Small Bridges Conference Melbourne, November 2015
DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA
RAIL OVER ROAD BRIDGE STRIKES -
![Page 2: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/2.jpg)
Thanks to…
![Page 3: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/3.jpg)
This presentation will cover:
• Background context of Bridge Strikes
• General concepts of Cost Recovery
• Lessons learned from a typical emergency
recovery
This is not a technical presentation – no time to
make things complicated in an emergency!
![Page 4: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/4.jpg)
• The railway often older than the road
• Many low clearance rail over road bridges
• Average of 34 strikes per year
• Usually at least 1 catastrophic strike a year
• Likely bridge strikes are unreported
Background
![Page 5: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/5.jpg)
The damage can
be catastrophic
but…
![Page 6: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/6.jpg)
The bridge
usually wins!
![Page 7: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/7.jpg)
In New Zealand:
• The driver of the vehicle is liable
• If a hit and run – the local authority is liable
• Insurance companies used to agreeing costs
before expended – Not possible for Bridge
Strikes
General Concepts of Cost Recovery
![Page 8: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/8.jpg)
General Concepts of Cost Recovery
![Page 9: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/9.jpg)
• Engineers lead initial response if catastrophic
• Dedicated cost recovery team manages
interfaces beyond initial response
• Short term aim is to record and recover ALL
costs - Average cost to KiwiRail is NZD$18,000
• Long term aim is to reduce bridge strikes
General Concepts of Cost Recovery
![Page 10: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/10.jpg)
It is not just physical repair costs that can be
recovered:
• Internal staff time and external Consultants
• Disbursements (hotels, flights, meals)
• Revenue losses
• Speed restrictions
• Alternative transport (buses, road bridging)
General Concepts of Cost Recovery
![Page 11: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/11.jpg)
Pitfalls;
• Must be able to prove costs – Good
documentation!
• Never discuss costs unless based on evidence
• Insurers will not pay for betterment
• Large claims likely to be contested and may
take years to recover
General Concepts of Cost Recovery
![Page 12: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/12.jpg)
• Cost recovery is a worthwhile process
General Concepts of Cost Recovery
Financial Year
Costs incurred by KiwiRail
Costs recovered by KiwiRail
Number of Strikes
10/11 $1,063,898 Nil 32
11/12 $319,677 $126,931 33
12/13* $341,912 $99,147 28
13/14 $429,598 $1,290,339 29
14/15 $1,087,203 $1,053,772 49
* Formal cost recovery process implemented
![Page 13: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/13.jpg)
Br 30 WL – Bridge Strike on 7th January 2015
• 220 passenger train movements per week
• Eastern Hutt road is a vital link
![Page 14: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/14.jpg)
Br 30 WL – Bridge Strike on 7th January 2015
• Forklift hit impact beam and cartwheeled up
into the span
![Page 15: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/15.jpg)
Br 30 WL – Bridge Strike on 7th January 2015
![Page 16: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/16.jpg)
Br 30 WL – Bridge Strike on 7th January 2015
![Page 17: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/17.jpg)
Br 30 WL – Bridge Strike on 7th January 2015
Timeline:
• Bridge hit at 2pm on Wed 7th Jan
• Temporary repairs and propping in place and
bridge re-opened at 4pm on Fri 9th Jan
• Temporary replacement span and full line
speed restored at 4pm on Sun 18th Jan
![Page 18: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/18.jpg)
Br 30 WL – Bridge Strike on 7th January 2015
Lessons learned:
• Don’t panic
• Consult with you customer
• Internal resource and experience that can be
mobilized immediately is vital
• Good working relationships with consultants
and contractors crucial
![Page 19: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/19.jpg)
Br 30 WL – Bridge Strike on 7th January 2015
Lessons learned:
• Recognize the limits of your knowledge
• Assess and mitigate risks (design, fatigue,
unknowns)
• Reinforced the value of BOL planning
• Don’t compromise – impact beam was hit
within 72hrs of the bridge re-opening
![Page 20: RAIL OVER ROAD BRIDGE STRIKES - DISCUSSION OF AN EMERGENCY RECOVERY …€¦ · Small Bridges Conference Melbourne, November 2015 DISCUSSION OF AN EMERGENCY RECOVERY IN A METRO AREA](https://reader033.vdocument.in/reader033/viewer/2022053012/5f0f66657e708231d443f8a1/html5/thumbnails/20.jpg)