radiate july 2015 meeting p. hurh fermilab 28 july 2015

20
RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

Upload: merryl-black

Post on 27-Dec-2015

221 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

RaDIATE July 2015 Meeting

P. Hurh

Fermilab

28 July 2015

Page 2: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

2

Agenda

• 1) RaDIATE News and Notes•   1a) MOU status•   1b) HiRadMat BeGrid status•   1c) NSUF User’s meeting•   1d) 3rd annual RaDIATE Collaboration Meeting Planning• 2) BLIP Irradiation Run Planning•   2a) Review of RaDIATE Test Plan•   2b) BLIP irradiation environment•   2c) Expression of interest (materials, samples, analysis)•   2d) Timetable• 3) Any Other Business

P. Hurh RaDIATE JulyMeeting

Page 3: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

3

RaDIATE News

• MOU Status– Revision signed and master copy distributed– Planning another revision to add new participants during

CY 2016

• HiRadMat “BeGrid” experiment status– Beam time starting Sept 14– Rig is being fabricated at RAL, will be tight to make scheduled

delivery to CERN on August 24

• NSUF Users Meeting (Nuclear Science User Facilities)– Kavin and Pat attended– Met with D. Senor (PNNL), R. Kennedy (INL) and J. Cole (INL)

to discuss using NSUF partner facilities for Target R&D• In a nut-shell: Make the objectives relevant to Fission, don’t

mention accelerators

P. Hurh RaDIATE JulyMeeting

Page 4: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

4

RaDIATE News

• Not too early to begin planning for next year’s collaboration meeting!– Volunteer host needed– Set available dates?

P. Hurh RaDIATE JulyMeeting

Page 5: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

5

BLIP Irradiation Run Plan• Fermilab conducting an irradiation run at BLIP in FY16/17

and will be paying the associated costs (not insignificant)• Include materials from RaDIATE participants that are of

interest to Fermilab’s program and/or of general interest to the RaDIATE community

• RaDIATE participants will have to:– Provide their own samples, including any experiment design

labor– Arrange for their own PIE activities

• Coordination of the irradiation run and simulations of the entire test assembly will be provided by Fermilab and BNL

P. Hurh RaDIATE JulyMeeting

Page 6: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

6

BLIP Irradiation Run Plan• Several RaDIATE participants can provide PIE services

– Perhaps arrangements can be made to cost-share or otherwise minimize PIE costs

– e.g. One could consider doing the PIE on BLIP irradiated samples as a separate study using other funding agencies, such as the NSUF in the US or the ESPRC in the UK

• Regardless of which participant provides what, the results will be shared with all. So, even if you feel that you cannot or will not participate by putting actual samples into the irradiation test matrix, we want to encourage you to participate in:– planning the experiment (setting objectives and priorities)– helping with results analysis– or just giving (good) advice

P. Hurh RaDIATE JulyMeeting

Page 7: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

Simos_LHC-LARP_May2015

Facilities CURRENTLY Integrated and in UseBLIP (Brookhaven Linear Isotope Producer)

Tandem Van de Graaff: Irradiations with 28 MeV protons (197Au ion irrad planned)

Isotope Extraction-Processing Facility: An experimental area in the facility hot cells for complete macroscopic analysis of irradiated samples

Center of Functional Nanomaterials: A complete experimental evaluation (electron microscopy, EDS, annealing, DSC/TGA, etc.) of un-irradiated samples for base lining

BNL Light Sources NSLS (X17B1 and X17A Beamlines) – beamlines used to-date for x-ray diffraction

BLIP or Tandem irradiated reactor and/or accelerator materialsNSLS II (XPD Beamline) – Beamline used for Glidcop benchmarking during

commissioning

From Nick Simos’ slides on LHC Collimator materials studies:

Page 8: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

Simos_LHC-LARP_May2015

BNL Accelerator ComplexBLIP & Tandem Facilities

2013 & 2014 RUNSAverage Current ~ 110 uA

Page 9: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

Simos_LHC-LARP_May2015

High Energy 200 MeV Proton Irradiation Consisted of 2 Phases Double the effort !!

RUN1 Array Configuration

Isot

ope

arra

y

Page 10: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

Simos_LHC-LARP_May2015

Spallation-induced Fast Neutron Irradiation – CuCD

Irradiation damage studies from mixed spectrum (dominated by fast neutrons) – CuCD Irradiation

Neutron Energy Spectrum

Page 11: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

Experimental Facility occupies 2 hot cells and a HEPA-filtered fume hood

PIE analyses performed are:

Stress-strain (tension, 3-point and 4-point bending)Thermal Expansion and annealing (extremely sensitive dilatometer)Thermal Conductivity (electrical resistivity)Magnetic Whole probeUltrasonic measurements

PLUSPhoton spectra and isotopic analysisActivity measurementsWeight loss or gain

Macroscopic Post-Irradiation- Isotope Extraction and Processing Facility

Simos_LHC-LARP_May2015

Page 12: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

Simos_LHC-LARP_May2015

Center of Functional Nanomaterials (Paola Nocera will expand on this)

Complimentary post-irradiation experimental activity(a) Electron Microscopy (SEM & TEM)(b) Annealing Studies under various atmospheres (vacuum, air, oxygen and noble gases) (c) Differential Scanning Calorimetry and TGA(d) Dual Beam and TEM

Page 13: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

Simos_LHC-LARP_May2015

Synchrotron Experiments Conducted to-date

• EDXRD Experiment 1 (NSLS X17B1 Beamline, 200 KeV white beam)- Mo (RT, 660C, 965C with/without 4PointBending) – un-irradiated- MoGR - unirradiated- CuCD – unirradiated- Phase I Gidcop (irradiated, loaded)- Phase II Glidcop- Phase I 2D-CC (irradiated, loaded) – plus 3D-CC

• XRD Experiment (NSLS X17A Beamline, 70 KeV monochromatic beam)- Mo (Tandem Irradiated)- Mo-GR (BLIP and Tandem Irradiated)- Cu-CD (BLIP & Tandem irradiated)- Glidcop Phase 2 (Tandem irradiated/loaded)

• EDXRD Experiment 2 (NSLS X17B1 Beamline)- Mo (Tandem Irradiated, loaded)- Mo-GR (BLIP and Tandem Irradiated, loaded) end-of-light Experiment- Cu-CD (BLIP & Tandem irradiated)- Glidcop Phase 2 (Tandem irradiated/loaded)

• XRD-preliminary (NSLS II XPD Beamline)- Glidcop Phase I and Phase II

Page 14: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

Simos_LHC-LARP_May2015

Page 15: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

Multi-functional stage capable of handlingReal size irradiated specimens, under vacuum and four point bending state of stress and eventually Heating/annealing via a portable, collimated laser beamTensile stress-strain test

Simos_LHC-LARP_May2015

Page 16: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

Simos_LHC-LARP_May2015

BNL Post-Irradiation Facilities X-ray Diffraction at NSLS & NSLS II

X-ray diffraction studies of irradiated samples with the aid of a multi-functional experimental stage enabling:• Laser-induced annealing• Tension/twisting/4-point-bending• Exposure to different environments• Diamond anvil cell to be introduced in future update

Stage at NSLS II XPD Beamline

Page 17: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

17

Other BLIP Important Parameters• No ability for on-line instrumentation

– Fear is that signal wires will tangle in sample “cage” conveyor system (see below)

– Irradiation temperature designed into cooling “path” via simulation– Simulation-predicted temperature validation via annealing effect

• Target sample “cages” are irradiated in a 30 ft water “well” and a conveyor system carries the “cages” up and down– Water provides shielding and cooling– Water is recirculated, flowing from bottom to top– Water flows through “cages” and sample surfaces– Samples can be packaged in sealed capsules (welded SS) under

vacuum– Thermal path can be designed into capsule to attain desired average

temperatures• Pulsed beam (6.67 Hz, 440 micro-sec pulse length)

P. Hurh RaDIATE JulyMeeting

Page 18: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

18

Discussion of BLIP irradiation environment

• Open for questions

P. Hurh RaDIATE JulyMeeting

Page 19: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

19

Next Steps• Expression of interest!

– Input spreadsheet distributed– Please input on that spreadsheet for specific objectives– Also, can e-mail Pat

• After we have input, we will combine on one spreadsheet– Distribute compiled table– Ask for interest on individual studies from other participants

• Combine studies to make more efficient (reduce total number of samples)

• Perform simulations to judge energy degradation limits• Remove scope to fit within 201 MeV limit

P. Hurh RaDIATE JulyMeeting

Page 20: RaDIATE July 2015 Meeting P. Hurh Fermilab 28 July 2015

20

Any other business?

P. Hurh RaDIATE JulyMeeting