Page 1: Rachel Hughes Portfolio

RACHEL HUGHES PORTFOLIO

2015

Page 2: Rachel Hughes Portfolio

Table of Contents

Hand Sketches………………………………………………………………………….……….3-7

SketchUp…………………………………………………………………………………………8-11

AutoCAD……………………………………………………………………………………….12-26

Revit Families………………………………………………………………………………..27-30

Revit……………………………………………………………………………………………..31-35

Revit Hotel Sheets…………………………………………………………………………36-54

Page 3: Rachel Hughes Portfolio

HAND SKETCHES

Page 4: Rachel Hughes Portfolio
Page 5: Rachel Hughes Portfolio
Page 6: Rachel Hughes Portfolio

WALL DETAILS

Before drawing anything

in Revit, wall details were

hand sketched. The

different details helped us

see how the wall and the

foundations interact.

INTERIOR BEARING

HOLLOW CORE PLANKS

With our hotel project,

we used hollow core

planks and this detail

helped us understand

how the floor is

connected to a bearing

wall.

Page 7: Rachel Hughes Portfolio

BEAM CONNECTIONS

Here are examples of a

few of the hand sketches

done to learn about

different beam

connections.

Doing different hand

sketches helped us learn

many of the different

beam connections that

can be done in a project.

Page 8: Rachel Hughes Portfolio

SKETCHUP

Page 9: Rachel Hughes Portfolio

KITCHEN DESIGN

Given the SketchUp file

for the house, the

assignment entailed us to

design the kitchen any

way we would like.

Creating all furniture from

scratch and grabbing the

stove, sink, fridge, and

microwave from 3D

warehouse, the kitchen

was complete.

After designing the

kitchen, I went into

AutoCAD and drew up the

floor plans for the kitchen

and labeled the furniture.

Page 10: Rachel Hughes Portfolio

DECORATIVE WALL

PANEL

Here is an example of the

wall panel that I created

in SketchUp for my hotel

lobby.

It is 54”x54” and it is 1”

thick. After creating the

extrusion, lines were

created everywhere. I then

offset the lines by ½” and

then deleted the inside.

After it was complete I

created a component of it.

SHED

This shed was created

piece by piece in

SketchUp. We started out

creating the boards for

the frame and making

them become

components. Then we

created the frame. While

created all the parts to

build the shed, color was

also added. Once

completed, we added

trim to the shed.

Page 11: Rachel Hughes Portfolio

TWO STORY HOUSE

This house was created in

SketchUp by scratch.

Following the instructors

direction, we created a

lovely two story house.

We started by creating

the foundation and

footings. Then we started

to create all of the walls

on the first level.

We then moved on to the

second floor. After

creating all of the walls,

we then created the roof.

Windows and doors were

added then it was time to

start adding materials.

Page 12: Rachel Hughes Portfolio

AUTOCAD

Page 13: Rachel Hughes Portfolio

LIBRARY PROJECT

When doing the library

project, making the stairs

was one of the

assignments that we

learned. We first

calculated how many

treads and how many

risers were needed. Then

we started to create the

stairs in AutoCAD.

WALL DETAIL

In my Intro to AutoCAD

class, we learned how to

do wall details and how to

use line thickness.

Page 14: Rachel Hughes Portfolio

PLUMBING AND

ELECTRICAL

In this assignment we first

calculated the pipe sizes

for the restrooms. After

calculating the sizes, we

then went into AutoCAD

and created this diagram.

BATHROOM ELEVATIONS

After creating a floor plan

for the bathroom in our

library project, I created

elevations for all views.

To help get the placement

right, lines were drawn

from the floor plans out.

Page 15: Rachel Hughes Portfolio

NURSES ROOM AT WITC

OBJECTIVE: Dimension

and view a room or area

on the WITC campus and

see if it is accessible. If

not then design it to be

accessible.

This is the AutoCAD file of

the room that was

dimensioned. When using

a wheelchair, the room

was not accessible. We

were barely able to make

it through both doors and

were not able to go in the

bathroom.

ELEVATION

One of the assignments

that we did was to

recreate a set of floor

plans and elevations.

Given the PDF, we

created the floor plans

and projected lines in

AutoCAD to help create

the elevations.

Page 16: Rachel Hughes Portfolio
Page 17: Rachel Hughes Portfolio
Page 18: Rachel Hughes Portfolio
Page 19: Rachel Hughes Portfolio
Page 20: Rachel Hughes Portfolio
Page 21: Rachel Hughes Portfolio
Page 22: Rachel Hughes Portfolio
Page 23: Rachel Hughes Portfolio
Page 24: Rachel Hughes Portfolio
Page 25: Rachel Hughes Portfolio
Page 26: Rachel Hughes Portfolio
Page 27: Rachel Hughes Portfolio

REVIT FAMILIES

Page 28: Rachel Hughes Portfolio

FARM KITCHEN TABLE

Objective: 1) Make an

object using extrusions,

Blends, Revolves, sweeps,

voids, or swept blends. 2)

Add two material

parameters. 3) Make sure

object flexes when it is

changed to a different

size.

FINISHED PRODUCT

Table Top: Extrusion

Table Skirt: Extrusion

Table Skirt Design: Void,

Symbolic lines so design is

seen in a project

Table Legs: Revolve,

edited revolve for a

better design

Plinth: Extrusion,

between plinth and leg is

a blend to connect the

revolve and the square

plinth

[Type the sidebar content.

A sidebar is a standalone

supplement to the main

document. It is often

aligned on the left or right

of the page, or located at

the top or bottom. Use

the Drawing Tools tab to

change the formatting of

the sidebar text box.

Type the sidebar content.

A sidebar is a standalone

supplement to the main

document. It is often

aligned on the left or right

of the page, or located at

the top or bottom. Use

the Drawing Tools tab to

change the formatting of

the sidebar text box.]

FARM KITCHEN TABLE

Objective: 1) Make an

object using extrusions,

Blends, Revolves, sweeps,

voids, or swept blends. 2)

Add two material

parameters. 3) Make sure

object flexes when it is

changed to a different

size.

FINISHED PRODUCT

Table Top: Extrusion

Table Skirt: Extrusion

Table Skirt Design: Void,

Symbolic lines so design is

seen in a project

Table Legs: Revolve,

edited revolve for a

better design

Plinth: Extrusion,

between plinth and leg is

a blend to connect the

revolve and the square

plinth

Page 29: Rachel Hughes Portfolio

DOUBLE HUNG WINDOW

Objective: 1) Create a

window using extrusions,

voids, blends, revolves,

sweeps, and swept

blends. 2) Add two

material parameters. 3)

Make sure object flexes

when it is changed to a

different size.

FINISHED WINDOW

Trim: Sweep, profile

created through editing

profile

Mullions: created a

mullion profile and then

used the sweep tool

Window Frame: Two

rectangles in an extrusion

profile to create the void

Glass: Extrusion with an

extrusion end of ½” and

an extrusion start of -½”.

Page 30: Rachel Hughes Portfolio

RESIDENTIAL DOOR

FAMILY

Objective: 1) Create a

door using extrusions,

voids, blends, revolves,

sweeps, and swept

blends. 2) Add two

material parameters. 3)

Make sure object flexes

when it is changed to a

different size.

FINISHED DOOR

Door: Being in the

exterior elevation, I

created an extrusion and

then created voids for

room for the panels.

Panels: With the voids

already created, I created

an extrusion and offset

the beginning and end so

it is recessed more into

the door.

Trim: Sweep, profile

created through editing

profile

Materials: door is steel

with a paint finish and the

trim is wood.

Page 31: Rachel Hughes Portfolio

REVIT

Page 32: Rachel Hughes Portfolio

WALL TYPES

Before drawing any walls

in Revit for our hotel

project, we needed to

know what walls were

going to be used and

make the many different

wall types.

Using a wall closest to the

new wall that needed to

be created, it was then

duplicated and renamed

for the new wall type.

Editing the wall materials

were either added or

deleted.

SCHEDULES

Once the floor plans were

finalized and the rooms

were named and

numbered, a room

schedule was created for

the levels along with a

legend for the

abbreviations.

Page 33: Rachel Hughes Portfolio

UP

A202

A201

1

2

70' - 0"

33' -

3 1

/4"

4' - 5 3/4" 12' - 4 7/8" 8' - 8 5/8" 30' - 2 1/4"

19' -

6 3

/4"

3' -

0"2'

- 1"

3' -

0"

1' -

2 3/

4"3'

- 0"

1' -

4 3/

4"

3' -

0"

0' - 6" 3' - 0" 4' - 10 5/8"

www.autodesk.com/revit

Scale

Project number

Date

Drawn by

Checked by

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

1/4" = 1'-0"

3/4/

2015

10:

56:1

3 P

M

A101

Basement Plan

Project Number

Gammel GardenOwner

Issue DateRCH

Checker

No. Description Date

1/4" = 1'-0"1 BASEMENT

Page 34: Rachel Hughes Portfolio

UP

DN

UP

A2021

A201

A202

A201

1

2

2

8' - 3 1/2" 28' - 9 7/8"

5' -

0 1/

8"10

' - 9

1/4

"4'

- 2

1/4"

15' - 7"

33' -

6"

4' - 7 1/8" 9' - 0" 3' - 7 1/4" 7' - 1 1/4" 6' - 5 5/8" 4' - 2 1/8" 12' - 9 1/4" 2' - 2 1/4" 20' - 3 7/8"

12' -

5 1

/2"

6' -

9 7/

8"

1' -

10 3

/4"

16' -

0 3

/4"

1' -

10 3

/4"

6' -

5 3/

4"

4' - 3 1/8" 5' - 4 3/4" 5' - 5 1/4" 2' - 1 1/4" 30' - 6 1/4" 22' - 6 1/8"

70' - 2 3/4"

3' -

3 7/

8"5'

- 4

3/4"

15' -

7"

4' -

2 1/

4"

5' -

0 1/

8"

0' - 4 3/4"

6' - 6 1/2"

0' - 4 3/4"

0' -

2 1/

8"

8' -

10 1

/4"

0' -

9 1/

2"

1' -

7 1/

8"

7' - 3" 14' - 3" 14' - 4" 5' - 3" 21' - 11 3/4" 7' - 2"

4' -

7"24

' - 4

"4'

- 7"

12' - 8 5/8" 7' - 3 1/2"

5' -

11"

6' -

2 3/

8"

7' - 9 1/2" 7' - 9 1/2"

7' - 3 1/2" 14' - 2 7/8" 13' - 1 1/4"

4' -

7"12

' - 8

"7'

- 8

3/4"

5' -

0"3'

- 6

1/4"

3' -

0"1'

- 3"

3' - 0"

1' -

10"

2' -

10 1

/4"

3' -

0"

3' -

0"

0' -

11 3

/8"

5' -

0"

4' -

3 1/

2"12

' - 4

"

4' -

3 1/

2"1' -

10"

3' -

2"1'

- 3

1/2"

3' -

9 1/

2"3'

- 9

1/2"

3' - 4 7/8"

www.autodesk.com/revit

Scale

Project number

Date

Drawn by

Checked by

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

1/4" = 1'-0"

3/4/

2015

10:

56:1

4 P

M

A102

First Floor Plan

Project Number

Gammel GardenOwner

Issue DateAuthor

Checker

No. Description Date

1/4" = 1'-0"1 FIRST FLOOR

Page 35: Rachel Hughes Portfolio

DN

DN

A2021

A201

A202

A201

1

2

2

4' - 7 1/8" 9' - 0 3/4" 3' - 6 1/2" 6' - 8 1/2" 0' - 9 1/2" 5' - 8 1/8" 0' - 9 1/2" 39' - 0 3/4"

11' -

6 7

/8"

5' -

5 1/

8"7'

- 4

7/8"

9' -

1 1/

8"

8' - 10 7/8" 8' - 3 1/2" 6' - 10" 6' - 11 1/4"

14' - 5 7/8"

7' - 3" 14' - 3" 14' - 4" 5' - 3" 24' - 0 1/4" 3' - 0" 2' - 1 1/2"

4' -

7"24

' - 4

"4'

- 7"

7' - 3 1/2" 14' - 2 7/8" 20' - 7" 20' - 9 7/8" 7' - 3 1/2"

4' -

7"28

' - 1

1"

0' - 2" 3' - 0" 10' - 0 1/2" 3' - 0"

3' - 0" 0' - 5 5/8"

0' -

11 1

/4"

3' -

0" 4' -

11 1

/2"

3' -

0"

9' -

6 1/

4"

1' -

8 5/

8"

0' -

2 1/

8"

0' -

2 15

/16"

3' -

2"

1' -

10"

16' -

2 9

/16"

3' -

9 1/

2"3'

- 8

1/4"

www.autodesk.com/revit

Scale

Project number

Date

Drawn by

Checked by

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

1/4" = 1'-0"

3/4/

2015

10:

56:1

5 P

M

A103

Second Floor Plan

Project Number

Gammel GardenOwner

Issue DateAuthor

Checker

No. Description Date

1/4" = 1'-0"1 2nd FLOOR

Page 36: Rachel Hughes Portfolio

HOTEL SHEETS

Page 37: Rachel Hughes Portfolio

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

3/4/

2015

11:

10:5

9 P

M

T101

Title Sheet

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

-

No. Description Date

WHITE OAK HOTEL

Sheet List

SheetNumber Sheet Name

T101 Title SheetA101 First Floor PlanA102 Second Floor PlanA201 Building ElevationsA301 Building SectionsA302 Wall SectionsA401 Enlarged Plan & Interior ElevationsA402 Enlarged Plan & Interior ElevationsA403 Enlarged Stair PlansA404 Enlarged Stair SectionsA501 DetailsA601 ScheduleS101 FDTN & foundation PlanS102 Plank FramingRD101 1st & 2nd Level Addition DemoRD102 2nd Level Addition DemoR101 1st Level AdditionR102 2nd Level AdditionR201 Addition ElevationsR202 Addition ElevationsR301 Building Addition Section

EAU CLAIRE, WI

Construction Type: IIBOccupancy: R-1Sprinklered: NoArea per Floor: 6933 SFTotal Area: 27732 SFHeight: 45'-11"

Page 38: Rachel Hughes Portfolio

UP

UP

A2011

A201

A201

A201

3

4

2

1 2 3 4 5

D

6

13' - 7" 13' - 5" 13' - 5" 13' - 7" 17' - 10"

A

B

CG

F

VENDING VENDINGMechanical Room

111

Hotel Lobby101

Typical Guest Room116

Typical Guest Room115

Typical Acc. Guest room113

W1 W1 W1 W1

Office103

Kitchen105

4A301

Breakfast Area104

12' - 8"

4' - 0" 6' - 0" 7' - 4" 6' - 0" 7' - 4" 6' - 0" 7' - 4" 6' - 0" 4' - 0"

VENDING VENDING

2' - 4" 3' - 4" 15' - 4" 3' - 4" 2' - 9" 3' - 4" 5' - 4" 3' - 4"1' - 4" 6' - 4"

2' - 6" 3' - 4" 18' - 4" 5' - 1" 17' - 6"

Vending Area108

Elev. Lobby107

Corridor110

71' - 11 1/4"

Reception Desk102

113a115a

115b

110

116a

116b

103105

111 109

106a

Family TR109

Decorati ve wallpanels, heightto ceiling

Stairs106

14' -

4"

8' -

0"8'

- 0"

Counter, 42" AFF

Counter, 36" AFF

8' -

7"28

' - 5

3/4

"11

' - 3

1/4

"28

' - 0

"

14' - 11 1/2" 11' - 0 1/2" 28' - 0"

8' -

0"

W1 W1 W1

113b

2A301

3A301

1A301

E

32' -

2"

3' -

4"32

' - 3

"4' - 0" 6' - 0" 4' - 11 1/2" 11' - 0 1/2" 4' - 8" 6' - 0" 7' - 4" 6' - 0" 4' - 0"

76' -

4"

8' -

7"26

' - 6

1/2

"

Vestibule117

100b

100a

106b

Counter, 36" AFF

15' -

0"

A401

2

5 4

3

A402 3

2

5

4

P4 P4

P4

P7

P6

E1 E1

E1

P4

E2

P7

P10

P8

P5

E1 P4

P6

P8

P5

P6

P9 P9

P9

E1

P3

P4

P6

P9

RFS ABBREVIATION LEGENDCPT CARPETCT CERAMIC TILECTB CERAMIC TILE BASEP PAINT

RB RUBBER BASESC SEALED CONCRETEWB WOOD BASEWOWD WHITE OAK WOOD

1/2" TILE

1/2" CEMENTBOARD

P1

4" MTL. STUD@ 16" O.C.

5/8" GYP BD.

7/8" MTL. FURRINGSTRIPS @ 16" O.C.10" CMU BLOCK7/8" MTL.FURRING STRIPS@ 16" O.C.

1/2" CEMENT BOARD

1/2" CERAMIC TILE

5/8" GYP BD.

7/8" MTL. FURRINGSTRIPS @ 16" O.C.10" CMU BLOCK

5/8" GYP BD.

7/8" MTL. FURRINGSTRIPS @ 16" O.C.

5/8" GYP BD.

7/8" MTL.FURRINGSTRIPS @16" O.C.8" CMUBLOCK

1/2" CEMENT BOARD1/2" CERAMIC TILE

6" MTL. STUD @ 16" O.C.

5/8" GYP BD.

6" MTL. STUD@ 16" O.C.5/8" GYP BD.

1/2" CEMENT BOARD1/2" CERAMIC TILE

6" MTL. STUD @ 16" O.C.1/2" CEMENT BOARD1/2" CERAMIC TILE

1/2" CEMENT BOARD1/2" CERAMIC TILE

6" MTL. STUD @ 16" O.C.

5/8" GYP BOARD

5/8" GYP BD.

4" MTL. STUD@ 16" O.C.5/8" GYP BD.

P2 P3

P4 P5 P6

P7 P8 P9

E1 E2

5/8" GYP BD.

7/8" MTL.FURRINGSTRIPS @16" O.C.8" CMU2" RIGIDINSULATION2" AIR GAP4" FACE BRICK

8" CMU W/HORIZ REINF.@ 16" O.C.2" RIGIDINSULATION2" AIR GAP4" FACE BRICK

5/8" GYP BD.

7/8" MTL. FURRINGSTRIPS @ 16" O.C.8" CMU BLOCK

5/8" GYP BD.

7/8" MTL. FURRINGSTRIPS @ 16" O.C.

P10

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

As indicated

3/4/

2015

11:

10:1

0 P

M

A101

First Floor Plan

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCHCMM

1/8" = 1'-0"1 1st Floor

Room Schedule - 1st LevelNumber Name Floor Finish Base Finish Wall Finish Ceiling Finish Comments Area

101 Hotel Lobby WOWD WB P P 282 SF102 Reception Desk CPT WB P P 85 SF103 Office CPT WB P P 93 SF104 Breakfast Area WOWD WB P P 583 SF105 Kitchen CT CTB P P 99 SF106 Stairs CPT WB - P 273 SF107 Elev. Lobby CPT WB P P 84 SF108 Vending Area CPT WB P P 96 SF109 Family TR CT CTB P P 65 SF110 Corridor WOWD WB P P 246 SF111 Mechanical Room SC RB P P 422 SF113 Typical Acc. Guest room CPT WB P P 294 SF113-1 Guest Bathroom CT CTB CT P 65 SF115 Typical Guest Room WOWD WB P P 305 SF115-1 Guest Bathroom CT CTB CT P 49 SF116 Typical Guest Room CPT WB P P 305 SF116-1 Guest Bathroom CT CTB CT P 49 SF117 Vestibule CT - - P 92 SF

1" = 1'-0"PARTITION TYPES

No. Description Date

Page 39: Rachel Hughes Portfolio

UP

UP

A2011

A201

A201

A201

3

4

2

1 2 3 4 5

D

6

13' - 7" 13' - 5" 13' - 5" 13' - 7" 18' - 0"

4' - 0" 6' - 0" 7' - 4" 6' - 0" 7' - 4" 6' - 0" 7' - 4" 6' - 0" 4' - 0"

3' - 4"207a 205a 203a

202a204a206a208a

212b

W1 W1 W1

W1 W1 W1 W1

W1

72' - 0"

5' -

4"

8"

5' -

4"

VENDING VENDINGTypical Guest Room203

Game Room201

Typical Guest Room202

Typical Guest Room204

Typical Guest Room206

Typical Guest Room208

Typical Guest Room207

Typical Acc. Guest room205

207b 205b 203b

202b

201

Vending209

Elev. Lobby211

A.O.R.

A.O.R.

VENDING

3' - 4" 3' - 4" 15' - 4" 3' - 4" 4' - 4" 3' - 4" 10' - 4" 3' - 4"

5' - 1" 15' - 6"

23' -

4"

5' -

0"11

' - 4

"5'

- 0"

23' -

0"

11' -

4"

5' -

3"

9' -

3"

A

B

CG

F

30' -

8"

6' -

4"30

' - 8

"

212a

26' -

6 1

/2"

12' -

4 3

/4"

28' -

8 3

/4"

4A301

2A301

3A301

1A301

E

Corridor212

Stairs213

32' -

4"

3' -

4"32

' - 0

"3' - 4" 6' - 0" 7' - 4" 6' - 0" 7' - 4" 6' - 0" 7' - 4" 6' - 0" 4' - 0"

67' -

8"

6' - 0"

17' - 4 3/16"

P4E1

P9

P5P6

P6

P4

P8

P6

E1 P4 E1

P4

E1P7

E2P7

P10

P10

P6

E1

P6

E1

P9P8

P6

P6

P4

E1 P4P4P4 E1E1

P9

P6 P6

P8

P6

P5 P5

P8

P6

P9 P9

P5

P3

P7

208b 206b 204b

RFS ABBREVIATION LEGENDCPT CARPETCT CERAMIC TILECTB CERAMIC TILE BASEP PAINT

RB RUBBER BASESC SEALED CONCRETEWB WOOD BASEWOWD WHITE OAK WOOD

1/2" TILE

1/2" CEMENTBOARD

P1

4" MTL. STUD@ 16" O.C.

5/8" GYP BD.

7/8" MTL. FURRINGSTRIPS @ 16" O.C.10" CMU BLOCK7/8" MTL.FURRING STRIPS@ 16" O.C.

1/2" CEMENT BOARD

1/2" CERAMIC TILE

5/8" GYP BD.

7/8" MTL. FURRINGSTRIPS @ 16" O.C.10" CMU BLOCK

5/8" GYP BD.

7/8" MTL. FURRINGSTRIPS @ 16" O.C.

5/8" GYP BD.

7/8" MTL.FURRINGSTRIPS @16" O.C.

8" CMUBLOCK

1/2" CEMENT BOARD1/2" CERAMIC TILE

6" MTL. STUD @ 16" O.C.

5/8" GYP BD.

6" MTL. STUD@ 16" O.C.5/8" GYP BD.

1/2" CEMENT BOARD1/2" CERAMIC TILE

6" MTL. STUD @ 16" O.C.1/2" CEMENT BOARD1/2" CERAMIC TILE

1/2" CEMENT BOARD1/2" CERAMIC TILE

6" MTL. STUD @ 16" O.C.

5/8" GYP BOARD

5/8" GYP BD.

4" MTL. STUD@ 16" O.C.5/8" GYP BD.

P2 P3

P4 P5 P6

P7 P8 P9

E1 E2

5/8" GYP BD.

7/8" MTL.FURRINGSTRIPS @16" O.C.8" CMU2" RIGIDINSULATION2" AIR GAP4" FACE BRICK

8" CMU W/HORIZ REINF.@ 16" O.C.2" RIGIDINSULATION2" AIR GAP4" FACE BRICK

5/8" GYP BD.

7/8" MTL. FURRINGSTRIPS @ 16" O.C.8" CMU BLOCK

5/8" GYP BD.

7/8" MTL. FURRINGSTRIPS @ 16" O.C.

P10

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

As indicated

3/4/

2015

11:

10:1

2 P

M

A102

Second Floor Plan

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCHEMR

1/8" = 1'-0"1 2nd Floor

Room Schedule - 2nd LevelNumber Name Floor Finish Base Finish Wall Finish Ceiling Finish Area Comments

201 Game Room CPT WB P P 116 SF202 Typical Guest Room CPT WB P P 306 SF202-1 Guest Bathroom CPT CTB CT P 49 SF203 Typical Guest Room CPT WB P P 315 SF203-1 Guest Bathroom CT CTB CT P 49 SF204 Typical Guest Room CPT WB P P 315 SF204-1 Guest Bathroom CT CTB CT P 49 SF205 Typical Acc. Guest room CPT WB P P 293 SF205-1 Guest Bathroom CT CTB CT P 65 SF206 Typical Guest Room CPT WB P P 315 SF206-1 Guest Bathroom CT CTB CT P 49 SF207 Typical Guest Room CPT WB P P 305 SF207-1 Guest Bathroom CT CTB CT P 49 SF208 Typical Guest Room CPT WB P P 305 SF208-1 Guest Bathroom CT CTB CT P 49 SF209 Vending CPT WB P P 96 SF211 Elev. Lobby CPT WB P P 84 SF212 Corridor CPT WB P P 245 SF213 Stairs CPT WB P P 274 SF

1" = 1'-0"PARTITION TYPES

No. Description Date

Page 40: Rachel Hughes Portfolio

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

Bar Joist Brg.41' - 4"

TOMas Wall45' - 4"

Foundation Plan-4' - 0"

5' -

8"39

' - 0

"

LW CONCRETE COPING

16' - 4"

BELDEN CO., CHOCOLATE BROWN, STANDARDRUNNING BOND, THIN BRICK

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

BELDEN CO., TUMBLEWEED VELOUR,SOLDIER COURSING, THIN BRICK

BELDEN CO., CHOCOLATE BROWN, STANDARDRUNNING BOND, THIN BRICK

GRADEGRADE

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

TOMas Wall45' - 4"

Foundation Plan-4' - 0"

W1 W1 W1 W1

W1 W1 W1 W1

W1 W1 W1 W1

W1 W1 W1

LW CONCRETE COPING

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

9' -

3 31

/32"

1' -

4"8'

- 0"

1' -

4"8'

- 0"

1' -

4"9'

- 4

1/32

"5'

- 4"

4' -

0"

BELDEN CO., CHOCOLATE BROWN, STANDARDRUNNING BOND, THIN BRICK

BELDEN CO., TUMBLEWEED VELOUR,SOLDIER COURSING, THIN BRICK

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

BELDEN CO., TUMBLEWEED VELOUR,SOLDIER COURSING, THIN BRICK

BELDEN CO., TUMBLEWEED VELOUR,SOLDIER COURSING, THIN BRICK

BELDEN CO., TUMBLEWEED VELOUR,SOLDIER COURSING, THIN BRICK

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

BELDEN CO., CHOCOLATE BROWN, STANDARDRUNNING BOND, THIN BRICK

GRADE GRADE

2' - 0"

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

TOMas Wall45' - 4"

Foundation Plan-4' - 0"

W1 W1 W1 W1

W1W1W1W1

W1 W1 W1 W1

W1W1W1W1

9' -

0"9'

- 8

1/32

"1'

- 4"

8' -

0"1'

- 4"

8' -

0"1'

- 4"

9' -

3 31

/32"

2' - 0"

LW CONCRETE COPING

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

BELDEN CO., CHOCOLATE BROWN, STANDARDRUNNING BOND, THIN BRICK

BELDEN CO., CHOCOLATE BROWN, STANDARDRUNNING BOND, THIN BRICK

BELDEN CO., TUMBLEWEED VELOUR,SOLDIER COURSING, THIN BRICK

BELDEN CO., TUMBLEWEED VELOUR,SOLDIER COURSING, THIN BRICK

BELDEN CO., TUMBLEWEED VELOUR,SOLDIER COURSING, THIN BRICK

BELDEN CO., TUMBLEWEED VELOUR,SOLDIER COURSING, THIN BRICK

GRADEGRADE

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

TOMas Wall45' - 4"

Foundation Plan-4' - 0"

4' -

0"5'

- 0"

39' -

0"

16' - 4"

14' -

8"

LW CONCRETE COPING

BELDEN CO., CHOCOLATE BROWN, STANDARDRUNNING BOND, THIN BRICK

BELDEN CO., TUMBLEWEED VELOUR,SOLDIER COURSING, THIN BRICK

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

GRADE GRADE

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

1/8" = 1'-0"

3/4/

2015

11:

10:1

7 P

M

A201

Building Elevations

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

Checker

1/8" = 1'-0"1 East Elevation

1/8" = 1'-0"2 South Elevation

1/8" = 1'-0"3 North Elevation 1/8" = 1'-0"4 West Elevation

No. Description Date

Page 41: Rachel Hughes Portfolio

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

TOMas Wall45' - 4"

Foundation Plan-4' - 0"

3A301

10' -

8"

8' -

6"8'

- 6"

9' -

4"9'

- 4"

11' -

6"

4' -

0"

A3023

Mechanical Room111

Typical Acc. Guest room113

Typical Guest Room115

Game Room201

Conference Room301

Conference Room401

Typical Guest Room403

Typical Acc. Guest Room405

Typical Guest Room407

Typical Guest Room307

Typical Acc. Guest room305

Typical Guest Room303

Typical Guest Room203

Typical Acc. Guest room205

Typical Guest Room207

15' -

2"

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

TOMas Wall45' - 4"

4A301

Foundation Plan-4' - 0"

2A301

10' -

8"

8' -

2"7'

- 10

"8'

- 6"

8' -

0"4'

- 0"

5' -

4"4'

- 0"

5' -

4"4'

- 0"

14' -

8"

9' -

4"9'

- 4"

11' -

6"

4' -

0"

1A301

Typical Guest Room306

Typical Guest Room206

Typical Guest Room406

Corridor110

Typical Acc. Guest room113

Typical Acc. Guest room205

Typical Acc. Guest room305

Hotel Lobby101

Reception Desk102

Office103

Typical Acc. Guest Room405

Corridor412

Corridor312

Corridor212

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

TOMas Wall45' - 4"

Foundation Plan-4' - 0"

3A301

8' -

6"

9' -

4"9'

- 4"

11' -

6"

4' -

0"

Breakfast Area104

Hotel Lobby101

Typical Guest Room116

Typical Guest Room208

Typical Guest Room206

Typical Guest Room204

Typical Guest Room202

Typical Guest Room302

Typical Guest Room304

Typical Guest Room306

Typical Guest Room308

Typical Guest Room408

Typical Guest Room406

Typical Guest Room404

Typical Guest Room402

---- ---

-

Elev. Lobby107

Elev. Lobby211

Elev. Lobby311

Elev. Lobby411

Mechanical Room111

Typical Guest Room203

Typical Guest Room303

Typical Guest Room403

A3024

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

1/8" = 1'-0"

3/4/

2015

11:

10:1

9 P

M

A301

Building Sections

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCHEMR

1/8" = 1'-0"2 Building Section East-West

1/8" = 1'-0"3 Building Section North-South at Canopy

1/8" = 1'-0"4 Building Section East-West at Entrance

1/8" = 1'-0"1 Building Section - East-West Through Elev.

No. Description Date

Page 42: Rachel Hughes Portfolio

Typical Guest Room407

Typical Guest Room307

Typical Guest Room207

Typical Guest Room115

----

A5011

----

20K6 Bar Joist4'-0" O.C.

Gyp on Mtl. Stud

Typical Guest Room116

Corridor110

Corridor212

Typical Guest Room208

Typical Guest Room308

Corridor312

Corridor412

Typical Guest Room408

AK1 Bar Joist4'-0" O.C.

20K6 BarJoist4'-0" O.C.

A5012

----

----

Gyp on Mtl. Stud

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

TOMas Wall45' - 4"

Foundation Plan-4' - 0"

Typical Guest Room115

Typical Guest Room207

Typical Guest Room307

Typical Guest Room407

----

----

A5013

20K6 Bar Joist4'-0" O.C.

Elev. Lobby411

Elev. Lobby311

Elev. Lobby211

Elev. Lobby107

Mechanical Room111

Typical Guest Room203

Typical Guest Room303

Typical Guest Room403

----

A5014

----

Gyp on Mtl. Stud

20K6 Bar Joist4'-0" O.C.

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

3/8" = 1'-0"

3/4/

2015

11:

10:2

0 P

M

A302

Wall Sections

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCHCMM

3/8" = 1'-0"1 North-South Exterior Bearing Wall Section

3/8" = 1'-0"2 North-South Interior Bearing Wall Section

3/8" = 1'-0"3 East-West Non-Bearing Exterior Wall Section

3/8" = 1'-0"4 East-West Interior Non-Bearing Wall Section

Gyp on Mtl. Stud

No. Description Date

Page 43: Rachel Hughes Portfolio

A401

2

5 4

3

A401

6

A401

7

E1

P4

P6

P4

P1

P8

P9

MOHAWK SPICED REDWOOD CARPET

BENJAMIN MOORE SLATE TEAL PAINT

7" K616 WHITE OAK TRIM

MOHAWK SPICED REDWOOD CARPET

BENJAMIN MOORE SLATE TEAL PAINT

7" K616 WHITE OAK TRIM

MOHAWK SPICED REDWOOD CARPET

BENJAMIN MOORE SLATE TEAL PAINT

7" K616 WHITE OAK TRIM

10' -

1"

7"BENJAMIN MOORE SLATE TEAL PAINTBEHIND DECORATIVE WALL PANEL

BLACK CONTINUOUS HEADBOARDMADE BY MANUFACTURUR

MOHAWK SPICED REDWOOD CARPET

WHITE OAK TRIM

7" K616 WHITE OAK TRIM

7' -

6"

WHITE OAK DOOR

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

As indicated

3/4/

2015

11:

10:2

2 P

M

A401

Enlarged Plan &Interior Elevations

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

-

1/4" = 1'-0"1 1ST FLOOR HOTEL ROOM

1/4" = 1'-0"2 North Interior Elevation

1/4" = 1'-0"3 East Interior Elevation

1/4" = 1'-0"4 South Interior Elevation

1/4" = 1'-0"5 West Interior Elevation

1/2" = 1'-0"6 guest room 1/2" = 1'-0"7 guest room 2

No. Description Date

Page 44: Rachel Hughes Portfolio

A402 3

2

5

4A402

6A402

7

P4

P4

P9P4

E1

P4

E1

P9

BENJAMIN MOORE SLATE TEAL PAINT

K616 WHITE OAK TRIMK616 WHITE OAK FLOORING

RECEPTION DESKMADE BY MANUFACTURUR 3'

- 6"

DECORATIVE WALL PANEL

DECORATIVE WALL PANEL

BENJAMIN MOORE SLATE TEAL PAINT

K616 WHITE OAK FLOORINGK616 WHITE OAK TRIM

BENJAMIN MOORE SLATE TEAL PAINT

CURTAIN WALL MADE BY MANUFATURER

K616 WHITE OAK FLOORING

BENJAMIN MOORE SLATE TEAL PAINT

7" K616 WHITE OAK TRIM

RECEPTION DESKMADE BY MANUFACTURUR MOHAWK SPICED REDWOOD CARPET

10' -

8"

3' -

6"

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

1/4" = 1'-0"

3/4/

2015

11:

10:2

2 P

M

A402

Enlarged Plan &Interior Elevations

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

-

1/4" = 1'-0"1 1st Floor Lobby

1/4" = 1'-0"2 North Interior Lobby Elevation 1/4" = 1'-0"3 East Interior Lobby Elevation

1/4" = 1'-0"4 South Interior Lobby Elevation

1/4" = 1'-0"5 West Interior Lobby Elevation

1/4" = 1'-0"7 BREAKFAST AREA

1/4" = 1'-0"6 LOBBY ENTRANCE

No. Description Date

Page 45: Rachel Hughes Portfolio

4" FACE BRICK

2" AIR GAP

2" RIGID INSULATION

8" CMU BLOCK

5/8" METAL FURRING @ 16" O.C.

7/8" GYP BOARD

2" CONCRETE TOPPING

#4 DOWEL @ 4'-0" O.C. INSTALLERTO DRILL THRU KEYWAY & 4" MININTO BOND BEAM & GROUT SOLID

10" CONC. FILLED BONDBEAM WITH (2) #4REBAR AND EMBEDDEDCOPING ANCHOR

KOROLATH

DOOR FRAME

2" LW CONCRETE TOPPING

8" HC PLANK

#4 DOWEL @ 4'-0" O.C. iNSTALLERTO DRILL THRU KEYWAY & 4" MININTO BOND BEAM & GROUT SOLID

10" CONC. FILLED BONDBEAM WITH (2) #4REBAR AND EMBEDDEDCOPING ANCHOR

2" MIN SPACE

KOROLATH

4" FACE BRICK

2" AIR GAP

2" RIGID INSULATION

8" CMU BLOCK

5/8" METAL FURRING @ 16" O.C.

7/8" GYP BOARD

2" LW CONCRETE TOPPING

#4 DOWEL @ 4'-0" O.C. iNSTALLERTO DRILL THRU KEYWAY & 4" MININTO BOND BEAM & GROUT SOLID

(2) #4 REBAR

4HC6 LW CONCRETE PLANKS

10" CMU WALL W/HORIZ REIN @ 1'-4"O.C.

7/8" METAL FURRING @ 16" O.C.

5/8" GYP BOARD

2" LW CONCRETE TOPPING

8" HC PLANK

2 x 6 STUDS 16" O.C.

5/8" GYP BOARD

DOOR

4" LW CONCRETE SLAB

10" CMU BLOCKFOOTING

2" AIR GAP

2" RIGID INSULATION

8" CMU BLOCK W/ HORIZ. REINF.

7/8" METAL FURRING @ 16" O.C.

5/8" GYP BOARD

4" FACE BRICK W/ BRICK TIES

WEEP HOLES @ 2' O.C.;1/4" MINIMUM

2" PERIMETERINSULATION

FLASHINGMORTAR FILL

REINFORCED CONCRETEFOUNDATION

4" CONCRETE SLABW/ 1/2 EXPANSION JOINT

4' FDTN WALL

FOOTING

WELDED WIRE MESH

2" AIR GAP

2" RIGID INSULATION

8" CMU BLOCK

7/8" METAL FURRING5/8" GYP BOARD

4" FACE BRICK

WEEP HOLES @ 2' O.C.;1/4" MINIMUM2" PERIMETERINSULATION

FLASHINGMORTAR FILL

REINFORCED CONCRETEFOUNDATION

4" CONCRETE SLABW/ 1/2 EXPANSION JOINT

FOOTING

WELDED WIRE MESH

2 x 6 METAL STUD @16" O.C.

5/8 GYP BOARD

4" CONCRETE SLAB

CHANNEL RUNNER

TOMas Wall45' - 4"

4" FACE BRICK

2" AIR GAP

2" RIGID INSULATION

8" CMU BLOCK

LW CONCRETE COPING

BOND BEAM

LIGHT-WEIGHT CONCRETE COPING

10" CONC. FILLED BONDBEAM WITH (2) #4REBAR AND EMBEDDEDCOPING ANCHOR8" CMU BLOCK

2" RIGID INSULATION2" AIR GAP4" FACE BRICK

1/2" ROOFING8" RIGID INSULATION2" METAL DECKING

20K6 BAR JOIST

WELD PLATE10" CONC. FILLED BONDBEAM WITH (2) #4REBAR AND EMBEDDEDCOPING ANCHOR5/8" METAL FURRING7/8" GYP BOARD

METAL FLASHING

EPDM

10" CMU W/ 7/8" FURRING AND 5/8" GYP BOTH

20K6 BAR JOIST 16" O.C.8K1 BAR JOIST 16" O.C.

WELD PLATE

(2) #4 REBAR10" CMU BLOCK

7/8" METAL FURRING @16" O.C.5/8"GYP

20K6 BAR JOIST

WELD PLATE(2) #4 REBAR

1/2" ROOFING8" INSULATION

2" METAL DECKING

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

As indicated

3/18

/201

5 5:

34:0

8 P

M

A501

Details

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

Checker

1 1/2" = 1'-0"5 Ext. Bearing Planks

1 1/2" = 1'-0"6 Int. Bearing Planks

1 1/2" = 1'-0"7 Ext. Non-Bearing Planks

1 1/2" = 1'-0"8 Int. Non-Bearing Planks

1" = 1'-0"10 Haunch Foundation

1" = 1'-0"11 Non-Bearing Foundation

1" = 1'-0"9 Bearing Wall Foundation

1" = 1'-0"12 Foundation

3/4" = 1'-0"3 East-West Non-Bearing Exterior Wall Detail

3/4" = 1'-0"1 North-South Exterior Bearing Wall DETAIL

3/4" = 1'-0"2 North-South Interior Bearing Wall Detail

3/4" = 1'-0"4 East-West Interior Non-Bearing Wall Detail

No. Description Date

Page 46: Rachel Hughes Portfolio

GLAZING ABBREVIATION LEGENDG1 1/4" TEMPERED GLASSG2 1" TEMPERED INS. GLASSG3 1/4" WIRE GLASS

DOOR MATERIAL ABBREVIATION LEGENDHM HOLLOW METALSCWD SOLID CORE WOOD DOORAL ALUMINUM

7' -

0"2"

7' -

2"

2" 3' - 0" 2"

5" 2' - 0"2 1/2" 6' - 0" 2 1/2"2' - 0" 5"

2 1/

2"2'

- 3"

2 1/

2"6'

- 9

1/2"

2 1/

2"

9' -

8"

11' - 3"

7' -

0"4"

7' -

4"

2" 3' - 0" 2"

F1 F2 F3

3' - 4" 3' - 4"

D2D1 D3

7' -

0"

3' - 0"

4' -

0"1'

- 6"

1' -

6"

7' -

0"

6"6" 2' - 0"

3' - 0"

6"6'

- 0"

6"

7' -

0"

6" 2' - 0" 6"

3' - 0"

D4

4' -

0"2'

- 6"

6"

7' -

0"

6" 2' - 0" 6"

3' - 0"

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

1/4" = 1'-0"

3/4/

2015

11:

10:2

6 P

M

A601

Schedule

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

AV

Door Schedule

MarkDOOR FRAME

HDWE GROUP Fire Rating Glazing CommentsWidth Height Thickness Material Type Material Type100a 6' - 0" 7' - 10 3/4" 1 3/4" AL D3 AL F3 GROUP A 1 HOUR G2100b 6' - 0" 7' - 10 3/4" 1 3/4" AL D3 AL F3 GROUP B 1 HOUR G2103 3' - 0" 7' - 0" 1 3/4" HM D4 HM F2 GROUP I 1 HOUR G1105 3' - 0" 7' - 0" 1 3/4" HM D4 HM F2 GROUP E 1 HOUR G1109 3' - 0" 7' - 0" 1 3/4" HM D1 HM F2 GROUP H 1 HOUR -110 3' - 0" 7' - 0" 1 3/4" INS HM D2 HM F2 GROUP D 1 HOUR -111 3' - 0" 7' - 0" 1 3/4" HM D1 HM F2 GROUP E 1 HOUR -113a 3' - 0" 7' - 0" 1 3/4" HM D1 HM F2 GROUP A 1 HOUR -113b 3' - 0" 7' - 0" 1 3/4" SCWD D1 HM F1 GROUP B - -115a 3' - 0" 7' - 0" 1 3/4" HM D1 HM F2 GROUP A 1 HOUR -115b 3' - 0" 7' - 0" 1 3/4" SCWD D1 HM F1 GROUP B - -116a 3' - 0" 7' - 0" 1 3/4" HM D1 HM F2 GROUP A 1 HOUR -116b 3' - 0" 7' - 0" 1 3/4" SCWD D1 HM F1 GROUP B - -201 3' - 0" 7' - 0" 1 3/4" HM D4 HM F2 GROUP J 1 HOUR -202a 3' - 0" 7' - 0" 1 3/4" HM D1 HM F1 GROUP A 1 HOUR -202b 3' - 0" 7' - 0" 1 3/4" SCWD D1 HM F1 GROUP B - -203a 3' - 0" 7' - 0" 1 3/4" HM D1 HM F1 GROUP A 1 HOUR -203b 3' - 0" 7' - 0" 1 3/4" SCWD D1 HM F1 GROUP B - -204a 3' - 0" 7' - 0" 1 3/4" HM D1 HM F1 GROUP A 1 HOUR -204b 3' - 0" 7' - 0" 1 3/4" SCWD D1 HM F1 GROUP B - -205a 3' - 0" 7' - 0" 1 3/4" HM D1 HM F1 GROUP A 1 HOUR -205b 3' - 0" 7' - 0" 1 3/4" SCWD D1 HM F1 GROUP B - -206a 3' - 0" 7' - 0" 1 3/4" HM D1 HM F1 GROUP A 1 HOUR -206b 3' - 0" 7' - 0" 1 3/4" SCWD D1 HM F1 GROUP B - -207a 3' - 0" 7' - 0" 1 3/4" HM D1 HM F1 GROUP A 1 HOUR -207b 3' - 0" 7' - 0" 1 3/4" SCWD D1 HM F1 GROUP B - -208a 3' - 0" 7' - 0" 1 3/4" HM D1 HM F1 GROUP A 1 HOUR -208b 3' - 0" 7' - 0" 1 3/4" SCWD D1 HM F1 GROUP B - -212a 3' - 0" 7' - 0" 1 3/4" HM D2 HM F1 GROUP A 1 HOUR G3212b 3' - 0" 7' - 0" 1 3/4" INS HM D2 HM F1 GROUP B 1 HOUR G3

1/4" = 1'-0"Frame Types

1/4" = 1'-0"Door Types

No. Description Date

Page 47: Rachel Hughes Portfolio

UP

--

R201

2

R201

1

R202 1

40' - 8"

8' - 4" 3' - 4" 16' - 8" 3' - 4" 9' - 0"

8' - 4" 3' - 4" 16' - 8" 3' - 4" 9' - 0"

32' -

4"

3' -

4"32

' - 0

"

67' -

8"

4' - 0" 6' - 0" 2' - 4" 6' - 0" 4' - 0" 6' - 0" 2' - 4" 6' - 0" 4' - 0"

4' -

5 1/

2"6'

- 3"

6' -

6"3'

- 4"

10"

1' -

6"

4' - 0"

1R301

2R301

Accessible Guest Suite109

Guest Suite111

Corridor113

Guest Suite112

Guest Suite110

Conference Room106

Workout Room107

Mechanical Room105

Men's Bathroom102

Women's Bathroom103

W1 W1 W1 W1

W1 W1 W1 W1

109a

109b

111a

111b

112a

112b 110b

110a

102

113

Patch any damages towalls, paint to matchexisting

Patch any damages towalls, paint to matchexisting

Paint ceiling to matchexisting

Paint ceiling to matchexisting

Fill door opening, matchexisting wall, paint tomatch existing wall

1' - 7" 4' - 6"Paint ceiling to matchexisting

7' - 4 1/2"

WALL MOUNTEDDESK

WALLMOUNTEDTABLE

WALLMOUNTEDTABLE

WALLMOUNTEDTABLE

WALLMOUNTEDTABLE

Patch any damages towalls, paint to matchexisting

NEW EXISTING

DOOR MATERIAL ABBREVIATION LEGENDHM HOLLOW METALSCWD SOLID CORE WOOD DOORAL ALUMINUM

GLAZING ABBREVIATION LEGENDG1 1/4" TEMPERED GLASSG2 1" TEMPERED INS. GLASSG3 1/4" WIRE GLASS

RFS ABBREVIATION LEGENDCPT CARPETCT CERAMIC TILECTB CERAMIC TILE BASEP PAINT

RB RUBBER BASESC SEALED CONCRETEWB WOOD BASEWOWD WHITE OAK WOOD

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

As indicated

3/4/

2015

11:

10:2

8 P

M

R101

1st Level Addition

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

Checker 1/8" = 1'-0"1 1st Floor - Suite Addition

Door Schedule - Suite Addition

Mark Width Height ThicknessDoor

Material Door TypeFrame

Material Frame TypeHDWE

GROUP Fire Rating Glazing Comments102 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F2 1 HOUR -109a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F2 1 HOUR -109b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -110a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F2 1 HOUR -110b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -111a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F2 1 HOUR -111b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -112a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F2 1 HOUR -112b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -113 3' - 0" 7' - 0" 0' - 1 3/4" HM D2 HM F2 1 HOUR G2201a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F1 1 HOUR -201b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -202a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F1 1 HOUR -202b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -203a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F1 1 HOUR -203b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -204a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F1 1 HOUR -204b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -205 3' - 0" 7' - 0" 0' - 1 3/4" HM D2 HM F1 1 HOUR G2

Room Schedule - Suite Addition

Number Name Floor Finish Base Finish Wall FinishCeilingFinish Comments Area Level

102 Men's Bathroom CT CTB P P 65 SF 1st Floor103 Women's Bathroom CT CTB P P 65 SF 1st Floor105 Mechanical Room SC WB P P 736 SF 1st Floor106 Conference Room CPT WB P P 366 SF 1st Floor107 Workout Room CPT WB p P 362 SF 1st Floor109 Accessible Guest Suite CPT WB P P 465 SF 1st Floor110 Guest Suite CPT WB P P 465 SF 1st Floor111 Guest Suite CPT WB P P 465 SF 1st Floor112 Guest Suite CPT WB P P 465 SF 1st Floor113 Corridor CPT WB P P 204 SF 1st Floor201 Accessible Guest Suite CPT WB P P 475 SF 2nd Floor202 Guest Suite CPT WB P P 475 SF 2nd Floor203 Guest Suite CPT WB P P 465 SF 2nd Floor204 Guest Suite CPT WB P P 465 SF 2nd Floor205 Corridor CPT WB P P 205 SF 2nd Floor

No. Description Date

Page 48: Rachel Hughes Portfolio

UP

--

R201

2

R201

1

R202 1

4' - 0" 6' - 0" 2' - 4" 6' - 0" 4' - 0" 6' - 0" 2' - 4" 6' - 0" 4' - 0"

40' - 8"

32' -

4"

3' -

4"32

' - 0

"

Accessible Guest Suite201

Guest Suite203

Corridor205

Guest Suite204

Guest Suite202

W1 W1 W1 W1

W1 W1 W1 W1

205

204a

204b 202b

202a

201a203a

201b203b

67' -

8"

A.O.R.

VENDING

8' - 4" 3' - 4" 16' - 8" 3' - 4" 9' - 0"

8' - 4" 3' - 4" 16' - 8" 3' - 4" 9' - 0"

12' - 4 1/2" 11' - 7 1/2"

19' - 0 1/2"18' - 11 1/2"

WALLMOUNTEDTABLE

WALLMOUNTEDTABLE

WALLMOUNTEDTABLE

WALLMOUNTEDTABLE

NEW EXISTING

DOOR MATERIAL ABBREVIATION LEGENDHM HOLLOW METALSCWD SOLID CORE WOOD DOORAL ALUMINUM

GLAZING ABBREVIATION LEGENDG1 1/4" TEMPERED GLASSG2 1" TEMPERED INS. GLASSG3 1/4" WIRE GLASS

RFS ABBREVIATION LEGENDCPT CARPETCT CERAMIC TILECTB CERAMIC TILE BASEP PAINT

RB RUBBER BASESC SEALED CONCRETEWB WOOD BASEWOWD WHITE OAK WOOD

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

As indicated

3/4/

2015

11:

10:3

1 P

M

R102

2nd Level Addition

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

Checker

1/8" = 1'-0"1 2nd Floor - Suite Addition

Door Schedule - Suite Addition

Mark Width Height ThicknessDoor

Material Door TypeFrame

Material Frame TypeHDWE

GROUP Fire Rating Glazing Comments102 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F2 1 HOUR -109a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F2 1 HOUR -109b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -110a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F2 1 HOUR -110b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -111a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F2 1 HOUR -111b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -112a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F2 1 HOUR -112b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -113 3' - 0" 7' - 0" 0' - 1 3/4" HM D2 HM F2 1 HOUR G2201a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F1 1 HOUR -201b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -202a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F1 1 HOUR -202b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -203a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F1 1 HOUR -203b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -204a 3' - 0" 7' - 0" 0' - 1 3/4" HM D1 HM F1 1 HOUR -204b 3' - 0" 7' - 0" 0' - 1 3/4" SCWD D1 HM F1 1 HOUR -205 3' - 0" 7' - 0" 0' - 1 3/4" HM D2 HM F1 1 HOUR G2

Room Schedule - Suite Addition

Number Name Floor Finish Base Finish Wall FinishCeilingFinish Comments Area Level

102 Men's Bathroom CT CTB P P 65 SF 1st Floor103 Women's Bathroom CT CTB P P 65 SF 1st Floor105 Mechanical Room SC WB P P 736 SF 1st Floor106 Conference Room CPT WB P P 366 SF 1st Floor107 Workout Room CPT WB p P 362 SF 1st Floor109 Accessible Guest Suite CPT WB P P 465 SF 1st Floor110 Guest Suite CPT WB P P 465 SF 1st Floor111 Guest Suite CPT WB P P 465 SF 1st Floor112 Guest Suite CPT WB P P 465 SF 1st Floor113 Corridor CPT WB P P 204 SF 1st Floor201 Accessible Guest Suite CPT WB P P 475 SF 2nd Floor202 Guest Suite CPT WB P P 475 SF 2nd Floor203 Guest Suite CPT WB P P 465 SF 2nd Floor204 Guest Suite CPT WB P P 465 SF 2nd Floor205 Corridor CPT WB P P 205 SF 2nd Floor

No. Description Date

Page 49: Rachel Hughes Portfolio

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

TOMas Wall45' - 4"

Foundation Plan-4' - 0"

NEW EXISTING

LW CONCRETE COPING

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

W1 W1 W1 W1

W1W1W1W1

W1 W1 W1 W1

W1W1W1W1

15' -

2"

9' -

4"9'

- 4"

11' -

6"

4' -

0"

GRADE GRADE

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

TOMas Wall45' - 4"

Foundation Plan-4' - 0"

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

NEWEXISTING

W1 W1 W1 W1

W1W1W1W1

W1 W1 W1 W1

W1W1W1W1

LW CONCRETE COPING

GRADE GRADE

4' -

0"11

' - 6

"9'

- 4"

9' -

4"15

' - 2

"

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

1/8" = 1'-0"

3/4/

2015

11:

10:3

4 P

M

R201

Addition Elevations

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

Checker

1/8" = 1'-0"1 South Elevation - SUITE ADDITION

1/8" = 1'-0"2 North Elevation - SUITE ADDITION

No. Description Date

Page 50: Rachel Hughes Portfolio

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

TOMas Wall45' - 4"

Foundation Plan-4' - 0"

LW CONCRETE COPING

BELDEN CO., GREY 671 SMOOTH,RUNNING BOND, FACE BRICK

GRADEGRADE

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

1/8" = 1'-0"

3/4/

2015

11:

10:3

6 P

M

R202

Addition Elevations

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

Checker

1/8" = 1'-0"1 West Elevation - SUITE ADDITION

No. Description Date

Page 51: Rachel Hughes Portfolio

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

TOMas Wall45' - 4"

Foundation Plan-4' - 0"

3' -

9 1/

2"11

' - 4

1/2

"9'

- 4"

9' -

4"11

' - 6

"4'

- 0"

Guest Suite403

Guest Suite303

Guest Suite203

Guest Suite111

Accessible Guest Suite109

Accessible Guest Suite201

Accessible Guest Suite408

Accessible Guest Suite406

10' -

8"

8' -

6"8'

- 6"

8' -

0"

1st Floor0' - 0"

2nd Floor11' - 6"

3rd Floor20' - 10"

4th Floor30' - 2"

TOMas Wall45' - 4"

Foundation Plan-4' - 0"

Guest Suite203

Guest Suite111

Corridor113

Corridor205

Guest Suite204

Guest Suite112

Guest Suite303

Guest Suite403

Corridor305

Corridor405

Guest Suite404

Guest Suite304

10' -

8"

8' -

6"8'

- 6"

8' -

0"

8' -

0"4'

- 0"

5' -

4"4'

- 0"

5' -

4"4'

- 0"

7' -

4"4'

- 0"

7' -

4"

4' -

0"11

' - 2

"9'

- 4"

9' -

4"11

' - 6

"4'

- 0"

5/8" GYP ONMTL. STUD

5/8" GYP ONMTL. STUD

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

1/8" = 1'-0"

3/4/

2015

11:

10:3

7 P

M

R301

Building AdditionSection

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

Checker

1/8" = 1'-0"1 Building Section East-West Addition 1/8" = 1'-0"2 Building Section North-South Addition

No. Description Date

Page 52: Rachel Hughes Portfolio

2

1

2

2

3

4 3

5

6

78

1 9

7

1

10

1

5

2

2

3

4 3

5

6

2

34

36

2

11

12

13

14

8

1 9

13

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

1/8" = 1'-0"

3/4/

2015

11:

10:3

9 P

M

RD101

1st & 2nd LevelAddition Demo

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

Checker

1/8" = 1'-0"1 1st Floor - Suite Addition DEMO

1/8" = 1'-0"2 2nd Floor - Suite Addition DEMO

DEMOLITION SCHEDULE

Number Description1 REMOVE DOOR AND STORE ONSITE2 REMOVE WALL3 REMOVE TILE ON WALL & REPLACE WITH WALL GYP4 REMOVE AND STORE ONSITE BATHROOM PLUMBING FIXTURES5 REMOVE SHOWER PAN, CAP AND LEVEL FLOOR6 REMOVE FLOOR TILE7 REMOVE CLOSET SHELF AND WALL8 REMOVE STAIRS, STORE ONSITE FOR FUTURE9 REMOVE DOOR AND STORE ONSITE10 REMOVE DOOR, CLOSE OPENING WITH SIMILAR WALL TYPE11 CREATE 3'-4" W x 7'-4" H DOOR OPENING12 REMOVE GRAB BARS STORE ONSITE FOR FUTURE13 REMOVE CONCRETE SLAB14 REMOVE WALL, REPLACE WITH 8" CMU W/ GYP ON BOTH SIDES

No. Description Date

Page 53: Rachel Hughes Portfolio

26' -

11

1/4"

12' -

11

1/4"

29' -

1 1

/2"

2' - 4" 3' - 4" 15' - 6" 3' - 4"

2' - 7"

3' - 4" 5' - 4" 3' - 4" 1' - 4"

2' - 6" 3' - 4" 18' - 4"

15' - 3 1/2" 11' - 8 1/2" 28' - 4"

69' -

0"

55' - 4"

SEE FRAMING GEN.NOTES B

SEE FRAMING GEN.NOTES C

SEE FRAMING GEN.NOTES G

SEE FRAMING GEN.NOTES F

SEE FRAMING GEN.NOTES D

SEE FRAMING GEN.NOTES A

4" CONCRETE SLAB WITH6x6 10'10" WWM ON 4" COMPGRAN. FILL ON 6 MIL. V.B.EACH SIDE

SEE FRAMING GEN.NOTES E

SEE FRAMING GEN.NOTES F

SEE FRAMING GEN.NOTES C

A - EXTERIOR BEARING FOOTINGS TO BE 4' x 1' CENTERED ON WALL

B - EXTERIOR NON-BEARING FOOTINGSTO BE 3' x 1' CENTERED ON WALL

C - INTERIOR BEARING FOOTINGS TO BE3'-10" x 1'-4" CENTERED ON WALL

D - INTERIOR NON-BEARING FOOTINGSTO BE 2' x 1' CENTERED ON WALL

E - EXTERIOR FOUNDATION WALLS TO BEWIDTH OF THE EXTERIOR WALLS 4'-0" HIGH

F - INTERIOR FOOTING ELEVATION TO BE -4'-0"

G - HOLD DOWN TOP OF FOUNDATION 0'-8" ATOPENINGS

4A301

2A301

3A301

1A301

4" B

rg.

4" Brg. 4" Brg.

32' - 0" = (9) 20K6 BAR JOISTS @ 4'-0" O.C.

11 1

/16" 16

' - 0

" = (5

) 20K

6 @

4'-0

" O.C

.11

' - 8

7/8

" = (3

) 20K

6 B

AR

JO

IST

@ 4

'-0" O

.C.

6' -

9"30

' - 4

31/

32"

48' - 0" = (13) 20k6 JOIST @4'-0" O.C.

4" B

rg.

4" B

rg.

3' - 11 7/8"16' - 0" = (5) 20K6 BAR JOIST @ 4'-0" O.C.

30' -

2 1

5/16

"30

' - 1

15/

16"

4" B

rg.

4' - 0" 3' - 8" 13' - 0 1/2"

2' - 8" 2' - 8"

12' -

6 1

/8"

3' - 10 3/8"

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

As indicated

3/4/

2015

11:

10:4

0 P

M

S101

FDTN & foundationPlan

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

-

1/8" = 1'-0"1 Foundation Plan

1/4" = 1'-0"FRAMING GEN. NOTES

1/8" = 1'-0"2 Roof Framing

No. Description Date

Page 54: Rachel Hughes Portfolio

4A301

2A301

3A301

1A301

4' - 0" 40' - 0" = (11) 4'-0" PLANKS

30' -

3"

6' -

5"30

' - 4

"

2' - 9"3' - 0"

2' - 11"

10' -

6 7

/8"

30' -

4"

3' - 0" 2' - 11"

L-1 L-1 L-1 L-1

L-1L-1L-1L-1

L-2

L-2

L-2L-2

L-2

L-3

18' -

5 1

/8"

L-2 L-2

L-2 L-2

GENERAL NOTES

1. 8" HOLLOW CORE CONCRETE PLANKSTO BE USED AT ALL LOCATIONS

2. 4" BRG. @ ALL BEARING WALLS

3. 2" CONCRETE TOPPING TO COVER ALLPLANKS

LINTEL SCHEDULE

MK

L-1

L-2

L-3

LENGTH

7'-4"

4'-8"

7'-4"

MAT'L

8" CONC. FILLED BOND BEAMW/ (2) #4 REBAR W/ 7" x 2" x3/8" BRICK ANGLES

10" CONC. FILLED BOND BEAMW/ (2) #4 REBAR

10" CONC. FILLED BOND BEAMW/ (2) #4 REBAR

Scale

Project number

Date

Drawn by

Checked by

Rachel Hughes320 W South Street Apt. 202(920)[email protected]

Architectural Commercial Design Program1900 College DriveRice Lake WI, 54868(715)234-7082

Instructor - Deb Kutrieb1900 College DriveRice Lake WI, 54868(715)234-7082 ext. [email protected]

As indicated

3/4/

2015

11:

10:4

1 P

M

S102

Plank Framing

2014001

White Oak HotelDeb Kutrieb

2/09/2015RCH

-

1/8" = 1'-0"1 3rd Floor Plank Framing Plan

No. Description Date