Report run on: January 10, 2012 11:54 PM
RECAPP Facility Evaluation Report
Ecole Maurice Lavallee SchoolB3098A
Edmonton
Greater North Central Francophone Education Region#2
Report run on: January 10, 2012 11:54 PM Page 2 of 51
B3098ABuilding Id:
Ecole Maurice Lavallee SchoBuilding Name:
EdmontonLocation:8828 - 95 Street Address:
7,113.60Gross Area (sq. m): $21,212,000Replacement Cost:1972Construction Year:
Evaluation Date: September 30 2011
Burgess Bredo Architect Ltd.Evaluation Company:
Burgess BredoEvaluator Name:
The original two storey 6,457 sq.m. school was built in 1972. The school is of non-combustible construction, unsprinklered. In 1977 a single storey addition of 300 sq.m. for a Cafeteria and Kitchen was constructed on the roof of the CTSshops. A single stand-alone portable of 140 sq.m. was constructed in 1997. A major modernization was completed in 1997 to the Resource Centre, CTS areas, Reception area, and Cafeteria. The student capacity of the school is 700 and serves grades 10 - 12. Total area of the school including the portable is 6,897 sq.m.
General Summary:
Structural Summary:Exterior wall structure is steel frame and concrete masonry. Interior load bearing walls are concrete masonry throughout on a reinforced concrete slab on grade. The roof structure consists of OWSJ supporting a metal deck. The building structure is overall in good condition
Envelope Summary:Roofs are BUR. Exterior cladding is brick veneer with some exposed concrete block bands. Windows are site sealed aluminum with integral horizontal blinds with some awning type operators. Exterior doors are insulated hollow metal doors in thermally broken PS frames. Entry soffits are stucco clad. Metal cap flashings are painted. The building envelope is in good condition.
Interior Summary:Floor finish is generally VAT or ceramic tile in the classrooms and corridors. Student changerooms and washroom floors are 'Desco' seamless epoxy flooring. The Resource Centre and Administration Suite are carpeted. The Gymnasium has a sprung wood floor with painted sports lines. The interior partitions are metal framed GWB partitions or painted concrete masonry. Ceilings are acoustic tile in standard metal t-bar suspension or GWB. Interior doors are SCWD or painted hollowmetal typically in PS frames. Interior finishes are generally in good condition. Some minor cracking but generally good. Acoustics are poor in the gymnasium and music. Some finishes require upgrade.
Mechanical Summary:Commercial grade plumbing fixtures. Hot water heating system with perimeter radiation, force flow units, unit heaters.and radiant panels. Three built-up air handling units with one for service to gymnasium, one to industrial arts, and third to main school. Air conditioning provided to school via DX compressor on roof. Four fan coil units in computer room connected to condensing units on roof.
21.13%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $4,482,392
Edmonton - Ecole Maurice Lavallee School (B3098A)
Report run on: January 10, 2012 11:54 PM Page 3 of 51
Projects included reconstruction of boys and girls shower rooms to comply with current codes, and replacing ofrefrigeration compressor on roof. Mechanical in acceptable condition.
Electrical Summary:Oil filled pad mounted utility transformer, 600-120/208V/3PH/4W step-down transformer, 800A-347/600V/3PH/4Wmain power distribution switchboard, branch circuit panelboards located throughout school, manual motor startersand motor control centers, mixture of surface and recessed mounted T8 & T12 fluorescent light fixtures, LED exitsigns, wall mounted high pressure sodium light fixtures at exterior, addressable Simplex fire alarm system, securityalarm system, video surveillance system, AC clocks, telephone system, school call system integrated withtelephones, Cat 5E and Cat 6 data system, PA system for stage, cable TV, and emergency power provided by naturalgas emergency generator. Projects include replacing of T12 light fixtures. Electrical in acceptable condition.
Edmonton - Ecole Maurice Lavallee School (B3098A)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: January 10, 2012 11:54 PM Page 4 of 51
A1010 Standard Foundations*
A1030 Slab on Grade*
B1010.01 Floor Structural Frame (Building Frame)*
B1010.02 Structural Interior Walls Supporting Floors (or Roof)*
4 - Acceptable
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1972
1972
1972
1972
Installed
Installed
Installed
Installed
0
0
0
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Mud Jack Concrete Slab in Select Areas (60sq.m.)
Repair 2012 $9,000 Low
Original 1972 floor slab has a history of settlement problems.Mud jacking undertaken at area adjacent south entrance andStaff Lounge. Significant settlement cracks at corridor floorslab opposite Drama Room, student washrooms and at Boysand Girls Shower/Change Rooms.
Concern:
Investigate cause of cracking and settlement of slab in Girl'slocker room and repair. Repair costs based on mud jackingsince it appears to have resolved a similar issue in the StaffLounge.
Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)S1 STRUCTURAL
Event:
Type Year Cost Priority
Updated: JAN-12
Reinforced concrete perimeter grade beams on reinforced concrete piles.
Reinforced concrete slab on grade.
Precast concrete double tees bearing on precast concrete beams and columns at suspended floor assemblies.
Load bearing concrete masonry partitions in a few locations.
Cracking in floor slab of Girl's Locker room.
Report run on: January 10, 2012 11:54 PM Page 5 of 51
B1010.03 Floor Decks, Slabs, and Toppings*
B1010.05 Mezzanine Construction*
B1010.06 Ramps: Exterior*
B1010.07 Exterior Stairs*
B1010.09 Floor Construction Fireproofing*
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1972
1972
1972
1977
1972
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Edmonton - Ecole Maurice Lavallee School (B3098A)
Concrete topping poured over precast concrete at suspended floor assemblies.
Precast concrete double tees bearing on precast concrete beams and columns.
Concrete ramp up to entrance at northwest corner of school, adjacent locker rooms.
Steel-framed exit stair with metal grates at landings and treads serves as second exit from Cafeteria.
No fire proofing visible on the steel framed floor assembly. Assumed that the building complied with the code at time ofconstruction.
Report run on: January 10, 2012 11:54 PM Page 6 of 51
B1010.10 Floor Construction Firestopping*
B1020.01 Roof Structural Frame* - 1972 Section
B1020.01 Roof Structural Frame* - 1977 Section
B1020.04 Canopies* - 1972 Section
B1020.04 Canopies* - 1997 Canopy
3 - Marginal
4 - Acceptable
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
1972
1972
1977
1972
1997
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Repair Fire-stopping at Floor Assemblies (6,457sq.m./gfa)
Repair 2013 $5,000 Low
Openings made in floor slabs have not been properly scaled. Concern:
Repair fire stopping at floor assemblies.Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Type Year Cost Priority
Updated: JAN-12
Openings have been made in floor assemblies to accommodate renovations and changing technology.
Precast concrete double tees bearing on precast concrete beams and columns.
Open-web steel joists bearing on steel beams and columns over existing precast concrete construction below.
Precast concrete canopy at east entrance facing 95 Street.
Steel-framed canopy bearing on concrete piles constructed at south entrance to school.
Report run on: January 10, 2012 11:54 PM Page 7 of 51
B1020.06 Roof Construction Fireproofing*
4 - AcceptableRating
1977Installed
0Design Life
JAN-12Updated
Edmonton - Ecole Maurice Lavallee School (B3098A)
No fire proofing visible on the steel framed roof assembly. Assumed that the building complied with the code at time ofconstruction.
Report run on: January 10, 2012 11:54 PM Page 8 of 51
B2010.01.02.01 Brick Masonry: Ext. Wall Skin* - 1972 Section
B2010.01.02.01 Brick Masonry: Ext. Wall Skin* - 1977 Section
B2010.01.02.02 Concrete Block: Ext. Wall Skin* - 1972 Section
B2010.01.02.02 Concrete Block: Ext. Wall Skin* - 1977 Section
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
B2010.01.09 Expansion Control: Ext. Wall*
4 - Acceptable
5 - Good
4 - Acceptable
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1972
1977
1972
1977
1977
1977
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Updated
Edmonton - Ecole Maurice Lavallee School (B3098A)S2 ENVELOPE
Face brick as outer wythe of exterior cavity walls.
Face brick as outer wythe of exterior cavity walls.
Split-face concrete block banding as outer wythe of exterior cavity walls.
Split-face concrete block banding as outer wythe of exterior cavity walls.
Stucco at north wall of Cafeteria.
Control joints in face brick and at exterior stucco finish at second floor Cafeteria.
Report run on: January 10, 2012 11:54 PM Page 9 of 51
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
B2010.02.03 Masonry Units: Ext. Wall Const.* - 1972 Section
B2010.02.03 Masonry Units: Ext. Wall Const.* - 1977 Section
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation* - 1972 Section
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation* - 1977 Section
B2010.06 Exterior Louvers, Grilles, and Screens*
4 - Acceptable
5 - Good
5 - Good
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1972
1972
1977
1972
1977
1972
Installed
Installed
Installed
Installed
Installed
Installed
20
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
JAN-07
Updated
Updated
Updated
Updated
Updated
Updated
Replace Caulking (490 meters)
Lifecycle Replacement 2015 $15,000 Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Type Year Cost Priority
Updated: JAN-12
Control joints and transitions between dissimilar materials are caulked.
Concrete blocks as inner wythe of exterior cavity walls.
Concrete blocks as inner wythe of exterior cavity walls.
Drawings indicate air space, insulation, and vapour-barriers in exterior cavity walls.
Drawings indicate air space, insulation, and vapour-barriers in exterior cavity walls.
Dark anodized aluminum louvers at Mechanical Room and Mechanical Mezzanine exterior walls.
Report run on: January 10, 2012 11:54 PM Page 10 of 51
B2010.09 Exterior Soffits*
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1972 Section
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1977 Section
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - Cafeteria
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1972
1972
1977
1997
Installed
Installed
Installed
Installed
0
40
40
40
Design Life
Design Life
Design Life
Design Life
JAN-07
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace 1972 Section Aluminum Windows (55sq.m.)
Replace 1977 Section Aluminum Windows (2sq.m.)
Replace Cafeteria Aluminum Windows (18 sq.m.)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2017
2037
$60,000
$2,500
$20,000
Unassigned
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Stucco clad exterior soffits at recessed entrances.
Field-glazed, aluminum-framed windows with awning type vents.
Field-glazed, aluminum-framed windows with awning type vents.
Clear anodized, thermally broken fixed aluminum windows added at Cafeteria during modernization.
Report run on: January 10, 2012 11:54 PM Page 11 of 51
B2030.01.02 Steel-Framed Storefronts: Doors**
B2030.02 Exterior Utility Doors** - 1972 Section
B2030.02 Exterior Utility Doors** - 1977 Section
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
2008
2008
1977
Installed
Installed
Installed
30
40
40
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace Steel-framed Storefronts (6 doors)
Replace 1972 Section Exterior Utility Doors (12doors)
Replace 1977 Section Exterior Utility Doors (2doors)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2038
2048
2017
$20,000
$10,000
$1,600
Unassigned
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Glazed, hollow metal doors with side lites at north, east, and south entrances to school.
Insulated hollow metal doors set in pressed steel frames replaced in 2008.
Glazed insulated hollow metal doors set in pressed steel frames.
Report run on: January 10, 2012 11:54 PM Page 12 of 51
B2030.03 Large Exterior Special Doors (Overhead)*
B2030.04 Exterior Gates*
B3010.01 Deck Vapour Retarder and Insulation* - 1972 Section
B3010.01 Deck Vapour Retarder and Insulation* - 1977 Section
3 - Marginal
4 - Acceptable
5 - Good
5 - Good
Rating
Rating
Rating
Rating
1977
1977
2009
2003
Installed
Installed
Installed
Installed
0
0
0
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-07
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace Wood Overhead Door (9 sq.m.)
Failure Replacement 2012 $7,000 Low
Existing wood overhead door to Industrial Arts 124 in poorcondition- paint peeling, surface cracks. Existing steelthreshold requires refinishing- signs of rust.
Concern:
Replace existing wood overhead door with insulated metalsectional overhead door, including all hardware.
Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Type Year Cost Priority
Updated: JAN-12
Existing wood overhead door to Industrial Arts 124.
Exterior gate at Cafeteria fire exit stair enclosure.
Vapour-retarder and insulation replaced during last re-roofing.
Vapour-retarder and insulation replaced during last re-roofing.
Report run on: January 10, 2012 11:54 PM Page 13 of 51
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** - 1972 Section
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - 1977 Section
B3020.02 Other Roofing Openings (Hatch, Vent, etc)*
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
2009
2003
1972
Installed
Installed
Installed
25
25
0
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace 1972 Section Built-up Roofing (3,847sq.m.)
Replace 1977 Section SBS Roofing (300 sq.m.)
Lifecycle Replacement
Lifecycle Replacement
2034
2028
$645,000
$50,000
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Built-up roofing over 1972 Section replaced with new from 2009 - 2010.
Original roofing over 1977 Section (Cafeteria) replaced with two-ply SBS membrane.
Ladder roof access hatch at Mechanical Mezzanine 204.
Report run on: January 10, 2012 11:54 PM Page 14 of 51
C1010.01 Interior Fixed Partitions*
C1010.02 Interior Demountable Partitions*
C1010.03 Interior Operable Folding Panel Partitions**
C1010.04 Interior Balustrades and Screens, Interior Railings*
C1010.05 Interior Windows*
C1010.06 Interior Glazed Partitions and Storefronts* - 1972 Section
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1972
1997
2004
1972
1972
1972
Installed
Installed
Installed
Installed
Installed
Installed
0
0
30
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Updated
Replace Operable Partition (35 sq.m.)
Lifecycle Replacement 2034 $38,000 Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)S3 INTERIOR
Event:
Type Year Cost Priority
Updated: JAN-12
Interior concrete masonry partitions and load bearing walls. Some framed GWB partitions at Administration Suite andResource Centre 136 workrooms and adjacent classrooms.
Student Counseling Offices subdivided with demountable partitions.
Drama Room and Stage 117 renovated in 2004 including new vinyl clad operable folding panel partitions between Stageand Gymnasium.
Balustrade at mezzanine overlooking Gym is concrete block.
Tempered or wired glass in pressed steel frames throughout.
Hollow metal storefronts with wired glass throughout.
Report run on: January 10, 2012 11:54 PM Page 15 of 51
C1010.07 Interior Partition Firestopping*
C1010.08 Other Partitions*
C1020.01 Interior Swinging Doors (& Hardware)*
3 - Marginal
5 - Good
5 - Good
Rating
Rating
Rating
1972
1997
2008
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Repair Partition Fire-stopping
Repair
Failure Replacement
2012
2011
$5,000
$85,000
Medium
Low
Openings in fire separations have not been properly fire-stopped. May be due to subsequent renovations.
Problems with finish hardware (original locksets) reported.Replacement of original locksets initiated.
Concern:
Concern:
Repair fire-stopping to fire rated partitions where required.
Replace all existing latchsets (knob style) with new lever stylelatchsets (approximately 125 total)
Recommendation:
Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Structure, mechanical ductwork and electrical conduit penetrate fire partitions throughout.
Suspended fabric curtain divides Gym into separate teaching stations.
Solid core wood doors in combination with hollow metal doors at fire rated openings. Knobstyle latchsets throughout.
Report run on: January 10, 2012 11:54 PM Page 16 of 51
C1020.03 Interior Fire Doors*
C1020.04 Interior Sliding and Folding Doors*
C1020.05 Interior Large Doors* - Rolling
C1030.01 Visual Display Boards**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1972
1972
1997
1997
Installed
Installed
Installed
Installed
0
0
0
20
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-07
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace Visual Display Boards (140 boards)
Lifecycle Replacement 2017 $86,000 Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Type Year Cost Priority
Updated: JAN-12
Hollow metal and solid core wood rated doors set in pressed steel frames.
Some SCWD bi-fold doors.
Lockable rolling grille at Administration Reception Desk. Stainless steel rolling shutter at Cafeteria 226 between Kitchen229.
Whiteboards and vinyl-wrapped tackboards throughout.
Report run on: January 10, 2012 11:54 PM Page 17 of 51
C1030.02 Fabricated Compartments (Toilets/Showers)**
C1030.06 Handrails*
C1030.08 Interior Identifying Devices*
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1972
1972
1972
Installed
Installed
Installed
30
0
0
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-07
Updated
Updated
Updated
Replace Metal Toilet Partitions (24 cubicles)
Failure Replacement 2014 $28,000 Low
Some metal toilet/shower partitions have been repainted.Some urinal screens missing. Many partitions damaged,bent, vandalized.
Concern:
Provide new metal toilet partitions throughout.Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Type Year Cost Priority
Updated: JAN-12
Floor mounted metal toilet partitions in staff and student washrooms including barrier-free stall. Metal shower partitions atstudent showers/change rooms.
Clear finish hardwood handrail complete with metal picket railing at stairs.
Door mounted metal sign plates.
Damaged mteal toilet partition.jpg
Report run on: January 10, 2012 11:54 PM Page 18 of 51
C1030.10 Lockers** - 1972
C1030.10 Lockers** - 1997
C1030.12 Storage Shelving*
C1030.14 Toilet, Bath, and Laundry Accessories*
C2010 Stair Construction*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1972
1997
1972
1972
1972
Installed
Installed
Installed
Installed
Installed
30
30
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-07
JAN-12
Updated
Updated
Updated
Updated
Updated
Replace 1972 Metal Lockers (102 lockers)
Replace 1997 Metal Lockers (302 lockers)
Lifecycle Replacement
Lifecycle Replacement
2015
2027
$48,000
$143,000
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Half-tier metal lockers in locker rooms and corridor just outside locker rooms.
Single tier metal lockers at main and second floor corridors complete with original GWB bulkhead.
Variety of storage shelving including metal, painted plywood, and clear finish plywood.
Institutional grade mirrors, soap dispensers, paper towel dispensers and toilet tissue holders in all washrooms.
Original cast-in-place concrete stairs between main floor and second floor (3 stairs total). Painted steel stairs to accessStage 117.
Report run on: January 10, 2012 11:54 PM Page 19 of 51
C2020.05 Resilient Stair Finishes**
C2020.08 Stair Railings and Balustrades*
C2020.11 Other Stair Finishes*
C3010.02 Wall Paneling**
C3010.04 Gypsum Board Wall Finishes (Unpainted)*
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1997
1972
1972
1972
1972
Installed
Installed
Installed
Installed
Installed
20
0
0
30
0
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Replace Rubber Treads on Stairs (38 treads)
Replace Wood Strips in Music Room (52 sq.m.)
Lifecycle Replacement
Lifecycle Replacement
2017
2015
$3,800
$50,000
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Full-width rubber treads on stairs from Gym to mezzanine.
Painted metal railings and handrails.
Epoxy concrete flooring at all stairs complete with carborundum strips.
Wood strips over acoustic insulation in Music room.
Gypsum board wall finishes on minimal amount of framed partitions.
Report run on: January 10, 2012 11:54 PM Page 20 of 51
C3010.06 Tile Wall Finishes**
C3010.09 Acoustical Wall Treatment** - 1972 Section
C3010.09 Acoustical Wall Treatment** - Drama
C3010.11 Interior Wall Painting*
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
1972
1972
2004
1972
Installed
Installed
Installed
Installed
40
20
20
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace Ceramic Wall Tile (8 sq.m.)
Replace 1972 Section Acoustic Wall Treatment(58 sq.m.)
Replace Drama Room Acoustic Wall Panels (64sq.m.)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2024
$76,292
$35,000
$14,000
Unassigned
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Ceramic wall tile in Boy's Washrooms adjacent urinals.
Wood baffles over acoustic insulation in Music room 116.
Fabric-wrapped acoustic panels at Drama room.
Painted concrete masonry partitions throughout. Some painted GWB partitions. Interior wall painting part of ongoingmaintenance.
Report run on: January 10, 2012 11:54 PM Page 21 of 51
C3020.01.01 Epoxy Concrete Floor Finishes*
C3020.01.02 Painted Concrete Floor Finishes*
C3020.02 Tile Floor Finishes**
C3020.04 Wood Flooring**
4 - Acceptable
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1972
1972
1997
1972
Installed
Installed
Installed
Installed
0
0
50
30
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace Porcelain Tile at Vestibules (60 sq.m.)
Replace Wood Flooring in Gym (669 sq.m.)
Lifecycle Replacement
Lifecycle Replacement
2047
2015
$9,500
$165,000
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Epoxy concrete flooring in locker rooms and washrooms. Some cracking, but no displacement.
Painted concrete floor slab at Mechanical Room 123.
Porcelain tile has replaced original floor finishes at entrance vestibules.
Sprung wood floor at Gymnasium 118- refinished with new sports lines as part of regular maintenance.
Report run on: January 10, 2012 11:54 PM Page 22 of 51
C3020.07 Resilient Flooring** - 1972 Section
C3020.07 Resilient Flooring** - 1997 Sheet Vinyl
C3020.07 Resilient Flooring** - 1997 Vinyl Tile
4 - Acceptable
5 - Good
5 - Good
Rating
Rating
Rating
1972
1997
1997
Installed
Installed
Installed
20
20
20
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace 1972 Section Vinyl Asbestos TileFlooring (3,560 sq.m.)
Replace 1997 Sheet Vinyl Flooring (130 sq.m.)
Replace 1997 Vinyl Tile Flooring (360 sq.m.)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2017
2017
$295,000
$7,000
$18,500
Unassigned
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Vinyl asbestos tile flooring throughout most classrooms, corridors, storage rooms, work rooms, and service rooms.Replacement costs will require hazardous materials abatement. Refer to K4030.01 Asbestos*
Sheet vinyl flooring added to Kitchen and Reception Area during 1997 modernization.
Vinyl tile flooring replaced original flooring in Ancillary Classroom, Sewing, and Foods.
Report run on: January 10, 2012 11:54 PM Page 23 of 51
C3020.07 Resilient Flooring** - Classroom 218
C3020.07 Resilient Flooring** - Drama
C3020.07 Resilient Flooring** - Mezzanine
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
2003
2004
1997
Installed
Installed
Installed
20
20
20
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Repace Classroom 218 Vinyl Tile Flooring (101sq.m.)
Replace Drama Room Vinyl Tile Flooring (137sq.m.)
Replace Rubber Flooring in Mezzanine (138 sq.m.)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2023
2024
2017
$5,500
$7,000
$8,000
Unassigned
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Original flooring replaced in Classroom 218 in 2003.
Vinyl tile flooring added to Drama room in 2004.
Rubber athletic flooring added to mezzanine weight room.
Report run on: January 10, 2012 11:54 PM Page 24 of 51
C3020.07 Resilient Flooring** - Skates
C3020.08 Carpet Flooring** - Resource Room
C3030.04 Gypsum Board Ceiling Finishes (Unpainted)*
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 1972 Section
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1985
1997
1972
1972
Installed
Installed
Installed
Installed
20
15
0
25
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace Skate Flooring (36 sq.m.)
Replace Resource Room Carpet (488 sq.m.)
Replace 1972 Section Acoustic Ceiling Tiles(4,420 sq.m.)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2015
$2,000
$32,000
$193,000
Unassigned
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Skate flooring added to a portion of corridor adjacent northwest entrance.
Carpet flooring replaced in Resource Room and two adjacent Technology Suites.
Some painted GWB ceilings on standard metal suspensions in service rooms.
Suspended T-bar grid system with acoustic tiles.
Report run on: January 10, 2012 11:54 PM Page 25 of 51
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 1997 Modernization
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - Kitchen
C3030.07 Interior Ceiling Painting*
D1010.01.02 Hydraulic Passenger Elevators**
5 - Good
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
1997
1997
1997
2009
Installed
Installed
Installed
Installed
25
25
0
30
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace 1997 Acoustic Ceiling Tiles (700 sq.m.)
Replace Kitchen Acoustic Ceiling Tiles (44 sq.m.)
Replace Hydraulic Elevator
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2022
2022
2039
$31,000
$2,300
$72,000
Unassigned
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Original ceiling tiles replaced in suspended T-bar grid system in Cafeteria, Ancillary Classroom, and Resource Centre.
Mylar-clad acoustic ceiling tiles in suspended T-bar grid system.
Some painted GWB ceiling on metal suspension. Painted exposed concrete roof tees at Gymnasium 118.
New hydraulic elevator replaced existing elevator. Manufactured by RAM, 800-pound capacity.
Report run on: January 10, 2012 11:54 PM Page 26 of 51
D2010.04 Sinks**
D2010.05 Showers**
4 - Acceptable
4 - Acceptable
Rating
Rating
1972
1972
Installed
Installed
30
30
Design Life
Design Life
JAN-12
JAN-12
Updated
Updated
Replace Sinks (41)
Reconstruct shower rooms (2)
Replace shower units (12)
Lifecycle Replacement
Code Upgrade
Lifecycle Replacement
2015
2012
2015
$72,000
$150,000
$9,000
Unassigned
High
Unassigned
Existing showers all drain into floor drain located in center ofroom which is not in compliance with current codes for healthconcerns.
Concern:
Redo shower drainage to comply with current codes.Estimate cost as 2 shower rooms @ $50,000.00 per showerroom.
Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)S4 MECHANICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
1972, 1977. 1-1/2 Bradley wash sink, 1- cast iron janitor sink, 4 - floor mounted janitor sinks, 1-stainless steelcommercial kitchen sink, 32 - stainless steel sink, and 2-fiberglass hair wash sinks.
2-metal shower stalls in gym offices, and 2 - gang type showers in boys & girls change room each with six bradleyshower heads each and one floor drain in center of shower room.
Consequences of Deferral:Showers can be a health concern in their presentconfiguration.
Report run on: January 10, 2012 11:54 PM Page 27 of 51
D2010.08 Drinking Fountains/Coolers**
D2010.10 Washroom Fixtures (WC, Lav, Urnl)**
D2020.01.01 Pipes and Tubes: Domestic Water*
D2020.01.02 Valves: Domestic Water**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1972
1972
1972
1972
Installed
Installed
Installed
Installed
35
35
0
40
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace Drinking Fountains (6)
Replace washroom fixtures (22) WC, (9) Urnl, &(18) Lav
Replace domestic water valves (8)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2015
$10,000
$88,000
$9,000
Unassigned
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
3 - electric refrigerated coolers and 3 - wall mounted china drinking fountains.
22 - floor mounted water closets with tanks and flush valves, 9 - floor and wall mounted urinals with flush valves, 7 -recess mounted stainless steel lavatories, 5 - recess mounted enameled steel lavatories, and 6 - wall mounted chinalavatories.
1972 & 1977. Copper domestic water piping.
Isolation valves provided to hot water heater and main water service.
Report run on: January 10, 2012 11:54 PM Page 28 of 51
D2020.01.03 Piping Specialties (Backflow Preventers)**
D2020.02.02 Plumbing Pumps: Domestic Water**
D2020.02.06 Domestic Water Heaters**
D2020.03 Water Supply Insulation: Domestic*
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
2011
1996
1996
1972
Installed
Installed
Installed
Installed
20
20
20
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace backflow preventers (4)
Replace domestic circulating pump (1)
Replace hot water heaters (2)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2031
2016
2016
$1,200
$1,700
$10,000
Unassigned
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Backflow preventers provided on fire and main domestic water service lines.
Gundfoss recirculation pump to hot water heater.
Two State natural gas fired hot water heaters, each with 95 kw input and 265 L storage capacity.
1972 & 1977. Fiberglass pipe insulation on piping.
Report run on: January 10, 2012 11:54 PM Page 29 of 51
D2030.01 Waste and Vent Piping*
D2030.02.04 Floor Drains*
D2040.01 Rain Water Drainage Piping Systems*
D2040.02.04 Roof Drains*
D3010.02 Gas Supply Systems*
D3020.02.01 Heating Boilers and Accessories: H.W.**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1972
1972
1972
1972
1972
1972
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
35
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Updated
Replace heating boilers (3)
Lifecycle Replacement 2015 $135,000 Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Type Year Cost Priority
Updated: JAN-12
1972 & 1977. Cast iron and copper piping.
Floor drains in mechanical rooms and washrooms.
1972 & 1977. Cast iron and schedule 40 steel piping.
1972 & 1977. Drains with aluminum domes with average two per roof section.
Schedule 40 steel piping.
Three natural gas fired Teledyne Larrs boilers, model HB1890B, 554.25 kw input each.
Report run on: January 10, 2012 11:54 PM Page 30 of 51
D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**
D3020.02.03 Water Treatment: H. W. Boiler*
D3030.06.01 Refrigeration Compressors**
4 - Acceptable
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
1972
1972
1972
Installed
Installed
Installed
35
0
25
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace Chimney (20 meters)
Replace Packed Cooling Unit
Lifecycle Replacement
Failure Replacement
2015
2012
$13,000
$175,000
Unassigned
Medium
Existing packaged DX compressor condenser unit is rustingand repair parts hard to obtain.
Concern:
Replace unit with new complete with new unit.Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Galvanized steel chimney to boiler. Galvanized steel common combustion air.
Chemical pot feeder and sidestream filter.
Packaged Trane model #RA10005A DX type R22 compressor condensing unit providing service to building main airhandling unit.
Consequences of Deferral:System could fail and leave school without air conditioningsystem.
Report run on: January 10, 2012 11:54 PM Page 31 of 51
D3030.06.02 Refrigerant Condensing Units**
D3040.01.01 Air Handling Units: Air Distribution**
D3040.01.03 Air Cleaning Devices: Air Distribution*
D3040.01.04 Ducts: Air Distribution*
D3040.01.07 Air Outlets & Inlets: Air Distribution*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
2002
1972
1972
1972
1972
Installed
Installed
Installed
Installed
Installed
25
30
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Replace condensing units (4)
Replace Air Handling Units (3)
Lifecycle Replacement
Lifecycle Replacement
2027
2015
$12,000
$300,000
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Four carrier condensing units on roof with connection to fan coil units in computer room, each model number1303X61855.
One Buffalo built up air handling unit in second floor mechanical room serves school, two Mark-hot built up air handlingunits in main mechanical room - one unit services industrial arts and second serves gymnasium. Each has mixingsection, return fan, supply fan, filter section, and heating coil. Second floor Buffalo unit also includes DX cooling coil.
Murphy dust collector to Industrial Arts Shop.
1972 & 1977. Galvanized steel ductwork.
1972 & 1977: Ceiling and wall mounted supply and return air grilles and diffusers.
Report run on: January 10, 2012 11:54 PM Page 32 of 51
D3040.03.01 Hot Water Distribution Systems**
D3040.04.01 Fans: Exhaust**
D3040.04.03 Ducts: Exhaust*
D3040.04.05 Air Outlets and Inlets: Exhaust*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1972
1972
1972
1972
Installed
Installed
Installed
Installed
40
30
0
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace hot water distribution system (6,757square meters/GFA)
Replace exhaust fans (12)
Lifecycle Replacement
Lifecycle Replacement
2015
2015
$630,000
$25,000
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
1972 & 1977. Schedule 40 steel and copper piping.
1972 & 1977. Dome mounted roof top exhaust fans for service to washrooms and storage rooms. Upblast type roofmounted exhaust fan for service to kitchen range hood in cafeteria.
1972 & 1977. Galvanized steel ductwork. Stainless steel ductwork for kitchen exhaust.
Ceiling mounted exhaust grilles in washrooms.
Report run on: January 10, 2012 11:54 PM Page 33 of 51
D3050.01.02 Packaged Rooftop Air Conditioning Units (& Heating Units)**
D3050.02 Air Coils**
D3050.05.02 Fan Coil Units**
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1977
1972
1972
Installed
Installed
Installed
30
30
30
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace HVAC unit (1)
Replace reheat coils (30)
Replace Fan Coil Units (9)
Failure Replacement
Lifecycle Replacement
Lifecycle Replacement
2012
2015
2015
$25,000
$45,000
$50,000
Medium
Unassigned
Unassigned
Unit enclosure is rusting and starting to leak. Repair partshard to obtain. Unit no longer reliable.
Concern:
Replace unit with new.Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Carrier HVAC unit for service to second floor cafeteria. Appears to be 7.5 ton unit, natural gas fired with electric cooling.No labels to indicate capacities.
Reheat coils in ductwork.
Fan coil unit units with hot water heating coils at entry vestibules. Fan coil units with DX cooling coils provide service tocomputer room.
Report run on: January 10, 2012 11:54 PM Page 34 of 51
D3050.05.03 Finned Tube Radiation**
D3050.05.06 Unit Heaters**
D3050.05.08 Radiant Heating (Ceiling & Floor)**
4 - Acceptable
4 - Acceptable
5 - Good
Rating
Rating
Rating
1972
1972
2004
Installed
Installed
Installed
40
30
35
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace finned tube radiation (6,757 squaremeters/GFA)
Replace Unit Heaters (5)
Replace radiant heating (40 units)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2039
$318,000
$27,000
$34,000
Unassigned
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
1972 & 1977. Finned tube radiation in metal cabinet.
Hot water unit heater in mechanical rooms and industrial arts room.
Hot water radiant panels installed in music room and drama room.
Report run on: January 10, 2012 11:54 PM Page 35 of 51
D3060.02.02 Pneumatic Controls**
D3060.02.05 Building Systems Controls (BMCS, EMCS)**
D4020 Standpipes*
D4030.01 Fire Extinguisher, Cabinets and Accessories*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1972
1986
1972
1972
Installed
Installed
Installed
Installed
40
20
0
0
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
MAR-07
JAN-12
Updated
Updated
Updated
Updated
Replace pneumatic controls (6,757 squaremeters/GFA)
Replace building DDC system (6,757 squaremeters/GFA)
Lifecycle Replacement
Lifecycle Replacement
2015
2015
$40,000
$148,000
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
1972 & 1977. Pneumatic control valves, thermostats, and dampers.
Andover DDC system.
Fire hose standpipe cabinets located throughout building.
1972 & 1977. ABC fire extinguishers in enclosures and fire hose cabinets.
Report run on: January 10, 2012 11:54 PM Page 36 of 51
D4090.04 Dry Chemical Fire Extinguishing Systems (Kitchen Hood)**
4 - AcceptableRating
1977Installed
40Design Life
JAN-12Updated
Replace fire extinguishing system (1)
Lifecycle Replacement 2037 $13,000 Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Type Year Cost Priority
Updated: JAN-12
Fire suppression in kitchen range hood.
Report run on: January 10, 2012 11:54 PM Page 37 of 51
D5010.01.02 Main Electrical Transformers (Utility Owned)*
D5010.02 Secondary Electrical Transformers (Interior)**
D5010.03 Main Electrical Switchboards (Main Distribution)**
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1972
1972
1972
1972
Installed
Installed
Installed
Installed
0
40
40
30
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Replace secondary Electrical Transformer (1)
Replace main distribution switchboard (1)
Replace branch circuit panelboards (14)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2015
$24,500
$15,000
$70,000
Unassigned
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)S5 ELECTRICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Oil filled pad mounted utility transformer located outside on West side of building.
150KVA 600-120/208V dry type transformers located in main electrical room.
800A-347/600V/3PH/4W main distribution switchboard as manufactured by Federal Pioneer Electric. Switchboardlocated in main electrical room.
Federal Pioneer NBLP 120/208V/3PH/4W and NHDP 347/600V/3PH/4W panelboards located throughout school.
Report run on: January 10, 2012 11:54 PM Page 38 of 51
D5010.07.01 Switchboards, Panelboards, and (Motor) Control Centers**
D5010.07.02 Motor Starters and Accessories**
D5020.01 Electrical Branch Wiring*
D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*
D5020.02.02.01 Interior Incandescent Fixtures*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1972
1972
1972
1972
1997
Installed
Installed
Installed
Installed
Installed
30
30
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Replace motor control centres (5 sections)
Replace motor starters (10)
Lifecycle Replacement
Lifecycle Replacement
2015
2015
$50,000
$10,000
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
One 2 section and one 3 section motor control centers as manufactured by Klockner Moeller located in mechanicalrooms.
10 manual motor starters to small motor loads.
Copper wiring installed in conduit.
Light control is provided by low voltage switches. Each classroom has own switches to control lights. Dimmer switchescontrol lights in Stage.
Surface mounted track lighting located in Resource Center.
Report run on: January 10, 2012 11:54 PM Page 39 of 51
D5020.02.02.02 Interior Fluorescent Fixtures** - (1972 & 1977)
D5020.02.02.02 Interior Fluorescent Fixtures** - (1997)
D5020.02.03.02 Emergency Lighting Battery Packs**
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
0
1997
1972
Installed
Installed
Installed
30
30
20
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace interior light fixtures (1250 fixtures)
Replace interior light fixtures (200 fixtures)
Replace emergency lighting battery pack unit (1)
Failure Replacement
Lifecycle Replacement
Lifecycle Replacement
2012
2027
2015
$475,000
$75,000
$1,600
High
Unassigned
Unassigned
Repair parts are no longer available and T12 fluorescent lightfixtures no longer provide reliable operation.
Concern:
Replace T12 fluorescent light fixtures.Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
(1972 & 1977) Mixture of surface and recessed mounted light fixtures with T12 lamps. Some fixtures in exit corridorsconnected to emergency generator to provide emergency lighting in school.
Recessed mounted fluorescent light fixtures with T8 lamps and electronic ballasts.
DC emergency battery pack unit by emergency generator.
Report run on: January 10, 2012 11:54 PM Page 40 of 51
D5020.02.03.03 Exit Signs*
D5020.03.01.04 Exterior H.P. Sodium Fixtures*
D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*
D5030.01 Detection and Fire Alarm**
D5030.02.02 Intrusion Detection**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1972
1997
1972
2003
1997
Installed
Installed
Installed
Installed
Installed
0
0
0
25
25
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Replace fire alarm system (6,757 squaremeters/GFA)
Replace intrusion detection system (6,757 squaremeters/GFA)
Lifecycle Replacement
Lifecycle Replacement
2028
2022
$200,000
$200,000
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Exit signs at exit doors and to identify paths to exit. Exit signs upgraded to include LED lamps in 2003.
Wall mounted HPS lights located along building perimeter and in soffits at building entrances.
Exterior lighting is controlled by a photo cell with a manual override.
Simplex addressable fire alarm system complete fire alarm panel, annunciators, horn/strobe alarm units, and firedetection devises.
Basic security system complete with alarm keypad, door sensors, and motion sensors. System monitored by Telsco.
Report run on: January 10, 2012 11:54 PM Page 41 of 51
D5030.02.04 Video Surveillance**
D5030.03 Clock and Program Systems*
D5030.04.01 Telephone Systems*
D5030.04.03 Call Systems**
D5030.04.04 Data Systems*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
2000
1972
1997
1997
1997
Installed
Installed
Installed
Installed
Installed
25
0
0
25
0
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Updated
Updated
Replace video surveillance (16 cameras)
Replace call system (30 classrooms)
Lifecycle Replacement
Lifecycle Replacement
2025
2022
$100,000
$60,000
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
16 CCTV cameras located throughout school and along building exterior. Cameras monitored in general office andcustodian office. System includes digital recorder.
AC wall mounted clocks located in classrooms and corridors.
Norstar phone system with telephone in each classroom and general office. System connected to school call system.
Rauland Telecenter call system interfaced with telephone system. Installation includes paging speakers in corridors andclassrooms.
Cat 5E and Cat 6 data system with outlets located throughout school and cables installed to server located on mainfloor.
Report run on: January 10, 2012 11:54 PM Page 42 of 51
D5030.05 Public Address and Music Systems**
D5030.06 Television Systems*
D5090.02 Packaged Engine Generator Systems (Emergency Power System)**
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1997
1972
1972
Installed
Installed
Installed
20
0
35
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace public address system (1)
Replace Emergency Generator (1)
Lifecycle Replacement
Lifecycle Replacement
2017
2015
$5,000
$55,000
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
TOA 9000 series wall mounted amplifier to Stage. Installation includes speakers, mixers, and microphone outlets.
Cable TV system with TV outlets located throughout school.
Onan natural gas fuelled generator with transfer panel. Generator rated for 347/600V/3PH/4W and is protected with a20A circuit breaker. Emergency lighting is provided by emergency generator.
Report run on: January 10, 2012 11:54 PM Page 43 of 51
E1090.03 Food Service Equipment*
E1090.04 Residential Equipment*
E1090.07 Athletic, Recreational, and Therapeutic Equipment*
E2010.02 Fixed Casework** - 1972 Section
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1997
1997
1972
1972
Installed
Installed
Installed
Installed
0
0
0
35
Design Life
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-07
JAN-12
Updated
Updated
Updated
Updated
Replace 1972 Section Casework (6,457 sq.m./gfa)
Lifecycle Replacement 2015 $560,000 Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
Event:
Type Year Cost Priority
Updated: JAN-12
Food Studies Cafeteria 226/Kitchen 229: modernized in 1997,contracted out service. Includes commercial kitchenequipment- cooler, fryer, commercial range with hood and residential freezers.
Residential-grade appliances in Staff room and Food side of Home Economics room. Residential washer and dryer in theSewing side of Home Economics room.
Gymnasium 118: main court powered basketball backstops (2), cross court basketball backstops (4), score clock,assorted exercise equipment.
Industrial Arts: painted plywood with plastic laminate countertops; heavy-duty storage shelving with galvanized ironcountertops. Educational: Plastic, laminate-clad casework with acid resistant countertops in Science rooms. Miscellaneous: Plastic laminate-clad vanities in washrooms, painted plywood storage shelving, plastic laminate-cladcountertops over painted plywood casework in staff washroom. Replacement costs for Lifecycle Replacement event excludes costs for 1997 and 2003 casework.
Report run on: January 10, 2012 11:54 PM Page 44 of 51
E2010.02 Fixed Casework** - 1997
3 - MarginalRating
1997Installed
35Design Life
JAN-12Updated
Repair Countertops in Student Kitchens (36meters)
Repair Resource Centre Desk (12 meters)
Replace 1997 Casework (53 meters)
Repair
Repair
Lifecycle Replacement
2012
2012
2032
$3,500
$3,000
$40,000
Low
Low
Unassigned
Laminate is beginning to de-laminate on countertops instudent kitchens of Home Economics room.
Veneer is peeling off in some areas; casework requiresrefinishing.
Concern:
Concern:
Repair plastic laminate on countertops in Student Kitchens.
Repair veneer on Resource Centre desk and refinish.
Recommendation:
Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Plastic, laminate-clad countertops over clear finish casework in Reception and Resource Desk. Clear finish woodbookshelves in Resource Centre. New countertops provided in Home Economics Food.
Laminate is de-laminating.
Report run on: January 10, 2012 11:54 PM Page 45 of 51
E2010.02 Fixed Casework** - 2003
E2010.03.01 Blinds**
E2020.02.03 Furniture*
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
2003
1972
1997
Installed
Installed
Installed
35
30
0
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Replace 2003 Casework (24 meters)
Replace Window Blinds (75 sq.m.)
Lifecycle Replacement
Lifecycle Replacement
2038
2015
$20,000
$7,500
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Plastic, laminate-clad countertops over clear-finish casework in Staff Lounge. Acid-resistant countertops over clear-finishcasework in Science room 218.
Metal, horizontal blinds located between two lites in windows.
Wide-variety of educational furnishings including desks, tables, and chairs.
Report run on: January 10, 2012 11:54 PM Page 46 of 51
F1010.02.04 Portable and Mobile Buildings** - 1997 Portables
5 - GoodRating
1997Installed
30Design Life
JAN-12Updated
Replace Doors (2), Visual Display Boards (4), VinylTile (42 sq.m.), Carpet (98 sq.m.), Acoustic WallPanels (24 sq.m.), Acoustic Ceilings (140 sq.m.),Casework (6 Meters) and Window Blinds (2.5sq.m.)
Replace Furnace (1) and Condensing Unit (1)
Replace Lights (20), Emergency Battery Packs (2)and Panel (1)
Replace Siding (194 sq.m.), Exterior Doors (2),Windows (2.5 sq.m.), Shingles (148 sq.m.) andEavetroughs (35 meters)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2017
2022
2027
2027
$40,000
$9,000
$15,000
$48,000
Unassigned
Unassigned
Unassigned
Unassigned
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Event:
Event:
Type
Type
Type
Type
Year
Year
Year
Year
Cost
Cost
Cost
Cost
Priority
Priority
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Description: one stand alone portable without link located on the west side of the school in 1997 and totalingapproximately 140 sq.m. Year of construction reported to be 1997. This portable serves as a music room and does notappear on the mini plans. Structural: Wood framed walls and floor with pitched wood trusses at roof. Portable is set on screw piles with metal cladplywood skirting. Envelope: Metal siding exterior finish with asphalt shingles, PVC horizontal slider windows and hollow metal exteriordoors set in pressed steel frames. Two wood framed steps at entrances. Interior: Partitions are wood frame and gypsum board. Finishes include painted walls, vinyl wall coverings, acousticceiling tiles and vinyl tile flooring. Clear finish wood casework in classrooms. Acoustic wall panels with fabric drapes atwindows, whiteboards and tackboards throughout. Mechanical: Natural gas furnace with DX cooling coil in furnace room complete with ductwork in ceiling space, ceilingmounted grilles, fresh air intake, condenser on roof, and ABC fire extinguisher in cabinet. Electrical: Recess mounted fluorescent light fixtures with T8 lamps, DC emergency lighting system, wall mounted DCclock, and 120/240V/1PH/3W power panels.
Report run on: January 10, 2012 11:54 PM Page 47 of 51
F1010.02.05 Grandstands and Bleachers**
4 - AcceptableRating
1972Installed
30Design Life
JAN-12Updated
Provide Guardrails for Bleachers
Replace Gym Bleachers (280 seats)
Code Upgrade
Lifecycle Replacement
2012
2015
$6,000
$63,000
Low
Unassigned
Gymnasium bleachers at south side do not have guardrails atoutside ends as required by building code.
Concern:
Provide sleeves in existing units and removable guardrails toconform to current code requirements.
Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
Updated:
JAN-12
JAN-12
JAN-12
Retractable metal and wood bleachers seating approximately 280 in Gym.
Report run on: January 10, 2012 11:54 PM Page 48 of 51
K4010.01 Barrier Free Route: Parking to Entrance*
K4010.02 Barrier Free Entrances*
4 - Acceptable
3 - Marginal
Rating
Rating
1997
1972
Installed
Installed
0
0
Design Life
Design Life
JAN-12
JAN-12
Updated
Updated
Add Door Operators at South Entrance (2 doors)
Barrier Free Access Upgrade 2012 $8,000 Low
Power door operators are not provided at a main entrance tothe school.
Concern:
Add power door operators to south entrance. Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)S8 SPECIAL ASSESSMENT
Event:
Type Year Cost Priority
Updated: JAN-12
Designated barrier-free parking stall provided adjacent south entrance complete with dropped curb. Bus drop-off is ateast doors of 95 Street.
Power door operator required at one main entrance (south).
Report run on: January 10, 2012 11:54 PM Page 49 of 51
K4010.03 Barrier Free Interior Circulation*
K4010.04 Barrier Free Washrooms*
K4030.01 Asbestos*
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1972
1997
1972
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Add Wheel Chair Lift to Stage
Upgrade Access to Public Counters (2)
Barrier Free Access Upgrade
Barrier Free Access Upgrade
2012
2014
$25,000
$4,000
Low
Low
The Stage adjacent Drama Room is used as a teachingspace, but does not have a lift.
Barrier-free access to Reception counter and Resource roomdesk does not comply to current code (too high, no kneespace).
Concern:
Concern:
Add wheel chair lift to Stage.
Upgrade public counters by lowering one section and addingknee space.
Recommendation:
Recommendation:
Edmonton - Ecole Maurice Lavallee School (B3098A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JAN-12
JAN-12
Good access to all teaching spaces in the building with exception of stage adjoining Drama room. Lever-style doorhardware added in 2002.
A special-needs washroom complying to current code has been provided on second floor.
Asbestos present in vinyl asbestos tile. Refer to C3020.07 - 1972 Section.
Report run on: January 10, 2012 11:54 PM Page 50 of 51
K4030.04 Mould*
K4030.09 Other Hazardous Materials*
K5010.01 Site Documentation* - Site Plan
4 - Acceptable
4 - Acceptable
5 - Good
Rating
Rating
Rating
1972
1972
1972
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
JAN-12
JAN-12
JAN-12
Updated
Updated
Updated
Edmonton - Ecole Maurice Lavallee School (B3098A)
No mould was observed or reported.
No other hazardous materials known or reported.
Site was evaluated on September 30, 2011 by Burgess Bredo Architect Ltd. A site plan was supplied by the SchoolDistrict. This site plan was supplemented with aerial photographs to help quantify site components. All areas of the sitewere evaluated.
Site plan supplied by School District.
Report run on: January 10, 2012 11:54 PM Page 51 of 51
K5010.02 Building Documentation* - Floor Plan
5 - GoodRating
1972Installed
0Design Life
JAN-12Updated
Edmonton - Ecole Maurice Lavallee School (B3098A)
Building was evaluated on September 30, 2011 by Burgess Bredo Architect Ltd. A floor plan was supplied by the SchoolDistrict. The building has an area of 13,245 sq. m. which includes one addition and three portables in one group. Allareas of the building were evaluated.