

Time of Use (701.1). Peak (A-2) 1.98 0.30% 2.618

I Total industdall

Bulk .

Cl(a) Supply at 400 Vohs - up lo 5 kW - 0.00% 11

C I(b) Supply et 400 Vons .exceeding 5 kW 0 15 002% 78

Time of Use ROLA . Peak 0. 46 0.07% 105

Time of use (TOO- Off-Peak 2.29 0 34% 12

C2 Sktp_piii kV 1 22 0.18% -

lime of Use (70u) - Peak 2.44 0 37% 25

Time of use (TOU) - Off-Peek

C3 Supply above 11 kV

10 37 1.56%

- -

25

l_i_nricebil Use (TOO - Peak • _

I Time of use (IOU) - Off-Peak -

I Total Single Point Supply 17 256

Agricultural Tube-walla • Tariff D -

❑169_97 _ 1.66 0.25%

Time of Use (IOU) 1 52 0.23%

Time of UseCOy) 9.00 135%

D2 Agncunuai Tube-wens 492.18 74.00%

Agricola, Tuce.weils 0.2 (ib -

Time of use (TOW- Peak 0-25 -

Time of Use (IOU) - Peek 02 0.76 0 11%

I Time of Use (TOU). Off-Peak 02 5.49 0.83%

I Total Agricultural 611

P

0 46 0.07%

Residential H 0.01 0 00%

Special Contracts - Tenff KJAJK)

Time of Use (701)- Peek

Time of Use 'TOD Off-Peak

RailwaractionTractIon • 1

Co-Genearo.x

General Service

Grano Total 655 100 00% 588,965 I

FORM -281 A )

QESCO

Revenue and Subsidy Statement Oct 2017

01-100 Units

101-300 Units

Time of use (TOU) - 011-Peak (Tempt 7.32 110% 37

Total Commercial 37.97 0.00% 107,308 I

'Industrial - 000%

131 0 15 0.02% -

13n (Peak) 046 007% 1,004

1. (Off Peak) 2 13 032% 1.452

B2- 0.15 0.02% 104

82 - TOU (Peak) 229 034% 1.009 _

2. Toy,9,,,,,eak,

-I

9.15 1.36% 1

13111/]J KV (Peak)

84 I 8.69 1.31%

0.46 0.071 16

3I

23 000% 3,670

294

115 99

16.23

309

136.31

169.07

0.01

1 76

12 15

0,65

4 79

19.37

0 09

0.95

5 74

6.77

0 68

021

1 44

1 02

0.70

3 57

7.62

381.18

105.21

144.09

165.89

19120

17 38

59.46

1,077.22

165 13

299 61

25 49

27.22

105 70

7235 10

14 48

69 71

7,477.70

6.40

0 08

9,716.51 148.65 7,748.65 20.42 1,969.85 I

37.68

95.14

697.64

2.21

8 69

27.75

213

43 45

117 10

8.69

110.38

320.41

221

8.69

29 73

17.44

46 35

132.71

237.14

12.131

95.57

16 23

3.09

114.69

001

1 76

1215

0.65

4 79

19.37

0 09 299.61

0.95

5 74

6.77

0.68

0.21

1.44

1.02

0 70

3.57

7.62

16 47

• 57 18

748.74

15644

20 13

27 22

105.70

5.66D 11

11 44

48,58

6973.17

6.40

0 08

176.56

56.88

97 98

155 13

181141

35 68

91 48

883.21

221

8 23

26 68

213

41 17

112 43

8 23

106 03

307.13

2.21

8 23

28 59

17.44

43 91

127.53

227.92

6 40

20 42 1.574 99

305

21.13

20.42 1,604.54 I

204 62

41332

46 11

976

10 06

0.91

2 29

328.48 I

8 69

5 37

1 98

3.66

14.33 I

0 46

1.07

2.29

4.67

0.46

4.35

13.28 I

6 40

046

1.14

244

5.18

9.22 I

22.494

3,139 -

521

26 448 •

260

Page 119: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 28

QESCO

Revenue and Subsidy Statement Nov 2017

Residential

%kWh) reagel

I I to 50 Units 308 0.48% 124,575

For peak load requIremem up l05 kW

01-100 Lint 29 30 458% 168,002

101-300 Units 674 1.05% •

201-300 Unit 9.23 1 44% 102,652

301-700Unds 938 147% 29.542 _ 1 Above 700 Units 9.67 151% 5,859

For peak load requirement exceeding 5 kW •

Time of Use (TOU). Peak 0 88 0 14% 2.649

Time of Use (TOU) • Off-Peak 4 40 0 69% 17,663

Total Residential 72.67 I I 451,023

Commercial - A2 Commercial • Fm peek load requirement up l05 kW 8.35 1.31% 104620

Commercrel(18 19.19 300% 34

Commercial (420 KW) For peak load requirement exceeding 5 kW

Regular 1 •

Time of Use (T0u) -Rem (A-2) 1 1.90 0.301 k

1.10%

2.618

Time of Use (TOU) Off-Peak (Temp) 7.03 37

Total Commercial 36.48 I 0.00%1 107.308

'Industrial

EH 015 0.02% -

BL(Peek) 0.44 007% 1,084

13(0ff Peak) 2 05 0.32% 1,452

132- 015 002% 104

B2 - TOU (Peak) 2 20 1 0 14%1 1,009

82 - TOU(Off•Peak)

i

8 79 1.38% 1

B3- I I/33 KV (Peak) 0.44 007% 16

04 8.35 1.31% 3

I Total Industrial 23 I I 3,670

Bulk I I

Cite) Supply al 400 Volts up lo 5 JON 11

Cl(b)SemAyat 400 Vats -exceeding 5 kW 0.15 002% 78

Tom of L.(TOU) • Peak 0.44 0.07% 105

Time of Use (TOU) Orf.Peak 2.20 0,34% 12

C2 Supply at 11 kv 1.17 0 le%

lime of Use (TOU) Peak 2 34 0.37% 25 Time of use • Off-Peak 9.96 1.56% 25

C3 Supply above 11 kV

Time of Use croo - Peek

Time of Use (IOU) - Off-Peak

Total Single Point 3upPlY I 16 I 256

Agricultural Tube-wells - Tariff 0

01 Scarp 1 61 0 25% 294

Time of Use (TOU) 1.47 0.23%

Lime of Use (fOU) 8.64 1.35%

plimncaual Tube-wells 472.97 74 00% 22,494 Nncultual Tube -wells 0-2 Oil •

Time of Use (TOU)- Peak 132W 3,139

Time of Use (1131.1). Peak 0-2 0.73 0.11% 521

I Time of Use (TOU) • Off-Peek 02 5.27 0 83%

Total Agricultural 491 I I 26,448

gl 0.44 007% 260 Reseenhal Colonies ki 0.01 0.00%

Special Contract Tariff K (AJK)

Time of Use (TOW:peak • Time of Use (TOU)- Off•Peak

Parlays TrectionTrection • 1

CO-GORfat1011-.1

Genera/ Service

Grand Total 639 1 100 00%I 588.965 I

(MAWR% in✓cW10 (RsAvvim) I (174/4WM R (Avow 1

400 200 2.00

579 6.71 12 50

15.00 8 11 6.89

1500 10.20 4.80

17.00 16.00 100

19 00 18.00 1.00

19.00 18.00 1 00

13.00 12.50 0 50

19 00 • 18 00 100

400.00 15.00 400.00 _ 15.00

• • •

400.00 19 00 400 DO 18.00 1.00

400.00 13 00 400.00 I 12.50 I 050

111. 14.50 • 14.50 -

19.00 - 18.00 1.00_

13 00 - 12.50 0.50

400 00 14 00 400 00 14.00 -

400.00 19.00 400.00 18.00 1.00

400 00 1280 400 00 12 29 0 51

3130 00 19 00 380.00 115.13171 100

38000 12.70 I 380 DO 12 20 0.50

15.00 15 00

400 00 14.50 400 00 14.50

400.00 19 00 400 00 18 00 1,00

400 00

k_

13.00 400 00 12 50 0.50

380 00 14.30 380.00 14 30

380 00 19.00 380 00 18.00 1.00

350.00 12 80 380.00 12 30 • I 050

1 Ai 12.00

17.85

15.20

1785

11.75 11 75

200.00 14.70 20000 11.50 3.20

20000 20000

20000 190D 200.00 15.00 ADD

1 200 00 I 1270 20000 885 355

• 14 00 1400

14 00 14 00

Mtge)

12.25

Page 120: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

- -

0.95 38.19 0.95 I 34 29

5 74 91 43 5.74 67 91

- I 8.77 674.21 6.77 i 680.44

2 12 212

8 35 7.91

26 67 2564

0 01 205 0.01 205

176 41.76 1.76 39 56

12.15 112.53 12.15 108 04

0-65 8.35 065 7 91

4.79 106 07 4 79 101 89

19.37 307.90 19.37 295.13

• -

068 2.12 068 212

0.21 8.35 021 7 91

1.44 28.57 1 44 27 47

1021 16.76 1.02 16 76

70 44.54 0 70 42.20

3.57 127.53 3.57 122 55

- -

7.62 I 227.68 7.62 219.02

24 50

26 15

101.57

115.99 6,952 60

16 271 -

309 13.92

68 99

136.31 7,185.74

6.15

0.08

169.07 9637.12

2.20

4 48

044_

4 18

12.76 1

0 44

1.10

234

4.98

ass

5 16

26.22 1,51349 49

2.93

20 31

26,22 1,541.89 I

FORM -28 ( A )

QESCO Revenue and Subsidy Statement Nov 2017

(Min RI) flrilFTia maga)

Residential

pro 50 Units 308 048% 124575 •

For peak load requirement up to 5 kW • 0 00% - •

01-100 Unto 29.30 459% 168,002

101-300 undo 674 -

101-300 Unns 9.23 1 44% 102,652

301-7000nne 9.38 1.47% 29.542

Abode 700 Unite 967 151% 5,659

(Fos peak load warmer! exceeding 5 kW - 0.00% -

Time of Use ROU). Peak 0.88 0 14% 2 649

I Time 01 Use (IOU) - 011.Peek 4 40 0.89% 17663

I Total Residential 72.67 000% 451,023

I Commercial. A2 - 0.00% -

8.35 1 31% 104620

19.19 3 DO% 34

- 000% -

.

__,"

000% -

1 90 0.30% 2,818

7.03 110%I 37

36.48 000% 107,308

Industrial

0.00%

Br

0 15 0.02% -

0.44 0.07% 1,084

Bt (Off Peak)

2.05 0.32% 1,452

FR

0.15 0.02% 104

82 TOU pealL

2.20 0.34% 1.009

92 • TOU (0/1.peak)

8.79 138% 1

83- 1193 IMI (Peak)

044 007% 16

94

835 131%I 3

Total Industrial

23 0 00% 3,670

Bulk_

61666i.mply414i)0kielts • up us 5 kW - 000%

112) Sultnly or 400 volts -exceeding 55W 0 15 002%

Time of Use (11:11.1 Peak 0 44 0.07%

Time or Use (TOU) - Off-Peak 2.20 0 34%

C2 Supply al 11 kV 1.17 0 16%

Time of Use gout - Peek 2.34 037%

25

Time of Use (101.0 . Off-Peak 9.96 1 58%

25

676apply above 11 dv •

lime of Use (TOU) Peak •

Time or USO {TOW OMPeak

Total Single Point Supply 16

Agricultural Tube-wells- Tariff 0 -

DI Scarp_ 1.61 015% 294

Time of Use (TOU) 147 0.23%

Time of Use_UOU1 8 64 1 35%

13Licullirel Tubmwells 472.97 7400% 22,494

Aariculium Tube-wells 132 (10

Time of Use (TOU)- Peak 0.2(0 3,139

Time of Use (TOLD - Peak Dig 073 0.1 1% 521

Time of Use (IOU) - Off.Peak 02 5 27 I 0113%

I Total Agricultural 491 I I 26 448

Pubiii grag1 S_ 044 _0.07%

260

Residential Colonic H 0.01 0.00%

special Contracts - Tam It (0.11t)

Time of Use (7121)- Peak •

Time of Use (r01.11 - Off-Peak

1.._ RailwaradionTracliOn • I

CO-Genrillion-J

General Service

Grand Total 639 10000% 588,965

Commercial - For peak load requirement up to 5 kW

Commertlei (4100)

Commercial (420 KW) For peek Iced requirement exCeechng 5 kW

Regular

Time of Use (IOU) • Peak (A-2) H

Time of Use (MU). OD.Peak Ramp)

1 Total Commercial

256

11 1 •

78

105

12

H

0 09

366.30 169 67

101 10 54.66

138.46 94 15

159.41 150.04

183.74 174 07

16 70 k_ 15.82

57.14 54 94

1,035.16 • 719.51

158.68 150.33

287.91 0.09 287.91

12.31 6 15

109.09

142.86 7.44448 28.22 1,892.94

89.77

16 23

3 09

19 34

26 15

101.57

5.439.11

10.99

46 BS

5,643.65

0.15

0.08

8 35

1 90

3.52

13.77 I

044

615

196.63

46 44

44 31

938

9.67

0 88

2.20

316.65 I

1.03

Page 121: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

686,965 I I Grand Total 876 1 100 00%1

1800

12.50

400 00

400 00

FORM - 28

QESCO

Revenue and Subsidy Statement Dec 2017

Residential

(Wang m.o., I rimocii

Up to 50 Unas 3.26 0.48% 124.525

For peak load requIremeni up to 5 kW •

01-100 Undo 31 02 4.59% 168,082

101-300 Unds 7.13 1.05%

201-300 Units 9 77 144% 102,652

301•7000nds 9.93 1.47% 29,542

Above 700 Undo 10.24 1.51% 5,859

For peek load requirement exceeding 5 kW

0.93 I Time of Uae (TOLD Peak 0.14% 2649

I Time of Use (TOU) • Off.Peak 4 65 I 0.69% 17.863

Total Residential 76.92 I I 461,023

Commercial • A2

Commercial . For peek load requirement up ID 5 kW 8.84 1.31% 104.620

Commermai (F100) 20 32 100% 34

Commercial 1F20 KW) For peak load requirement exceeding 5 kW

Regular

Time of Use (IOU) • Peak (A-2) 202 030% 2 618

Time of Use oto - Off-Peak (Temp) 7 44 110% 37

Total Commercial 38.62 0.00%I 107308

Industrial

131 016 002%

01 (Peak) 0.47 007% 1084

01 - (On Peak) 217 032% 1.452

B2 • 0 16 D.02% 104

62 TOU (Peak) 233 0.34% 1.009

B2 - TOU 1011-peak) 9.30 30% 1

83- 11(33 KV (Peak) 0.47 0.07% 16

Be 8.84 1.31% 3

Total industrial 24 3.670

Bulk

C12git et ADO volts • up lo 5 kW 11

CUD) Supply at 400 Volts -exceeding 5 kW 0 16 0.02% 70

Time of Use (TOU) • Peak 0.47 007% 105

Time of Use (TOU) - Off-Peak 2 33 0 34% 12

02 Supgy at I I kV 1 24 0 10%

Time of use (TOu)- Peak 2.48 1 0 37% 25

Time of Use (IOU) • Off-Peek 10.55 1 56% 25

03 Sup!, above 11 kV -

I

llme of Use (70.16• Peak I

Time of Use (TOU) - Off-Peek

-.

I Total Single Point Supply 17 I I 256

Agricultural Tube•welis • Tariff D

01 Scam 1.71 0.25% 294

Time or Use (IOU) 1.55 0.23% -

Time of Use (TOU) 9 15 1 35% •

02 Amtunuat Tube-wells 50060 74.00% 22,990

Tube-wells 0-2 (F)

H

NTi

ll

me of use 001.0 - Peak 0-2(11 - 3,139

Time of use (row - Peak D-2

V Time of Use (IOU). Off-Peak D2

0 78 1 0 11% 521

Time

5 58 I 003% -

I Total Agricultural 519 1 I 26,448

(Public Lighting G 047 I 0.07% 260

Residential CMoniesH H0.01 0.00%

SE3cial Confirms • Tariff K(F-M)

%me of Use (TOUT • Peak -

Time of Use (TOU) • Off-Peak

Railway TractionTramon • 1 •

Co•cenrabon•0

General Service

14.50

19.00

13 00

400 DO 14.00

400.00 19 00

400.00 12 80

380 00 19.00

1 380 00 12.70

tqa/kW/11)

19 00

400.00 15.00

400 00

400 00

1500 _ -

400.00 14.50 400 00

400.00 19 00 400.00

400 00 13 00 I 400 00

380.00 10 30 380 00

380.00 19.00 380 00

380 00 12.60 38000

19 DO

13 00

15.2D 12.00

17.85 17.85

11.75] • 11.75

14,70 200.00 11 50

200.00 •

19 00 20000 15.00

12 70 200 00 8 85

14 00

• H

400 00

400 00

400 00

400.00

380,00

380 00

18.00

15 00

14.00

14 00

tootwx1

200

14 50

18 00

12.50

1400

1600

12.29

10 00

12.20

1 00

0 50

1 00

0.51

1.00

050

1 00 _

050

100

1500

14 50

18.00

12.50

14 30

1800

12 30 050

14 00

S

3.20

4 00

3.85

4 00

12 50

15.00

15.00 I

17 00

19 00

19.00

13 00 1

200.00

200 00

200.00

200 DO

tawkIrvan) (8KIFffn) oisimaA)

200

5.79

011

10 20

16.00

18.00

18.00

12 50

6 71

6 89

4.80

1 00

1.00

1.00

0 50

Page 122: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Residential

tan l0 50 Units

For peak load requirement up to 5 kW

01-100 units

101-300 Units

101-300 Liras

301-700Unds

Above 700 Lints

FORM -28 ( A)

QESCO Revenue and Subsidy Statement Dec 2017

Mkwn %epel

3:26 048% 124.575

0.00%

31.02 4,59% 168.052

7.13 • 9.77 1.44% 102,652

9.93 1 47% 29,542

10 24 1 51% 5.659

0.00%

0.93 0 14% 2.649

465 089% 17,683

76.92 0.00% 451,023

0.00%

BMA 1.31% 104.620

20.32 3.00% 34

000%

• 000% -

2.02 030% 2.615

7.44 1 10% 37

38.62 0.00% 107,308

Indust/1M 0.00%

13I 0 16 0.02%

131 (Peak) 047 007%

1.084

B1 (Off Peak) 2,17 0.32%

1.452

_ B2- 016 002%

104

BLIOU (Peak) 2.33 I 034%I

1 009

B2 J0111(Pf- 930 1 38%

1

133- Kv (Peak) 0 47 0 07%

16

84 8.84 I 131%

3

Total induslolai 24 I 0.00%

3.670

Bulk

ClrellopEly at 400 Volts 1.0/11 - 0.00%

11

C I (b) Supply at 400 Voila •exceeding 5 kW 0 16 002%

78

Time Of Use (301.3 Peek 047 0 07%

105

Time of Use (TOO Ott.Peek 2.33 0.34%

12

C2 Supply al 11 kV 1 24 0.18%

Time of Use (TOU) • Peak 2.48 I 0 37%

Time or use (TOU) - On-Peak 10.55 I 1 58% 25

25

C3 Supply above 11 kV

Time of Use crouli • Pee%

I Time of Use (TOU) • On-Peak

Total Single Point Supply 17 I

256

Agricultural Tube-wells • Tariff 0

DI Scarp

1.71 I 0 25%

l

ions of Use (TOU)

Time of Use (TOU)

9.15 135%

155 023%

500.60 74.00% 02 NLiculuel Tube-wells

Agricullua/ Tube-wells 0-2 39 •

Time of Use 0330 - Peak 0.2(9

0 78 Time at Use Ng; Peak 0-2

5 58 Time Of Use (TOU) • OGPeak D2

519

26,448 Total Agricultural

0 47

0.07% 260 Public LighttraG_

001

000% Residential Coionles H

Span Contracts • Ted111Ca-16) •

Time of Use (TOU) Peak

TIme of Use (TOL.6.011-Peak

• Railway TractionTrecilon -1

Co-Genrelion,1

General Service

675 100 00% Grand Total

pain Rs) n RI) AIM Pie

13.03 651 651

• -

387.70 179 58 205 12

107.01 57 85 A9 15

146 55 99 66 46.90

166.73 158.60 9.93

194.47 _i 184.24 1024

17

60.46 - H

5616 2.33

1768 16 75 0 93

1,095.56 - 761.55 334.10 I

. I

167.95 159 11 8.64

304 73 0 09 304.73

- -

• . _

38.31 I 0.95 38.29 2.02

96 77 5.74 93.05 372

807.76 6.77 593.18 14.58 I

- __I

2.25 225 •

8.84 8.37 047

28.22 27 14 1.09

2.17 001 2.17 -

44.20 1.76 41.67 2 33

119.10 12.15 114 36 475

13,I34 0 65 8.37 0.47

112.26 479 107 84 442

326.89 I 19.37 312.38 13.51 I

J . . .

2.25 068 2.25

6.64 0.21 8 37 0.47

30 24 1.44 2906 1.16

17.74 1.02 17.74 -

47.14 0.70 4466 2 48

134.98 357 129 71 527

• -

- ' -

241.20 I 7.62 231.62 9.38 I

• I

25.93 20.47 5 46

27.68 27.68

107 51 107 51 -

7.358.84 96.11 5.756 92 17 88 1.60192

16 23

3.09 11 63 3 10

49 41 21 49

117.43 9,973.82 17.88 1,631.98 I

6.51

009

151.19 7,879.15 I 17.88 2.003.54 I

Hume

0.09

0 95

5 74

6.77

0.58

0 21

1 44

1 02

0 70

3 57

- 7.82

294

22,494 115 99

3.139

Om% 521

083%

16 23

309

136.31

5543.965 I • 169.07

0 01

1 76

I 12 15 0.65

4 79

19.37

14 73-

70 90

7,605.60 I

6.51

009

9.882.69 I

L

For peek load reduiremenl exceeding 5 kW

Time or Use (TOU)- Peak

Time of Use (TOU) • On.Peak

Total Residenlial

Commercial - A2 Commercial • For peek load requirement up m 5 kW

Commercial (m00)

Commercial 1-120 KW) For peak load revel-anima exceeding 5 kW

Reeder

Time of Use (7013)-Peak (A-2)

Time of Use (TOW- Off.Peak (Temp)

Total Commercial

Page 123: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

IRWI•Wh,

200

671

6 89

4.80

1 00

1.00

100

0.50

1.00

1.00

0 50

• • 100

050

1 00

051

1 00

050

1'00

• 0.50

1.00

050

400 00

400.00

400.00

380.00 I

380.00 I

14.50

19.00

13 00

14.00

19.00

12 80

19.00

12 70

15.00

400.00 14.50

400.00 19 00

400.00 13.00

360.00 14.30

380 00 19 00

300.00 12.80

14 50

18 00

12 50 •

400.00

14.00

400.00

18 OD

400.00

12 29

380.00

1800

300.00

12.20

15.00

400 00 14 50

400 00 18.00

400.00 12.50

380.00 14.30

380,00 18.00

380.00 12.30

19.00

18 00

13 00

12 50

19 00 18.00

400 00

15 00 40000 15.00

400.00

19.00 400.00

18.00

400 00

13.00 I- 400.00

1250 I

15 20 - 12.00

17.85

17 85

11 75

11 75

200.00

14.70 200 00

11 50

3 20

200 00 200.00

200.00

1900 200 00

15.00

4 00

200 00

12 70 200.00

85

3.85

FORM - 213

QESCO

Revenue and Subsidy Statement Oct-Dec 2017

I 04kWM I (%agei I PM

Residential

yoto 50 Units 9 54 0.48% 124,575

For peak load requirement up to 5 kW

01-100 Units 90 81 4.59% 168,082

101-300 Units 20.89 1.05%

201-300 Units 26 61 144% 102.652

3019000nils 29.06 1.47% 29,542

Above 700 Units 29.97_ 1.51% 5.659

Otapro Ills/kW/74

H I I

tfisewe owkwee I (Rol■Wh) feekwee

4.00 2.00

12.50 n 5 79

15.00 811

15.0 10.20

17.00 16.00

1900 18.00

For peak load requirement exceeding 5 kW •

Erne of Use (l0u) - Peek 2.72 0 14% 2.649

Time of Use frOu) Off-Peak I 13.62 0 69% 17,663

Total Reeldentlell 226.22 I I 451,023

Commercial . A2

Commercial . Fot peak load requiremem us to 5 kW 25.88 1 31% 104,620

Cornmerciall_ 5948 300% 34

Commercial 140 KW) For peak load requirement exceeding 5 kW

14±. •

Time ofj_eTe Tat) - Peak 0-2) 5.90 0.30% 2,618

Time of Use (TOU) - 0(f-Peak (Temp) 21.80 1.10% 37

Total Commercial 113.06 I 0.00%1 107,308

Industrial

045 131 0.02%

(peal_ 1 36 I

6.38

007% 1084

- (Off Peak) 0.32% 1,452

045_ 0.02% 104

132 - TOU (Peak) 6.81 0.34% 1.009

B2 -TCOOA011-peek) 27.24 136% 1

131 11/331i±V(Peak) 1.68 0 07% 16

Be

r_

25.86 131% 3

1 Total Incluemal 70 I 3,570

Bulk

Cl(a) Supply al 400 Volts - up lo 5 kW - 11

C1(17) Supply at 400 Voris -exceeding 58W 045 002% 78

Time of Use1(:7)_.J - Peak 1.36 0.07% 105

Time of Use (IOU) - OH-Peak _ 6.81 0.34% 12

C2 Sae 11 kV 363 0 18% -

Time of Use (IOU) -Peek 7 27 037% 25

Time of Use (TOU) • 011-Peat 30.66 I I 56% 25

a6upply above 11 kV -

lime of Use (TN- Peak - -

Time of Use (IOU) • Off-Peak H -

/ Total Single Point Supply 50 I I 266

Agricultural Tube-wells - Tariff 0 I I

01 Scarp 4.99 0.25% 294

rime of Use (TOU) 454 0.23% -

Time of Use:(1.1) 26.79 1 35% -

Indcullual Tube-wets 1,45535 7400% 22.494

Npicultual Tube-WOOS 0-2 (Ii)

Time of 1.150. 1.6.: POOR 0-2(9_ 3,139

Time of Use (IOU) - Peak 0-2 227 0 11% 521

_ Time of Use (TOU) • Off-Pen 02 16 35 083% -

Total Agdcultural 1.621 I 26.448 I

1Puele LeVolli9_6.

Residential Colonies Hi 0 02 0 00%

1.31 0.07% 260

special Contracts - Tar/111( (W641 • I

Time ol Use (1016 • Peak I

Time of Use (TOU) - orf.Peak

kCa RmvaectionTraction • 1

o-Genraiion-4

General Service

I Grand Total 1.981 1 100.00%I 588.666 I

Page 124: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

0,26

285

17 22

20.32

002

5.28

36 46

1438

1 95

68.10

2.03 063

4.33

3 05

2.09

10.71

22.86

347 97_1

48 70

927

405.94

607.21

FORM - 28 ( A)

QESCO Revenue and Subsidy Statement Oct-Dec 2017

MR&

1 1 1 1 -1 l 1 1 1

1 J

Residential

INMAN Dime.) Medal

Up to 50 Units 9.54 0.48% 124.575

For peak load requirement up to 5 ION 000%

01-100 Units 90 81 459% 168,082

101-300 Units 20 89

101-300 (inns 28.61 1 44% 102.652

301-7000nas 29 06 1.47% 29.542

Aimee 700 Um 2997 151% 5,859

For peak load requirement exceeding 5 kW 0.00%

Time of Use (YOU) • Peak 2.72 0 14% 2.649

I Time of Use (tOU)- Off-Peak 13 62 0.69% 17.663

Total Residential 225.22 000% 451,023

ICommercial A2 0.00%

Commercial For peak load requirement up th 5 kW 25.138 1.31% 104,620

Commercial c(11)) 59.48 3.00% 34

Commercial (20 KW) For peak load requirement exceeding 5 kW 0.00%

Regular 000%

Time of Use (IOU) - Peek (A•2) 5 90 0.30% 2.618

Time of Use (T016- Oft-Peak (Tema) 21 80 1.10% 37

Total Commerclai 113.06 000% 107,308

Industrial 000%

Bt 045 __ 002%

136 007% 1.084

B1- (Off Peak) 6.36 0.32% 1.452

02 • 0.45 002% 104

82 • TillUtPeath 681 1 009

B2 TOU (Off-peak) 27.24

0.34%I

1 38% 1

133- 11/33 KV 136 0.07% 16

B4 2568 1]1% 3

Total Indust.% 70 0.00%I 3.670

Bulk

C1(a_aply a1 400 Volts up to 5 kW 000% 11

Cl(b) Supply at 400 Volts .exceedIng 5 kW 045 0.02% 78

_ . Tone Dl Use (TOO • Peak 1.36 007% 105

034% 12 rime of Use (TOU)- Off-Peak 6 81

gBopp)y at 11 kV 363 0.1e%

Time of Usegoy) - Pen 717 037% 25

Time of Use (TOU) - Off-Peak 30 88 1.58% 25

C3 Supply above 11 kV •

1

H Time of Use (IOU) - Peak • Time of Use (ICU) • Off-Peak

Total gingie Point Supply 60 158

Agricultural Tube-wells • Tariff •

01 Scarp_ 4.99 035% 294

Time of Use (TOU) 4.54 0 23%

Time of Use D'OUL 26.79 035%

D2 A9ncunual Tube-wells 1.465 75 74.00% 22.494

Mlicultual Tube-wells D-2 Oa

Time or Use (YOU). Peak 91(i) _ 3.139

Time of Use (TOU)• Peak 03 2 17 }-0 II% 521

Time of Use (TOU) Off-Peak D2 16.351 0 63% -

Total Agricultural 1,621 1 26,44B

Public Udliamd G 1.361 007% 260

Residential Colonies H 0.02 0.00%

Special Coniracts - Tenn K BON •

Time of Use Peak

Tune of use (TOU) • Off-Peak

Railway TractonTrecilon • 1

co-Genration4

General Service

Grand Total 1,981 i 100.00% 588.965 I

OAS Pa) (min Rs) I (Min Os) (m""

38.14 • 19 07 19.07 •

1,13518 525.82 609.37

313 31 169 40 143.91

410.10 291 79 137.31_

494,03 954 97 29.06

589.41 539 44 29 97

51.76 49 04 2 72

177.09 170.28 6.81

3,208.03 - 2,229.80 978.23 I

491.76 465 88 25 88

892.16 0,26 892.26

112.16 2 135 106.25 5.90

283 34 17 22 272 44 10.90

1,779.62 20.32 1,735.83 42.681

658 6,58

25.98_ 24.52 1'36

82 6,1 79.46 316

6.36 0.02 636

129 41 5.26 122 60 6.81

348.73 3646 334.83 13.89

25.88 1.95 24.52 1 36

328 70 14 38 315 76 17 90

954.19 68.10 914.64 39.55 I

6 58 2 03 6 58

25.88 063 _ 24 51 1 36

88 54 4.33 85,14 3 41_

51.95 305 51.95

138.04 2.09 130.77 7 27

395 23 10 71 379.79 15 44 _

• • •

706.22 22.85 678.76 27.47

75 92 59 94 15 98

81.05 01.05

314.79 314 79

21,546 54 283.46 16.856 13 64.51 4.690 40

- 46 70

43 14 927 34.06 9 08

207 60 144 67 62 93

22,269.04 341.43 17,490.64 64.61 4,778.40 I

19 07 19 07

0.25 0.25 1

- I

28,936.32 442.70 23,069.98 64.51 6,866.14 I

Page 125: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

100

0.50

1.00

1.00

0 50

1.00

050

1.00

0.51 I

1 00

0.50

1.00

0 50

100

050

(RN/PM) 1 frienwu

2.00

6.71

6.89

4 80

100

1.00

1 - -

400.00 19.00 400.00 18.00

40000 13 00 400 00 12.501

1

14.50 10.50

19.00 18.00

13 00 12.50

400 DO 14.00 400.00 14.00

400.00 19.00 400.00 18.00

400.30 12 80 400.00 12.29

380.00 19.00 380.00 18.00

380.00 12 70 1 380 00 12 20 1

1

15.00 - 15.00

14.50 400.00 14 50

19.00 400.00 18.00

13 00 400 00 12 50

14.30 380.00 14.30

1900 380 00 18 00

12 80 380.00 12.30

- •

1 - -

I . -

400.00

400.00

400.00

380 00

380.00

300.00

15 20

17.85

11 75

200.00 14 70

200 00

200 00 19.00

200 00 1 12 70

1

- 1

1

12.00 Ai

17115

11]5

200.00 11.50 • 3.20

• • .

200 au - •

200.00 15.00 - 4 00

200 00 6 85 3.85

(RtaWri (11(44w441 tRucWil)

4 00

12.50

15.00

15 00

17.00

19 00

19.00

13 00

H 16.00

12 50 1

2 00

5.79

8 11

10 20

16.00

18.00

1900 18.00

15.00 40000_ 15.00

(Fitow(M)

000 30_

14.00

14 00 14.00

14 00

FORM 28

QESCO

Revenue and Subsidy Statement Jan 2018

1

OmATI I 0"PR 1

IkW1 PUN)

Residential

lo 50 Unin 3.30 0.48%

124,575

For peak load requirement Lip ic 5 kW

01.100 Units

31.40 4.59% 168.082

101.300 Units

7.22 105%

201.300 Units

9 89 1 1 44% 102,552

301.700Unns

1005 147% 29,542

_ Above 700 Unite _ 10.36 1.51% 5,859

For peek load requirement exceeding 5 kW •

Time of use (TOLO - Peek 094 0.106 2.549

lime of Use (TOU). 08•Peak 4.71 069% 17,563

1 Total Residential 77.86 1 1 451,023

Commercial - A2 -

Commercial • For peek load requirement up to 5 WV 8.95 1 31% 104,620

COMM:Val (..1130) 20.56 3.00% 34

Commercial 1020 Kinn For peek load requirement exceeding 5 kW •

Regular

Time of use (TOO) - Peak (A-2) 204 030% 2.618

Time of Use (TOUT. Ori-Peak (Temp) 754 1 1.10%1 37

1 Total Commercial 39.09 0 00%1 107,308

Industrial

B1 0.16 002%

131 (Peak) 0 47 0 07% 1,084

61 • pi Peaky 2.20 0.32% 1.452

B2- 0.18 0.07% 104

82. TOU (Peak) 2.35 0.34% 1 009

B2. TOU (Off-peek) 9 42 1 38% 1

BY 11/3314V (Peak 0.47_1 0.07% 16

BI 8.95 131% 3

1 Total Industrial 24 1 I 3,670

9.26 1.35% -

506.74 7400% 22.494

3,139

0.761 011% 521 1

5.651 083% - I

526 I I 26,448 I

0.471 007% 280

001 000%

Bulk

Cl(a) Supply at 400 Wogs up to 5 kW

C1035uppltai 400 Vona •exceeding 5 kW

Time of use_g0U6 • Peak

Time of use (TOO - Off -Pear

C25upp al 11 kv

Time of Use (Tan - Peak

Time d Use(TOU) -Off-Peak

Time of Use (IOU) • Peek

Time Of Use (MU) Off-Peak

Total Single Point Supply

A 1_0 rIcullund Tube-wells • Tariff D

01 Scarp

Time of Use (101)_

Time of Use (IOU)

02 Agricullual Tube-reels

AgrieUiluei TUbe-rieliS D-2 (Ii)

Time of Use (TOU) • Peak D-2(i)

Time al Use (IOU) • Peak 0-2

Time of Use (TOU) • Off-Peak 02

1 Total Agricultural

Pagi N),G

Residential Colonies if

Special Contracis - Tariff K (4-1S)

Time of Use (TOU). Peak

Time of useg01.11. Off-Peat

Railway TractionTreccon • 1

Co-Genration.J

General service

1 Grand Total' 685 1 100 00%1 558,965 I

- I 11

0 16 0.02% 78

0,47 0.07% 105

2.35 0 If % 12

126 018%

2.51 0.37% 25

10.67 1.56% 25

17 1 1 256

1.73 0.25% 294

1.57 0.23%

12 25

Page 126: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

8.95

6 59

181 79

58 56

100.68

160 75

186.50

16 95

58,87

770.09

6 59

210 67

49.75

47 47

1005_ 10.36

0.94

2 35

338.20 1

161 07

1

1 1 1

1 1 1

1

FORM - 28 ( A)

QESCO Revenue and Subsidy Statement Jan 2018

Residential

Up io 50 units

For peak load requirement up to 5 kW

01-100 Units

101-300 Unlit

101.300 Units

ao,_l-mounne

Above 700 Usk!

For peak load requirement exceeding 5 kW

Time at Use (Wu) • Peek

Time of Use (TOU) - Off-Peak

Total Residential

Commercial - A2

0.00%

Commercial- FOr peak load requIremonl up lo 5 kW

Commercial 0100)

Commercial (.20 KI/16 For peak load requirement exceeding 5 kW

Regular

Time of UleEOU) • Peak (W2)

Time of Use (TOU)- Off-Peak (Temp)

Total Commercial

Industrial - 0.00% -

_ 61 0.16 0024 •

131 (Peak) __ 047_ 007% 1084 1.084

Ell • ION Peak) 2.20 032% 1.452

B2- 0 16 0.02% 104

92 - 101.± reties.) 2.35 0.34% 1,009

82. IOU (011-peak) 9 42 1.30% 1

133- 11133 KV (Peak) 0.47 007% 16

Be 8 95 1 1.31% 3

Total Industrial 24 I 0 00%1 3,670

Bulk I -

0 I (a) Supply al 400 Voila • up la 5 kW - 000% 11

at Cl(b) Supply 400 Volts -exceeding 5 kW 0.16 002% 78

Time of Use (Tou) - Peak 047 007% 105

Time of Use (TOUT- Off-Peak 2.35 0.34% 12

C2 Sureff II kV 1.26 0.18%

Time of Use (T01.1)- Peak 2.51 0 37% 25

Time of Use /row • Off-Peak 10.67 1.56% 25

03 Supply above 11 kV

Time of Use JOU) . Peal( 1 - 1

1 Tole ot Use (Tou) - 011-Peak i 1 - 1

1 Total Single Point Supply 17 1 I 256 1

Agricultural Tube-welle • Tariff B •

01 Scarp 1.73 0.25%

294 •

Time of Usee(TC/U) 1 57 033%

Time of use (TOU) 926_ 1.35%

D1 Kgricullual Tube-Relit `506.74 74.00%

22.494

A geclitral Tube weas 0-2 (ill

Time of Use (TOU) - Peal( 0-2g)

Time of Use (TOU) - Peak 0-2 0 78 0 11%

Time of Use (70L) OfCfsen 02 5 65 0 83%

Total Agricultural 526

Public11951119 G 047 0.07%

Residential Colonies H 0 01 000%

Special Contracts • Tariff K (P.M)

Time of Use iTOU) - Peak •

Time of Use (70u)- Off-Peak

IKailway Trarlion7raolion

Co-Genralion-J

General Service

Grand Total 685 100 00%

5E93,965

31 40 4.59%

7 22

9.89 1 44%

10 05 1.47%

10 36 151%

• 000%

094 0.14%

4 71 0.69%

77.86 1 0 00%1

20 56 300%

• 000%

• 0.00%

204 0.30%

7 54 110%

39.09 I 0 00%

(tape)

3.30 0.48%F 124.575

- 000% -

8 95 1.31% 104.620

188,082

102.652

29.542

5,859

25491

17,663

451.023

2,618

37

107.308 I

34

3,139

521

26,448

260

04P 14.1 IMIn Rs) Wm Rs)

H

0 01

1151

12.15

0.65

1 479

I 19.37

26 25

28.02

106.63

115.99 7 449 12

16 23

3 09 14 91

71 77

135.31 I 7,896.91

6.59

009

169.07

009

0 95

5.74

6.77

0.68

0.21

144

1 02

070

3 57

7.82

10,003.94 163.05

13 19

392 46

108 32

148.35

170.80

196 86

6

17.90

22

1,109.09

170 01

308.47

• • 1

38.77 0.95 38.731

97.96 5 79 94 19

615. 22 I 6.77 600.46

22B

8.95

28.57

2.20

44 74 I

120 56

8.95

113.64

329.89

2.213

1395

30 61

17.96

47.72

136.64

244.18 7.62

0 70

119.29

009 301347 -

204

3.77

14,76

22B

B 0 47

Il 27.47 1.10

001 220

1,76 42.39 205

12.15 115 76 480

0.65 8.481 047

4.79 109 17 I 447

19.37 316.21 13.67 I

0.68 228 -

0.21

1.94 29 43

8 48 0.47

_1_18

1.02 17.96

95_21 251

3.57 131 30 53d

• •

234.66 LSO I

20.72 5.53 1 2802

99 97

16 23

309

108.133

5,827.55

11.77

50 01

6046.91

6 59

7,975.81 16.02

9 09

16 02

16.02

3 14

21.76

1,652.00

1.621 58

2,028.12

Page 127: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM 28

()ESC()

Revenue and Subsidy Statement Feb 2018

(PRAWN)

Residential

1p to 50 Unds

For peak load requirement up to 5 kW 01-100 Units

101-300 Units

201900 Units

9 1.47%

Aocive 700 Units

301-700Untis

10

85

17I 151%

For peak load requiremeni exceeding 5 kW

29,542

5.1359

-

Time of Uff01.1) - Peak

Time of Use (TOU)- Oft.Peak 4.62

0 92 1_ 0 14% 2,649

0 69% 17.663 Ti

I Total Residential 76.42 I 1 451,023

I thewr) I (76.910 1

I OW) (Mega)

3.24 048%I

124.575

30 81 4.59%

166082

7.09 1.05%

9 71 1.44% 102,652

IftsAwn)

(FekveL11 0/serwl (Rekwfm) IR

4.00 1 200

- . •

12.60 1 - 579

15001 - 8.11

15 00 . 10 20

17.00 I - 16.00

19 00 - 18.00

- . .

19001 • 18.00

13.00 1 12 50

2.00

6.71

6 89

4.80

1.00

1 00

100

0 50

. I Commercial . 42

Commercial •

For peek load requirement up to 5 kW 8 78 1 31% 104.620

Commercial j4100) 20.18 3.00% 34

Commercial 1.20 Kffft For peak load requirement exceeding 5 kW -

Saar - •

Time of Use (TOU)- Peak (4-2)

ROUT Off-Peak (Temp)

2.00 I 0 30% 2,618

Time of Use

7,40 1 10% 37

I Total Commercial 38.36 I 0.00%1 107,308

Indu 61 0151 0 02% -

trial -

B1 (Peak) 0 48 0 01% 1,084

B1 -108 Peak) 2.16 0.32% 1,452

B2- 0 15 0.02% 104

62 - TOU (Peak) 2 31 0 34% 1,009

_ B2- TOU (Off.peak) 9.24 1.38% 1

133-• 11r33 KV (Peak) 1 0.46 0.07% 16

El4 I 8.78 131% 3

I Total Industrial' 24 I 1 3,670

Bulk

C1(a) Supply at 400 Volts - up to 5 kW • 11

0104 Supply Eft 400 Volts -exceeding 5 kW 015 0.02% 78

Time of Use (TOUT -Peak 0.46 007% 105

Time of Use a0U) - Oft-Peak 231 034% 12

C2 Supply al 11 kV 123 0 18% -

Time of Use (ToU)- Peak 2 47 0 37% 25

25

256 I

1.69 0.25% 294

1.54 0.23%

909 135%

497.33 74.00% 22.494

3.139

011% 521

083%

26.448

0.07% 260

000%

Grand Toted 672 1 100.00%1 688.965

19 00 1800 1.00

400 00 15.00 400 00 15.00

400 00

19.00

400.00

18.00

400.00

13 00

400 00

12.50

14.50 14 50

19 00 1 18.00

13 00 - 12.50

400.00

14 00 400.00 14 00

400 00

1900 400.00 11300

400 OD

12.80 400. 00 I 12 29

380.00

19 00 360.00 18.00

380 DO

12 70 30000 1220

15.00 • 15.00 • _ i

400 00

14.50 400 00 14 50 - - 400.00

W00 400.00 18.00 • 100

400 01)

13 00 400 00 12 50 • 0.50

380.00

14.30 380 OD 14.30 • -

380.00

19.00 380 00 18 00 - 1 00

380 00

12 80 380.00 12 30 0.50

. H .. • _

15 20 I - 12 00 liall17 .85 17.&5 i

11.75 - 11.75

20000 14.70 200 00 11.50 - 3.20

- • . .

200.00 200.00 - _

200.00 19 00 200 00 15 00 I 4 00

200.00 12 70 200 00 8 85 3.85

14 00

14.00

12 25

Time of Use (TOU). Off-Peak 10.48 165%

C3 Supply above 11 kV

Time el Use (TOO Peak

Time of Use (T0u)- Off-Peak

1 Total stogie Point Supply 17 I

Agricultural Tube-wells • Tariff D

Cm Scarp_

Time at Use (IOU)

Time of Use irou) D2 Agriculture Tube-wells

NH:equal Tube-wells 0-2 61)

Time of Use (Mu). Peak 0-201

_ Time of Use (TOU)- Peak D-2 077

Time of Use (10U) -Off•Peak D2 I 5 55 1

1 TotelAgricuhurall 516 1

Publl[U9MingG 0.46 1

Residential Colonies H

_1

01

Special

of Use (TOU) • Peak

0:

Ti

ecial Comraus • Tan(q AJK)

Time of Use (70u)- Off-Peak

Railwej_TraolonTraction • 1

Coff enrabon-J

General Service

100

0 50

11111 1 oo 0 50

1.00

051

1 00

0 50

14.00

14.00

1

Page 128: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 28 ( A)

QESCO

Revenue and Subsidy Statement Feb 2018

3 24

(%ese)

0.48% 124,575

-

NW 1 60.920 IxIm Fts)

I

(Min Rs)

12.94

36517

10631

(min Rai (min Rs1

647

178 41

(Min I%) (min FIB

647_

- 0.00%

30_81

7 09

4.50% 1613.082 208 76

48.83 57 48

9.71 144% 102,652 145.59 99.00 46 59

9.86 167.62 157.76 986

10.17

1 471 29.542

1.51% 5.859 193 20 18303 10.17

- 0.00%

0.92 0.14% 2.649 17 58 16 64 092

462 089% 17,663 60.09 57.77 2 31

76.42 0.00% 451,023 1,088.48 756.57 331.91 I

0.00% 1

8.78 1 31% 104,620 168 85 158.07 678

20.18 300% 34 009 302.74 0.09 302.74

• 001%

0.00%

2.00 030% 2.618 0 95 313.055 0.95 36.05 2 00

7 40 1.10% 37 574 96 14 5.74 92 44 3.70

38.36 000% 107.308 6.77 603.79 6.77 689.30 14.48 I

0.00% - 1

0 15 0.02% 2.23 2.23 -

046 007% 1.064 878 13 32 046

2.16 0.32% 1.452 28.04 26.96 1.08

0.15 002% 104 0 01 2 16 0.01 2 16 -

2 31 031% 1.009 1.76 43 91 176 41 60 2 31

9 24 1.30% 1 1 12 15 118 32 12 15 113.611 4.71

0.46 007% 161 065 878 0.65 832 I 0.46

878 1.31% 3 4.79 111.53 4 79 107.14 1 4 39

24 000% 3,670 19.97 323.76 19.37 310.34 I 13.42 I

- A - 0.00% 11

0.15 0.02% 78 068 223 068 223 -

0.46 0.07% 105 0.21 878 0.21 8.32 046

231 0.34% 12 30.04 1 44 28 89 1.16

1 23 0 18% - H 1.44

1 02 17 63 1.02 17.63

2.47 0 37% 25 0 70 46.84 0 70 44.37 2.47

10.48 I 1.58% 25 • 3 57 134.10 3.57 126.86 5.24

• • • -

- • • •

17 I • 255 7.62 2390.2 7.62 230.30 I • 9.32I

- 20 3,71

1

1.89 0.25% 294 25 76 542

1.54 023% 27.50 27.50

909 135% - 106.81 106 81

- 115.99 7.310 71 97.13 5,719 26 18.136 1.591 45

• 16.23 - 16.23 .

- 3 09 14 64 3.09 11 55 3.08

70 44 49.09 2195

135.31 7.556.85 118.45 6,34.54 16.66 1,621.30 I

647 647 .

0.08 0.08 .

- -I

. _

169.07 I 18.86 1,990.44 I 8,016.05 150.21 7,827.61

Residential

lffi lo 50 Units

For peak load requirement up to 5 kW

01.100 undo

101.300 Units

101-300 Units

30I•700Units

Above 700 Units

For peek toed requirement exceeding 5 kW

Time of Use (TON' Peek

Time of Use (TOO- Off-Peek

Total Residential

Commercial • A2

Commercial - Fmpeak load requirement up to 5 kW

CommercialieJ00)

Commercial (40 KW) For peak load requirement exceeding 5 kW

Ruler

Time of Use (TOU)- Peek (A-2)

Time of Use (7010.- Off-Peek (Temp)

Total Commercial

Industrial

131

Br (Peak)

81- (Off PeakL

E12. TOUiPeek)

82. TOU (Off•peak)

B3- 1 tr33 RV Lsiitalc

84

I Total industrial

Bulk

C1(a) Supply et 400 Volts • up to 5 kW

1__01 Supply al 400 Vona -exceeding 5 kW

Time of Use (TOO( - Peak

Tune of Use (1040- On•Peek

C2 Sum, at 11 kV

Ti me of Use (TOU)- Peek

Thine of Use (TOU) • Off-Peak

G3 suppl9 above 11 kV I

Time of laeak I

I Tine of Use (TOO - 011-Peek

I Total single Point supply

Agricultural Tube-wells- Tariff D

DI sum

Time of use (TOIL

Time of Usa il.))

02 Agricultusi Tube-wells

ngncuituai Tube-wens 0-2111)

1_._3.139 Tlme of Use (TOU) • Peak 0-2(i)

Time of Use (IOU) - Peak 0-2

Time of Use (TOU) - Off-Peek 02

Total Agricultural

P111?119149B. r19 esl

SPeCial Comrade • Tenn K (SA) -

flenlial Colonies H

d

Time of Use (TOU) • Peal,

Time of Use (TOU): Off-Peak

Railway TremionTraclion • I

a-Geer-anon-7

General Service

Grand Total

497.33 74 00% 22.494

-

-

0.77 0.11% 521

5 55 0,83% -

616 26.448

046 0.07% 260

0 01 0.00% -

10000% 588965 672

Page 129: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

AllIk S 3.20

4 00

3 85

3.20

FORM • 28

QESCO

Revenue and Subsidy Statement Mar 2018

(WIWI) I 07'80 I 1 I woo 1%sgei (76AWAtt (Rsnwto 1 lessWe0 IttsAltts) I tesAwrmi (RIAINtO I

2 00 2001

5 79

671_

6 89

480

100

1 00

1.00

050

H

4 00

12 50

1500 8.11

15.00 10 20

17.00 1500 1

19.00 1500

19.00 1800

1300 12,501

1 00_ 19.00 18.00

400 00 15 00 400.00 15.00

- -

- - -

400 00 19 00 400 00 1 18 00 1.00

400 00 13 00 400.00 1 12.50 050

1

I a

I 1450L - 1 14.50 W 19 00 - 1 18.00 - 1.00

13 00 12.50 - 0.50

400.00 14 00 400.00 14.00 • -

400.00 19.00 400.00 18.00 - 100

400.00 12.80 400.00 12 29 H 0.51

38000 19.00 380 00 18 00 1.00

380 00 12 70 350 00 1 12 20 0.50

1 1

1

1

15.00 - 1 _15.00

400.00 14.50 400.00 14.50

0.50

400 00

400.00

380 00

380.00

380.00

19 00 400 00 18.00

13 00 400.00 12.50

14.30 3130 00 14.30

19.00 380 00 18 00

12 BO 380 00 12.30

• •

15 20 12.00

17.85 17.85

1175 11.75

14 70 200 00 11 50

200 00

19 00 200.00 15 00

12 70 200.00 8 85

200 00

200 00

200 00

200 00

14.00 14 00

14 00 14 00

Residential

3.09

I I

L2p to 50 Units

Forak load requirement up io 5 WV

098% 124.575

166,052

102,652

29,542

5,859

2,649

17,663

451.023

1

-

29.43 4.59% 01-100 Untis

101.300 (Juin

H

1

6.77 1.05%

201-300 Units

391-700011ts

9.27 1 44%

1

1

9.42

9.71

147%

1.51% Above 700 Units

For peak load requirement exceedD 5 kW -

Timed Use E0Ui. -Peak 088 0.14%

0 69%

I 1

I

I 1

Time of Use (TOW- 03-Peek

1 Total Residential

Commercial - A2

0 41

72.99

Commercial - Far peak Toad requirement up to 5 kW 0 39 1 31% 104.620

Commercial( 0 19 28 300% 34

Commeruat 140 KW) For peak loaa requitement exceeding 5 kW - -

ir.dar_ _ _ • -

Time el Use (IOU) • Peak (A-2) 1 91 0.30% 2.618

Time or Use (TOU) - Oil-Peak (Tempi 706 1 10% 37

1 Total Commercial 36.64 1 0 00%1 107,308

lindustdal - I

B1 0.15 003%1 -

j 11_ Pea) _ 0.441 007% 1.084

131:_1011 Peak) 206 0.32% 1452

B2- 0.15 0.02% 104

82 - TOU (Peak) 2 21 0 34% 1.009

B2. TOU (On) 8.53 138% 1

B3-11/13 kV/Peak) 0.44 007% 16

04 839 131% 3

1 Total industdai 23 I 1 3,670

Bulk

Clickippty a1400 Vow up lo 5 kW 11

C1(51 Supply at 400 Volts -exceeding 5 kW 0.15 002% 78

Time of Use (IOU)-Peak _ 044 0.07% 105

Time 01 Usa(TOV). 071-Peak 2.21 0.34% 12

C7 Supply at a kV 1.18 0 18%

Time of use (TOU_) nhseak 2.35 0.37% 25

nine or Use (TOU). 10.01 1.56% 25

C3 Supply above 11 kV

Time or Use (701.1) • Peak

Time or Use (TOul Off-Peak

1 Total dingle Point SuPPtY 16 1 258 1

Tube-wells - Tacit! D

!

Agricultural

025%! ot Scarp 162 294

Time or Use (TOU) 1 47 0.23%

Dine of Use (TOU) B.68 1.35%

02A rojiCUITual Tube-walls 475 01 7400% 22.494

Nttoultuar Tube-wells 0-2 (10

Time or Use (TOU) • Peak 0-2(1) 3.139

Time of Use (TOU) Peek 0-2 0.74 011% 521

Time of Use (TOU) 011•Peak D2 5.30 0 113%

1 Total Agricultural 493 1 28,448

Public LS,qG 044 007% 260

Residentlei Colonies H 0.01 000%

special COM/Ide • rare K .(Al,

Time of use (TOU)- Peak

Time Or Use (IOU) • Ott-Peak

IRitay irealiOnTraClien - 1 1 Ca-Genrabon-t

General Service

Grand Total I 642 1 100 00%1 686,985 12.25

./ r

Page 130: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM -28 ( A )

QESCO Revenue and Subsidy Statement Mar 2018

Residential

Lip° 50 Units

For peek load requirement up to 5 kW

01-100 units

101-300 Units

101.300 thins

301.7000145 _

Above 700 Units

For peak load requirement exceeding 5 kW nine of Use (TOU) • Peak lime of Use (TOU) - Ott-Peak

Total Residential

I

3.09 048% 124.575

- i 0.00% -

29.43 459% 168.082

6 77

927 1.44% 102.652

9.42 147% 29,542

9 71 I 51% 5,859

• 0.00% -

088 0.14% 2.649

4.41 0 69% 17,663

72.99 000% 451,023

12 313 6 18 6 18

367 BB 17040 19748_

101.53 54 90 46.64

139106 94.65 44 .50

160.10 150 68 242

184 53 174_82 971

16 78 15 89 0.88

57.39 55 18 221

1,039.63 722.61 317.02I

Commercial. A2 - 000%

Commercial. For peak load requiemem uo to 5 irW 8.39 1.31% 104620

19.28 3.00% Commervai (41001_ 34

Commercial (c20 KW) For peek load requirement exceeding 5 kW 0 00% •

mauler - 0.00%

Time of UsekTOUL Peek (A-2) 191 0.30% 2,618

Time of Use (TOU). CM-Peek (Tome) 7.06 I 1.10% 37

Total Commercial 36.64 1 0.00% 107,308

Industrial - _0.00% -

01 0.15 002% •

131 (Peek) 044 007% 1084

131 • (011 Paolo 2.16 032% 1.452

132 015 0.02% 104

132 - 7011118.ex) 2 21 1 054% 1 009

B2 - TOU (011.peek) 8.83 1 1.38% 1

131 11231.1 Jar) 0 44 1 007% 16

ea 8 39 1 1,31% 3

I Total Industrial' 23 1 000% 3.670

Built

c iktosuppiy at 400 Voris • up to 5 kW 11

CT(b) Suppn400 Voris .exceeding S kW 0 15 0.02% 78

Time of Use (TOU) • Peek 0.44 0 871 106

Time of Use (70U). Off-Peek 2.21 034% 12

1.18 0 RI% -

2.35 0.37% 25

10.01 I 158% 25

lime ol Use (TOU). Peak i I -

1 Tone of Use (TOU) • ON•Peek I - I •

I Toter Single Point SupPlirt 16 1 256

Agricultural Tuba-wells - Tariff D I • I •

ol scT3 _ 1 62 0.25% 294

Tare or Use (TOU) 1.47 023% -

Tlme of Use_g0U) 8.68 135% -

02 A_pnoutlual Tube-weils 475 01 74.00% 22,494

NISIIIUS1 Tube-WOVE. 0-2 (12 -

Sm., of Use (Tan - Peak 0-2(11 - 3,139 Time of Use (TOU). Peak 0-2 0.74 0.11% 521 -

1 Time of Use (TOU). Ott Peek 02 5.30 093% • -

I Total Agricultural' 493 1 26.448 1 -

Public Ughtng C 0 44 0.07% 260 -

Residenbal Camps H 0 01 0.00% •

Spectra Convects • Tann K (AA() -

Time of Use JOU). Peak

Time of Use (TOU) • OR-Peak

Railway TracionTraction • I

Co-Genranon-a

General Service

C2 Sappho( 11 kV

Time of Use (T01.1) • Peek

Time of Use (0) - On-Peak

03 s I1 kV

159 37 150.98 8.39

0 09 289.15 0.09 289 15

135.31

11599

- - _ • - -

095 36.35 0.95 34.43 191

5 74 91.82 5.74 88.29 3 53

6.77 576.89 6.77 582.88 13.83 I

. I

213 213

B.39 _ 795 0.44

2678 2575 1.03

001 206 0.01 206 -

1.76 41 94 176 39.73 - 2 21

0.65 8.39

13 51_1_ 4 50

0.44 0 65 7.95

• 12 15 113.01 12 15 10

4 79 106.52 4.79 1102.33 4 19

19.37 309.23 19.37 296.41 12.82 I

. _I - - .

068 213 0.88 2.13 -

021 8.39 0.21 7.95 044

1.44 28.69 144 27 59 1.10

1 02 18.83 1.02 1623 -

070 44.73 070 42 38 2.35

3.57 121308 3.57 123.08 500

• - - - - - •

7.82 22827 7.62 219.96 • 8.90 I

i 5.18

16 23

309

24.60 19 42

26.27 26.27

102.01 102.01

6,982 60 I 90.30 1 5,462 58 •

15 23 •

13.98 3.09 11.04

67 28 1 48.88

7,216.74 109.70 1 6,668.20

616 8 18

0.08 008 •

9,377.41 143.46 7.476.30 25.61 1,901.11

25 61 1,520 02

294

20.40

25.61 1,548.54

Grand Total 642 100 00%1 588.955 1 189.07 I

Page 131: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

(RAMO) (RVIMM) (RINVYMI IRshm/h) (%./kW/M) fRenAVII)

18.00 19 00

400.00 15.00 400 00 15 00

19 00 400.00 18.00

13.00 400 00 12.50

400.00

400 DO

14 50

11300

12 50

14 00

1800

12 29

18.00

1220

14 50

19 00

13 00

14.00

19 00

1280

19 00

12.70

400 00

400 00

400.00

380.00

380 00

400.00

400 00

400 00

360.00

380 00

400 00

400 00

15.00 15 00

14.50 400.00 14.50

19.00 400.00_ 18.00 1 00

13 00 400 00 12.50 0.50

14 30 380 00 14 30 -

19.00 380 00 18.00 1.00

12 80 380.00 12 30 0.50

FORM • 28

QESCO

Revenue and Subsidy Statement Jan-Mar 2018

IResidential

Up to 50 Uinta

15%5V5)

9.62

91 64

21.08

Nagel

0.48%

4.59%

I

124.575

168,082

102652

29.542

5.859

ow) Okage)

For peak load requirement up to 5 kW

01-100 Units

101.300 Units

201-300 Units

301.700Units

105%

28.07

29.32

1 44%

47%

Above 700 Otis 30.24 1.51%

For peak load requirement exceeding 5 kW

Time al Use 'TOO). Peak 2 75 014% 2,649

Time of Use (TOY) Off-Peak 13 75 085%I 17.663

Total Residential 227.27 I 451,023 I

Commercial • 412

Commercial - For peak load requirement up to 5 kW 26 12 1 31% 104.620

Commercial (41018 60.02 3.00% 34

Commercial 1520 K% For peak load requirement exceeding 5 kW

Solar

Time of Use (TOUT - Peal( (A-2) 5.96 o 30% 2.618 1

nine of Use (TOO). Off-Peak (Tema) 21.99 1.10% 37 I

Total Commercial 114.09 0 00%I 107,308

'Industrial

131 046 0.02%

01 (Peak) 1 37 0.07% 1,084

131 - (Off Peak) 6.41 0.32% 1.452

B2. 0.46 0.02% 104

02. IOU [Peak) 6.87 0 34% 1.009

02 • IOU (Off-pa 27.49 138% 1

133. 11(33 AV (Peak) 137 0 07% 16

134 26 12 1.31% 3

Total Industrial 71 3.670

Bulk

C10) Supply at 400 Volts • up to 5 kW 11

jLL:i el 400 Volts -exceeding 5 kW 046 002% 78

Time of Use (TOU). Peak 1.37 _0.07% 105

%me or Useir011)- Off .Peak 6.87 0.34% 12

C2 Supply at li kV 367_ 018%

Time 0) UsetTOLJeek 7.33 037% 25

Time of Use (TOU)- Of-Peak 31.16 158% 25

C3 Supply above 11 kV

Time at Use JTOU). Peak

Time of Use (TOLA • Off-Peak I

I Total Single Point SupplY1 51 I I 256

Agricultural Tube-wells • Tariff D I I

01 Scarp I 5.04 025% 294

Time of Use (TOU) I 4.58 0 23% -

27.03 1.35% Time of (IOU)

to

Use

02 nalities-welts 1479.08 74 00% 22,494

/korona! Tube-wells 0-2 (4) •

Time of Use (TOUT - Peak 0-280 - 3.139

Time of Use (TOO) - Peak 0-2 2.29 0.11% 521

Time of Use (TOO) • OP.Peak 02 I 16 50 0 03%

(

Total Mricunural l 1,835 I I 26.448

Public G 1.37 0.07% 260

Rasidamiai Colonies H 002 0.00%

Special Convects . Tanll K (44K)

Time of Use - Peak •

Time of Use_LTOO)• Of-Pear

Rahway TrackenTracoon • 1

C6Denration...i

General Service

Grand Total 1.999 1 100 00%I 688,966 I

12.25

400.00

380 00

380 00

380.00

4.00

12.50

15 00 1

15 00

17.00

19 00

19.00

13 00

2 00

5.79

8.11

10.20

16 00

18.00

18.00

12 50

2.00_

671

689

4.80

1.00

1.00

1 00

0 50

1.00

1 00

0 50

1.00

0.50

1.00

051

1.00

0.50

15.20

17.85

11 75

14 70 200.00

200.00

19 00 200 00

12.70 I 200 00

14 00

14 00

15.00

8 85

14 00

14 00

3.20

...-

a.00

3 85

12 00 I

1785

11 75

11 50 200.00

200.00

200.00

200 00

Page 132: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 28 ( A )

QESCO

Revenue and Subsidy Statement Jan-Mar 2018

talkW4) Weal

(kW)

Residential _

uslo 50 Units

9 62

For peek load requirement up in 5 4W

01100 Units

101.300 Untie

101.300 Units

301700Unas

AbOve 700 Unns

For peek load requirement exceeding 5 kW

Time of use (700)- Peak

Time of Use (701.1)• Off-Peak

Total Residential

Commercial • A2

Commercial. For peak load requirement up l05 kw 26.12

Commercial (4 100) _ 60 02

Commercial (<20 KW) For peak load requirement exceeding 5 kW - 0 00%

Re ular - 000%

Time of Use (IOU( • Peak (4-2) 5.96 0.30%

2.618

Time on Use (TOW-Off-Peak (temp) 21.99 1.10%

37 - 1

Total Commercial 114.09 0 00%1

107,308 - I

Industrial • 0 00% _ •

131 048 002%

131 (Peak) 1.37 0.07%

1,084

81 • (Off Peak) 6 41 0.32%

1.952

82 - 70U (Peak) _ 6.87 0.34%

B2. 0.46 0.02%

109

101

,0

82 - 700•11.peek 27 49 1 18%

1

81 11/33 KV (Peek( 1 37 0.07%

16

Ele 26 12 131%I

3

3,670

Total Industrial 71 0 00%

Bulk • •

C1(e) Supply el 400 Volts . up to 5 kW - 000% 11

C106 Suppty at 400 Vons arruS 5 ION 0.46 0.02% 7E1

Time Of Use (701.1)• Peak 1.37 0.07% 105

Time of Use (TOU)• on-Peak 6.87 0.34% 12

_2 Supply el 11 kV 367 0.18% -

Time Of Use (IOU)-Pear 7.33 037% 25

Time of Use ()DUI. On-Peak 31,16 1.56% 25

3 Supply above II kV

Time of Use (1 TOU)LPeek • - -

Time of Use (TOU). Off-Peak -

Total Single Point Supply 51 I 258

Agricultural Tube-wells • Taal! D -

01 Scarp 504 0.25% 294

Time of US, (TOU) 4.58 023% -

Time of Use (TOU) 27 03 1.35% - _

02 Aanculuel Tube-wells 1479.08 74.00% 22,494

Ag

al

riculluai Teoemmas 0-2 Oil - •

lucre of Use (TOU) • Peak 0-2(1 • 3.139 -

Time of Usa (TOU). Peek 0-2 229 0 11% 521

Time of use (Ta) • Off-Peak D2 16 50 083% •

Tonal Agricultural 1,536 I 26,448

Public U9Mino G 1 37 0.07%

260 •

Residential Colonies H 0.02 0.00%

Special Contracts • Tariff K (AJK)

rime of Use (TOU) - Peak

Time of Use (TOU) - off-Pen

-

GRIMM Service 1

- Railway TractionTraclion . 1

Co-Genranon•J

I Grand Total 1.999 1100,00%I 588,965

Irls) (Min Rol (MB Ral

38.49

1,145.51

316.18

433 00

998.52

574 59

(min RE (Mln RI)

19 24

530.60

170 94

294.44

469.20

544 34

49.49

171 63

2,250.08

-C

(Min as)

(,)/..

(Mln RS) I

19 24

614.91

145 22

138.56

29 32

30.24

52.24 I

178 70

3,237.20

2.75

6 B7

987.12 I

496 23 470 12 26 12

0.26 900.37 L 0.26 900 .37

' - •

" - -

2.135 113 18 I 285 107.22 5 96

17 22 I 285.92 17.22 274 92 1100

20.32 I 1,796.69 20.32 1.752.62 43.07

. - . .

664 - 664

- 26.12 • 24 74 1 37

- 83 39 L - 80.19 121

002 6.41 002 641

5.28 130.59 _ 5.28 12371 6 87

36.46 351 90 36.48 337.88 14 02

1.95 26 12 I 1.95 24.74 1 37

I 14 38 331 69 14 38 318.53 13.06

68.10 962.87 I 58.10 922.96 39.91 I

- . .

2 03 6.64 2.03 6.64

0.63 26.12 0.83 24.74 1 37

4 33 89 35 4.33 65.91 344

3.05 52.42 3.05 E 52A2

1 209 139.29 209 131 96 733_

10.71 398.82 10.71 383.24 15 58

. - • •

• •

22.86 712.64 22.85 684.92 27.72 I

- . -

78.61 - 60.40 16 13

81 79 - 61 79 •

317.65 • 317131 •

347 97 21.742 43 267.48 17.009 38 80 49 4,733 05

- - . •

4870 - 48 70

9.27 43.53 9 27 34.37 916

• 209.49 - 145 96 I 63 51

405.94 22.47110 346.46 17,649.65 60.49 4.821.85 I

19.24 19 24

025 025

29,19940 446.72 23,279.73 60.49 5,919.67 I I 607.21

91=H.64

21 08

2B 87

2932

30.24

2 75

13.75

227.27

048%

0 00%

4.59%

144% 102.652

1,47% 29 542

1.51% 5.859

0.00%

0.14%1 2.649

0 69%1 17,863

0.00% 451023 -

000%

1.31% 104.620

3.00% 34

124575

188.082

Page 133: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 28

QESCO

Revenue and Subsidy Statement Apr 2018

[Residential

(mliWol Made)

0.48%

I (kW) ("Age) (11sAWAI I

U 10 50 Units 3 46 124.575

For peak load requirement up 10 5 kW

01.100 Units

1

32.92 459% 168.082

101.300 Unils 7.57 1.05%

201.300 Units 10.37 1.44% 102.652

301-700Un06 10.53 1 47% 29.542

Above 700 Units 10 86 151% 5,859

For peak iime requirement exceeding 5 kW I _ Time of Use OMR - Peak 0.99 I 0 14% 2.649

Time of Use (TOU). Otf.Peek 494 I 089% 17.663 I

Total Residential 81.63 I I 461,029 I

Commercial - A2

Commercial For peek load requirement up to 5 kW 9.38 1.31% 104620

Commorciet (4100) 21.56 3.00% 34 400.00

Commercial (420 k%9 For peak load requirement exceeding 5 kW -

Regular - I

Time of use (Toil) - Peak (A-2) 2.14 0.30% 2,6113 I I 400.00

rime of Use (TOU) . Off -Peak (Temp) 790 1 10% 37 I 400 00

I Total Commercial 40.98 0.00%1 107,308

ino:Waffle! - I

BI 0 16 0.02%

131 (Peak) 0 49 0 07% 1.064 I I_

Si . (Oft Peak) _ 2 30 0.32% 1.452 I

B2- 016 0.02% 104 400.00

82 .70U (Peak) 247 034% 1.009 400 00

B2 - TOU (06.peak) 9.87 1 30% 1 400 00

131 I 103 KV (Peak) 049 007% 16 380.00

64 938 131% 3 380 00

I Totellnauemal 25 I I 3,670

Bulk

CI sa) supply at 400 Volts. up lo 5 kW 11

SSuppltat 400 Volts -exceeding 5 kW 0 16 002% 78l 400.00

Time of Use (TOU) . Peak 0.49 0.07% 105 400.00

Time of 1..(10U], - 011-Peali 2.47 0.34% 12 400.00

C2 Supply at II kv 1.32 0 18% - 380 00

Time of Use (70U)- Peak I 2 63 0.37% 25 380.00

Time of Use (70U). Off-Peak I 11 19

I

156% 25 380.00

gpi ply above 11 kV

Time of Use (TOU) . Peak

I Time of Use (TOU1.06-Pesk I

I Total Single Point Supply) la I I 266

Aviculture! Tube-wells • Tariff D I DI Scarp 1 81 0.25% 294

Ti Time or Use (TOU) 1 65 0 23%

h

Time ol Use (TOU) 971 I 1.35%

02 Agncurlual Tube wells 22,494 200 00

A3rIcutual Tube-wails 0.2 (11) -

531 251 74.00%

-

Time of Use (IOU) • Peak 0-2g) 3,139 200 00

Time of Use (YOU). Peak 0-2 0.82 1 0.11% 521 1 200 00

lime of Use (TOU). OH-Peak 02 5.92 0.03% 200.00

Total Agricultural 651 I I 26.448 Public U91- 1g G 049 1 007% 260

Residenhal Colonies Fl 0.01 0.00%

548 .1a1Coniraci9 - Tariff a (A111)

Time of Use (TOU) • Peak

Time of Use (YOU) - Ott-Peak

Railway TracoonTraction • 1

Co-Genralion.J

I General Serdce

I Grand Total na 1 100 00%1 688,986

(RvikWh) 11,

4 00 2.00

12.50 5 7D

15.00 8.11

15 00 10.20

17.00 16.00

19.00 18.00

19,00 18.00

13 00 12 50

19 00 18.00

15.00 400 00 15,00

19.00

13.00

14 50_

19_00

13 00

14 00 1 400 00

19.00 I 400.00

12 801 400 00

19 00 380.00

12.70 380.00

15 00

14.50

19 00

13.00

14.30

19 00

12 BO

15.20

1785

11 75

14.70

12 70

19.00

400.00

400.00

400 CO

400 00

400 00

380 00

380.00

380.00

• I 12 00

- I 17 85

11.75

200.00 11.50

200 DO

200.00 15.00

200 00 I 885

(Re/11■1011 diekWAO I (HsikWhl

2 00

18.00

12 50

14 50

10 00

12 50

14 00

18.00

12 29

16.00

12 20

15.00

14 50

1800

12 50

14.30

1600

12.30

Mir

1.00

050

1.00

051

1 00

050

671

6 89

480

1.00

1.00

1 00

0 50

050

0.50

0 50

4.00

385

100

1,00

1.00

320

100

Page 134: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

1 1 1

1

1

I

LJ

11

lJ

FORM • 28 ( A)

QESCO

Revenue and Subsidy Statement Apr 2018

Residential

IMliWTI %NE (%aM( (ten Re) (min Rs) (min Rs) nun Rs) (min R%

-7‘

(Men Rol

691 Up lo 50 Urals 3.46 0 48% 124,575 13.82 691

For peak load requirement up to 5 kW 0.00% - -

01.100 units 32 92 4,59% 168.082 411.44 190 58 220.66 _

101-300 units 7 57 11356 61 40 52.16_

101-100 Units 10.37 1 44% 102.652 155.52 105 76 _1 49.77

301.700Units 10 53 147% 29,542 179.06 168 53 10.53_

Above TOO Units 10 86 1.51% 5,859 206 38 195 52 10.86

For peak load requirement exceeding 5 kW 0 00% - -

Time of Use (TOU) - Peak 0.99 014% 2,649 18.70 17 77 a99_

Time of Use (TOU) Off-Peak 4.94 0.69% 17.663 64.18 61 72 I 2.47

Total Residential 81.63 0.00% 451.023 1.162.73 808.18 354.55 I

Commercial-A2 • 000% - I

Commercial - For peak load requirement up to 5 kW 9.38 131% 104,620 178 24 16886 938

Commercial n0(1) 21 56 3 00% 34 0.09 323.39 009 323.39

Commercial (C0 KW) For peak load requirement exceeding 5 kW • - 0 00% - _ - -

• 000% - - - - Iruiet_

Time of Use (T0t6 - Peak (A-21 2 14 030% 2.618 0.95 40.65 0.95 38 51 2 14

Time of Use (TOU). off-Peah (Temp) 7 90 1 10% 37 5 74 102.70 5 74 98.75 3.95

Total Commercial • 40.98 0.00% 107,3081 6.77 644.97 6.77 629.50 15.47 I

Industrial - 0.00% - • I

01 _ 0.16 0.02% 7 2 39 2.39 __

Itl'Asiillr 0.49 0.49 0.07% 1664 9.38 6.89

61- (Off Peak) 2.30 0.32% 1.452 29 95 26.80 1.15

B2. 0.16 0.02% 104 001 2.3D 001 2.30 2.30 .

62 - IOU (Peak) 0.34% 1009 1.76 46 90 1.76 44 04 2.47

02 • TOU (011:mis)

2.471

9 87 1 35% 1 12.15 126.39 12.15 121 36 5.04

8111!33 KV (Peak) 049 007% 16

3 H 0 85

4 79

9.38

119 14

0.65

4.79

8.89

114.45

0 49

04 938 1.31% 4.69

I Total Industrial 25 0.00% 3,670 19.37 946.84 19.37 331.61 14.33 I

Bulk • - I

Clilial8upp al 400 Voila- up to 5 kVT - 000% 11 - _

CI (Pqr pAil 400 Voss -ermire Jgclin 5 kW 0 16 0.02% 78 0 68 2.39 0.86 _ _2.39

Time of Use (TOU) . Peak 0.49 0.07% 105 _ 0.21 9.38 0.21 8.89 049

Time of use (IOU) - Off-Peek 2 47 0,34% 12 1.44 32 09 1.44 3086 123

02 Supply at 11 kV 1.32 0.18% . 1 02 18.83 1.02 18.83 •

Time of Use (1-01.6:_Peek 2.63 037% 25 0 70 50 03 0 70 47.40 263

Time of Use (TOU) . Off-Peak 11.19 1.56% 25 3.57 143 25 1 3.57 137.65 5 60

C3 supply above 11 hV - . . •

Time of use ircAuf see - . . •

Tune of Use (IOU) - Off-Peak - • • . •

I Total Single Point Supply

Agricultural Tube-walla • Tariff D

18 256 7.62 255.97 7.62 246.01 • 9.96 I

I Di Scarp 1.81 025% 294 27.52 21 72 579

Time of Use (TOU) 1.65 023% 29.38 29.38 -

Time of Use (TOO 971 35% • 114.09 11409 _

D2 Agriculluel Tubs-wails 531 25 7400% 22,494 115.99 7609 40 107.37 6109 39 8.62 1 700 01

Liticultual Tube-wells 62 pa_

Time of Use (TOU) • Peek 0-2(1) 3,139 16.23 16.23

I Time of Use (TOU) • Peak 0-2 0 82 011% 521 3.09 15 83 309 12.34 3.29

1

Time of Use (TOU) • Off-Peak 02 5.92 083%1 75.24 52 43 22.81

Total Agricultural 661 26448 I 135.31 8.071.26 126.69 6.339.36 8.62 1.731.90

Public Ugfriing G 0.49 007% 260

000% •

6.91 F 0.09

6.91

0.09 Residenlial Colonies H 001

Special Contracts - Tariff X (AJK) •

Time of use (70U)- Peak

Time of use (70U) Off-Peak

Ralltsys -1 _TractionTraction

Co-Genratron-v

General Service

Grand Total 718 I 100 00% 588,965 169.07 10,487.77 160.46 11,36136-I- 2426.21

)k (

Page 135: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

(RI*VaM) CRIAAM)

2.00

6.71

6.89

480

1 CO

100

100

0 50

1 CO

1.00

0.50

1 03

0.50

1,00 051

100

0.50

0 50

1.00

0 50

4 00

3 85

24 20 300%

Bee!andel

mo to 50 Unfts

For peak load requirement up to 5 kW

01-100 Unlis

101-300 Unlis

201-300 Units

301•7000nile

I 11411wN I 0441141 I

I 388 048%1

1

36.95 4.59%

8.50 1.05%

11.64 1.44%

11.82 1.47%

1 Total Commercial

L03

Tune

Supply above 11 kV -

Time of Use (TOU) • 011•Pealt

Above 700 Unite 12.19 1.51%

For peak load requirement exceeding 5 kW •

Time of Use QOU)- Peak 1.11 0.14%

Time of Use (TOU) • Off-Peek 554 069%

I Total ResidoMlel 91.63 I I

Commercial - A2 • I I

Commercial. For peak Imo requirement up lo 5 kW 10.53 1.31%

Commerce! (.100)

Commercial 1420 WM For peak bed requirement exceeding 5 kW

Regular

rime of Use (TOU) • Peak (A.2) 2.40 030%

Time of use (rout . off-Peek (Tame)

887 1.10%

46.00 I 0.00%1

InclUS(rial

E11 0181 0.02%

131 Peatr)_ 0 55 0.07%

B1 • (Off Peak) 259 0.32%

10 • 0.18 0,02%

82 TOU (Peal,) 2.77 0.34%

B2 - TOU 108-per 11.08 1,313%

63- 11/33 KV Teak) 0.55 0.07%

84 10 53 1.31%

1 Total industrial 28 1 1

Bulk

Cita) Supply at 400 Volts • up to 5 kW -

ci() Supply a1400 Volts •exceern5 kW 0 18 0.02%

lime or Use (IOU) • Peek 0.55 007%

Tlmo of UstOCIU) • Off -Peek 277 034%

C25upPly91. I kV 1 48 0.18%

lime of Use (ICU) • Peek 2.96 0.37%

of Use (TOU1 • Off-Peak 12.56 1.56%

Time ofatTOU) • Peak

Total Single Point Supply 21

Agricultural Tube-wells - Tariff D 1

DI scarp_ 2.03 0.25%

Time of Use (TOU)_ 1 85 0.23%

Time of Usi(7_OU) 10.90 1.35%

02 rkgricultusa tube-wells 596 32 74.00%

egrIcoltual Tube-wells 0-2 Off

Time of Usa_g0.11: Peak 0-26) •

lime of Use (IOW - Peak 0-2 0.92 0.11%

time of use (TOUT - Off-Peak 02 6.65 0.83%

1

Total Agricultural 619 1 1

Public 149li G

0.551 0 07%

Residential GolonieS H

0011 0.00%

Spacial Coniracis Tent IS (PJK

Time of Use (T01.3 • Peak

Time ofiALCf OU) • Off-Peak

Railway traclienrrechon- I

Co-Genralion-J

General Service

Grand Toted 806 100 00%1

FORM • 28

OESCO

Revenue and Subsidy Statement May 2018

Mosel (ile/kW/M) (RVINVIG divirWM9 1 'RPM")

I 124.5751 4.00 • 2.00

168,082 12.50 5.79

- 15.00 8.11

102.652 15.00 10.20

29,542 17 00 16.00

5.859 19.00 18 00

-

2.649 19 00

I

113 DO I

12.50 17,663 13.00

451.023 1

104.620 19.00 18 00

34 400.00 15.00 400.00 1560

- -

2.618 18.00 400.00 19 00 400 DOI

37 400.00 13 00 1 400.00 1 12 50

107.308

J 14 50 14.50

1,084 19.00 18.00

1.452 13.00 12 50

104 400.00 14 00 400.00 14.00

1.009 400 00 1900 400.00 18.00

400.00 12.80 400 00 12.29

16 313000 19.00 380 00 18.00

3 380.00 12 70 380.00 12 20

3.670 1

I 11 15 00 - 15 00

78 400 00 14.50 400.00 14.50

105 400.00 19.00 400.00 18.00

12 400 00 1300 400 00 12.50

380.00 14 30 38200 14 30

25 380 00 19 00 380.00 18 00

25 380 00 12 80 38000 12 30

- -

-

I .

256

294 15 20 - 12 00

17.85 • 17 135

11.75 • 11 75

22,494 I 200.00 14 70 200 00 11.50 I

3.139 200.00 200.00

521 20000 19.00 200.00 15.00

200 00 12.70 200.00 8.85

26,448 I 260 14.00 14.00

• 14.00 14 00

12 25

588.965 1 I 1

1\'

Page 136: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

388

36 95

8.50

11 64

11 82

12.19

111

5 54

91.63

0.45%

o 00%

459%

1.44%

147%

151%

o 00%

0 14%

0 69%

0.00%

481.84

127.47

174.57

200.99

231 66

21.06

72 05

1,305.15

200 07 H

383 00

213.92

68 92

118 71

189.17

219 46

19.95

69 28

907.17 •

189.54

009 363 00

FORM • 211 ( A )

1 1

1 1

QESCO

Revenue and Subsidy Statement May 2018

Residential

Up to 50 Units

For peak load requIramen1 in lo 5 kW

01-100 Units

101.300 Units

101-300 Units

301.700Unn

Move 700 Units

For peak load requiremeni exceeding 5 kW

Time of Use (1016 - Peak

Time of Use (TOO • Off-Peet

Total Residential

Commercial - A2 0.00%

Commero6 • For peak load requirement up to 5 kW 10.53 1 31% 104.620

Commercial (<100) I 24.20 3.00% 34

Commercial (<20 KW) For peak load requirement exceeding 5 SW - 000%

Regular 0.00% •

Time of Use (TOU). Peak (A-2) 2.40 030% 2.618

Time of Use (IOU). Oil-Peak Ramp) 8 87 1.10% 37

Total Commercial 46.00 0 00% 107,308

Industrial 0.00%

81 0.18 002% •

_131 (Peak) 055 0.07%

Ell • (Off Peak) 2 59 0329%

82. 0.18 0.02%

B2 • TOU (Peak) 2 77 034%

82 - TOU (08.peak) 11 08 1.38%

83- 11E33 ITV (Peak)

0.55 0.07%

84 10 53 131%

Total Industrial 28 0.00%

Bulk

Ci(a)• ply 51400 Volts • up to 5 kW • 0.00%

C1(0) Supply a1400 Vans -eag 5 kW 0.18 0.02%

Time of Use rrou) - Peak 0.55 0.07%

Time of Use :)1.1) • Off-Peek 277 0.34%

025q.piy at 11 kV 1.48 018%

Time of Use OU1- Peak 2.96 0.37%

Time of Use (TOU) • 06-Peak 12 56 156%

r

ISupply above 1 kV

Time or use (Tom- Peak

Time of Use (1016 • off-Peax

Total Single Point Supply 21

Agricultural Tube-webs • Tariff D

p1 Suter 2 03 0 25% 290

Time of Use (TOU) 1 85 0.23%

Lime of Use (TOU) 10.90 1 35%

02 Awiculluel Tube-IVOSS 596.32 74.00% 22.494

Naicutluai Tube-wells 0-2 (Ii) •

Time of Use (TOU) • Peak 0-2(0 • 3,139

Time olUseTTOU)- Peak 62 0.92 0.11% 521

Time of Use (TOU)-Off-Peak D2 665 0 83%

Total 49tlttamsr.l 619 26,448

Public Ligating G 0.55 0 07% 260

Residential Colonies H 0.01 0.00%

Special CoMrads • Tariff K (AJK)

Tme of UsefrOU) • Peak

TIM? al 1.011.a0ff-Peak

RellvreuracilonTracilon • 1

CoGenratIon-J

Generel Service

Grand Total 506 1 100 00%1 568.965

124.575

168.082

102.652

29.542

5.859

2 649

17.663

451 023

1.084

1.452

104

1,009

1

16

3

3.670

11

78

105

12

25

25

256

0.01

-I

12.15

1.78

0.65 10.53 0.65

4.79 133 73 1 4 79

19.37 388.20 19.37

H 0 68

1.44 38 02

10 53

2.68

0 21

[_

.0

0 70 56.16

21.13 12

3.57 180 79

7.62 257.32

115 99

136.31

169.07

16.23

0.09

- -

• .

0.95 45.63 0.95 43.23

5 74 115.27 5.74 110 84

6/7 723.98 8.77 706.61

309

64in Psi Rs}

1552 776 775

30 89 24 38

32.98 32.98

128.07 128.07

8,76595 I 127.03 6.65772 (11 04)

16.23

17.55 3.09 13.86

84 46 58.66

9,059.89 146.35 7,116.86 (11.04)

7.76 7 76

010 010

11.772.44 160.11' 9,389.76 (11.04)

2.68

10 53

33.62

2.59 0 01

52.65 1.76

141.88 I 12.15

0.68 284 -

021 9.98 •

144 34 64

1.02 21 13

070 53 20

3 57 154.51

7.62 276.14

2 68

9 98

32.33

2 59

49 88

138.22

9.98

128 46

372.11

1 90823

3 69

25.60

1,944.041

I

2.386.66 I

247 01

58.55

55 86

11 82

12.19

111

2.77

397.80

10 53

2 40

443

17.37 I

J

55

1 29

2.77

5 65

0.55

5.26

16.09 1

0.55

1 6 50

1.39

Page 137: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

(uck)

FORM • 28

QESCO

Revenue and Subsidy Statement June 2018

1

Residential

HF

ip lo 50 Units

For peak load requirement up la 5 kW

01-100 Units

(12kwm I lategel I 3.66 0.48% 124,575

36.75

8.45

168.082 4 52%

1.05% 101-380 Undo

102652

29.542

5.859

2.649

_ 201-300 units

301-700Units

Above 700 Uni6

For peak load requirement exceedIng 5 kW

11.58

11.76

1.44%

1.47%

12 13 1.51%

Time or Use (TOU) • Peak

[

time of Use (TOU) - Off-Peak

I Total Residential

Commercial -A2

110

551

91.14

0 14%

069%

1 1

17.663

951.023

104.620

34

Commercial • For peak load requirement up to 5 kW

Commercial (,1001

10 47

24.07

1.31

8822

1.31%

3.00%

Commercial (CO KW) For peak load requitement exceeding 5 kW

030%I

_Regular

2.618 rime of Use (IIDU). Peak (A-2)

Time of Use (TOG) • Off-Peak (Temp) 1.10% 37

1 Total Commercial 46.76 I 000%1 107,308

Industrial

B1 0.18 0.02% -

B1 (Peek) 0.55 007% 1084

BLJOR Peek) 257 032% 1.452

82. 0 18 0.02% 104

132 TOU (Peak) 1 76 034% 1,009

62 • TOU (011yeak) 11 02 138% 1

133- 11/33 KV/Int 0.55 007% 16

134 10 47 131% 3

Total industrial 28 1 1 3.670

Bulk

01017 rplyei 400 Volts • up to 5 KW • 11

Ittipply at 400 Volt -exceeding 5 kW 016 0_02% 78

Time of Use (TOU) Peak 0.55 0.07% 105

Time or Use (TOW- OR-Peak 1 76 034% 12

02 Supf±dtal 11 kV 1 47 0 la%

Time of Use (IOU) • Peak 2.94 0.37% 25

Time of Use (TOU) • OR•Peak 12 49 1.58% 25

03 Supply above 11 kV

Time of Use (TOU1- Peak

Time of Use (IOU) - On-Peak

Toot! Single Point Supply 20 I 256

Agricultural Tube-wells • Tariff 1)

O1 Scam_ 2 02 1 025% 294

Time of Use (TOU) 1.84 0.23% -

Time of Use (IOU) 10.84 I 1.35%

02 Agncultual Tube-wells 593 12 74_00% 22.494

Agiiicollual rube-wells 0-200

Time of Use (704)Paaa 3,139

Time al Use (TOU) Peak 0.2 092 0.11% 521

Time of Use (701.1) Off-Peak 02 681 083% I

Total Abricuttural 815 I I 26.448 I

Public Lighting G 0 55 1 007% 260

Reelaenthe Coiames 0.00%

Contracts • Tariff K (AJK)

0011 I

Time olLSTOU)• Peak

Time of Use (Toy) • 011-Peek •

Railway TreclionTranion 1

Co-Cenration-J

General Service

Grand Total 801 1 100 00%1 688,965 I

400 00

H 400.00

400.00

400 00

400 00

400.00

38000

1 380 00

(RSAWhi (RilkW/12)

2.00

5 79

8.11

10.20

16.00

18.00

1800

12 50

18.00

400.00 15.00

. ' .

- - -

19.00 1 400 00 16.00

13 00 1 400 00 1 12 50

RisnrWM

2.00

671

6.89_

480

1 00

1.00

1 00

0.50

hRstWAIi IF/AWN (RslicW,M)

4.001

12 50 1

1 15001

15 00 1

17.00

19.00

19 00 1

13 00 1

19.00

1500

1 00

050

12.00 320

17.85

11,75

200.00 11.50 • 3.20

15 00

12.70

400 00

400.00

400.00

380.00

350.00

380 00

15.00

14.50 400 00

19.00 400.00

13.00 400.00 I

14 30 380 00

19.00 38000

15.00

14 50

16.00

12 50

14 30

18.00

12.30

200 00

200.00

100 00

11 75

12.80 380 00

15 20

14,70

19.00

200 00

200 00

20000

12.25 1-

1.00_

1.00

050

4.00

3 85

14 50 1 14.50 1--.

19.001 - 18 00 1.00

13 00 j - 12 50 050_

14 00 1 400.00 14.00 -

19 00 1 400.00 18.00 100

12.80 400.00 12.29 0 51

19.00 380 00 18.00 1.00

12.701 380.00 1220 050

14.00

14 00

685

1400

14.00

• - 1.00

• 050

Page 138: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 28 ( A)

Pane)

I

QESCO

Revenue and Subsidy Statement June 2018

I (Memo I „age) I

Residential I

Up le 50 Units 3.86 046%I124.575

For peak load requirement Irv° 5 kW - 0.00%1

_ 01-100 Units 36.75 4.59% 188.082

101-303 Units 8.45

101-300 Units 11.58 1 44% 102.652

k

301.7001.Mils

11 76 147% 29.542

Above 700 units 12.13 1.51% 5659

For peak load requirement exceeding 5 kW - 0.00% •

Time of Use (TOU) • Peak 1.10 0 14% 2,649

lime of Use (TOU) . 011-Peak 5 51 069% 17.663

I Told Residential 91.14 0.00% 451.023

000%

1047 131% 104.820

24.07

Industrial

Total Industrial

I

O piiilave 11 kV

Time of Use (TOW- Peak

Time of Use goo - Off-Peak •

1

1 Total Single Point Supply 20

256

1

porlcullural Tube-wells Tariff D

DI Scarp 2.02 0.25%

294

71me of Use (TOU) 1.84 0.23%

lime of Use (TOU) 10 84 1.35%

lApgricultual Tube-wells 593.12 7400% 22.494

&Meatus! Tube-wells 0-2it •

3.139 Time of Use (IOU) • Peek 0-700

I

stutegpt0 - Peak 0-2 0 92 0 11% 521 ime ft 6 61 0 83% Time Cl Use (TOU)- OH-Peak D2

1 Total Agneulturei 615 26,448

Public UghtnG 0.55 0.07% 280

Rosanna! Colonies H 001 0.00%

Special Conlraos - Izmir If (W.0)

llme of Use (TOU) • Peak

Time of Use (TOU) • Off-Peek

RarlisTraclionTraction • 1

0s-Genralern-J

General Service

1 Orand Total 801 100 00% 588.965

Win Rs) Win Rd

15 43

459 36

126 713

173 64

199 91

iffln Re) leen RE win Rs) rho, Rs) 1

7.72

212.77

58 55

118.07

188.15

7 72

246.58

58 24

55 56

11.76

230.41 218.29 12 13

• •

20.95 19.84 110

71.66 68 90 2 76

1,298.14 902.30 • 395.84 I

198 99 18852 10 47

0 09 361 05 009 361 05

- - .

• - •

095 45.38 0.95 43 00 2.39

5 74 114.66 5 74 110.25 4 41

6.77 720.09 6.77 702.821 - 17.271

2.66 266

10 47 992 • 055

33 44 32 16 1.29

001 2 57 0.01 2.57

1.76 52 37 1.76 49 61 • 2 76

12 15 141 11 12.15 13540 5.62_

0.65 10.47 0.65 9.92 0.55

4 79 133.01 479 127.77 5 24

19.37 388.12 19.37 370.11 16.00 1

- -

0.68 2.66 0.65 2.66

0 21 10.47 0 21 992 0 55

1 44 35.83 1.44 34.45 1 38

1.02 21.02 1.02 21 02

070 55 BB 070 52 92 7 94

3.57 159.93 3.57 153.68 6 25

- .

- .

- -

7.62 286.78 7.62 274.86 11.12 1

30 72 24.25 6 47

32 BO 32 BO

12138 127.38

115.99 6718.90 126 70 6,820.91 (1071 1,897.99

16 23 16.23 •

3.09 17.46 309 13 78 3 67

84.01 58.54 25 47

135.31 9,011.26 146.02 7,077.68 (10.71 1,933.60 I

7.72 7.72

0.10 0 10

7-•

169.07 11,709.20 179.78 9,335.36 (10.7111 2,373.84 I

Commercial • A2

Commercial . For peak load requirement up lo 5 kW

Commercial 0100)

Commercial 1020 aw) for peak load requirement exceeding 5 kW

Regular

Time of Use (TOU) • Peak (A-2)

Time of Use (TOU) • Off-Peak Rerrifff

1 Total Commercial

Bulk

Cast Sapp! igEMO VontLig. to 5 ION

Clibfluppry friit00 Volts -exceeding 5 kW

Time of Use (TOU) Peek

Time of Use(TOU) - Off -Peak

02 Supply al 11 kV

Time of Use (11:sealt

Time of Use (TOU) - OH-Peak

13i

01 (Peals)

_ 01- (Off Peas)

82

02- TOU (Peak)

142 • TOULOff-peek)

133 1 ii23Skjr FAsek)

84

000%

0.00% -

2.39 03a% 2,618

882 t.t0% 37

46.76 000% 107.308

0.00%

0 18 0.02%

0.55 007% 1,084

257 032% 1,452

0 18 002% 104

2.76 034% 1.009

11 02 138% 1

0.55 007% 16

10 47 131% 3

28 0.00% 3.670

000% 11

0 15 0.02% 78

0.55 0.07% 105

276 0.34% 12

1.47 0.15% -

2.94 0 37% 25

12 49 1.56%I 25

3 00% 34

He0

. , '

Page 139: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 28

QESCO

Revenue and Subsidy Statement Apr-June 2018

Raslaennal

nawill I Meg.) I m^0

1

Ofliti I fiterkwito

lip to 50 lines 11.19 040% 124,575

For peak load requirement up It 5 kW •

01-100 lines 106 61 4.59% 168,082

101-300 Unix 24 52 1.05%

201-300 Units 33 50 144% 102,652

301-700UnI6 34.12 1 47% 29.542

Above 700 Unix 35.18 1.51% 5,659

For peak load requirement exceeding 5 kW •

I lime of Use (ToU)- Peak 3.200.14% 2649 2

I Time of Use (OU) • Off-Peak 15.99 0.60% 17.663

I Total Resfaemla 264.39 I 1 461,023

Commercial - A2

Commercial - For peak load requiremeni up to 5 kW 30 38 I 31% 104.820

CommercialS 69.83 3.00% 34 I 400 00

Commercial (<20 KW) For peak load requirement exceeding 5 kW - -

Regular •

Time Of Use rout-Peek (A2) 693 030% 2818 400 00

Time of Use (Too • Off-Peak (Temp) 25 59 7.10% 37 I 400.00

I Total Commercial 13273 I 0 00% 107,308

Industrial

0 53 002% 131

Enoesk) 1 60 0.07% 1,084

SI • (Off Peat/ 7.46 032% 1,452

E12 0.53 0.02% 104 400.00

82 - TOU (Peak) 800 0.34% 1,009 I 400.00

62 - TOU (Cif-peak) 31.98 1.30% 1 400.00

0111/33 KV (Peak) 1.60 0 07% 16 380.00

84 30 38 1.31% 3 380 00

Total Indusinal 82 3,670 1

Bulk

CIO% Supply al 400 Volts • up lo 5 kW - 11

LL(11x) Supply a1400 Volts -exceeding 5 kW 0.53 0.02% 78 400.00

Time of Use (TOW. Peek 1.60 0.07% 105 40000

Time of Use (TOO - off.Peek 8.00 0.34% 12 400.00

Supply al 11 k‘r 4.26 0.18% 380 00

Tune of Use (TOU)• Peak 8.53 0.37% 25 380.00

Time of Use (FOU)- Off-Peak 36.25 1 56% 25 360.00

03 Supply above 11 kV -

Time of Use (TOU)- Peak -

Time of Use (TOU)- Off-Peak • 1

1 Telal Single Point Supply 59 I I 266

Agricultural Tuba-wells - Tarld D

01 Scarp 5.56 0.25% 294

Time of Use (TOUL 5.33 0.23%

Time of use (TOW) 31 45 1.35%

02 Agncullual Tube-wells 1720.70 74.00%

-

1 22494 200 DO

Agficunual Tube'wells 0-2 00

Time of UseifOtff• Peak 0411) ..

2.67 I 0 11%

3,139 200 00

lime of Use (TOU) - Peak 0-2 521 200.00

Time of Use (TOUT - Off-Peek 02 19 19 I 0133%1 200 00

I Total Agricultural 1,785 I I 25,448

Piano U Mni G 1.60 0.07% 260

ResIdemial Colonies ki 0.02 0.00%

Special Cuntracis • Tariff it (fUlt)

Time of Use (15Peak

lime of uee (TOU)- Off-Peak

RaIKVEly Tractiontraction - 1

Co-Genraffon-) -

General Service

Grand Total 2,325 1 100 00%1 588,966 I

(Renown I pow,'

4 00

12 50

15.00

15.00

17.00

1900

1900

14 50

19.00

13 00 1

14.00 1

19 00 I_

12 80 1

19 00 1

12 70

15.00

14.50

19.00

13.00

14.30

19.00

12 80

12.70

19.00

1300

15.00

19 00

13 00

15 20

17.85

11 75

14.70

19.00

14 00

1400

(tkovv/m)

400.00

400 00

400 00

400 00

400 00

350 00

380.00 1

- 1 15 00

400.00 14 50

400 00 18 00

400.00 12.50

380 00 14 30

38000 18.00

380.00 12 30

• -

• -

• )

-7-I 12 00

17.65

- 11 75

200 00 11 50

- -

200 DO -

200 00 1500

200 00 8.85

- 14.00

- 14 00

400.00 I

pis:liven) I fft envied ) I

2.00

5.79

8.11

10 20

1600

18.00

18.00

12 50

1800

1500

18.00

12 50

14.50

16.00

12.50

14.00

1800

12 29

18.00

12 20

-71

H

a

1

2 00

6.71

6.89

4.80

100

1.00

1.00

050

0 50

1 00

0.50

- _

1.00

0 51

100

0.50

050

050

400

3 85

1.00

100

100

Page 140: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

44.78

1,33283

367 81

503 74

579 96

668.45

60.77

207 89

3,766.02

11.19 0.48% 124.575

0.00%

106.61 4.59% 188,082

24 52 -

33.58 1 44% 102652

34 12 1.47% 29.542

35.18 151% 5.659

000% 57 57

199.90

2,617.66

OM Rs) (Min Rs) PAM Rs)

22 39 22.39

617.26 715 36

198.86 168.95

342 54 161 20

545 85 34 12

633 27 35.18

3 20

8 00

1,148.36 1

IResidential

O21650 units

For peak load requirement up lo 5 kW

01-100 Units

101.300 Units

101-300 Units

301-700Units

Above 700 Units

For peek load requirement exceeding 5 kW

Time or Use (Mu). Peak 3.20 0 14% 2,649

Time or Use (TOU) - Off-Peak 15 99 0 69% 17,863

Total Residential 264.39 0.00% 451,023

70 36

95.15

369.54

360.48 19,78802

413 70

9.27 39 98

169 B3

416.43 20,532.88

22.39

029

419170' 27,082.68

FORM • 28 A)

QESCO Revenue and Subsidy Statement Apr-June 2018

607.21 33,969.30

0.02

5.28

3846

1.95

14 3B

58.10

263

0 63

433

3 05

2.09

10 71

Commercial . A2 0.00%

Commercial • For peak load req±ireff enl up to 5 kW 30.38 1 31% 104820

Commercial (<1001 69 83 3.00% 34

Commercial (<20 KW) For peak Mad requirement exceeding 5 kW • 000%

Regular - 0.00%

Time of Use (TOU) Peas (A-2) 6.93 030% 2 618

1 Time of Use (IOU) - Off.Peek (Temp) 25 59 1 10% 37

Total Commercial 132.73 0.00% 107,308 1

Industrial • 000% .

81 0.53 002% -

Ell (Peak) 1 60 0.07% 1.084

81 jOff Peak)_ 746 0.92% 1.452

82 - 0.53 002% 104

112 • TOU (Pam) 800 0.34% 1,009

82- TOO(Offs 31 98 135% 1

03- 11(33 KV (Peak) 1 60 007% 16

B4 30 38 131% 3

Total industrial 82 0 00% 3.670

Bulk • -

Cllanupply_el 400 Volts - up to 5 kW - 0.00% 11

C11) Supply al 400 Vohs -exceeding 5 kW 0 53 0.02% 78

Time of Use (TOG) - Peak 1 60 007% 105

Time of Use goy'. CM.Peak 8.00 0.34% 12

C2 Supply al II kV 4.26 0.18% -

Time of Use (TOD) - Peak 8.53 0.37% 25

_ Time of Use (TOG) - Off-Peak 36.25 156% 25

C3 Supply above 11 kV

Tient of Use (TOG) - Peas i 1 Time of Use (TOU). Off-Peak -

Total Single Point Supply 59 256

Agricultural Tube-wells - Tariff D -

01 scam 5.86 0.25% 294

Time of SOU) 5.33 023%

Time of Use (TOO) 31 45 1.35%

D2 Agrleuaual Tube-wells 1720 70 74 Mr% 22.494

NalCultual Ribe-wells 0-2 lit) -

TIms of Use (TOU) - Peak 0-20) • 3.139

Time of I..(Te GU) • Pose 0-2 267 011% 521

lime of Use (TOO) • on-Peak 02 19.19 0.83% -

1 Total Agriculture) 1,765 26,448

I Public Lighting G 160 007% 250

Residential Colonies M 0.02 0.00% -

Special CoMracis • Tanff 0ANK) •

Time of Use (TOU) - Peek - or

Railway TractionTraction • 1

Time Use (70U) - Off-Peak

1Co-Genrelion-J

General Service

-

Grand Total 2,325 100 00% 588.965

1

548 91

30 38

1,047.45

1-1

124 73 6 93

319.83 12 79

2,038.93 50.11 1

773 •

28.7B 1.60

93.26 3 n

7.46 -

143.92 8.00

393.07 18.31_

28.78 1.60

370 69 15.19

1,073.73 46.43 1

-J

2 03 7.73

28 78

1.60

99.95

4 00

60.96

153 52

8 53

445 85

18.12

796.81

(12.491 6,885.70 1

22.85

347.97

48.70

9 27

405.94 •

H

89.13

95 15

369.54

25.294 25

50 64

243 71

26,142.42

22.39

0 29

7.73

30.38

103.95

60.98

162.05

463 97

829.06

• 577 30

026 04745

0 26

• - - . - -

2.85 131 66 I 205

17 22 332 63 1 17.22

20.32 2,089.04 1 20.32

. I .

7 73 1 -

3038 1 -

97 02 1 -

7.46 0.02

151.92 5.28

409.39 1 36 46

30.381 1.95

385.88 1 14 38

1,120.16 I 68.10

063

4 33

3.05

2.09

10 71

22.86 32.25 1

18.76

(12 49)1 5,506 23

10 88

73 88

(12.49) 6,609.54 1

Page 141: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 28

QESCO Revenue and Subsidy Statement 2017-2018

ffakw5)

Residential

Up to 50 Units

41 02

Foe peak Hail requirement up To 5 kW

01.100 Unns 390 71

101-300 Units 89 88

201-300 Unith 123 07

301•700Units 125.03

Above 700 Units 128.93

For peak load requiremern exceeding 5 xW

Title of Use (TOU)- Peak 11.72

Time of Use (TOU) - Off-Peak 55 61

Total Residential 968.95 I

Commercial - A2

Commercial - For peak load requirement up to 5 kW 111 35

Commercial (0 100) 255 91

Commercial 1x201091) For peak load requirement exceeding 5 kW

_Regular

Time of Use (TOU) • Peak (A-2) 25 40

Time of Use (TOU) • Off-Peak (Temp) 93.77

Total Commercial 468.43

Bulk

dial Supply at 400 Volts • up to 5 kW

Cliff) Supply at 400 Volts •exceeoing 5 kW 1 95

Time of Use (TOI..Peak 5.86

Time of Use (TOU) • Off-Peak 29 30

ftui pbo at 11 kv 15 63

Time of Use (TOU)_- Peak 31.26

Time of UseiTOU) • Off-Peak 132.84

c3Suppiy above 11 kV

Time of use (TOU)- Peak

lime of Use (IOU) • Off-Peak

Total Single Point Supply 217 I

Agricultural Tube-wells • Tariff D

21.49

Time of Use (TOU) 19.54

Time or Use_EO)J 11526

02 Agacunual Tube-wells 8.305 98

]Nficanuai Tube-wells 0.2

Time of Use (rte • Peak 0-20)

Time of Use (TOU) • Peak 0-2

977

Time of Use (70U)- Off-Peak 02

70 33 1

1 Total Agricultural'

6,542 I

PuNic

5 86

Residential Colonies H

0.08

Special Contracis • Tall K (AJS)

Time of Use (T0u)- Peak

Time of Use (TOO) - Off-Peak

RailyViraCliOnTraction - I Co-Genration4

General Service

1 Grand Total

Mace) I (kW) Maps) IRYFWIMI Ms/kWh)

4.00

12.50

15.00

15 00

17.00

iReawcii

200

5.79

811

10 20

1600

iRsAwAi)

0.49% 124.575

168.082

102,652

29.542

4.59%

1 05%

1.44%

147%

1 51% 5.859 19.00 18.00

0 14% 2,649 19.00 18.00

0 69% 17 663 13.00 1250

461,023 I

1.31% 109,62D 19 DO 18 00

3.00% 34 400.00 15 00 400.00 15.00

2,618 400.00 19.00 400.00 18.00 0 30%

1.10% 37 400 00 13 00 400 00 12 50

0.00%1 107,308 I

0.02d - 14 50 14.50

0.07% 1,084 19 00 18.00

032% 1 452 13.00 12.50

0.02% 104 400.00 14 00 400.00 1a 00

0.34% 1,009 400.00 19.00 400.00 18 DO

1.38% 1 400.00 12 80 400 00 12.29

0.07% 15 38000 1900 1 380.00 18.00

131% 3 380.00 12 701 380 00 12 20

I 3,670

I 11 15,00 • 15 00

0.02% 78 400.00 14.50 400.00 14.50

0.07% 105 400 00 19.00 400_00 18.00

0.34% 12 400.00 13.00 400 00 12 50

0 18% • 380.00 14.30 380.00 14.30

037% 25 380 00 19.00 380.0D 18 00

1.58% 25 380.00 12 80 380.00 12 30

- -

256

025% 294 15.20 12.00

0 23% 17.135 • 17.85

1.35% 11 75 • 1175

74 00% 22,494 200 00 14.70 200.00 11 50

3,139 200.00 200 00

0 1 1% 571 200 00 1900 200 00 1500

0.83%I 200.00 12 70 200 00 8.85

28,448 I

0.07% 260 14.00 19 00

040% 14 00 14.00

12 25

689.965 I

Induatdal

01

131 (Pea)

131 • (Off Peat_

02 -

B2 • TOU (Peak)

132 • TOU (Off-peak)

B3- 1103 KV (Peak)

04

Total Indunwin

195

27.35

5 86

_I 1 95

29.30

117.21

5.86

111 35

301

1

8.521 I 100 00%1

iRaaiWril

2.00

6.71

6.89

4.80

100

1.00

100

0 50

1.00

1 00

0 50

S 1_00

0.50

1 00

051

1.00

0 50

1 00

050

1 00

0.50

a 3.20

400

385

Page 142: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 28 ( A)

QESCO Revenue and Subsidy Statement 2017-2018

yy

t .

1MeNsl nine vs.1 Nape) IMIn Rai (Min Rs) IMin Rs) (Mm Re) (Min Re] (Min RSI

:

:t I t!

Residential Up 1o50 Lines 41 02 0.48% 124.575 - 184.10 - 82 05 62.05 For peek load requirement up to 5 kW • ' -

01-100 Units 39071 4.59% 168082 - 4.8133 82 2.262.18 2621 63 101-300 Units 6986 - 1347.93 726.78 619.15

101400 Units 123.07 144% 102652 1.846.08 1255 34 590 75 301.7000ms 125.03 1.47% 29,542 2.12544 2.000 41 125.03 Above 700 Unes_____ 128.93 1.51% 5.859 2.449 72 - 2,320 79 128.93

For peak load requirement exceeding 5 kW - 000% - - - Time of Use (TOIA_. Peek 11.72 0 14% 2,649 222.70 210.98 11.72- Time of Use (TOU) . Off-Peak 58 61 069%I 17,863 761.88 732 57 29 30

1 Total Residential 988.95 0.00% 451,023 - • - 13,801.88 - 9,693.10 - 4,208.56 I Commercial • A2 - 000% - - Commercial - For peak load requremen1 up to 5 kW 111.35 1.31% 104.620 - 2,11567 - 2,004.32 III 35 . __ Commercial H loco 255 91 3.00% 34 1.03 3.838 65 1.03 3,838.65 Commercial (420 KW) For peak load require-men! exceeding 5 kW • 0.00% , - - - -

Regular - 0.00% - . • • . • Time of Use (TOU) ak (A-2) 25.40 0.30% 2.618 11.39 482 52 11 39 457 13 25 40 Time of Use (T0U) • Off-Peak (Temp) 93 77 1.10% 37 • 68.66 1219.00 68.86 1,172.12 46 08

1 Total Comrnerclal 486.43 I 0.00% 107.308 - • - 91.28 7.655.87 I 51.28 7472.24 • 183.63 I Industrial - 0.00% • - - - A

B1 1.95 002% - 28.33 - 2833 - B?Teal 5.86 0.07% 1084 111.35 - 10549 586 131 - (Off Peek) 2735 0.32% 1.452 - 355.54 - 341.87 13.67 132- 195 002% 104 • 0.06 27.35 0.08 27.35 - B2. TOU (Peak) 29.30 0.34% 1.009 21.12 556.75 21.12 527.45 29.30 B7. TOU (011-s¢a10 117 21 1 38% 1 - 145.85 160031 145.85 1.440.53 59.78 FM. 11/33 KV (Peal() 5.86 007% 16 • 781 111.35 7.61 105.49 5.86 134 111.35 1.31% 3 57.53 1,414.16 57 53 135848 55 80

1 Total Industrial 301 1 000% 3,670 - • 232.39 I 4,106.74 232.39 3,934.99 • 170.15I Sulk - - - - • C184 Supply at 400 Volts • up to 5 kW - 000% 11 - - - - - C1Lej Supply al 400 Volts -exca4S 5 kW 1.95 0.02% 78 • 8 14 28.33 8 14 28.33 •

Time of Use (T01.1) • Peak 5.013 0.07% 105 2.50 111.35 250 105 49 586 Time of use (TOUT-Off-Peak 29.30 0.34% 12 • 17.33 380.94 17.33 366 29 14 65

C2 Supply at 11 kV 15 63 0 la% - - 1222 223.48 12.22 223.48 . Time of Use goy.) - Peak 31 26 037% 25 • 837 593.67 8.37 562 62 31.26_ Time of Use (TOM - Off-Paak 132.84 1.56% 25 42.84 1700.35 42614 1,633.93 66.42

03 Supply above I I kV • - - • - Time of Liti (IOU)- Peak - • • .

I rtme of Use (TOW - Off-Peak - - - - 7-1 _...: _

1 Total Single Point Supply 217 256 • - - 91.39 3,038.32 91.39 2,920.13 118.19I Agricultural TUbe-wella - Tariff 0 - - 01 Scam 21 49 0.25% 294 • 328.83 • 257.87 68.76 Time of Use (TOU) 19.54 023% - 348 70 - 348 70 - Time of Use (TOU)_ 115 26 1.35% • - 1.354 28 - 1,154 28 • Coricullual Tube-wells 6,30598 7400% 22,494 1,391.90 92,697.94 128763 72,518.60 124.27 20,179 14 Agncuitual Tute.wers 0.2 pi) - - • - - • - Time of Use (TOU) - Peak 0.2(i) • 3,139 d 194 79 - 194.79 - -

Time of Vie/TOM- Peet 0-2 9 77 0.11% 521 37.08 185 58 37.08 146.51 39.07 rime of Use (TOW- Off-Peak 02 70 33 083% - - 89315 - 622 39 270 76

Total Agriculture! 6,642 26,448 - - 1,623.77 95,806.30 1,499.60 75,248.56 124.27 20,557.74 PailEiLigntyla 9 5.86 0.07% 260-

- -1 82.05 - 82.05

Residenlial Colonies H 0.08 0 00% - • 1 07 1.07 . Special Contracts-Tariff INK) - - • -

Time of Use (TOU) • Peak - -:___I

Time of Use (TOg) - On-Peek RaiuratTiadionTraclion . I - • CoGenTalion.../ - •

General service • Grand Total 8,521 100.00% 588,965 - 2,028.83 124,490.41 1,904.56 99,212114 ' 12417 26;238.27

1 1 1 1

J J

J

Page 143: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

I (MkWhi inbsee)

FORM - 29

QESCO Proposed Revenue and Subsidy Statement July-2017

Residential

Up lo 513 Units 3.63 046%

For peek load requirement up 10 5 kW -

01-100 Units 34.56 4.59% 168,062

101-300 Into 7 95 1.05%

201-300 Units 10.89 1 44% 102.652

301•7000nls 11 OS 1 47% 29,542

Above 700 Unita 11.40 1 51% 5.859

For peak load requirement exceeding 5 kW •

Time of Use (T0u). Peak 1 04 0 14% 2,649

lime of Use (TOU)- OMPeak 5.1B 0 69% 17863

I Total Residential 85.71 I I 451.023

E I Commercial -A2 A2 .

For peak load requirement unto 5 kW 9.85 1 31% 104.620 Commercial.

Commercial 8100) 22.64 3.00%I 34

For peak load requlremem exceeding 5 kW

I

-

Commercial 1420 K%

Sr

Time of use (TOO) . Peak (A.2) 2.25 0 30% 2.618

Time of Use (TOU) .0II-Peak (Tema) 8 29 1.10% 37

I Total Commercial 43.03 I 000%I 107,305

I Industrial -

B1 0.17 002% .

81 (Peak) 0.52 0 07% 1,084

81 - JOH Peak) 2 42 0.32% 1,452

02 . 0.17 0.02% 104

82 • TOU (Peak) 2.59 031% 1.009 _. 812 . TOO (Offweak) 10 37 1.35% 1

124575

Tana of Use (TOU) -Orr-Peak 11.75

03 spumy alcove 11 kV •

Time of Use (TOO) • Peak

I Time of Use (TOO) -Off-Peak

1 Total Single Point Supply 19

Via)-Supply al 400 Vona up 10 5 kW

CiffSeppiltel 400 Vohs exceeding 5 kW 0.17

Time of Use (TOU) • Peak 0 52

Time of use (IOU) - Off.Peek 2.59

83- 11/33 KV (Peak) 0.52

84 9 85

Total industrial 27

Bulk

C2 Supply at 1 1 kV 1.38

Time or Use (TOO) • Peak 2.76

0.02%

001%

0.34%

0.18%

0 37%

1.56%

007% 18

131% 3

3,670

256

11

7B

105

12

25

25

Agricultural Tube-wells • Tariff D

Di Scarp 1.90 025% 294

Time of Use (TOO) 1.73 0.23% -

Time of Use (IOU) 10.19 135% -

1:7N theltal Tube-wells 557.78 74.00% 22.494

Nnculhal Tube-walls ID-2 (S)

Time 01 Use (TOU) - Peak 0-26) • I 3.1391

_ Time of Use (TOO) . Peak 0-2 0.86 011%I 521 I

Time or Use (TOU)- 011-Peek D2 6.22 0.83%I - I

I Total agriculture!, 579 I 26,448

Public UgnliegG 0 52 0 07% 260

Residential Colonies H 0 01 _000%

Special Contracts . Time Pi 0..114) 1

Time of Use (TOU) - Peek - Time 01 Use (TOU) - Off-Peak

Railviiyi±rreclionTraclion • I

Ca.Geniallon-J

General Service I

ow) Mean Iiinntw/M) iiRotelh)

4 00

12.50

15.00

15.00

IsisneWMI) IRNWm

200

(FiseitirMi Insenn 1

1

2.00_

671

6.89

4 80

5.79

8 11

10 20

17 00 16.00 1 00

19.00 18 00 1.00

19.00 16.00 too

13.00 12 50 0.50

19 00 18 00 100

400.00 15 00 400.00 15.00

400 00 19.00 400.00 18.00 1.00

400.00 13 00 400.00 12 50 050

S 14.50 14 50

19 00 - 18 00 1 00_

1300 12.50 0 50

400.00 14 00 400.00 14.00

400 00 19 00 400.00 18.00 1.00

400.00 12 80 400.00 12.29 0.51

380 00 19.00 380.00 18 00 100

380 00 12 70 380 00 12 20 0.50

15 00 - 15 00

40000 14.50 400.00 14.50

40 00 19 00 40.00 18.00 100

400.00 13.00 40000 12.50 0 50

I 360 00 14 30 380 00 14 30

I 380 00 19 00 380.00 18.00 oo

380.00 12.80 380 00 12.30 0 50

15 20 120

17.85 -a 17 85

11 75 11.75 w

200 13.38 200.00 11.50 1.88

200 00 200 00

200.00 19.00 200.00 150 4o0 200.00 12 70 200 00 8 85 3.85

14.00 - 14.00

14 00 14.00

i Grand Toted 754 1 100 00%1 598,965 I

Page 144: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 29( A)

QESCO

Proposed Revenue and Subsidy Statement July-2017

I Residential

IMSNTI Ow9e) Om) 1%.6e/ (min Rai IMIn Rs) IMIn Rs) IMIn Re) 1 (Min Rs) (min Rs)

IrU 1c0 Units 3 63 0.48% 129,575 - 14.51 7 26 7.26

For peek Mad requirement up to 5 kW 000%

I 01)100 units 34.56 459% 168,082 431 98 200 10 231.89

300 Un I s 7.95 119.23 64.46 54.77 1101-

101-500 Units 10 139 1 99•71. 102.552 163.29 111.04 52 25

301.700unes 11.06 1.47% 29,542 18E100 176.94 1108

Above 700 Units 11.40 1.51% 5.859 216 68 205 28 11 40

For peek load requirement exceeding 5 kW • 0.006 •

Time of Use (TOM - Peak 1 04 0 14% 2.649 19.70 18.66 1 04

Time of Use (TOM - Off-Peak 5 18 0.69% 17.663 67.39 64.80 2.59

Total Resident% 85.71 0 00% 451.023 1420.79 • 848.53 372.26

Commercial . At - 0.00%

Commercial- For peek load requirement up to 5 OW 985 I.31% 104.620 187.14 17729 9.85

Commegin100) 22.64 3.00% 34 009 339.54 0.09 339.54

Commercial (420 KW) For peak mad requirement exceeding 5 kW 0.00% • •

Regular • 000% - - -

lime olUse (TOU) • Peak (A.2) 225 0.30% 2.618 • 0.95 42 68 025 40.43 2.251

Time of Use (TOU) - Off-Peak (temp) 8 29 1.10% 37 5.74 107 82 5 74 103 68 I 9 15 1

Total commercial 43.03 I 0 00% 107.308 I 6.77 877.18 I 6.77 860.94 18.24 I

Industrial 0.00%

131 0 17 0.02% 2 51 2.51

B1 (Peak) 0.52 007% 1.084 985 9 331 0.52

B1 . (Off Peak) 2 42 0.32% 1.452 31 45 30.24 I 21

017 002% 104 001 2 42 0 01 242

82 • TOU (Peek) 2 59 0 39% 1,009 1.78 49.25 1.76 46.65 2.59

62- TOU ecifepeam 10 37 1.36% 1 12.15 132 71 12 15 127.42 5 29

133- 111331/ 0 52 007% 16 0.65 9 85 0.65 9.33 0.52

84 9.85 I 1.31% 3 4 79 125 09 4.79 120.16 4 92

Total Industrie 27 0.00% 3,670 19.37 963.11 19.37 348.08 15.05

Bulk •

a(f a.rcpbr at 400 Vohs- up to 5 kW 0.00% 11 •

C I(b) Supply at 400 Vohs -exceeding S kW 0 17 0.02% 78 068 2 51 068 251

- Time of Usef Peak 0.52 0.07% 105 021 9 85 0 21 9.33 0.52

Tone of Usa rou)-OR-Peak 2.59 0.34% 12 144 33 69 144 3240 130

02 Supply el 11 kV 128 0.10% • 1 02 19 77 1 02 1977

25 070 52 53 0.70 49.76 2.76

lime of Use (TOU/ - Off-Pea" 11 75 1.56% 25 3 57 1.540 3.57 144.52 5.87

03 Supply above 11 kV

Time or Use (TOU) - Peak

Time 01 Use HOU) • Off-Peak 7-1 Total sincge Point Supply' 19 256 7.62 268.75 7.62 268.29 10.48

Agricultural Tube-walla - Tariff D

131 Soap 190 025% 294 28.89 22.81 6.08

Time or Use (TOU) 1 73 0 23% 30 84 30.84

Time of Use/TOU) 10.19 1.35% 119 79 119.79

02 Aedeunuel Tube-cells 557.78 7400% 22,494 119 19 7,46386 113.58 641445 0.61 1.049 90

Aencunual Tube-wells 0-2 liiJ -

Time of Use (TOU) - Peak 0.2(i) • 3,139 16.23 16.23

Time of Use (TOU) - Peek 0-2 066 0.11% 521 3.09 16 42 309 12 96 3 46

Time of Use (IOU) • Off-Peek D2 6 22 0 03% 79 00 65 05 23.95

Total Aprlcultuml 679 26,448 133.61 7.738.80 132.90 6.655.91 0.61 1(082.89

Public eight 0.52 0.07% 260 7.26 7.26

Residential Colonies H 0.01 0.00% 009 009

eciel Contracts - Tariff rc pk.lff)

Time of Use (TOU) Peak •

Time of Use (TOM - Off-Peek

Ralway TractionTraction - 1

CoGenration-J

General seryme

Grand Tots 754 10000% 588,965 167.27 10,275.97 166.66 8,779.08I 0.61 1296.90

Page 145: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 29

QESCO

Proposed Revenue and Subsidy Statement Aug-2017

1 Vekwol 1%ege) I (RYAN%) (RsnisItn) 113 6AWAO MOO)

!Residential

4001 200

12 50 579

15.00 8.11

15.00 10.20

17.00 16.00

19 00 18 00

19.00 1800

13 00 12 50

19.00 18.00

1500 400.00 15.00

- - -

- •

19 00 40000 18.00

13.00 40000 1250

1.00

0.50

a

00

0.50

1.00

0 51

100

0.50

14 50 14. 50

19.00 16.00

13.00 12.50

1400 40000 1400

1900 400 00 1800

12.80 400.00 12 29

1900 380.00 18.00

12.70 380.00 12 20

Up to 50 LIMB 365 0.48%1 124.575

1For peek load requirement up to 5 kW

01-100 Unlis 34 7B 4.59% 166.082 101-300 thus 8.00 7.05% -

201400 Unlit 10.95 144% 102,652

301-700unga 11.13 1 1 47% 29,542

_ Above 700 Units _ 11.48 1.51% 5859 Rif peak load requirement exceeding 5 kW - -

Time or Use (TOU) • Peak _ 1.04 014% 2,649

Time of Use (TOU)- Oft-Peak I 5 22 069% 17,6831

1 Total Residential 66.25 451,023 1

!Commercial • A2 -

Commercial - For peak load requirement up l05 kW 991 131% 104,620

Commercial (c 1OO) 22.78 3.00% 34

Commercial 1020 KW) For peak load requirement exceeding 6 kW -

ar_

nm. of Use (70U)• Peek (A-2) 2.26 0.30% 2,616 Time of Use (TOU)- Off-Peak (Temp) 8 35 1 10% 37

1 Total Commercial 43.30 I 0.00%I 107,308

Industrial _

131 0.17 0.02% ___ 01 (Peak) 0.52 007% 1084

61 • (Off Peak) 2.43 0.32% 1,452

B2- 0.17 0.02% 104

62 - TOu (Peak) 261 0.34% 1,009

82 • 70U (Ott-Peak) 10 43 1 38% 1

. 133- 11/33 KV (Peak) 052 0.07% 18

B4 991 131%1 3

1 Total Industrial 27 1 1 3,670

050

400.00

400.00

400.00

380 00

380.00

380 00

11

15 00

14 50 1

1800

12.50

14.30

1800

12.30

1500

14.50

19.00

13.00

14 30

19 00

12 80

Bulk

C i (a) Supply al 400 Volta - uplo 5 kW - 11

Cl(b) Supply el 400 Volts •exceedIng 5 kW 017 0.02% 78 Tote or Use (Toll)-Peek 0.52 007% 105

lime of Use (TOU) • Off-Peak 261 034% 12 C2 Supply Cl 11 kV 1.39 0.18% -

Time oll..e_(TOU)• Peak 2.713 0.37% 25

Time of Use crow - Of f•Peak 11 82 1.56% 25 uiply above 11 kV .

Time of use (TOU) • Peak F • - Time of Use 00L6 - Off-Peak -

Teed single Point Supply 19 I 256

Agricultural Tube-wells • Tariff D

400.00

400.00

400.00

400.00

400 00

400 00

380.00

380 00

400.00

400 00

400 00

380.00

380 00

380.00

20000

200.00

200.00

200 00

a 1.91 025% 294

1.74 0 23%

10 26 1.35% -

56129 7400% 22.494 200.00

1 Scarp

ima of Use (70U)

Time of Use (TOU)

02 Agncuft obo-wells

AgncunueI Tube-walls 0-2 (II) rue of Use (IOU) - Peak 1)-2(11

Time el Use (TOU) Peak 0-2

Time of Use (TOU) - Off-Peak 02

Taal Agriculture

1.88

12.00

17 85

11 75

11.50

15 00

8 85

14.00

14 00

15.20

17.85

11 75

13 38

19.00

12 70

14.00

14.00

- I 200 00

200.00

200 00

0 87

6 26

582

0 52

001

3,139

0.111 521

0 in%

25,448

0 0711 260 0 00%

Pudic lighting

Resident/a Colonies H

%ESP.& Centreas • Tana K (A)K)

Time of Use (TOU) -Peak

Time of Use (TOU) • Oft-Peak

RailWay TnreionTradlon -1

CO-Genrnl1011-J

General service

4.00

3 85

12 25 Grand Total 758 700 00% 588,955

1 00

050_

2 OD

6.71

6 89

4 80

1.00

1.00_

1.00

0.50

H

1 00

Page 146: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

1

1 1 1 1

1

FORM - 29 ( A)

QESCO Proposed Revenue and Subsidy Statement Aug-2017

0 01

1 78

12.15

065

479

19.37

19 61

934 71

119 98

164 32

189.18

218.05

19 82

67 81

1,228.48

188 31

341.68

Residential

Up lo 50 Units

For peak load requirement up to 5 kW

01-100 Units

101400 Units

101-300 Units

301-700Unas

Above 700 Units

For peak load reduiremen1 exceeding 5 kW

Time of Use (TOU)-Peek

Time of Use (TOU) • Oft-Peat

Total Residential

Commercial A2

Commercial- For peak load requirement up to 5 kW

Commercial (000)

Commercial (<20 KW) For peak load requirement exceeding 5 kW

Reuutar

Time of Use (TOU) • Peak (A-21

Time of Use (TOU) Off-Peak (Temp)

Total Commercial

Industrial

Ell

131 (Peak)

91- fOrf Peak)

132 •

B2 • TOU (Peak)

82- TOU (OP- oak

03- 1103 KV (Peek)

1 04

1 Total Industrial

Bulk

C1M) Supply at 400 Volts - up to 5 kW

CUb) Supply at CO Volts -exceeding 5 kW

Time of Use (TOU) • Peak

Time of Use (TOU) • Off-Peak

L2 Supply at 11 kV

Time of Use (TOU) • Peek

Time of Use (TOU) - Ofrff eak

3 Supply above 11 CV

Time of use (TOU) • Peak

0.48%

124.575

0.00%

4.59%

168.082

102.852

29,542

5,859

1 2 649

7.653

451.023

9.91 1.31% 104.820

22 78 300%

• 000%

0.00%

2.26 0 30% 2.618

8.35 1.10% 37

93.30 000% 107,306 I

• 000% -

017 002% -

0.52 007% 1,064

243 032% 1.452

0.17 0.02% 104

2.61 034% 1,009

1043 138% 1

0.52 007% 16

991 131% 3

27 0.00% 3.670

0.00% 11

0.17 0.02% 78

0.52 0.07% 105

2 61 1 0.34% 12

1.39 018%

2.78 0.37% 25

11.82 156% 25

256

178 40

991

009 341 68

0.95 40.69 2.26

5.74 104 33 417

6.27 666.10 i 16.34 1

0.52

1 22

261

532_

0.52

4 96

16.16 I

068 252

021 939 •

0 52

1.44 32.60

1 30

102 19 89 1

0 70 50.08

2.78

3.57 145 43

5.91

7.82 259.92

009

0.95

5 74

6.71

42 95

108.50

681.44

2 52

991

31.85

2 43

49.56

133 54

9.91

125.87

366.40

068

021

.49

1.02

0 70

3.57

7.62

3.65

34.78

800

10.95

11 13

11.96

1.04

5 22

86.25

1 44%

1 47%

1.51%

000%

014%

0.69%

000%

000%

34

I Time of Use (TOU) - Off.Peak

Total Single Point Supply 19

201 36

6487

111 74

178 06

206.57

18 78

65/1

86188

7.30

23335

55.11

52.58

11.13

11.48

1 04

261

374.80

2 52

9.39

30 43

001

2 43

1.76

46 95

12 15

128 22

0.85

9 39

4 79

120 92

19.97

350.25

10.52 1

115.24

294

22.494

16.23

309

2 52

9 91

33 91

1989

52 66

151.35

270.44

29 07

31.04

120.54

7,510.86

16.52

79 50

7,797.94

7.30

010

3.139

521

26,448

260

13,198

Agricultural Tube-walls - Tariff 0 •

01 Scarp 1.91 0 25%

L

ime of Useff 1 74 0.23%

rime of use (TOU) 10 25 1 35%

igrt mutual Tube-wells 561.29 7400%

Agriculluai Tube-wells 0-2 (10

Time of UseITC • Peak 0-20)

Time of Use (Tou) - Peak 0-2 0.87 0 11%

Time of Use (TOU) • OP-Peak 02 6 26 0 83%

1 Teal Agriculture 682

1Public Ligntag O 0.52 0.07%

Residentai Colonies H O01 0.00%

pecial Contracie • Tann K (AM)

Time of Use (TOU) • Peak

Time of Use (TOU) • Off•Peak

Railway TradionTraction -1

1

Co-Genration-J

General Service

Grand Total 768 189.32 10,340.69 •

22 95

6 12

31.04

120 54

115.69 6.454 85 (0.45)

05601

16 23

3.09 1304

349

55.40

24 10

136.01 13,697.82

(0.45)

1,089.71 1

7.30

0.10

169.77 • 8,634.37 (0.45) 1,606.32

Page 147: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

I (MON I Okapi )kWl

1%.9e)

3 39 048%

124.575

32.30 4.59%

7 43 1 105%

10.18 1.44%

10 34

1.47%

10.66 1.51%

0,971 0.14%

4.85 I 0.69%1

168,082

102.552

29,542

5.859

2,649

17,663

451,023

(perkWfM)

1RIAMh1 (lisikWIM) IsIWAIri) (R./kW/MI I fRaNWIF

4.00

1250

15.00

15 00

17.00

19 00

19 00

13 00

19.00

40000 1500

1 400 00

400 00

H 400 00

400 00

400.00

380 00

360.00

19.00

13 00

14 50

19.00

13.00

14.00

19.00

1260

1900

12.70

200

671

6.139_

4 80

1 00

100

1 00

0 50

1.00

1 00

0 50

S

1.00

0.50

1 00

0 51

1 CO

0.50

2 00

H

5.79

811

10 20

16.00

1800

1800

12 50

18 00

400 00 15 00

400.00 I

18.00

400 00

12 50

14 50

18.00

12 50

400.00

14.00

400 00

18.00

400 00

12 29

380.00

18.00

380 00

12 20

FORM • 29

QESCO

Proposed Revenue and Subsidy Statement Sep-2017

Residential

1,1p_lo 50 UGH

For peak loacateremen1 up to 5 kW

01-100 Units

101-300 Unds

201-300 Unto

301-700Units

Above 700 Units

Fo

r peak load requirement exceeding 5 kW

Time of Use (IOU) - Peak

Time of Use (row - Off-Peek

Total Resideniial

Commercial • A2 -

Commercial - For peak load requirement up la 5 kW 9.21 1 31% 104,620

Commercial (.100) 21 16 3 00% 34

Commercial (<20 KW) For peak load requirement exceeding 5 kW ' -

Regular 1 - -

Time of Use (TOU)- Peak (A.2) 2 10 I 0.30% 2.615

Time of use 1101J) -Off-Peek (Temp) 7 75 1 10% 37

Total Commercial 40.22 0 00%1 107,308

Industrial

B1 016

811_82ekaf 0.48

BI • (Off Peak) 2.26

82 I 016

B2 • TOU (Peak) 2 42

--1

B2 - TOU (On•peak) 969

__ 13 1103 KV (Peak) 0.48 3- B4 1 921

1 Total Industrial! 25 1

Bulk I

clo) Supply at 400 Volts - up lo 5 kW • Id (0))__Supply al 400 Vole -exceeding 5 kWI 0 16 0 02% 78

Time me of Use (Mu) - Peak 0.46 007% 105

Time of Use (TOU)- 011.Peek 1 242 034% 12

02 Supply at I I kV 1.29 0 18%

11me al Ustailtl)- Peak 2.58 037% 25

Time of Use (IOU) - Oft-Peak 10.98 1.58% 25

C3 Supply above 11 kV

Time of Use (TOU)- Peak

Time 01 Use (TOUI• CM-Peak -

I Total Sinew Point Supply 18 I 256

Agricultural Tube-wells • Tariff D

DI Scarp 1.78 0.25% 294

Tlme of Use (TOU) _ 1 62 0 23%

Time al Use (101.0 9.53 1.35%

(22 ncuitual Tube•wens 521 39 74.00% 22,494

Agnculluel Tube-wells 0-2 (d) -

Time of Use (113u)- Peek 0-20) - 3.139

Time of Use (TOU) • Peak 0-2 0.81 0 17% 521

Time of Use (TOU) - Off-Peak 02 5 81 0.83%

1 Total Agdcuhoral 541 I 25,448

Public LugnliniG 0 48 0 07

Residential Coloes H

1

ni 0 01 0 00%

260

Special Coniraus • Tanfl ILVI,J19_

Time of Use (TOW - Peak

FC

Time of Use (TOU) • Off-Peak

Railway TracoonTracnon - 1

o-Genranon-J

General Service

15 00

15.00

40000 14.50

400.00 14.50

400 00 19.00

40000 1800

1 00

40000 13 00

40000 12 50

0 50

360.00 14.30

380.00 1430

380 00 19 DO

380.00 16.00

1 00

380.00 12.80

380.00 12.30

0 50 •

15.20

12.00

17.85 • 17 85

11.75

11.75 S

200.00

13.38

200 00 11 50

168

• •

200 00

200 00

200 00

19.00

200.00

15.00

4.00

200 00

12 70

200 00

8.85

3 65

14 00

1400

14.00

14 00

12.25

H

002%

007%

0.32%

0.02%

034%

1 38%

0.07%

131%

1.084

1,452

104

1,009

16

3

3,670

Grand Toted 705 10000%1 586,9551 1

Page 148: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

1

1 1 1

I

1

I

FORM - 29 ( A)

QESCO

Proposed Revenue and Subsidy Statement Sep-2017

(mimic memo

I

3.39 I 0 a% 124.575

For peat load requirement up to 5 kW - 0 00%

32.30 1.58% 168.082

7.43

01-100 Units

301-700Unds

10.18 1.441 102,652

10.34 1.47% 29,542

Above 700 Units 10.66 1.51% 5,859

For peak load requirement exceeding 5 kW - 0 00%

I Time of Use (TOU) • Peek 0.97 0 14%

I Time of Use (IOU) . Off-Peak 4 85 0.69%

I Total Residential 80.11 0 00%

I Commercial - A2 0.00%

Commercial • For peek load requirement up 105 kW 9.21 1.31% 104,620

Commercial (4100) ._ 21.18 300% 34

Commercial (CO CVO For peak load requirement exceeding 5 kW 0.00% -•

Regular - 0.00% -

Time of Use (TOU) - Peak (A-21 2 10 0.30% 2,618

Time of Use (TOU) - Off-Peak (Temp) 7 75 1 10% 37

I Total Commercial 40.22 0.00% 107.308

82 • TOU (Peak)

__132 Toy (Off-peal()

B3- 11(33 KV (Peek)

B4

Total Industrial

Bulk

C I (e) Supply at 400 Vohs - up le 5 kW

Lt b) Supply al 400 Vans -exceeding 5 kW

Time of Use (IOU) • Peals

Time of Use (TOW) Off •Peek

C2 Supply at 11 itv

Time of Use (TOU) - Peak

Time of Use (TOU) -OP-Peak

1

03 Supply above 11 kV

Time of Use (TOW - Peak

I Time of Use (TOU) • 011.Peek

Total Single Point Supply

Agricultural Tube-wells - Tariff 0 -

Ot

5L. De 1.78 025% 294

flex 01 Use (TOU) 1.62 023%

Time of Use (IOU) 9.53 1 35%

D2 Asneullual Tube•wells 521 39 7400% 22,494

Ag000ltoaljube-wells 0-2 00

Time of Use (TOLO - Peek 0.25) 3.139

rime of Use (10U)- Peek 0-2 0.131 0 11% 521

I Time of Use (TOU) - Off-Peak 02 591 cm%

Total Agricultural 641 28,448

Public Ligming G 0.48 0.07% 260

Residential Colonies t1 0 01 0.00%

Special Contracts Tarn K (AJK)

_ Time of Use (Tou)- Peak

Time of Use (TOU) - Off-Peak

Railway TrasionTraction • 1

o-Genration-J

General Service

Orand Total 706 100 00% 588.965

Residential

Up lo 50 Units

101.303 Units

101-300 Units

-I

2,649

17,663

451,023 I

IinclustrIal

01

131_01ti_

81' IOP Peek)

0_16

048

2 42

1.29

2 58

10.98

18

OSP% •

0.16 0.02% •

048 907% 1.084

226 032% 1,452

0.16

0.02%

104

2.42

0.34%

1.009

9 69

I 38%

1

0.48 0.07%

16

921 131%

3

25 000% 3.670

000% 11

0 02%

78

007%

105

o 34%

12

018% •

037%

25

1.55%

25

25B

(min Re)

103.28

16 23

3 09

122.60

001

1 76

12.15

065

4 79

19.37

0.6B

0.21

1.44

1 02

0.70

3 57

009 317.39

0 95

5 74

6.77

7.62 251.21 7.62 241.44 9.77 I

5 69

lull et)

18.41

62 99

1,141.14

174 93

27.01

28 63

111.97

6,976.90

15.34

73.65

7,233.90

6.78

0 09

5.606.65

403 80

111.45

15264

175 73

202 55

39 90

113379

633.00

2.34

9 21

29.40

2.26

48.03

124.05

9 21

118.92

339.42

2 34 0.68

921 0.21

31.50 1.44

18 48 1.02

49 101 0.70

140.59 3.57

13 57

(min Ro I Pen Re)

6.78

187 04

60 26

103.79

165.40

19169

17.44

60.57

793.17

111.00

144.76 8.206.31 11.60 1,399.24

21.32

28.83

111.97

91 6B 5.995 96

0.01

1 76

12.15

065

4.79

19.37

16.23

3.09

0 09

0 95

5 74

6.77

1211

51 46

8.221.68

6.78

009

165.72

317 39

37.80

96.91

817.82

226

43 61 242

119.11 94

872 048

112 32 460

326.36 14.07 I

234

872

0.48

30 29

1.21

18 48

46 52

2 58

135.10

5.49_

2.10

3.88

16.18 I

2.34

8.72 048_

28 27 1.13

8.14 es)

11.60

11.60

(Min Ps)

323

22.39

1,012.24

216.76

51 19

48.84

10.34

10 66

0 97

2.42

347.97 I

921

980 94

6.78

Page 149: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Rowing 1 tRuktviso Rowe IRIMWAO

• 18 00

I Redness (pekeue)

1

4.09

12 50

15 00

15 00

17.00

19 00

19.00

13 00

19 00

400.00 15.00

. . .

. . .

19 00 400 00 18.001

13 00 400 00 12 50 I

400 00

400.00

6.71

6 89

480

1.00

1 00

100_

0 50

1 00

0 50

11,

2.00

579

8.11

10.20

16 00

18.00

18.00

12 50

400D0 15.00

15.00 15.00

14.50 400.00 14 50

19 00 400.00 16.00

13 00 400.00 12.50

14 30 380 00 14.30

19.00 -380.00 18.00

12.60 380.00 12 30

15 20 • 12.00

17.65 17 85 1

11 75 • 11.75 1

13.38 200.00 11.50

200.00

19.00 200.00 1500I

12.70 200 00 885

14 00 14.00

14.00 14.00

186

4.00

3 85

• 1.00

• 0 50

1 00

0.50

S

256

92

99

101

22,270

515

3,107

26,184

257

200 00

200.00

200.00

200 00

FORM - 29

QESCO Proposed Revenue and Subsidy Statement July-Sep 2017

%age) I Im1"1 I 0.7.08) I

Residential

1 1

Up ea 50 Unns

10 67 0.40% 122,042

or peak load requirement up to 5 kW

01-100 Units 101 64 4.59% 65.866

'01.300 Units

23 38 1.05% 98,799

201300 Units

32.02 I 1A4%1 100,565

301.700units

Above 700 Units

32.521 1.47% 28,941

33 54 1.51% 5.740

For peak load requitement exceeding 5 kW •

3 05 0.14% 2,596 Time of Use (TOU) • Peak

Time of Use (TOUT - Off-Peak I

15 25 1 069% 17.304

252.07 I 441,853 I Total Residential

'Commercial - A2 /

Commercial - For peak load requirement up lo 5 kW 28 97 1 31% 101,733

Commercial (aoo) 6E57 3.00% 33

Commercial (420 FW) For peak load requitement exceeding 5 kW ' -

Regular -

6.61 I 0 30% 2.545 Time of Use (TOLI). Peak (A-2)

Time of Use (TOU)• Off.Peak WIMP/ 24 39 1.10%

36

1 Total Commercial 126.64 I 000% 104,347

Industrial .

at 0.51 0.02%

131 (Peak) 1.52 0.07% 1.064

61 - (Off Peak) 7 11 0.32% 1,425

02' 051 _ 002% 103

82 • T OU_ Ifedi±g_ 7.62 034% 991

_02 - TOU (Off-peak) 30.49 1.30% 1

8111/33 KV (Peak) 152 007% 16

134 28.97 1.31% 3

Total industrial 78 3,602

14.50 14 50

1900 - 18.00 1.00 -

13.00 . 12.50 • 0.50

40000 14.00 40000 14 00 -

400 00 19.00 400 CC 18.00 1.00

400.00 12.80 400 00 1 12 29 I - r---, 51

380.00 19.00 380.00 18.00 1.00

380 00 12.70 380 00 12.20 . 050

hik

Ej4e)Suppj at 400 Volts - up to 5 kW

C1(b) Supply at 400 Voile -exceeds', 5 g_p62_

Time of Use (10U)- Peak

Time of Use (IOU) - Off.Peek

C2 Suppital 11 kV 4 07 0.18%

Time of Use (TOO) • Peak 8.13 0.37%

Time of Use (TOLE- Off-Peak 34.56 1 56%

EnepplyAtiove 11 kV

_ Time of Use (Tau) • Peak

nme of Use (IOU) - 011•Peat • I

1 Total Single Point Supply 66 I A t

C

g rIcultural Tube-wells - Tariff 0

01 Scarp 5.59 025%

time of Use (TOU) 506 0.23%

Time of Use (TOO) 29.98 1.35%

02 Agncultual Tube-wens 1.640 46 7400%

Steelier Tubssvells 0-200 -

nine of Use (TOUI- Peak 0-2(i)

Time of Use (TOM - Peak 0-2 2.54 0.11%

Time of Use OU). Off-Peak 02 1B 30 083% (T

1 Total Apricirltural 1,702 1

Public LAillingG 1 52 007%

Residential Colonies H 0 02 0.00%

Special Contracts • Tenet K 61/4E) •

Time of Uee crouh Peak

Time of Use (TOUI • Off-Peak

Ramsay TrachonTrection -1

Csoenraiion-3

General Service

1 Grand Total 2.217 1 100 00% 676,499

11

0.51 0.02% 78

152 0.07% 105

762 0.34% 12

25

25

400 00

400 00

400.00

380 00

380 00

380 00

12 25

Page 150: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 29 ( A)

1 1 1

1

I

QESCO

Proposed Revenue and Subsidy Statement July-Sep 2017

Wawa I (Mtgel

I

10.671 046%

- I 000%

122,042

-

WI (1sagel

101.64 4.59% 65.866

23.38 98,799

32.02 1 44% 100565

32.52 1 47% 28.941

33.54 1.51% 5,740

• 0.00% -

3 05 014% 2596

15 25 0 69% 17.304

262.07 0.00% 441,853

000%

28.97 I 31% 101,733

66 57 300% 33

000%

0.00%1 -

6 61 0.30% 2.545

24 39 110% 36

126.64 0.00% 104.347

- 0 00%

0.51 0 02% -

1.52 0.07% 1564

7.11 032% 1,425

0 51 0.02% 103

7.62 0.34% 991

30 49 1.33% 1

1.52 0.07% 16

28 97 131% 3

78 0 00% 3.602

• 0.00% 11

0 51 0 02% 78

1.52 0.07% 105

7 62 034% 12

40] 073%

8.13 037% 25

34.56 150% 25

66 256

-

0 5.59 025% 92

5.08 0 23% 99

29 98 1 35% 101

1,64046 7400% 22.270

- - .

2.54 011% 515

16 30 I 0.33% 3,107

1.702 I 26,1154

1521 0 07% 2571

H 0.02 0.00%

2,217 I 100 00% 576,499

I

Residential

Up le 50 units

For peek load requirement up lo 5 kW

_ 01-100 Units_ _

101-300 Units

101-300 Unns

301-700Un1ts

Above 700 Units

For peak load requirement exceeding 5 kW

Time of Use (MU) • Peak I

Time of Use (Ott - off-Peak

Total Residential

HA A ricultural Tube-wells - Tariff D

Scarp __

Time of Use (TOU) _

Time of Use (TOL6_

02 Ag_hcunuel Tube-wells

Aghsuituat TubeiwellS 0-2 (IQ

T ime of Use_CTOU)- Peak 0-210

Time of Use (TOW - Peak 0-2

Time of Use (TOU) . OFI-Peek 02

Total Agricultural

Public titingG

ReSieerlial COlunie6 H

Commercial - A2

Commercial. For peek load requirement up to 5 kW

Commercial et 100)

Commercial (420 SiA0 For peak load requirement exceeding 5 kW

Regular

Time of Use (TOO) - Peak (,43)

Time of Use goo • Off-Peak (Temp)

Tolal Commercial

Industrial rial

El

Eli (Peek)

BI-(Off Peak)

B2-

82- TOU (Peak)

82 • TOU (011-peek)

B3 11133 XV (Peak)

64

Total Industrial

Bulk

61(a) SuPP6 at 400 vans • up lo 5 kW

(1)3 Supply et 400 WM -exceeding 5 kW

Time of UsejSTOth - Peak

lime or Use (IOU) • OM-Peak

C2Soly and kV

rime of Use (TOO: Peek

Time of Use (TOU) • Oft-Peek

03 Supply above 11 kV

ilma of Use gout,- Peek

rime of use (TOO -Oft-Peak

Total Single Point Supply

Specks Convects - Tariff K ()VP)

Time of Use croy) . Peet

Time of Use (IOU) Off-Peak

RanTractonTreGion •

Co-Gonfalon-2

General Service

Grand Total

84 97

90 71

352 31

332 71 21,951 62

48 701

92]7 48.28

232 35

390.68 22,760.24

21 34

491.95 30,222.21

- .

- -

265 125.52

17.22 317 11

20.32 1,991.82

7.37

28.97

52.49

0.02 7.11

528 144.84

36.46 390.29

1.95 28.97

14 38 367.88

58.10 1067.92

2.03 7.37

0.63 28.97

4.33 99 10

3.05 59 14

2 09 154.49

10 71 442 33

22.85 790.40

Isom 480.25

552 92

837.28

57.93

198.20

3.690.41

38

026 998 61

Nisi RIl f Min MO Vein MP

Win RE Men Psi I

1270 49

42 89

21 34

588 49

_I 189.59

326.57

520.39

603 74

54 89

190 57

21 34

687 00

161 07

153.68

32.52

33.54

3 05

7.62

2,495.58 1,094.83 I

• 52141 28 97

026 998.61

- - -

- . •

2.85 118 92 6 61

17.22 304.92 12.20

20.32 1,943.85 47.77 I

7 37

27.44 1.52

88.93 356

002 711

528 13721 7.62

36.48 374.74 1555

1 95 27.44 1 52

14.38 353 40 14 48

58.10 1,023.85 44.26 I

2.03 7 37

0.63 27.44 1 52

4 33 95.29 3 81

3.05 58.14

2.09 146.36 8_13_

10.71 425.06 17 28

22.85 769.55 30.75 I

67 08 17.89

90 71

352.31

320 96 18,865.26 11.75 3.066 36

48.70

9 27 313.11 10 16

• 161 91 70 44

378.93 19,576.39 11.76 3,184.85

21 34

0 26

480.20 25,819.16 11.75 4,402.48

Page 151: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

400.00

400.00 I_

FORM - 29

QESCO

Proposed Revenue and Subsidy Statement Oct-2017

IReelcientlal

up lo 50 Unite

For peek load requIremenl up to 5 kW

01-100 Units

101.300 Units

201-300 Units

301-700Umts

Above 700 Units

For peek load requirement exceeding 5 kW

Time of Use (TOU). Peak

Time cif use (YOU) • 011-Peak

Total Residential

Bowel Mapal

3 20 0.413,6 124575

30491 459% 168.082

701 105%

961 144% 102,652

9.76 I 1 47% 29.542

10 06 1.51% 5,859

0.91 014%

2,649

4.57 0.89%

17,663

2513 I

451.023

(91eree MVIONAO IRelybl

4.00

12 50

15.00

15.00

17.00

19 00

19 00

13.00

les/kW11.11 MsWNhl )RLWINI

2D0

5.79

811

10 20

1600

1800

1800

12 50

r RaPAINI)

2.00

8.71

689

4.80

1 00 I

1.00

1.00

0 50

400 00

100 1800

400.00 15.00

1900 40000

1800

13.00 I 400.00 I

12 50 I

Commercial - A2

Commercial - For peak load requirement up to 5 kW 8.69 1.31% 104.620

Commercial er103) 19.97 3 00% 34

Commercial (€20 KW) For peak load requiremem exceeding 5 kW

Regular

lime of Use (TOU)- Peak 14-21 1.98 0.30% 2.618

Time of Use (YOU) Off-Peak (Temp) 7.32 1 1016I 37

Total Commercial 37.97 0 00% 107,309

1900

15.00

1.00

0.50

1.00

0.50

100

051

1.00

050

400 00

400 00

400.00

3E10 ao

380.00

400 00

400 00

400 00

380.00

380 00

380 00

Industrial -

01 0.15 002% -

13l (Peak) 046 0.07% 1,084

01 - (Off Peak) 2 13 032% 1,452

B2- 0.15 002% 104

02 • IOUFeeelli_ 2.29 0.34% 1009

B2 - TOU (Off-peak) 9 15 1 38% 1

133- 11/33 KV (Peak) _ 046 0.07% 16

84 869 131% 3

Total Industrial 23 3,670

Bulk

ru1 Suppty ai 400 Voltsiltn Jo 5 kW - 11

Cl(b) Supply al 400 Volts -exceeding 5 kYv 015 0.02% 78

Time of Usa ROUT- Peak 046 007% 105

Time al Use (TON • 011-Peak 2 29 0.34% 12

_C]' supply al 11 kV 1.22 0.16% .

Time of Use (TOU) - Peak 244 0 37% 25

Time of Use (TOU) • Off-Peak 10.37 1.55% 25

Ca Supply above 11 kV -

Time of Use (T01.0- Peak -

Trite of Use (TOL)) - 011-Peak -

I Total Single Palm Supply 17 256

Agricultural Tube-wells - Tern D

D1 Scare

168 0.25% 294

Time of Use (MU)

1.52 023%

Time of Use (TOU)

9.00 1.15%

1

2119Lcatal Tube-wells

KIVICultuel Tube-wells 0-2 (ii)

492

18 I 74.00% 22,494 I

1_.

3.139 I Ti me of Use (IOU) - Peek 0-2(0

076

I

011% 521 Time of UDICA.1):Peek 0-2

54 053%

new of Use frau) • Off-Peak D2

I Total Ammeter&

611

!public ughting G 0 46 I 0.07%

Residential Colonies H 0.01 00 01

!p al Canuacis • Tertr K I0. 11) -

Time of Use (T09 - Peak

Time of Use (TOUT' 011•Peak

Railway TracuanTradlon -1

Co-Genration-J

grand Total' 665 1100.00%! 588,965 I

26.448 I

280 I

General Service

400 00

400.00

40000

380 00

380.00

400.00

400.00

400.00

380.00

380.00

380 00

15.20 1200

17.85 17.85

11 75 11 75

200.00 13 313 _ 20000 11 50

200.00 200.00

200.00 19.00 200.00 15.00

200.00 12 70 200 00 8 85

14 50

1900

3.00i 14 00

1900

12.80

1900

12 70

1500

14 50

19.00

13.00

14.30

1900

12.80

14 00 14.00

14.00 14.00

12.25

14 50

18 00

12.50

14.00

1800

12.29

18.00

12 20

1500

14.50

1800

1250

14.30

1800

12 30

I

100

0.50

1.00

0.50

_11

1,88

4.00

3.85

Page 152: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

QESCO Proposed Revenue and Subsidy Statement Oct-2017

IMkwnl 11ser0 18V41 Itsagel (min RE

FORM - 29 ( A)

1 1 1 1

1

1 1

.]

Residential _

Up to 50 Units 3.20 0.46% 124.575

For peak mad requirement up 105 kW • 0.00% -

01.100 Unds 3049 459% 168,0132

101400 Units 7 01

101.300 Unit

9 81 144% 102,652

301-700Unds

Above 7 706 Links 10 06 1 51%

9.76 H.47% 29,542

5859

For peak load requirement exceeding 5 kW - 0.00% •

Time of Use (TOU) . Peak 0 91 014% 2.649

lime or Use (TOU) • Off.Peak 4 57 069% 17.663

Tonal Residential 75.63 0.00% 451.023

Commercial - A2 • 0 00%

Commercial - For peak load requirement up to 5 kW 869 1 31% 104,820

Cammarciaw100) 18.97 3.00% 34

Commercial (e20 KW) For peak load requirement exceeding 5 kW 0.00%

Regular 000%

Time of Use (TOU) • Peak 1421 1 98 0.30% 2,618

Time of Use (TOU). Off-Peak (TernIl) 7.32 1.10% 37

Total Commercial 37.37 000% 107.308

k

idustrIal

B1

0.15 0.02%

0.00%

_ Ellyeaki 046 007%

l • (Oft Peak) 2.13 0.32%

82- 0.15 0025

B2 TOU (Peak) 2.29 0.34%

52 TOU (01Cpeak) 9.15 1.38%

83- 11/33 KV (Peak) 0.46 0.07%

Bd 869 1.31%

Total Industrial 23 0 00%

13011.

Ct fa) Supply at 400 Valls up le 5 kW

C1(0) Supply at 400 Vols -exceeding 5 kW

Time of Use (TOU) Peak

lime of Use (TOO Off-Peak

0.00%

0.15 002%

0.46 001%

2 29 0 34% H

C2 Supply at It kV 1.22 0.18%

Time of Use (70U). Peak 2 44 0.37%

Time of Use (TOU)=O6-Peak 10,37 1.58%

C3 Supply above I t kV •

Time of use (TOO - Peek •

Time of Use (TOO Off-Peak

Total Single Point Supply 17

Agricultural Tube-wells - Tariff D

Time ofrPUse (701.1

Time of use (TU)

02 Agricunual Tube-wells 492.18

Agncultual Tube-wells 0-2 Off

Time of Use (IOU). Peak 0-2(I)

Time of Use (TOU) • Peak 0-2 0.76

Time of Use (TOU) - Off-Peak 02 5 49

Total Agricultural 611

Pub/ h713 0.46

Residential Colonies H 0.01

Special Comrams Taff K (1-JK)

__ig

lime of Use 001.1ipeak

Time 01 Use (TOU) • 011-Peak_

Railway TracilonTraclion

Co-Genration-J

General Service

Grand Total 565 1100.00% 588.965

j

12 81 640 640

_ .

361.13 176 56 204.62

105.21 5686 48.32

144.09 97.98 46 11

165.89 155.13 9 76

191 20 181 14 10.06

17.38 16 47 091

59.46 57 18 2 29

1,077.22 748.74 328.48

I

165.13 156 44 8.69

0.09 299.61 0.09 29961

• -

095 37.66 0.95 35.68 1.98

5 74 95 14 5 74 91 48 3 66

8.77 697.54 8.77 683.21 14.33

2 21 2.21

8.69 823 046

27.75 28.68 1.07

2.13 001 213

43 45 1.76 41.17 2.29

117 10 12 15 112 43 4.67

8.69 0.65 8.23 046

110 38 4.79 106.03 4.35

320.41 19.37 307.13 13.28 I

• I

- -

0.58 2.21 0.66 2.21 -

021 8.69 021 823 046

1441 29.73

1 02 17 44

1.44 28 59 1.14

1.02 1744 -

0 70 46.35 0.70 43 91 2 44

3.57 132.71 3 57 127 53 5 18

. • _T___

- .

- -

7.82 237.14 7.62 227.92 9.22 I

. I

25 49 20.13 5.37

27.22 27 22

105 70 105.70

61.52 6,586 10 74 10 5,660 11 20.42 925.99

- -

16.23 16 23 •

3 09 309 11.44 3.05

48 58 21 13

113.84 93.42 6,873.17 20.42 955.54 I

6.40 -

0 08

147.60 8,067.51 127.18 7,748.65 20.42 1,320.86

168 025%

152 023%

900 135%

74.00%

0.11%

0 03%

007%

0.00%

256

294

22,494

3,139

521

26.448

260

1,084

1,452

104

1 009

1

16

3

3,670

11

78

105

12

25

25

H 0.01

1.76

12.15

0,65

4.79

19.37

14 48

69 71

8.828.71

6 40

0.08

Page 153: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

12.50

15.00

15.00

17 00

1900

19.00

13.00 112

13.D0

50

19.00 - 18 00

1500 400.00 15.00

(Ranonf h)

4 00

(womb

2.00

5,79

8.11

10.20

16.00

18.00

(Rs/01M' I Rsitnin)

2.00

6 71

889

4.80

1 00

1.00

1.00

0 50

1_00

- - -

• - •

19.00 400 00 18.00

13 00 40000 OD 1250

1450 - 14.50

19.00 - 18.00

13 00 • 12.50

14 00 400 00 14.00

19.00 00 400 00 18 DO

12.80 400.00 12 29

19 00 360.00 18.00

12 70 3130 00 12 20

15.00 15 00

14.50 400.00 14.50

19.00 400.00 18 00

13.00 4001391 12.50

14.30 380 00 14.30

190D 380.00 18.00

12 80 380 00 12.30

1

15.20 12 00

17 85 • 17.85 85

11.75 11.75

13.38 200 00 11.50

200.00

19.00 200.00 15 00

12 70 200 00 13 85

200 00

200.00

200 DO

200 00

14.00

14 00

14.00

14 00

12.25

400.00

400 00

400.00

400 CO

400.00

380.00

380 00 1

4(10.00

400 00

400.00

3130.00

380.00

380.00

1.00

050

1111-

1.00

050

1.00

• 0.51

• 100

050

100

0.50

100

0.50

1 88

4.00

3.65

FORM • 29

QESCO

Proposed Revenue and Subsidy Statement Nov-2017

1

Residential

Up to 50 Urels 3 08 0 40% 124,575

For peklOadregsi roman' up lo 5 kW • -

01-100 Units 29 30 459% 168.082

6 74 1 05% -

201-300

Unes

201-300 Unils 9 23 1.44% 102.652

301-700Unfis _ 9.38 1 47% 295412

I Above 700 Unds 967 67 1 51% 5.859

IFor peak load requirement exceeding 5 kW - .

Time of Use (TOU)-Peat

lime of Use crow - OfFFeall

0 88 0 14%

4.40 0 69% 17.663

2,649

1 Total Residential 72.67 I 1 451,023

Commercial -A2 A2 I Commercial For peak load requirement up to 5 kW

Commerolai 14100)

!Commercial 1<20 KW) For peak load requirement exceeding 5 kW

R ular

Time or Use (TOU) • Peak (A-2) 1.90

lime of use (10U)- Off-Peek (Temp) 7.03

1 Total Commercial 36.48

Industrial - I

61 015 002% -

6l (Peak) 0 44 0.07% 1,084

Ell • (On Peak) 2.05 0 32% 1.452

B2 . 0 15 002% 104

62 - TOU (Peak) 2 20 0.34% 1,009

92- TOU (Off.peak) 8.79 1.30% 1

63- 11/33 KV (Peak) 0 44 0 07115 16

B4 8 35 1 31% 3

1 Total Industrial 23 1 3,670

Bulk

CI (a) Suppivai 400 Vain. up to 5 kW - 11

01(b) Supply 11 400 Volts -exceeding 5 kW 0 15 0 02% 78

lime of Use (T0u) • peak 0.44 007% 07% 105

Time of Use (TOO • Off-Peak 2.20 0.34% 12

C2 Supply at 11 kV 1.17 0 18% -

Time of Use (TOU) • Peak 2 34 037% 25

lime of Use (TOUT 9.96 1.56% 25

3 Supply above 11 kV •

Time of UsalTOU) • Peak - •

Time of Use (TOUT - Oft-Peak -

Total Single Point Supply 15 1 I 256

Agricultural Tube-wells - Tariff D

DI Scarp 1 61 0.25% 294

Time of Use (40u) 1.47 0.23%

line of Use (TOO 13 84 ; 35%

02 Agecullual Tube-wens 472.97 74.00% 22.494 1

'

Arco/tug! Tube-wells 0-2_0( -

Time of Use (IOU) - Peak 0-2(1) 3.139

Time of use_g_Ou) • Peak 0-2 0.73 041% 521

lime of Use (TOU). Off-Peak D2 5 27 0133% -

1 Total Agricultural 491 1 1 26448

Public uglgG 0 44 1 001% 260

Readenilc Colonies m 0 D1 0.00% -

SNquial Comrads - Tanff K (0.11(1

Time of Use (IOU) - Peak

Time of latT01.1)- Off-Peak

Railway TracilonTrachon • 1

1

Co-Genration-d

General Service

Grand Tottll 639 1100.00%1 588.965

(RrikWAO

1

I IMtwnl I Congo)

030%2,618

i.10%1 37

0.00161 107,308

Ma all

8 35

1.31% 104.620

19 19

3.00% 34

400 00

Page 154: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 29 ( A )

QESCO Proposed Revenue and Subsidy Statement Nov-2017

Merl Pain Re)

Residential

Up to 50 Units

I

For peak load requirement up to 5 kW

01400 Units

101-300 units

101-300 Units

301.700Unas

Above 700 Units

For peek load requirement exceeding 6 kW

rime of yleiTOG) - Peek

Time of Use (TOW • 011-Peek

Total Residential

Commercial . A2 - 0 00%

ummercin • For peek load requirement up to 5 kW 8.35 1.31% 104620 158.68 150.33

Commercial ir 1001 19.1e 3.00%_ 34 0.09 28791 0.09 287 91

Commercial (°201181 For peek load requiremeni exceeding S kW - 0 00% - ' "

git tiler - 0.00% I • -

Time of Use (TOU) - Peak (A-2) 190 0.30% 2.818 I 0.95 38 19 095 34.29

Time of Use (TOU) • Off-Peak (TWO) 7 03 1.10% 37 5 74 91.43 5 74 87.91

Total Commercial 36.48 000% 107,308 6.77 674.21 6.77 560.44

212

2.12

835

7 91 0.44

26 67

25 64 1.03

2 05

0.01 2.05 -

41.76

176 39.56 220

112.53

12.15 1013.04 4.40

307.90

106.07

0.35

11.37 295.13

0.65

4.79 101 89

4

7.91

• 120..7414

68

- .

0.68 2.12 • •

1

0,44

1.02

791 h_

0 21

1.10 1.44 27 1

6 76 •

0.70 2.34_ 42 20

3.57 122.55 498

- I

I

- I

7.62 219.02 8.8

A

6 I

19 34 5.16

26 15 .

101 57

62 53 5,439.11 215.22 889.84

10 99

46.68

5,643.85

28.22

6.15

008

Industrial

81

131 (Peak)

81 • (Off Peak)

132 .

132 - IOU (Peek)

B2 - TOU (Oil-peek)

03- 1193 KV (Peak)

BA

Bulk •

Cfia) Supply al 400 Volts-up to 5 kW • 000%

ClibaSupp_n ai 400 Volts -exceeding) kW 0 15 0.02%

Time of Use (101) Peak 0 44 0.07%

Time of Use ;TOO. 00-Peek 2.20 034%

C2 Suepry el1 1 kV 1.17 0.18%

Time of Use (IOU) - Peak 2.34 0 37%

Time of Use (TOU). Off-Peak 9.96 1.56%

03 Supply above 11 kV

line of Use (TOO jrvek

rime al Use (TOU). Otf-Peak

Total Single Point Supply 16

Agricultural Tube-wells - Tariff 0

DI Yary

Time of use (7011)

Time of use Ig3.1)

02 Agncultuai Tube-wells

N-icuhual Tube-wells 0.22

Tana or Use (TOU) - Peek 0-20)

Time of Use (TOD) - Peak 0-2

Time of Use (TOU) - Off-Peak D2

Total Agricultural

Public LIghlin9 G

Residential Colonies

Special Convects • Tariff K (A.119

Total industrial

IMYWm 1%•eel

OM)

3.08 048%

124.575

0.00%

29.30 4.59%

168,082_

6 74

9.23 1 44%

102.852

938 147%

29.542

9.67 1.51%

5,859

0.00%

088 0 le%

2.649

4.40 069%

17,663

72.67 0 00%

451.023

1 61 015%

14] _023%

8 54 135%

472.97 74.00%

0.00% -

0.15 0.02%

0.44 0.07% 1.084

205 032% 1.452

0.15 0.02% 104

2.20 0.34% 1,009

8.79 1 138% 1

0.44 I 0.07% 16

8.35 1.31% 3

23 I 0.00% 3.670

0.73

5.27

491

044

001

011%

0 . 3 96I

26.448

007% 260

000%

22,494

3.139

521

11

78

105

12

25

25

256

2941

H

12.31

368 30

101 10

138 46

159.41

183.74

16.70

57,14

1,035.16

88 75

16.23

3.09

108.07

0.01

1 76

12 15

0 65

4 79

19.37

0 68

021

1 44

1 02

0.70

3 57

7.62

24.50

26.15

101 57

6.3213.95

• 16.23

13.92 309

66.99

6,862.08 8195

615

008

2.12

8 35

28 57

16.76

44 54

127.53

227.88

169.67

54.56

94.15

150 04

174 07

15.02

54 94

719.51

6 15

RMry I (Mm Ref pen sts1

6 15

196 63

46 44

44 31

938

9 67

0 88

2.20

315.65 I

_J 835

1.90

352

13.77 I

1 1 1 1

1 1 1

1

2.93

20 31

918.23 I

26.22 1.269.21 141.83 1,713.47

Time of Use (TOU) - Peak

Time of Use (TOU) • Oti-Peak

FlailwasalonTraclion - 1

CRGenretMnJ

General Service

Grand Total

5138,965 639 1 100 op%

Page 155: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

18.00 •

15.00 •

1800

12.50

1450

18 00

12.50

14 00

18 00

12.29

18.00

12 20

FORM • 29

QESCO

Proposed Revenue and Subsidy Statement Dec-2017

19 00

400.00

15 00 400.00

_ 01-100 Units 31.02 4.59%

101400 UrOs 7.13 1.05%

201-300 Liras 9 77 144%

301•700Unio 9.93 141%

_Above 700 Units 10.24 1.51%

For peak load requirement exceeding 5 kW

Time of Use (TOU) - Peak 0 93 0 14%

Time of Use (IOU) Off-Peek 4 65 I 0.69%

Total Residential 76.92 I

Commercial -A2 •

Commercial- For peak load requiremern up lo 5 kW 8 64 1.31% 104.620

004merosii4100) 20.32 300% 34

Commercial 1420 KW) For peak load requirement exceeding 5 kW - -

Regular •

Time of UseiTt..ffrl_seek (A-2) 202 0.30% 2,618

Time of Use (Tab- Off-Peak (tamp) 7 44 I 10% 37

Total Commercial 38,62 I 0 00%1 107,308

Residential

uP la 50 unas

For peek load requirement up to 5 kW

fnenorom

326 048% 124.575 4.00

168.082 I 12.50

15 DO

102,652 15 00

29.542 17.00

5,659 1900

2,649 19.00

17,663 13.00

461,023 I

400.00

400.00

400.00

400 00

400 00

380.00

380.00

400 00

400 00

400.00

380 CO

380.00

380 00

IFIVIrWm

I Ossa

700 200

579 671

8 11 6.89

10.20 460

16 00 100

18 00 1.00

18.00 1.00

12 50 050

Grand Total) 676 100 00%1 688,966

Industrial

131

B1 (Peak)

Bf • Off Peak)

02

62 - TOU (Peak)

B2 - Toulon-pew

133- tir13 RV (Peak)

64

Total industdal

Bulk

Gila) Soppy al 400 Vdis - up t05 kW

Cl(b) Supply at 400 volts -exceeding 5 kW

Time al Use (Tom,geak

Time of use (TOU) Off-Peak

C2 Supply et 11 kV

Time of use (TOU) • Peak

Time of Use (TOU).=08.Peak

C3 Supply above 11 AV

Time of Use (IOU) • Peak

I Time of Use (TOU) - Off•Peak

Total Single Point Supply

Agricultural Tube-wells • Tariff D

DI Scarp

Time of Use_(70( 11

Time of Use (TOU)

lagncuitusi Tube-wells

Agricullual Tube-wens 0.2 OD

Tome of Use (TOW). Peak 0.2(0

Time of Use (

T

MU) - Peak 0-2

Time of Use (70U). OISPeak D2

Total Agricultural

Public Llig C

Resigenuai Colonies H

Canireds • Term K (AJK)

Time of Use (TOta• Peek

Time of Use (TOU) - Off-Peak

111Av,..ya TreciionTraction •

CQ•GnnrelionJ

General Service

1900 400 00

13 00 400 00

14.50

19.00

13.00

14 00 I 400.00

19.00 400.00

12.60 400.00

19 00 360.00

12 70 380.00

15.00 - 1500

14.50 40000 14 50 -

19.00 400 OD 18.00 •

13.00 400.00 12.50 •

14.30 380 00 14.30 -

19.00 380.00 18.00 •

12 80 380.00 12.30 -

- .

15 20 1200

174351 17 85

11 75 11.75

13 38 200.00 11.50

- . -

20000 -

19 00 200.00 15.0D

12 70 200.00 8 85

14 00

14.00

12 25 --.

1,00

1.00

0 50

I 00

0 50

1.00

051

00

0 50

1.00

0 50

1.00

0.50

3.20

S

4.00

3 85

14.00

14 00

200.00

200.00

200 00

200.00

0.16 0.02%

0.47 007% 1,084

2 17 0.32% 1452

0 16 0.02% 1114

2.33 0.34% 1,009

9.30 1.38% 1

047 0.07% 16

8.84 131% 3

24 3,670

0.16 0,02% 78

047 007% 105

2.33 0.34% 12

1.24 0.18%

-

2.48 0.37% 25

10 55 1.56% 25

.17 I

256 I

1 71 0.25% 294

1.55 023%

9.15 1.35%

500.60 7400% 22,494

3,139

078 0.11% 521

5.58 0.83% •

619 I I 26,448

047 0.07% 260

0 01 0.00%

II

Page 156: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 29(A )

QESCO Proposed Revenue and Subsidy Statement Dec-2017

(%age n Rai

kwel 04.ger

Residential

Up lo 50 Units 3.28 0.48%

124,575

For peak load requirement up to 5 kW 0 00%

01-100 Units 31.02 459%

168,082

101-300 Units 7.13

501.300 Units 9.77 144%

102,652

301.700Unes 993 1 47%

29,542

Above 700 Units 10.24 1.51%

5,859

For peek load requiremenl exceeding 5 kW 000%

Time of Use (113 - Peak 0.93 0 14%

2649

Time of Use (TOU) • Off-Peek 4 65 0 69%I

17,663 I

Total Residential 76.92 I 0 00%

451 023

Commercial - A2 000% •

Commercial • For peak load requirement up lo 5 kW 8.64 _ 1.31% 104,820

Commercial ALWO) 20.32 000% 34

Commercial (<20 KW) For peak Iced requirement exceeding 5 kW

Regular 0.00%

Time of Use (TOL) • Peek (A-2) 2.02 I 0 3096 2.618 I

Time of Use (TOU). Off-Peak (Temp) 7.44 I 1 10% 37 I

Total Commercial 38.62 000% 107,308

Industrial - I 0 00% -

B1 0 18 0.02% -

81 (Peak) 0.47_ 0.07% 1,084

B1- ion Peak) 2 17 0 32% 1,452

_ B2- 0.15 0.02% 104

92 . TOU (Peak) 2311 0 34% 1,009

02 - IOU (011-peak) I 9 30 1 38141 1

83- 1103 KV (Peak) 0 47 0.07%1 16

I 84 1 8.64 131%I 3

I Total Industrial 24 0 00%I 3,670

Bulk

Cue) Supply al 400 volts . upiip_SAW

- 000%

Cum Supply e1400 Volts -excegen 5 kW 0.16 002% 78

Time of Uisi OU) - Peak

0.47 0.07% 105

Time of Use Ofl-Peak

2.33 034% 12

02 Supply at II kV

1 24 0.10%

Time of Use (TOU) • Peak

2.48 0.37% 25

_ Time of Use (TOU) - Off-Peek

10 55 1 56%1 25

C3 Supply above 11 kV

- -

lime of Use (TOUI • Peak - -

1 Time of Use (TOU) - Oa-Peak - -

Total Single Point Supply

17 I 256

Agricultural Tuba-wells • Tariff D

01 Scarp 1 71 025% 294

Time el use (70U) 1.55 0.23%

Time of Use (TOO) 9 15 1 35%

02 Agricultual Tube-wells 500 60 74 00% 22.494

Agncultud Tube-iweila0 11

Time of Use (70U) • Peak 0-2(5 3,139

of Time Use (TOU) - Peek 0.2 0.7

Time of Use (Tom- Off-Pees 02

8 0.11%1 521

5 58 063%

Total Agricultural l 519 26,448

Public Ligraing G 047 0.07% 260

Residential Colonies H 0 01 0.00%

/Pedal Conga= - Tariff lirAJK)

Time of Use (Tau) • Peak

Time of - Of f-Peak

Radially TrachonTradion - 1

Co-Genrallon-J

General Service I

Grand Total 676 1100.00%1 580.965

Re)

6.51

41

0.01

1.76

12 15

0.65

4 79

19.37

56

021

1 44

1.02

0.70

3.57

7.62

116.36

150.12

97.04

16.23

3.09

17 88

60 48

1,095.65

0.09

0 95 38.31

5.74 96 77

6.77 607.76

241.20

25 93

27.68

107.51

6,698 75

14 73

70.90

8,945.50

651

009

6,222.60 132.24

387.70

107 01

146.55

188.73

194 47

167.95

304_73 0.09

225

1334

26 22

2 17

44 20

119 10

864

112.26

326.89

2 251

864

30.24

17.74

47 14

134 98

13 03

0.01

1.76

12.15

0.65

4 79

19.37

79 16

16.23

3.09

98.48

0.95

5.74

6.77

0.68 2 25

0 21 B 37

1 44 29.08

1.02 1774

070 44 66

3.57 129 71

7.62 231.82 9.38 I

546 1 20.47

27.68

107 51

5,75892

11 63

49 41

6.973.62

6,51

0.09

7,679.16

651

179.58

57 85

9966

158.80

184 24

16.75

58 16

781.55

304.73

159 11

36 29

93 05

593.18

2 2

8371

27 14

217

41 87

1136

B.37

107 84

311.38

17.88

17.88

1728 1,343.45

2 33

• 4.75

0 47

4,42

13.51

0.93

2 33

334.10 I

. A

0.47

1.16

248

5.27

941 83

208 12

49 15

46.90

9 93

10.24

3 10

21 49

971.89 1

202

3 72

14.58 I

884

0.47

1 09

Page 157: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

(mInnM) I (tau el

9541 0.48% 124,575I

90.81 459% 168,082

20 09 1 1 05%

28.61 1.44% 102,652 I-

29 06 1 47% 29.542

29.97 1.51% 5,859

• •

2.72 014% 2.649

13.62 0.69% 17,663

225.22 I 451,023 I

1

133LkW/M1 (146BWIS I (13.6AVOM (Ran•WhI (RantW/MI lesIkWit)

4.00 I

12.50d

15 00

15.00

17.00

19 00 1

19 00

13 00

IMWI

200 200

5 79

611

10 20

16.00

18 00

18 00

12 50

H 6.71_

689

4 BO

1.00

1.00

100

050

18.00

12 50

14 50

la 00

12 50

14 00

16.00

12 29

113.00

12 20

19.00 1800

15.00 1 900 DO 15.00 1

• •

19 00 1 400 00

13.00 1 400 00

400.00

400.00

400 00

14.50 •

d 19.00

13 00 1

-

400 00_1 14.00 400.00

400.00 19 00 400 00

40000 12.80 40000

380.00 19 00 380.00

380 00 12 70 380 DO

H 14 00

14.00

FORM • 29

()ESC°

Proposed Revenue and Subsidy Statement Oct-Dec 2017

ReSIdenlja1

UP m 50 Units

For peek load requirement up to 5 kW

01.100 units

101-300 Units

201-300 units

301-700units

Above 700 Units

For peak load requirement exceeding 5 kW

Time of Use (TOU) -Peak

Time or Use oto - Off -Peak Total Residential

Commercial • A2

Commercial • For flia load requirement up 1c 5 kW

Commercial (5100)

Commercial 1c20 (WI For peek load requirement exceeding 5 kW

Regular

1

_ Time of Use (TOU) Peak (0.2)

Time of Use (IOU) - Off-Peak (Temp)

Total Commercial

industrial

B1

SI (Peak)

• riff Peek)

iso -

52 . TO)) (Peak)

82 • TOU

6111/33 KV (Peak)

04

Total In/warn&

Bulk

C I (ill.Supply at 400 Volt up lo 5 kW

CV)) Supply at 400 Vohs •exceeding 5 kW

Time of Use (TOO - Peak

Time of use (11120(1•Paak

G.2 Supply at I I kV

PITO Of Use (TOL). peek

Time of Use (TOU) • Oft-Peek

C3 Sups'', above 11 kV

Time of Use (TiDu)_ Peak

Time of Use 17010 • Off-Peek

1 Total single Point Supply

Agricultural Tube-wells - Tariff D

01 Scarp

Time of Use (TOU)

Time of Use (TOU)

02 Agncultuai Tube-wells

Tube-wellspga

Time of Use (TOU)• Peak 0.2(11

Time of use (TOU)• Peak 0-2

Time of Use (TOU) - OR-Peak 02

Total Agdconeral

Public LiglilingG

ResIbeniiiii Colonies

Special Contrecis - Tenn ff (0.K)

Time &Use (TOU) • Peak

Time of use (7Ciu) . Off-Peek

25 88 1.31% 104620

59.48 300% 34

- I

5.90 I 030% 2.618

21 80 1 t 10% 37

113.06 000%1 107.3081

045 002%

1.36 0.07% 1,084

636 0.32% 1.152

045 0.02% 104

6.81 0.34% 1.009

27 24 138% 1

1 36 0.07% 16

25 88 1.31% 3

701 1 3,6701

• 11

0.45 _0.02%

78

1.36 0.07%

105

681 034%

12

3.63 0 10%

727 037%

25

30.88 1.56%

25

so I 1 256

1

4.99 0.25% 294

4.54 023%

28.79 1.35% -

1,465.75 74.00% 22.494

3,139

227_ 0 1 1% 521

16 35 063%

1,521 I 26,448

1.36 007% 260

0.02 0.00%

15 001 15 00

14 50 400.00 14.50

19.00 400.00 18 00

13.00 400.00 12.50

14.30 380.00 14 30

19 00 390.00 18 00

12 80 380 00 12.30

1520 12.00

17.85 17.85

11.75 11.75

13 38 200 00 11.50

• -

200 00

121.00 200.00 15.00

12 70 200.00 885

14.00

14 00 1

400 00

400 00

900 00

360.00

380.00

380.00

200 00

200 00

200.00

200 00

4.00

3.85

1.00

100

050

1 OD

050

1.00

051

1.00

050

1.00

0.50

1 00

050

TracliOnTractIon I

05-Gansu's/I,'

General Service

12.25

Grand Total 1,981 10000% 598,965 1

Page 158: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

0.02

5 28

38 48

1.95

14.38

58.10

FORM- 29 (A)

QESCO Proposed Revenue and Subsidy Statement Oct-Dec 2017

AD'

1

1 1

1 1

11

.1

J

1MkW31 (%egis) (wet i 1%494)

Residential

Lip to 50 Units _ 9.54 046% 124.575

For peak load requiremen1 up 10 5 kW - 0.00% -

01.100 Ron 90611 4.59% 168,082 _

101-300 Units 20.89 -

101-300 UMW 28.81 1 44% 102.652 _

301-700Unns 29.06 1 47% 29,542

I

Above 700 units

29 97 1.51% 5.859

- For peak load requaemeni exceeding 5 kW _ • 0.00% - 1

Time of Use Q0.1_6 - Peak

2.72 _ 0.14% 2.649

rime of Use CroU) • CRP'," 1362 069% 17,663

Total Residential 325.22 0.00% 451,023

Commercial-A2 - 000% -

Commercial - For peek load requiremeni up to 5 kW 2586 1.31% 104,620 .

Commerciat (41001 59.48 300% 34 •

Commerual (420 KW) For peak load reoeirement exceeding 5 kW _ - 0.00% -

Regular - 0.00%

_ Time of Use (TOL° - Peek (A-2) 590 0.30% 2,818

Time of Use (TOU) • Off-Peak (Temp) 21.60 1.10%1 37

I Total Commercial 113.06 000% 107.3081

industdal - 0.00% -

131 0.45 0.02%

131 (Peak) 1 36 0.07%

131 • (Off Peak) 6.36 0 32%

62. 045 002%

62 • TOU(Peak) 6 81 0.34%

02 TOO (Off-peek) 27 24 1.36%

03- 11/33 KV (Peak) 1.36 007%

84 25 88 1.31%

i Total Industrial 70 0 00%

Bulk

CI(a) Supply at 400 Veils . up lo 5 kW

0.00%

01(b) Supply at 400 Volts -exceeding 59W 045

002%

Time of Use (TOU) - Peak 1.36

0.07%

Thee of Use (TOU) • Off.Peak 681

034%

C2 Supply to it kV 363

0.18%

Time of Use (TOO - Peak 7 27

0.37%

Time of Use (T0U) - Off-Peak 30.138

156%

03 Supply above 11 kV

Time of UseSrOU) • Peak

Mime of Use Row • Off-Peak

Taw Single point Supply 60

Agricultural Tube-wella - Tariff D •

DI Sca 4 99 0.25%

Time of Use (TOU)

454 _ 023%

Time of use (TOU)

26.79 1.35%

02 Apricullual Tube-wells

1,465.75 7400%

Aeltuai Tube-wells 0-2 (l1)

Time of Use (700 - Peak 02()

Time 01 Use (T01J) - Peak 0-2

Time of Use (TOU) • on-Peak 02

Total Agriculture)

G

Residents! Colonies H

Special Contracts • Tenn Iiiiik1K)

Tone of Use (IOU) • Peak

Time of Use (TOU) - Off-Peak

RalivactionTraction •

CoGenrabon-J

I General Service

1

Grand Total! 1,9131 I 100 00% 586,965

win Rs)

Men Rs1 (Min Rs)

38.14

1.135 18 -

31331 •

429.10

494 03 •

589.41

51,76

177.09

3,208.03

1907

609 37_

143.91

13731

29.06

2997

2 72

6.81

978.23 1

227 011%

16 35 083%

1,521

1.36 007%

002 000%

22,494

3.139

521

26,448

280 •

1,084

1.452

104

1,009

1

16

31

3670

11

78

105

12

25

25

256

294

19 07

52562

16940

291 79

464 97

539 44

49.04

170 28

2229.80

280.31

75 92

81.05

314 79

19.613 80

48 70

927 43 14 H 9

• 207 60

336.28 20.336.30

• 19 07

• 0.25

439956

2.85 I

17,22

20.32

002

5.28

36.46

1.95

14 38

56.10

2 03

0.63 IIF 4 33

3 05

2.09

1071

22.85

491.76

0.26 892 28 0.26

77,003.68 ii464 I'2 ̂ 64.51 3,933.60

112 16

283.34

1,779.62

6.58

25 88

82 64

636

129.41

348.73

25.88

328 70

954.19

6.58 203 658

25.88 0.63 24.52

88.54 433 135.14

51.95 3.05 51 95 _

138.04 2.09 130.77 7.27

395.2A _I

-

10 71 379 79

-

15 44

. - A •

706.22 2215 678.76 27.471

59 94

81.05

• 314 79

215.130 18,656 13

4870

9.27 34 06

1441.67

273.77 17490.64

• 19 07

0 25

84 51

64.51

- - •

2.85 106.25

17 22 272 44

I

10.90

5 90

20.32 1,736.83 42.681

.__I ,

465 88 25 88

892 26

6.58

24.52

7946

6 35

122 60

334.83

24 52

315 76

914.64

681

13 89

1 36

12 94

39.55 I

15.96

2,757 66

9.08

62 93

2,845.88

1 36

3 113

1.36

341

H

Page 159: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

I iRkWhi I MIKK4 I

I 1 1 3 30 1 04a% 124,575 - -

31.40 4.59% - 168.082

722 105% -

9.89 1,44% 102.652

10.05 147% 29.542

10 36 1.51% 5.859

094 0 14%

-

2,649

(%20/0

19 00

13.00

14.50

19.00

1300

400.00 14.00

400 00 1900

400 00 12 80

380 00 19.00

380 00 12.70

15.00

400,00

1

14 50 400.00

400.00 I 19.00 400 00

40000 1 13.00 I 400 00

1 380.00 14 30 380.00

380.00

19.00 380.

38 1

12.80

380.00

0. 00 380 00

200.00

200 00

200 00

200.00

15.20

17 85

11 75 1

1338

19 00 12.70

14 00

14 00

. -

200.00

200 00

200 00

200.00

400 00

400.00 I

400 00 I

1 00

050

• 1.00

0 50

1.00

0 51

1.00

050

1 00

0 50

1 00

050

3.41,

YINF 1.88

4.00

3 05

1500

14.50

18.00 -

1250 - 14.30 - 18.00

12.30

1200 _

17.85

11.75

11 50

15 00

8 85

14.00

14 00

Ditavolai DisAwn) I 031/kw4m1 Income I

1 CO

2.00

871

6 89

4130

1.00

100

1.00

0 50

2 00

5.79

8 11

10 20

16 00

18 00

11300

12.50

18 00

400.00 15.00

IFierkwri

400

12.50

15 00

1500 17.00

19.00 •

1900

1300

19 00

15 00

400.00 I

400.00 I

16.00

12.50 1

14.50

16.00

12 50

400.00 14.00

400 00 18.00

400 00 _ 12 29

380 00 18.00

360.00 12.20

FORM 29

QESCO

Proposed Revenue and Subsidy Statement Jan-2018

1 Residential

Up to 50 Unlls

For peek load requirement up 10 5 kW 01100 Units

101-300 Units

201.300 Units

301-700Unils

Above 700 Units

For peak lima requirement exceeding 5 kW

1

Time of Use (1-011)- Peak

Time of Use (TOO Off-Peak 4.71 0.69% 17 663

Total Residential 7726 I 1 451.023

Commercial . A2 Commercial • For peak load requirement up lo 5 kW 8.95 1.31% 104.620

I Commerual(e100) 20 56 300% 34

Commercial 1a20 KW) For peak road remnrament exceeding 5 kW -

_ an bier • -

Time of Use (TOUT . Peak (A-2) 2.04 0 30% 2,618

Time of Use (Tap • Off-Peak (Tamp) 754 1 10%1 37

I Total Commercial 39.09 0 00%I 107.308

IllidustrIal I

131 0 16 002% •

ittl peak) 047 007% 1.084

131 - (iall Peak) 2.20 032% 1.452

1_ 0 16 0.02% 104 _ 62 - IOU (Peak) 2 35 0.34% 1.009

B2- TOU (011-peak) 9.42 1.36% 1

133- 11/33 XV (Peak) 047 0.07% 16

Ba 695 1.31% 3

I Total Industrial 24 I 3.570

Bulk

Clle)SuPPly e1400 Volts - up lo 5 kW 11

Cl() Supply at 400 Vets -exceeding 5 kW 0 16 002% 78

Time of Use (TOL) - Peak 0.47 0.07% 105

Time of Use (roU). Off-Peak 2.35 034% 12

C2 Supply a111 kV 1.26 0.18% -

Time of Use_aliU)- Peek 2 51 0.37% 25

Time of Use (IOU) • Off-Peak 10.67 155% 25

03 Supply above 11 kV -

1

Noe of Use (Tout ❑ - Peak - I Time caUse (T0u) • 011.Peak - I

Total Single PoIM S uPPI VI 17 I I 266 1

12.25

AselCullurel Tube-wells - Tar111 D

01 Scarp

Time of Use (101.9

Time of TOU)

02 AgrIcullual Tube-wells

Aglicullual Tube-weld 0-2 00

Time of Use (1010 - Peak 0-2(1)

Time of use (Tote - Peak 0-2

Time of Use (TOU) • Off-Peak 02

1 Total Agriculture

PubbcMghtindG

Resnenlial Colonies H

Special Contracts • TerfIK (0.114)

Time of Use (IOU). Peak Time of use Off -Peek

Railway Bemoan action • 1

CoGenrattonal

I

1.73 0.25% 294

1.57 023% -

9.26 1.35% -

506.74 7400% 22.494

3.139

011% 521

0133% •

1 213.4413 1

260 •

688.965 1

• 0.78

5 65 526

0.47 007%

001 000%

General Service I Grand Total 685 110000%

Page 160: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 29 ( A )

QESCO Proposed Revenue and Subsidy Statement Jan-2018

Nagel TWO

124,5751

188.082

102,852

29,542

5.859

2,649

17.663

451.023

000%

5.95 1 31%

104,620

CommercIal ('100) 20.56 300% 34

Commercial <20 )l W) For peak load reguiremenl exceeding 5 kW - 0.00% -

Sala' - 000% ' Time of Use (TOU)- Peak (A.2) 204 0.30% 2.816

Time of Use (mu) - Off-Peek (Tamp) 1 7.54 1 10% 37

TMtl Commemlfl 39.09 I 0.00% 107,308

Industrial - 0 DO%

131 0 16 0 02% -

SI (Peak) 047 0.07% 1,084

81 - (Off Peak) 2.20_ 0.32% 1,452

02- 0.16 002% 104

- B2 - TOU (01 1-mak) 9 42 1 38% 1 02 - TOU anwo_ 2.35 0 34% 1.009

-1

I33- 11/33 KV (Peak) 0 47 1 0 07%1 16 -

84 8.95 I 1.31%I 3

Total Industnal 24 I 0.00%1 3,670

Bulk _ - - i I - Cl(a) Supply.' 400 Vohs - dp to 5 kW - 0.00% 11

Glib) Supply at 400 Wks -exceed' 5 kW 0 16 002% 78

Time of Use (TOU)-Peak 0.47 007% 105

Time or Use (TOU) - Off-Peak 2.35 0.34% 12

C2 26 at 11 kV 1.26 0 18% -

lime of Use 11.1). Peak 2 51 0.37% 25

Time of Use (TOUT-On-Peak 10 67 1 56% 25

C3 Supply above 11 kV

I

-

I

-

Time of Use (TOU) • Peak -

I Time of Use (TOU) - Off-Peek I - I

I Tote! Single Point SupplY I 17 I 256

Agricultural Tube-wells • Tariff D -

Di Sca ___ 1.73 0.25% 294

Time of Use (MU) 157 0 23%

lime of Use (TOO) 9.26 1 35%

pg Agnouhual Tube-wells 506.74 7400% 22,494

AgrIcutival Tube-wells 0-2 (II) -

Time of Use (IOU). Peak 0-28) 3.139

lime al Use (TOW. Peak D.2 078 _ 0 11% 521

Time of Use (TOO) On-Peak D2 1 5 65 0 83%

1 Total Agrieulturell 526 I 26,448

public Lighling G 1 0.47 I 007% 260

REPSIdenliel Cokwies H 0 01 0.00%

Special Convects . Tara K (AJN) .

Time or Use (Iou.)- Peak

Time of Use (IOU) - Off-Peak

Railway TramonTraction • I

Co•Genration4

General Service

I Grand Toted 885 1 100 00%1 566.965

Residential

50 Untb 371 0 048%

For peak load requirement To5kW • 0011

01.100 Units 31 40 4.59%

101-300 Units 7.22

101.300 Units 989 1.44%

301-7000ndS 10.05 1.47%

Above 700 Units 10 36 1 51%

1 For peak load regulremeni exceeding 5 kW 0.00%

k

Time of Use (TOU)- Peak 0.94 0.14%

Time of Use (IOU) • Off-Peak 4 71 0.69%

Total Residential' 77.86 0 00%

Commercial - A2

Commercial- For peak bad reeutremem up to 5 kW

H

1 1

1

1 eta

1 l

aJ

1

J J

1

Mown Men Rs) PAP FM

13.19

392.46

108.32

ims Rd) Fe)

6.59

181 79

58.56

(141n RS) (Min Rs)

6.59

210 67

49 75

148 35 100.88 47.47

170.80 160 75 10 05

198.86 186.50 10.36

17 90 16 95 094

61.22 I 58 87 2.35

1.109.09 770.89 338.20 I

170 01 161 07 8 95

0.09 308 47 0.09 30847

0 95 3877 0 95 36 73 1 2 04

5 74 97.96 5.74 94 19 1 377

6.77 816.22 I 6.77 600.46 14.76 I

1 2.28 228 -

8 95 848 047

28 57 27 47 1.10

0.01 2 20 001 220 •

1.76 44.74 176 42 39 2.35

120.56 12 15 115 76 4.80

121 0 65 6 95 065 8.48 0 47

4 79 113 84 479 109.17 4.47

19.37 329.89 19.37 I 316.21 19.67 I

0 68 2.28 0.68 228 • •

0.21 8.95 0.21 8.48 047

1.44 1.44 2943 118

102 30.61 17.96 1 02 17.96

070 47.72 070 4521 I 2.51

3 57 136.54 3 57 131 30 1 534 •

7.62 244.16 7.62 234.66 9.60 I

5.53 1 28 25 20.72

28.02 28.02

108 83 108 83

98 88 6.780 93 82 86 5,827 55 16.02 953 39

16.23 16.23

3.09 14 91 3.09 _ 11.77 3.14

71,77 50 01 21 76

118.20 7930.72 I 102.18 6.046.91 16.02 983.61

5.59_ 8 59 0,09 0.09

1 I 136.94 151.98 9336.75 16.02 1.359.93 7•976.81

Page 161: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

2.00 5.79 811

10.20 16.00 18.00 18 00 12 50

2 00 871

6 89 80 1.00 1.00 1 00

050

12 25

12.00 17 85 11 75 11.50

15. 00 8 85 14.00

14 00

0.50 a

1.00 0.50 1.00 0, 51

100 050

FORM - 29 QESCO

Proposed Revenue and Subsidy Statement Feb-2018

111 I 131.441

Residential

kip gi 50 Units 3.24 I D 48% 124.575

For peak load requirement up to 5 kW

01-100 units 30.81 I 4.59% 168.002

101-300 (Aids 7.09 I 1 05%

201.300 Units 9 71 1.49% 102,652

301-700Unne 9.86 1 47% 29,542

Above 700 Units 10.17 1 51% 5.859

For peak iced requirement exceeding 5 kW

Time of Use (70U) Peak 0 92 0.14% 2,649

Time of Use (TOUT Ott-Peak 4 62 0.69% 17,663

Total Residential' 76.42 I 451.023 Commercial • A2 Commercial. For peak ioad requirement up to 5 kW 8.76 131% 104.620

Commercial 1.1001 20 18 3.00% 34

4 00 12 50 15.00 15.00 17 00 19 00 19 00 13 00

18•Awn (ROMA.) I MOWN

19.00 15 00 400.00

18 00 1500

1 00

F

400.00 Commercial (<20 KW) For peak load requirement exceeding 5 kW •

Regular

Time of Use (TOU) - Peak (A.2) 2.00 I 0.30% 2.818

(7 Time of Use 0U) ON-Peak(Tema) 7 40 I 1.10% 37

Total Commercial 38.36 I 0.00%I 107.308

B2 TOUjiL)131. eek) 9.24 138% 1

6111(33 KV (Peak(_ 046 0.07% 16

04 878 131% 3

I Total Industrial' 24 I I 3.670 Bulk I

(/Gaupply el 400 Voris-up to 5 kW d - 11 c1(b) Supply a1400 Vona -exceeding! kW 0.15 002% 78

Tune of Use (70U)- Peak 046 007% 105

Time of Use (70U) • On-Peak 2 31 034% 12

C2 Sugp_taf 12 AV 1.23 0 10% -

_ Time of use (TOU) • Peak 2.47 0.37% 25

Time of Use (TOU)- Off.Peak 10.48 1.58% 25

03 Supply above 11 kV _ Tune of Use (70U) - Peak -

- Time of Use (70U) - Off-Peek • I -

Total Single Point Supply 17 I I 266 Agricultural Tube-wells - Tariff D I DI Scarp 1 69 0.25% 294 Iline of Use (TOO _ 1.54 0.23%

linme of Use (700A . 9.09 135%

02 Agnouluei TUSAwells 497.33 7400% 22.494

Stual Tube-weds 0-2 jai_

Time 01 Use (TOU) . Peak 0-j9

Time of Use goo - Peek 0-2

Time of Use (70111 - Off-Peek 02

Total Agricultural 616 I 25,448 PUNK Usising G 046 007

Residential Colonies H

1 260

0 01 0 00%

Special Contracts - Tariff K (AK) I -

Tune of use_COU) - Peak I - ] Time of Use (T • Off-Peak - I

Railway TractIonTrectIon -..7 .

Ho-Genrallon-d -

General Service

Grand Toted 672 100.00%1 588.965

• 3139 077 0.11% 521 5.55 0.83%

400 00 400 00

400.00 400.001 400 00 380.00

380 00 I

400 00 400.00j 400 00 360.00

380. 00

380.00

200.00 200 00 200.00 200.00

15.20 17.135 11 75 13 38 200.00 •

200 00 19 00 200.00 12 70 200 DO

• 1900 1300

14.50

19.001

13.00 14.00 19.00 12 80 19.01

12.70

1500 14 50 400.00 19.00 400.00

1300 400 00 14.30 380.00 19. 00 380 00 12.80 380.00

14.00

14 00

- I 400.00 113 00 400 00 12.50

14.50 1800 12 50 40000 14 00

400.00 18.00 400. 00 12,29

380.00 113.00 380.00 12 20 I

15.00 14. 50

1800 12 50 14.30 18 00 12 30

w

1 88

1.00 0.50 1 00

0 50

00

3 65

Industrial 01 0.02%

131 (Peak)

0 15

046 I 0.07% 1.084 • _

81 - (Off Peak) 2 16 032% 1.452

I 132 - 0 15 0.02% 104 H

B2 - TOU (Peaig 291 0.34% 1.009

Page 162: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 29 ( A )

QESCO Proposed Revenue and Subsidy Statement Feb-2018

Ikeerfq

Residential

nwom taw) Ben Re) 1mm MO then Flo !ken R9. (km Rsi

1

U M 50 Undo 324

i

045% 124,575 12.94 6.47 6.47

For peak load requirement up to 5 kW 0.00% •

01.100 units 30.81 4.59% 166,082 385.17 178 41 206 76

101-300 Unna 7.09 106 31 57.48 46.83

101.300 Una,. 9.71 1 44% 102,652 145.59 99 00 46 59

301-700unns 966 1.47% 29,542 167.62 157 76 986

Above 700 Ungs -1 10.17 1.51% 5,859 193.20 183 03 10 17

For peak load requirement exceeding 5 kW - 0.00%

true of Use (TOU)- Peak 0.92 0 14% 2.649 17.56 16 64 0.92

I Time of Use (TOW • Off-Peak 4 62 0.69% 17.663 60 09 57 77 2 31

I Total Residential 76.42 0.00% 451,023 I 1,088.48 766.57 331.91 I

Commercial. A2 • 0 00% -

Commercial For peak load requirement up to 5 kW 8.78 1.31% 104,620 16685 158.07 B78

Commercial (<100) 2016 3 00%1 34 0.09 302.74 0.09 302 74

Commercial f e20 KM For peak load requirement exceeding 5 kW - 0.00% .

Regular _ - 0.00% .

lime of Use (MU) - Peak (A-2) 2.00 1- 0,30% 2,618 0 95 38.05 0.95 36,05 200

Time of Use (IOU) - Off-Peak (Temp) 7 40 1.10% 37 5 74 96.14 5.74 92.44 3 70

I Total Commercial 35.36 I 000% 107.308 6.77 503.79 6.77 559.30 14.44 I

Industrial - 0.00% . •

Ell 0.15 002% - 2.23 2 23

B1 (Peak) _ 0 46 0.07% 1 084 8 78 8.32 0 46

81 • (Off Peal 2 16 0 32% 1.452 28.04 26.96 1.08

B2- 0 15 002% 104 H 0.01 2.16 0.01 I_ 2 16

92 - TOU APeelt) 2.31 034% 1.009 1.76 43 91 1.761 41 60 231

B2 - TOU (Off-peak) 9 24 1 35% 1 12 15 118.32 12.15 I 113.61 471

B3-11/33 llt.Peaki__ 046 007% 16 0 65 8 78 0.6 8.32 0.46

94 878 131% 3 4 79 111.53 4.79 10714 4 39

I Total IndusMai 24 0.00% 3,670 19.37 323.76 19.37 1 310.34 13.42 1

Bulk I - • J Ctra)Supply_at 400 yoga - up to 5 IIIN 0.00% 11 •

piSygotr at 400 Voits emceed 5 kW 0.15 0.02% 78 0.68 2.23 0 68 2 23

Time dl Use (TOW- Peak 0.46 0.07% 105 144 878 0.21 8 32 0 46

Time of Use (Ttu) - Off-Peak 2.31 0 34% 12 144 30 04 144 28 89 1.16

02 Sup177 at 11 kV 1.23 0 113% - 1 02 17 63 1 02 17.63

Time of Useattaz Peak 2.47 0.37% 25 0 70 46 84 0 70 44.37 2 47

Time of Use (TOU) • Off-Peak 10.48 1.93% 25 3.57 128 66 534

.p_i ggAbove 11 kV

3.57j 134.10

• •

Time of Use (TOU) - Peak I - I

I Time of Use (TOU)- Ott-Peek -

I Total Single Point Supply 17 I 256 7.82 239.62 7.62 230.30 9.32 I

Agricultural Tube-wells - Tariff D -

01 Seem 1 69 0.25% 294 25.76 20.34 5 42

Time of Use (TOU) 1.54 023% 27 50 F_ 27.50 - Time or use (IOU) 909 1.35% 106.81 106.81

D2 Agncullual Tubewells 497 33 74.00% 22,494 96.06 6,654.93 77.20 5,719.26 18.86 935.67

AgnculueLTuge-emils 0.2 OS

Time of Use (IOU) - Peak 192(1) 3,139 16.23 16 23

Time of Use (TOU) - Peak 0-2 0 77 0.11% 521 _ 309 14 64 3 09 11 55 3 06

lime of Use (TOW • off-Peak 02 5.55 083% 70 44 49 09 21,35

Toed Agriculture) 616 26,448 115.38 6,900.07 96.52 5,934.54 18.66 965.53 I

Pablic Ligotig 0.46 007% 260 6 47 6 47

Residential Colonies H 001 0.00% 0 08 0.06

Specel ConlraMs • TariffKjaJe)

Time of Use (7039 • Peak Time of Use (TOU) - Off-Peak

Raikvay TradionTraction -1

o-Genralion-J

General Semite

Grand Total 672 I lac 00%1 5138,965 1 149.14 9,15227 130.25 7.827.81 18.86 1.334.66 I

Page 163: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Mown% 11

200 1

050

6.71

8 69

480

100

1.00

100

0.50

00

100

100

0 50

1.00

0 51

1.00

0 50

400.00

400 00

400 00

380 00

380.00

380 00

15.00

14.50 400 00

10.00 400.00

13 DO 400.00-

14 30 380.00

19.00 380.00

12 80 380.00

15 20 •

17 85

11.75

20000 13 38

200 00

200 00

200 00

200 00 1900

200.00

200.00 12 70

200 00

1400

14 00

15.00

14.50 I

16 DO I

12.50

14 30

18 00

12 30

12 00

17 85

11.75

11 50

15.00

8.85

4.00

3 85

1.88

1400

14 00

12.25

FORM - 29

QESCO

Proposed Revenue and Subsidy Statement Mar-2018

0.15 0.02% -

044 0.07% 1087

206 012% 1452

0 15 002% 104

221 034% 1.009

8.83 1.38% 1

0.44 0.07% 16

839 131% 3

Total inoustol 23 I 3,670

PPM) I 1sssire

Residential

Up to 50 Units

IFor pen load requirement up lc 5 MY

01400 Units

101-300 Units

201-300 Units

301-700Units

I Above 700 Units

For ak load requirement exceeding 5 kW

_ Time of Use (70U). Peak

Time of Use (TOU) • Off-Peak

Tonal Residentla

Commercial - A2

Commercisi - Gar peak load requirement up to 5 kW

Commercial ro8101

Commerdai (c20 KW) For peak load requirement exceeding 5 kW

Time of Use (TOU) - Peak (A.2)

I Time of Use (TOU) Off •Peak (Terms)

Total Commereffil

Industrial

81

IEPeak

81 • (Off Peak)

02

92 TOU (Peak)

82 • TOtaf

133- 11/331afPeek)

04

(RelEVOMI (R2AMIN (FlaNWNI) pisikW17/ I 19.6W*9

400 - 2.00

12.50 5 79

15.00 811

15.00 10.20

17.00 16.00

19.00 1800

19 00 18.00

1300 • 12 50

19 00 1800

400.00 1500 400.00 15.00

400.00

19.00 400.00 18.00

400 00

1300 400 00 12 50

14.50 - 1---- 14.50

-4 19.00

13 00

-

16.00

• 12.50

400.00 14 00 400 00 14.00

400.00 19.80 400.00 18.00

400.00 12.80 400 00 12.29

380.00 19.00 380.00 18.00

380 00 12 70 380 00 12.20

(kW1 Marl

3.09 048% 124.575

29 43 4.59% 168.082 I

677 1.05%

927 144% 102.852

942 1.47% 29,542

B.71 1.51% 5,859

088 014% 2,649

0 41 0.69% 17,663

72.99 I 451,029

839 1.31% 104,620

19 28 300% 34

191 0.30%1 2.618

7.06 1 10% 37

35.64 0 00%I 107,308

Bulk

aa.g7tply at 400 Volts • up to 5 kW . 11

CI (6) Supply at 400 Voss -exceeding 5 kW 0.15_ 0.02% 78

Time of Use (TOU)- Peak 0.44 007% 105

Time of useinyhOff-Peas 2 21 0.34% 12

02 Supply at 11 kV 1.18 0.18% -

Time ol Use (T016 - Peak 2.35 037% 25

Time el Use (IOU) Off-Peak

I

10.01 I 1.56%1

-

25

C3 Supply above 11 kV

1_ Time of Use (IOU) - Peek

Time of Use (TOU) - Oft-Peak 1

.. 1

1

Teat simile Point Sueolvl 15 I 258

Agricultural Tube-wells • Tariff 0

DI Scarp 1.62

Time or Use (IOU) 1.47

Time of UsejTOU) 8.68

02 Agrcuftual Tube-wells 475 01

Tube-weilt 0-2 (p)

Time of UsagOU) Peak 0-20/

Time of Use TOU)- Peas 0-2 0]4

Time of Use (TOW Off-Peak 02 5.30

Total Agricultural' 493

0 44

001

Grand Total 642 100 00%I 590.955

Public Lighting G

Resdentid coronas H

apd_al Contracts • Tariff K

_ Time of use (IOU) - Peak

Time of Use (YOU) • Off-Peek

Railway inectionTraction • 1

Co-Genation J

General Service

0.25% 294

023% •

135% -

74.00% 22.494

3.139

011% 521

083%

I 26,448

007% 280

000%

Page 164: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

(kw)

124.575

168,082

102.652

29,542

5,859

2.549

17.663

451,023

(14reer

3 09 0.45%

- 0,00%

29 43 459%

6.77

927 1.44%

301-700Unds 942 147%

Above 700 Units 9.71 1.61%

For peak load requirement exceeding 5 kW - 0.00%

Time of Uat_j_OU) • Peak 0 68 014%

Time of Use (TOU) • Off-Peak 4 41 0.69%

1 Total Residential 72.99 0 00%

Commercial-A2 . 0.00%

Commercial - f or peak reed requirement up lo 5 kW 8.39 1 31%

Commercial (4100) _ 19.26

3 00%

Commercial 1420 KW) For peak load requirement exceeding 5 kW 000%

Regular 0.00%

time cd Use (70U) • Peak (A-2) 191 _ 030%

Time of Use (TOU)- Off-Peek gene/ 7.06 1 10%

I Total Commercial 36.64 I 0.00%

(IncluStrrel 000%

B1 0 15 0.02%

B1 (Peat) 0 44 0 07%

Br Jai Pee) 2.06 0.32%

02- 0.15 002%

B2- 70U (Paso) ) 2 21 0 34%

_

6.63 138%004p 132 -1121_4(0aasa

BS 1133 KV (Peak) 0.44 0 07%

84 839 5.31%

Total Industrial 23 1 000%

Residential

Up to 50 Unite

For peak load requirement up lo 5 kW 01.100 lines

101-300 Units

101.300 Units

104.620

34

2.818

37

107,308

1.084

1452

104

1.009

1

16

3

3.670

Sulk

iSupply at 400 Vans- up to 5 kW 000%

11

Cut) Supply at 400 Volts -examen 5 kW 0 15 0.02%

78

0.44 007% 105

221 0.34%

121

1.18 018%

2.35 037%

25

10 01 1.56%

25

16

256

1.62 025%

1 47 0.23%

868 135%

475 01 74 00%

3,139

0 74 0.11%

521

5.30 083%

493

26.446

0 44 1 007%

260

ResideMial Colonies H 0 01 0.00%

Special Connects • Tariff K (441K)

Time of usagpu( - Peak

Time of Use aDg - OH-Peek

Howe_ rixtionTradion - 1

CoGenrallon-J

General service

Grand Total' 642 1 100 00% 586965

Time or Use (70U) - Peak

Time or Use (rOU)- Off Peak

02 Spear all1 kV

Time of Use (IOU) - Peak

_ Tine of Use (700) CW•Peek

C3 Supply above 11 kV

Time or Use (TOU) • Peak

Time of Use (TOU)- Off-Peak

Total Single Perot Supply

Agricultural Tube-wells - Tariff 13

Di Scare

Time or Use (TOU)

Tinsel Use (TOU)

02 Agnorreen Tube-wells

ADdcutrual Tube-wells D-2 (II)

Time or Use 0048 Peak 020)

Time of Use (701). Peak D.2

Time of Use (TOU)- Off-Peak 02

Total Agricultural

19u1slic Lighling G

22.491

294

FORM • 29 I A)

QESCO

Proposed Revenue and Subsidy Statement Mar-2018

(YAM) (kiln Rs, (Min Rs)

12.36

367.88

101.53

{min Rs) lren RH

6.16

170 40

54 90

Odin reel min Rs)

618

197.48

46.64

139.06 94.56 44 50

160.10 150.68 9.42

184 53 174 82 971

18.78 15.89 0.88

57.39 55 18 721

- 1 1,039.63 722.61 317.02 I

159.37 150.98 El 39

0 09 289 15 0.09 289.15

• •

0.95 36.35 0.95 34.43 191

5.74 91 az 5.74 68.29 3 53

6.77 676.69 6.77 662.88 13.63 I

• J 2.13 213

8.39 795 044

26.78 25 75 103

07I 2.06 0.01 2 06

1 76 41.94 1.78 39.73 221

12 15 113.01 12.15 108.51 4.50

0.65 839 065 7.95 044

4.79 106 52 4 79 102 33 4.19

19.37 I 309.23 19.37 296.41 12.82 1

0 68 2 13 068 2.13

0 21 8 39 0 21 795 0 44

1.44 26 69 1.44 27 59 1.10

1.02 16.83 1 02 16 83

070 44.73 0.70 42.38 2 35_

3 57 128 08 3 57 123.08 5 00

7.62 228.87 7.62 219.98 8.90

• j 24.60 19 42 5.18

2627 28.27

102 01 102.01

89.37 6,366 26 63 76 5.462.58 25.61 893 68

16.23 - 16,23 -

309 13 98 3.09 11.04 I 2.94

67 28 46 se 1 20.40

108.69 6,690.40 83.08 6,888.20 26.91 922.20 I

6.15 6 18

0 06 0.08

• •

142.45 1 9,761.07 116.14 7.476.30 25.61 I 1,274.76 I

Page 165: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

.a W

1.68

3 20

4 00

588,985 I

1 FORM • 29

QESCO

Proposed Revenue and Subsidy Statement Jan-Mar 2018

1

12

fLi

(meNni I nespe)

I 070

[Residential

U 1o50 Units 9.62 048% 124.575

For peak load requirement to 5 WV - •

01.100 Units 91.64 4.59% 158,082

101.300 links 21 08 I 05% -

201.300 Unds

301-700Unfle

26 87 I 1.44% 10]6521

29.32 147% 29.542

Above 700 Undo • 30.24 1.51% 5.859

I

For peak load requirement exceeding 5 kW - _ -

Time of Use (TI: - Peek 2.75 I 014% 2549

Time of Use (TOU). Off-Peak H 13.75 I 0 69% 17.663

Total Residential 227.27 I I 451,023

Commercial • A2

Commercial • For peak load requirement up to 5 itW 26 12 I.31% 104.620

Commercial (<100) 60 02 3.000% 34

Commercial 1020 SAI For peak load requirement exceeding 5 kW

IR.398181 Time of Use (110U) - Peak (42)

I Time of Use (70U) • On-Peak (Temp)

Total Commercial

Industrial

B1

Eli (Peak)

81 - (0 If Peak)

B2

82 • TOO (Peak)

B2 - TOIL l:peak)

83-1193 KV (Pawn

84

Total Industrial

1 1 I I 1

IRP1Mbi

200 3

6.71

6 89

4.60

100

1 oo

1 DO

050

1 00

I

- I

596 I 0 30%1 2.616

21 99 I 110%I 37

114.09 I 000%I 107,308

0.461 002%I I

1.37 0.07% 1.084

641 032% 1452

046 0.02% 104

6.97 0.34% 1,009

27.49 1.38% 1

1.37 0.07% 16

26 12 1.31% 3

71 I I 3.570

11

78

105

12

25

25

256

294

22 494

3,139

521

26,4411

260

(S■egal

200 00

--I 200 00

200 00

I 200.00

• •

400 00 1900 400.00

I 400.00 13.00 400.00

Insrkwasi

19 00

400 00 1-1 15 00 400 00

14.50

19.00

13.00

400.00 14 00 400.00

400.00 19.00 400.00

400.00 12.80 400.00

380.00 19.00 380 00

380.00 12 70 3130 00

15.00 - 15 00

400.00 14.50 400 00 14.50

400.00 19 00 400.00 1900

400.00 13 00 1 400.00 12.50

390.00 14 30 380.00 14.30

350.00 19.00 380.00 18.00

380.00 12.80 380.00 __1230

- •

IRelkWhI

15.20

17 85

11.75

13 38

19.00

12 70

14 00

14.00

12.25

400

12.50

15.00

15.00

17 00

19 00

19 00

13 00

CROWN) (ROMP° (Ream/MI

2 00

5.79

8 11

10.20

16 00

18.00

18 00 1

12 50

16 00

15.00

16.00

12 50

14 50

18 00 •

12.50 •

14.00

1800

12.29

18 00

12 20

12 00

1795

11.75

200.00 11.50

200.00

200.00 15 00

200.00 885

14 00

14.00

Bulk

C1(e) Supply a1400 volts - uQjo 51)W

C1(0)S_upply_e1400 Volts .exceers 5 kW 0.46 002%

Time of UseEOU). Peak _ 1.37 0.07%

Time of Use (-mu) • Off-Peak I 6.87 _0.34%

C2 Supphr at 11 kv I 367 0.18%

Time of Joe (TOU) • Peak 733 0.37%

Time of Use (TOU)2 Off-Peak 31.16 1.56%

C3 Supply above 11 kV

Ti

Time of Use (TOU). Of f.Peeli H - I

me of Use pu o) • Peak

Total single Point Supply) 51 I

Agricultural Tube-wells • Tariff D

0.25%

023%

DI Scam 5.04

4.58

27.03

Time or Use (TOU)

Time of Use (TOU) 1.35%

02 Agncullual Tube-wells . 1479 06 74.00%

Niii_cultual Tupe-walla 0-2 Itill -

Time of Use 0011)- Peak 0.210 -

Time of Use (Tan. Peak D-2 . 2.29 0.11%

Time of Use (TOU) - Off-Peak D2 16 50 0.83%

Total Agricultural 1.636

Public Lighting G 1 37 0.07%

Residential Colonies H 0.02 000%

,striat Conlraols - Tarn, K 10.111)

Time of Use (TOU) - Peek -

nine of User00,1=,Off.Peek -

Raiieby TrectionTractron - I

CoGenratladJ

General Service

Grand Total 1,999 100 00%

Page 166: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

(%AP) Ifev Re) (Min Rn) tile Rn) PAM R% (Mn Re in Rs)

FORM - 29 ( A )

QESCO

Proposed Revenue and Subsidy Statement Jan-Mar 2018

'Residential

up to 50 Units 9 62 0.48%

For peak baa requirement up lo 5 kW - 0.00%

01-100 Units 91 641 4.59%

101300 Unita 21,08

101300 Units 28.87 1 44%

301.709Unas I 29.32 1 07%

Above 700 them 11 30 24 151%

For peak load requirement exceeding 5 kW - 0 00%

lime of use (IOU) • Peak 2 75 14%

rime of Use (TOW. Off-Peak 13 75 0 59%

Total Residential 227.27 0 00%

- 000%

26 12 1.31% 104.620

60.02 3.00% 34

- 000%

000%

596 0.30% 2,610

21 99 5.10%

37

114.09 000% 107,308

Industrial . 0.00% -

81 046 0.02% •

01 (Peak) 1.37 0.07% 1,084

131 • (Off Poem_ 641 032% _ 1,452

02- 0.46 0.02% 104

02. TOU (Peak) 8.87 0.34% 1.009

B2 - TOLJ_LCM-RealL

27 49 138% 1

B3- 11/331(V (Peak) 1.37 007% 16

I 134 I 26 12 1.31% 3

I Total Industrial' 71 0.00% 3,670

Bulk

C1(a)Supply al 400 Volts - up io 5 kW 1 _- 000% 11 •

C1(1S5rppl)( at 400 Volts -exceeding S kW 1 046 0.02% 78

Time of Us_a_EOU). Peak I 1.37 007% 105

Time of use (TOU) • Off-Peak 6.137 0.34% 12

, rp_ply al 1 1 kV 3.67 0 18% -

lime of use (704) . Peak 7.33 0,37% 25

Time of Use (TOU) • Off-Peak 31.16 1.56% 25

C3 Supp_troye 11 4V

lime of U5eg:112) • Peak H ' I -

I Time of Use (TOU)- Off-Peak I - I

I Tagil Single Point Supply' 61 I 256

Agricultural Tube-wella - 78116 D I - • D1 Scarp I 504 025% 294

Time ofOse(TOU) 4.58 0.23% -

Time of Use (TOU) 27.03 1.35% •

11.9yricultuai Tube-wells 1,479.08 74 00% 22.494

Nec_ulwal Tube-wells 0-2 (ii) - - Time of Use (T0U) • Peak 0-2(i)

3,139 •

Time of Use (Tay) - Peak D.2

2.29 011% 521

Time of Use (TOU) Off-Peak 02

16 50 083%

Total Agricaltumi

1,535 26,448

Pubic L19MIng G

1 37 0.07% 260

Residential Colonies H

0 02 0.00%

flcoril Contracts • Tariff 141A429

Time c ..%_(Te OU) . Peak

Time of UsiLROUT Off-Peak

ReariSreolonTractIon - 1

Co-Genratmn1

General ServIal

124,575

168,082

102,652

29,542

5.859

2.649

17.663

451,023

Commercial • A2

Commercial - For peak Mad requirement up l0 5 kW

Commercial (4 100)

Commercial H20 KW) For peak load requirement exceeding 5 kW

g•te Mar

Time Of Use (IOU) - Peak (A-2) llme of Use (WU) • Off-Peak (Temp)

Total Commercial'

H

0 26

52 24

178,70

3,237.20

496 23

900 37

38.49

1,145.51

316 16

433 00

498 52

574.59

026

530,60

170.94

294.44

469,20

544 34

49.49

171 83

2,250.08

470 12 26 12

900 37 1

19 24

614 91

145 22

138 58

29.32

30 24

2.75

6.87

987.12 I

J 1914

• - .

2.03 664 2 03 664

_ 0 83 26 12 0.63 24 74

4.33 89.35 4.33 8591

3 05 52.42 3.05 52.42

2,09 139 29 2.09 131.96

10.71 398 82 10 71 383 24

_ • - - -

- - - -

• • . -

22.85 712.84 22.85 884.92

284 31

48 70

917

342.28

2.135

17 22 I

20.32

0.02

5 28

36 46

1 95

14.38

68.10

. H

76.61

81_79

317 65

19,792 12

43.53

209 49

20,521.19

19.24

0 25

• ' ' I - _

• '

113 18 285 107.22 I 596

285.92 I 17.22 274.92 I I 11.00

1,795.69 20.32 I 1,752.62 I • I 43.07 I

- i

6.64 - 664

26.12 • 24.74 137

6339 - 80 19 3 21

641 002 6 41 -

130.59 5 28 123 71 6.87

351.90 36.46 337.68 14.02

26.12 1 95 24 74 1.37

331.69 14.38 318 63 1306

962.87 I 58.10 I 922.96 39.91 I

. . I - _

H •

- 6048

81 79

317 65

223.82 17,009 38

4870 •

9.27 34.37

145 98

261.79 17.649.65

1924

025

80 49 2,782.74

9.16

63.51

60.49 2,871.531

27.72

.J 16 13

1 37

3 44

7 33 _

15 58

443.55 27,249.09 383.06 23,279.73 60.49 3,969.36 Grand Total 1,999 100.00% 5613.035

Page 167: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

IeNWIM;

6.71

6.89

4.80

1.00

1,00

1.00

0 50

100

1.00

0.50

15.00

400 00

14 50

400.00

1900

400.00

13.00

380 00

14 30

36000

19 00

380 00

12.80

1520

17.05 I

200 00

13.38

200 00

200 00

19.00

200.00

12 70

15.00

400.00 14.50

400 00 18.00

400.00 12.50

38000 14.30

380.00 18 00

380.00 12.30

1200

17.65

• 11 75

200.00 11 50

200.00 - 20000 1500

200.00 1 8.85

1400

14 00

14.00

14.00

12 25

H

IMMOinu 1 Mewl 1

Residential

Up to 50 Units 346 045% 124.575

For peak load requirement up to 5 kW

01-100 Units 32.92 I 4.59% 168.082

201-350 Units 10 37 1 1.44% 102.652

101-300 Units 7.57 1.05% -

307-71100nde 10.53 147% 29.542

Above 700 units 10.86 1.51% 5,859

For peak load requirement exceeding 5 kW

lime of Us!_g0U)- Peak 0.99 0 14% 2.649

Time of Use (101.1) • Off-Peak 4.94 I 0 69% 17.663

1 Total Residing.' 81.63 I I 451.023

ICommercial • A2

Commercial • For peak load requirement up 10 5 kW

9.38 1.31% 104.520

Commercial (.1001

21.56 3.00% 34

Commercial Cr20 MSC For peak load requirement exceeding 5 kW

ROy ter

Tome of Use (10u- Peak (A-2)

2.14 0.30% 2518

Time of Use ITOU) • off-Peak (Temp)

7 90 1 1 10% 37

Total Commercial

40.98 I o.oy41 107.306

Industrial

B1 0181 0026

a (Peak( 049 0.07%

1,084

1.452 61. 1011 Peak) 2.30 0.32%

0.16 002% 104 B2 -

247 034% 1.009

9.67 1 1.38% 1

9.3B 1.31%

0.41 0.07% 16

.3 3

26 1 3,670

Bulk

CilMSuppLy al 400 Volts • up 10 5 kW • 11

01(b) Supplyl0 Volts -exceeding 5 kW 0.16 002% 78

Time of Use (701.1EPeak 0.49 007% 105

Time of Use (T018- OR-Peak 2.47 I 0 34% 12

Ciaippj at 1 1 kg 1.32 0.18%

Time of Use (T0u) • Peak 2 63 0.37% 25

Time of use 110U1 Off-Peak 11 19 1.56% 25

Supply above 11 kV

Time of usef101.)eak

Time of Use (10U)- Off-Peak

1 Total Single Pelf" Supply 16 256

Agricultural Tube-wells - Tariff 0

Di Scams 1 81 0.25% 294

Tore of Use (TOU) 1 65 0 23%

Time of Use ROUT 9 71 1.35%

O2 Agncuilum Tube-welis 531.25 74.00% 22,494

nuke& Tubwwelis D-2110

Time of Use (IOU) • Peak 0-2(1) 3.139

Time of Use (IOU) Peak 0-2 0.82 0.11% 521

Time of Use (TOU) - Off-Peak 02 5 92 0 83%

Total Agricultural 661 1 26,448

Public Opting G

Reudenh 0.00% al Colonies H

1 260 0.48 0

0.01

special Connects • TOR K (AK)

rime of Use frOU) • Peak

Time Of Use (TOU) Off-Peak

Railway TractionTraction •

Co-Genraifon-J

General Service

Grand Total 7113 100.00%1

mos I

OUWW/M) 0: ✓ AN

4.00 1 200

12 50 579

15.00 I 8.11

15 00 10.20

17.00 16.00

19 00 18 00

19 00 18 00

13.00 • 12 50

19.00 18.00

400 00 15.00 400.00 15.00

400.00 19.00 400.00 18.00

400 00 13 00 400 00 12 50

14 50 1 1450

19.00 18.00 • 1.00

13.00 12 50 • 050

400 00

14 00 400.00 19 00 - -

400.00

19 00 400.00 18.00 100

400.00

12 80 400.00 12 29 0 51

380 00

19 00 380 00 16.00 - 1.00

380.00

12 70 1 380 00 12 20 050

FORM - 29

QESCO

Proposed Revenue and Subsidy Statement Apr-2018

J

I

NW) Otagel

B2 IOU (Peak)

62 TOU (on.poax)

03- 11/33 KV (Peak)

B4

Telal Industrie

Crisco T)

1.00

0 50

1.00

0.50

32is 188

400

3 85

Page 168: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

1 FORM - 29 ( A )

QESCO Proposed Revenue and Subsidy Statement Apr-2018

1

0 09

0.95

5 74

6.77

(Min Rel

13.82

411 44

113 56

155.52

179 06

205.36

18.76

64 18

1,162.73

178.24

323 39

40.65

102.70

644.67

3851

98 75

629.60

0.95

574

6.77

(Min Re) (Min Rs) 11

6.91

22086

52.16

49 77

10 53

1086

0 99

2 47

354.55 I

168 86 938

0.09 323.39

(Min Re)

2.39

6.89 049

28. 80 1.15

2.30 •

44 44 • 247

5.04_

0.49

4.69

14.33 I

0.01

1.76

12 15

0 85

4.79

19.37

121 36

6.69

114 45

331.51

IMin Re)

691

190.58

61.40

105 76

168 53

195 52 52

1777

61 72

808.18

2 14

3.95

16.47 I

(ken Rs)

068

021

1.44

1 02

070

3.57

7.62

105 23

16.23

3,09

125.55

(sews) (%egel

i m

Commercial • 42

Commercial •

Commercial (a133) 21.56 300% 34

For peak load requiremem exceeding 5 kW Commercial (420 KW)

Regular • 0 00%

-

Time &Use (TOO) - Peak (A-2) 2 14 0.30% 2818

1 III Industrial

lime of use (TOM - Of-Peek (Temp)

Toted Commercial 40.96 0 00% 107308

7.90 1,10%

000%

37

01 0.16 0.02%

iltliceek) 0 49 0.07% 10134

-I

BI- (01I Peak)

82 .

132 • TOU (1±11L

0 16 0 02%

2.47 0.34%

2 30 0 32%

1,009

1.452

104

B2 - TOU (On-peak) 9.87 I.38% 1

133- 11133 icvreatO 0.49 0.07% 16

-1 1

114

Tool !Sushi al

9 38 1 31%1

26 1 0 00% 3.670

3

Built

• 0 00% 11

1

Itt11 SuPPIY ai 400 Volts-up to 5 kea

C1(0) Supply at 400 Volts 4xceeding 5 kYV

Time of Ust(11392Peak 049

0.16 0.02%

0 07% 105

78

02 sappy lei i 1 av -] 1.32 -

Time OUse (70u). orceeax 247 0.34% 12

C3 Slippy above li kV _

11 19 1.54%

2 61 0.37%

0 113%

2 5

25

I

Time &Use (TOU) • Off-Peak

Time of Use (TOU) - Peak

TmeolUse (TOU) • Peak - -

1 Time of Use (TOM - Off•Peak - -

i

Total Single Poise Supply FA rgIcultiral Tube--walla- Tariff 0

DI Scarp 1 81 0 25%

18 256

Tme or Use (TOU) 1.65 0.23%

.1

Time of Use f OW

D2 Agncunuo Tube-wells 531.25 7400% 00% 22.494

9 71 1.35%

AgLictoluel Tube-wells D-2 a -

Time of Use (MU). P081(13.2(0 3.139

Time of Use (TOU) -Peak Peek D-2 521

0.82 0.11%

Time of Use (TOU) - Ofi-Peak 02 5.92 I 0 83%

I Total Agricullurai 551 I 1 26,448

Puttee Ligmm9 0 0 49 0.07% 260

Residents) Colonies H 0 01 0.00% •

c-I

special Contracts • Taillf1_14 AJK)

Time of Use (TOUR- - Peat

rime of Use (TOU) • cm-Peak

Raihrfay_TrecticnTrecton • 1

i 1 General Sonic.

CO-Genralion-J

I Grand Total 718 1 100 00%1 585.965

294

159.31 8,787.27

0 01

1 76

12 15

0.65

79

19.37

27.52

29 38

114 09

7108 69 9761

j1623

3 09 15.6

75 24

7.370.75 116.93

6 91

0.09

2.39

938

29.95

2.30

48.90

126 39

9.36

119.14

345.84

2.39

9 38

32 09

1883 83

50 03

143.25

266.87

--]

j

160.601 8361.56 1 0112 1,425.71 I

068 2.39

0 21 8 89 0 49

239

1110442 3180 8683

1 23

0.70 47.40 2 63

357 137.65 5.60

7.62 246.01 9.96 1

579

21.72

29 38

114.09

6,109.39

12 34

5243

5.339.36

6 91

0.03

8 62

3 29

22 81

8.62 1.031.39 I

999 50

Residential

Up et 50 Units 3.46 0.48% 124.575

1For peak toad requirement up to 5 kW - 0.00%

101-300 Units

01.100Units

101.300 UM%

32.92 459% 168082

7 57

10 37 1.44% 102,652 -

301.7001MM 10.53 I 47% 29,542 -

Above 700 Units 10 86 1.51% 5.859 -

1

For peak load requirement exceeding 5 kW

Time of Use (TOU) - Peak 099 014%

• 0.00%

2.649 •

1 Time of Use (TOU) - Orr-Peac 4.94 069%I 17.663 •

Total Residential 81.63 0 00% 451,023 -

. 0.00%

For peak load requirement up to 5 kW 9.36 1 31% 104620

Page 169: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 29

QESCO Proposed Revenue and Subsidy Statement May-2018

IResidential

Up to 50 urine

fRraWfml fR✓neel I

I 200

6.71

689

4 80

1.00

1 00

1.00

0.50

1.00

0.50

Time of Use (71:13._

02 Actrieultual Tube-wells

41.7acenual Tube-wells OlitiL

Time of UseiTou) -Peak D-29j

Time of Use (IOU) - Peak 0-2

Time or Use (TOU) - Off-Peak 02

Total Agricultural

Peelle bqhlinaG

osalianital Colonies Ti

coal Contracts Tariff K (NEC)

Time of Use (TOU) - Peak

Time of Use (TOLS• Off-Peak

Fthilacuon/raceon .1

Co-Genret,on-J

Time of use (TOU) 1 BUT__

General Service

Grand Tots

MikW111 1 Mese 1 I (kW Solgel IRSAW4dI (AVMs) R 11/ (R I

I I I 3 88 124,575 4.00 2.00

I 0 01

- _

36 95 I 4.59% 166.082 12.50 579

8 50 105% ' __ 15 00 611

1164_ I 44% 102652 15.00 10.20

1.47% 29.542 1700 16.00

151% 5859 1800

-

19.001

1 11 0 14% 2.649 19 00 18.00

5 54 I 0.69% 17.553 1 50 13.00

91.63 I 1 451,023 •

• 1.31% 104.620 19.00 18 00

24.20 3 00% 34 400.00 15.00 400.00 15.00

-

• 2.40 0.30% 2,618 400.00 1900 400.00 18 00

8 87 1.10% 37 400 00 13.00 400 00 12 50

000%I 107,308

0.18 0.02% - 14.50 14.50

0.55 0.07% 1.084 19 00 18 CO

1.452 H 13 13.00 - 12 50 259 _032%

0 18 0.02% 104 400.00 14.00 400 00 14 00

277 0.34% 1,000 400.00 19_00 400.00 113.00]

1.38% 1 400.00 12 80 400.00 12.29

0.55 057% 16 380.00 1900 380.00 18 00

1.31% 3 MO 00 12 70 3130.00 12 20

28 1 1 3,670

I • 11 15.00 • 15 00

0.18 0.02% 78 400.00 14.50 400 DO 14.50

0.55 0.07% 105 400.00 1900 400.00 18.00

277 0.34% 12

I

400.00 13 00 400.00 12.50

1.48 0.18% - 380.00 14.30 380.00 14.30

2.96 0 37% 25 380.00 19.00 380.00 18.00

12.56 1_56% 25 380 00 12.80 380 00 12.30

- 1 -

- F 21 1 I 256

1 I 2.03 025% 294 15 20 12.00

1.85

10 90 0 23%

135%

• I- -I 17.65

11 75

17.85

11.75

596.32 74.00% 22,494 I 200.00 13.38 200.00 11.50

3.139 200.00 200.00

0.92 0 11% 521 200.00 19.00 200.00 15.00

665 0.83% 200 00 12 70 200.00 885

619 1 1 26.448 1

0.55 007% 260 14.00 14 00

0.01 0330% 14.00 • 14 00

12.25

606 100 00%1 568.965 1

For peek load requirement ups, 5 kW .1

01-t 00 Units

101-300 Units

201-300 Urals

301-7000nn5

Above 700 Unite

For peak lead requiremeni exceeding 5 kW

Time of Use (IOU) - Peak

Time of Use (TOU) • Off-Peak

Total ROSIclontlal

Commercial • A2 _

Commercial • For peek load requirement up l05 kW

Commercial (4100)

Commercial (420 AM For peak leao raquiremeni Weeding 5 kW

Rega

Time of Use (IOU) -Peak (A-2) Time of Use (TOU) - Off-Peak (Temp)

1 Total Commercial

Indiletalel

131

81 ?oak)

812_p1 Peak)

B2 .

B2 • TOUjPeak)

B2 : TOU (011-peak)

83-11/33 KV (Peak)

B4

I Total Inclussisl

Bulk

C193_7pp0y al 400 Volts • up to 5 kW

Su pry 91 400 Volts -exceeding S kW

Time of Use (lOU) • Peak

Twee of Use (TOLIL._011.Peak

C2 Supoy_el 11 kV

Time of Use (TOU) • Peek

Time of Use (Too) - 00474as

C3 Susan kV

Use (TOU)- Peak of Tuns

me of Uwe (IOU) • on-peak

Total Single Point Supply

Agricunurei Tube-wells • Tariff D

11.82

12.19

-

10.53

"

46.00

11.08

10 53

1'00

0.50

050

1.00

1.00

S i 06

0.50

0.51

1 00

050

1 88

4.00

- 1 365

Page 170: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM -29( A)

QESCO

Proposed Revenue and Subsidy Statement May-2018

(min Rs) (kiln Re) (Min R5) (Min Rs) I Pon 85) Omwal (maga) (min Rs) (5w) (154655)

For payY load requirenaM up (0 5 kW

0Lt00 Units

101-300 units

101.300 Units

Residential

Up to 50 Units 388 046% 124,575

• 0.00% •

36.91 4.59% 188,082

8 50

11.84 1.441% 102.652

11.82 147% 29,542

12.19 I51% 5,859

0.00% -

111 0.14% 2.649

554 089% 17,663

91.63 000% 451,023

7.76

247.91

58.55

55.86

1162

12 19

1,11

277

397.98 I

7.76

213.92

613 92

118 71

189 17

219.48

19.95

69.28

907.17

15.52 H

481 84

127 47

174.57

200 99

231.66

21 06

72 05

1606.15

301-700Unim

Above 700 Units

For peek load requirement exceeding 5 kW

Time of Use (TOY) - Peat

I Time of Use (TOU) - 08-Peak

Total Residential

10 53 200.07 189 54

0 D9 363 00 0.09 383.00

45.63

115.27

723.98

43 23

110 84

706.61

0 95

5.74

8.77

240

443

I 17.37 I

0 95

5 74

6.77

2.68

9.98

32 33

2.59

49.138

2.68

10 53

33.62

2.59

52_65

0.01 0.01

1.76 1.76

0.55

5.26

16.09 I

0 55

1 39

2.96

6 28

11.18 I

6 50

(11 0411 1.12192

309 369

25 60

1.167/2

12.15 141 88 12.15 136.22

0.65 10.53 0.65 990

4 79 133.73 479 128.46

19.37 368.20 19.37 372.11

0.68 266 0.68 268

0.21 10 53 0 21 99B

1.44 36.02 1.44 34.64

1.02 21.13 1.02 21.13

070 56.16 0.70 53.20

3.57 16079 3 57 154.51

• •

7.62 267.32 7.62 276.14

30.89 24.38

32 96 32 98

128.07 128 07

125 75 7.979 64 136 79 6.857.72

16 23 • 16.23

17.55 3.09 13.86

84 46 5866

146.07 8,273.68 158.11 7,116.86

776 7.76

0.10 010

(11.04)

(11.041 1.600341 178.63 10.966.09 169.87 9.386.76

Commerdel - A2 000%

Commercial. For peak load regomement up to 5 kW 10.53 1 31% 104.620

Commercial (4100) 24.20 3.00% 34

Commercial (<20 KW) For peak load requirement exceeding 5 kW • 000%

_ Regular . - 0.00% -

Time of Use (TOU) - Peak (A-21 240 0 30% 2,618

ill I Time et Use (TOO - on-Peek Cramp)

8 87 I 10% 37

I Total Commercial 46.00 0D0% 107.308

Industrial • 0.00% - -

BI 0 18 002% -

131 (Peak) 0.55 0.07% 10134

131 - (Off Peak) 2.59 032% 1.452

B2 - 0.18 0.02% 104

92. TOU glialff _ 2.77 0.34% 1.009

B2 - TOQ(0fITEM)) 11.08 1.38% 1

83.1193 KV peal)____ 0 55 0 07% 16

Be 10 53 131% 3

I Total Industrial 28 0 00% 3,670

Bulk

pi(a) Supply m 400 Volts. up m 5 kW • 0 00% .11

(1)) Supply al 400 Vans -exceeding 5 kW 0.18 0 02% 78

Time of Use (To-u) - Peak 0 55 0 07% 105

Time of UseJTC4) • Olt-Peak 2.77 0.34% 12

C2 Supply et 11 kV 148 0.18% -

1

_ Time or UsefOU) • Peak

Time of Use (IOU) - Off-Peak 12.56 156%

2 96 0.37% 25

1C3 SnumpeplyoreitkecloiukV. peak --I .

-

.

.25

I Time or Use GOO - Off-Peak -

I Total Single Point Supply 21 256

Agricultural Tube-walla • Tariff D -

01 Scarp 2.03 025% 294

Time of Use gou) H5 0.23%

Time of UsefOU) 10.90 135%

024 dcultual lute-wells_ 596.32 74.00% 22.494 -

Nncuitual Tube-wells 0.2 00 -

Time or Use (TOU)- Peak D•20) 3.139

I_ Time of Use UO.1 • Peak 0-2

0.92 011%

lime of Use (70U) • Off-Peak 02

6 65 0.63%

521

I Total Agricultural 819 26,448

I Public Lighting G 0.55 007% 260

Residemial Colonies li 0 01 0.00%

Special Contracts - Tariff K (AJK) •

Time of Use (70U) - Peak -

Time of Use g_09 - On-Peak .

RailveadionTraction - 1

Co-Genration-J

General Service

1 Grand Toth 606 I 100 00% 588,965 - I

:_J 0.55

1.29

2 77

5 65

Page 171: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

1900

15 00

19 00

13.00 I

400 00

400 00

400 00

400.00

380.00

380 00

14.50

19.00

13.00

14 00

19 00

12 80

19.00

12 70

400.00 I

400 CO

18 00

400 00

15 00

400 00

18 00

400 00 I

12 50

400 00

400.00

400.00

380.00

3E10.00

14 50

18 00

12 50

14 00

18.00

12 29

1800

12 20

19.00

12 70

200 00

200.00 15.00

200.00 8.85

14.00

14.00

12 25

14.00

14.00

_ •

12.00

17 85

1175

13.38 200.00 11 50

200 00

200 00

200.00

1520 1 - 17.85

11,75

200.00

3.20

- -C 1 88

4 00

3.85

2 00

671

6.89

4 80

1 00

1.00

1.00

0 50

1.00

1.00

0.60

-±1-1111 1 06

0.50

1.00

0.51

1.00

0 50

1 00

050_ •

1 00

0 50

FORM - 29

QESCO Proposed Revenue and Subsidy Statement June-2018

rPkWHI I (Magi) I OCNI Mailer

3 861 048% 124.575

Residential

Up 10 50 Units

For peak load requirement up to 5 kW -

01-100 Un/s 36.75 4.59% 168.082

101-300 Units 8.45 1.05% -

201-300 Units 11.58 1.44% 102,652

301•700unils 11 76 147% 29,542

Adore 700 units 12.131 1 51% 5,859

For peak toad requirement exceeding 5 kW -

Time of use (TOO • Peak 1.10 0.14% 2.649

Time of Use (TOU)- Off-Peat 5.51 089% 17.663

I Total Residential 91.14 I I 451,023

Commercial - A2

Commercial For peak lead reepremeni up to 5 kW 10.47 1.31% 104,620

Commercial (Mom 24 07 3.00% 34

!

Comma/mai (<20 KW) For peat load requirement exceeding 5 kW - I

_Regular

m Tt Use BOO - Peak (A-2) I 239 0.30% 2,618

I Tme of Use (10111. Off -Peak (Term) 8.82 I 1.10161 37

I Total Commercial 45.75 I 0.00%I 107,308

Industrial - I

131 0 18 0.02% -

01 (Peak) 0.55 0.07% 1.084

B1- (On Peat) 2.57 0.32% 1452

B2- 018 0.02% 104

B2- TOU (Peak) 2.76 0.34% 1,009

k. El2 • IOU (OffLpeek) 11 02 130% 1

Or 11/33 KV slra6 0.55 0.07% 16

BA 10.47 131% 3

I Total Industrial 28 I I 3,670

4 00

12.50

15.00

15 00

17.00

19.00

19 00

13.00

2 00

• 5.79

8.11

- I 10 20

16 00

1E100

18.00

12 50

Bulk

CI(a) Supply a1400 Volts - up to 5 kW 11

(11)Sup_ply Hi 400 Volts -exceedwg 5 kW 0 18 0.02% 78

Time of Use (1129peak 055 0.07% 105

Time of use (TOU) - Oft•Peak 2.76 034% 12

C2 Suffpta111 kv 1.47 0.18%

Time of Use (TOtff Peak 2.99 0.37% 25

_Iffne ofUacji Tp) 011•Peak 11.49 2.56% 25

C3 Supply above II kV

Time of use (TOU) - Peak

Time of Use (TOU)- Off-Peak

Taal Single Point Supply 20 256

Agricultural Tube-wells - Tariff

DI Scarp 2.02 0.25% 294

Time of use (TOtA 1.84 0 23%

Time of use (IOU) 10.84 I 35%

D2 AgrICurluel Tube-wells 593 12 74.00% 22,494

Tube-waist:3-2in) •

Time of use FFOLli . Peak 0-20) - 3,139

_ Time of Use ROW • Peek 0-2 0.92 0.11% 521

Time of Use (70u) Off-Peak D2 6.61 0 03%

Total Agricultural) 615 2I3A48 I

sire g G 0.55 0.071 260

esdenlial Colonies H 0.01 0.00%

peciai Commas • Tariff K (AA() •

Tens of Use (TOU3 - Peak

Tenet of Use (Ma - Off-Peak

Railway TredrOnTraction .1

CoOanralion-J

General Service

Brand Total 801 100 00%1 688,966

H 15.00 : 15.00

40000 1450_ 400 00 14 50

400 00 19 00 400.00 113.00

400.00 13.00 400.00 12.50

380.00 14.30 380 00 14.30

380 DO 19.00 I 380.00 1800

380 00 12 80 380 00 12 30

Page 172: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

7.72

212 77

69.55

118 07

188.15

218 29

19.84

66 90

902.30

7.72

248.58

56.24

55 56

11 76

12 13

1.10

278

396.84 1

15 43

459.36

126.78

173 84

199 91

230.41

20.95

71 86

1,298.14

198.99 188.52 10.47

0.09 361 05 009 361 05

F

FORM -29 ( A )

QESCO

Proposed Revenue and Subsidy Statement June-2018

IResidential Iipi_513 Units

For peak load requuemem up to 5 kW

01.100 Units

101.300 Una

101.300 Units

301.700Ungs

Above 700 Units

1_ For peek toad requirement exceeda 5 kW

Time of Use (IOU) • Peak

Time of Use (10U) -Oa-Peek

1 Total Residential

Commercial A2

Commercial • For peak load requirement up M 5 kW

Commercial (<100)

(Mewl Mugs)

3.86 1 0.46%1 124.575

0.00%

36 75 59% 168.082

- •

845

11.58 I--144% 11 76

12.13

1 10

5.51

51.14

t47%

151%

0.00%

014%

069%

0.00%

000%

10.47 1.31% 104,620

24.07 3.00%

34

102H.852

29,542

5.859

2.6491

17663

451,023

H

Commercial (<20 KW) Flak load requirement exceeding 6 kW - 000%

Regular - 0.00%

2.39 0.30% 2,618

8.82 1 10% 37

45.761 000% 107.308

- I 000% •

0 18 0.02% -

0.55 007% 1.084

2.57 032%

1.452

018 002% 104

276 034% 1,009

11.02 1.30% 1

0.55 0 07%

16

10 47 131%

3

281 000%

3,670

Bulk

p. ply 81400 Volts - Lip to 5 kW - 000% 11

C(14) Supply el 400 Volts -exceeding 5 kW _ 0 18

0 02% 78

nine of Use (TOU) • Peak 0.55 a 07% 105

Time of Use (70U) • Off-Peak 2 76 0.34% 12

C2 Supp3f m 11 kV 147 015% •

lima of Use (TOU)- Peak 2.94 037% 25

lime of Use (IOU). Off-Peek 12.49 1.56% 25

C3 simply above 11 kV - •

Time 01 Use (TOU) - Peek - •

I lime of Use (100) • Off-Peek - -

1 Total Single Point Supply1 20 I 256 I

Agricultural Tube-wells - Tariff D - -

CI Scarp 2.02 0.25% 294

time of Use DOW 1134 0 23% -

Time of Use (TOU) 10.84 1 35% •

Nalicullual Tuba-wells 593.12 7400%_ 22.494

Aenculluel Tube-wells 0-31) - -

Time of use - Peak 0-20 3,139

Time Dl Use (TO.)_ Peek 02 092 0 11% 521

lime of use (IOU). Off-Peak 02 6 61 0 83% •

Tote! Agricultural' 615 1 26,446 1

Public aliting G 0.55 0 07% 260

Residertial Colonies I-I 0.01 000% •

Special Conine!- Tule K I.AJK) -

Time of Use() • Peek - -

Time of Use (TOU) - Off-Peak

_ -I I -

Reimer TractonTraction -1

CoCenralrooJ

General Service

1 Grand Total 801 100 00% 938,985

0 95 43.00 2 39_

5.74 1 110.25 4.41

6.77 I 702.62 1 . 17.27 I

f I._ _I

2.66 2.66 • -

10 47 9.92 - 0.55

33 44 32 16 - 1.29

001 2.57 0 01 257 • _

1.76 52.37 1 76 49.61 • 2.76

12.15 141.11 12 15 135.49 • 562

0.65 10 47 065 992 0.55

4 79 133 01 4.79 127.77 5.24

19.37 306.12 1 18.37 370.11 - I 16.00 1

0 68

068 2.66

0 21 10.47

0.21 992 0.55

1.44 35,83

144 34.45 1.38

1.02 21.02

102 21 02 •

070 5566

0.70 52 92 2 94

-- 3.57 159.93

3.57 153.68 625_ _

7.52 285.78

--11

3012

7.62 274.86 11.12 1

24.25

6 47 A

32.130 32. 80

127.38 127 38

124.79 1 ],93681 (10.711 1.115.90 135.50 6,132091

16 23 • 16.23 -

3.09 17 46 3.09 13.76 3.67

84.01 5854 25.47

144.11 5.229.17 164.52 7,077.86 (10.71) 1,151.51

7.72 1___ 712

010 0.10 -

- -

177.87 10,927.11 1E15.58 1 5.335.36

110.7111 1.551.75

H

Time of Use (TOU) • Peak (4-2)

Time of Use (T0U) • Off-Peak (Tea)

1 Total Commercla

Industrial

131

131 fis mak)

BI • fOff Peal!)

02-

B2. TOSI(Peek)

2. TOU (O9-peak)

3. 11,33 kV peak)

04

1

Total Industrie

0.95 45.38

5 74 114 66

6.77 720.09

Page 173: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM • 29

QESCO

Proposed Revenue and Subsidy Statement Apr-June 2018

(16Wal I (%agel

mom) (17slitWIMI

4.00

12 50

15 00

15.00

1700

19 00

19 00

13 00

200

579

811

10.20

1600

18.00

18.00

12 50

19.00

18 00

400 00 15 00 _ 400.00

15 00

400 00

19 00 400.00

18 00

400.00

130D 400 00

12 50

400.00

400 CO

400 00

%coo 380.00

14.50 14.50

19.00 - 18.00

13 00 - 12 50

14 00 400.00 14.00

19.00 400 00 18.00

12.80 400.00 12.29

1900 380 DO 18.00

12 70 380 00 12 20

1

15.00 - 400 00 I

1450 400 OD

400.00

19.00 40000

400.00

13.00 400.00

380 CO

14.30 380.00

380 00

19 00 380 00

380.00

1280 380 00

15.00 -

1450 •

18 DO 100

12 50 050

14 30 -

1800 100

12 30 1 050

makWAII ORMW10

2.00

6 71

6 89

4 BO

100

1 00

1 00

050

100

1.00 0 50

too 0.50

1.00

0 51

1.00

050

Residential

Up lo 50 Unls 11 19 0.413%

For peak load requirement up to 5 kW -

01.100 Wills 106.61 4.59%

101-300 Units 24 52 1.05%

201-300 Units 33.58 144%

301.7000n4s 34 12 147% _

Above 700 Units 35 113 1 51%

For peak load requirement exceeding 5 kW - 1

Time of Use (TOO • Peek

Time of Use (TOU) • off-Peek

I 3 20 I 0 14%

15 99 059%

I Total Residential 264.39 I

124.575

168.082

102,652

29.542

5.859

2.649

17,663

951.023

Commercial - A2

Commercial - For peak load requirement up to 5 kW 30.38 1 31% 104.620

Commercial (4100) 69.83 3.00% 34

Commercisi (420 KIM For peak load requirement exceeding 5 SW

Sear

Time of Use (7011) Peak (A-2)

Time of Use (TOO - ORPeak (Temp)

Total Commercial

industrial

DI

Ell (teak)

• (Oil Peak)

82-

02 .liro_(Pea)

132 - TOU (Off:peak)

133- II 133 KV (Peak)

134

Total incluauis I 82 I

Bulk

C I (a) Supply al 400 Volts - up to 5 kW 11

Ca Supply at 400 Volts •excee4irre5 kW 0.53 0.02% 78

Time of Use (10U)- Peak 1.60 007% 105

Time of LaJTOLAPeak 8.00 034% 12

25

Time of Use (709) • 011-Peak I

36.25 1 93.4

25

C2 Supply ells kV 4_26 0.18% - Time of use (101.0 - Peek o 37%

03 Supply above II kV •

Time ofips

Time of Use (TOU) • 011-Peek

t17i

Total single Point supply) 59 1 2615 I

Agricultural Tube-wells - Tariff D

01 Scarp 5.86 0.25% 294

Time of Use (TOU) 5.33 0.23%

Time of Use (10U) 31.45 1.15%

AmIcunuel Tube-wells 1.72070 74.00% 22,494

Agncullual Tube-wens 0-2 00

lime of Use (10(.) - Peak 1120) 3,139

Time of Use (100) Peek D-2 2.67 0.11% 521

TM. of Use (70U) Off-Peek 02 19 19 0.13%

Tom! Agdculturall 1,785 I 26,448 I

Public Lighiing G 1.60 0.07% 260

Residential Colonies H 002 000%

Comracls • Tariff X (AM)

Time of Use (TOLIPsiek

Time of use (709 • 011•Peak

Railway TraclionTractiom 1

Co-Genretion-J

General Service

Grand Toted 2,325 I /00 00%) 588.965

13J 030% 2,618

25.59 I 1.10% 37

132.73 I 0.00%I 107,308

0531 0.027-.1

1 60 I 0.07% 1084

748 0.32% 1.452

0.53 0.02% 104

8.00 0.34% 1.009

31.98 1.30% 1

1 BO 0.07% 16

30.38 131% 3

3,670

15.20

12.00

3 20

17 85

17 85

11.75

11.75

200 00

13 38

200 00 11.50

1.88

200.00

200.00

200 00

19 00

200.00 15.00

400

200.00

12 70

200 00 885

3.85

14.00

14.00

14 OD

12 25

Page 174: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

FORM - 29 ( A )

QESCO Proposed Revenue and Subsidy Statement Apr-June 2018

Residential

(Iambi (Wage evil (Wage PAH Bp (Min RE min vii train Rsi ihen las) Rol

Up 10 50 Unds 11.19 0.45% 124,575 - 4478 22 39 22.39

Forpeak bad requiremen1 up to 5 tW • 0.00% . - •

01.100 Odds _ 106.61 4.59% 168,082 - 1,33263 617.28 715.36

101.300 Units 24.52 . 367.131 195.86 168,95

101.300 Units

[

33.58 I44% 102.652 503.74 342 54 161.20

301.700Unds

Above 700 units

34 12

35.15

147%

1.51%

29.542

5,859 . k 579.96

668.45

545 85

633.27

34 12

35.18

For peak load requirement exceeding 5 kW - 0.00% • , -

Time Of Use ff0U). Peak

Time of Use (TOU)- OffiPeah

d 3.20 0 14% 2,649 - 80.77 57 57 3.20

15 99 0139% 17,663 . 207 89 199 90 8.00

I Total Residential 264.39 000% 451.023 3,756.02 - 2,617.66 1,148.38 I

Commercial - A2 0.00% . .

Cornmerciai • For peak bad requirement up to 54W 30.38 1.31% 104.620 577.30 546 91 30 38

Commercial (5100) 69.83 _ 300% 34 0.26 1,047 45 _ 0 26 1,047.45

Commercial (.20 KW) For peak bad requirement exceeding 5 MIV 0.00% - - • - -

Requiem 000% - - • -

Time of uzeTOO - Peak (A-2) 6.93 2.618 2.85 6.93 0.30% 131.66 2.85 124.73

Time of Use (TOU) • Off-Peek (temp( I 25 59 110% 37 17 22 332 53 17.22 319.83 I 12 79

Total Commercial 132.73 000% 107,308 20.32 2.089.04 20.32 2,038.93 50.111

Industrial • 000% • -

01 0.53 002% - 7 73 - 7.73 .

E(P777K) 1.60 0.07% 1.054 - 30.38 - 28 78 160

51- (Off Peak) 746 032% 1452 _ . 97 02 • 93.28

7.46

3 73

52- 0.53 0.02% 104 0 02 7.46 0.02 -

-I 132.70U (Peak) _.. 13.00 0.34% 1.009 5.28 151 92 5 28 143,92 8.00

B2- TOU_(Clf-peak) 31 98 138% 1 36.46 409.39 36.46 393 07 16.31

0111/3310/1PeaA 1.60 0.07% __ 15 1.95 I 30213 1.95 28.78 1.60

Ba I 30 38 131% 3 14 3B 385.88 19 38 370 89 15.19

I Total industrial' 82 0.00% 3.670 58.10 1,120.16 58.10 1,073.73 46.43 I

Bulk • • . . . .

CI (a)Suppy al 400 Volts . up to 5 kW - 0.00% 11 - - - .

C 1(b) Supply.' aDO Vohs -eaceechn_g 5 kW 0.53 0.02% 78 203 7.731 2.03 7.73 -

Time of Use (101) . Peak 1 60 0.07% 105 0.63 30.38 0.63 28 78 • 1.60

Time of UsecrOt0 - Off-Peak 8.00 0.34% 12 - 4.33 103.95 I 4.33 99.95 4.00

C2 Supply!' II hV 4.26 0.18% - • 3 05 60.98 1 3 05 60.98 -

Time of Use (TOU) - Peak 8.53 0 37% 209 162.05 I

483 97

I 209 151 52 8.53

Time of Use_fOU)- 011-Peek 36.25 156%

25_1

25 10.71 10 71 1 445.85 15.12

C3 Supply above II IN •

Time of Use (TOU) - Peek - - •

Time of Use (TOU) • Off-Peek I 1

I Total Single point suppix I 59 I 256 I 22.85 828.06 I 22.86 796.81 - 32.25 I

Agricultural Tube-wells - Taeff . - .

01 5coR 586 025% 294 89,13 7036 ____. 1876

Time of Use 5.33 0.23% . 95.15 - 95.15

Time of Use gou) 31 45 1.35% - 369.54 369.54

02 Agraullual Tube-wells 1720.70 74.00% 22494 356.77 23,025 34 1 369.26 19.788 02 (12.49 3,237 32

Nalcunual Tube-wells 0-214 • . • - -

limo of Up (Tot)) • Peet 0-21) 48.70 - __ _ 46.70 - - _ 3 139

Time of Use_STOta Pet* Ch2 2137_1 0 11% 521 1 9.27 50.64 9 27 39.98 10.66

Time ol Use o✓ Off-Peak 02 19 19 1 0 63% . 243.71 1 - 169 83 73.88

Total Agaculturel 1.785 I 28.448 I - 414.74 23.873.61 I 427.23 20,532.88 (12.49) 3.340.631

- 1.60 0.07% 260 . _______ _ • 22.39 22 39

Residential Colonies H 002 0.00% _ - 029 029

Specal Contracts-Tariff K (A.At) •

Time of UsecCiu)- Peak •

Time of Us(TOU) • Off-Peak

Railway TrectionTranon - 1 •

Co-Genralion-J

General service I

Grand Total 2,326 I 100 00% 588,965 • 616.01 I 31,700.47 626.60 27,082.68 I 112.49)1 4,617.7911\

Page 175: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

_ 201-300 Urals

301.7000nlis _ Above 700 Units

123.07 1 44% 102.652

125.03 1 47% 29,542

12E393 1 51% 5,859 1

1.00

050

1.00

0 51

100

0 50

1.00

0.50

1.00

0.50

1

FORM - 29

QESCO

Proposed Revenue and Subsidy Statement 2017-2018

tketn Maps utsAwilet

1 1

1 Residential

Up lo 50 Units 41 02 0.48% 124575

For peak load requirement - up loS kW

01-100 Units 390 71 4 59% 168.082

101-300 Ones 89.86 1 05%

For peak wad requirement exceecling 5 kW • _____ Time of Use golf) • Peak

Time of Use (TOUT-Off -Peak

11 72 0 14% 2 649

58 61 089% 17 663

Total Residential 968.95 I I 4151,023 I

Commercial - A2 •

Cornmarciai • For_mk toad requIremem up to 5 kW 111.35 1 31% 104.620

Commercial ('1001 255 91 3.00% 34

- I

Comme<call (<20 KW) For peak load requiremeni exceeding 5 kW

Industrial

Time of Use (TOU)- Peak (A-2) 25 40 0.30% 2.818

Time of use (IOU)- on-ooak (Tamp) 93 77 I 1 10% 37

Total Commercial 488.43 I 0 00%1 107,308

- I I

a/

Ors/kVvii) lReAudff I

4 00 200 2.00

12 50 579 6.71

15.00 B 11 6.89

15 00 10.20 4.80

17.00 16 00 1.00

19,00 18.00 1 00

19.00 18.00 100

13 00 12.50 0.50

19.00 18.00 H 1.00

400 00 15.00 400.00 15.00

19.00

13 00

400.00

400.00

18.00 1.00

12 50 1 0.50

400 00

400 00 I

B1 195 0.02% • 1450 14.50 81 (Peak) 586 007% 1,084 H 19.00 1000 81 • (on Peak) 27.35 032% 1,452 13.00 12 50 B2. 1.95 002% 104 400.00 14 DO 400.00 14.00 B2. TOU (Peak) 29.30 0.34% 1.009 400 00 19.00 I 400 00 I 18 00

B2. Mu jOffipeaS 117.21 138% 1 [ 40000 12.80 400.00 12 29 133. 11/33 KV (Peas 5 86 0.07% 15 380.00 19.00 380 18 00 B4 III 35 I 1.31% 3 380 00 12.70 8001 12 20

I Total Industrial 301 I I 3.670 I I I

Bulk I I Cie) Supply,t00 Vonsrcpio 5 kW - 11 I 15 00 I 15.00 C±)SgpMr al 400 Volt •excoetsinIT 1 95 0.02% 78 400.00 14.50 I 400.00 14.50

Time or UsecTOULPeak 5.86 007% 105 400.00 19.00 400.00 18.00 Time of Use (TOU) - 01I-Peak 29.30 0 34% 12 400.00 13.00 400 00 1 1250

02 Supply al II kV 15.63 0 18% • 380.00 14.30 180.00 14.30 Tune or UsrLEOUreak 31.25 037% 25 380.00 19.00 380.00 18.00 Time of Use aaU) • Off•Peak 132.64 1 56% 25 380.00 12.80 380.00 12.30

C3 Si.ipio sbove 11 kV - • Tune of Usa (IOU). Peak . 1 Time of Use (TOU) • Off-Peak I

II

1

Total Single Point SupplYI 217 I I 256 I I I I . I

Agricultural Tube-wells • Tariff D

En Scarp 21 49 0.25% 294 I

I

15.20 t__ 12.00 Irma of use (70U) 19.54 0.23% - 17.85

- 1785 Time al 1.151.(T0u) 115 26 1.35% 11,75 11,75 02 AgLlcullual Tuee-wells 6.30598 7100% 22.494 zoom 13.38 200.00 11.50 Aotcurcial Tubs-wells 0.2 0) - - - Time of uao_(rou) - Peak 0-201 - 3,139 200.00 200.00

Time or Use (TOU) • Peek 0-2 9.77 0.11% 521 200.00 19 00 200 00 15.00 Time of Use (TOW- OH-Peak 02 70.33 083% 200 00 12.70 200.00 885

1 Total Aorleurturail 6,642 1 I 26,448 1 I I I

oionlos ix 0.08 0.00% 14.00 14 00

14.00 14,00 Residential C

Public 4/him° G 5,86 0.07% 260

Special Contras% • Tariff K (MK) - Time of Use (70U)- Peak -

Railway TractionTraclion • I 1

Time of We ))1U1_- OH-Peak -

_I

I Grand Total 8,621 1100.00%1 588,966 I

Co-Genrabon.d

General Service 12 25

ISO

4.00

3.85

Page 176: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Win Rs) 04ln Re) Win Rs) (ken Ral (Mln RBI

. 1.354 28 - 1354.28

1 ,254,12 84,382.88 1.129 85 72518.80 124.27 11861 08

- . •

194.79 - 194.79

37 08 185.58 37.08 146.51

. 893 15 - 622 39

1,485.99 87,491.23 1,361.72 75,248.56

- 82.05. • 8205

107 107

- •

• • - •

-.--

39.07

270 76

124.27 12,242.67 1

1

000%

1 95 0.02%

5.86 007% 1064

27.35 032% 1,452

1 95 0.02% 104

2930 0.34% 1,009

117.21 1 38% 1

5.86 007% 16

111 35 t 31% 3

Total Industrial 301 I 0 00% 3,670

Inclustdal

131 __

Beal

O1r (OII Peak)

82-

B2- TOU reeky

B2. MU loft-peak)

BS i/33 itv_taa)

04

FORM • 29 ( A)

QESCO

Proposed Revenue and Subsidy Statement 2017 2018

1

1 1

eeel I Mega)

For peak load regulremem exceeding 5 kW 0.00%

lime of UseiliOgl - Peak 11.72 014% 2,649

Time of Use (IOU). Off-Peak 58 61 0 69% 17,863

Total Residential 968.95 000% 451023

Commercial • A2 - 000%

Commercial • For peak Iced requirement up to 5 kW II I 35 1.31% 104.620

Commercial (€100) 255.91 3.00% 34

Commercial (•20 KM For peak load requirement exceeding 5 kW • 000%

Regular - 0.00% •

Time of Use (TOUT-Peak IA-2) 25 40 0.30% 2,618

i

Time of Use (TOO) - Off-Peak (Temp) 93.77 110% 37

-4 I Total Commercial 466,43 I 000% 107,308

164.10 • 8205

8205

_ •

4,883.52 . 2,262 18

Z621.63

- 1347.93 - 728.78

619.15

1 2.125 44

2.

1.846 08 - 1,25534

449 72

2D00 41

2320.79

590 75

125 03

128.93

222 70 b 210 98

• •

11.72

- 761.88 732.57

29 30

4,208.56 I • 13,801.88 9,593.10

. . _

2.115.67 2004 32 111.35_

1.03 3,83888 103 3,63868 •

11.39 482.52 11.39 457 13 25 40

68 88 1 219 00 68.86 1,172 12 I 46.88

81.28 7,155.87 81.28 7.472.24 183.63I

Residential

Up to 50 Units

For peak Red requirement up to 5 kW

01-100 Una

101-300 Units

101 300 Units

301 700Units

Above 700 Unils

41 02 048% 124,575

000% -

39011 4.59% 168.082

89 86 -

12307 1.44% 102.652

125.03 1.47% 29,542

128 93 1.51% 5,859

Bulk

CI(a15sppy at 000 Vohs • qpjo 5 kW

cnimery at 40) Volts -exceeding 5 kW

Time of Use (TOU). Peak

Time of Usea_OLI)- Off-Peak

02 Supptet 11 kV

Time of Use (T054 • Peak

Tints of Use (IOU) - Of

C36upp7 above 71 kV

Time of Use (TOO) Peak

I Time of Use (TOU) • O6-Peak

Total Single Point Supply

Agricultural Tube-wells - Tariff D

DI Scarp

Time of Use (IOU)

Time of UsijeOlA 115.26 135%

02 Agriculluel Tube-wells 6.305.913 74.00% 22.494

Agrleulluai Tube-wells D-2 (Ii) -

Time al Use (11 • Peek 51-211) - 3.139

Time of use CO)- Peak 0-2 9.77 0 11% 521

Time of Use (101ff • off-Peek 02 70 33 0 83%

I Total Agricultural 6,542 I I 26,448 I

Pubes Llignitng G 5.86 0.07% 2601

Residenc Colonies e! Colons H 0.08 000% •

28.33 25.33

111.35 10549 586

- 355.54 • 341 87 13.67

0.08 27.35 0.08 27.35 -

21.12 556.75 21.12 527 45 29 30

145 85 1,500.31 145.55 1440 53 5078

7 81 111.35 7.81 105.49 5.86

57 53 1,414.16 57.53 1.358 48 55.88

232.39 4,106.14 232.39 3,934.99 170.151

. . I ...J . . •

28.33 8.14 28.33

11135 _ 2.50 105.49 . 5 86

380 94 17.33 366.29 14.65

223.48 12.22 22348 -

593.87 8.37 56262 31.26

1,700.35 42.134 1,63393 66.42

- • .

- - .

• - -

3,038.32 91,39 2,920.13 . 118.19 I Jo

J

000% 11

195 002% 78

5 86 1 0.07% 105

Special Camisole • TarifAJI()

Time al Use (TOOL- Peak

Tare of Use (TOU) • Off-Peek

Railway TrecOonTramon • 1

co-Genracon-.1

General Service

29.30 0.34% 12

1563 018%

_ 3126 _ 0.37% 25

132.84 1.543% 25

217 1 256

21 49 025% 294 326.63 257 87 60.76

814

2 50

17 33

12 22

637

42 84

91.39

19.54 0.23% 348 70 348 70

Grand Total 6,521 100.00% 588,9651 1,1391.05 118.175.34 1,766.78 99,252.14 124.27 16,923301

Page 177: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

JL

Phone # 081 9203308 Fax # 081 9201335 E.Mail fdaescoe/vahoo.com

No. lit / FD QESCO / Comp

MANY FINANCE DIRECTORATE QESCO ZARGHOON ROAD QUETTA

Dated: to/ 2017

Mr. Muhammad Farhan,

Section Officer, Ministry of water & Power,

Govt. of Pakistan,

Islamabad.

Subject: Realstration of Quetta Electric Suooly Company (QESCO) With Balochistan Revenue Authority (BRA).

Reference:- No.PF-5(22)/2012 dated: 14/12/2016.

With reference to above, it is to inform that following practical

implication after registration with BRA will be faced by QESCO:

i. Operational cost of the running and the future project services will be increase

up to 15%.

II. New staff would be required for documentation and filing of the returns with

BRA, so also increase the management expenses.

iii. Revision of tariff due to increase in the operational cost.

iv. No contractor has yet been registered with BRA therefore, education and

circulation for registration of the contractors with BRA is necessary.

v. Status of the running contracts and upward revision of rates of the contractor

due to the charging and collection of Sales Tax on the services.

vi. Cash flow and budgetary allocation of the funds for the running and future

contracts.

WIT Other related taxation issues.

FINANCE DIRECTOR 111,

Scanned by CamScanner

Page 178: QUETTA ELECTRIC SUPPLY COMPANY LTD FY 2017-18.pdf · Length of High Voltage Transmission lines (132 kV) 5,046.00 5,447.00 Length of SIG lines (66 and 11 kV) 35,865.00 35.965.00 Length

Projection of PPP for Distribution Companies FY 2017-18

1Energy Sold-GWh 'Names July IA ugust September I October November December 'January February 1March 'April May 'June 'Total

IQESCO I 754 1 758 1 705 1 665 1 639 1 676 1 685 1 672' 642 1 718 1 806 1 Ku I 8,521

[Maximum Demand in MW

[Name 'July IP ugust (September 'October 'November 'December 'January February 1March 'April I May (June 'Total

IQESCO 1 2,078 1 1,912 1 1,914 1 1,937 1 1,949 1 2,127 1 2,064 1 1,773 1 1,914 1 1,992 1 1,836' 1,898 1 1,949

'Load Factor

'Name IJuly IP ugust (September 'October (November 'December 'January 1February (March 'April 'May 'June 'Total IQESCO 1 80%1 80%1 80%1 80%1 80%1 80%1 80%1 80%1 80%1 80%1 80%1 80%1 80%1