Page 1: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM

RECAPP Facility Evaluation Report

Mayerthorpe Health Care CentreB1123A

Mayerthorpe

Aspen Regional Health Authority

Page 2: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 2 of 60

B1123ABuilding Id:

Mayerthorpe Health Care CeBuilding Name:

MayerthorpeLocation:P. O. Box 30 Address:

0.00Gross Area (sq. m): $38,268,750Replacement Cost:0Construction Year:

Evaluation Date: July 7 2009

Francis Ng Architect Ltd.Evaluation Company:

Francis NgEvaluator Name:

The Health Centre is under the jurisdiction of Alberta Health Services Board Aspen Regional Health Authority. (1985) Original Building Main Floor (Administration, Emergency, Radiology, Laboratory, Operation) - has 1528.0 square metres. (1985) Original Building Main Floor (Acute Care) - has 729.73 square metres. (1985) Original Building Basement (Cafeteria, Services, Maintenance, Delivery) - has 1498.25 square metres. (1985) Penthouse (Mechanical Area) - has 208.8 square metres. (1989) Addition (Long Term Care, Physiotherapy, Dining Area) - has 1802.9 square metres. The original 3,964.78 square metres Health Centre was built in 1985. An addition of 1,802.9 square metres was built in 1989. Total building area is 5,767.68 square metres. ABC 2006 Group B2 - Hospital and Infirmary. The 1985 Original Building is a single storey with Basement and the 1989 Addition is a single storey, non-combustible construction and sprinklered.

General Summary:

Structural Summary:(1985) Original Building - Main Floor has concrete slab and concrete blocks on concrete gradebeams on concrete piles; Basement has concrete foundation walls and concrete floor slab; Main Roof has metal deck on OWSJ on steel beams onsteel columns and concrete blocks; concrete staircases from Basement to Main Floor. (1985) Penthouse - has steel deck on steel beams on steel columns; steel staircase from Main Floor to Penthouse. (1989) Addition - has concrete gradebeams on concrete piles along perimeter and along interior Corridor walls; has concrete floor slab on grade; has metal deck on OWSJ on steel beams on steel columns; has metal stud exterior and interior walls; Roof has metal deck on steel beams on steel columns. Recommendations for future action include: replace concrete slabs at exits. Overall structural system rating is acceptable.

Envelope Summary:(1985) Original Building - has built-up roofing, facing bricks, aluminum windows; Entrances have aluminum framed storefront and doors; greenhouses; cement board parging; metal soffit; Entrances have aluminum framed storefront and doors; and glazed curtain walls; Exits have metal doors and frames. Ambulance Garage and Delivery Area have overhead doors. Sheet metal roof over Basement greenhouse. (1985) Penthouse - has built-up roofing, prefinished insulated metal siding; Exit has metal door and frame. (1989) Addition - has built-up roofing, facing bricks, aluminum windows; Entrances have aluminum framed storefront and doors; Exits have metal doors and frames; has a pyramidal unit skylight. Recommendations for future action include: replace cement board parging; replace gaskets; repair storefront windows; replace built-up roofing; repair greenhouse; provide flute closure pieces for sheet metal roof. Overall envelope system rating is acceptable.

Interior Summary:(1985) Original Building has concrete block walls and metal stud partitions, drywall ceiling and sheet vinyl flooring in bedrooms, medical areas, washrooms and Corridors; wood doors and metal frames; painted concrete flooring in

5.15%5 year Facility Condition Index (FCI):

Facility Details Evaluation Details

Total Maintenance Events Next 5 years: $1,971,500

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Page 3: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 3 of 60

Maintenance area; epoxy flooring in Kitchen and laundry areas. (1989) Addition has metal stud partitions, suspended T-bar with acoustic ceiling tiles and sheet vinyl flooring in Bedrooms and medical area and Corridors; drywall ceiling and sheet vinyl flooring in washrooms; wood doors and metal frames. Recommendations for future action include: repaint metal door frames; replace wood doors; repaint concrete flooring; replace wall coverings; repair floor finishes, replace acoustic ceiling tiles; remove and repair recessed floor grille. Overall interior system rating is acceptable.

Mechanical Summary:Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers. Heating pumps and piping are not leaking. Isolation valves are gate and globe valves. Air Conditioning & Ventilation is provided by built-up roof mounted and indoor air systems with Chilled water cooling and ductless split systems. Humidification is provided by a low pressure steam boiler. Controls are combination of electric & electronic. Sanitary Plumbing piping and fixtures are in acceptable condition. Overall Condition: Acceptable (4)

Electrical Summary:The facility, built in 1985 is an active treatment centre,with a long term care centre attached to it. It has been provided with a 1600 Amp, 600V, 3 phase 4 wire service, obtained from an on-site pad mounted transformer. A main distribution centre is provided in the electrical room. Step down transformers have been provided to step down the voltage to 120/208 Volts, 3 phase, 4 wire. 120/208V central distribution panels and branch circuit panel boards have been provided at strategic locations. An emergency power distribution system, fed from a 450 kW diesel engine-generator set has been provided to provide power via an automatic transfer switch, in the event of utility power failure. Lighting is primarily fluorescent with fixtures utilizing T12 lamps and magnetic ballasts. Fixtures are not of the energy efficient type and an energy efficiency upgrade is recommended by replacing these fixtures with energy efficient fixtures utilizing T8 lamps and electronic ballasts. The fire alarm system was replaced in 2008 with an Edwards addressable system. A Rauland Responder 3 nurse call system has been provided. The electrical systems are well maintained and overall, the electrical systems are in good condition.

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

Rating Guide

5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

Page 4: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 4 of 60

A1010 Standard Foundations* (1985)

A1010 Standard Foundations* (1989)

A1030 Slab on Grade* (1985)

A1030 Slab on Grade* (1989)

A2020 Basement Walls (& Crawl Space)* (1985)

B1010.01 Floor Structural Frame (Building Frame)* (1985)

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1985

1989

1985

1989

1985

1985

Installed

Installed

Installed

Installed

Installed

Installed

100

100

100

100

100

100

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Updated

Updated

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)S1 STRUCTURAL

(1985) Original Building (Main Floor - Acute Care) - has concrete gradebeams on concrete piles. (1985) Original Building (Main Floor - Ambulance) - has concrete gradebeams on concrete piles. (1985) Original Building Basement (Cafeteria, Services, Maintenance, Delivery) - has concrete foundation walls on concrete pile caps on concrete piles..

(1989) Addition - has concrete gradebeams on concrete piles.

(1985) Original Building (Basement - Mechanical Room 0144, Gas Storage 0149, Communication 0148) - has 300 mm concrete slab on grade. (1985) Original Building (Basement) - has 225 mm concrete slab on grade. (1985) Original Building (Main Floor - Acute Care) - has 225 mm concrete slab.

(1989) Addition - has 225 mm concrete slab on grade.

(1985) Original Building Basement (Cafeteria, Services, Maintenance, Delivery) - has concrete foundation walls.

(1985) Original Building (Basement) - has concrete slab on concrete walls and concrete columns. (1985) Original Building (Main Floor - Administration, Emergency, Radiology, Laboratory, Operation) - has metal deck on OWSJ on steel beams on steel columns and concrete blocks. (1985) Original Building (Main Floor - Acute Care) - has metal deck on OWSJ on steel beams on steel columns and concrete blocks.

Page 5: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 5 of 60

B1010.01 Floor Structural Frame (Building Frame)* (1989)

B1010.02 Structural Interior Walls Supporting Floors (or Roof)* (1985)

B1010.02 Structural Interior Walls Supporting Floors (or Roof)* (1989)

B1010.03 Floor Decks, Slabs, and Toppings* (1985)

B1010.05 Mezzanine Construction* (1985)

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1989

1985

1989

1985

1985

Installed

Installed

Installed

Installed

Installed

100

100

100

100

100

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Updated

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

(1989) Addition - has metal deck on OWSJ on steel beams on steel columns.

(1985) Original Building (Basement) - has concrete slab on concrete columns. (1985) Original Building (Main Floor - Administration, Emergency, Radiology, Laboratory, Operation) - has metal deck on steel beams on steel columns. (1985) Original Building (Main Floor - Acute Care) - has metal deck on steel beams on steel columns.

(1989) Addition - has metal deck on steel beams on steel columns.

(1985) Original Building (Main Floor- Administration, Emergency, Radiology, Laboratory, Operation - over Basement) - has 225 mm concrete slab on concrete columns. (1985) Original Building (Main Floor- Acute Care) - has 225 mm concrete slab. (1985) Original Building (Penthouse) - has 64 mm concrete topping on 140 mm concrete slab on metal deck on steel beams on OWSJ on steel columns.

(1985) Original Building (Penthouse) - has steel deck on steel beams on steel columns. (1985) Original Building (Mezzanine in Penthouse) - has steel grate deck on steel beams on steel columns.

Page 6: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 6 of 60

B1010.06 Ramps: Exterior*

B1010.07 Exterior Stairs*

B1010.09 Floor Construction Fireproofing*

3 - Marginal

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

0

1985

1985

Installed

Installed

Installed

40

40

50

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace concrete slab. (4 slabs)

Failure Replacement 2011 $4,000 Low

(1985) Original Building Basement (Vestibule 0101) - concreteslab has settled. (1985) Original Building (Operation - Exit near Labour Delivery Room 1187; 1189) - concrete slab has settled. (1985) Original Building (Operation - Exit near South Stair) - concrete slab has settled. (1985) Original Building (Acute Care - Exit near Solar 124) - concrete slab has settled. (1989) Addition (Long Term Care - Exits near Lounge 10, 209) - concrete slab has settled.

Concern:

Replace and mudjack concrete slabs. (4 slabs)Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

(1985) Original Building Basement (Vestibule 0101) - has concrete slab. (1985) Original Building (Operation - Exit near Labour Delivery Room 1187; 1189) - has concrete slab. (1985) Original Building (Acute Care - Exit near Solar 124) - has concrete slab. (1989) Addition (Long Term Care - Exits near Lounge 10, 209) - has concrete slab.

(1985) Original Building (Main Roof) - has metal stairs c/w metal checker plate and metal pipe railing to (1985) Original Building Acute Care Wing roof. (1985) Original Building (Main Roof) - has metal stairs c/w metal checker plate and metal pipe railing to (1989) Addition roof.

(1985) Original Building (Main Floor over Basement) - has concrete slab. (1985) Original Building (Penthouse over main Floor) - has concrete slab.

(1985) Original Building (Acute Care - Exit near Solar 124) - has settled concrete slab and damaged parging.

Page 7: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 7 of 60

B1020.01 Roof Structural Frame* (1985)

B1020.01 Roof Structural Frame* (1989)

B1020.03 Roof Decks, Slabs, and Sheathing*

B1020.04 Canopies*

B1020.06 Roof Construction Fireproofing*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1985

1989

1985

1985

1985

Installed

Installed

Installed

Installed

Installed

100

100

0

50

50

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Updated

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

(1985) Original Building (Main Floor - Administration, Emergency, Radiology, Laboratory, Operation) - has metal deck on OWSJ on steel beams on steel columns and concrete blocks. (1985) Original Building (Main Floor - Acute Care) - has metal deck on OWSJ on steel beams on steel columns and concrete blocks. (1985) Original Building (Penthouse) - has metal deck on steel beams on OWSJ on steel columns.

(1989) Addition - has metal deck on steel beams on OWSJ on steel columns.

(1985) Original Building (Main Floor) - has 12.7 mm drywall sheathing on metal deck. (1985) Original Building (Penthouse) - has 12.7 mm drywall sheathing on metal deck. (1989) Addition (Main Floor) - has 13 mm drywall sheathing on metal deck.

(1985) Original Building (Basement - North Entrance) - has facing brick fascia, built-up roofing, drywall sheathing, metal deck, steel HSS frame, fabricated soffit of anodized aluminum bonded to 18.5 mm plywood and metal stud frame. (1989) Addition (Dining - Outside Recreation and Dining R05) - has prefinished metal siding fascia, built-up roofing, metal deck, steel channels, steel beam on steel HSS columns.

(1985) Original Building (Laboratory - Electrical Room 1151) - has fire rated spray ceiling. (1985) Original Building (Acute Care - Electrical Room 155) - has fire rated spray ceiling.

Page 8: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 8 of 60

B2010.01.02.01 Brick Masonry: Ext. Wall Skin* (1985)

B2010.01.02.01 Brick Masonry: Ext. Wall Skin* (1989)

B2010.01.06.03 Metal Siding**

B2010.01.09 Expansion Control: Exterior Wall Skin*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1985

1989

1985

1985

Installed

Installed

Installed

Installed

75

75

40

75

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace metal siding. (approx. 250 square metres)

Lifecycle Replacement 2025 $25,000 Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)S2 ENVELOPE

Event:

Type Year Cost Priority

Updated: MAR-10

(1985) Original Building (North side of Basement) - has facing bricks. (1985) Original Building (Main Floor) - has facing bricks.

(1989) Addition (Main Floor) - has facing bricks.

(1985) Original Building (Mechanical Room Penthouse) - has horizontal prefinished metal siding. (1989) Addition (Canopy outside Recreation and Dining R05) - has prefinished metal siding fascia, built-up roofing, metal deck, steel channels, steel beam on steel HSS columns. Replace metal siding. (approx. 250 square metres)

(1985) Original Building - facing bricks have expansion joints. (1989) Addition - facing bricks have expansion joints.

Page 9: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 9 of 60

B2010.01.11 Joint Sealers (caulking): Ext. Wall**

B2010.01.99 Other Exterior Wall Skin* (Parging)

B2010.02.03 Masonry Units: Ext. Wall Const.* (1985)

4 - Acceptable

3 - Marginal

4 - Acceptable

Rating

Rating

Rating

1985

0

1985

Installed

Installed

Installed

20

0

100

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace joint sealers (caulking): Ext. Wall. (approx.100 linear metres)

Replace rigid insulation and cement board. (approx. 420 linear metres)

Lifecycle Replacement

Failure Replacement

2013

2011

$5,000

$84,000

Unassigned

Low

(1985) Original Building (Acute Care Wing - outside Office 107, Exit near Patient Room 125, outside Lounge 136) - has damaged rigid insulation and cement board parging. (1989) Addition (Long Term Care - near Patient's Room 05; 06; 07; 08; 09) - has damaged rigid insulation and cement board parging.

Concern:

Replace rigid insulation and cement board. (approx. 420 linearmetres)

Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

(1985) Original Building - expansion joints have sealers. (1989) Addition - expansion joints have sealers. Replace joint sealers (caulking): Ext. Wall. (approx.100 linear metres)

(1985) Original Building - has rigid insulation and cement board parging. (1989) Addition - has rigid insulation and cement board parging.

(1985) Original Building - has 90 mm facing brick, air space, 50 mm rigid insulation, vapour barrier, 240 mm concrete block, vapour barrier.

(1985) Original Building (Acute Care - near Patient Room 125) - has damaged rigid insulation and cement board.

Page 10: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 10 of 60

B2010.02.03 Masonry Units: Ext. Wall Const.* (Glass Block)

B2010.02.04 Load-Bearing-Metal Studs: Ext. Wall* (1989)

B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation*

B2010.05 Parapets*

B2010.06 Exterior Louvers, Grilles, and Screens*

B2010.09 Exterior Soffits*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1989

1989

1985

1985

1985

1985

Installed

Installed

Installed

Installed

Installed

Installed

100

100

100

50

50

50

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Updated

Updated

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

(1989) Addition (Signage near North Entrance Vestibule R01) - has glass block column.

(1989) Addition - has 90 mm face brick, air space, 50 mm rigid insulation, vapour barrier, 16 mm drywall, 92 mm metal studs at 400 mm o.c., 16 mm drywall.

(1985) Original Building - has air space, 50 mm rigid insulation, vapour barrier. (1989) Addition - has air space, 50 mm rigid insulation, vapour barrier.

(1985) Original Building - has 90 mm facing brick, air space, 50 mm rigid insulation, vapour barrier, 240 mm concrete block, 18.5 mm plywood, built-up roofing, metal flashing. (1985) Original Building - Penthouse has prefinished metal flashing, insulated metal liner, Butyl membrane, 12.7 mm drywall sheathing, 152 mm metal studs c/w metal steel angle supports, batt insulation, vapour barrier, 12.7 mm drywall sheathing, built-up roofing, metal flashing. (1989) Addition - has 90 mm facing brick, air space, 50 mm rigid insulation, vapour barrier, 150 mm metal studs at 400 mm o.c., 16 mm treated plywood, built-up roofing, metal base flashing.

(1985) Original Building (Basement - Mechanical Room 0160) - has metal louvres on North wall.

(1985) Original Building (Basement - North Entrance Canopy) - has fabricated soffit of anodized aluminum. (1985) Original Building (Emergency - Ambulance 1138) - has prefinished metal deck soffit. (1989) Addition (Acute Care - near Lounge 10, 209) - has fabricated soffit of anodized aluminum. (1989) Addition (Acute Care - Outside Recreation and Dining R05) - has prefinsihed metal sheet siding soffit.

Page 11: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 11 of 60

B2020.01.01.02 Aluminum Windows (Glass & Frame)**

3 - MarginalRating

1985Installed

40Design Life

MAR-10Updated

Replace aluminum windows (Glass & Frame). (approx. 45 windows in 1989)

Replace aluminum windows (Glass & Frame). (approx. 55 windows in 1985

Replace gaskets. (approx. 30 windows)

Lifecycle Replacement

Lifecycle Replacement

Failure Replacement

2025

2025

2011

$135,000

$165,000

$15,000

Unassigned

Unassigned

Low

(1985) Original Building (Acute Care) - gaskets have worn out.Concern:

Replace gaskets. (approx. 30 windows)Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

(1985) Original Building - has aluminum window c/w fixed glazed panes, casements and awnings. (1989) Addition - has aluminum window c/w fixed glazed panes. Replace aluminum windows (Glass & Frame). (approx. 55 windows in 1985; 45 windows in 1989)

Page 12: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 12 of 60

B2020.02 Storefronts: Windows**

B2020.03 Glazed Curtain Wall**

3 - Marginal

4 - Acceptable

Rating

Rating

1985

1985

Installed

Installed

40

40

Design Life

Design Life

MAR-10

MAR-10

Updated

Updated

Repair storefront window base panels. (1 storefront)

Replace storefront windows. (approx. 8 windows in 1985)

Replace storefront windows. (approx. 8 windows in 1989

Replace glazed curtain wall. (2 walls)

Repair

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2011

2025

2025

2025

$3,000

$24,000

$24,000

$10,000

Low

Unassigned

Unassigned

Unassigned

(1985) Original Building (Acute Care - Solar 124) - has damaged aluminum storefront windows

Concern:

Repair storefront window base panels. (1 storefront)Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Event:

Type

Type

Type

Type

Year

Year

Year

Year

Cost

Cost

Cost

Cost

Priority

Priority

Priority

Priority

Updated:

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

MAR-10

(1985) Original Building (Acute Care - Solar 124, Lounge 136) - has aluminum storefront windows. (1989) Addition (Exit near Lounge 10) - has aluminum storefront window and door. (1989) Addition (Exit near Lounge 209) - has aluminum storefront window and door. Replace storefront windows. (approx. 8 windows in 1985; 8 windows in 1989)

(1985) Original Building (North Main Entrance) - has aluminum sloped glazing assemblies. (1989) Addition (North Entrance) - has aluminum sloped glazing assemblies. Replace glazed curtain wall. (2 walls)

Page 13: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 13 of 60

B2020.04 Other Exterior Windows* (Wood Framed Windows c/w Insect Screens)

B2030.01.01 Aluminum-Framed Storefronts: Doors**

B2030.01.06 Automatic Entrance Doors**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1989

1985

1985

Installed

Installed

Installed

40

30

30

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace aluminum-framed storefronts: doors. (8 doors)

Replace automatic entrance doors. (4 doors)

Lifecycle Replacement

Lifecycle Replacement

2015

2015

$32,000

$40,000

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

(1989) Addition (Patio Area - Outside Recreation and Dining R05) - has wood framed windows c/w insect screens.

(1985) Original Building (Basement - North Vestibule 0101) - has aluminum storefront window and door. (1985) Original Building (Exit near Labour Delivery Room 1187, 1189) - has aluminum storefront window and door. (1985) Original Building (Exit near ECG 1150) - has aluminum storefront window and door. (1985) Original Building (Acute Care - Exit near Solar 124) - has aluminum storefront window and door. (1989) Addition (Exit near Dining R06) - has aluminum storefront window and door. (1989) Addition (Exit near Lounge 10) - has aluminum storefront window and door. (1989) Addition (Exit near Lounge 209) - has aluminum storefront window and door. Replace aluminum-framed storefronts: doors. (8 doors)

(1985) Original Building (West Main Entrance) - has aluminum automatic sliding doors. (2 doors) (1989) Addition (North Entrance) - has aluminum automatic sliding doors. (2 doors). Replace automatic entrance doors. (4 doors)

Page 14: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 14 of 60

B2030.02 Exterior Utility Doors**

B2030.03 Large Exterior Special Doors (Overhead)*

B3010.01 Deck Vapor Retarder and Insulation*

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1985

1985

1985

Installed

Installed

Installed

40

30

25

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace exterior utility doors. (approx. 4 doors)

Lifecycle Replacement 2025 $8,000 Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

(1985) Original Building (Basement - Mechanical Room 0160) - has metal doors. (1985) Original Building (South Stair Exit) - has metal door. (1985) Original Building (Exterior Storage near South Stair Exit) - has metal door. (1989) Addition (North Stair Exit) - has metal door. Replace exterior utility doors. (approx. 4 doors)

(1985) Original Building (Ambulance Garage 1148) - has electrical power operated metal insulated overhead doors. (2 doors) (1985) Original Building (Basement - Receiving 0156) - has electrical power operated metal insulated overhead door. (1 door)

(1985) Original Building - has rigid insulation and vapour barrier. (1989) Addition - has rigid insulation and vapour barrier.

Page 15: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 15 of 60

B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** (1985)

B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** (1989)

3 - Marginal

4 - Acceptable

Rating

Rating

1985

1989

Installed

Installed

25

25

Design Life

Design Life

MAR-10

MAR-10

Updated

Updated

Replace built-up roofing. (approx. 2000 square metres)

Replace built-up roofing. (approx. 1700 square metres)

Failure Replacement

Lifecycle Replacement

2011

2014

$300,000

$225,000

Low

Unassigned

(1985) Original Building (Main Roof) - has damaged roof caused by installation of roof hanger (1985) Original Building (Main Roof) - has soft spots, blisters, bubbles and ponding.

Concern:

Replace built-up roofing. (approx. 2000 square metres)Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

(1985) Original Building (Main Roof) - has built-up roofing, 12.7 mm protection board, rigid insulation, vapour barrier, 12.7 mm drywall sheathing, metal deck. (1985) Original Building (Penthouse)) - has built-up roofing, 12.7 mm protection board, rigid insulation, vapour barrier, 12.7 mm drywall sheathing, metal deck.

(1989) Addition - has built-up roofing, 25 mm fibreboard, 75 mm rigid insulation, vapour barrier, 13 mm exterior grade drywall, metal deck. Replace built-up roofing. (approx. 1700 square metres)

(1985) Original Building Main Roof - has damaged roof caused by installation of roof hanger.

Page 16: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 16 of 60

B3010.07 Sheet Metal Roofing**

B3010.08.02 Metal Gutters and Downspouts**

B3010.09 Roof Specialties and Accessories*

3 - Marginal

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1985

1985

1985

Installed

Installed

Installed

40

30

0

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Provide flute closure pieces. (approx. 60 pieces)

Replace sheet metal roofing. (approx. 60 square metres)

Replace metal downspouts. (approx. 60 linear metres)

Repair

Lifecycle Replacement

Lifecycle Replacement

2011

2025

2015

$2,000

$6,000

$12,000

Low

Unassigned

Unassigned

(1985) Original Building (Basement- Nourishment 0140 Greenhouse) - sheet metal roofing is missing flute closure pieces.

Concern:

Provide flute closure pieces. (approx. 60 pieces)Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

(1985) Original Building (Basement- Nourishment 0140 Greenhouse) - has sheet metal roofing. Replace sheet metal roofing. (approx. 60 square metres)

(1985) Original Building - flat roof has roof drains entering the building with downspouts connected to storm sewers. (1989) Addition - flat roof has roof drains entering the building with downspouts connected to storm sewers. Replace metal downspouts. (approx. 60 linear metres)

(1985) Original Building - has prefinished metal flashing over parapets. (1985) Original Building (Penthouse) - has prefinished metal flashing over parapets. (1989) Addition - has prefinished metal flashing over parapets.

Page 17: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 17 of 60

B3010.11 Roof Covering Other*

B3020.01 Skylights**

4 - Acceptable

4 - Acceptable

Rating

Rating

1985

1989

Installed

Installed

25

20

Design Life

Design Life

MAR-10

MAR-10

Updated

Updated

Replace skylight. (3 skylights)

Lifecycle Replacement 2013 $12,000 Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

(1985) Original Building (Roof) - has concrete pavers.

(1985) Original Building (West Main Entrance) - has sloped aluminum framed skylight. (1989) Addition (West Main Entrance) - has sloped aluminum framed skylight. (1989) Addition (Roof over Smoke Room 22) - has pyramidal unit skylight. Replace skylight. (3 skylights)

Page 18: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 18 of 60

C1010.01 Interior Fixed Partitions*

C1010.03 Interior Operable Folding Panel Partitions**

C1010.04 Interior Balustrades and Screens, Interior Railings*

C1010.05 Interior Windows*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1985

1989

1985

1985

Installed

Installed

Installed

Installed

0

30

40

80

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace folding partition. (1 partition)

Lifecycle Replacement 2019 $4,000 Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)S3 INTERIOR

Event:

Type Year Cost Priority

Updated: MAR-10

(1985) Original Building (wall between Ambulance 1148 and Office 1147) - has concrete blocks. (1985) Original Building Basement - has concrete blocks. (1985) Original Building - has metal stud partitions. (1989) Addition - has metal stud partitions.

(1989) Addition (Dining Area - Recreation & Dining R05) - has folding partitions. Replace folding partition. (1 partition)

(1985) Original Building (Corridors) - has wood railing. (1989) Addition (Corridors) - has wood railing.

(1985) Original Building (Administration - Pharmacist 1197, Vestibule 1222, Filing Room 1223, Reception 1224) - has metal framed windows c/w wired glass. (1985) Original Building (Emergency - Observation Room 1129; 1132) - has metal framed windows c/w wired glass. (1985) Original Building (Radiology - X-Ray General 1143 Control) - has metal framed window. (1985) Original Building (Acute Care - Treatment 144; Lounge 147, Conference Room 163) - has metal framed windows c/w wired glass. (1989) Addition (Physiotherapy - Corridor R16) - has metal framed window. (1989) Addition (Dining Area - Conference Room R27) - has metal framed window. (1985) Basement (Services - Office 0120) - has metal framed windows. (1985) Basement (Maintenance - Office 0143) - has metal framed window. (1985) Basement (Delivery - Storage 0155) - has metal framed windows.

Page 19: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 19 of 60

C1010.06 Interior Glazed Partitions and Storefronts*

C1010.07 Interior Partition Firestopping*

C1010.08 Other Partitions*

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1985

1985

1985

Installed

Installed

Installed

80

50

0

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

(1985) Original Building (Administration - Office 1209; 1210) - has interior glazed partitions and storefronts.

(1985) Original Building Basement - has concrete block walls.

(1985) Original Building (Main Foyer near Waiting Area 1110) - has wood pony wall.

Page 20: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 20 of 60

C1020.01 Interior Swinging Doors (& Hardware)*

C1020.02 Interior Entrance Doors*

3 - Marginal

4 - Acceptable

Rating

Rating

0

1985

Installed

Installed

40

0

Design Life

Design Life

MAR-10

MAR-10

Updated

Updated

Repair and repaint metal door frames. (approx. 60 doors)

Replace wood doors. (approx. 60 doors)

Repair

Failure Replacement

2011

2011

$3,000

$30,000

Low

Low

Paint on some metal frames have faded.

(1989) Addition (Long Term Care - Patient Rooms) - has damaged wood doors.

Concern:

Concern:

Repair and repaint metal door frames. (approx. 60 doors)

Replace wood doors. (approx. 60 doors)

Recommendation:

Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

(1985) (1989) Building - has wood doors and metal frames.

(1985) Original Building (Administration - Vestibule 1101) - has aluminum storefront doors. (1985) Original Building (Emergency - Vestibule 1113) - has aluminum storefront doors. (1985) Original Building (Administration - Corridor 1102; 1107; 1106; 1108; 1109) - has wood doors and metal frames. (1985) Original Building (Radiology - Corridor 1146) - has wood doors and metal frames. (1985) Original Building (Laboratory - Corridor 1104) - has wood doors and metal frames. (1985) Original Building (Acute Care - Corridor 101; 102; 103; 104; 164) - has wood doors and metal frames. (1989) Addition (Long Term Care - Corridor 11; 212) - has wood doors and metal frames. (1989) Addition (Physiotherapy - Corridor R16) - has wood doors and metal frames. (1989) Addition (Dining Area - Corridor R02) - has wood doors and metal frames.

Page 21: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 21 of 60

C1020.03 Interior Fire Doors*

C1020.07 Other Interior Doors*

C1030.01 Visual Display Boards**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1985

1985

1985

Installed

Installed

Installed

50

0

20

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace visual display boards. (4 boards)

Lifecycle Replacement 2013 $4,000 Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

(1985) Original Building (Ambulance 1148 to Vestibule 1113) - has 1.5 hour fire rated metal doors and frames. (1985) Original Building (Emergency - Reception 1123) - has fired rated metal shutter over counter. (1985) Basement (Services - Janitor 0127) - has 3/4 hour fire rated metal door and frame. (1985) Basement (Services - Elevator Machine Room 0124) - has 1.5 hour fire rated metal door and frame. (1985) Basement (Maintenance - Mechanical Room 0160) - has 1.5 hour fire rated metal door and frame. (1985) Basement (Maintenance - Workshop 009, Office 0140) - has 3/4 hour fire rated metal door and frame. (1985) Basement (Delivery - Vestibule 0151;Receiving 0156; Gas Tank Storage 0159) - has 3/4 hour fire rated metal doors and frames. (1985) Penthouse (Mechanical - Mechanical Room 2000) - has 1.5 hour fire rated metal door and frame.

(1985) Original Building Corridor to (1989) Addition - has barrier free access doors.

(1989) Addition (Physiotherapy - Physiotherapy R13; Office R15) - has 2 white boards. (1989) Addition (Dining Area - Dining R06, Conference R27) - has 2 white boards. Replace visual display boards. (4 boards)

Page 22: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 22 of 60

C1030.02 Fabricated Compartments(Toilets/Showers)**

C1030.05 Wall and Corner Guards*

C1030.08 Interior Identifying Devices*

C1030.10 Lockers**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1985

1985

1985

1985

Installed

Installed

Installed

Installed

30

15

20

30

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace fabricated compartments(Toilets/Showers). (approx. 6 partitions)

Replace lockers. (approx. 139 lockers)

Lifecycle Replacement

Lifecycle Replacement

2015

2015

$6,000

$69,500

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

(1985) Original Building (Operation - Male Washroom 1179; Female Washroom 1183) - has prefinished metal toilet partition. (2 partitions) (1985) Basement (Maintenance - Female Washroom 0135; Male Washroom 0137) - has prefinished metal toilet partition.(4 partitions). Replace fabricated compartments(Toilets/Showers). (approx. 6 partitions)

(1985) Original Building (Basement) - has metal corner guards.

All rooms have interior identifying devices.

(1985) Original Building (Operation - Male Washroom 1179; Female Washroom 1183) - has prefinished single tier metal lockers. (10 lockers) (1985) Basement (Maintenance - Female Locker Room 008; Male Locker Room 0138) - has prefinished single tier metal lockers. (129 lockers). Replace lockers. (approx. 139 lockers)

Page 23: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 23 of 60

C1030.12 Storage Shelving*

C1030.14 Toilet, Bath, and Laundry Accessories*

C2010 Stair Construction*

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1985

1985

1985

Installed

Installed

Installed

30

20

100

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

(1985) Original Building (Radiology - X-Ray General 1138) - has metal shelves. (1985) Original Building (Acute Care - Conference Room 163, Clean Linen 158) - has metal shelves. (1989) Addition (Dining Area - Storage R21) - has wood shelves.

(1985) Original Building (Administration - Public Washroom 1129; Female Washroom 1120; Male Washroom 1121; Washroom 1194) - has toilet accessories. (1985) Original Building (Emergency - Public Washroom 1121; Washroom 1133) - has toilet accessories. (1985) Original Building (Radiology - Washroom 1145) - has toilet accessories. (1985) Original Building (Laboratory - Washroom 1159; Washroom 1160) - has toilet accessories. (1985) Original Building (Operation - Washroom 1170; Washroom 1181, Washroom 1183; Washroom 1188) - has toilet accessories. (1985) Original Building (Operation - Male Shower 1180; Female Shower 1184) - has shower accessories. (1985) Original Building (Acute Care - Patient's Room 108; 111; 113; 115; 117; 119; 122; 125; 127; 129; 132; 134; 137; 139; 142; 149 - Bathrooms) - has toilet and shower accessories. (1985) Original Building (Acute Care - Tub Room 156; 159)- has toilet and bath accessories. (1985) Original Building (Acute Care - Washroom 165) - has toilet accessories. (1989) Addition (Long Term Care - Patient's Room 05; 06; 07; 08; 09; 13; 14; 15; 16; 17; 18; 203; 204; 205; 206; 207; 208; 213; 214; 215; 216; 217; 218 - Washrooms) - has toilet accessories. (1989) Addition (Long Term Care - Tub Room 21))- has toilet and bath accessories. (1989) Addition (Dining Area - Washroom R22; R23) - has toilet accessories. (1985) Basement (Cafeteria - Washroom 0106) - has toilet accessories. (1985) Basement (Maintenance - Female Washroom 0135; Male Washroom 0137) - has toilet and shower accessories.

(1985) Original Building (South Stair - from Basement to Main Floor) - has concrete stair. (1985) Original Building (Main Floor to Penthouse) - has metal stairs c/w metal pan treads filled with concrete, metal risers, metal stringers. (1985) Penthouse (Mechanical - Mechanical Room 2000 to Mezzanine) - has metal ship ladder c/w metal pipe railing. (1989) Addition (North Stair - from Basement to Main Floor) - has concrete stair.

Page 24: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 24 of 60

C2020.05 Resilient Stair Finishes**

C2020.08 Stair Railings and Balustrades*

C3010.06 Tile Wall Finishes**

C3010.11 Interior Wall Painting*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1985

1985

1985

1985

Installed

Installed

Installed

Installed

20

40

40

10

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace resilient stair finishes. (2 stairs)

Replace tile wall finishes. (approx. 100 square metres)

Lifecycle Replacement

Lifecycle Replacement

2013

2025

$6,000

$15,000

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

(1985) Original Building (South Stair) - concrete stair has rubber treads. (1989) Addition (North Stair) - concrete stair has rubber treads. Replace resilient stair finishes. (2 stairs)

(1985) Original Building (South Stair - from Basement to Main Floor) - concrete stairs have metal pipe railings. (1985) Original Building (Main Floor to Penthouse) - metal stairs have metal pipe railings. (1989) Addition (North Stair - from Basement to Main Floor) - concrete stairs have metal pipe railings.

(1985) Original Building (Operation - Male Washroom Shower 1180; Female Washroom Shower 1184) - has ceramic walltile finish. (1985) Original Building (Acute Care - Patient's Room 108; 111; 113; 115; 117; 119; 122; 125; 127; 129; 132; 134; 137; 139; 142; 149 - showers) - has ceramic wall tile finish. (1985) Basement (Maintenance - Female Washroom 0135 - shower; Male Washroom 0137 - shower) - has ceramic wall tile finish. Replace tile wall finishes. (approx. 100 square metres)

(1985) Original Building - has paint on gypsum boards and concrete blocks. (1989) Addition - has paint on gypsum boards and concrete blocks.

Page 25: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 25 of 60

C3010.12 Wall Coverings*

C3020.01.01 Epoxy Concrete Floor Finishes*

3 - Marginal

4 - Acceptable

Rating

Rating

1989

1985

Installed

Installed

15

0

Design Life

Design Life

MAR-10

MAR-10

Updated

Updated

Replace wall coverings. (approx. 150 square metres)

Failure Replacement 2011 $7,500 Low

(1989) Addition (Dining Area - Recreation & Dining R05; Dining R06; R07) - has damaged prefinished wall coverings.

Concern:

Replace wall coverings. (approx. 150 square metres)Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

(1989) Addition (Dining Area - Recreation & Dining R05; Dining R06; R07) - has prefinished wall coverings. (1989) Addition (Long Term Care - Office 219) - has prefinished wall coverings.

(1985) Original Building (Operation - Operating Room 1173; Work Room 1174) - has epoxy concrete floor finish. (1998) Addition (Long Term Care - Tub Room 21) - has epoxy concrete floor finish. (1985) Basement (Cafeteria - Corridor 0102; Dishwashing Room 0105; Kitchen 0109; 0110) - has epoxy concrete floor finish. (1985) Basement (Services - Supply 0117; Laundry 0121; 0122; 0125; Morgue 0129) - has epoxy concrete floor finish. (1985) Basement (Maintenance - Cart Wash 0130; 0131) - has epoxy concrete floor finish.

Page 26: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 26 of 60

C3020.01.02 Paint Concrete Floor Finishes*

C3020.02 Tile Floor Finishes**

3 - Marginal

4 - Acceptable

Rating

Rating

1985

1985

Installed

Installed

10

50

Design Life

Design Life

MAR-10

MAR-10

Updated

Updated

Repair and repaint concrete floor finishes. (approx.320 square metres)

Replace tile floor finishes. (approx. 70 square metres)

Repair

Lifecycle Replacement

2011

2035

$16,000

$10,500

Unassigned

Unassigned

(1985) Basement (Maintenance - Storage 004; Computer 005;Workshop 009; Filing Room 009A; Water Treatment Room 009B; Corridor 0139; Mechanical Room 0144) - paint of concrete floor has faded.

Concern:

Repair and repaint concrete floor finishes. (approx. 320 square metres)

Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

(1985) Original Building (Emergency - Ambulance 1138) - has painted concrete floor finish. (1985) Basement (Elevator Machine Room 0124) - has painted concrete floor finish. (1985) Basement (Maintenance - Elevator Machine Room 003; Storage 004; Computer 005; Workshop 009; Filing Room 009A; Water Treatment Room 009B; Vestibule 0134; Corridor 0139; Office 0143; Mechanical Room 0144; Emergency Generator 0145; Electrical Room 0146; 0147; Communication 0148; Gas Tank Storage 0149) - has painted concrete floor finish. (1985) Basement (Delivery - Vestibule 0151; Office 0152; Storage 0153; 0155; Receiving 0156; Gas Tank Storage 0157; 0159; Garbage 0158; Mechanical Room 0160) - has painted concrete floor finish. (1985) Penthouse (Mechanical - Mechanical Room 2000) - has painted concrete floor finish.

(1985) Original Building (Operation - Male Washroom Shower 1180; Female Washroom Shower 1184) - has ceramic floor tile finish. (1985) Original Building (Acute Care - Tub Room 156; 159) - has quarry floor tile finish. (1985) Original Building (Acute Care - Patient's Room 108; 111; 113; 115; 117; 119; 122; 125; 127; 129; 132; 134; 137; 139; 142; 149 - showers) - has ceramic floor tile finish. (1985) Basement (Maintenance - Female Washroom 0135 - shower; Male Washroom 0137 - shower) - has ceramic floor tile finish. Replace tile floor finishes. (approx. 70 square metres)

Page 27: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 27 of 60

C3020.07 Resilient Flooring**

3 - MarginalRating

1985Installed

20Design Life

MAR-10Updated

Repair resilient flooring. (approx. 30 square metres)

Repair 2011 $3,000 Low

(1985) Original Building (Administration - Pharmacy 1201) - has damaged sheet vinyl flooring. (1989) Addition (Long Term Care - Janitor 04) - has damaged sheet vinyl flooring.

Concern:

Repair resilient flooring. (approx. 30 square metres)Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

(1985) Original Building (Administration -Vestibule 1101; Corridor 1102; 1107; 1106; 1108; 1109; Public Washroom 1129;Female Washroom 1120; Male Washroom 1121; Pharmacy 1201; 1202; Reception 1224; Electrical Room 1190; Janitor 1191; Soiled Linen 1192; Treatment 1193; 1195; Washroom 1194; Surgical Scrub 1196) - has sheet vinyl flooring. (1985) Original Building (Emergency - Waiting Area 1110; Corridor 1111; 1112; Public Washroom 1121; Change Room 1115; 1115A; 1116; 1117; 1118; 1119; Reception 1123; Conference 1124; Waiting Area 1125; Trauma 1126; Janitor 1127; Observation Room 1129; 1132; Emergency Room 1130; 1131; Washroom 1133; Soiled Linen 1134; Ambulance 1138) - has sheet vinyl flooring. (1985) Original Building (Radiology - Waiting Area 1136; X-Ray General 1137; 1138; 1139; 1140; 1141; 1142; 1143; 1144; Washroom 1145; Corridor 1146; Office 1147; ECG 1150) - has sheet vinyl flooring. (1985) Original Building (Laboratory - Corridor 1104; Electrical Room 1151; Storage 1153; Lab 1152; 1155; 1156; 1158; Public Washroom 1159; Washroom 1160; Janitor 1161) - has sheet vinyl flooring. (1985) Original Building (Operation - Operating Room 1162; Janitor 1164; Recovery 1166; 1167; 1168; 1169; 1171; Washroom 1170; Nursing Station 1172; Doctor's Lounge 1177; Male Washroom 1179; Male Shower 1180; Female Washroom 1183; Female Shower 1184; Doctor's Sleep Room 1175; Labour Delivery Room 1187; 1189; Washroom 1188) - has sheet vinyl flooring. (1985) Original Building (Acute Care - Medical Prep Room 106; Office 107; Patient's Room 108; 111; 113; 115; 117; 119; 122; 125; 127; 129; 132; 134; 137; 139; 142; 149; Solar Room 124; Lounge 136; Treatment 144; Lounge 147; Nursing Station 152; Nourishment 154; Soiled Linen 157; Clean Linen 158; Janitor 161; Equipment Room 162; Conference Room 163; Corridor 101; 102; 103; 104; 164; Washroom 165) - has sheet vinyl flooring. (1985) Original Building (Acute Care - Electrical Room 155) - has vinyl tile flooring. (1985) Basement (Cafeteria - Vestibule 0101; Nourishment 0104; Washroom 0106; Corridor 0107; Janitor 0108; Cooler 0111; Freezer 0112; Office 0114) - has sheet vinyl flooring. (1985) Basement (Cafeteria - Storage 0113) - has vinyl tile flooring. (1985) Basement (Services - Janitor 0127; Office 0128) - has vinyl tile flooring. (1985) Basement (Services - Receiving 0115; CSR Clean Room 0119; Office 0126) - has sheet vinyl flooring. (1985) Basement (Maintenance - Corridor 001; Female Locker Room 008; Male Locker Room 0138; Workshop 0141; 0142; Office 0140) - has vinyl tile flooring. (1985) Basement (Maintenance - Treatment 006; Female Washroom 0135; Male Washroom 0137) - has sheet vinyl flooring. (1989) Addition (Long Term Care - Supply 01; 02; 03; Janitor 04; Patient's Room 05; 06; 07; 08; 09; 13; 14; 15; 16; 17; 18; 203; 204; 205; 206; 207; 208; 213; 214; 215; 216; 217; 218; Lounge 10; Storage 12; Smoke Room 22; Electrical Room 22A; Office 201; Lounge 209; Patient Care 202; Corridor 11; 212) - has sheet vinyl flooring. (1989) Addition (Physiotherapy - Storage R11; Physiotherapy R13; Vestibule R14; Office R15; R18; Corridor R16; Storage R17; Treatment R19) - has sheet vinyl flooring. (1989) Addition (Dining Area - Vestibule R01; Corridor R02; Recreation & Dining R05; Dining R06; R07; Nursing Station R09; Janitor R20; Storage R21; R25; Washroom R22; R23; Electrical Room R24; Washroom R26; Conference Room R27; Medication Room R28; Nourishment R29) - has sheet vinyl flooring. Replace resilient flooring. (approx. 4000 square metres)

Page 28: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 28 of 60

C3020.08 Carpet Flooring**

C3020.14 Other Floor Finishes* (Concrete Tiles Flooring)

3 - Marginal

4 - Acceptable

Rating

Rating

1985

1989

Installed

Installed

15

20

Design Life

Design Life

MAR-10

MAR-10

Updated

Updated

Replace resilient flooring. (approx. 4000 square metres)

Replace carpet flooring. (approx. 120 square metres)

Replace carpet. (approx. 150 square metres)

Lifecycle Replacement

Lifecycle Replacement

Failure Replacement

2013

2013

2011

$400,000

$12,000

$15,000

Unassigned

Unassigned

Low

(1985) Original Building (Administration - Office 1205; 1206; 1213; 1214; Filing Room 1199; 1223; Pharmacist 1197; Doctor's Lounge 1198) - has rippled and worn out carpet. (1998) Addition (Dining Area - Therapy Room R03; Office R04) - has rippled and worn out carpet.

Concern:

Replace carpet. (approx. 150 square metres)Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

(1985) Original Building (Administration - Office 1213; 1214; Office 1204; 1205; 1206; 1207; 1208; 1209; 1210; 1211; 1212; Filing Room 1199; 1223; Pharmacist 1197; Doctor's Lounge 1198) - has carpet. (1985) Basement (Maintenance - Computer 006A) - has carpet. (1989) Addition (Long Term Care - Office 212; 219) - has carpet. (1989) Addition (Physiotherapy - Office R15) - has carpet. (1989) Addition (Dining Area - Therapy Room R03; Office R04) - has carpet. Replace carpet flooring. (approx. 120 square metres)

(1989) Addition (Dining Area - Outside Recreation and Dining R05) - has coloured concrete tile flooring.

Page 29: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 29 of 60

C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)**

3 - MarginalRating

1985Installed

25Design Life

MAR-10Updated

Replace acoustic ceiling tiles. (approx. 100 tiles)

(1985) Original Building (Administration - Filing Room 1199; Washroom 1194; Office 1204) - has stained acoustic ceiling tiles. (1985) Original Building (Acute Care - Patient's Room 122) - has damaged acoustic ceiling tiles. (1985) Original Building (Acute Care - Lounge 147) - has stained acoustic ceiling tiles. (1998) Addition (Long Term Care - Storage 12; Tub 21) - has stained acoustic ceiling tiles. (1998) Addition (Long Term Care - Office 201) - has missing acoustic ceiling tiles. (1998) Addition (Dining Area - Washroom R26; Medication Room R28; Nourishment R29) - has stained acoustic ceiling tiles. (1985) Basement (Services - Laundry 0121) - has stained acoustic ceiling tiles.

Concern:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

(1985) Original Building (Administration - Vestibule 1101; Corridor 1102; 1107; 1106; 1108; 1109; Office 1213; 1214; Office 1204; 1205; 1206; 1207; 1208; 1209; 1210; 1211; 1212; Pharmacy 1201; 1202; Filing Room 1199; 1223; Reception 1224; Pharmacist 1197; Doctor's Lounge 1198; Electrical Room 1190; Soiled Linen 1192; Treatment 1193; 1195; Washroom 1194; Surgical Scrub 1196) - has suspended T-bar system and acoustic ceiling tiles. (1985) Original Building (Emergency - Waiting Area 1110; Corridor 1111; 1112; Reception 1123; Conference 1124; Waiting Area 1125; Trauma 1126; Janitor 1127; Observation Room 1129; 1132; Emergency Room 1130; 1131) - has suspended T-bar system and acoustic ceiling tiles. (1985) Original Building (Radiology - Waiting Area 1136; X-Ray General 1137; 1138; 1139; 1140; 1141; 1142; 1143; 1144; Corridor 1146; Office 1147; ECG 1150) - has suspended T-bar system and acoustic ceiling tiles. (1985) Original Building (Laboratory - Corridor 1104; Storage 1153; Lab 1152; 1155; 1156; 1158) - has suspended T-bar system and acoustic ceiling tiles. (1985) Original Building (Operation - Operating Room 1162; Recovery 1166; 1167; 1168; 1169; 1171; Washroom 1170; Nursing Station 1172; Work Room 1174; Doctor's Lounge 1177; Doctor's Sleep Room 1175; Labour Delivery Room 1187;1189) - has suspended T-bar system and acoustic ceiling tiles. (1985) Original Building (Acute Care - Office 107; Patient's Room 108; 111; 113; 115; 117; 119; 122; 125; 127; 129; 132; 134; 137; 139; 142; 149; Solar Room 124; Lounge 136;Treatment 144; Lounge 147; Nursing Station 152; Nourishment 154;Tub Room 156; 159; Soiled Linen 157; Clean Linen 158; Conference Room 163; Corridor 101; 102; 103; 104; 164) - has suspended T-bar system and acoustic ceiling tiles. (1985) Basement (Cafeteria - Vestibule 0101; Corridor 0102; Dishwashing Room 0105; Corridor 0107; Kitchen 0109; 0110) - has suspended T-bar system and acoustic ceiling tiles. (1985) Basement (Services - Receiving 0115; Supply 0117; CSR Clean Room 0119; Laundry 0121; 0122) - has suspended T-bar system and acoustic ceiling tiles. (1985) Basement (Maintenance - Treatment 006; Computer Room 006A; Computer Room 005; Office 0140; 0143; Workshop 0141; 0142) - has suspended T-bar system and acoustic ceiling tiles. (1985) Basement (Delivery - Office 0152) - has suspended T-bar system and acoustic ceiling tiles. (1989) Addition (Long Term Care - Supply 01; 02; 03; Janitor 04; Patient's Room 05; 06; 07; 08; 09; 13; 14; 15; 16; 17; 18; 203; 204; 205; 206; 207; 208; 213; 214; 215; 216; 217; 218; Lounge 10; Storage 12; Tub Room 21; Office 219; Smoke Room 22; Office 201; Office 212; Lounge 209; Patient Care 202; Corridor 11; 212) - has suspended T-bar systemand acoustic ceiling tiles. (1989) Addition (Physiotherapy - Storage R11; Physiotherapy R13; Vestibule R14; Office R15; R18; Corridor R16; Storage R17; Treatment R19) - has suspended T-bar system and acoustic ceiling tiles. (1989) Addition (Dining Area - Vestibule R01; Corridor R02; Therapy Room R03; Office R04; Recreation & Dining R05; Dining R06; R07; Nursing Station R09; Janitor R20; Storage R21; R25; Washroom R22; R23; Washroom R26; Conference Room R27; Medication Room R28; Nourishment R29) - has suspended T-bar system and acoustic ceiling tiles. Replace acoustic ceiling treatment (Susp.T-Bar). (approx. 2700 square metres)

Page 30: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 30 of 60

C3030.07 Interior Ceiling Painting*

4 - AcceptableRating

1985Installed

20Design Life

MAR-10Updated

Replace acoustic ceiling treatment (Susp.T-Bar). (approx. 2700 square metres)

Repair

Lifecycle Replacement

2011

2013

$1,000

$135,000

Low

Unassigned

(1985) Basement (Services - Receiving 0115) - has missing acoustic ceiling tiles.

Replace acoustic ceiling tiles. (approx. 100 tiles)Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

(1985) Original Building (Administration - Public Washroom 1129; Female Washroom 1120; Male Washroom 1121; Janitor 1191) - has painted drywall ceiling. (1985) Original Building (Emergency - Public Washroom 1121; Change Room 1115; 1115A; 1116; 1117; 1118; 1119; Washroom 1133; Soiled Linen 1134) - has painted drywall ceiling. (1985) Original Building (Radiology - Washroom 1145) - has painted drywall ceiling. (1985) Original Building (Laboratory - Public Washroom 1159; Washroom 1160; Janitor 1161) - has painted drywall ceiling. (1985) Original Building (Operation - Operating Room 1173; Janitor 1164; Male Washroom 1179; Male Shower 1180; Female Washroom 1183; Female Shower 1184; Washroom 1188) - has painted drywall ceiling. (1985) Original Building (Acute Care - Medical Prep Room 106; Patient's Room 108; 111; 113; 115; 117; 119; 122; 125; 127; 129; 132; 134; 137; 139; 142; 149 - Bathrooms; Janitor 161; Equipment Room 162; Washroom 165) - has painted drywall ceiling. (1985) Basement (Services - Cart Wash 0116; Elevator Machine Room 0124; Morgue 0129) - has painted concrete ceiling. (1985) Basement (Services - Office 0126) - has interior painted drywall ceiling. (1985) Basement (Maintenance - Storage 004; Cart Wash 0130; 0131; Workshop 009; Filing Room 009A; Corridor 0139; Mechanical Room 0144; Electrical Room 0146; 0147; Communication 0148; Gas Tank Storage 0149 ) - has painted concrete ceiling. (1985) Basement (Maintenance - Female Locker Room 008; Female Washroom 0135; Male Washroom 0137; Male Locker Room 0138; Emergency Generator 0145) - has painted drywall ceiling. (1985) Basement (Delivery - Vestibule 0151; Storage 0153; Receiving 0156; Gas Storage 0157; 0159; Mechanical Room 0160) - has painted concrete ceiling. (1985) Basement (Delivery - Garbage 0158) - has painted drywall ceiling. (1985) Penthouse (Mechanical - Mechanical Room 2000) - has painted metal deck ceiling. (1989) Addition (Dining Area - Electrical Room R24) - has painted metal deck ceiling. (1989) Addition (Long Term Care - Electrical Room 22A) - has painted metal deck ceiling. (1989) Addition (Long Term Care - All Patient's Washrooms) - has painted drywall ceiling.

Page 31: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 31 of 60

C3030.09 Other Ceiling Finishes* (Metal Linear Ceiling)

C3030.09 Other Ceiling Finishes* (Sprayed Ceiling)

D1010.01.02 Hydraulic Passenger Elevators**

D1090 Other Conveying Systems*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1985

1985

1985

1985

Installed

Installed

Installed

Installed

0

50

30

0

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace hydraulic passenger elevators. (2 elevators)

Lifecycle Replacement 2015 $20,000 Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

(1985) Basement (Cafeteria - Nourishment 0104) - has metal linear ceiling. (1985) Original Building (Emergency - Waiting Area 1110) - has metal linear ceiling. (1985) Original Building (Radiology - Waiting Area 1136) - has metal linear ceiling.

(1985) Original Building (Laboratory - Electrical Room 1151) - has fire rated spray ceiling. (1985) Original Building (Acute Care - Electrical Room 155) - has fire rated spray ceiling.

(1985) Basement (Maintenance - Elevator 1 from Basement near Storage 004 to Main Floor near Therapy Room R03) - Otis c/w egg crate ceiling, prefinished wall panels, sheet vinyl flooring, capacity 25 persons, maximum loading of 4000 lbs. (1985) Basement (Services - Elevator 2 from Basement near Laundry Supply 0123 to Main Floor near Reception 1224) - Otis c/w egg crate ceiling, stainless steel metal wall panels, sheet vinyl flooring, capacity 25 persons, maximum loading of4000 lbs. Replace hydraulic passenger elevators. (2 elevators)

(1985) Original Building (Basement Services - from CSR Clean Room 0119 to Main Floor Vestibule 1176 near Doctor's Sleep Room 1175) - has dumb waiter.

Page 32: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 32 of 60

D2010.04 Sinks - 1985 building**

D2010.04 Sinks - 1989 addition**

D2010.05 Showers** (1985 building)

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1985

1989

1985

Installed

Installed

Installed

30

30

30

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace 35 Sinks.

Replace 10 sinks.

Replace 20 Showers.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2015

2019

2015

$70,000

$10,000

$40,000

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)S4 MECHANICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

Various single and double compartment stainless steel sinks, scullery sinks, laundry tubs, janitor sinks, scrub sinks throughout this area of the building.

Various single and double compartment stainless steel sinks, janitor sinks throughout this area of the building.

Tiled shower stalls in patient rooms. Tiled shower stalls in staff locker rooms in basement.

Page 33: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 33 of 60

D2010.05 Showers** (1989 addition)

D2010.06 Bathtubs**

D2010.09 Other Plumbing Fixtures*

D2010.10 Washroom Fixtures (WC, Lav, Urnl)** (1985 building)

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1989

1989

1987

1985

Installed

Installed

Installed

Installed

30

30

0

35

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace 2 assisted showers.

Replace 4 Bathtubs.

Replace 30 WC's, 30 Lavs, 4 Urinals.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2019

2019

2020

$5,000

$250,000

$150,000

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

2 Wheelchair accessible, assisted showers in Long Term Care area.

3 Assisted bathtubs in Long Term Care areas. Hydrotherapy tub in Physiotherapy area.

Various Sitz bath, Bedpan washers, etc. Throughout building. Install date averaged.

Flush tank and flush valve, floor & wall mounted water closets. Vanity and Wall mounted, vitreous china and stainless steel lavatories. Urinals in staff & public washrooms.

Page 34: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 34 of 60

D2010.10 Washroom Fixtures (WC, Lav, Urnl)** (1989 addition)

D2020.01.01 Pipes and Tubes: Domestic Water*

D2020.01.02 Valves: Domestic Water**

D2020.01.03 Piping Specialties (Backflow Preventors)**

4 - Acceptable

4 - Acceptable

4 - Acceptable

5 - Good

Rating

Rating

Rating

Rating

1989

1985

1985

2009

Installed

Installed

Installed

Installed

35

40

40

20

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace 30 WC's, 30 Lavs.

Replace 150 Valves: Domestic Water.

Replace 5 Backflow Preventors.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2024

2025

2029

$130,000

$150,000

$80,000

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

Flush tank and flush valve, floor & wall mounted water closets. Vanity and Wall mounted, vitreous china and stainless steel lavatories.

Domestic water piping is mainly copper with solder fittings. Piping has been upgraded in 1975 as part of those renovations.

Mainly 1/4 turn ball valves throughout building. Isolation service.

Watts backflow preventor on Boiler make up water lines, fire lines and main water service.

Page 35: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 35 of 60

D2020.02.02 Plumbing Pumps: Domestic Water**

D2020.02.04 Domestic Water Conditioning Equipment**

D2020.02.06 Domestic Water Heaters**

D2020.03 Water Supply Insulation: Domestic*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1985

1985

1985

1985

Installed

Installed

Installed

Installed

20

20

20

40

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace 4 Plumbing Pumps: Domestic Water.

Replace Domestic Water Conditioning Equipment.

Replace Domestic Hot Water storage tanks.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2013

2013

2013

$10,000

$100,000

$40,000

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

Domestic water booster pumps for RO system and general service.

Commercial water softening equipment and RO filters serving the Laundry and remainder of Hospital.

Domestic hot water storage tanks in mechanical room c/w integral heat exchangers. Make & model are unknown. Hot water from the building Heating boilers is used as a primary heat source.

Mainly preformed fibreglass piping insulation throughout building.

Page 36: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 36 of 60

D2030.01 Waste and Vent Piping*

D2030.02.04 Floor Drains*

D2030.03 Waste Piping Equipment*

D2040.01 Rain Water Drainage Piping Systems*

D2040.02.04 Roof Drains*

D2090.01 Compressed Air Systems (Non Controls)**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1985

1985

1985

1985

1985

1985

Installed

Installed

Installed

Installed

Installed

Installed

50

50

30

50

40

30

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Updated

Updated

Replace Compressed Air System.

Lifecycle Replacement 2015 $50,000 Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

Copper DWV grade venting; primarily cast iron & plastic waste lines below grade.

Conventional, general purpose floor drains throughout building, funnel floor drains in Mechanical rooms.

Grease interceptor in Kitchen. Plaster trap in LTC area.

Rainwater collection via roof drains to storm water piping located inside building.

Conventional roof drains with cast iron dome strainers.

Air compressor located in Penthouse Mechanical room. Serving Washer / Sanitizer machine in CSR.

Page 37: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 37 of 60

D2090.10 Nitrous Oxide Gas Systems**

D2090.11 Oxygen Gas Systems**

D2090.13 Vacuum Systems (Medical)**

D2090.16 Medical Air System*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1985

1985

1985

1985

Installed

Installed

Installed

Installed

30

30

30

0

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace Nitrous Oxide Gas System.

Replace Oxygen Gas System.

Replace Medical Vacuum System.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2015

2015

2015

$100,000

$200,000

$200,000

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

Nitrous Oxide medical gas system distributed mainly to acute care wing and Operating rooms from storage cylinders.

Oxygen medical gas system distributed mainly to acute care wing and Operating rooms from Oxygen concentrator located in basement.

Medical Vacuum system distributed mainly to acute care wing and Operating rooms from SIHI Vacuum pump in Mechanical room.

Medical Air system distributed mainly to acute care wing and Operating rooms from SIHI Medical Air Compressor in Mechanical room.

Page 38: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 38 of 60

D2090.17 Nitrogen System*

D3010.01 Oil Supply Systems (Fuel, Diesel)*

D3010.02 Gas Supply Systems*

D3020.01.01 Heating Boilers & Accessories: Steam**

D3020.01.02 Feedwater Equipment*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1985

1985

1985

1985

1985

Installed

Installed

Installed

Installed

Installed

0

60

60

35

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Updated

Replace 2 Heating Boilers & Accessories: Steam.

Lifecycle Replacement 2020 $150,000 Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

Nitrogen medical gas system distributed to Operating Rooms from storage cylinders.

Diesel for operation of Emergency Generator, in above ground storage tank located on north side, between LTC and Main building. Oil lines down to Generator below.

Metered natural gas supply from utility servicing heating and domestic water equipment Laundry and Kitchen cooking equipment. Schedule 40 steel piping.

LP Steam Boiler is a Volcano Model MF 500E-11HL. Capacity is 50 HP. High pressure steam is used for sterilization. HP Steam Boiler is a Bryan, model unknown. Low pressure steam is used for humidification.

Steam Boiler Feedwater equipment using RO purified water.

Page 39: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 39 of 60

D3020.01.03 Chimneys (&Comb. Air) : Steam Boilers**

D3020.02.01 Heating Boilers and Accessories: H.W.**

D3020.02.02 Chimneys (&Comb. Air): H.W. Boiler**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1985

1985

1985

Installed

Installed

Installed

35

35

30

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace main Chimney.

Replace 2 Hot Water Heating Boilers and Accessories.

ReplaceHot water boiler vent connectors.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2020

2020

2015

$20,000

$200,000

$10,000

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

Insulated metal chimney serving all gas fired appliances in Mechanical Room. Insulated vent connectors from Steam boilers.

Hot Water Heating boilers (2) are Volcano Model MF 1430J 11HL. Capacity is 143 HP each.

Insulated metal vent connectors from Hot water boilers to main Chimney.

Page 40: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 40 of 60

D3030.02 Centrifugal Water Chillers**

D3030.05 Cooling Towers**

D3030.06.02 Refrigerant Condensing Units**

5 - Good

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

2008

1985

1985

Installed

Installed

Installed

25

25

25

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace Centrifugal Water Chiller.

Replace Cooling Tower.

Replace Lab, Xray & Morgue / Garbage room Condensing unit.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2033

2013

2013

$500,000

$200,000

$15,000

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

Multistack Chiller located in Penthouse Mechanical room. Model & Capacity unknown.

Baltimore Aircoil cooling tower on roof. Unknown model and capacity.

Keeprite condensing unit located in Basement, serving Morgue and Garbage room refrigeration systems. Mitsubishi Ductless Split A/C condensing unit serving the Lab and Xray areas.

Page 41: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 41 of 60

D3040.01.01 Air Handling Units: Air Distribution** (1985 building)

D3040.01.01 Air Handling Units: Air Distribution** (1989 addition)

D3040.01.04 Ducts: Air Distribution*

D3040.01.06 Air Terminal Units: Air Distribution (VAV Box)**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1985

1989

1985

1985

Installed

Installed

Installed

Installed

30

30

50

30

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace 4 Air Handling Units: Air Distribution.

Replace LTC Air Handling unit.

Replace 50 VAV Boxes.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2015

2019

2015

$300,000

$75,000

$125,000

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

Various Roof mounted and Indoor units located in Penthouse Mechanical room and Roof. These units serve the ventilation requirements of the OR / Acute Care / General areas of the hospital. Mainly Glycol Heating coils and cooling coils.

Roof mounted unit serving the ventilation requirements of the Long Term Care areas of the hospital. Glycol heating and cooling coils.

Mainly Supply & return, medium & low velocity ductwork distribution system throughout building.

VAV boxes located throughout building - various zones.

Page 42: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 42 of 60

D3040.01.07 Air Outlets & Inlets:Air Distribution*

D3040.02 Steam Distribution Systems: Piping/Pumps**

D3040.03.01 Hot Water Distribution Systems**

D3040.03.02 Chilled Water Distribution Systems**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1985

1985

1985

1985

Installed

Installed

Installed

Installed

30

40

40

40

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace Steam Distribution Systems: Piping/Pumps.

Replace Hot Water Distribution Systems.

Replace Chilled Water Distribution Systems.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2025

2025

2025

$100,000

$400,000

$100,000

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

Ceiling and wall mounted supply air outlets and return air inlets.

Schedule 40 steel piping connecting boilers to humidifiers and sterilization equipment.

Recirculation pumps servicing AHU coils and building heating c/w expansion tank and glycol fill tank. Schedule 40 steel and copper piping.

Steel piping connecting Chiller to circulating pumps and cooling coils in Air Handling Units.

Page 43: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 43 of 60

D3040.03.03 Condenser Water Distribution Systems Pumps*

D3040.04.01 Fans: Exhaust**

D3040.04.03 Ducts: Exhaust*

D3040.04.05 Air Outlets and Inlets: Exhaust*

D3040.05 Heat Exchangers**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1985

1985

1985

1985

1985

Installed

Installed

Installed

Installed

Installed

40

30

50

30

30

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Updated

Replace 10 exhaust Fans.

Replace 4 Heat Exchangers.

Lifecycle Replacement

Lifecycle Replacement

2015

2015

$40,000

$80,000

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

Piping & pumps connecting Chiller to cooling tower on roof.

Approximately 10 general exhaust fans located on roof and mechanical rooms servicing washrooms and general exhaust.Exhaust systems servicing fume hoods and Operating rooms. Exhaust system servicing Kitchen exhaust hoods.

Various mainly low velocity sheet metal ducts connecting grilles and hoods with roof mounted fans.

Various exhaust grilles and hoods ducted to exhaust fans. Mainly Washrooms, Operating rooms and Kitchen areas.

Various Shell & Tube Glycol / Water heat exchangers, serving air handling unit heating coils.

Page 44: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 44 of 60

D3050.01.03 Packaged Terminal Air Conditioning Units*

D3050.05.02 Fan Coil Units**

D3050.05.03 Finned Tube Radiation**

D3050.05.06 Unit Heaters**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1985

1985

1985

1985

Installed

Installed

Installed

Installed

30

30

40

30

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace 10 Fan Coil Units.

Replace 100m of Finned Tube Radiation.

Replace 6 Unit Heaters.

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2015

2025

2015

$20,000

$100,000

$10,000

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

Ductless Split systems serving the Lab and Xray areas.

Mostly ceiling mounted force flow units servicing entrances and vestibules. Wall mounted units in main entrance.

Perimeter finned tube and radiant panels - various locations throughout Hospital. Various enclosure sizes and types.

Unit heaters providing local heating - mainly in Mechanical Rooms and Ambulance bay.

Page 45: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 45 of 60

D3050.05.08 Radiant Heating (Ceiling & Floor)**

D3060.02.01 Electric and Electronic Controls**

D3060.02.05 Building Systems Controls (BMCS, EMCS)**

D4010 Sprinklers: Fire Protection*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1985

1985

2008

1985

Installed

Installed

Installed

Installed

35

30

25

60

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace 50 Radiant Heating panels.

Replace Electric Controls.

Replace Building Systems Controls (BMCS, EMCS).

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2020

2015

2033

$125,000

$20,000

$200,000

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

Radiant ceiling panels in Acute Care and LTC wings.

Local electric controls for force flow and unit heaters.

BMCS: Delta Controls system servicing HVAC systems throughout building c/w operator workstation.

Wet pipe sprinkler system installed throughout building.

Page 46: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 46 of 60

D4030.01 Fire Extinguisher, Cabinets and Accessories*

D4090.04 Dry Chemical Fire Extinguishing Systems (Kitchen Hood)**

D4090.05 Halon Extinguishing Systems**

4 - Acceptable

4 - Acceptable

3 - Marginal

Rating

Rating

Rating

1985

1985

1985

Installed

Installed

Installed

30

40

0

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace Dry Chemical Fire Extinguishing Systems (Kitchen Hood).

Replace Halon System.

Lifecycle Replacement

Failure Replacement

2025

2012

$50,000

$90,000

Unassigned

Low

Present system has had leaks.Concern:

Replace Halon system with a new environmentally friendly system

Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

Both surface mounted and recessed fire extinguisher cabinets. ABC dry chemical units noted. Regularly checked. Coverage appears reasonable.

Commercial kitchen, dry chemical fire suppression system associated with exhaust canopy.

Halon 1301 systems, protecting the basement electrical and generator rooms.

Page 47: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 47 of 60

D5010.02 Secondary Electrical Transformers (Interior)**

D5010.03 Main Electrical Switchboards (Main Distribution)**

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

5 - Good

5 - Good

5 - Good

Rating

Rating

Rating

1985

2008

1985

Installed

Installed

Installed

40

40

30

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace Secondary Electrical Transformers (Interior).

Replace Main Electrical Switchboards (Main Distribution).

Replace Electrical Branch Circuit Panelboards (Secondary Distribution).

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2025

2048

2015

$150,000

$650,000

$150,000

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)S5 ELECTRICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

Dry type step down transformers have been provided in strategic locations to step the voltage down to 120/208V, 3 phase, 4 wire. The primary voltage is 600 Volts, 3 phase. The transformers are located in the main electrical room, the mechanical room and sub-electrical rooms. There are approximately 7 transformers, rated at 30 kVA, 75 kVA, 112 kVA, 150kVA, 225 kVA. Transformers are the product of Federal Pioneer.

A Federal Pioneer main distribution centre has been provided in the electrical room. It is fed underground from an on-site pad mounted transformer located on the north side. The distribution centre is rated at 1600 Amps, 600V, 3 phase, 4 wire, and is complete with a 1600 Amp main breaker and a feeder breaker distribution section. Feeder breakers feed various loads in the building including CDPs, breaker panels and mechanical equipment. The main breaker is complete with ground fault protection. Feeders breakers are adequately identified and there is spare capacity for the addition of future breakers.

Approximately 38 branch circuit panel boards (347/600V and 120/208V), have been provided throughout the facility for power to 347V lights and 120/208V for outlets and equipment. Panels generally have spare breaker capacity.

Page 48: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 48 of 60

D5010.07.01 Switchboards, Panelboards, and (Motor) Control Centers**

D5020.01 Electrical Branch Wiring*

D5020.02.01 Lighting Accessories (Lighting Controls)*

5 - Good

5 - Good

5 - Good

Rating

Rating

Rating

1985

1985

1985

Installed

Installed

Installed

30

50

30

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace Switchboards, Panelboards, and (Motor) Control Centers.

Lifecycle Replacement 2015 $150,000 Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

347/600V and 120/208V central distribution panels, (CDPs) have been provided for sub distribution. The CDPs feed the various 120/208V breaker panels that are located throughout the facility. FPE motor control centres, (MCCs) have been provided for motor control. The MCCs are located the boiler room and in each of the penthouses. MCCs fed from emergency power have been provided in each of the pent houses. A total of 4 MCCs have been provided. All MCCs are complete with combination type magnetic motor starters, pilot lights and selector switches. Control terminal sections havebeen provided in each of the MCCs. MCCs are installed on concrete housekeeping pads and have spare starter capacity.

All wiring is copper and is installed in conduit.

A low voltage switching system has been provided for lighting control. Lighting in all common areas, corridors is controlledby the low voltage switching system with each area being locally controlled. Certain areas, such as service rooms, patient rooms, have been provided with line voltage switches.

Page 49: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 49 of 60

D5020.02.02.02 Interior Florescent Fixtures**

D5020.02.03.01 Emergency Lighting Built-in*

D5020.02.03.03 Exit Signs*

3 - Marginal

5 - Good

5 - Good

Rating

Rating

Rating

1985

1985

1985

Installed

Installed

Installed

30

35

30

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace Interior Florescent Fixtures.

Upgrade Interior Florescent Fixtures.

Lifecycle Replacement

Energy Efficiency Upgrade

2015

2011

$450,000

$400,000

Unassigned

Low

The fluorescent fixtures are not of the energy efficient type. Concern:

Replace fluorescent fixtures with energy efficient type fixtures that utilize T8 lamps and electronic ballasts. Basis of estimate: Quantity of fixtures, based on building area. Estimated payback: 4 to 6 years.

Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

Lighting is provided by fluorescent fixtures. Depending on the ceiling type and system, fixtures are either of the recessed type, surface mounted or suspended mounted. Majority of the fixtures are complete with T12 lamps and magnetic ballasts. Basis of Estimate: Quantity of fixtures based on building area.

Emergency lighting is provided by feeding selected light fixtures with emergency power as supplied by an on-site diesel fired generator. These include fixtures in the hall ways, corridors, common areas, etc. All paths and points of egress are well illuminated.

Exit signs have been provided at each required exit. Majority of the exit lights are with LED lamps. As the old exit lights fail, they are replaced with LED type exit lights.

Consequences of Deferral:High energy costs.

Page 50: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 50 of 60

D5020.02.11 Operating Room Lighting*

D5020.03.01.04 Exterior H.P. Sodium Fixtures*

D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*

D5030.01 Detection and Fire Alarm**

D5030.02.03 Security Access**

5 - Good

5 - Good

5 - Good

5 - Good

5 - Good

Rating

Rating

Rating

Rating

Rating

1985

1985

1985

2008

1988

Installed

Installed

Installed

Installed

Installed

0

30

30

25

25

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Updated

Replace Detection and Fire Alarm.

Replace Security Access.

Lifecycle Replacement

Lifecycle Replacement

2033

2013

$300,000

$150,000

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

Operating rooms have been provided with operating lights. Lights utilize incandescent lamps and wall mounted controls.

Exterior lighting is provided by wall mounted fixtures rated at 70 Watts. Fixtures are controlled by the exterior lighting control system ( photo-cell).

Exterior lighting is controlled by photo-cell. The control system is located in the electrical room.

An addressable 2 stage system has been provided, consisting of heat detectors, smoke detectors, manual pull stations, and bells/horns, all inter-connected to form a complete and operating system. A remote annunciator has been provided at each of the 3 nurses' station ( admitting, OR, and long term care). The system is the product of Edwards EST3. The system is tested annually and externally monitored.

A door access system has been provided for building access. Keypads and door contacts have been provided. The headend equipment is located in the electrical room. The system is the product of Scantronic.

Page 51: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 51 of 60

D5030.02.04 Video Surveillance**

D5030.03 Clock and Program Systems*

D5030.04.01 Telephone Systems*

D5030.04.03 Call Systems**

5 - Good

5 - Good

5 - Good

5 - Good

Rating

Rating

Rating

Rating

1995

1985

1985

1985

Installed

Installed

Installed

Installed

25

25

25

25

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace Video Surveillance.

Replace Call Systems.

Lifecycle Replacement

Lifecycle Replacement

2020

2013

$40,000

$150,000

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

A CCTV system has been provided and it consists of 9 cameras located throughout the building. The TV monitors are located in the nurses stations.

A Simplex 2350 master clock system has been provided. Remote LED clocks, (recessed mounted) have been provided throughout the building. The head end equipment is located in the electrical room.

Telephone service has been provided and it is underground, with the terminal board located in the electrical room. Telephone cabling has been provided throughout the facility. A Nortel Norstar telephone system has been provided for the facility.

The nurse call system is the product of Rauland Responder 3, with the head end equipment located in the electrical room.The system has voice communication capabilities and is complete with bedside call stations, bathroom call stations, dome lights located outside the patient rooms, duty stations, staff stations, and desk consoles at the nurses stations.

Page 52: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 52 of 60

D5030.04.05 Local Area Network Systems*

D5030.05 Public Address and Music Systems**

D5030.06 Television Systems*

D5090.02 Packaged Engine Generator Systems (Emergency Power System)**

5 - Good

5 - Good

5 - Good

5 - Good

Rating

Rating

Rating

Rating

2000

1985

1985

1985

Installed

Installed

Installed

Installed

15

25

20

35

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Replace Address and Music Systems.

Replace Packaged Engine Generator Systems (Emergency Power System).

Lifecycle Replacement

Lifecycle Replacement

2013

2020

$140,000

$400,000

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

MAR-10

MAR-10

Cat 5e data cabling has been provided, with data outlets in the administration areas, patient rooms, and the nurses stations. The network is located in the manager's office and is provided with data racks containing patch panels, data switches and hubs.

A 120 Watt, Bogen 150 paging amplifier has been provided in the administration area and is interfaced with the telephonesystem for paging purposes. Speakers have been provided throughout the facility.

TV service has been provided, with the terminal board located in the telephone room. TV service is distributed to each patient room and other common areas.

A Detroit Diesel Allison diesel fired engine-generator set has been provided to supply power to the facility in the event of utility power failure. The engine-generator set is rated at 450 kW, 347/600V, 3 phase, 4 wire, and is complete with an Asco 400 Amp automatic transfer switch, battery charger, and block heater. The system is located in a dedicated room which also contains the fuel day tank, with a containment dyke. An emergency power distribution system has been provided with breaker panels in strategic locations. Selected light fixtures and selected mechanical equipment are supplied with emergency power. The emergency power system is tested on monthly basis.

Page 53: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 53 of 60

E1010.05.01 Barber and Beauty Shop Equipment*

E1010.06 Commercial Laundry and Dry Cleaning Equipment*

E1010.08 Office Equipment*

E1020.02 Library Equipment*

E1020.07 Laboratory Equipment*

E1020.08 Medical Equipment*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1985

1985

1985

1985

1985

1985

Installed

Installed

Installed

Installed

Installed

Installed

0

0

0

25

25

25

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Updated

Updated

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION

(1989) Addition (Long Term Care - Patient Care 202) - has barber and beauty shop equipment.

(1985) Basement (Services - Laundry 0121; 0122; 0125) - has laundry equipment.

(1985) Original Building (Administration - Filing Room 1199; 1223) - has mobile filing system.

No library equipment observed.

(1985) Original Building (Administration - Janitor 1191; Pharmacy 1201) - has eye wash station. (1985) Original Building (Laboratory - Lab 1152; 1155; 1156; 1158) - has eye wash station, emergency shower, fridge, and freezer. (1985) Original Building (Operation - Janitor 1164) - has eyewash station. (1985) Original Building (Acute Care - Janitor 161) - has eyewash station. (1989) Addition (Long Term Care - Janitor 04; Janitor Room Near Patient Room 208) - has eyewash station. (1989) Addition (Dining Area - Janitor R20) - has eyewash station. (1985) Basement (Cafeteria - Janitor 0108) - has eyewash station. (1985) Basement (Services - Receiving 0115; Laundry 0125; Janitor 0126) - has eyewash station. (1985) Basement (Maintenance - Workshop 0142) - has eyewash station.

(1985) Basement (Services - Receiving 0115; CSR Clean Room 0119) - has sterilizer equipment. (1985) Original Building (Operation - Operating Room 1162; 1173) - has operation equipment. (1985) Original Building (Radiology - X-Ray General 1137; 1138; 1139; 1140; 1141; 1142; 1143; 1144; ECG 1150) - has radiology equipment.

Page 54: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 54 of 60

E1020.09 Mortuary Equipment*

E1030.03 Loading Dock Equipment*

E1090.03 Food Service Equipment*

E1090.04 Residential Equipment*

E1090.07 Athletic, Recreational, and Therapeutic Equipment*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1985

1985

1985

1985

1985

Installed

Installed

Installed

Installed

Installed

0

25

25

10

15

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Updated

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

(1985) Basement (Services - Morgue 0129) - has an empty space.

(1985) Original Building (Basement - Receiving 0156) - has loading dock platform.

(1989) Addition (Dining Area - Nourishment R29) - has microwave, range, fridge, and dishwasher. (1985) Basement (Cafeteria - Nourishment 0109; 0110) - has deep fryer, steamer, range c/w burner and grille, exhaust hood c/w fire compressor, baker equipment, service line equipment, fridges. (1985) Basement (Cafeteria - Dishwashing Room 0105) - has dish washing equipment.

(1985) Original Building (Administration - Office 1214,Pharmacy 1200) - has fridges and microwaves. (1985) Original Building (Operation - Recovery 1171; Doctor's Sleep Room 1175; Doctor's Lounge 1177) - has fridge and microwave. (1985) Original Building (Acute Care - Lounge 147) - has fridge, microwave. (1985) Original Building (Acute Care - Medical Prep Room 106) - has fridge. (1985) Original Building (Acute Care - Nourishment 154) - has ice maker, fridge, and microwave. (1989) Addition (Physiotherapy - Storage R11) - has fridge. (1989) Addition (Dining Area - Storage R25; Conference R27; Medical Room R28) - has fridge. (1985) Basement (Cafeteria - Nourishment 0104) - has fridge, microwave, and vending machine.

(1989) Addition (Physiotherapy - Physiotherapy R13) - has physiotherapy equipment.

Page 55: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 55 of 60

E2010.02 Fixed Casework**

E2010.03.01 Blinds**

E2010.03.06 Curtains and Drapes**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1985

1985

1985

Installed

Installed

Installed

35

30

30

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Replace fixed casework. (approx. 10 linear metres)

Replace blinds. (approx. 116 blinds)

Replace curtains. (approx. 14 curtains)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2020

2015

2015

$10,000

$46,400

$5,600

Unassigned

Unassigned

Unassigned

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

MAR-10

MAR-10

MAR-10

(1985) Original Building (Administration - Reception 1224) - has reception counter. (1985) Original Building (Emergency - Waiting 1125) - has reception counter. (1985) Original Building (Operation - Nursing Station 1172) - has reception counter. (1985) Original Building (Acute Care - Nursing Station 152) - has reception counter. (1989) Addition (Long Term Care - Nursing Station R09) - has reception counter. Replace fixed casework. (approx. 10 linear metres)

(1985) Original Building (Administration, Emergency, Laboratory, Operation, Acute Care ) - has vertical blinds. (1989) Addition (Long Term Care, Physiotherapy) - has vertical blinds. (1989) Addition (Dining Area) - has roll-up blinds. Replace vertical blinds. (approx. 63 blinds in 1985; 53 blinds in 1989)

(1985) Original Building (Administration - Treatment 1193; 1195)- has curtains and tracks. (1985) Original Building (Emergency - Emergency Room 1130; 1131) - has curtains and tracks. (1985) Original Building (Operation - Recovery 1166; 1167; 1168; 1169) - has curtains and tracks. (1985) Original Building (Acute Care - Treatment 144) - has curtains and tracks. (1989) Addition (Long Term Care - Patient's Room 203, Tub Room 21) - has curtains and tracks. (1989) Addition (Physiotherapy - Physiotherapy R13) - has curtains and tracks. Replace curtains. (approx. 14 curtains)

Page 56: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 56 of 60

E2010.04 Fixed Floor Grilles and Mats*

E2010.06 Fixed Interior Landscaping*

3 - Marginal

4 - Acceptable

Rating

Rating

1985

1985

Installed

Installed

0

10

Design Life

Design Life

MAR-10

MAR-10

Updated

Updated

Provide new concrete finish. (1 recessed grille)

Failure Replacement 2011 $3,000 Low

(1985) Original Building has recessed floor grille which collects dust and dirt and is unhealthy to users.

Concern:

Provide new concrete finish. (1 recessed grille)Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

(1985) Basement (Vestibule 0101) - has recessed floor grilles. (1985) Original Building (North Main Entrance) - has recessed floor well for carpet. (1989) Addition (North Entrance) - has recessed floor well for carpet.

(1985) Original Building (Reception 1224) - has flower planter. (1985) Original Building (Main Foyer) - has flower planter. (1985) Original Building (Basement - Nourishment 0104) - has flower planter. (1989) Addition (Dining Area - Outside Dining R06) - greenhouse has flower beds.

Page 57: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 57 of 60

F1010.02.03 Glazed Structures* (Greenhouses)

F1020.02.04 Cold Storage Rooms*

F1030.05 Other Special Construction Systems*

F1040.05 Liquid and Gas*: Storage Tanks*

3 - Marginal

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1985

1985

1985

1985

Installed

Installed

Installed

Installed

0

50

0

20

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Repair greenhouse. (8 bays)

Repair 2011 $8,000 Low

(1985) Original Building (Administration - Office 1208; 1209; 1210; 1211) - aluminum framed sloped glazing has damaged trims.

Concern:

Repair greenhouse. (8 bays)Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

(1985) Basement (Cafeteria - Nourishment 0104) - has aluminum framed greenhouse and sloped glazing. (installed in 2000) (1985) Original Building (Administration - Office 1208; 1209; 1210; 1211) - has aluminum framed greenhouse and sloped glazing. (1989) Addition (Dining Area - Dining R06) - has aluminum framed greenhouse and sloped glazing.

(1985) Basement (Cafeteria - Cooler 0111; Freezer 0112) - has walk-in freezer and walk-in cooler.

(1985) Original Building (Basement - Water Treatment Room 009B) - has water treatment equipment.

(1985) Basement (Maintenance - Gas Tank Storage 0149) - has gas tanks. (1985) Basement (Delivery - Gas Tank Storage 0157; 0159) - has gas tanks.

Page 58: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 58 of 60

F2020.01 Asbestos*

F2020.02 PCBs*

F2020.04 Mould*

F2020.06 Radioactive Compounds*

F2020.07 Chloroflorocarbons (CFC Refrigerants)*

3 - Marginal

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1985

1985

1985

1985

1985

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Updated

Replace cement board below exterior brick with non-asbestos exterior finish.

Hazardous Materials Abatement

2011 $8,000 Low

Parging cement board may have asbestos.Concern:

Replace cement board below exterior brick with non-asbestosexterior finish. (See B2010.01.99 Other Exterior Wall Skin* (Parging))

Recommendation:

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

Event:

Type Year Cost Priority

Updated: MAR-10

Parging cement board may have asbestos.

No apparent PCB's observed.

No apparent mould observed.

(1985) Original Building (Radiology Area) - has radioactive compounds.

No apparent chloroflorocarbons observed.

Page 59: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 59 of 60

F2020.08 Biohazardous Materials*

F2020.09 Other Hazardous Materials*

4 - Acceptable

4 - Acceptable

Rating

Rating

1985

1985

Installed

Installed

0

0

Design Life

Design Life

MAR-10

MAR-10

Updated

Updated

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)

(1985) Original Building (Laboratory Area) - has biohazardous materials.

No other hazardous materials observed.

Page 60: RECAPP Facility Evaluation Report - Alberta · Heating is provided by perimeter radiation and radiant ceiling panels. Heating plant is well maintained, consists of copper tube boilers

Report run on: March 29, 2010 9:55 AM Page 60 of 60

K4010.01 Barrier Free Route: Parking to Entrance*

K4010.02 Barrier Free Entrances*

K4010.03 Barrier Free Interior Circulation*

K4010.04 Barrier Free Washrooms*

K4020 Building Code

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1985

1985

1985

1985

1985

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

MAR-10

MAR-10

MAR-10

MAR-10

MAR-10

Updated

Updated

Updated

Updated

Updated

Mayerthorpe - Mayerthorpe Health Care Centre (B1123A)S8 FUNCTIONAL ASSESSMENT

Building has barrier free route from parking lot.

(1985) Original Building (Ambulance Garage to Emergency) - has handicapped access. (1985) Original Building (West Main Entrance) - has aluminum automatic sliding doors. (2 doors) (1989) Addition (North Entrance) - has aluminum automatic sliding doors. (2 doors)

Building has Corridors wide enough for wheelchairs.

(1985) Original Building (Administration - Public Washroom 1129) - is a handicapped washroom. (1989) Addition (Dining Area - Washroom R22; R23) - are handicapped washrooms.

ABC 2006 Group B2 - Hospital and Infirmary. The 1985 Original Building is a single storey with Basement and the 1989 Addition is a single storey, non-combustible construction and sprinklered.