Josh Ramirez President, Institute for Neuro & Behavior Project Management 2020 Project Management Symposium REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN

Upload: others

Post on 20-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Josh Ramirez President, Institute for Neuro & Behavior Project Management2020 Project Management Symposium

REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN

Page 2: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

2

Definition of a Project: a Temporary Endeavor

Megías, A., Navas, J. F., Petrova, D., Cándido, A., Maldonado, A., Garcia-Retamero, R., & Catena, A. (August 01, 2015). Neural mechanisms underlying urgent and evaluative behaviors: An fMRI study on the interaction of automatic and controlled processes. Human Brain Mapping, 36, 8, 2853-2864.

Toward the Science of Delivering Dreams Through Projects

Page 3: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

The Need for Redesign3

• Over $15 trillion a year in global GDP is projects

• Between $5 and $7 trillion a year in failed schedule and cost objectives is due to human factors

• No more time for anecdote and guessing, we have to bring science and discipline to project management

Toward the Science of Delivering Dreams Through Projects

Page 4: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

4

There's only one way to increase project performance:

start with the source of information processing - the computer between your ears.

(Side note: relying on AI or data alone will not solve it. Computers give us data, humans make decisions.)

Toward the Science of Delivering Dreams Through Projects

Page 5: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

5

Toward the Science of Delivering Dreams Through Projects

Page 6: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

PROJECTS LeadingProjects.org Project Management Meets Behavioral and Neuroscience!

6

That’s a lot of power!

• Around 100 billion neurons

• Processes information between neurons at speeds up to 250 MPH

• Uses 20% of your body’s oxygen

• Up to 2,500 terabytes of storage, or 5,000 standard computers

Brain Facts

Page 7: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

One Issue: Humans are Optimized for SurvivalNot Always Logic

7

Toward the Science of Delivering Dreams Through Projects

Page 8: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

PROJECTS LeadingProjects.org Project Management Meets Behavioral and Neuroscience!

8

“I am completely operational, all my circuits are functioning perfectly”

Can we trust our brain to tell us it’s functioning perfectly?

From the AI computer in the movie 2001: A Space Odyssey

Page 9: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

9

Information Input

Logical Output

Computer processing is logical and rational

yielding an accurate and consistent output

Toward the Science of Delivering Dreams Through Projects

Page 10: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

10

Information Input

Incomplete Output

Processing is bypassed

due to time pressure

Toward the Science of Delivering Dreams Through Projects

Page 11: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

11

Information Input

Incomplete Output

Processing is avoided due to mental

discomfort (cognitive dissonance)

Toward the Science of Delivering Dreams Through Projects

Page 12: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

12

Information Input

Incomplete Output

Processing is decreased due to

cognitive load

Toward the Science of Delivering Dreams Through Projects

Page 13: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

13

Information Input

Erroneous Output

Processing defaults to learned patterns

due to mental shortcutting (heuristics)

Toward the Science of Delivering Dreams Through Projects

Page 14: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

What does this mean?

14

All our project management methods, which are based on the rational model

of human behavior, are missing the human element and are not designed for

optimal performance.

Thus, we need to redesign project management around the brain

Toward the Science of Delivering Dreams Through Projects

Page 15: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

from Project Management to

Project Science

Toward the Science of Delivering Dreams Through Projects

Page 16: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

Applying Science to Project Management16

Toward the Science of Delivering Dreams Through Projects

Page 17: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

17 Behavioral Economics & Behavioral Finance……Now Behavioral Project Management

Toward the Science of Delivering Dreams Through Projects

Page 18: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

18

Toward the Science of Delivering Dreams Through Projects

Page 19: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

Meet Some of the Scientists

Daniel KahnemanNobel Prize Laureate

and Cognitive Psychologist

19

Tali Sharot

Neuroscientist

Dan Ariely

Behavioral Economist

Roger Buehler

Social Psychologist

Toward the Science of Delivering Dreams Through Projects

Page 20: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

Richard Thaler

Nobel Prize winner

20

Wait! Who’s this guy?

Toward the Science of Delivering Dreams Through Projects

Page 21: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

Some Behavioral Results

• 18 percent change in human decisions

due to reframing• 80 percent increase in prediction

accuracy

21

• 35 percent increase in employees

following procedures

• 25 percent increase in monthly

schedule forecast accuracy

Toward the Science of Delivering Dreams Through Projects

Page 22: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

22

The Human Factor Impacts Projects More

70% Impact 30% Impact

Behavioral

Technical

Toward the Science of Delivering Dreams Through Projects

Page 23: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

23

Project-Based Leadership & Organizational Psychology

Cognitive Impacts of Time Pressure

Project-Based Teams

The Neuro/Behavioral Domains Across Project Phases

Behavioral Project ClosingBehavioral Project ExecutionBehavioral Project PlanningBehavioral Project Initiating

Heuristics

Choice Architecture/Nudge

Judgment & Decision Making Sciences

Social Psychology

Uncertainty Sciences

Risk Sciences

Forecasting/Prediction Sciences

Cognitive Biases

Neuroscience

Toward the Science of Delivering Dreams Through Projects

Page 24: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

24

The New Foundation of Popular Methods – Project Science

Behavioral Project Management

Agile

PMBOK

APM

Toward the Science of Delivering Dreams Through Projects

Page 25: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

Your Brain on Projects

Toward the Science of Delivering Dreams Through Projects

Page 26: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

26

What’s time have to do with it?

Megías, A., Navas, J. F., Petrova, D., Cándido, A., Maldonado, A., Garcia-Retamero, R., & Catena, A. (August 01, 2015). Neural mechanisms underlying urgent and evaluative behaviors: An fMRI study on the interaction of automatic and controlled processes. Human Brain Mapping, 36, 8, 2853-2864.

• Time constraints activate an

area of the brain releasing

the motor system from

inhibition, causing faster and

premature decisions.

• Time pressure reduces

creativity, and thus

innovation.

Toward the Science of Delivering Dreams Through Projects

Page 27: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

27

Time Pressure Processing

Inputs Time Pressure

Processing

Reduced Training & Coaching

Reduced Creativity

Decision Errors

Increase

Biases Increase

Risky Decision-Making

Increases

Changes Trust,

Ethics, and Governance

Toward the Science of Delivering Dreams Through Projects

Page 28: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

28

Your Brain on Optimistic Planning

• We are more optimistic than

pessimistic, resulting in unrealistic:

• Risk analysis (Risk KA)

• Schedule duration estimation (Time KA)

• Cost estimation (Cost KA)

• Note that future events are more

heavily weighted toward

optimism. Sharot, T., Riccardi, A. M., Raio, C. M., & Phelps, E. A. (2007). Neural mechanisms mediating optimism

bias. Nature, 450(7166), 102-5. http://dx.doi.org.tcsedsystem.idm.oclc.org/10.1038/nature06280

Toward the Science of Delivering Dreams Through Projects

Page 29: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

29

Confirmation Bias in the Brain

Toward the Science of Delivering Dreams Through Projects

Page 30: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

30

Prediction in the Brain

Volz, K. G., Schubotz, R. I., & von Cramon, D. Y. (2003). Predicting events of varying probability: uncertainty investigated by fMRI. Neuroimage, 19(2), 271-280.https://pure.mpg.de/rest/items/item_725506/component/file_2008120/content

Toward the Science of Delivering Dreams Through Projects

Page 31: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

The Redesign Part

Toward the Science of Delivering Dreams Through Projects

Page 32: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

Applying Science to Project Management32

Toward the Science of Delivering Dreams Through Projects

Page 33: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

Project Science > New Process33

Identify Obstacles

New Process

Toward the Science of Delivering Dreams Through Projects

Page 34: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

Designing Processes Around the Brain34

Toward the Science of Delivering Dreams Through Projects

Page 35: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

35

Design processes to account for how the brain operates

ProcessesFormulate metrics that measure human factors with project factors

Metrics

Design human interfaces around the way humans think

InterfacesTrain employees in debiasing methods when using processes, interfaces, and metrics

Skills

4 Major Modalities

Toward the Science of Delivering Dreams Through Projects

Page 36: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

36

Identify Obstacles

Insert identify obstacles before estimate durations process

Processes

Measure optimism bias in correlation to obstacles identified

Metrics

Add obstacles as activity option in scheduling software

Interfaces

Train to elicit obstacles from planners that are typically obscure

Skills

New science-based process

across the modalities

Toward the Science of Delivering Dreams Through Projects

Page 37: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

37

Increasing Your Value

• Increased on-time project delivery (Time KA).

• Higher project management organizational competency.

• Reduced risk for your client (Risk KA).

• Increased customer trust in project outcomes.

• Being a leader in advanced project management.

Toward the Science of Delivering Dreams Through Projects

Page 38: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

38

The next big steps for innovative organizations

• Developing a College of Project Science at a university

• Full adoption of Behavioral Project Management in a

PMO – a Behavioral PMO

• Government agencies implementing Project Science

• Adopting science-based planning, designed around the

brain

Toward the Science of Delivering Dreams Through Projects

Page 39: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

We’ve Started the Project Science Revolution

So we can all accelerate the performance of projects, worldwide

Toward the Science of Delivering Dreams Through Projects

Page 40: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

Some of Our Scientists40

Josh Ramirez (PhD Cand.)

Jodi Wilson, PhDShari De Baets, PhD

Michael Barbera, PhD

Toward the Science of Delivering Dreams Through Projects

Page 41: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

PROJECTS LeadingProjects.org Project Management Meets Behavioral and Neuroscience!

41

NEUROPROJEXat the Institute for Neuro & Behavioral Project Management

Page 42: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

Toward the Science of Delivering Dreams Through Projects

Page 43: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

43

Mapping the Biases to PMBOK and Other Methodologies

Toward the Science of Delivering Dreams Through Projects

Page 44: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

44

Mapping Example for Uncertainty Aversion Bias

In PMBoK, may present itself in:

o Initiating Process Groupo Planning Process Groupo Following processes:

Develop Project Charter (Section 4.1)

Estimate Activity Durations (Section 6.4)

Estimate Costs (Section 7.2) Estimate Activity Resources

(Section 9.2) Identify Risks (Section 11.2) Perform Qualitative Risk

Analysis (Section 11.3) Plan Risk Responses (Section

11.5) Control Schedule (Section

6.6) Control Cost (Section 7.4) Monitor Risks (Section 11.7)

In Agile (PMI), may present itself in:

o Higher uncertainty, both technicaland requirements domains (Section 2.4)

o Flow-based Agile (Section 3.1.4)o Predominantly predictive

approaches (Section 3.1.8)o While under time-pressure during

stand-ups (Section 5.2.4)o The following Pain Points (Section

5.1) Unclear purpose or mission

for the team Unclear working agreements

for the team Unclear team context Unclear requirements Inaccurate estimation Unclear work assignments

or work progresso Backlog preparation (Section 5.2.2)o Sprint planning

In APMBoK, may present itself in:

o Concept phase of project lifecycle

o More predictive lifecycles, versus evolutionary

o During project justification and closure

o More urgent tasks in task prioritization

o Projects that are higher in the hierarchy of legal and regulatory influences

o Contingency planningo Provisions for known and

unknown risko Progress reportingo Forecastingo Estimating

Toward the Science of Delivering Dreams Through Projects

Page 45: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

45

The Upcoming NPPQ Certification

Toward the Science of Delivering Dreams Through Projects

Page 46: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

46

DECISIONDATAscience science

• We put tons of effort into this

• We spend billions on this

• We keep our data processors updated

• We design organizations around this

• We have QA on this

• We write processes for this

This only shows performance

• How much effort do we put into this?

• What percentage of our budget is here?

• Do we keep our decision processors updated?

• Do we design organizations around this?

• Do we have QA on this?

• Do we write processes for this?

This changes performance

Toward the Science of Delivering Dreams Through Projects

Page 47: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

Behavioral Project Management…

…the Science of Delivering Dreams!

Toward the Science of Delivering Dreams Through Projects

Page 48: REDESIGNING PROJECT MANAGEMENT AROUND THE BRAIN · Time Pressure Processing. Inputs. Time Pressure Processing . Reduced Training & Coaching. Reduced Creativity. Decision Errors Increase

Institute forNeuro & Behavioral Project Management

Contacts, Links, and Social Media

www.nbpmi.com

Contact Josh at [email protected]: www.linkedin.com/in/joshramirezpmp/

Twitter: @BehavioralPMFacebook: https://www.facebook.com/behavioralprojectmanagement/

48

Toward the Science of Delivering Dreams Through Projects