r103/2019 : construction of link road between dubai- hatta … approval.pdf · 2020. 11. 22. ·...

11
P a g e 1 | 1 Date: 07-Jul-2020 Ref. : W&C-6457-2020 M/S PARSONS Tel: 04-4029700 P.O. Box 9123 Dubai, U.A.E Attention: Mr. Mohammed Amin, Resident Engineer R103/2019 : Construction of Link Road between Dubai- Hatta Road and Sharjah - Kalpa Road Passing through Wadi Al Qawr Area, Package -2 Pre-Qualification for Water Works Dear Sir, With reference to your letter ref. no. 215/R103/2019/20A0006A, dated on 15 June 2020 regarding the above mentioned subject, please note that your request to appoint M/s. ARAR INFRA Contracting Co. LLC is APPROVED to carry out the works related to DEWA water pipe lines networks subject to compliance with the following conditions: DEWA reserves the right to withdraw this approval if the subcontractor’s performance is not satisfactory. The consultants and main contractor will not be relieved of their respective contractual obligations. Strict Adherence to the standards Quality measures of works. Satisfactory performance in terms of Quality on the site. Pipe and other material required for the works shall be new and the contractor shall submit sample/catalogues for the same, along with the shop drawing for our review and approval. Work shall be carried out in compliance with our standards and specifications as well as RTA/DM regulation. Material for existing Network shall be available prior to the commencement of work in case of any breakage or leak. List of staff shall be provided prior to the commencement of the work for DEWA’s review and comment. Moreover, instruct M/s. ARAR INFRA Contracting Co. LLC to submit shop drawings for our review and approval. Yours faithfully, Abdul Aziz Jassem A Almarzouqi Sr Mgr - Water Engg

Upload: others

Post on 24-Jan-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: R103/2019 : Construction of Link Road between Dubai- Hatta … APPROVAL.pdf · 2020. 11. 22. · Dubai, U.A.E Attention: Mr. Mohammed Amin, Resident Engineer R103/2019 : Construction

P a g e 1 | 1

Date: 07-Jul-2020 Ref. : W&C-6457-2020

M/S PARSONS

Tel: 04-4029700

P.O. Box 9123

Dubai, U.A.E

Attention: Mr. Mohammed Amin, Resident Engineer

R103/2019 : Construction of Link Road between Dubai- Hatta Road and Sharjah -

Kalpa Road Passing through Wadi Al Qawr Area, Package -2Pre-Qualification for Water Works

Dear Sir,

With reference to your letter ref. no. 215/R103/2019/20A0006A, dated on 15 June 2020 regarding the above

mentioned subject, please note that your request to appoint M/s. ARAR INFRA Contracting Co. LLC is APPROVED

to carry out the works related to DEWA water pipe lines networks subject to compliance with the following

conditions: DEWA reserves the right to withdraw this approval if the subcontractor’s performance is not satisfactory.

The consultants and main contractor will not be relieved of their respective contractual obligations.

Strict Adherence to the standards Quality measures of works.

Satisfactory performance in terms of Quality on the site.

Pipe and other material required for the works shall be new and the contractor shall submit sample/catalogues for

the same, along with the shop drawing for our review and approval.

Work shall be carried out in compliance with our standards and specifications as well as RTA/DM regulation.

Material for existing Network shall be available prior to the commencement of work in case of any breakage or leak.

List of staff shall be provided prior to the commencement of the work for DEWA’s review and comment.

Moreover, instruct M/s. ARAR INFRA Contracting Co. LLC to submit shop drawings for our review and approval.

Yours faithfully,

Abdul Aziz Jassem A AlmarzouqiSr Mgr - Water Engg

afreen.eqbal
EW Outgoing Stamp
Page 2: R103/2019 : Construction of Link Road between Dubai- Hatta … APPROVAL.pdf · 2020. 11. 22. · Dubai, U.A.E Attention: Mr. Mohammed Amin, Resident Engineer R103/2019 : Construction

P a g e 1 | 1

Date: 19-May-2020 Ref. : W&C-4729-2020

M/s Al GURG Consultant Dubai U.A.E

Tel: 04-3024999

Attention: Mr. Emad Bander – Resident Engineer

Construction Office Block Phase-01 on Plot No. 2420195 Al Qusais Ind. First, Dubai for

Emirates General Petroleum Corporation ( Emarat )Request for Prequalification Approval for 900mm dia Water Line

Dear Sir,

With reference to your letter ref. no. EB/SA/2643/DEWA-007, dated on 17 May 2020 regarding the above

mentioned subject, please note that your request to appoint M/s. ARAR INFRA CONTRACTING CO. L.L.C is

APPROVED to carry out the works related to DEWA water pipe lines networks subject to compliance with the

following conditions: DEWA reserves the right to withdraw this approval if the subcontractor’s performance is not satisfactory.

The consultants and main contractor will not be relieved of their respective contractual obligations.

Strict Adherence to the standards Quality measures of works.

Satisfactory performance in terms of Quality on the site.

Pipe and other material required for the works shall be new and the contractor shall submit sample/catalogues for

the same, along with the shop drawing for our review and approval.

Work shall be carried out in compliance with our standards and specifications as well as RTA/DM regulation.

Material for existing Network shall be available prior to the commencement of work in case of any breakage or leak.

List of staff shall be provided prior to the commencement of the work for DEWA’s review and comment.

Moreover, instruct M/s. ARAR INFRA CONTRACTING CO. L.L.C to submit shop drawings for our review and approval.

Yours faithfully,

Abdul Aziz Jassem A AlmarzouqiSr Mgr - Water Engg

afreen.eqbal
EW Outgoing Stamp
Page 3: R103/2019 : Construction of Link Road between Dubai- Hatta … APPROVAL.pdf · 2020. 11. 22. · Dubai, U.A.E Attention: Mr. Mohammed Amin, Resident Engineer R103/2019 : Construction

P a g e 1 | 1

Date: 27-Apr-2020 Ref. : W&C-4201-2020

To: M/s. VX Studio Consultancy.

Dubai, U.A.E.

Tel. 043708909

Attention: Mr. Santhosh Subramanl , Projects Director

MAG-EYE MEYDAN – Roads and infrastructure works on PLOT no. 6310140,MBR City District-7

Request of Pre-qualification Approval

Dear Sir,

With reference to your letter no. MCM-PH1-INF/VX-SS/DEWA/GC-003 dated 21 April 2020 regarding the above-

mentioned subject, please note that your request to appoint M/s. Arar Infra Contracting Co. LLC. is approved to carry

out the works related to DEWA water pipe lines networks up to 300 mm dia as per your request subject to compliance

with the following conditions:

DEWA reserves the right to withdraw this approval if the subcontractor’s performance is not satisfactory.

The consultants and main contractor will not be relieved of their respective contractual obligations.

Strict Adherence to the standards Quality measures of works.

Satisfactory performance in terms of Quality on the site.

Pipe and other material required for the works shall be new and the contractor shall submit sample/catalogues

for the same, along with the shop drawing for our review and approval.

Work shall be carried out in compliance with our standards and specifications as well as RTA/DM regulation.

Material for existing Network shall be available prior to the commencement of work in case of any breakage

or leak.

List of staff shall be provided prior to the commencement of the work for DEWA’s review and comment.

Moreover, instruct M/s. Arar Infra Contracting Co. LLC. to submit shop drawings for our review and approval.

Yours faithfully,

Abdul Aziz Jassem A AlmarzouqiSr Mgr - Water Engg

afreen.eqbal
EW Outgoing Stamp
Page 4: R103/2019 : Construction of Link Road between Dubai- Hatta … APPROVAL.pdf · 2020. 11. 22. · Dubai, U.A.E Attention: Mr. Mohammed Amin, Resident Engineer R103/2019 : Construction

P a g e 1 | 1

Date: 16-Apr-2020 Ref. : W&C-3873-2020

M/s Al GURG Consultant Dubai U.A.E

Tel: 04-3024999

Attention: Mr. Emad Bander – Resident Engineer

Construction of Office Block Phase -01 on Plot No. 2420195 Al Qusais Ind. First, Dubai Emirates

General Petroleum Corporation (Emarat)Request of Pre-qualification Approval

Dear Sir,

With reference to your letter ref. no. EB/SA/2643/DEWA-005, dated on 06 April 2020 regarding the above-mentioned

subject, please note that your request to appoint M/s ARAR Infra Contracting CO. L.L.C is APPROVED to carry out the

works related to DEWA water pipe lines networks up to 300dia subject to compliance with the following conditions:

DEWA reserves the right to withdraw this approval if the subcontractor’s performance is not satisfactory.

The consultants and main contractor will not be relieved of their respective contractual obligations.

Strict Adherence to the standards Quality measures of works.

Satisfactory performance in terms of Quality on the site.

Pipe and other material required for the works shall be new and the contractor shall submit sample/catalogues

for the same, along with the shop drawing for our review and approval.

Work shall be carried out in compliance with our standards and specifications as well as RTA/DM regulation.

Material for existing Network shall be available prior to the commencement of work in case of any breakage or

leak.

List of staff shall be provided prior to the commencement of the work for DEWA’s review and comment.

Moreover, instruct M/s ARAR Infra Contracting CO. L.L.C to submit shop drawings for our review and approval.

Yours faithfully,

Abdul Aziz Jassem A AlmarzouqiSr Mgr - Water Engg

afreen.eqbal
EW Outgoing Stamp
Page 5: R103/2019 : Construction of Link Road between Dubai- Hatta … APPROVAL.pdf · 2020. 11. 22. · Dubai, U.A.E Attention: Mr. Mohammed Amin, Resident Engineer R103/2019 : Construction
Page 6: R103/2019 : Construction of Link Road between Dubai- Hatta … APPROVAL.pdf · 2020. 11. 22. · Dubai, U.A.E Attention: Mr. Mohammed Amin, Resident Engineer R103/2019 : Construction

Scanned by CamScanner

Page 7: R103/2019 : Construction of Link Road between Dubai- Hatta … APPROVAL.pdf · 2020. 11. 22. · Dubai, U.A.E Attention: Mr. Mohammed Amin, Resident Engineer R103/2019 : Construction
Page 8: R103/2019 : Construction of Link Road between Dubai- Hatta … APPROVAL.pdf · 2020. 11. 22. · Dubai, U.A.E Attention: Mr. Mohammed Amin, Resident Engineer R103/2019 : Construction
Page 9: R103/2019 : Construction of Link Road between Dubai- Hatta … APPROVAL.pdf · 2020. 11. 22. · Dubai, U.A.E Attention: Mr. Mohammed Amin, Resident Engineer R103/2019 : Construction
Page 10: R103/2019 : Construction of Link Road between Dubai- Hatta … APPROVAL.pdf · 2020. 11. 22. · Dubai, U.A.E Attention: Mr. Mohammed Amin, Resident Engineer R103/2019 : Construction
Page 11: R103/2019 : Construction of Link Road between Dubai- Hatta … APPROVAL.pdf · 2020. 11. 22. · Dubai, U.A.E Attention: Mr. Mohammed Amin, Resident Engineer R103/2019 : Construction

Scanned by CamScanner