Reactive Power Management

- Case study

-- Nandan Pathak (AE)

Page 2: Reactive Power Management - Case study -- Nandan Pathak (AE)

ICT -1 ICT -2

G-3 G-4 G-5

200 MW160 MVAR

160 MW135 MVAR

200 MW

160 MVAR 160 MW135 MVAR

160 MW140 MVAR

LOAD LOAD

220 kV Girwali Bus

220 kV Parli Bus

Page 3: Reactive Power Management - Case study -- Nandan Pathak (AE)

~GENERATION

870 MW

730 MVAR

LOAD:

A ) GENERATORS:a) High MVAR drawlb) High excitation current

B) ICT:a) Overloading due to MVARb) Low voltage on 220 kV bus ( 200 kV)

Page 4: Reactive Power Management - Case study -- Nandan Pathak (AE)

C) LOAD:11 kV side:

a) Overload trippingb) Very low voltagesc) Conductor snappingd) Local load shedding

440 V side:a) Failure of transformersb) Conductor snapping

Page 5: Reactive Power Management - Case study -- Nandan Pathak (AE)

A)High seasonal load especially agriculture during October to March

B) Failure of reactive compensation

Page 6: Reactive Power Management - Case study -- Nandan Pathak (AE)

A)Identification of areasa) Beed districtb) Solapur districtc) Nanded districtd) Pabhani districte) Latur district

Page 7: Reactive Power Management - Case study -- Nandan Pathak (AE)

A)Identification of radial feeders

220 kV Girwali Bus

220 kV Nanded160 MW 100 MVAR

220 kV Parbhani100 MW 80 MVAR 132 kV

Parli Bus

132kV Beed80 MW 60 MVAR

~ ~

132 kV Latur -190 MW 75 MVAR

132 kV Latur -260 MW 45 MVAR

132 kV Girwali Bus

On similar lines loaded 11 & 33 feeders were identified.

Page 8: Reactive Power Management - Case study -- Nandan Pathak (AE)

I) Reactive power compensation available :i. Substation ----- 164 MVARii. Switched capacitors on 11kV – 240 MVAR (0.6 X405)

II) Focus Area – 11 kV , 0.6 MVAR capacitorsa. Repairs in a central laboratoryb. On site replacement, checking, modification, training

Page 9: Reactive Power Management - Case study -- Nandan Pathak (AE)

Modifications adopted for optimum compensation

1. Cell rating 0.66 Mvar at 12 kV

2. De-rating at Low Voltage2. De-rating at Low Voltage 3. 3. ModificationModification

A. Fixed capacitorsA. Fixed capacitors B. Addition to basic schemeB. Addition to basic scheme

Page 10: Reactive Power Management - Case study -- Nandan Pathak (AE)
Page 11: Reactive Power Management - Case study -- Nandan Pathak (AE)
Page 12: Reactive Power Management - Case study -- Nandan Pathak (AE)

4. On site demonstrations 5. Team visit – Nasik , Pune (R

), Kolhapur, Sangli,Parbhani

Page 13: Reactive Power Management - Case study -- Nandan Pathak (AE)

1. Reduction in overload tripping of 11 kV & 33 kV feeders.

2. Reduction in blowing of HG fuses at 33/11 kV transformers.

3. Reduction in conductor snapping. 4. Improvement in voltage profiles

LT LT 105 Volts to 190 volts105 Volts to 190 volts 11kV11kV 7.6 kV to 9.8 kV7.6 kV to 9.8 kV

Page 14: Reactive Power Management - Case study -- Nandan Pathak (AE)

ICT -1 ICT -2

G-3 G-4 G-5

250 MW (200)100 MVAR(160)

200 MW(160)60 MVAR(135)250

MW(200)100MVAR(160)

200 MW60 MVAR

195 MW(150)80 MVAR(140)

LOAD LOAD

220 kV Girwali Bus

220 kV Parli Bus

Page 15: Reactive Power Management - Case study -- Nandan Pathak (AE)

~GENERATION

1095 MW (870)

400 MVAR (730)

LOAD:

Voltage changes: 220 kV 215 kV (200 kV) 132 kV 125 kV (106 kV) 33 kV 31 kV (27 kV)

Page 16: Reactive Power Management - Case study -- Nandan Pathak (AE)

Radial load changes

132 kV Parli Bus

132kV Beed95 MW 30 MVAR(80 MW 60 MVAR)

~ ~

132 kV Latur –1105 MW 40 MVAR(90 MW 75 MVAR)

132 kV Latur –270 MW 30 MVAR(60 MW 45 MVAR)

132 kV Girwali Bus

Page 17: Reactive Power Management - Case study -- Nandan Pathak (AE)

MONTH KWH 1998 KWH 1999 KWH 2000 KWH 2001January 791500 1101100 1014800 401700

February 545000 938100 699100 239400March 667900 819800 663300* 262200April 539400 790900 87400* 183400May 512000 473200 -* 275400June 164400* 459800 167700* 43800**July 313900 1170300 442100  

August 310400 948000 490900  September 330600 630400 342700  

October 500300 706100 350100  November 530400 854700 626000  December 307300* 1104100 542000  

•---Load shifted to another feeder --- Load of other feeder taken on this feeder

•** --- kWh meter stopped due to leading PF

Note:

0.6 MVAR capacitor bank recommissioned at village Pandharee on Dt.28.11.2000

0.6 MVAR capacitor bank added at same location on Dt.4.12.2000

  New 0.6 MVAR capacitor bank commissioned at Pokharni Phata on Dt.8.12.2000

KWH recorded on 11kV Matkuli feeder from 132 / 11 kV T/F at 132 kV Ashti substation

Page 18: Reactive Power Management - Case study -- Nandan Pathak (AE)

0

200000

400000

600000

800000

1000000

1200000

1998

1999

2000

2001

Page 19: Reactive Power Management - Case study -- Nandan Pathak (AE)

Month Forecasted Energy sent out (kWH)

Actual Energy sent out (kWH)

Savings (kWH)

Remark

Dec 2000 689997 542000 147997 21.45

Jan 2001 624172 401700 222472 35.60

Feb 2001 520905 239400 281505 54.00

Mar 2001 562029 265200 296829 52.00

Apr 2001 511766 183400 328366 64.10

May 2001 451451 275400 176051 39.00

Total 3360320 1907100 1453220 43.24

Energy savings on 11 kV Matkuli feeder

Page 20: Reactive Power Management - Case study -- Nandan Pathak (AE)

1.System requires high order reactive compensation.

2.Use of fixed value non switched/seasonal manual switched capacitors is economical.

3. Complementary switching for optimum compensation.

4. Dedicated setup for overall line loss reduction.