Car Hire Rules 7 and 8
• January 1, 2011 new Car Hire Rules 7 and 8 became active
• The updated rules eliminate the need to create reclaims for rules 7 and 8
• The rules reference special road marks that will be used to show car hire with the equipment owner or that the equipment is to be dismantled– DSP7,DVR7,DSP8,SHP7,SHP8 and DEAD
2
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Special Road marks
• Car Hire Rule 7 (107 Incident ) o DSP7 -- Equipment owner’s account
Equipment interchanged to an intermediate carrier after DV/Disposition has been provided
o DVR7 -- Equipment owner’s account DV/Disposition requested but equipment owner has not responded within the 15 day time limit
3
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Special Road marks Cont.
• Car Hire Rule 7 (107 incident)o SHP7 -- Equipment owner’s account
The equipment reported on-hand at a repair shop. This can occur by an interchange reported showing “SHOP” in the “to road” or the equipment is reported on-hand through DDCTS.
o DEAD -- Equipment owner’s accountThe equipment owner decides to dismantle the
equipment. All events after will be marked with LCS Code “X” for inactive. If the equipment was approved for dismantle, but the equipment was not dismantled and returned to service, please contact the Railinc Customer Support Center.
4
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Special Road marks Cont.
• Car Hire Rule 8 (Incident 108 or 1)o DSP8 -- Equipment owner’s account
Disposition requested o SHP8 -- Equipment owner’s account
Equipment reported on-hand at a repair shop. This can occur by an interchange reported showing “SHOP” in the “to road” or the equipment is reported on-hand through DDCTS.
o DEAD -- Equipment owner’s accountThe equipment owner decides to dismantle the
equipment. All events after will be marked with LCS Code “X” for inactive. If the equipment was approved for dismantle, but the equipment was not dismantled and returned to service, please contact the Railinc Customer Support Center.
5
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
DDCT Interaction with LCS and ER
• When an incident is created in DDCT, a TRAIN10 message will be sent to the Event Repository (ER)
• The TRAIN10 message will flag the equipment to be evaluated by DDCT LCS and LCS will not be evaluating the equipment
• Once DDCT LCS is turned on, TRAIN10 messages sent to the ER from DDCT will be evaluated and GAP records will be created using the special road marks
6
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
LCS Messaging
• TRAIN61, TRAIN62, TRAIN63 and TRAIN69 messages will be created to show car hire in either a railroad’s account or the equipment owner’s account
• The DDCT special road marks will be sent in the “To Road” or “From Road” fields in the TRAIN message
• There has been no change to the format of the TRAIN messages
7
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Key Events for 107 Description From Road To Road
Incident 107 created N/A N/A
DV/Disposition requested N/A N/A
15 days hit since DV/Disposition requested Damaging Carrier
DVR7
DV/Disposition Provided after 15 days DVR7 Damaging Carrier
Equipment interchanged after DV/Disposition Provided
Intermediate Carrier
DSP7
Offer accepted Damaging Carrier
DSP7 then to DEAD
Equipment reported on hand at SHOP Damaging Carrier or DSP7
SHP7
8
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Key Events for 1/108
9
Description From Road To Road
Incident Created N/A N/A
Disposition requested Handling Carrier
DSP8
Disposition provided N/A N/A
Equipment interchanged after DV/Disposition Provided
Intermediate Carrier
DSP8
Equipment reported on-hand at SHOP Intermediate Carrier or DSP8
SHP8
Equipment released from SHOP SHP8 DSP8
Equipment marked as repaired SHP8 Handling Carrier
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Example: Incident 107 EVENT TS FROM MARK TO MARK LCS Code DESCRIPTION
20AUG2010:13:38:00.000000 PAS PAS Vincident created
23AUG2010:11:30:00.000000 PAS PAS VDV_DIPSO requested
23AUG2010:12:30:00.000001 PAS PAS VDV_DISPO provided
23AUG2010:12:42:00.000000 PAS ST R interchange reported from DC
23AUG2010:12:43:00.000000 ST DSP7 G Gap record created one min after reported interchange
23AUG2010:13:30:00.005272 DSP7 SHP7 G Gap record created one min prior reported at Shop
23AUG2010:13:31:00.000000 SHP7 SHP7 V car reported on hand through DDCT
23AUG2010:14:31:00.000001 SHP7 SHP7 V Repairs are reported complete
10
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Example: Incident 108
11
EVENT TS FROM MARK TO MARK LCS CODE DESCRIPTION
20AUG2010:11:56:00.000000 MRL MRL V incident created 23AUG2010:13:00:00.005272 MRL DSP8 G Gap created to place
CH in owners account
23AUG2010:13:01:00.000000 DSP8 DSP8 V DV_DIPSO requested
23AUG2010:14:17:00.000000 DSP8 DSP8 V DV_DISPO provided23AUG2010:15:09:00.005272 DSP8 MRL G Gap created 1 min
prior to interchange23AUG2010:15:10:00.000000 MRL BNSF P interchange
reported from HC23AUG2010:15:11:00.000000 BNSF DSP8 G Gap created 1 min
after Interchange23AUG2010:15:16:00.005273 DSP8 SHP8 G23AUG2010:15:17:00.000001 SHP8 SHP8 V car reported on
hand 23AUG2010:16:17:00.000002 SHP8 SHP8 V car reported repairs
complete
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Shops and DDCT LCS
• For car moving under a DDCT Incident it can be reported at a Shop in multiple ways – Railroad can report an interchange event to SHOP– Repair Shop can mark the car on-hand through DDCT
system
• The DDCT LCS system works on a first come first serve logic, unless both are reported with 120 hours
• If Both are reported with 120 hours the reporting from DDCT system will be used
12
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Interchange to SHOP Reported• If a Railroad reports an interchange to SHOP with no
on-hand reporting from DDCT system within 120 hours– The interchange to SHOP will be used for DDCT LCS and
liability will be moved to SHP7 or SHP8– If on-hand is reported through DDCT system it will be
marked as “X”
• If a Railroad reports an interchange to SHOP and an on-hand reporting from DDCT system is reported with 120 hours– The interchange will be marked as “I”– The On-Hand reporting from DDCT system will be used for
DDCT LCS and liability will be moved to SHP7 or SHP8
13
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Repair Shop marks Car On-Hand through DDCT
• On-Hand reporting's by the repair shop from DDCT system will always be used for DDCT LCS to move liability to SHP7 or SHP8 UNLESS:– An interchange to SHOP reported by a Railroad has been
evaluated by DDCT LCS and liability has already been moved to SHP7 or SHP8
– If this occurs the On-Hand reporting will not be used by DDCT LCS
14
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
System Enhancements For 2011
• Currently once a car has been placed to DEAD the only way that the car can be evaluated by LCS is by a database update– The enhancement will look at load/empty status and if the
status changes twice we will return the car to LCS processing
• This change was requested during the project, but due to time restrictions could not be completed in 2010
15
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved 16
Questions?
7001 Weston Parkway, Suite 200, Cary, NC 27513 –877.724.5462 -- www.railinc.com
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved 17
Contact us:
7001 Weston Parkway, Suite 200, Cary, NC 27513 –877.724.5462 -- www.railinc.com