RAIL DEVELOPMENTAL WORKS Mahbubnagar Parliamentary Constituency Jurisdiction
South Central Railway serving the entire state of Telangana, major portion
of Andhra Pradesh and considerable portion of Karnataka, Maharastra states and small parts
of Tamilnadu and Madhya Pradesh.
Mahabubnagar Parliamentary
Constituency falls under Telangana State.
Entire Railway Network of this constituency is being served by
South Central Railway.
SOUTH CENTRALRAILWAY
Shri Narendra ModiHon’ble Prime Minister
Mahbubnagar parliamentary constituency
Green Initiatives
New Trains introduction
1. Tr.No.77622/77623 Mahabubnagar–Jaklair–Mahabubnagar Bi-Weekly DEMU passenger has been introduced.
Running of Special trains
1. Krishna to Guntakal 12 special trains.
2. Krishna to Tirupati 11 special trains.
3. Krishna to Secunderabad 12 special trains.
4. Mahabubnagar to Bolarum 1 special train S.
(Total 36 special Trains)
Provision of Stoppage
1. Tr.No.16353/16354 Kacheguda–Nagercoil–Kacheguda Weekly Express stoppage is given at Mahabubnagar
2. Tr.No.17021/17022 Hyderabad–Vasco-da-Gama–Hyderabad Weekly Express stoppage is given at Shadnagar, Mahabubnagar & Gadwal
3. Tr.No.77622/77623 Mahabubnagar–Jaklair–Mahabubnagar bi-Weekly DEMU passenger stoppage is given at Manyamkondda, Devarakadra, Marikel
4. Tr.No.17615/17616 Kacheguda – Madurai at Shadnagar
5. Tr. No. 17652/17651 Kacheguda – Chengalpattu at Shadnagar
6. Tr. No. 12769/12770 Tirupati – Secunderabad at Shadnagar
Extension of Trains
1. Tr. No. 11303/11304 Kolhapur – Hyderabad Express upto Manuguru
2. Tr. No. 12785/12786 Kacheguda – Bengaluru Express upto Mysuru
Passenger Train Services
Details of New Trains/ Special Trains/ Provision of Stoppages/ Extension/ Increase in the frequency of Trains in Mahbubnagar Parliamentary Constituency Jurisdiction.
1. Towards energy saving at Mahabubnagar station 5 kWp solar power panels were installed with the cost ̀ 2.4 lakh and 30 kWp Solar Panels are installed at Jadcherla Station
2. All stations in Mahbubnagar Parliamentary Constituency have been completely provided with LED lighting.
With a view to strengthen safety at Level Crossing gates and to avoid untoward incidents and also to provide seamless journey to r o a d t r a f f i c , t h e f o l l o w i n g R o a d u n d e r / o v e r B r i d g e s (RuB/RoB) are constructed / proposed for construction under Mahabubnagar Parliamentary constituency.
Road Over / Under Bridges
Road over Bridges (RoB)
1. Construction of RoB in lieu of LC No.73 between Devarakadra and Kaukuntla at sanctioned cost of ̀ 27.66 crore is in progress.
2. Proposed for construction of RoB in lieu of LC No. 60 between Mahabubnagar and Manyamkonda with an estimated cost of ̀ 66.37 crore
Road under Bridge (RuB)
1. Construction of RuB in lieu of Manned LC No. 56 between Mahabubnagar and Divitipalli stations in Secunderabad – Dhone Section with an estimated cost of ̀ 2.41 crore is completed
2. Construction of RUB in lieu of Manned LC No. 101 E between Gadwal and Poodoor stations in Secunderabad – Dhone Section by open cut method with an estimated cost of ̀ 2.40 crore is completed
3. Construction of RUB in lieu of Manned LC No. 115 between Itikyala–Manopad in Secunderabad – Dhone Section by open cut method with an estimated cost of ̀ 2.47 crore is completed
4. All Unmanned Level Crossings in Mahabubnagar Parliamentary jurisdiction are eliminated through construction of RuBs/LHS/Direct closure
Provision of Passenger Amenities and facilities, and its improvements at Railway Stations is one of the most important aspect Railway Services.
Passenger Amenities Station Amenity Amount Status
Mahabubnagar 3Water Vending --- Installed Machines
Mahabubnagar TIB/CIB 14.14 Lakh Installed`
Mahabubnagar 20 CCTVs 46 Lakh Proposed`
Shadnagar TIB/CIB 1.693 crore In Progress`& Jadcherla
Gadwal 2 Lifts 1 crore Proposed`
Mahabubnagar 2 ATVMs 6 Lakh Installed`
Jadcherla 1 ATVM 1.5 Lakh Installed`
Shadnagar 1 ATVM 1.5 Lakh Installed`
Mahabubnagar Concrete Apron 1.78 crore Provided`
Chegunta New Station 90 Lakh Proposed` Building
Divitipalli Toilets 0.10 crore In Progress`
Mahabubnagar Toilets 0.05 crore In Progress`
Manyamkonda Platform work 0.50 crore Proposed`
Mahabubnagar Platform work 0.80 crore Proposed`Town
Mahabubnagar Circulating area 1.42 crore Proposed`
Mahabubnagar Platform Shelter `0.14 core In Progress
Krishna Station Building `1.99 crore In Progress
Krishna Station Building `6.20 crore Proposed
6 Stations Wi-Fi 9 lakh Provided`
Infrastructural Development
New Railway Lines 1. Devarkadra–Jaklair section for a distance
o f 2 8 . 5 k m s i s C o m p l e t e d a s a p a r t o f Munirabad–Mahbubnagar New line at a cost of `279.30 crore (SCR Portion Devarakadra-Krishna )
2. Construction of Jaklair–Krishna new Railway line for the distance of 36.2 kms as a part of Munirabad– Mahabubnagar New line with an estimated cost of `354.76 crore (SCR Portion Devarakadra–Krishna) is in progress
Safety is the priority on SCR, to ensure safety of the Rail users, Foot over Bridges (FoBs) are constructed / proposed for construction at various stations/ locations in Mahabubnagar Par l iamentary Const i tuency Jurisdiction.
Safety – The First PriorityProposed FOBs
Station Cost in ` Crore
Chegunta 1.18
Balanagar 1.24
Divitipalli 0.98
Mahabubnagar 0.85
ASSEMBLY SEGMENTS
RAIL DEVELOPMENTAL WORKS Mahbubnagar Parliamentary Constituency Jurisdiction
Kodangal
Narayanpet
Mahbubnagar
Jadcherla
Devarkadra
Makthal
Shadnagar
Doubling of Railway Lines It is proposed for Doubling of Secunderabad – Mahbubnagar section for the distance of 85 Kms with an estimated cost of ̀ 728.10 crore
Electrification of Railway LinesIt is proposed for electrification of Manmad – Dhone section for the distance of 868 Kms with an estimated cost of ̀ 1031 crore