May 14, 2014

RAMSHORN POND DAM

REHABILITATIONPUBLIC INFORMATION SESSION

PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer

Additional EvaluationsProposed Design ApproachAdditional Design Considerations

OUTLINE

Upstream Membrane Option

ADDITIONAL EVALUATIONS

Upstream Membrane Option

ADDITIONAL EVALUATIONS

Toe Drain Impacts Reviewed improvements provided by downstream toe drain Existing Seepage Exit Gradient Factor of Safety = 1.2 With Toe Drain Exit Gradient Factor of Safety = 2.0 Dam safety practice designs for a Factor of Safety = 5.0

ADDITIONAL EVALUATIONS

Opinions of Cost

Significant cost impacts associated with contingencies and early stage of design

ADDITIONAL EVALUATIONS

Recommended Approach Upstream Cutoff Wall

Durability Permittability Schedule Drawdowns

ADDITIONAL EVALUATIONS

Proposed Site Plan

DESIGN APPROACH

Proposed Spillway

DESIGN APPROACH

Proposed Low Level Outlet

DESIGN APPROACH

Proposed Upstream Wall

DESIGN APPROACH

Proposed Parking

DESIGN APPROACH

Proposed Public Access

DESIGN APPROACH

Proposed Drainage

DESIGN APPROACH

Control of Water Drawdowns Bypass / Flow Maintenance Cofferdams

Construction Phasing

Detours / Road Closure

Public Access Information / Signage

ADDITIONAL DESIGN CONSIDERATIONS

QUESTIONS