1 INDUSTRIAL TRAINING PROJECT REPORT ON ONLINE SALES ORDER MONITORING MODULE FOR SECONDARY PRODUCT “ IN BOKARO STEEL PLANT BOKARO STEEL CITY, JHARKHAND. IN THE PARTIAL FULFILLMENT OF THE DEGREE OF MASTER OF BUSINESS ADMINISTRATION (MBA) EAST POINT COLLEGE OF HIGHER EDUCATION BANGALORE (KARNATAKA) SUBMITTED BY: PROJECT GUIDE: NAME RAKESH ROUHSAN PROF. ROOPA DEVI G TRAINEES NO.-5914825

Upload: jitendrakumar

Post on 07-Feb-2016

29 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rakesh Roushan Mba Doc

1

INDUSTRIAL TRAINING PROJECT REPORT ON

“ONLINE SALES ORDER MONITORING

MODULE FOR SECONDARY PRODUCT “

IN

BOKARO STEEL PLANT

BOKARO STEEL CITY, JHARKHAND.

IN THE PARTIAL FULFILLMENT OF THE DEGREE

OF

MASTER OF BUSINESS ADMINISTRATION (MBA)

EAST POINT COLLEGE OF HIGHER EDUCATION

BANGALORE (KARNATAKA)

SUBMITTED BY: PROJECT GUIDE:

NAME –RAKESH ROUHSAN PROF. ROOPA DEVI G

TRAINEES NO.-5914825

Page 2: Rakesh Roushan Mba Doc

2

CERTIFICATE

This is to certify that the project entitled “ONLINE SALES ORDER MONITORING

MODULE FOR SECONDARY PRODUCT” at BOKARO STEEL PLANT (SAIL)

has been carried out and submitted by RAKESH ROUHSAN from 11th August to 6th

September, 2014, under my supervision in partial fulfillment of his course MBA

at EAST POINT COLLEGE OF HIGHER EDUCATION, BANGALORE

under BANGALORE UNIVERSITY.

I am satisfied with his sincere performance and study conducted by him in BOKARO

STEEL PLANT (SAIL). The project is hereby approved as a bonafide work carried out

and presented in a manner satisfactory to its acceptance area to theMaster of business

administration for which it has been submitted.

I recommend submitting the project report. I wish him all success in life.

This is also certified that the project work is original and has not been submitted to any

other place.

PROJECT GUIDE

Mr. A.D.EKKA

JR. MANAGER-MARKETING

BOKARO STEEL PLANT (SAIL),

BOKARO STEEL CITY.

Page 3: Rakesh Roushan Mba Doc

3

DECLARATION

I hereby declare that the research project titled –

“ONLINE SALES ORDER MONITORING MODULE FOR SECONDARY

PRODUCT”

”This report is submitted in the partial fulfillment of the requirement for the degree of

Masters of Business Administration. This report is a bonafide research work carried out by

me. No part of this report has been submitted for the award or any other

diploma/degree/fellowship or any other similar title or prize. This report is based upon my

personal opinion. Hence, it cannot be referred to for official or legal purposes.

RAKESH ROUSHAN

M.B.A

TRAINEES NO- 5914825

Page 4: Rakesh Roushan Mba Doc

4

ACKNOWLEDGEMENT

At the very outset of engaging myself into the project report. I would like to express my

sincere gratitude to all those who extended their not only to convey their best wishes but

also to give me support on this hi-undertone path. This Project Report on my 4 weeks

practical training in “Bokaro Steel Plant” Bokaro (SAIL) in area of Bokaro is a part of my

course curriculum of my MBA.

This project could not have been completed without timely suggestion advice and co-

operation of a lot of persons. I am extremely thankful and pay my gratitude to Mr.

A.D.Ekka (Jr. Manager-Marketing) for his valuable guidance and support on completion

of this project in itspresently.

I am greatly obliged to Mr. Rajesh Singh (Junior Manager,HRD) who accommodated me

for training in this esteemed organization.

I am highly indebted to Mr. Manish Sahay (Marketing Developing Officer, Bihar) who

provided me an opportunity to work and also guided me at every stage on my project. His

proper direction and consult inspiration proved to be an asset for this project.

A special appreciative “Thank you” in accorded to all staff of “Bokaro Steel Plant

(SAIL),Bokaro for their positive support.

I also acknowledge with a deep sense of reverence, my gratitude towards my parents and

member of my family, who has always supported me morally as well as economically.

I hope this report will be special interested to the marketing student, who are on look for

such real life situations beyond their classroom studies.

RAKESH ROUSHAN

Page 5: Rakesh Roushan Mba Doc

5

CONTENTS

EXECUTIVE SUMMARY--------------------------------------------------------------------6

OBJECTIVE OF THE STUDY--------------------------------------------------------------7

COMPANY PROFILE------------------------------------------------------------------------8

COKE OVEN &BYPRODUCT PLANT---------------------------------------------18

PRODUCT & THEIR MARKETING STRATEGY----------------------------------26

STRUCTURE OF THE PROCESS OF SALES & MARKETING-----------------29

LIST OF MAJOR CUSTOMERS OF BY PRODUCT------------------------------33

FORM DEVELOPMENT PROCEDURE & REQUIREMENT--------------------36

COMPLETE STRUCTURE OF THE SALES MODULE ---------------------------42

E-AUCTION-------------------------------------------------------------------------------42

FIXED PRICE SALE---------------------------------------------------------------------58

TENDER------------------------------------------------------------------------------------61

MODULE WISE DESCRIPTION---------------------------------------------------------65

DATA ANALYSIS & INTERPRETATION---------------------------------------------71

SWOT ANALYSIS----------------------------------------------------------------------------79

FINDINGS--------------------------------------------------------------------------------------84

SUGGESTIONS-------------------------------------------------------------------------------86

FUTURE SCOPE------------------------------------------------------------------------------88

CONCLUSION--------------------------------------------------------------------------------90

BIBLIOGRAPHY-----------------------------------------------------------------------------92

Page 6: Rakesh Roushan Mba Doc

6

EXECUTIVE SUMMARY

It is difficult to remember which other policy more harmed our economy than this License

– permit RAJ because of which growth took the rear seat. But thisbeared many successful

PSUs in which SAIL claims the top knot.Things have not remained the same for SAIL.

Post liberalization period have experienced the venturing of this sector my many business

barons, which have led to mushrooming of steel players throughout the country. In these

days SAIL changed its mission from ”Labor intensive” to “Profit maximizations”.

“Compete or perish” is the new strategy which is top in priority.

Marketing department of SAIL is not the newest genesis and always attempted to reach

where no corporate have ventured so far. It has also one of widest coverage throughout

country. so, it has remained a challenge for marketing department to keep a perfect blend

of mass & class. The Project was conducted in Marketing Department and Sales

Coordinationdepartment. I was to find out the marketing strategy adopted by BSL to

sell its secondary & by product

Secondary &By products are directly marketed by BSL, while when we talk about primary

products it is the responsibility of CMO. Various mode of selling like E-auction, fixed price

sell, tendering process, inter plant transfer are used. To know about the E-auctions of

marketing departments. How they use this technique and 60% marketing and selling is

done through auction and rest will be taken through fixed price selling and tenders.

During my training I had to find out mode of sale of secondary products of BSL. Primary

products are sold by CMO, Delhi. I passed through various stages of problems and

difficulties to accomplish the task of project work but it was a privilege for me to take this

opportunity a challenging work to study and observe "marketing of Secondary products in

B.S.L"

The basic objective behind the study carried out by me is to study the major contribution

of Secondary product to total sale, which is pre-determining for the success of the

company. By selling the Secondary product in local market company is earning profits. It

is also creating a employment in small scale industries and developing the economy

Page 7: Rakesh Roushan Mba Doc

7

OBJECTIVE OF THE STUDY

If any ambition is not combined with prudence and clear understanding, it can lead to

terrible consequences in simpler words we can say that if we don’t have a clear vision of

objectives,then whole work goes in vain.

The objectives of my projects are as follows:-

1. To know what are the secondary & by products in BSL

2. To analysis the current market condition of by products and determine the strategies for

efficient marketing of by products in this highly competitive market so as to earn maximum

revenue.

3. To know the internal environment of marketing department of company and its relation

with its customers.

4. Marketing strategy & pricing of marketing department to sell these products.

Page 8: Rakesh Roushan Mba Doc

8

COMPANY PROFILE

Steel Authority of India Limited (SAIL) is the leading steel-making company in India. It

is a fully integrated iron and steel maker, producing both basic and special steels for

domestic construction, engineering, power, railway, automotive and defence industries and

for sale in export markets. SAIL is also among the five Maharatna’s of the country's Central

Public Sector Enterprises.

Background and history

SAIL traces its origin to the formative years of an emerging nation - India. After

independence the builders of modern India worked with a vision - to lay the infrastructure

for rapid industrialisation of the country. The steel sector was to propel the economic

growth. Hindustan Steel Private Limited was set up on January 19, 1954.

Expanding Horizon (1959-1973)

Hindustan Steel (HSL) was initially designed to manage only one plant that was coming

up at Rourkela. For Bhilai and Durgapur Steel Plants, the preliminary work was done by

the Iron and Steel Ministry. From April 1957, the supervision and control of these two steel

plants were also transferred to Hindustan Steel. The registered office was originally in New

Delhi. It moved to Calcutta in July 1956 and ultimately to Ranchi in December 1959.

The 1 MT phases of Bhilai and Rourkela Steel Plants were completed by the end of

December 1961. The 1 MT phase of Durgapur Steel Plant was completed in January 1962

after commissioning of the Wheel and Axle plant. The crude steel production of HSL went

up from .158 MT (1959-60) to 1.6 MT. A new steel company, Bokaro Steel Limited, was

incorporated in January 1964 to construct and operate the steel plant at Bokaro.The second

phase of Bhilai Steel Plant was completed in September 1967 after commissioning of the

Wire Rod Mill. The last unit of the 1.8 MT phase of Rourkela - the Tandem Mill - was

commissioned in February 1968, and the 1.6 MT stage of Durgapur Steel Plant was

completed in August 1969 after commissioning of the Furnace in SMS. Thus, with the

completion of the 2.5 MT stage at Bhilai, 1.8 MT at Rourkela and 1.6 MT at Durgapur, the

Page 9: Rakesh Roushan Mba Doc

9

total crude steel production capacity of HSL was raised to 3.7 MT in 1968-69 &

subsequently to 4 MT in 1972-73.

Holding Company

The Ministry of Steel and Mines drafted a policy statement to evolve a new model for

managing industry. The policy statement was presented to the Parliament on December 2,

1972. On this basis the concept of creating a holding company to manage inputs and outputs

under one umbrella was mooted. This led to the formation of Steel Authority of India Ltd.

The company, incorporated on January 24, 1973 with an authorized capital of Rs. 2000

crore, was made responsible for managing five integrated steel plants at Bhilai, Bokaro,

Durgapur, Rourkela and Burnpur, the Alloy Steel Plant and the Salem Steel Plant. In 1978

SAIL was restructured as an operating company. Since its inception, SAIL has been

instrumental in laying a sound infrastructure for the industrial development of the country.

Besides, it has immensely contributed to the development of technical and managerial

expertise. It has triggered the secondary and tertiary waves of economic growth by

continuously providing the inputs for the consuming industry.

About SAIL

SAIL manufactures and sells a broad range of steel products, including hot and cold rolled

sheets and coils, galvanised sheets, electrical sheets, structural, railway products, plates,

bars and rods, stainless steel and other alloy steels. SAIL produces iron and steel at five

integrated plants and three special steel plants, located principally in the eastern and central

regions of India and situated close to domestic sources of raw materials, including the

Company's iron ore, limestone and dolomite mines. The company has the distinction of

being India’s second largest producer of iron ore and of having the country’s second largest

mines network. This gives SAIL a competitive edge in terms of captive availability of iron

ore, limestone, and dolomite which are inputs for steel making.

SAIL's wide ranges of long and flat steel products are much in demand in the domestic as

well as the international market. This vital responsibility is carried out by SAIL's own

Central Marketing Organization (CMO) that transacts business through its network of 37

Page 10: Rakesh Roushan Mba Doc

10

Branch Sales Offices spread across the four regions, 25 Departmental Warehouses, 42

Consignment Agents and 27 Customer Contact Offices. CMO’s domestic marketing

effort is supplemented by its ever widening network of rural dealers who meet the

demands of the smallest customers in the remotest corners of the country. With the total

number of dealers over 2000, SAIL's wide marketing spread ensures availability of

quality steel in virtually all the districts of the country.

SAIL's International Trade Division ( ITD), in New Delhi- an ISO 9001:2000 accredited

unit of CMO, undertakes exports of Mild Steel products and Pig Iron from SAIL’s five

integrated steel plants.

With technical and managerial expertise and know-how in steel making gained over four

decades, SAIL's Consultancy Division (SAILCON) at New Delhi offers services and

consultancy to clients world-wide.

SAIL has a well-equipped Research and Development Centre for Iron and Steel (RDCIS)

at Ranchi which helps to produce quality steel and develop new technologies for the steel

industry. Besides, SAIL has its own in-house Centre for Engineering and Technology

(CET), Management Training Institute (MTI) and Safety Organization at Ranchi. Our

captive mines are under the control of the Raw Materials Division in Kolkata. The

Environment Management Division and Growth Division of SAIL operate from their

headquarters in Kolkata. Almost all our plants and major units are ISO Certified.

Page 11: Rakesh Roushan Mba Doc

11

MAJOR UNITS :

Integrated Steel Plants

1. Bhilai Steel Plant

Ten - times winner of Prime Minister's Trophy for best Integrated Steel Plant in the

country, Bhilai Steel Plant (BSP) is India's sole producer of rails and heavy steel

plates and major producer of structural. The plant is the sole supplier of the

country's longest rail tracks of 260 metres. With an annual production capacity of

3.153 MT of saleable steel, the plant also specializes in other products such as wire

rods and merchant products. Since BSP is accredited with ISO 9001:2000 Quality

Management System Standard, all saleable products of Bhilai Steel Plant come

under the ISO umbrella. At Bhilai IS0:14001 has been awarded for Environment

Management System in the Plant, Township and Dalli Mines. It is the only steel

plant to get certification in all these areas. The Plant is accredited with SA: 8000

certification for social accountability and the OHSAS-18001 certification for

Occupational health and safety. These internationally recognised certifications add

value to Bhilai's products and helps create a place among the best organisations in

the steel industry. Among the long list of national awards it has won, Bhilai has

bagged the CII-ITC Sustainability award for three consecutive years.

PRODUCT-MIX TONNES/ANNUM

Semis 5,33,000

Rail & Heavy Structural 7,50,000

Merchant Products

(Angles, Channels, Round & TMT bars) 5,00,000

Wire Rods (TMT, Plain & Ribbed) 4,20,000

Plates (up to 3600 mm wide) 9,50,000

Total Saleable steel 31,53,000

Page 12: Rakesh Roushan Mba Doc

12

Location: Forty kms west of Raipur, the capital city of Chhattisgarh, along the

Howrah-Mumbai railway line and the Great-Eastern highway, stands Bhilai Steel

Plant (BSP).

2. Durgapur Steel Plant

Set up in the late 50's with an initial annual capacity of one million tonnes of crude

steel per year, the capacity of Durgapur Steel Plant (DSP) was later expanded to

1.6 million tonnes in the 70's. A massive modernization programme was undertaken

in the plant in early 90's, which, while bringing numerous technological

developments in the plant, enhanced the capacity of the plant to 2.088 million

tonnes of hot metal, 1.8 million tonnes crude steel and 1.586 million tonnes saleable

steel. The entire plant is covered

underISO9001:2000qualitymanagementsystem.The modernized DSP now has

state-of –the-art technology for quality steel making. The modernized units have

brought about improved productivity, substantial improvement in energy

conservation and better quality products. With the successful commissioning of the

modernized units, DSP is all set to produce 2.088 million tons of hot metal, 1.8

million tons of crude steel and 1.586 million tons of saleable steel annually.

PRODUCT-MIX TONNES/ANNUM

Merchant Products 2,80,000

Structural 2,07,000

Skelp 1,80,000

Wheels & Axles 58,000

Semis 8,61,000

Total Saleable steel 15,86,000

Page 13: Rakesh Roushan Mba Doc

13

Location

Situated at a distance of 158 km from Calcutta, its geographical location is defined

as 230 27' North and 880 29' East. It is situated on the banks of the Damodar river.

The Grand Trunk Road and the main Calcutta-Delhi railway line pass through

Durgapur.

Durgapur Steel Plant has always made relentless efforts to maintaining a healthy

and clean environment. The units in DSP are provided with necessary pollution

control facilities and the liquid effluents and chimney emissions from the plant are

well within norms. DSP has undertaken massive afforestation to maintain clean

environment. Some 3,266 acres of land have been covered with 14 lakh plantations.

In order to develop healthy awareness about the environment amongst the younger

generation, eco-clubs have been formed in DSP schools.

Centre for Human Resource Development- DSP has always attached maximum

importance on proper training and development of its employees. Its Centre for

Human Resource Development has all modern facilities including the state-of-the-

art Electrical and Electronics laboratory, Hydraulics and Pneumatics laboratory and

workshop for effective training and development of its employees.

Communication

The Public Relations Department publishes monthly house journals in English,

Bengali and Hindi for extensive information of company affairs to the employees.

DSP also has an in-house TV studio (DSTV) along with all modern facilities, which

telecast news and a gamut of other programs covering various aspects of plant and

township activities.

Page 14: Rakesh Roushan Mba Doc

14

3. ROURKELA STEEL PLANT

Rourkela Steel Plant (RSP), the first integrated steel plant in the public sector in

India, was set up with German collaboration with an installed capacity of 1 million

tonnes. Subsequently, its capacity was enhanced to 1.9 million tonnes.

The plant was modernised in the mid-1990s with a number of new units having

state-of-the-art facilities. Most of the old units were also revamped for effecting

substantial improvement in the quality of products, reducing cost and ensuring

cleaner environment.

RSP was the first plant in India to incorporate LD technology of steel making. It is

also the first steel plant in SAIL and the only one presently where 100% of slabs

are produced through the cost-effective and quality-centric continuous casting

route.

RSP presently has the capacity to produce 2 million tonnes of hot metal, 1.9 million

tonnes of crude steel and 1.67 million tonnes of saleable steel. It is SAIL’s only

plant that produce silicon steels for the power sector, high quality pipes for the oil

& gas sector and tin plates for the packaging industry. Its wide and sophisticated

product range includes various flat, tubular and coated products.

Almost all major units of the plant, including its Personnel Department and Steel

Township, are certified to ISO: 9001 standards. RSP’s Silicon Steel Mill, Sintering

Plant II, Environment Engineering Department, Plate Mill, Hot Strip Mill, ERW

and SW Pipe Plants, Special Plate Plant as well as Steel Township have been

awarded ISO:14001 certification for Environment Management.

Page 15: Rakesh Roushan Mba Doc

15

PRODUCT-MIX TONNES/ANNUM

Plate Mill Plates 2,99,000

HR Plates 92,500

HR Coils 3,98,000

ERW Pipes 75,000

SW Pipes 55,000

CR Sheets & Coils 4,33,000

Galvanized Sheets (GP& GC) 1,60,000

Electrolytic Tin-Plates 85,000

Silicon Steel Sheets 73,500

Total Saleable Steel 16,71,000

Location:

Rourkela Steel Plant is located in the north-western tip of Orissa and at the heart of

a rich mineral belt. Being situated on the Howrah-Mumbai rail mainline, Rourkela

is very well connected with most of the important cities of India. The nearby

airports are Ranchi (173 km), Bhubaneswar (378 km) and Kolkata (413 km).

Rourkela also has an airstrip maintained by RSP.

Page 16: Rakesh Roushan Mba Doc

16

4.IISCO STEEL PLANT (ISP)

The Indian Iron & Steel Company (IISCO), a SAIL subsidiary, was amalgamated

with SAIL on 16th February 2006 and renamed IISCO Steel Plant (ISP). This full-

fledged integrated steel plant is one of India’s oldest. Established as an industrial

enterprise in 1918, IISCO produced iron from an open-top blast furnace at Hirapur

(later to be called Burnpur) in West Bengal for the first time in 1922. The plant was

progressively upgraded to a capacity for production of 4.26 lakh tonnes of saleable

steel and 2.54 lakh tonnes of pig iron annually. The plant manufactures a range of

products, over some of which it holds exclusive market dominance. Iron & steel

produced by it has been acknowledged as being of the finest quality.

The plant is presently undergoing the final touches of a Rs. 16,480-crore

modernisation-cum-expansion programme to raise its saleable steel capacity to 2.5

million tonnes per year.

Location: Situated at a distance of about 200 kms from Kolkata in Burnpur on the banks

of the perennial Damodar river in West Bengal, ISP is well connected by both South

Eastern and Eastern Railways and National Highway 2. Its proximity to Kolkata and Haldia

ports is an additional strength.

History

IISCO held the proud distinction of being the owner of India’s “oldest unit

producing pig iron by modern methods” at Kulti on the banks of river Barakar near

Hirapur. An open-top blast furnace set up in 1870 by a company known as Bengal

Iron Works Co. (BIW) founded by James Erskine pioneered production of iron in

India in 1875. The same unit at Kulti also pioneered steel production in India

through small open-hearth furnaces in 1904-06. BIW was absorbed by IISCO in

1936 and steel making started as a regular measure in 1939. Another company

named Steel Corporation of Bengal (SCOB), incorporated in 1937, was also

amalgamated with IISCO in 1952. SCOB’s Napuria Works and IISCO’s Hirapur

Works in unison came to be known as the Burnpur Works of IISCO. The Burnpur

Works underwent two overlapping expansion in 1953 and 1955, increasing its

Page 17: Rakesh Roushan Mba Doc

17

production capacity to 1 million tonnes of ingot steel and 0.8 million tonnes of

saleable steel.

As the flagship business enterprise of Martin Burn House, IISCO had acquired iron

ore mines at Gua and Chiria in what is today’s Jharkhand state and collieries in

Chasnalla and Jitpur (also in Jharkhand) and Ramnagore (in Bengal). These captive

sources of high quality raw materials gave IISCO a major competitive edge and

enabled it to establish a prestigious reputation in domestic and foreign markets. It

also became the first Indian blue chip company to have its shares traded at the

London Stock Exchange. The Burnpur Works of IISCO reached its pinnacle of

performance during the 1960s and produced more than a million tonnes of ingot

steel.

Despite growth plans, however, a combination of factors drove the company into

stagnation and decline, resulting in lack of investment for technology up gradation

to meet emerging market competition. IISCO was nationalized in 1972 and became

a wholly-owned subsidiary of SAIL in 1979.

Page 18: Rakesh Roushan Mba Doc

18

5. BOKARO STEEL PLANT:

Bokaro Steel Plant - the fourth integrated plant in the Public Sector - started taking shape

in 1965 in collaboration with the Soviet Union. It was originally incorporated as a limited

company on 29th January 1964, and was later merged with SAIL, first as a subsidiary and

then as a unit, through the Public Sector Iron & Steel Companies (Restructuring

&Miscellaneous Provisions) Act 1978. The construction work started on 6th April 1968.

The Plant is hailed as the country’s first Swadeshi steel plant, built with maximum

indigenous content in terms of equipment, material and know-how. Its first Blast Furnace

started on 2nd October 1972 and the first phase of 1.7 MT ingot steel was completed on

26th February 1978 with the commissioning of the third Blast Furnace. All units of 4 MT

stage have already been commissioned and the 90s' modernization has further upgraded

this to 4.5 MTofliquid steel. The new features added in modernization of SMS-II include

two twin-strand slab casters along with a Steel Refining Unit. The Steel Refining Unit was

inaugurated on 19th September, 1997 and the Continuous Casting Machine on 25th April,

1998. The modernization of the Hot Strip Mill saw addition of new features like high

pressure de-scalars, work roll bending, hydraulic automatic gauge control, quick work roll

change, laminar cooling etc. New walking beam reheating furnaces are replacing the less

efficient pusher type furnaces.

Bokaro Steel Plant - the fourth integrated plant in the Public Sector - started taking shape

in 1965 in collaboration with the Soviet Union. It was originally incorporated as a limited

company on 29th January 1964, and was later merged with SAIL, first as a subsidiary and

then as a unit, through the Public Sector Iron & Steel Companies (Restructuring &

Miscellaneous Provisions) Act 1978. The construction work started on 6th April 1968.The

Plant is hailed as the country’s first Swadeshi steel plant, built with maximum indigenous

content in terms of equipment, material and know-how. Its first Blast Furnace started on

2nd October 1972 and the first phase of 1.7 MT ingot steel was completed on 26th February

1978 with the commissioning of the third Blast Furnace. All units of 4 MT stage have

already been commissioned and the 90s' modernization has further upgraded this to 4.5MT

ofliquidsteel.The new features added in modernization of SMS-II include two twin-strand

Page 19: Rakesh Roushan Mba Doc

19

slab casters along with a Steel Refining Unit. The Steel Refining Unit was inaugurated on

19th September, 1997 and the Continuous Casting Machine on 25th April, 1998. The

modernization of the Hot Strip Mill saw addition of new features like high pressure de-

scalars, work roll bending, hydraulic automatic gauge control, quick work roll change,

laminar cooling etc. New walking beam reheating furnaces are replacing the less efficient

pusher type furnaces. A new hydraulic coiler has been added and two of the existing ones

revamped. With the completion of Hot Strip Mill modernization, Bokaro is producing top

quality hot rolled products that are well accepted in the global market.Bokaro is designed

to produce flat products like Hot Rolled Coils, Hot Rolled Plates, Hot Rolled Sheets, Cold

Rolled Coils, Cold Rolled Sheets, Tin Mill Black Plates (TMBP) and Galvanized Plain and

Corrugated (GP/GC) Sheets. Bokaro has provided a strong raw material base for a variety

of modern engineering industries including automobile, pipe and tube, LPG cylinder, barrel

and drum producing industries.

People - The moving force

Bokaro Steel values its people as the fulcrum of all organizational activities. The saga of

Bokaro Steel is the story of Bokaroans erecting a gigantic plant in the wilderness of

Chhotanagpur, reaching milestones one after another, staving off stiff challenges in the

liberalised era, modernising its facilities and innovating their way to the top of the heap.

Directions

Bokaro Steel is working towards becoming a one-stop-shop for world-class flat steel in

India. The modernization plans are aimed at increasing the liquid steel production capacity,

coupled with fresh rolling and coating facilities. The new facilities will be capable of

producing the most premium grades required by the most discerning

customersegments.Brand Bokaro will signify assured quality and delivery, offering value

for money to the customers.

Page 20: Rakesh Roushan Mba Doc

20

COKE-OVEN AND BY PRODUCT PLANT

Coke oven and by product plant is considered as the initial phase of production of the

desired product and mainly deals with the listed activities….

1) PREPARATION OF COKE FROM COAL.

2) USING THIIS COKE AS A FUEL FOR THE PRODUCTION OF PRIMARY

AND BY-PRODUCTS.

Coal is selected mainly on the basis of its Ash percentage. i.e. lesser the ash % of coal,

greater the chances of using that coal for production process.

TYPES OF PRODUCTS

1) PRIMARY PRODUCTS: -

These are the actual products, which are originally produced by at bokaro steel

plant. These includes …..

HOT ROLLED (HR) – COIL.

HOT ROLLED (HR) – SHEET.

HOT ROLLED (HR) – PLATE.

GALVANISED PLANE (GP) - SHEET.

GALVANISED PLANE (GP) – COIL.

2) BY-PRODUCTS : -

These are those products that are not originally produced by bokaro steel plant, but

are the outcomes while producing the prime products..these includes………

Benzene, Toluene.

Anthracene.

Naphthalene.

Still Bottom Oil.

Hot pressed Naphthalene.

Ammonium Sulphate.

Ferrous Sulphate.

Page 21: Rakesh Roushan Mba Doc

21

3) SECONDORY PRODUCTS:- these are the defectives or rejected materials due

to improper mixing of chemical components or fail to meet the optimum

requirements. Scraps generated inside the plant are also termed as secondary

products.

INDUSTRY SCENARIO

Though the steel market has started picking up recently, the last four or five years have

been listing times for steel industry in view of the market. The competition has been

roughest in the flat products. Bokaro has been able to meet this challenge through

continuous improvement in quality, cost and delivery of its product and retained its market

share.

ITS MARKET AND COMPETITOTRS

1) TISCO

2) RINL

3) ISPAT

4)

OTHER COMPETITORS

Essar Steel

Jindal Steel

Usha Ispat

Lanco Industries limited

Saeas Goa.

Nippon Denro Ispat.

Page 22: Rakesh Roushan Mba Doc

22

MARKETING DEPARTMENT

MARKETING OBJECTIVE Marketing has been defined as “the process of planning and executing the

conception, pricing, promotion, and distribution of ideas, good and service, to

create exchanges that satisfy individual and organization objective”

The Marketing department decides as to how secondary & by product is

disposed through sale. The process requires an understanding of buyer and

seller behavior within the context of overall market environment. Added emphasis

is given to the important area of global markets with their own special challenge

and opportunities

FUNCTION OF MARKETING DEPARTMENT 1. To take stock of item a regular basis

2. To take disposal as per procedure

3. To review and fix the price

4. To settle refund claims

5. To create awareness in the market about various product

6. Creating long term growth

7. Communicating value

Page 23: Rakesh Roushan Mba Doc

23

CHAPTER - 3

CURRENT MARKETING ENVIRONMENT

In the Steel Plant, while producing steel, a number of strategically important and

commercially profitable bye-products and secondary products are produced. The defective

core products (which cannot be delivered against an order) are also churned out in large

quantity. Some of them are recycled and rests are made available in the open market to

earn revenue.

These products are highly in demand in metallurgical industries, cement industries,

chemical industries etc. Except core products all the other secondary and bye-products are

marketed by the marketing department of Bokaro Steel Plant. It has been recognized that

proper disposal of waste products can generate huge revenue for the company and hence

this area has found the increased interest of the policy makers of the company.

Marketing department is an important wing of the Material Management Division of the

Bokaro Steel Plant. It takes the responsibility of planning and controlling of various

marketing functions viz. pricing, distribution, sales and product promotion, market search

and research and executing the sales orders of various products.

The selling is done in three ways:

(a) Fixed Price Selling

(b) Tender

(c) E-auction

MARKETING DEPARTMENT OF BSL IS HAVING FOLLOWING SECTIONS:

1. Secondary product

2. Coal chemicals

3. Idle Assets

4. Pricing

5. Waste Product

Page 24: Rakesh Roushan Mba Doc

24

OBJECTIVE:

To maximize the revenue from sale of secondary products, bye-products, idle or used

material and other waste products and to keep the pool of customers satisfied.

FUNCTIONS:

To take stock of various items on regular basis

To take disposal action as per procedure

To gather market information; feedback from customers

To review and fix the price

To ensure smooth execution of order

To settle refund claims

To create awareness in the market about the various products

ADVERTISING POLICY:-

Companies in the present scenario of globalization and liberalization needs to do more than

making good product or competitively pricing its product-they need to inform consumers

about product and carefully position product in consumer’s mind.

Advertisement is the best form of non-personal communication. It is good way to inform

and persuade. Advertising serves the dual purpose of informing the product benefit and

positioning the product in consumer’smind. Bokaro Steel Plant, products (i.e. –products)

is used mainly of industrial use. Its product is the raw material for most of its consumers.

The customer base of BSL Plant is knowledgeable and knows about the products and its

benefit so on special effort is needed inform them about the product.

In BSL Plant, the main form of advertising is Tender Notice and notice other form of

advertising is also used but rarely. Information is provided to various persons through

advertising, which are directly or indirectly related with company. There are:-

o Customers.

o Users.

o General Public or neutral persons.

o People who are related with the economic progress of the company.

Page 25: Rakesh Roushan Mba Doc

25

Public relation Department of Bokaro Steel Plant looks after the advertising policy of

Bokaro Steel Plant. All decisions related with advertising are taken by both Marketing and

Public Relation Department jointly supported by sales co-ordination.

All advertisement of SAIL mainly contains factual date related to the products and its

comparative advantage over other similar products sometimes it also contains information

related to sales of a particular kind of product.

Main media used for advertising these products are newspapers and business magazines.

News papers and business magazines are selected based on the following criterions:-

1. Kind of product to be advertised and its used.

2. Are where the product is in demand.

3. Circulation of a particular newspaper and business magazines in the area.

4. Cost of advertising.

MARKET SEGMENTATION AND TARGET MARKET

MARKETING STRATEGIES OF BSL

Steel being an industrial commodity it is very necessary to maintain customer relationship

for profitability and smooth running of company.

Customer Satisfaction

BSL adopts following practices for customer satisfaction.

a. Procedure / process adapted to access current / future expectation of customers.

b. It induces market research visiting customer premises attending to customer complaints.

c. CMO has Market Management Group where specialists monitor changing demand

pattern and development in each Market segment is carried on.

d. It has posted market development officers at various locations that are its eyes and ears

for monitoring current and future expectation of its customer.

e. The Business-planning department is exclusively meant to study customer's changing

demand scenario and assess current and future expectation.

Page 26: Rakesh Roushan Mba Doc

26

f. To understand customer needs seminars and workshops are also organized by BSL.

Building Customer Relationship

BSL has adopted the philosophy of recognizing segment of the market and identifying key

customer in segment and giving them preferential treatment. CMO sales executives have

been trained to use direct selling as tool for building long lasting relationship with the

customers. Easy access to customers to seek assistance makes proposals send comments

and compliments.

MARKET DEVELOPMENT

BSL has valued customers group in identifying their specific needs Specific to that group

thus segmenting and developing market segment for our products. Major product

modifications are done as per their specific needs of the Market segment thereby creating

product differentiation packages.

PRODUCTION ACCORDING TO MARKET NEEDS

BSL is always in touch in market and try to produce according to market needs. BSL tries

to produce quality products / new products which fulfill the need of market

Page 27: Rakesh Roushan Mba Doc

27

PRODUCT & THEIR MARKRTING STRATEGY

MARKETING OF SECONDARY PRODUCTS

During the seventies and sixties when the plant was one million-tones and2.5 million-

tonnes capacity respectively, arising of secondary products was limited and such arising

was recycled for re-melting. Therefore there was no scope for marketing in other words it

was not economical. The plant capacity has been increased from 2.5 million tons to 4

million tones in the late sixties. New technology has been adopted while increasing the

capacity of the plant where by the use of arising for re-melting drastically reduced. This

has given more impact to the making of secondary product.

In the nineties we have seen lot of changes in the economic scenario of the country. The

concept of more employment in Public Sector Enterprises has changed to more profits.

There by the plant also has geared up its strategy towards this end. One of the strategies

adopted by the plant for increasing the profit is marketing of secondary products.

In the recent years a number of foundries and re-rolling Mills come into existence

throughout the country. These small scales Sector need the "Secondary products" as input

raw material for their production. The company has engaged in educating them the use of

secondary products for different kinds of end products for consumption of general public.

The plant extends all types of facilities and assistance to these small-scale units. This, in

turn gives scope for more employment opportunities.

The plant for marketing has adopted following strategy:

1. Committed delivery.

2. Competitive price

3. Quick complaint settlement.

4. Culture of customer service.

It is necessary to mentioned here that the companies' profit consists of 10% turnover of

secondary products for the Last two years.

Page 28: Rakesh Roushan Mba Doc

28

SALES PROCEDURE

PLANNING FOR SALE OF SECONDARY PRODUCT

1. Marketing Recovery Department (MRD) works out the quantum of different types of

scrap available for sale on monthly basis. This is determined by ascertaining the total scrap

stock at the beginning of the month. Scrap arising during consumption. The remaining

quantity is considered for sale. A, monthly report on availability of scrap is prepared by

MRD and sent to marketing department.

2. Marketing Department finalizes the plan for actual quantity of scrap to be sold in

consultation with MRD. Marketing department finalizes mode of sale, terms and conditions

for sale, locations and commercial aspects.

3. The pricing committee consist of Managing Directors fixes the price of each type of

scrap.

4. Marketing department obtains MD's approval on price fixed by pricing committee.

PROCEDURE APPLIED FOR SALE OF SECONDARY

PRODUCTS

1. After obtaining approval of quantity and price for sale, Marketing department

scrutinizes the demand from various parties, examine the Priorities and issue "offer letters"

to respective parties. The terms and conditions for sale are also enclosed with the "offers

Letter"

2. About one third of the quantity of material to be sold during the year is offered to the

actual users, subject to registration of demand.

3. For the balance quantity to be sold at prices fixed by pricing committee, preference is

given to actual users over traders. If there are no actual users, the material may be offered

to traders giving preference to registered traders over others.

Page 29: Rakesh Roushan Mba Doc

29

4. First preference is given to the actual users for allotment of scrap against particular

category of users. Scrap processing units are given second preference for such allotments.

5. The amount received from the party towards advance payment and security deposit is

forwarded to finance department by marketing department after recording the details in the

register.

6. Parties are allowed to visit the respective location disposals site, and inspect the scrap

offered for sale.

7. Marketing department prepares sale order for the parties who have accepted the offer.

Sale orders are issued party wise and category wise i.e. individual sale order covers such

categories like C I scrap, steel scrap, re-rollable, slag and waste products. The sale order is

issued on the basis of each financial year and the security deposit of each sale order is

carried over to the next year.

8. Based on the deposit made by the party, finance department intimates to marketing

department about release of requisite scrap for supply. Marketing department prepares

release orders, which are treated by MRD, as delivery order.

Page 30: Rakesh Roushan Mba Doc

30

THE STRUCTURE OF THE PROCESS OF SALES AND

MARKETING

PRODUCTS

PRIMARY (SPECIFIC PARAMETER) SECONDARY/BY-PRODUCTS

CMO (KOLKATA) UNITS- BSL, BSS, RSP, DSP etc

BSL MARKETING

METHOD OF SELLING

E-AUCTION SALE TENDER FIXED PRICE SALE

BSL MARKETING

(MAIN SECTION)

STEEL CHEMICAL &

BYE-PRODUCTS

SLAGS & WASTE

PRODUCTS

IDLE ASSETS PRICING

Page 31: Rakesh Roushan Mba Doc

31

DEMAND REGISTRATION OF BSL

Marketing department of BSL sales homogeneous steel scrap at fixed price. For this

purpose the procedure for registration of demand and offers is as below:

1. Preference for sale of material given to local parties and those, which are actual

customer. Material is not sold for trade.

2. Sale of material made to re-rolling mills and scrap processing units and the lots of sale

between them maintained at 67:33.

3. Based on the above consideration “offer letter” issued to the party offering a quantity,

which has been lifted by them during the last preceding year or allocated by the state

industries, Department. In the offer letter party is advised to complete commercial

formalities e.g. submission of “Die Registration Certificate “etc.

“Sales and Distribution of Secondary & By-Product”

SELLING OF SECONDARY PRODUCT

This involves a direct marketing process. The management of BSL in consultation with the

official of the market development and customer service department work as group for the

sale of these items.

MODE OF SALE

1.E-Auction Sale.

2.Fixed Price Sale.

3. Tender.

4. Interplant Transfer.

5. Transfer to PSU.

Page 32: Rakesh Roushan Mba Doc

32

DISTRIBUTION CHANNEL

Bokaro Steel Plant deals with its customer directly. There are liaising persons in the

marketing department who always remain in contact with the customers and extract

information about the current market demand on the basis of their interaction with them.

The products are directly marketed from Bokaro Steel Plant to the customers there are no

other intermediaries .This is the business to Business marketing (B2B).

MANUFACTURER TO INDUSTRIAL CONSUMER

Packing and modes of delivery of the by-product is mainly by three ways.These are as

follows:-

1. Railway tanks (wagon)

2. Roadways (tanker)

3. Piggy back (rail and truck)

In the above surveys shows roadways do that 70% transportation of By-product reason

consumer are local. They are mainly traders they are buying and selling the By-product to

the market.

Railway is also important to the transportation of By-product but it’s more costly because

less number of the buyer involvement in the outside of the country. The distribution

channel the Bokaro Steel Plant has for its chemical product is designed keeping in the mind

the hazardous nature and difficulty in storing these products. so this distribution channel

cannot be changed but for Ammonium Sulphate the distribution channel can be more

flexible by:-

a. Appointment of authorized agents :- It will help in increasing the sale and awareness

about the product in the regions other than Bihar,Orissa,Jharkhand and west Bengal. Such

arrangement will minimize the problem that the customers are facing .

Page 33: Rakesh Roushan Mba Doc

33

b. Appointment of authorized dealers;- appointment of the authorized dealers in Uttar

Pradesh from where a few enquiries have come for the product. Such enquiries show that

there is a presence of the potential customer base in that area and need to be tapped.

Buying and using vehicles off its own can change the mode of the transportation for the

chemical products. This will decrease customer’s problem of arranging for the vehicles

from the transporters and the handling and security problem of the plant. The customer will

be changed the transportation cost.

The pricing policy adopted by the plant is the best policy followed by this plant but

this policy can be made more compatible including a few big customers in the

pricing committee which will bring the prices of the product competitive to the

market trend and thus will decrease the chances of marketing strategy failure and

surplus inventory.

As the product quality is not taken care of some method should be divided to take

care of product quality without affecting the quality of its prime product.

the internal environment of the marketing department should be more customer

friendly and customer oriented.

though computerization of the marketing department has been done but to get full

advantage of computerization, sales co-ordination ,scrap and salvage department

and by-product plant should be brought into account so that party wise and

dispatches wise a order can be fulfill.

In future sales and excise section of the finance and account department also be brought

under same roof :-

The Market segment should be more clearly defined on the basis of geographical

location, nature buying unit, loyalty status of buying unit ,customer demand etc.

Market Research for knowing about the potential customer as well getting the

feedback from the customer should be frequently done. Feedback can be easily

available through questionnaire and ask them to fill and back to organization and

suggestion.

Page 34: Rakesh Roushan Mba Doc

34

My studies have been done from a management student’s point of view .the above

mentioned recommendation are in any based upon informal and formal feedback obtained

from the manager’s .The Management of SAIL(BOKARO STEEL OLANT) honestly

concerns for the future growth of the organization at the time of increased competitors

,should take care on the recommendation given above. The macro and micro planning is

definitely varied but their enforcement will ensure SAIL in regaining and building its glory

on top.

Page 35: Rakesh Roushan Mba Doc

35

LIST OF MAJOR CUSTOMERS OF THE BY-PRODUCT

A. N.G.BENZENE

1.ShriBhole Udyog Pvt. Ltd.

2 .Durgapur Chemical Pvt. Ltd.

3. India Petrochemical Pvt.Ltd.

4. Bharat Chemicals Pvt.Ltd.

5. KCI PolychemPvt.Ltd.

6. Shri Ram Industries Pvt.Ltd.

7. Shikhar Chemicals Pvt.Ltd.

8.Shiva chemical Pvt.Ltd.

B. N.G.TOLUENE

1. ShriBhole Udyog Pvt. Ltd.

2..Shri Ram Industries Pvt.Ltd.

3.Shiva chemical Pvt.Ltd.

4.Shri Bhole Industries

5. GOVT.OPIUM & ALKALOID

C.LIGHT SOLENT NAPTHA

1.Shri Chemical Pvt. Ltd.

2. ShriBhole Enterprises

3.Shri Bhole Udyog pvt. Ltd.

Page 36: Rakesh Roushan Mba Doc

36

4.Indian chemical Industries Pvt. Ltd.

D. STILL BOTTOM OIL

1. Jharkhand tar product pvt.ltd.

2.Omega hydro carbon pvt.ltd.

3. Jalan Carbon & chemical pvt.ltd.

4. bajaj Chemical Pvt. ltd.

5.Shiva Chemical Pvt. Ltd.

6.utkal hydro Carbon pvt.ltd.

7.Mangolia Hydro pvt.Ltd.

E. EXTRA HARD PTCH

1. Bharat Refractory Pvt. ltd.

F.HARD MEDIUM PITCH

1. Himandri chemical Pvt. ltd.

Panasonic hydro carbons Pvt. ltd.

jalan Carbon Pvt . Ltd.

Parliebal Pvt. ltd.

G.HOT PRESSED NAPTHALENE

Selezine and Intermediaries Pvt. Ltd.

Eastern naptha Chemicals Pvt.Ltd.

BAFS Media Pvt. Ltd.

Preeti Enterprises

Page 37: Rakesh Roushan Mba Doc

37

H. ANTHRACENE OIL

Bajaj alkine Pvt. Ltd.

Kedia carbon Pvt.ltd.

HTP Pvt. Ltd.

Jalan Carbon Pvt. ltd.

I. AMMONIUM SULPHATE

ShriAmbika Sales Corporation

M.K.chemical and Fertilizer

Page 38: Rakesh Roushan Mba Doc

38

CHAPTER – 4

FORM DEVELOPMENT PROCEDURE AND REQUIREMENT

ORACLE MENU

As commercial application developers our primary task is to design data entry forms that

look as close to the printed sheets of the paper that the data entry operators use in the current

manual system of the data collection.

Oracle form designer give us a powerful graphical user interface to designnsuchforms.All

objects properties can be selected by simply clicking on an appropriateicon.Oracle form

designer a graphical tool lets quicly create forms .this tool allows application developer

todesign form that captures,validate and store data keyed in by the data entry operators

with the very minimum of codes. Form designer,Oracle GUI based form creation tool

comprises of the following components:-

Form Designer

Form Generator

Run Forms

FORM DESIGNER- It is what the programmer needs tocreate a form. It allows the user

use pre created objects ,design the layout of the data entry screen and codes blocks that

may be required for data manipulation and validation.

FORM GENERATOR:-It is required to compile the file created in the form of the designer

and create a binary file which can be executed by the runforms.

RUNFORMS:-It is used to run compiled code created by the Form generator .To run an

Oracle form that has passed quality control test and is fully functional only the runform

module is required. Hence, at the time of the software deployment only the runform module

needs to be installed on the machine used by the data entry operators.To Program and Test

debug on an Oracle form a complete installation of the forms tool is required.

Page 39: Rakesh Roushan Mba Doc

39

FORMS IN SECONDARY MARKETING MODULE

1. mktg.fmb (This is profile form and calls the working menu)

2.mktg_menu.fmb.The various menu that are called by this mktg.menu.fmb are aas

follows:-

draft_menu.fmb:-When party wins auction money is paid by the party in the form

of the draft. The various columns of the draft are collected from the table

DRAFTBL

so.fmb(mb.rdf): As form provides frontend to the user this form is used to fill the

details of the Sales Order .The Columns of SOTBL are selected and the form is

designed.

money_tms.fmb: This form is used to transfer money to the SO. When various

draft details are filled by the party in the draft_menu.fmb then this money is

transferred to the So through this form.

do_form.fmb(dorpt.rdf): After the party pays the relevant amount for the product

the delivery order is to be prepared, so that the party can go to t the CISF pass

section with that delivery order. This is the form which enables this.(This form is

used to make DO)

mp.rdf: after the SO form has been prepard the next work done is making the report

for it.(This report is for SO printing)

forfeit_menu.fmb: If the party does not fulfill all the requirement for the delivery

of the product then there are different types of the forfeir and this form calls the

different forfeit forms.(This form calls different forfeit forms)

aipc_crupd.fmb(/sales/salesqry/aipc_crupd.fmb): When a product is readyto be

delivered to the party during this period various kinds of the creation and updation

may takes place. For these updating this form is prepared.It may happen that the

price of the product s increases /or the quantity is to be delivered after some days

from the due date. This type of updating are made possible through this form.(This

form is used for party creation/updating)

Page 40: Rakesh Roushan Mba Doc

40

pa_ac.fmb(/sales/salesqry/pa_ac.fmb):-The party whom product is to be sold ,it is

required to keeps details of the account of the party. Party’s account need to be

updated if some changes occur. This creation and updating take place through this

form.(This form is used for party account Creation /Updating)

pricelog_fmb(/sales/poonam/pricelog.fmb); A form is required for the entries of

the price details.This form logs on pricing.

(This Form Calls forms for pricing)

itmcd.fmd:Every item in the plant has its code .This code is generated to make

uniqueness to the item .For creating item code this form is called.(This form is used

for item code Creation)

so_ext.fmb (This Form is for S.O.Validity and Quality Expression)

refund.fmb(This Form calls Different Forms Related to Refund)

idasrep.rdf(/ales/sales report/idasrep.fmb) this is item wise Report for IDLE

ASSET.)

DRAFT MENU

emd.fmb:-Earnest money deposit is made by theparty ,a form is built which

contains all the necessary entries for the draft.(This is draft Entry Form For the

EMD)

appl.fmb:-A Form is made for keeping account of Application money.

(this is draft Entry Form For APPLICATION MONEY.

draft_all.fmb:- A draft entry form is made for the advance and other account.9This

is Draft Entry Form is made for advance and any other a/c heads as well a SO

Generation )

adv.fmb:Some money is paid by the partly in advance this is taken account by this

form.(This is Draft Entry for advance and any other a/c heads).

billadj.fmb:-A form is made to adjust bill for SO generation.(This is SO Generation

For Bil Adjustment)

ipt.fmb:- This is SO Generation Form or IPT.

Page 41: Rakesh Roushan Mba Doc

41

draft.rdf; A report is generated for entering for entering draft details of the particular

date. Various details are filled in this form.(This report for Entered Drafts of a given

Date)

drupdt.fmb: Sometimes some updation is required during draft

submission.Theseupdation is made possible through this form .(This is a Form for

Draft Correction)

draft data transfer to caash (script for Draft Data Transfer to Cash Section).

koldraft.fmb: Some drafts are from Kolkata based Centers .These draft entries other

form is made .This is made possible through this draft.(This is Draft Entry Screen

for Kolkata Draft)

FORFIET MENU

forfeitemd.fmb(fore.rdf) if partly fails to pay the earnest money deposit then

forfeiture of this amount takes place through form and calls the report fore.rdf.(This

is Form for forfeiture of EMD and calls the Report fore.rdf)

foreitappl.fmb(fora.rdf) If the party does not pay the application money in the

correct amount and date .Then forfeiture of this money takes place through form

.This calls the report forardf(This is the form for forfeiture of APPLICATION

MONEY and calls the report forardf)

foreitsd.fmb(forso.rdf); Security deposit is forfeiture and for this it is caleed(This

is form for forfeiture of SD and calls the report forso.rdf)

forfeitslab.fmb(forso.rdf):-A form is created so that the security deposit made by

the party for the slab can be forfeitured. This calls the report forso.rdf) This is form

for Forffeiture of SLAB SD and calls the reports forso.rdf)

(1)MARKETING MODULE;-For secondary product sale at first an auction is conducted.

A list of various secondary product to be sold is prepared party at first gets himself

registered for the auction Party has to pay the amount which is non-refundable. Then Party

bids for the same and if wins buys the aforesaid product .BSL sends payment for

reevaluation.

Page 42: Rakesh Roushan Mba Doc

42

(2) CISF Module: - after the marketing department have completed their job it’s the turn

CISF .For collecting product party has to enter plant and for that pass is required .At first

party goes to Pass Section with a copy of Delivery Order. This pass is required to get

permission to take vehicle inside the plant.

(3)DA Module:-Loading unit prepares the dispatches advice depending upon the delivery

order and sales order and is given to the Party. Party goes to the invoice cell inside the plant

and gets the invoice prepared. after checking all the payment details and onvoices party

goes out of the Plant.

(4)Refund module :-Sales a/c department takes care of the amount party claims .Marketing

department initiates the refund process after taking claim form from the Party. after

checking all the Payment details and invoices made party settles claim.

(5)Forefeit Module

(6)Report generation Module:- This module generates various reports.some of these

reports are;-1)Movement Plan Reports

2)sales order report

3) Delivery order report

Page 43: Rakesh Roushan Mba Doc

43

ANALYSIS

PRICING POLICY

Price is one of the elements of marketing mix that generates revenue. Companies do this

in a variety of ways. The basic thing to be kept in mind while deciding the price is the

product for which the price is to be fixed.As we know coal, chemicals are not the core

products of Bokaro Steel Plant and hence, the pricing strategies of the secondary and bye-

products are a very difficult part. The core products of the four steel plants are sold through

Central Marketing Organization which has its head office at Kolkata. Every item produced

by SAIL i.e. pig iron, semi finished and finished steel are distribute by CMO. The exports

are also handled by CMO. Despite CMO, there is marketing department in every unit of

SAIL which co-ordinates the marketing process of the products which are not under

CMO.Hence, the marketing department of Bokaro Steel Plant is responsible for the sale of

all secondary and bye-products. There are few processes which the department follows to

come to the final price of the product:-

1) The basic thing which any firm needs to identify is the objective of pricing. There

can be objectives like earning profit, maximizing market share, market penetration

pricing, market skimming prices etc.

2) The next thing which the firm does in estimating costs. The cost earned by the

company during the production process.

3) The third point to be considered is the demand.

4) Dispatches of last three months.

5) Order Balance.

6) Stock in hand.

1. PIG IRON: - The price of pig iron includes direct dispatches, base price, excise

duty, railway freights, and engineering expert’s assistance. It also includes

stockyard expenses before final price of pig iron is fixed.

2. PRICE OF STEEL MATERIAL: - It too considers the above procedure before

the price of the steel material is fixed and lastly the BICP recommends the price for

the product to be approved by the government.

Page 44: Rakesh Roushan Mba Doc

44

CHAPTER – 5

1. E-AUCTION

COMPLETE STRUCTURE OF THE PROGRAM

DATA FLOW DIAGRAM OF E-AUCTION

Advertisement of dates/type

of materials on SAIL

website/Newspaper

Posting of lot details to be

auctioned on SAIL / Metal

Junction website

Inspection of lots by

customers

Auction conducted on

metaljunction.com

Report of Auction by

metaljunction.com

Reserve Price Opening

Committee meeting

Recommendations

Approval for Sale

Issue of Offer Letter

Page 45: Rakesh Roushan Mba Doc

45

PROCEDURE OF E-AUCTION

Advertisement/posting of dates and types of materials to be auctioned in SAIL website and

various news papers (Local & National) every 15th to 20th of the month for the next month,

1. Posting of details of lots to be auctioned one week prior to the date of auction, on

the website of SAIL and metal Junction.com

2. Inspection of lots to be auctioned by customers.

3. Auction is held on www. Metal Junction.com

4. Report of auction conducted is give by Metal Junction.com

5. Meeting of reserve price opening committee and their recommendation.

6. Approval for sale of lots recommended by RP opening committee.

7. Issue of offer to the customers, based on approval of chief Executives.

8. In this method the defective materials from all the mills is arranged in heaps of 100-

150 tones to be sold by auction. Generally auction sale takes place ones in a month.

Representative from all the re-rolling mills turn up during auction and they bid for

the available material. The raw material need of this mill is being made by the plant

and the availability of the re-reliable has increased the re-rolling mill to develop

very fast. The plant extends all types of facilities and assistance to these small scale

units, which to turn give scope for more employment, and then the material is lifted

on the terms and conditions as mentioned in the tenders.

Page 46: Rakesh Roushan Mba Doc

46

GENERAL RULES AND REGULATION GOVERNING CONDUCT OF ONLINE

AUCTIONS ON THE “SERVICE PROVIDER” PLATFORM

INTRODUCTION:

This Online Forward Auction is being conducted for Bokaro Steel plant, Steel Authority

of India Ltd (hereinafter referred as the “Client’’) on the Auction Platform of

metaljunction.com, (hereinafter referred as “Service Provider”) .The General Rules

and Regulations provided herein govern the conduct of on line Forward Auctions arranged

by “Service provider” on its Auction Platform. These rules cover the roles and

responsibilities of the parties in the online Forward Auctions on the Auction Platform.

Acceptance in-Toto to these General Rules and Regulations governing conduct of online

auctions, and Terms and Conditions for Sale of Materials by tender or online auction, of

Bokaro Steel Plant is a pre – requisite for securing participation in the online auctions. key

terms pertaining to the online Forward Auctions are provided in the “Annexure-D”.

Prospective bidders are advised to read through the same.

ROLE OF “SERVICE PROVIDER”

1. “Service Provider’ is the agency (operator) primarily providing the service of the

Forward auction to the “client”.

2. Finalization of the auction items in consultation with the client. The same to the Bokaro

steel Plant Client.

3. Defining of bidding rules for each auction in consultation with the client.

Enhancing bidder awareness of and comfort with the auction mechanism and bidding

rules

4. Enlarging the customer base by introducing new bidders.

5. Input of the Auction items and defining the bidding rule in the auction engine.

Providing access to the approved bidders to participate in the Auction.

6.Summarizing the Auction proceedings and communicate the outcome to the Client.

Page 47: Rakesh Roushan Mba Doc

47

7. The responsibility of fulfillment of the contract rests between the bidders and the client

and the responsibility of the “Service Provider” shall be restricted to the extent of the

services provided by them.

ROLE OF BIDDER

The role of the bidder is outlined below:

The bidder would participate in the auction with the aim of bidding to secure the auctioned

item in the auction. The bidder would be provided access to the Auction through a “User

ID” protected by a “Password”. The bidder needs to ensure that the “User ID” and

“Password” is not revealed to unauthorized persons. Bidders are also requested to change

the password allocated to them by the “Service Provider” to keep their confidentiality.

However it would be bidder’s sole responsibility to ensure the security and privacy of the

same and he/they would not hold the “Client” / “Service Provider” responsible in any

manner whatsoever for any misuse of these user IDs and/or Password. Access to the auction

mechanism shall be provided to all the approved bidders subsequent to obtaining their

written consent to the General Rules & Regulations and the Letter of Interest. Payment of

Earnest Money Deposit (EMD) as decided by the client

Minimum3 days before the of the Forward auction will be one of the necessary conditions

for participating in the auction. Bidders hereby confirm that they shall commit to lift the

items/Lots (being bid for) at the price entered by them in the auction engine AND at the

terms and conditions specified herein by the Client. All Prices entered shall be legally

binding on the bidders. Bidders are strongly advised to exercise due diligence while placing

bids. Failure to honor the bids placed during online bidding shall render the bidders liable

for penal action as mentioned at point no 12 of the notice for Forward Auction i.e.

Forfeiture of the EMD and debarring them for future participation for 6 months.In the

event of winning an allotment in the auction mechanism, the bidder shall commit to fulfill

outlined obligations under the contract.

The bidders shall bid on the terms specified by the client & place their bid in the auction

engine in the manner specified by “Service Provider”. The bidders shall not stipulate any

conditions on their own unless the terms of the client (the client’s terms & conditions)

Page 48: Rakesh Roushan Mba Doc

48

expressly permit such conditions being stipulated by the bidder. Bids entered with

conditions attached shall be considered Conditional bids & “service provider” retains the

right of rejecting these bids even without intimating the client.

BIDDING RULES

The Bidding Rules refer to the information and terms defined specifically for a particular

auction. The purpose of the Bidding rules is to provide approved bidders with the

information and terms specific to the auction in which they are bidding. This would

include:

1. Definition of the unit bidding.

2. Start Time and duration of the auction.

3. Any extension of the duration of the auction in the event of bids

Being received towards the end of the pre-specified duration.

4. Start Bid Price.

5. Specified Unit for Bidding.

6. Price Increments and any reduction in the price increment in the auction in

the event of inactivity.

7. Other attributes (informational/non-negotiable in nature).

While it shall be the endeavor of “Service Provider” to specify these rules at the earliest

for each online auction, the “Service Provider” shall retain the right to delay the

announcement of these biddings rules or modify rules specified earlier at the time of the

online bid. These details would be available to the bidders on the Auction Engine at the

time of bidding. Participation in the auction process presumes complete awareness and

understanding of the bidding rules.

Page 49: Rakesh Roushan Mba Doc

49

CONDUCT OF THE AUCTION

Only those bidders who have been approved by the “Client” and handed over stamped and

manually signed “General Rules and Regulations governing conduct of online auction

along with Letter of Interest, required EMD amount and other necessary documents to the

“Service Provider” at least 3 days prior to the start of online auction will be given “Login

ID” and “PASSWORD” to enable them view and participate in online auction. However a

time of 10 working days shall be provided for in-between the date of the Online Auction

Notice and the date of Online Forward auction so as to give sufficient time to the eligible

bidders to be ready in all respect for taking part in the Online Forward auction.

The Auction shall be conducted on pre-specified date. The Key Terms pertaining to the

conduct of Auction such as “START TIME”, “DURATION”, “END TIME” AND

“AUTO EXTENSION FACILITY” Shall be specified separately for each Auction.

“Service provider” retains the right to cancel or reschedule the auction, with the approval

of the Competent Authority of the Client, on any of the following reasons:

1. The number of confirmed bidders is deemed insufficient to conduct the auction.

2. Some of the confirmed bidders are unable to access the module due to infrastructure

problems such as sustained power failure or telecommunication breakdown.

3. There are no bids, which are equal to or below Start Bid Price.

4. Any other reason which in the opinion of “Service Provider” / “Client” requires such

action to be initiated.

5. The duration of auction may also vary from the pre-specified period of time either on

account of termination of the auction by “Service Provider” on the advice of the Client

Or

1. In case of situations where it is felt that continuance of the auction proceedings is

prejudicial to the smooth conduct and / or the integrity of the auction process.

Or

2. Due to Auto Extension during the Auction, duration may increase from specified

period.In the event of any problems being faced in the smooth conduct of the auction,

Page 50: Rakesh Roushan Mba Doc

50

“Service Provider” with the approval of the Competent Authority of the Client, shall

have the right to undertake one or more of the following steps:

1. Cancellation/ premature termination of the auction with/ without a

subsequent rerun of the auction on a mutually decided date.

2. Cancellation of a bid.

3. Locking / deactivate a bidder’s account (suspension of operations in the

account), etc.

In case of failure of net connection, bidder will give his best price to the “Service Provider”.

“Service Provider” will bid on behalf of the bidder with the minimum increment until the

bid price reaches the best price offered by the bidder, by proxy bidding mechanism. The

best price communicated by the bidder will have to be authenticated by written

confirmation or fax to the “Service Provider” and will be kept confidential between the

“Service Provider” and the bidder. Bidder will be bound by the price offered.

LIABILITY OF “SERVICE PROVIDER”

“Service Provider” shall not be liable to the client/ bidders participating in the auction or

any other person(s) for:

1. Any breach of contract by any of the parties in the fulfillment of the underlying

contract.

2. Any delays in initiating the online auction or postponement / cancellation of the online

auction proceedings due to any problem with the hardware / software / infrastructure

facilities or any other shortcomings.

While, reasonable care and diligence will be taken by “Service Provider” in discharge of

its responsibilities such as design of the online bid, communication of bid details and rules,

guidance to client/ bidders in accessing the Auction Engine and placing bids, etc. the

bidders shall specifically indemnify “Service Provider” from all liabilities for any

shortcomings on these aspects. It is clearly understood that these activities are undertaken

by “Service Provider” to assist the bidders in participation but the ultimate responsibility

on all these counts lies totally with the bidders.

Page 51: Rakesh Roushan Mba Doc

51

RIGHT OF THE CLIENT

The Client reserves the right to partially or totally accept or reject any / all bids placed in

the Online Auction without assigning any reason whatsoever. The decision of the client

would be final and binding on the bidder in any such case.

CONFIDENTIALITY CLAUSE

“Service Provider” undertakes to handle any sensitive information provided by the client

or confirmed bidders for the auctions conducted with utmost trust and confidentiality.

JURISDICTION

Any disputes relating to the online auction module shall be subject to the sole jurisdiction

of Court of Law having jurisdictions over the Plant from where the materials are being

sold. On line Auction conducted at Bokaro Steel Plant shall exclusive jurisdiction of

Bokaro Civil Court.

TERMS AND CONDITIONS FOR THE SALE OF MATERIALS BY ON LINE

AUCTION / TENDER FROM BOKARO STEEL PLANT

MANAGEMENT: The Management will mean the Managing Director, Steel Authority

of India Limited, Bokaro Steel Plant or any officer authorized by him to act on his behalf.

PURCHASER: The Purchaser will mean the successful bidder whose bid has been

accepted under the terms of the online auction/tender process.

TERMS AND CONDITIONS

Bids are accepted on the assumption that the bidders are aware for what they are bidding

for that the principle of “Caveat Emptor” shall apply. The sale is on the basis of “AS IS

WHERE IS”. The materials will be lifted from the site of storage with all faults and errors

in description or otherwise, if any. Quantity, Quality, Size measurement, marks and

number stated in the tender documents are approximate and no warranty or guarantee

should be implied. The bidders/Tenderers are advised to inspect the materials before

offering their prices.

Page 52: Rakesh Roushan Mba Doc

52

Inspection of Stores/Site: Interested parties will be permitted to see the materials from 9.30

Hrs to 4.30 Hrs daily on working days. Necessary entry passes may be obtained from the

Receptionist/ CISF.

TENDER FORMS

The tenders will sign on each page of the tender documents from Annexure B to E, terms

and conditions of sales, schedule etc. in token of acceptance thereof. However, the

signature on the tender schedule along with the terms and conditions shall be deemed to be

acceptance of all terms and conditions of sale & schedule and other documents forming

parts of the online auction / tender.

Earnest Money: Each tender/ online auction will be accompanied by an Earnest Money

Deposit in the form of Demand Drafts/ Pay Order/ Banker’s Cheques in the name of “Steel

Authority of India Limited, Bokaro Steel Plant”, payable at any scheduled nationalized

Bank at Bokaro Steel City or Chas Branch. The amount of Earnest Money will be

stipulated in the invitation to on line auction/tender. Cheque/Cash will not be accepted

towards earnest money deposit, it is not possible to adjust earnest money from any sum of

money due from the SAIL Bokaro Steel Plant, on account of pending bill security deposit

or earnest money paid towards another on line auction.

Submission of Online auction/ Tender documents: Documents will be submitted by the

date and time stipulated in the Invitation to on line auction/Tender to the appropriate

authority. The documents shall enclose the Demand Draft/ BC/PO towards the Earnest

Money. The intending buyers may submit their documents either personally or through

Dak / courier to the office of METAL JUNCTION.COM as per Annexure F

Any document / application for tender/ online auction received before the publication of

the advertisement or after due date and time fixed as per point no 2 of the notice shall not

be considered. Successful Bidders will have to pay Security Deposit (SD) @ 3% of the

total quantity of material as per bid rate in the form of DD / PO / BC drawn on any

Page 53: Rakesh Roushan Mba Doc

53

nationalized bank in favour of SAIL/Bokaro Steel Plant payable at Bokaro Steel City or

Chas within 5 days from the date of issue of Offer Letter for issue of sale order. The

material cost along with the applicable ED and Sales Tax etc shall have to be deposited by

the buyer in the form of DD / PO / BC drawn on any nationalized bank in favour of

SAIL/Bokaro Steel Plant payable at Bokaro Steel City or Chas within 7 days from the date

of issue of Offer Letter for the issue of PIM CUM DO. No money whatsoever lying at BSL

on account of the party except Credit Note issued by BSL on account of past purchase shall

be adjusted against any cost of material and all the intending buyers have to deposit the

same a fresh. Delay in payment by the buyer may be permitted with interest @ 24% per

annum for 15 days only from the last due date of payment as per Offer letter. Delay in

payment is not permitted for security deposit. The delayed payment shall not entitle a party

for extra lifting time.

In the event of failure on the part of the bidder to pay the Security Deposit against each or

any lot within specified period, the Earnest Money Deposit (EMD) of the bidder will be

forfeited and they shall be debarred from participating in future auctions for next six

months by Metal Junction. The successful party shall have to lift the entire material falling

under the category of items for which he has participated and is the H1 bidder within the

period and from the area specified in the sale order. The lifting time allowed shall be

counted from the date of issue of sale order.

In the event of failure in lifting the material by the party within stipulated time, the party

may be allowed to lift the balance quantity to complete the tonnage/clear the site from the

purchased material. A time extension may be granted to the buyer on request and payment

of ground rent @ 5% of the Basic value of left over quantity of material for extension up

to 15 days and 10% of the Basic value of left over quantity of material for extension up to

30 days. No extension beyond one month shall be granted. Extension granted shall be

counted from the next date of delivery order validity for the purpose of ground rent.

Page 54: Rakesh Roushan Mba Doc

54

Validity of Offers: The Bid/quotations shall remain valid for 15 days from the date of

award of auction/opening of tender.

(a) In case the date of online auction becomes a holiday the auction will be opened on the

next working day.

(b) The Management reserves the right to accept or reject any or all the online auction/

tenders without assigning any reasons thereof at any stage.

(A)Conditional Online auction Auction/Tenders: Conditional bids will not be

considered.

(a) When the H1 price of a lot/item is approved, the purchaser shall be notified by an Offer

Letter, which will be sent on E-mail/Fax/by hand/through courier. The offer letter will

indicate full details namely the particulars of the materials, quantity, accepted rate, sale

value, sales tax, other taxes, and amount deposited towards earnest money and the date of

making payment.

(b) Security Deposit: The refund of the security deposit is subject to the satisfactory

execution of the order. The Management will be entitled to recover from the security

deposit all the money due to the Plant concerning the sale.

(c) In the event of failure on part of the bidder to make full payment within the date

specified in the Offer letter, the Management may at its option cancel the offer/ sale relating

to the lot/ items forfeiting the earnest money & security deposit without issuing any prior

notice to the tenderers/ bidders.

Payment: On receipt of the Offer letter, the purchaser will deposit the amount as per

details indicated in the Offer letter, by Demand Drafts or Pay Order or Banker’s cheque,

drawn in favor of Steel Authority of India Ltd, Bokaro Steel Plant, payable at Bokaro Steel

City or Chas. Cheques/Cash will not be accepted towards payment, however credit note

issued by BSL towards balance amount of any previous purchase shall be acceptable only

towards material cost and not against Security Deposit.

Page 55: Rakesh Roushan Mba Doc

55

Extension of Date of Payment:

Delay in payment of material value by the buyer may be permitted only for 15 days from

the last due date of payment as per Offer Letter with an interest @ 24% per annum. No

delay in payment will be allowed for security deposit: All taxes / excise duty under the

local, state, central or any other law shall be payable by the purchaser in addition to the

sale value, as applicable for each item at the rates prevailing on the date of delivery.For all

the purpose the date of DA in case of Road Despatch and date of RR in case of Rail

despatch will be deemed to be the date of delivery.

a)Delivery Order and delivery: - On receipt of payment from the purchaser, BSL will

issue a PIM CUM Delivery Order (PIM CUM DO) which will enable the purchaser to take

delivery of the materials from the stock holder. The Bidder/ tenderer is required to sign

the PIM CUM Delivery order (PIM CUM DO). If this is not possible and if the Bidder/

tenderer desires to take delivery through his authorized representative, he must authorize

persons by a letter of authority in the prescribed format on non-judicial stamp paper of Rs.5

duly notarised, which shall be presented to the appropriate Management. The letter of

authority shall bear the photograph and specimen signature of the authorized representative

duly attested by the Bidder/ tenderer. BSL may, in its entire discretion decline to act on

any such authority and it shall be in all case, for the purchaser to satisfy the stockholder

that the authority is genuine.

Delivery by proxy will be at the purchasers sole responsibility and no risk

and no claim shall lie against the Management on account, whatsoever, if

delivery is effected to wrong person. The option of delivery of any item by

rail or Road shall lie with BSL Management. In case of Rail Delivery, rail

underload, siding charge, demurrage etc. shall have to be paid by the buyer

along with cost of material.

b)Actual Delivery/Lifting:The buyer /his authorised representative shall lift the material

from the lot/area allotted on the basis of PIM CUM Delivery Order (PIM CUM DO) in

terms of tonnage/ number/lot/measurement. In case of big equipment/Plant/Unit sold,

where whether the entire Plant/Equipment/Unit is lifted in one or different parts/lots, the

delivery shall be on the basis of the prices quoted is for the entire unit/equipment/plant.

Page 56: Rakesh Roushan Mba Doc

56

For extra tonnage of the item, proportionate extra payment shall be required to be made

by the parties with reference of the item mentioned in the tender/ PIM CUM Delivery

Order (PIM CUM DO).

c)Weighment:Theweighment of material as recorded on BSL’s weigh-bridge/reflected in

DA/RR shall be final and binding.

1.(a)Delivery time for removal of goods: The delivery of the materials will be effected

“in situ” by the Management. Time is the essence of the contract. The goods sold will be

removed by the buyer from the site within validity of the sale order. Delivery of the

materials will be made during working hours on all working days on presentation of PIM

CUM Delivery Order (PIM CUM DO) by the purchaser to the officer in charge, who may

suspend the delivery for particularperiod of time for want of any clarification or other

technical / operation reasons. The buyer will make their own arrangement for collection /

removal and transportation of the items/ lots purchased and will not be entitled to claim

any facilities or assistance for the transport/ removal of the goods/ lots from the Plant

premise. The Management may, subject to the availability, extend at its discretion certain

facilities such as cranes etc. on chargeable basis or otherwise for handling the lot. The fact

that such application has been made to the Management or any delay on the part of the

Management to grant such facilities does not entitle the purchaser for any extension of the

delivery date.

(b) The removal of the materials within the stipulated period is not subject to the

availability or otherwise of labour, wagons and such other factors as climatic conditions

and transport etc. which is the responsibility of the purchaser.

(c) However the Management may, consider allowing extra lifting time in special

circumstances/ situation when lifting could not be done due to reasons such as strikes,

Bandh, failure of loading equipment/EDP computer system or any other unforeseen

reasons etc.

2.(a) Railway siding facilities: The purchasers may, at the discretion of the

Management be permitted to use the Plant siding at the purchaser’s cost, risk and

arrangements, granting of permission is subject to Railway restrictions from time to time.

Page 57: Rakesh Roushan Mba Doc

57

The purchaser will have to pay the Management in advance the siding charges as applicable

from the time to time. Necessary Security Deposit payment will be made by the purchaser

on this account, the purchaser will be liable for the payment of al the charges payable to

the Railways whenever the Plant siding is used under their own arrangement or through

the Plant in case of delivery by Rail. Delivery by rail shall be subject to wagon availability

and Railway permission. On this account no claim/complaint shall be entertained by BSL.

(b) No picking, sorting, cutting, cleaning or breaking up of goods of materials sold will be

permitted, except in certain special circumstance where prior sanction for such a

permissions has been accorded by the Management. Such permission will be accorded

only for cutting or breaking of heavy/big pieces into loadable sizes and not processing.

(c) Whenever permitted, the purchaser shall carry out cutting, breaking and dismantling of

the sold good for lifting in pieces under the supervision of authorised representative of

Loading Unit/Delivery department.

The delivery Department will ensure proper identification of the

items/equipments/installations and marking on them during cutting and dismantling works

in order to avoid mixing of the sold items with any other assets of BSL. However, before

starting the dismantling work, written approval of HOD concerned shall be obtained from

Delivery Department/Loading Unit.

3.Shortage of goods: Where goods are sold in lots and not in number or units, any

reference to the quantity, quality, size, measurement number and other documents shall not

be a point of dispute and the purchaser shall have no claim against the Management for

refund of whole or any part of the purchaser’s money or for loss of profit, of interest,

damage or otherwise. Where materials are sold by number and the purchaser fails to obtain

delivery of the whole or a portion of the goods sold, he shall be entitled to make a claim

for the proportionate refund of the sale value of the undelivered quantity. He shall not be

entitled to claim any damages, loss, profit, interest or compensation on any account due to

such short delivery.

4.Re-Sale: The Management will not recognize Re-Sale. Sale Orders and release orders

will be made out only in the name of actual Bidder or tenderer.

Page 58: Rakesh Roushan Mba Doc

58

5.Custody and preservation of goods after sale : The materials shall remain in every

respect at the risk of the purchaser from the date of Sale Order is issued to the purchaser.

The Management shall not be under any liability for the safe custody or preservation

thereof from that date.

TIMINGS OF THE ONLINE BID

All the timings of the Online Bid shall be based on the time indicated by the Server hosting

the Auction Engine. It shall be the endeavor of "Service Provider" to ensure that the Server

Time reflects as closely as possible the Indian Standard Time (IST) i.e. GMT + 0530 hrs.

However, in the event of any deviations between the Server Time and the Indian Standard

Time, the functioning of the Auction Engine

(Launch, operation, and closure) would be guided by the Server Time. Bidders are advised

to refresh both the windows of the Auction Module check the exact Server Time (displayed

in both the windows).

PREVIEW TIME

Preview Time refers to the period of time that is provided prior to the commencement of

bidding. This is to facilitate approved participants to view the auction details such as item

specifications, bidding details and bidding rules. The purpose is also to familiarize

participants with the functionality and screens of the auction mechanism. It is not

mandatory for "Service Provider" to provide Preview Time.

START TIME

Start time refers to the time of commencement of the conduct of the online auction. It

signals the commencement of the Price Discovery process through competitive bidding.

DURATION OF THE AUCTION

Page 59: Rakesh Roushan Mba Doc

59

It refers to the length of time the price discovery process is allowed to continue by accepting

bids from competing bidders. The duration of the auction would normally be for a pre-

specified period of time. However, the bidding rules may state the conditions when the pre-

specified duration may be curtailed/ extended. The conditions include:

Shortening of auction duration in the event of no bids for a specified period of time

(Inactivity Time)

Automatic extension in the event of bids being entered towards the end of the scheduled

duration to facilitate the other bidders to view and react to the bid.

AUTO EXTENSION OF THE AUCTION TIMINGS

In the event of bids in the last few minutes of the scheduled bid time, the Bid Timings are

automatically extended for a specified period from each such bid. Such Auto Extension

shall continue until no bids are placed for the specified period (Engine remains inactive for

the specified period). The Inactivity Time for Auto Extension purpose is normally X

minutes. "Service Provider" however retains the right to change the same. The Inactivity

Time applicable for the particular Online Bid shall be visible to the bidders under the

Bidding Rules module on the engine.

END OF THE AUCTION

End of the Auction refers to the termination of the auction proceedings signaling an end to

the price discovery process.

Page 60: Rakesh Roushan Mba Doc

60

2. FIXED PRICE SELL

FLOW CHART OF FIXED PRICE

Advertisement of type of

materials on SAIL

website/Newspaper

Application from customers

Allocation of material

Issue offer letter

Page 61: Rakesh Roushan Mba Doc

61

PROCEDURE OF SALE THROUGH FIXED PRICE

1.General Sale notices for different items to be sold is posted on SAIL website and

advertise in various newspapers (Local and National) between every 15th to 20th of the

month for the next month,

2.For requisition of materials, applications are invited from customers bet 25th -30th/31st of

every month.

3.Allocation of material to various customers is done as per approved procedure of priority

allocation.

4.Offer letters are issued to the customers.

5.Price applicable will be the price rising at the time of dispatch.

Page 62: Rakesh Roushan Mba Doc

62

PRIORITY IN BOOKING OF MATERIALS BY MARKETING

DEPTARTMENT

Category Priority

Buyer

Quantity to be

allotted

A 1st Govt. Units/PSUs & its

subsidiaries & joint ventures

of govt. units having more

than 50% govt. share

Any quantity

required by them

B 2nd Dependent BIADA units with

MD/BIADA’S

recommendations & MD/BSL’s

approval.

Maximum 70% of

the balance

available quantity

after meeting the 1st

priority

C 3rd Consumers/Processes of

Jharkhand state

30% of balance

D 4th To all other customers Out of the balance

quantity of material

left if any

Page 63: Rakesh Roushan Mba Doc

63

3.TENDER

TENDER DOCUMENT

TERMS & CONDITIONS

1) The parties desirous of purchasing the material have to quote for entire quantity of the

material.

2) The Tenderers are advised to inspect the material at B.F. Slag Dump, if so desired, before

submitting the quotations.Parties will be permitted to see the materials from 9.30 Hrs to

4.30 Hrs daily on working days. Necessary entry passes may be obtained from the

Receptionist/ CISF

3) Terms of sale: On “As is where is basis ", " No complaint basis “and” Ex-works basis"

No PICK and CHOOSE shall be allowed other than sorting out Iron/Steel pieces found, if

any.

4) The conditional quotations are liable to be rejected.

5)EARNEST MONEY

EMD (Earnest Money Deposit) Rs.100000/- for the item to be deposited in the form of

DD/BC/PAY ORDER in favors of SAIL/Bokaro Steel Plant, payable at Bokaro, from any

Nationalized / Scheduled banks along with the quotations. Any variation / demand in such

taxes, duties, levies, and charges and / or any fresh imposition of such taxes, duties,levies

and charges shall also be to the account of the bidder to whom the tender is awarded.The

tenders should quote their rate in per cubic meter against the total quantity as asked for in

the tender document both in words and figures.

In case of any mismatch / ambiguity between the two the higher of the two rates only shall

be considered.The tender should be submitted in the TENDER BOX placed inside the

CONFERENCE HALL OF MARKETING AND STRATEGIC PLANNING

DEPARTMENT on the 5th floor of ISPAT BHAWAN. The general terms and conditions

of lifting by road and safety stipulations in force shall be applicable.

Page 64: Rakesh Roushan Mba Doc

64

6)PAYMENT TERMS:

The successful bidder has to make payment for the quoted quantity in 12 (twelve) equal

installments of 1000 CU. each. 1st installment is to be deposited within 10 (Ten) days from

date of issue of sale order inclusive of the date of issue of sale order. Subsequent

installments are to be deposited within 30 (Thirty), 50 (Fifty), 70 (Seventy), 90 (Ninety),

110 (One hundred ten), 130 (One hundred thirty), 150 (One hundred fifty), 170 (One

Hundred seventy), 190 (One hundred Ninety), 210 (Two Hundred ten) & 230 (Two

Hundred Thirty) days from the date of issue of sale order (inclusive of the date of issue of

sale order). However, lifting of entire quantity of material has to be completed within the

validity period of 300 (Three Hundred) days from the date of issue of sale order (inclusive

of the date of issue of sale order). Payments shall be in the form of DD/BC/Pay order or

acknowledgement note from SBI, IFB commercial, Branch of Raipur /Bokaro payable at

Bokaro from any of the Nationalized / Scheduled banks in favor of SAIL /Bokaro Steel

Plant. In case of failure of payment as mentioned above and or failure in lifting of material

within the validity period of lifting, the Management reserves the right to cancel the sale

Order and forfeit the security deposit.

7) LOADING AND TRANSPORTATION:

Loading and transportation of the material in the tenderer vehicle has also to be done by

the tenderer at their own cost and arrangements.

Successful customer will be allowed to lift the material only 4 days in a week.

8) Bokaro Steel Plant reserves the right to accept or reject any of the tenders or all the

tenders or award contract to any other customer fully or partially without assigning any

reason.

9) The management reserves the rights to divide the quantity offered for sale and allot the

material to more than one tenderer.

Page 65: Rakesh Roushan Mba Doc

65

10) VALIDITY OF LIFTING:

The successful tenders have to complete the lifting of the allocated quantity of material

within 300 (Three hundred) days from the date of issue of sale order.

11) The offer of the customer would remain valid for a period of 90 (Ninety) days from the

date of opening.

12) Loading will be done under the supervision of MRD, the operating agency of the

contract.

13) Evaluation criteria are the highest price for whole quantity (12000 Cu.) subject to the

price being acceptable to the management of Bokaro Steel Plant.

14) The standard Arbitration Clause of BSL as per the Arbitration and Conciliation act

1996 would be applicable.

ROLE OF “SERVICE PROVIDER”

1. “Service Provider’ is the agency (operator) primarily providing the service of the

Forward auction to the “client”.

2. Finalization of the auction items in consultation with the client..

3. Defining of bidding rules for each auction in consultation with the client.

Enhancing bidder awareness of and comfort with the auction mechanism and bidding

rules.

4. Enlarging the customer base by introducing new bidders.

5. Input of the Auction items and defining the bidding rule in the auction

engine.Providing access to the approved bidders to participate in the Auction.

6. Summarizing the Auction proceedings and communicate the outcome to the Client.

7. The responsibility of fulfillment of the contract rests between the bidders and the client

and the responsibility of the “Service Provider” shall be restricted to the extent of the

services provided by them.

Page 66: Rakesh Roushan Mba Doc

66

ROLE OF BIDDER

The role of the bidder is outlined below:

The bidder would participate in the auction with the aim of bidding to secure the auctioned

item in the auction. The bidder would be provided access to the Auction through a “User

ID” protected by a “Password”. The bidder needs to ensure that the “User ID” and

“Password” is not revealed to unauthorized persons. Bidders are also requested to change

the password allocated to them by the “Service Provider” to keep their confidentiality.

However it would be bidder’s sole responsibility to ensure the security and privacy of the

same and he/they would not hold the “Client” / “Service Provider” responsible in any

manner whatsoever for any misuse of these user IDs and/or Password. Access to the auction

mechanism shall be provided to all the approved bidders subsequent to obtaining their

written consent to the General Rules & Regulations and the Letter of Interest. Payment of

Earnest Money Deposit (EMD) as decided by the client minimum 3 days before the of the

Forward auction will be one of the necessary conditions for participating in the auction.

Bidders hereby confirm that they shall commit to lift the items/Lots (being bid for) at the

price entered by them in the auction engine AND at the terms and conditions specified

herein by the Client. All Prices entered shall be legally binding on the bidders. Bidders are

strongly advised to exercise due diligence while placing bids. Failure to honor the bids

placed during online bidding shall render the bidders liable for penal action as mentioned

at point no 12 of the notice for Forward Auction i.e. Forfeiture of the EMD and debarring

them for future participation for 6 months. In the event of winning an allotment in the

auction mechanism, the bidder shall commit to fulfill outlined obligations under the

contract.

The bidders shall bid on the terms specified by the client & place their bid in the auction

engine in the manner specified by “Service Provider”. The bidders shall not stipulate any

conditions on their own unless the terms of the client (the client’s terms & conditions)

expressly permit such conditions being stipulated by the bidder. Bids entered with

conditions attached shall be considered Conditional bids & “service provider” retains the

right of rejecting these bids even without intimating the client.

Page 67: Rakesh Roushan Mba Doc

67

CHAPTER-6

MODULE WISE DESCRIPTION

INTRODUCTION TO PROPOSED SYSTEM

(1)SALES ORDER PROCESSING AND DISPACTCH

ADVICEPREPARATION SYSTEM deals with the orders that are placed by the

customers. The System processes these sales order keeps track of the dispatches that were

made from the loading unit and helps in the speedy preparation of accurate D.A.’s .This in

turn helps in the generation of the invoices, which are sent to the stockyards to various

customers.

(2)TEST CERTIFICATE SYSTEM

It makes certificate for each and every product manufactured by the plant .The test

certificate states the physical and chemical properties of the product and also ascertains the

quality of the products and assigns it the correct quality code.

(3)MATERIAL MANAGEMENT SYSTEM

it maintains an inventory of the different materials which are used in the day to day working

of the plant. For example the system keeps a track of the who ordered a particular material

to be bought ,whether the material has been used or not ,if yes who issued it and it issued

.thus a complete account of all the material kept.

(4)ACCOUNTING SYSTEM

It takes care of various accounts such as purchase accounts, plants and equipment account,

raw material account, works account etc. are maintained by the EDP Center. Apart from

this book keeping work the centre also analyzes these accounts to check for various over

expenditure.

Page 68: Rakesh Roushan Mba Doc

68

ONLINE SALESORDER PROCESSING AND DESPATCH ADVICE

PREPARATION

Bokaro Steel Plant is dispatching its product everyday to the its various destinations

.bokaro’s product range hot rolled plates, sheets and coils, cold rolled sheets and coils,

galvanized coils, plates and sheets and black plates of the various sizes and

specificatios.Secondary product like Pig iron ,ammonium sulphate,granulated slag and

various tar products are also send to different parties. These products are marketed through

a network of stockyards and distribution centers scattered all over the country. Apart from

these some materials are also sold directly to the parties.

THE GENERAL PROCEDURE TO SUPPLY A PRODUCT TO THE CUSTOMERNIS

AS FOLLOWS:-

1. first the order is placed ,for the primary products the order is placed at various branches

of the SAIL all over the country. These orders are compiled and the orders concerning the

BSL are sent to Central Marketing Organization (CMO) at bokaro.For fertilizers and

chemicals, which are obtained as by-product the order is placed at CMO,Kolkata. For

secondary products like scraps etc the orders is placed at the commercial department of

Bokaro Steel Plant. This order is kept as sales order. The present system deals only with

the sale order of the secondary products.

2. Next, whenever the product is dispatched from loading unit ,a dispatch advice is or the

DA (a document stating material’s ,parties and the wages details) is made at loading unit.

The product is dispatched by rail and sometimes road.

3. From the loading unit the railway wagons carrying the product go to steel workstation

where the wagons are handed over to the railways to be sent to the specified destinations

and railway receipt RR is obtain in return.

4. Now depending upon the product sent (whose complete information is present in the

dispatch advice and RR) the invoice is prepared .It is checked error corrected and printed.

Page 69: Rakesh Roushan Mba Doc

69

5. Before the product was dispatched from the loading unit its test certificate was also

prepared. Thus now to complete the procedure, the invoice, the test –certificate and a copy

of the RR ,all the three pinned together are sent to the concerned party.

In this procedure the speedy disposal of the materials from the stockyard

depends upon the accurate and timely receipt of invoices at the branch offices. It was

observed that the manual system of the dispatch advice preparation was one of the major

bottle necks for timely preparation of the invoices. Production of the saleable steel was on

the increase and in still increasing .With the increase it would have got impossible to cope

up with the DA preparation for all dispatches and thus a computerized on-line system was

essential. Thus to overcome all problems and increase the efficiency the On-line Sale Order

Processing DA Preparation was planned.

SCOPE OF THE SYSTEM

The scope of the system includes;-

i) Sales Order Processing

ii) Dispatch advice preparation

iii)Finished product inventory

SALES ORDER PROCESSING

The purpose of the sale order processing is tocapture relevant details of all the orders before

making any dispatch plan and actually executing the orders.This ensures dispatches against

valid orders which ultimately helpin the quicker and accurate preparation of DA and

monitoring of despatches vis-à-vis sale orders.Foreach purpose sale orders are

electronically received for the CMO thereby avoiding duplication in the data preparation

and at the same time ensuring accuracy.

DESPATCH ADVICE PREPARATION

It was planned to prepare computerized DA at the loading unit and update RR details in

the DA through remote terminals installed at the steel workstation.This speeds up the

Page 70: Rakesh Roushan Mba Doc

70

preparation of the dispatch aadvices .Initially the dispatch advices were prepared manually

at all loading Unit.As a result a number of copies were to be prepared to be sent to the

various concerned departments in which there was scope of making many errors and also

the procedure took a lot of time.As a result of computerized on-line system the required

data was needed to be fed to the system only once .The concerned department would then

take out there own reports.

THE AGENCIES AND THERE FUNCTION

AGENCIES INVOLVED

SRM’s office ,Bokaro steel city

CMO(KOLKATA)

Commercial Department

Sales Co-ordination Department

Sales account department

Loading unit at CRm shopping

Loading unit at HRCF shipping

Loading unit at hdgl shipping

Traffic Department

C & IT Center

Telecom Department

THE INFORMATION ON THE COMPUTERS

All the information is stored in the following database using tables. The information can

be categorized in the following two parts:-

1. Sale Order information

2 Item Information

Page 71: Rakesh Roushan Mba Doc

71

SALE ORDER INFORMATION:-

Information regarding Sale Order is stored in the table SOTBL.Some of the main columns

of the table is:-

PRODUCT CODE DA NUMBER

Da date Transport mode

Owning Railway Wagon type

Tare Weight Gross weight

Paying authority code Destination code

State code Consignee code

Type of sale Branch code

Loading unit no. Status of DA

ITEM INFORMATION: Item information corresponding to all the DA is

stored in the table item file.Some of the main column of the table are:

PRODUCT CODE DA NUMBER

Item no. Sales order no.

Sub product code Specification code

Weight Extra code

TYPE OF OUTPUT OR REPORT GENERATION

1. Report on the movement plan for sales order; This report should clearly indicated details

of the party, product for the sales and its price ,instructions for customers,dispatch delivery

instructions.That is the report for each sale order tell party’s code number,account number

,name and address.This report should also show the product code and other details of the

product. The instructions for customers contains term and conditions of the company

whichthe customers are required to follow.

Page 72: Rakesh Roushan Mba Doc

72

FORMAT ON THE REPORT

The report has the following rows .a brief description of each row are as follows;-

1. Name

2. Party Details: - This row contains all important information about any parties.

3. Product and Price Details;-This row contains product code ,lot code,Rate of the

product/unit tax collection at source.

4. Instruction for the customer;-This contains instructions which is to be followed by the

customer by any cost.

5. dispatch/delivery instruction;-contains instruction for the delivery of the product.

6. Remarks;-If any remarks then to be written here.

7. Distributions: Necessary detail products are to be distributed.

REPORT SHOWING DELIVERY ORDER DETAILS:-

This Report should list all delivery details. It should clearly show the specifications of the

product that were delivered. This report also contain some important instruction for the

product delivery.

FORMAT OF THE REPORT

A report has following rows. A brief description of the rows contains:-

1. D.O. no. and date –This Rows contains the delivery order number of the product and

date on which product is to be delivered.

2. Customer Code:-This row contains code number of the customer ,consignee name and

address, Tin number and other customer Details.

Page 73: Rakesh Roushan Mba Doc

73

3. Procode:-This shows the code of the product to be delivered, it also contains the change

in the quantity to be delivered, price of the quantity and other details.

4. Account instructions

5. Payment Details

6. Dispatch /Delivery instructions

Page 74: Rakesh Roushan Mba Doc

74

CHAPTER-7: DATA ANALYSIS &INTERPRETATION

SALES OF SECONDARY STEEL (Value in Lakhs)

Interpretation: Better marketing strategy pushed the sales of secondary steel of

B.S.L. According to the above chart sales in 1stqtr of year 2009-10 was 11464 lakhs in 2nd

qtr of the year it was 13179 lakhs. Similarly in 4th qtr of the year 2009-10 it was 15194

lakhs. And in the year 2010-11 it was first increases in the 1st qtr i.e.13022 lakhs and

then decline in the 4th qtr of the same year to 9159 lakhs.

0

10000

20000

30000

40000

50000

60000

70000

3rd Quarter (Oct.'13-Dec.'13

4th Quarter (Jan.'14-Mar.'14)

Total

Chart Title

Value (Rs. Lakh) Cash Collected (Rs. Lakh) Column1

Quarter value (Rs.

Lakh)

cash collected (Rs. Lakh)

1st Quarter (April'13-june'13) 13875 10557

2nd Quarter (July'13-sep.13) 13004 10153

3rd Quarter (Oct.'13-dec.13) 14503 8916

4th Quarter (Jan.'14-mar.'14) 19795 14563

Total 61177 44189

Page 75: Rakesh Roushan Mba Doc

75

SALES OF IRON & SCRAP (Value in Lacks)

PERIOD 2007-08 2008-09

1stQtr 958 1326

2ndQtr 1115 1039

3rdQtr 1014 1103

4thQtr 1472 915

0

200

400

600

800

1000

1200

1400

1600

1st Qtr 2nd Qtr1115 1039

3rd Qtr 4th Qtr

Series1

Series2

Page 76: Rakesh Roushan Mba Doc

76

SALES BFG SLAG (Value in Lacks)

SALES PIG IRON(Value in Lacks)

PERIOD 2008-09 2009-10

1st Qtr 797 840

2nd Qtr 933 914

3rd Qtr 953 882

4th Qtr 940 998

0

200

400

600

800

1000

1200

1st Qtr 2nd Qtr 3rd Qtr 4th Qtr

Page 77: Rakesh Roushan Mba Doc

77

PERIOD 2009-10 2010-11

1st Qtr 1436 0

2nd Qtr 854 458

3rd Qtr 0 175

4th Qtr 0 603

(source:marketing department)

0

200

400

600

800

1000

1200

1400

1600

1st Qtr 2nd Qtr 3rd Qtr 4th Qtr

Page 78: Rakesh Roushan Mba Doc

78

SALES BY PRODUCTS(Value in Lacks)

PERIOD 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09

1STQtr 904 1218 1041 1263 1759 2906

2NDQtr 1320 1731 1417 1458 2047 2797

3RDQtr 1145 1038 1312 1295 2104 2041

4THQtr 2024 1797 2045 2115 1918 1701

TOTAL 5393 5784 5815 6131 7828 9445

(source:marketing department)

INTERPRETATION

This table and graph shows that the quarterly sale of By-product is different in every year

& it shows lots of ups and down and maximum sale in last quarter it is because its

production is depend on prime product.

Page 79: Rakesh Roushan Mba Doc

79

SALES MISC OTHERS (Value in Lacks)

PERIOD 2009-10 2010-11

1st Qtr 961 1457

2nd Qtr 848 1515

3rd Qtr 987 1065

4th Qtr 1182 462

(source:marketing department)

0

200

400

600

800

1000

1200

1400

1600

1st Qtr 2nd Qtr 3rd Qtr 4th Qtr

Page 80: Rakesh Roushan Mba Doc

80

E-AUCTION(Value in Lacks)

PERIOD 2008-09 2009-10

1stQtr 8144 13410

2ndQtr 12100 10800

3rdQtr 9146 11223

4thQtr 12619 6553

0

2000

4000

6000

8000

10000

12000

14000

16000

1st Qtr 2nd Qtr1210010800

3rd Qtr 4th Qtr12619

Page 81: Rakesh Roushan Mba Doc

81

METHODOLOGY ADOPTED

The methodology adopted by me during the project on "Online sales order monitoring

module of Secondary Product on B.S.L" can be divided into two parts:

(A) To know about the organization

(B) To know about the procedure and working of Marketing Department and Secondary

Section.

(A) About the organization : Information / data has been collected from:-

(i) Government Publications.

(ii) Books of organization.

(iii) Journal.

(iv) Company's Website.

(B) Procedure and working of Marketing Department and Secondary Section information

has been collected by:

(a) Observation Method

(b) Personal Interview with

Senior managers

Jr.Managers

(c)Document provided by them.

Page 82: Rakesh Roushan Mba Doc

82

SWOT ANALYSIS

Strengths

SAIL is the largest steel company in India with a 26% share in total crude steel production.

Captive iron ore mines, skilled manpower base, and existing infrastructure for brown-field

expansion provide it the strength to retain its leadership position in the Indian steel industry.

Its Captive power plants provide it with more than 60% of its total power requirement, a

proportion that is likely to increase after expansion in capacity of power plants in its Joint

Venture Companies. SAIL has the largest distribution network in India comprising 37

branches, 64 warehouses and 24 customer contact offices. It has a presence in all districts

in India through a dealers' network. Its wide range of product-mix enables it to meet the

entire range of a customers' requirement. The Company has a strong Research and

Development Centre enabling it to develop superior products matching customized needs.

As a top profit earner in India SAIL has a healthy balance sheet and is virtually debt free

as its short term deposits are much higher than its total loans.

1. Bokaro Steel Plant has huge pool of skilled and experienced personnel.

2. Principle of hierarchy is given due respect in BSL enabling management to ensure

proper planning and its implementation.

3. Flawless corporate image of SAIL enhances the confidence of managers and

customers alike.

4. Record of harmonious customer relation boots the revenue gap towards north.

5. Huge infrastructure, which provides a strong base for better production and

marketing since it has country network of stockyards, dockyards and sales branch

offices.

6. The By Product of BSL is coal based and of best quality against the petroleum

based By Products of its competitors giving the company edge.

Page 83: Rakesh Roushan Mba Doc

83

7. A strong R&D cell of the company keeps on working over enriching the quality of

the products and to reduce the cost of whole process.

8. It has countrywide network of stockyards and dockyards/ branches/ customer

can take material from any location.

9. Customer perception of SAIL is fair and of reliable supplier > SAIL product

has International standard.

10. SAIL has a customer friendly approach and improved customer orientation.

11. SAIL is in the market from long time having long term relation from the

customers.

12. SAIL, BSL never compromises regarding ‘QUALITY’ so it has superior

quality.

Weakness

The current weaknesses of the Company stem from dependence on purchased coal from

domestic and overseas suppliers. Some technologically obsolete processes such as ingot

casting and the twin hearth furnaces continue to operate and will be eliminated only after

implementation of the modernization cum expansion plan. As the integrated steel plants of

SAIL are located primarily in the eastern states, it increases the transportation cost to the

fast growing markets of the west and south. Due to historical legacy the manpower cost in

the Company is higher than its competitors. Also, being a public sector company adherence

to a number of rules and procedures slows down the business.

1. Lack of team work inhibits proper implementation of company’s policy. Word “I”

is very much rampant in the workforce of BSL, phrase like “ I am not responsible

for the undersigned responsibility”

2. Complex pre and post sale activities repel the probable customers.

3. Due to its large organizational structure involving numerous policies and officials,

prompt decision making a real problem.

Page 84: Rakesh Roushan Mba Doc

84

4. No one wants to take initiative as he/she does not want to be reason for blame if the

trick doesn’t click.

5. The hard working marketing officials are not given due recognition and appropriate

reward that hurts their motivation and interest.

6. Due to its large organizational structure, which involves numerous policies and

officials, it becomes difficult to take decision quickly and as result final decision

making becomes very slow.

7. Secondary product marketing depends on the primary product demand i.e. the

demand for primary product is less the production will have to be slowed down

thus even if the demand for secondary product is mounting up still the

production won’t be increased, so the secondary product is directly linked to

primary product demand.

8. Quality of the product which is slightly inferior as compared to competitors

who are having latest technology.

9. Sometimes products are not supplied as per requirement of customer.

OPPORTUNITY

Steel consumption in India is growing at a rate of more than 10%, a trend that is likely to

persist as the nation enters into a steel intensive phase of development. The 11th Five Year

Plan has given a major thrust on the infrastructure sector with the total spending planned

at around US $ 500 billion by 2012. Mega projects in the power, energy, ports, railways

and surface transportation sectors, plans for rural infrastructure like Bharat Nirman,

allocation for which was raised to Rs. 31,280 crore and building over 2 lakh kilometers of

National Highways by 2010, present an unprecedented opportunity for SAIL which is

implementing expansion cum modernization plan to cater to the emerging demand. The

size range and quality makes SAIL's long products a preferred choice for project customers.

In case of flat products, SAIL remains a major supplier of HR Coils to the tube making

sector and is slowly increasing its presence in cold reducing segment. Plates from SAIL

Page 85: Rakesh Roushan Mba Doc

85

are rated amongst the best and are in good demand from project customers. The water

supply and oil & gas sectors are the other segments where there is a large growth potential.

The modernized ERW Pipe Mill at Rourkela Steel Plant is able to cater to the requirement

of these sectors. Bokaro Steel Plant and Bhilai Steel Plant are also producing small

quantities of API grade HR Coil and Plates for servicing these sectors. The per capita

consumption in India at around 46 kg remains very low compared to the world average of

around 200 kg. One of the reasons for low steel consumption is low availability of steel in

the rural area. SAIL in recent years has developed a dealers' network which covers all the

districts in India. This will facilitate availability of quality steel in the interiors and promote

market development and growth. At a macro level, steel consuming segments such as

construction, auto, capital goods etc. are growing rapidly registering a double digit growth

in recent years and would continue to be the growth drivers given the structure of the

economy. The auto sector in India has experienced rapid growth for a number of years.

Improved road, growing middle class and globally competitive auto ancillary industry have

been the facilitators of good growth for the sector. Technological breakthrough and global

competitiveness in two wheeler and small car segments are likely to make India a global

hub for these products boosting demand for steel in the country.

The world market is showing the sign of revival from the spiral of recession in

which it remained engulfed for one year.

State government has plans for revocation of small scale industries in & around

Bokaro, which will fuel the demand of secondary & by product.

Cock oven batteries 1 & 2 are rebuilt which will ultimately increase the

efficiency of Coke Oven By product plant.

Since SAIL has a wide network of stockyards/branch offices, it can supply its

products directly to customers without any difficulty.

SAIL has a very strong base it can diversify itself into the production of

different goods as per market requirements.

There is growing demand for secondary product in both domestic.

Page 86: Rakesh Roushan Mba Doc

86

THREATS

Customs duty on steel imports has been made nil in India and products such as TMT are

also exempt from CVD. Sluggish market conditions in developing economies may make

India destination for large scale imports adversely affecting domestic players. Government

of India has imposed export levy on steel products. India is a net exporter of galvanized

products as its total capacity is in excess of domestic demand. Adverse impact on exports

of galvanized products will have a cascading impact on domestic market for cold rolled

and hot rolled coils and sheets. China's production of crude steel at 489 million tonne in

2007 was around 36% of the global production. As Chinese economy matures and its steel

consumption stabilizes, a part of the capacity will be serving only the export markets. The

proximity and growing domestic steel consumption will make India a preferred destination

for Chinese steel, significantly intensifying the competition.

Globalized economies have erased the geographical boundaries and have brought

stiff competition

“Execution & dispatch of order” include lot of paper works & formalities, which

makes it a cumbersome task. This has led to drifting of customers towards

competitor.

By products are not the main products of BSL, neither BSL is the market leader

of these product.BSL fixes the price of the By Products on the basis of price set

by its market leaders i.e. Petroleum refineries & this pricing is known as going

rate pricing.

Acquisition of Corus by Tata Steel will led to integration of their technology &

this is the place where Tata is going to gain a lot. Technology in India is two to

three generation behind. Exposure to latest technology will help Tata to improve

quality & reduce cost. So SAIL should be cautious in this respect.

Page 87: Rakesh Roushan Mba Doc

87

FINDINGS

RELATED TO MARKETING DEPARTMENT

During my eight weeks training in marketing department of BSL. I have observed certain

problems in it these problems are findings of my studies.

All marketing procedure of prime products are decided by SAIL and carried

out by the Central Marketing Organization (CMO).

As the organization is concerned with a large number of productions activities

and the departmental work are done mostly manually from placement of

orders to documentation, which ultimately frustrates the employees.

The organization is more concerned with larger orders of steel products by

ignoring the smaller orders.

The local customers with business of by-products are sometimes made to wait

for days to get their papers Cleared by the department.

Most of the existing yards suffers from improper stocking space and siding

facility often they are not well developed due to this the material stored there

are rusted and other defects are caused and later they are disposed of by

offering some concession or at low rate which result in loss.

Due to improper packing, the materials reach the stockyard often in damaged

condition, which is attracting criticism from the customers and these damaged

materials are sold with loss.

Export considered Secondary to domestic selling as BSL is a govt.

undertaking and its First priority is given to domestic marketing.

Secondary product CRUAC/Def CR Coil/CREC, this is industrial scrap and

they generate maximum revenue from this product.

Sale of By- Products shows lots of up & down in different quarters in the

year & maximum sale in last quarter.

Production of By-products shows lots of fluctuation because its production is

depending on Coke oven plant.

Dispatch of By-product shows continuous growth.

By-Product N.G.BENZENE they produce maximum revenue

Page 88: Rakesh Roushan Mba Doc

88

RELATED TO SECONDARY SECTION

1. Payment is accepted from the customers even when the material is not available in stock,

in anticipation that the material will be made available shortly in the stockyard.

2. Unavailability of material in the stockyard leads to holding up of the huge investment

of the customers i.e. material cannot be purchased from the alternative source.

3. Refund of excess payment takes long time sometimes more than a year.

4. Price list made available to the re-rollers every month contains even the price of

materials, which is not available.

5. The price prevailing in the market of the finished goods manufactured by the re-rollers

are sometimes less as compared to the material purchased from BSL which results in heavy

losses.

Page 89: Rakesh Roushan Mba Doc

89

SUGGESTIONS

1. The pricing as we well as the distribution policies should be framed by keeping in mind

the requirements of the complete range of manufactures and not only the bulk consumers.

This will encourage the new re-rolling mills to approach BSL for the material.

2.Ensure delivery of the material for which the payment is accepted so that mills are not

closed or shut down for want of material.

3.Alternatively if the material is not available the BSL authorities should not accept the

payment so that the buyer can approach some other source for procuring the material and

should not unnecessarily wait for the material, which is not available.

4.Representative from the member of the rolling mills association can be introduced in the

committee formed for pricing the various secondary products. That representative holds

the complete picture of the products as placed in the market and the prices fixed with his

consent will be on rational grounds and acceptable to all.

5.Price of the material for which 100% payment has been received as advance should not

be changed if the delay in the lifting of the material by the party is due to some fault of

BSL but if is due to deliberate delay in lifting the material by the customer than the

same policy should be applicable.

6. When the customer having rolling mill of a smaller size purchase material, which are

rolled in a bigger rolling mills than this, clearly indicates that the material is being purchase

for trading. This practice can be prevented if BSL obtains a copy of certificates issued to

the owner of every mill by the District industry centre specifying the size of the mill.

7. BSL can appoint 2-3 authorized stockiest also to avoid trading practice. In this way the

benefit of break up pricing can be passed on to the one for whom these have been framed

i.e. the actual re-rollers.

8. Price list made available to the various re-rollers every month by BSL should count all

the items but it should clearly indicate the material which is not available so that the

customers requiring that particular material can approach some other source.

9.The infrastructure facilities at the disposal yard should be maintained properly and needs

improvements so that the pace of the lifting process be increased.

Page 90: Rakesh Roushan Mba Doc

90

10.The management should see that the actual stock is lifted is more than what is arising.

11. To achieve this goal it is quite necessary that lifting of the materials may start from the

early hours and be extended to evening hours.

Induction of computers in marketing department.

12. Proper packing is to be done to safeguard the materials from damage, which is

occurring due to multistage handling and transportation.

13. Creating product awareness through print media, hoarding, industrial magazines etc.

14. Refund of excess payment process should be improved and simplified. It. should make

payment in less time.

15. Customer satisfaction has to be ultimate aim. Customer specifications have to be exact

to match the customer need. More stringent quality policies have to be implemented.

16. E-payment should be implemented for complete automation of the e-auction process.

17. E-invoicing should be adopted for saving money by replacing paper based processes.

18. Concept of Key Account Manager should be adopted for better customer satisfaction

of regular customers.

Page 91: Rakesh Roushan Mba Doc

91

FUTURE SCOPE

The Bokaro steel plant is under the SAIL and taken care and guided by the steel ministry

of the India. The major competitors are Tata Steel, Jindal steel, HPCL etc, even though

company has large scope for the people and benificiaries. The scope of the company is

summarized as follows:-

PSU’s are often considered as white elephant. Determined to change this perception

honchos launched a campaign “there is little bit of SAIL in everybody’s life” in

1996, portraying SAIL as a larger- than – life company with a reliable and strong

identity. This campaign reaped its result and a subsequent survey indicated that

SAIL was the third best known company in the country & also won pioneer award

of Lintas for best campaign for the year.

But SAIL has been using same punch line from last thirteen years & carry the same

image what it had 13 years ago. Every business goes through change in

environment and those who respond to change goes further in the race and those

who don’t lose their position.

“The more you will tell the more you will sell” but Policies and strategies to create

awareness among the customers about the products are not effective.

All marketing procedure of prime products are decided by SAIL and carried out by

the Central Marketing Organization (CMO).

“Breakdown” is a common scene in almost all shops of BSL. When all the private

players are implementing new management practices in their system while BSL

is still struggling to overcome this old problem

It is a paradox that though BSL claims itself to have one of largest store(inventory)

in India but it is facing the problem of “space keeping”. Reasons like obsoleteness

due to technological up gradation, purchase of more goods than requirement e.t.c

has led to augmentation of goods. In many cases maintenance cost have out stripped

the its actual cost.

Periodical transfer of top brass from one department to another is norm of the

company to discourage monopoly but this sometime reduces efficiency, till the time

Page 92: Rakesh Roushan Mba Doc

92

one understand what he/she has to do he/she get another transfer order as everyone

is not ”jack of all trade”. Transfer also encourages practices like cronyism.

Producing all the ingredients, products(i.e.; coke, limestone) that are consumed

during the process of production of steel within the plant sounds good, but it

ultimately increases the cost of production

When we closely watch the production process of top steel players of the world

then we will realize that they outsource everything and they channelize their

expertise in increasing the quality of their core product & product mix.

It is truly said for Indians “we are best planner but worst executer”. Authorities of

BSL are gung ho about the expansion plans but it can be paralyzed by the locals

(whose land are being acquired) in the absence of proper land acquisition policy.

So, state government & top brass have to sit together and waste a lot of chalk in

their boards to sort out this problem.

“Badahai to behtarhai“BSL has always been concerned about the orders from big

players without giving due importance to small one. But it should prepare itself for

any bad circumstances when dark horses can prevent their balance sheet going red.

Red tapism: Lot of paper work & bureaucratic behavior of officer kills lot of

valuable time of company as well as its customers.

“SAIL TMT, SAIL Jyoti GP/GC Sheets” are few products which are directly

consumed without further value addition in it.TMT market is already overcrowded

with many players.

Page 93: Rakesh Roushan Mba Doc

93

CONCLUSION

In the past six weeks during my training. In order to gain practical knowledge a visit was

undertaken to see the Secondary Products and by products of BSL.The study was

undertaken to see the mode of sale of Secondary and By Products of BSL. During the

training process I learned how e-auction, fixed price sale and tenders are used for marketing

purpose by Bokaro Steel Plant. The sales of Primary Products are assign to CMO (Central

Marketing Organization) of SAIL.

To market a product good knowledge of products is pretty necessary and for the same I

had visited different workshops such as

SSD(SCRAP AND SALVAGE DEPARTMENT)

A place where normally scrap and salvage is being kept which do not suits the

specification. Scrap generally is steel which is not above conditions. Generally

scrap and salvage is recycled to use in convertor and rest is being sold.

BPP( BY PRODUCTS PLANT)

How these by products gets produced during production process of steel and when

coal is converted into coke.

SMS(STEEL MELTING SHOP)

SALES AND CO-ORDINATION DEPARTMENT

Main focus of study was to know how they use technique and 90% marketing and selling

is done through e-auction and rest will be sold through fixed price selling and tenders.

As Bokaro Steel Plant recognizes that leadership is essential for survival in competition.

Customer’s satisfaction like quality is a journey not a destination .as SAIL has a small

contribution in every bodies life, there is a bit of SAIL in every one’s life more or less

.That’s why improved customer satisfaction is key to ensure companies prosperity and

profitability. And it is possible only when there is an ability to produce quality products

and continuous improvement in profit and growth.

Page 94: Rakesh Roushan Mba Doc

94

The basic objective behind the study was to find out the contribution of secondary products

to total sales. By selling the secondary products and by- products in the local market

company is earning more revenue to the Company. And along with this also creating

employment opportunity in small scale industries and developing the economy too. It is

essential that everyone in the company have a clear understanding of what customer

satisfaction means if the plant aim to achieve leadership in customer satisfaction

Customer's satisfaction would happen when the management fulfills

The following dimensions.

1. Delivery in time.

2. Product mix according to customer requirement

3. Flexible pricing policies

4. Complaint settlement

5. Culture of customer service.

Page 95: Rakesh Roushan Mba Doc

95

BIBIOLOGRAPHY

1. MARKETING PERFORMANCE REPORT (Apr’12-March13’)

2. WEBSITES:

www.sail.co.in

(Date of site visited: 04-07-10, article name: history of Bokaro steel plant)

www.metaljunction.com

(Date of site visited: 04-07-10, article name: about methods used to sell

products)

www.steelrx.com

www.bokaro.nic.in

http://money.rediff.com/money/jsp/p_l.jsp?companyCode=15510002

http://www.jstor.org/pss/3516789

www.steel.gov.in

3. Magazine published by SAIL

4. Books of organization (page no: 19, 31, 56, 59-62, Date of issue: May 2013,)

5. Annual Directors Report 2013-2014