    StepstoincreaseTransportCapacity

    byRailway

    1. IncreasingTrainOperationSpeed

    IntroductionofDMU

    ImprovementofLevelCrossing

    . ncreas ng ne apac y

    Trackdoubling

    ElectrificationandintroductionofEMU

    Introduction of CBTC CommunicationBased Train Control

    2

  • 8/13/2019 Railway Draft

    3/20

    RailwayNetworKPlanatNairobiandSurroundings

    KRC Lines (Existing)

    Planned MRT Lines

    Planned LRT Lines

    3

  • 8/13/2019 Railway Draft

    4/20

    KRCProposalsforExpandedCommuter

    RailwayNetwork

    4

  • 8/13/2019 Railway Draft

    5/20

    ShortTermPlan Introductionof

    DMU(Diesel

    Multiple

    Unit)

    Fastertrainoperation

    thanpulling

    by

    diesel

    locomotive.

    Noelectrification

    required.

    Im rovementoftrack

    structurerequired.

    &Telecommunication

    .

    5

  • 8/13/2019 Railway Draft

    6/20

    DMUTrainOperationPlan

    betweenNairobi

    Ruiru

    0+000Nai rob i

    Makada ra

    6:00 6:30 7:00 7:30 8:00 8:30 9:00 9:30 10:00 10:30 11:00

    5 + 3 0 5

    1 2 2 1 4

    Makada ra

    Dandora1 2 + 2 1 4

    17+723Mw i k i

    2 4 + 2 3 8Gui thura i

    3 2 + 2 8 6Ru i ru

    a ro u ru: m approx. m nu es r p y .

    3 sets of train required for 30minutes headway operation6

  • 8/13/2019 Railway Draft

    7/20

    DMUTrainOperationPlan

    betweenNairobi

    Kikuyu

    2 + 0 4 4Langa tha Rd

    Na i rob i6:00 6:30 7:00 7:30 8:00 8:30 9:00 9:30 10:00 10:30 11:00

    4 + 8 1 8

    7 + 9 6 0

    Si langaKibera

    W o o d le y - U go n g R d

    1 3 + 6 2 7

    1 7 + 2 5 1

    RirutaMu t u i n iu tu i n i

    W o od le y U go ng R d

    2 0 + 0 1 7

    2 3 + 3 3 8Dago r e t t i Rd So u t h

    Dagorett i Rd

    3 0 . 4 4 1K ikuyu

    Nairobi - Kiku u: 30km a rox. 45 minutes tri b DMU.

    3 sets of train required for 30minutes headway operation7

  • 8/13/2019 Railway Draft

    8/20

    DMUTrainOperationPlan

    betweenNairobi

    Athi

    River

    0 + 0 0 0Nai rob i

    6:00 6:30 7:00 7:30 8:00 8:30 9:00 9:30 10:00 10:30 11:00

    5 + 3 0 5

    1 1 + 0 6 8Imara D iama

    Makada ra

    1 1 + 0 6 8

    17+700New St a t i o n )

    2 4 + 2 3 8Marimbet i

    2 9 . 7 3 6At i R iver

    Nairobi Athi River: 30km a rox. 45 minutes tri b DMU.

    3 sets of train required for 30minutes headway operation8

  • 8/13/2019 Railway Draft

    9/20

    for3Ma orCommuterLines

    Passenger Capacity

    per Train

    Line Capacity between

    6:00am - 9:00am

    perdirection

    Line Capacity

    per hour per direction

    4 cars train 1,200(1,800)

    6,000(9,000)

    2,000(3,000)

    6 cars train,

    (2,700)

    ,

    (13,500)

    ,

    (4,500)

    8 cars train

    2,400

    (3,600)

    12,000

    (18,000)

    4,000

    (6,000)

    9

  • 8/13/2019 Railway Draft

    10/20

    DMUTrainOperationPlan

    betweenNairobi

    Embakasi

    6:00 6:30 7:00 7:30 8:00 8:30 9:00 9:30 10:00 10:30 11:00

    0 + 0 0 0

    5 + 3 0 5

    Nairob i

    Makadara

    9 + 6 5 2

    1 2 + 9 6 2Embaka s i

    Stage Mpya

    0 + 0 0 0Nairob i

    6:00 6:30 7:00 7:30 8:00 8:30 9:00 9:30 10:00 10:30 11:00

    5 + 3 0 5

    Stage Mpya

    Makadara

    9 + 6 5 2

    1 2 + 9 6 2Embaka s i

    Nairobi Embakasi: 13km approx. 20 minutes trip by DMU.

    1 set of train requires 40 minutes headway operation,

    2 sets of train can operate 10 30 minutes headway operation.10

  • 8/13/2019 Railway Draft

    11/20

    Mid LongTermPlan

    Introductionof

    Urban

    Transit

    System

    11

  • 8/13/2019 Railway Draft

    12/20

    General Features of Various Urban Transit Systems

    System

    Item

    (e) Monorail(suspension type)

    (f) Monorail(straddle type)

    (g) Heavy Rail(elevated)

    (h) Heavy Rail(underground)

    (a) Bus(surface)

    (b) Bus(elevated)

    (c) LRT(at grade)

    (d) AGT(elevated)

    SystemAppearance

    Capacity Small Small Small - Medium Medium Medium Medium - Large Large Large

    Speed Low Low - Medium Low - Medium Medium Medium Medium - Large Large Large

    Cost forLowest Low - Medium Low - Medium Medium Medium - High Medium - High Medim - High Highest

    Cost for O&M Low - Medium Medium Low - Medium Medium Medium Medium Medium - High Medium - HighRequiredSpace

    Large Medium Large Small - Medium Small - Medium Small - Medium Medium - Large Small

    EnvironmentalIm act Lar e / Lar e / Lar e / Medium / Medium / Medium Small / Medium / Small / Medium / Small / Medium / Medium / Medium Small / Small /

    (air / noise /landscape)

    Small

    Large

    / Small

    Large

    Medium

    Small

    / Large

    Small

    PastExperiences

    Many A few Many Many A few Many Many Many

    - Small capacity- Lowest cost - Small capacity- Less E&M - Small to mediumca acit - Medium capacity- Unmanned - Medium capacity- Heavier - Medium to largeca acit - Large capacity- Hi her s eed - Large capacity- Hi her s eed

    Features

    - Limited effect

    facilities- Few experiences

    - Passengerfriendly system- Disturbing roadtraffic

    operation ispossible

    structure thanstraddle type

    - Simple trackstructure- Lessenvironmentalimpacts

    - Large space fordepot andworkshop

    - Highestconstruction cost- Lessenvironmentalimpacts

    12

  • 8/13/2019 Railway Draft

    13/20

    UrbanTransit:NgongRoadSection

    Distance between NRS and Thomson Estate: 8.53km, Max ground level: 1,808m,

    n. groun eve : , m, ax. gra en : . , verage gra en : .

    Steep slope section between Golf course and Upper Hill area.13

  • 8/13/2019 Railway Draft

    14/20

    ConceptualPlanofRingLine

    Medium size urban transit system is recommended for the Ring Line.14

  • 8/13/2019 Railway Draft

    15/20

  • 8/13/2019 Railway Draft

    16/20

    Advantages of Monorail System

    Proven and safe Technology

    Proven in Japan and all over the world.

    Flexibility in design, slim structure Small CurvatureMin. Curve Radius 60m

    Max. Gradient 6.0%

    Slim structure

    Steep Gradient

    Environmental friendly features

    -Quiet (Using electric power, rubber tyre)- o em ss on gas , x, x .

    -Saving fuel consumption

    -Less land acquisition

    Low construction cost16

  • 8/13/2019 Railway Draft

    17/20

    8m8m4m 4m (for Evacuation)

    2 x @3.5m 4m

    18m excluding width of sidewalk

    2 x @3.5m

    Kita-Kyusyu Monorail, Fukuoka,

    Japan

    17

  • 8/13/2019 Railway Draft

    18/20

    (Folding type seat)Standing Area

    18

  • 8/13/2019 Railway Draft

    19/20

    Straddle Type Monorails operating in Japan

    TOKYO, JAPAN

    DISNEYLAND

    Since 2001

    TOKYO JAPAN5.0km

    TAMAMONORAIL 16.0km

    TOKYO JAPANOSAKA JAPANKITA-KYUSHU JAPANOKINAWA JAPAN

    Since 1990 Since 1964Since 1985Since 2003