Report run on: March 20, 2007 3:15 PM
RECAPP Facility Evaluation Report
Breton High School
B2483ABreton
Wild Rose School Div #66
Report run on: March 20, 2007 3:15 PM Page 2 of 36
B2483ABuilding Id:
Breton High SchoolBuilding Name:
BretonLocation:P. O. Box 666 Address:
4,230.30Gross Area (sq. m): $8,503,631Replacement Cost:0Construction Year:
Evaluation Date: October 17 2006
Manasc Isaac ArchitectsEvaluation Company:
Sareena JamalEvaluator Name:
In 1959 the single storey original school was constructed, with a double height Industrial arts room. In 1965 a single storey addition was constructed, to the west of the original school, with a double heightancillary/theatre space. In 1968 a single storey addition was constructed south of the 1965 addition. In 1991 a further two storey addition was constructed, and extensive interior and exterior renovations were completed. The current total gross area of the building is 4,230 m2 Current enrollment is 185.
General Summary:
Structural Summary:Concrete and steel construction, original building and additions The original 1958 building is concrete piles and grade beam with steel structure, concrete block interior walls, a partialconcrete basement and crawlspace. The 1965, and 1991 additions are slab on grade, steel structure, concrete block interior walls, with double height areas,and concrete topping on steel deck mezzanines in each (gymnasium, industrial arts, ancillary/theatre). The 1968 addition is slab on grade steel structure with concrete block interior walls. The roof structure throughout is steel deck on open web steel joists.
Envelope Summary:Coarse aggregate acrylic stucco and metal siding on exterior walls, with aluminum flashing and painted steel trim. All windows are aluminum frame. Casements in classrooms are original (1959, 1965, 1968). Balance of windows are double glazed aluminum frame (1991). Roof is built-up bituminous roofing with SBS parapets. Exterior doors are steel in steel frame with and without glass lites.
Interior Summary:Interior partitions are painted gypsum board or concrete block, floors are linoleum in hallways and service rooms,ceramic tile in lobby and washroom areas and carpet in classrooms and offices. There is wood strip flooring in theGymnasium. Ceilings are painted gypsum and suspended acoustic tile, with wood panel ceiling in theoffice/administration area. Interior doors are solid core wood in pressed steel frames, and interior windows are in paintedsteel frames.
Mechanical Summary:150dia sanitary service from 200dia water main. 50 dia. Water service from Town Main to water meter in meter room. Fire hydrant located within 50m from main entrance. Surface type storm drainage system. Medium pressure gas to gas meter in meter room. Two Engineered Air central air handling units provide ventilation for facility. Heating system consists of two water tube boilers serving perimeter radiation, heating coils, radiant panels, unit heatersetc. Domestic water system complete with recirculation pump is fed from two gas fired water heaters. Copper pipingdistribution to various plumbing fixtures. DDC control system updated by Johnson Controls.
1.99%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $169,300
Breton - Breton High School (B2483A)
Report run on: March 20, 2007 3:15 PM Page 3 of 36
Electrical Summary: The main service is fed from a utility owned pad mount transformer (size unknown) with secondary's feeding a Siemens1200amp 120-208volt 3phase 4wire MDP c/w a 1000amp main breaker which feeds branch cct panelboards andmechanical loads throughout. Mechanical loads are controlled by loose, wall mounted starters. Interior florescent lightingis magnetic ballasts and T-12 lamps, controlled by low voltage switching throughout. Battery packs c/w integral andremote lamps, exit lights are LED style. Exterior fixtures consist of 70/100watt HPS wall and 250watt MH pole mountedfixtures controlled via photo cells. The fire alarm system is a Simplex 40002 FACP c/w manual pullstations,bells,heat/smoke/duct detectors and door hold open devices. A push button at the main entrance ringsthroughout the entire school, the intrusion detection system is a Silent Knight c/w motion detectors, keypad.Surveillance is an I3 DVR c/w color cameras throughout. Clock system is a combination Simplex, Nortel Meridiantelephone system c/w handsets throughout. Dukane public address/music system c/w a Sony CD player. Supernet isinstalled, cat5 and 5e installed throughout c/w main servers, data racks, patch panels. APC 1000va and 1500va UPSprotecting servers. Overall Rating is Good
Breton - Breton High School (B2483A)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: March 20, 2007 3:15 PM Page 4 of 36
A1010 Standard Foundations* - 1959
A1030 Slab on Grade* - 1965
A1030 Slab on Grade* - 1968
A1030 Slab on Grade* - 1991
A2020 Basement Walls (& Crawl Space)*
B1010.01 Floor Structural Frame*(Building Frame)
B1010.02 Structural Interior Walls Supporting Floors (or Roof)* - 1959
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
Rating
1959
1965
1968
1991
1959
1959
1959
Installed
Installed
Installed
Installed
Installed
Installed
Installed
100
100
100
100
100
100
100
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (B2483A)
S1 STRUCTURAL
Concrete piles and grade beam
Concrete slab on grade.
Concrete slab on grade.
Concrete slab on grade.
Concrete walls in basement and crawl space.
Steel floor structural frame above basement and crawlspace.
Concrete block interior walls
Report run on: March 20, 2007 3:15 PM Page 5 of 36
B1010.02 Structural Interior Walls Supporting Floors (or Roof)* - 1965
B1010.02 Structural Interior Walls Supporting Floors (or Roof)* - 1968
B1010.02 Structural Interior Walls Supporting Floors (or Roof)* - 1991
B1010.05 Mezzanine Construction*
B1020.01 Roof Structural Frame*
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
1965
1968
1991
0
0
Installed
Installed
Installed
Installed
Installed
100
100
100
80
100
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (B2483A)
Concrete block interior walls
Concrete block interior walls
Concrete block interior walls.
1959, 1965, 1991 - Concrete topping on steel deck
1959, 1965, 1968, 1991 - Steel deck on open web steel joists.
Report run on: March 20, 2007 3:15 PM Page 6 of 36
B2010.01.06.03 Metal Siding**
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
B2010.01.09 Expansion Control: Exterior Wall Skin*
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
B2010.06 Exterior Louvers, Grilles, and Screens*
B2010.09.03 Siding Panels:Soffits
B2020.01.01.02 Aluminum Windows (Glass & Frame)**
5 - Good
5 - Good
5 - Good
4 - Acceptable
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
Installed
Installed
40
75
75
20
30
0
40
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (B2483A)
S2 ENVELOPE
1959 original building, 1965, 1968, 1991additions - Metal siding along top of exterior walls
Coarse aggregate acrylic stucco on exterior walls.
Expansion joints for stucco exterior walls.
Caulking at joints of acrylic stucco on exterior.
Painted metal exterior louvers and grilles
Prefinished metal soffits at main entry doors at West and Southwest entrances.
Double glazed windows in thermally broken aluminum frames, west face of building.
Report run on: March 20, 2007 3:15 PM Page 7 of 36
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - integrated blinds
B2020.02 Storefronts**
B2030.01.02 Steel-Framed Storefronts**
B2030.02.01 Metal Doors and Frames
B2030.03 Large Exterior Special Doors (Overhead)*
4 - Acceptable
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
0
1991
1991
1965
1991
Installed
Installed
Installed
Installed
Installed
40
40
30
0
30
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Replace Aluminum windows
Failure Replacement 2008 $13,000 High
Integrated blinds sticking, caulking failure.Concern:
Replace with energy efficient windows. 10 windows, aluminum frame casement windows 1800mm x1500 mm.
Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
(1959, 1965, 1968) Aluminum windows with integral horizontal blinds
Aluminum storefront entry way vestibule with two sets of double doors, lites on both sides of doors and glazed detail above.
Steel framed storefront at north building entry, pair of wood doors with lites, panic hardware and closers.
1959, 1965, 1968, 1991 - Steel exterior doors in painted steel frame (with and without glass lites), panic hardware andclosers.
Industrial overhead garage door (4m high) with glazed lites.
Report run on: March 20, 2007 3:15 PM Page 8 of 36
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)**
B3010.08.02 Metal Gutters and Downspouts**
B3020.01 Skylights**
4 - Acceptable
4 - Acceptable
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
Rating
1991
1991
0
1991
Installed
Installed
Installed
Installed
25
25
30
20
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Repair Skylight seals
Repair 2008 $5,000 Unassigned
Skylights are leaking, staining walls below.Concern:
Repair roof skylight. Patch and repair gypsum walls below.Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
1959 original building, 1965, 1968, 1991 additions - Built up roof.
1959 original building, 1965, 1968, 1991 additions - SBS Parapets
1959, 1965, 1968, 1991 - Metal gutters and downspouts draining to concrete splashpads.
1965 - Double glazed octagonal skylight, aluminum frames, tinted glazing, main lobby. 1991 - Double glazed angled skylight, aluminum frames, tinted glazing, gym lobby.
Report run on: March 20, 2007 3:15 PM Page 9 of 36
C1010.01 Interior Fixed Partitions*
C1010.04.02 Wood Handrails and Guard Rails
C1010.05 Interior Windows*
C1010.06 Interior Glazed Partitions and Storefronts*
5 - Good
2 - Poor
5 - Good
5 - Good
Rating
Rating
Rating
Rating
0
0
1991
1991
Installed
Installed
Installed
Installed
50
0
40
30
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Code Repair Wood Guard Rails
Code Repair 2007 $5,600 Unassigned
Mezzanine at IA classroom has retrofit wood railing that is notconstructed to building code.
Concern:
Install permanent balustrade and railing. Painted steel pipe railing 40 mm, 900mm high, 10 m long with 12 mm tube pickets $5,600
Recommendation:
Breton - Breton High School (B2483A)
S3 INTERIOR
Event:
Type Year Cost Priority
Updated: MAR-07
(1959, 1965, 1968, 1991) - Painted concrete block and gypsum board and steel stud interior fixed partitions.
Wooden rail at IA room mezzanine.
1959 building, 1965, 1968, 1991 additions - Painted steel framed interior windows and sidelights at classroom doors
1965 addition - Painted steel framed storefronts with wood doors at Library and main office entrance 1959 original school, 1991, 1968 additions - painted steel storefronts with wood doors at building entry vestibules.
Report run on: March 20, 2007 3:15 PM Page 10 of 36
C1020.01.07 Wood Doors
C1020.03 Interior Fire Doors*
C1020.07 Other Interior Doors*
C1030.01 Visual Display Boards**
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
1991
1991
1991
1991
Installed
Installed
Installed
Installed
0
50
15
20
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Breton - Breton High School (B2483A)
1959 building, 1965, 1968, 1991additions - wood doors in painted steel frame with and without glass lites, panic hardware orclosers. Plexi kick plate on inside of some doors.
1959 building, 1965, 1968, 1991 additions - Fire rated painted steel doors and frames.
Fabricated steel grille/gate with panic hardware at base of stairs from fitness room mezzanine.
Bulletin boards and white boards in classrooms and hallways.
Report run on: March 20, 2007 3:15 PM Page 11 of 36
C1030.02 Fabricated Compartments(Toilets/Showers)**
C1030.08 Interior Identifying Devices*
C1030.10 Lockers**
3 - Marginal
5 - Good
4 - Acceptable
Rating
Rating
Rating
1991
1991
1991
Installed
Installed
Installed
30
20
30
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Failure Replacement
Replacement shower accessories
Failure Replacement
Failure Replacement
2008
2008
$3,300
$800
High
Medium
Damaged partitions.
Missing shower curtains and rods
Concern:
Concern:
Replace 3 painted metal toilet partition cubicle $3,300
Shower curtains and rods 8 sets $800
Recommendation:
Recommendation:
Breton - Breton High School (B2483A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-07
MAR-07
Painted metal floor mounted toilet and shower partitions.
Printed acrylic room name signage and/or plastic signs with engraved text on each door.
Painted metal lockers along hallways, and in Gym changing rooms
Report run on: March 20, 2007 3:15 PM Page 12 of 36
C1030.12 Storage Shelving*
C1030.14 Toilet, Bath, and Laundry Accessories*
C2010 Stair Construction*
C2020.05 Resilient Stair Finishes**
4 - Acceptable
3 - Marginal
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
1991
0
0
1991
Installed
Installed
Installed
Installed
20
20
100
20
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Failure Replacement Toilet Accessories
Lifecycle Replacement 2007 $1,300 High
8 new soap dispensers, 4 new paper towel dispensers and 3toilet roll dispensers missing.
Concern:
Replace missing toilet accessories. Liquid soap dispenser, wall type surface mounted, 450ml 8 at$105 ea Paper towel leaf type, Surface mounted horizontal 4 at $84 ea Toilet tissue, roll type, flush mounted double 3 at $42 ea
Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
Clear finish or painted wood shelving in Janitor/storage rooms. Adjustable painted steel textbook storage shelving in Adminstorage room.
Mirrors, towel dispensers, toilet roll holders, soap dispensers of various ages.
1959, 1965, 1991 - Cast in place concrete stairs to mezzanines
1991 addition - Rubber treads and risers.
Report run on: March 20, 2007 3:15 PM Page 13 of 36
C2020.06 Carpet Stair Finishes**
C2020.08 Stair Railings and Balustrades*
C2030.02 Ramp Finishes*
C2030.03 Ramp Railings*
C3010.01 Concrete Wall Finishes*
3 - Marginal
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
1991
0
1991
1991
1965
Installed
Installed
Installed
Installed
Installed
10
50
0
50
100
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Replace standard carpet on stairs
Failure Replacement 2008 $1,000 Medium
Broadloom carpet on stair buckling, worn.Concern:
Replace standard carpet on stairs (nylon 750g.). 15 m2
Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
Broadloom carpet on stairs room 120 with rubber trim.
1959, 1965, 1991 - Painted steel pipe rails at mezzanines and stairs
Textured rubber flooring on ramp
Painted steel pipe rail at ramp
Painted concrete block walls in original building and additions.
Report run on: March 20, 2007 3:15 PM Page 14 of 36
C3010.06 Tile Wall Finishes**
C3010.09 Acoustical Wall Treatment**
C3010.11 Interior Wall Painting**
C3020.01.02 Paint Concrete Floor Finishes**
C3020.02 Tile Floor Finishes**
C3020.03 Terrazzo Floor Finishes*
5 - Good
5 - Good
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1991
1991
2001
0
1991
1991
Installed
Installed
Installed
Installed
Installed
Installed
40
20
10
10
50
75
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (B2483A)
1959, 1965, 1968, 1991 - 100mm glazed ceramic wall tile in water closets, changerooms, at water fountains and janitor'smop sinks 1965 - 300mm wall tile in student lounge, north of main entry
Acoustic fabric covered wall panels in room 120. Acoustic block gymnasium walls.
1959, 1965, 1968, 1991 - Painted gypsum wall board and concrete block.
Painted concrete floor in mechanical rooms and IA classroom/workshop.
100 mm square quarry tile on washroom floors (1968 addition) 300 mm square ceramic tile in main lobby and adjacent lounge (1965 addition), and sw lobby at gym (1991 addition) 300 mm square ceramic tile on washroom floors (1991 addition)
Sloped terrazzo shower floor in staff wc/shower room.
Report run on: March 20, 2007 3:15 PM Page 15 of 36
C3020.04 Wood Flooring**
C3020.07 Resilient Flooring** Lino
C3020.07.02 Resilient Sheet Flooring - vinyl
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1991
1991
1991
Installed
Installed
Installed
30
20
0
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Refinish wood plank flooring
Repair 2009 $10,000 High
Preventative maintenanceConcern:
Major sanding, sealing and resurfacing of wood floor.Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
Wood slat floor in Gymnasium.
Linoleum sheet flooring (hallways, science, storage, fitness, mechanical, beauty culture).
Sheet vinyl flooring in infirmary and staff workroom.
Report run on: March 20, 2007 3:15 PM Page 16 of 36
C3020.08 Carpet Flooring**
C3020.08.03 Carpet Tile
C3030.02 Ceiling Paneling (Wood)*
C3030.03 Plaster Ceiling Finishes*
C3030.04 Gypsum Board Ceiling Finishes*
4 - Acceptable
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
0
Installed
Installed
Installed
Installed
Installed
15
0
60
60
50
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Replace Broadloom Carpet
Preventative Maintenance 2009 $90,000 Unassigned
Past serviceable life, stained, worn, bucklingConcern:
Replace carpet, Provide chair mat for librarian Total carpet to be replaced 1200 m2
Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
Broadloom carpet in Classrooms, Library, Administration
Carpet tile in room 113,123
1965, 1968 , 1991 additions - Paneled maple ceiling in main office/administration areas.
Stipled plaster ceiling finish in student lounge, and corridors, 1991 addition, room 120.
1959, 1965, 1968 and 1991- Gypsum board cove ceiling in main entry, student lounge, corridors, gypsum soffit inclassrooms
Report run on: March 20, 2007 3:15 PM Page 17 of 36
C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)**
C3030.06 Acoustic Ceiling Treatment (baffles)
5 - Good
4 - Acceptable
Rating
Rating
1991
1965
Installed
Installed
25
25
Design Life
Design Life
MAR-07
MAR-07
Updated
Updated
Preventative Maint. Acoustic Ceiling Treatment
Preventative Maintenance 2007 $1,200 High
Stained and damage ceiling tiles - moisture and potential ofmold
Concern:
Stained and damage ceiling tiles - moisture moldRecommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
ACT in suspended grid in original building and additions.
Suspended ceiling baffles in Ancillary rm 120.
Report run on: March 20, 2007 3:15 PM Page 18 of 36
D2010.01 Water Closets**
D2010.02 Urinals**
D2010.03 Lavatories**
D2010.04 Sinks** - Cosmetology
4 - Acceptable
4 - Acceptable
3 - Marginal
4 - Acceptable
Rating
Rating
Rating
Rating
1991
1991
1991
1991
Installed
Installed
Installed
Installed
35
35
35
30
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Lavatories Replacement
Failure Replacement 2007 $6,000 Medium
Some bowls starts rusting. Concern:
Replace lavatories and faucets. Approximately 4 units.Recommendation:
Breton - Breton High School (B2483A)
S4 MECHANICAL
Event:
Type Year Cost Priority
Updated: MAR-07
Floor mounted, vitreous china flush tank units with open front seats. Floor mounted flush tank with regular bowl serving staffwashrooms. One toilet not in service - repair required.
Floor mounted, vitreous china units complete with infrared flush valve.
Vitreous china, counter type complete with polished chrome faucets.
Shampoo sink, porcelain enamel cast-iron shampoo bowl.
Report run on: March 20, 2007 3:15 PM Page 19 of 36
D2010.04 Sinks** - Home Ec
D2010.04 Sinks** - Industrial Arts
D2010.04 Sinks** - Janitorial
D2010.05 Showers**
D2010.08 Drinking Fountains / Coolers**
4 - Acceptable
3 - Marginal
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
30
30
30
30
35
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Sink Replacement
Failure Replacement 2007 $2,000 Medium
Some damage, faucet loose.Concern:
Replace sink.Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
Stainless steel, counter top sinks located in home economics area complete with chrome faucet.
Semi circular sink in Industrial Arts. Stainless steel bowl. Hand push button faucet.
Molded stone mop sink located in Janitor Rooms.
Ceramic tile, push button complete with wall head.
Stainless steel, wall hung fountains complete with push button bubbler and freeze resistant valve system.
Report run on: March 20, 2007 3:15 PM Page 20 of 36
D2020.01.01 Pipes and Tubes: Domestic Water*
D2020.01.02 Valves: Domestic Water**
D2020.01.03 Piping Specialties (Backflow Preventors)**
D2020.01.08 Hose Bibbs
D2020.02.02 Plumbing Pumps: Domestic Water**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
40
40
20
0
20
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Domestic Hot Water Recirculation PumpReplacement
Lifecycle Replacement 2010 $3,700 Low
Pumps are approaching the end of operational life.Concern:
Replace pumps.Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
Copper piping distribution to plumbing fixtures.
Each plumbing fixture isolated individually.
Check valve installed on make-up water from domestic water line to the domestic hot water system.
Non freeze hose bibbs have been provided as exterior water tap connections at various locations outside the building.
One in-line recirculation pump serving domestic water distribution system, continuous operation. Submersible pump installed in Mechanical Room to drain weeping tile water.
Report run on: March 20, 2007 3:15 PM Page 21 of 36
D2020.02.06 Domestic Water Heaters**
D2020.03 Water Supply Insulation: Domestic*
D2030.01 Waste and Vent Piping*
D2030.03 Waste Piping Equipment*
D2040.01 Rain Water Drainage Piping Systems*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
20
30
50
30
50
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Domestic Water Heaters Replacement
Lifecycle Replacement 2011 $10,000 Low
Units are approaching the end of operational life.Concern:
Replace water heaters with new units same capacity.Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
Two A.O.Smith water heaters, 365MBH hating output, 100 gal. Capacity. Water heaters are operated by a storage tankmounted aquastat.
Domestic lines are insulated.
Cast iron and ABS.
Double compartment sump located in Industrial Arts area.
Rain water leaders drain to parking lot area.
Report run on: March 20, 2007 3:15 PM Page 22 of 36
D2040.02.04 Roof Drains**
D3010.02 Gas Supply Systems*
D3020.02.01 Heating Boilers and Accessories: H.W.**
D3020.02.02 Chimneys (&Comb. Air): H.W. Boiler**
4 - Acceptable
4 - Acceptable
4 - Acceptable
3 - Marginal
Rating
Rating
Rating
Rating
1991
1991
1991
1991
Installed
Installed
Installed
Installed
40
60
35
30
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Combustion Air Duct Repair
Repair 2008 $8,000 Medium
Backdrafting is occuring in the boilers chimney. Concern:
The dimensions of the combustion air opening should beconfirmed. Installation of additional supply air opening with balancingdamper should be confirmed. Methods to prevent backdrafting should be identified.
Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
Deep sump, cast iron, full open flow.
Medium pressure, natural gas service. Building shut-off valve located in the meter room before gas meter and pressurereducing station. A shut-off valve, pressure regulator valve and pilot valve are located at each gas fired unit.
Two Raypack water tube boilers provide heated hot water to the perimeter radiation, reheat coils, unit heaters, force flowheaters, air handling coils, ceiling radiant panels and hot water to glycol heat exchanger. Heated water is circulated by two primary circulation pumps (175 gpm @ 60' head). Each boiler is complete with low watercut-off device and remote alarm system.
Class B chimney, insulated combustion air duct. Unit heater preheats combustion air.
Report run on: March 20, 2007 3:15 PM Page 23 of 36
D3020.02.03 Water Treatment: H. W. Boiler*
D3040.01.01 Air Handling Units: Air Distribution**
D3040.01.02 Fans: Air Distribution*
D3040.01.03 Air Cleaning Devices:Air Distribution*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1991
1991
1991
1991
Installed
Installed
Installed
Installed
30
30
30
30
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Upgrade to Air Distribution System
Indoor Air Quality Upgrade 2007 $6,000 Medium
Complaints of stuffy spaces and not-sufficient ventilation in theadministration areas.
Concern:
Rebalance the air supply system from AS-1.Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
Chemical pot feeder. Side stream filter installed between heating supply and return piping.
Two main air handling units serving building. AS-1 located in fan room by the Gymnasium and AS-2 located on the IndustrialArts mezzanine. Both units are Engineered Air LM series. AS-1 has 15,700 cfm supply air and AS-22,000 cfm. AS-1supplies Gymnasium and administration area. Unit AS-2 provides ventilation to all classrooms. Each air handling unit consist of supply air fan, evaporative humdifier, heating coil, air filter, air blender, mixed air sectionand return air fan. Integral time clock cycle supply air and return air fans ON and OFF based on time of day schedule.
See section D3040.1.01 for details.
Air system filter section complete with cartridge filters.
Report run on: March 20, 2007 3:15 PM Page 24 of 36
D3040.01.04 Ducts: Air Distribution*
D3040.01.07 Air Outlets & Inlets:Air Distribution*
D3040.03.01 Hot Water Distribution Systems**
D3040.04.01 Fans: Exhaust**
D3040.04.03 Ducts: Exhaust*
3 - Marginal
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
50
30
40
30
50
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Ductwork Cleaning
Preventative Maintenance 2008 $16,000 Medium
Dust and debris build-ups noted in several ducts.Concern:
Complete thorough cleaning of air distribution system.Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
The air distribution system is via ceiling space. The air changes provided to each classroom are set at 6, system canprovide min. 15cfm outside air per student and meet present codes.
Combination of wall mounted grilles and ceiling square diffusers for supply air application. Egg crate type grilles for return,transfer and exhaust air.
Cooper piping.
Located throughout the building. EF-1,2,3,&15 are interlocked with air system AS-1. EF-4 to EF-13 and dust collector withAS-2.
Low pressure exhaust ductwork accessible in service spaces. Medium pressure ducts serving welding area.
Report run on: March 20, 2007 3:15 PM Page 25 of 36
D3040.04.05 Air Outlets and Inlets: Exhaust*
D3040.05 Heat Exchangers**
D3050.02 Air Coils**
D3050.05.03 Finned Tube Radiation**
D3050.05.06 Unit Heaters**
D3050.05.08 Radiant Heating (Ceiling & Floor)**
D3060.02.02 Pneumatic Controls**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
1991
2004
Installed
Installed
Installed
Installed
Installed
Installed
Installed
30
30
30
40
30
35
40
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (B2483A)
Egg crate type.
Glycol heat exchanger, 50% ethylene glycol - water solution to AS-2 heating coil.
Reheat coils serving Infirmary, Counseling, Offices, Kitchen, Robotics, Darkroom & Gymnasium.
Single slope perimeter radiation located throughout. No signs of leaks or concerns.
Unit heaters serve Gymnasium, Industrial Arts and combustion air to mechanical room.
Ceiling radiant panels in washroom.
Johnson Controls DDC upgraded in 2004.
Report run on: March 20, 2007 3:15 PM Page 26 of 36
D3090 Other Special HVAC Systems and Equipment*
D4030.01 Fire Extinguisher, Cabinets and Accessories**
4 - Acceptable
4 - Acceptable
Rating
Rating
2005
1991
Installed
Installed
25
30
Design Life
Design Life
MAR-07
MAR-07
Updated
Updated
Breton - Breton High School (B2483A)
Welding exhaust system in IA area. Wall mounted fan tied into welding exhaust hoods. Murphy dust collector serving Industrial Arts.
Fire extinguishers located throughout facility. Units complete with hangers or cabinets in common areas. One fireextinguisher missed in Gymnasium.
Report run on: March 20, 2007 3:15 PM Page 27 of 36
D5010.01 Main Electrical Transformers**
D5010.03 Main Electrical Switchboards (Main Distribution)**
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
D5010.07.02 Motor Starters and Accessories**
D5020.01 Electrical Branch Wiring*
D5020.02.01 Lighting Accessories (Lighting Controls)*
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
1992
1992
1992
1992
1992
1992
Installed
Installed
Installed
Installed
Installed
Installed
40
40
30
30
50
30
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (B2483A)
S5 ELECTRICAL
Utility owned (size unknown) pad mount transformer located on North side of school.
Siemens 1200amp 120-208volt 3phase 4wire MDP c/w a 1000amp main breaker which feeds branch cct panelboards andmechanical loads throughout.
Siemens 225amp 120/208volt branch circuit panels controlling lighting and power loads throughout.
Siemens loose, wall mounted starters controlling mechanical loads.
Copper conductors installed in a flexible and metallic conduit system.
Low voltage switching for gymnasium and common areas and line voltage switching located throughout.
unknown
1200
225
Capacity Size
Capacity Size
Capacity Size
kVA
amps
amps
Capacity Unit
Capacity Unit
Capacity Unit
Report run on: March 20, 2007 3:15 PM Page 28 of 36
D5020.02.02.01 Interior Incandescent Fixtures*
D5020.02.02.02 Interior Florescent Fixtures**
D5020.02.03.02 Emergency Lighting Battery Packs**
D5020.02.03.03 Exit Signs*
D5020.02.05 Special Purpose Lighting*
5 - Good
3 - Marginal
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
2001
1992
1991
2002
1991
Installed
Installed
Installed
Installed
Installed
30
30
20
30
30
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Upgrade Florescent Lighting
Energy Efficiency Upgrade 2012 $105,000 Low
Excessive energy costs and higher maintenance costs. Concern:
Upgrade florescent lighting from T12 to T8Recommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
Upgraded to compact florescent lamps throughout.
T12 withy magnetic ballasts
Wall mounted battery packs c/w integral and remote lamps and remote batteries throughout.
Upgraded to LED style.
Par style theatre lighting in music room
Report run on: March 20, 2007 3:15 PM Page 29 of 36
D5020.03.01.03 Exterior Metal Halide Fixtures*
D5020.03.01.04 Exterior H.P. Sodium Fixtures*
D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*
D5030.01 Detection and Fire Alarm**
D5030.02.01 Door Answering*
D5030.02.02 Intrusion Detection**
D5030.02.03 Security Access**
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
Rating
1992
1992
1992
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
Installed
Installed
30
30
30
25
25
25
25
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (B2483A)
Pole mounted 250watt MH, single and dual head fixtures.
70/100watt HPS wall and ceiling mounted fixtures.
Photo cells controlling exterior lighting.
Simplex 4002 FACP c/w manual pull stations,bells,heat/smoke/duct detectors and door hold open devices.
Push button at main entrance, rings throughout entire school.
Silent Knight c/w key pad, motion detectors throughout.
Proximity card access reader at main entrance.
Report run on: March 20, 2007 3:15 PM Page 30 of 36
D5030.02.04 Video Surveillance**
D5030.03 Clock and Program Systems**
D5030.04.01 Telephone Systems**
D5030.04.03 Call Systems**
D5030.04.04 Data Systems**
D5030.05 Public Address and Music Systems**
D5030.06 Television Systems*
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
Rating
2002
1992
1991
1991
2001
1992
1991
Installed
Installed
Installed
Installed
Installed
Installed
Installed
25
25
25
25
25
20
20
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (B2483A)
I3 DVR digital recording system c/w 16 color cameras located throughout.
Simplex system controlling clocks throughout.
Nortel, Meridian system c/w hand sets throughout.
Integrated with phone system.
Main servers c/w patch panels, data racks, routers, cat 5e cabling throughout.
Dukane system c/w a separate Sony CD player.
Co-ax cable from local company stubbed into building only.
Report run on: March 20, 2007 3:15 PM Page 31 of 36
D5030.07 Other Communications and Security Systems*
D5090.01 Uninterruptible Power Supply Systems**
5 - Good
5 - Good
Rating
Rating
2005
1992
Installed
Installed
20
30
Design Life
Design Life
MAR-07
MAR-07
Updated
Updated
Breton - Breton High School (B2483A)
Supernet installed.
Belkin 1000va protecting DVR system, 2 X 1400va APC protecting servers.and an APC 500va protecting BMS system.
Report run on: March 20, 2007 3:15 PM Page 32 of 36
E1020.02 Library Equipment*
E1020.03 Theater and Stage Equipment*
E1020.07 Laboratory Equipment*
E1030.01 Vehicle Service Equipment*
E1090.04.01 Residential Appliances
E1090.04.02 Residential Kitchen Equipment
4 - Acceptable
4 - Acceptable
5 - Good
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1965
0
1991
1991
1991
0
Installed
Installed
Installed
Installed
Installed
Installed
25
25
25
25
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (B2483A)
S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
Painted plywood study carrels. Clear finish maple library shelving.
1965 addition: room 120 stage, lights, blackout drapery/rigging, projection screens stage curtains and theatrical lighting, acoustic baffles
Lab bench in Science classroom with 5 integral sinks.
Hydraulic vehicle lift/hoist in Industrial Arts garage.
Residential washer and dryer in janitor's room.
Home Ec. Classroom Microwaves, ranges/ovens, dishwashers, refrigerators. Staff room, three microwaves, dishwasher, coffee maker, refrigerator. Age varies
Report run on: March 20, 2007 3:15 PM Page 33 of 36
E1090.07 Athletic, Recreational, and Therapeutic Equipment*
E2010.02 Fixed Casework**
E2010.02.03 Display Casework
E2010.02.99 Other Casework
E2010.02.99 Other Casework - bootracks
E2010.03.01 Blinds**
5 - Good
4 - Acceptable
5 - Good
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1991
1991
1965
0
1991
1991
Installed
Installed
Installed
Installed
Installed
Installed
15
35
0
0
0
30
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (B2483A)
6 electronic basketball backstops on steel supports, Painted steel volleyball net posts. Electronic scoreboard Various electronic exercise equipment (stationary bikes, treadmills, weight machines).
Clear finish maple veneer or plastic laminate millwork.
Wall mounted clear finish maple display cabinet with sliding glass doors, main lobby.
Chemical resistant countertops with hairwash sinks in "Beauty Culture" classroom (1959) and on millwork in Industrial Artsworkshop. (1965)
Boot racks located near exterior doors (painted metal or wood racking).
Vertical fabric blinds on fixed track in Library. Vertical vinyl blinds in Fitness room, administration/office areas.
Report run on: March 20, 2007 3:15 PM Page 34 of 36
E2010.05 Fixed Multiple Seating**
E2010.06 Fixed Interior Landscaping*
E2020 Moveable Furnishings*
F1010.02.05 Grandstands and Bleachers**
F1020.02 Special Purpose Rooms*
5 - Good
4 - Acceptable
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
1991
1965
0
1991
2004
Installed
Installed
Installed
Installed
Installed
35
10
20
50
50
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Preventative Maintenance refinish benches
Preventative Maintenance 2010 $2,400 High
Refinish maple benchesRecommendation:
Breton - Breton High School (B2483A)
Event:
Type Year Cost Priority
Updated: MAR-07
Fixed benches in Library, clear finish maple with upholstered cushions. Fixed wood and steel benches in student lounge and gym entry lobby. Fixed wood benches on painted steel supports in change rooms.
Fixed circular maple bench with integral planter under skylight. Concrete block planters faced with ceramic tile in Student lounge.
Student and teachers' desks and chairs and free standing storage cabinetry. Age varies
5-step wood bleachers in gymnasium.
Classroom 129: 2 cameras, 2 projectors, Smart board, Plasma television and projector screens.
Report run on: March 20, 2007 3:15 PM Page 35 of 36
F1020.02.13 Paint Booths*
F1040.06 Other Special Facilities*
F2020.01 Asbestos*
F2020.03 Mercury*
F2020.04 Mould*
F2020.09 Other Hazardous Materials*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
3 - Marginal
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1959
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
50
10
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (B2483A)
Exhausted paint booth in IA workshop.
3 welding stations, a large kiln and three potter's wheels in Industrial Arts.
None observed or reported.
None observed or reported.
Some stained ceiling tiles (see C3030.06).
None observed or reported.
Report run on: March 20, 2007 3:15 PM Page 36 of 36
K4010.01 Barrier Free Route: Parking to Entrance
K4010.02 Barrier Free Entrances
K4010.03 Barrier Free Interior Circulation
K4010.04 Barrier Free Washrooms
5 - Good
2 - Poor
5 - Good
5 - Good
Rating
Rating
Rating
Rating
0
0
0
1991
Installed
Installed
Installed
Installed
0
0
0
0
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Barrier Free Access Upgrade
Barrier Free Access Upgrade 2007 $6,000 High
No power operated entrance doorConcern:
Install new set of power operated swinging doors at mainbuilding entrance
Recommendation:
Breton - Breton High School (B2483A)
S8 FUNCTIONAL ASSESSMENT
Event:
Type Year Cost Priority
Updated: MAR-07
Well marked barrier free parking zone, curbcuts and route to entrance provided.
No power operators provided at entrances. No designated entrance. No lever type hardware provided.
No elevators or lifts required, interior ramp at south wing. Door width min. 800 mm clear.
Grabbars and accessible toilets and lavatories provided throughout facility.
Report run on: March 21, 2007 7:59 AM
RECAPP Facility Evaluation Report
Breton High School
S2483Breton
Report run on: March 21, 2007 7:59 AM Page 2 of 8
S2483Building Id:
Breton High SchoolBuilding Name:
BretonLocation:Address:
0.00Gross Area (sq. m): $0Replacement Cost:0Construction Year:
Evaluation Date:
Evaluation Company:
Evaluator Name:
Coniferous trees to West of site, deciduous trees to south of playing fields, more field to the east...baseball diamond tothe south, football fields south of baseball diamond, playing field to the south west. Mature trees along west of site. Two storage sheds at north of 1959 original school.
General Summary:
Structural Summary:
Envelope Summary:
Interior Summary:
Mechanical Summary:
Electrical Summary:
0%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $21,000
Breton - Breton High School (S2483)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: March 21, 2007 7:59 AM Page 3 of 8
G1030 Site Earthwork (Site Grading)*
G2010.02.02 Flexible Pavement Roadway (Asphalt)**
G2010.05 Roadway Curbs and Gutters*
3 - Marginal
3 - Marginal
3 - Marginal
Rating
Rating
Rating
0
1991
1991
Installed
Installed
Installed
50
25
25
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Repair
Repair
Repair
Repair
2007
2008
$5,000
$12,000
Unassigned
High
Concrete splash pads at building perimeter not properly slopedaway from building. Stucco spalling at drains.
Concrete curb/pedestrian sidewalk heaving at north end of site.
Concern:
Concern:
Remove splashpads, correct grade away from building,reconnect downspouts to ensure drainage away from thebuilding face and replace splashpads. Repair stucco at drains, 10 gutters/splashpad.
Remove concrete and asphalt roadway, provide recompactedsubbase, and replace with new concrete and asphalt.
Recommendation:
Recommendation:
Breton - Breton High School (S2483)
S7 SITE
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-07
MAR-07
Asphalt school bus right of way at north end of site. See Event at G2020.02.02
Concrete roadway curb/pedestrian sidewalk at north of site.
Report run on: March 21, 2007 7:59 AM Page 4 of 8
G2020.02.02 Flexible Paving Parking Lots(Asphalt)**
G2020.05 Parking Lot Curbs and Gutters*
G2020.06.01 Traffic Barriers*
G2020.06.03 Parking Lot Signs*
G2020.06.04 Pavement Markings*
G2030.04 Rigid Pedestrian Pavement (Concrete)**
G2040.02 Fences and Gates**
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
Installed
Installed
10
25
25
25
25
15
30
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (S2483)
Asphalt parking lot to the west of school.
Cast in place concrete curbs and gutters.
Large concrete bollards at north garage door to Industrial Arts classroom.
Designated staff parking, fire lane signage, metal.
Painted parking lot stall markings
Saw cut concrete paving at west entrance.
Chain link fence around fields to the east south and west of school. Painted metal garbage enclosure at north of school.
Report run on: March 21, 2007 7:59 AM Page 5 of 8
G2040.03 Athletic and Recreational Surfaces**
G2040.04.01.04 Sports Goals and Equipment*
G2040.04.01.05 Bleachers
G2040.05 Site and Street Furnishings*
4 - Acceptable
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
1991
1991
1991
1991
Installed
Installed
Installed
Installed
25
10
0
15
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Breton - Breton High School (S2483)
Baseball diamond and football fields under snow at time of inspection.
Two basketball hoops (wood backboards, steel supports) at south west corner of school. Set of painted steel footballuprights in field south of school.
Painted steel bleachers with wooden benches at football field.
Painted wood and steel park bench and painted steel pipe bike racks.
Report run on: March 21, 2007 7:59 AM Page 6 of 8
G2040.06 Exterior Signs*
G2040.08 Flagpoles*
G2050.05 Trees, Plants and Ground Covers*
G2050.07 Planting Accessories*
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
1991
1991
1991
1991
Installed
Installed
Installed
Installed
25
30
10
10
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Replace exterior signage
Failure Replacement 2008 $4,000 Unassigned
Exterior signage has been vandalised.Concern:
Replace ood and plexi-glass illuminated signage at northwestcorner of site.
Recommendation:
Breton - Breton High School (S2483)
Event:
Type Year Cost Priority
Updated: MAR-07
Brushed steel letters "Breton High School" on West building face, north of main entrance. Illuminated "billboard" sign atnorth of site.
Single flagpole in parking lot, to the west of school.
Mature trees at perimeter of site to the South and West, and in central island at parking lot.
Raised planting bed along school north of west entrance.
Report run on: March 21, 2007 7:59 AM Page 7 of 8
G3010.03 Site Fire Protection Water Distribution*
G3020.01 Sanitary Sewage Collection*
G3030.01 Storm Water Collection*
G3060.01 Gas Distribution*
G4010.02 Electrical Power Distribution Lines*
G4010.03 Electrical Power Distribution Equipment*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1992
1992
Installed
Installed
Installed
Installed
Installed
Installed
50
50
50
50
50
50
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
MAR-07
Updated
Updated
Updated
Updated
Updated
Updated
Breton - Breton High School (S2483)
50mm dia. water line from 150mm dia. water main on First Street. Fire hydrant located within acceptable distance at First Street.
150mm dia. And 100 mm dia. sanitary mains to manhole located at N/W side of property. From the manhole 150mm dia. sanitary line is directed to main line on First Street.
No underground storm system installed. Rain water collection to surface run-off.
Metered natural gas supply from utility to gas meters located in Meter Room. Black steel piping.
Under ground feeders from pole to utility owned pad mount (size unknown) transformer.
Utility owned (size unknown) pad mount transformer located on North side of school.
Report run on: March 21, 2007 7:59 AM Page 8 of 8
G4010.04 Car Plugs-ins*
G4020.01 Area Lighting*
3 - Marginal
5 - Good
Rating
Rating
1992
1992
Installed
Installed
25
25
Design Life
Design Life
MAR-07
MAR-07
Updated
Updated
Install car plug-in pedestals
Program Functional Upgrade 2006 $2,000 Low
Stall to staff ratio inadequate.Concern:
Install 2 new pedestals at existing stalls. Recommendation:
Breton - Breton High School (S2483)
Event:
Type Year Cost Priority
Updated: MAR-07
Stand alone pedestals c/w duplex receptacle and WP cover, controlled by T-stat and timer.