refer drawing 17003 142 for detail of bus shelter ... - gov
TRANSCRIPT
Con
cret
eRW
P
RS
RSRS
PI PI
PO
JT
Bank Top
S25
94.6
04
S26
94.8
60
EL 97.8
9
RL 99.5
0
EL 99.5
0
IC CL9
5.09
94.8
1
94.8
8
94.7
0
94.5
9
94.6
6
95.3
0
95.5
8
95.2
6
95.66
95.7
995
.81
G:0
.35
S:12
.00
G:0
.35
S:12
.00
94.69
94.42 94
.52
94.8394.84
94.78
94.7
6
94.7
094
.73
94.7
7
94.72 94.7094
.74
94.7
9
94.77
96.44
96.26
94.32
93.95
93.94
94.32
94.55
94.85
95.02
95.04
95.18
95.27
95.35
95.31
95.22
95.13
95.08
94.98
94.86
95.23
95.93
96.22
95.38
94.74
96.34
95.64
94.05
94.42
RWP-
G
L A R U E D E L A F R O N T I E R E
73000
site visibility splay to achieve 73 metres
orange hatch shows land to be ceded to DfLarea quantum - 115sqm
l a r u e d e l a f r o n t i e r e
new public footpath installedto edge of field
field 772
new treated timber post and rail fence
existing roadside edge relocated
existing trees replaced
bus shelter
COPYRIGHT 1999 - FIREHOUSE DESIGNS
COPYRIGHT 2000 - FIREHOUSE DESIGNS
COPYRIGHT 1999 - FIREHOUSE DESIGNS
COPYRIGHT 1999 - FIREHOUSE DESIGNS
COPYRIGHT 1999 - FIREHOUSE DESIGNS
existing roadside edge retained- no change
1500 6000 1500road widened locally
new 1500mm wide pedestrian refugecreated for bus passengers
demolitions
new planting
existing mature trees retained - nochange
l a r u e d e l a f r o n t i e r e
field 772
existing roadside edge - partialgranite/partial planted
existing trees
COPYRIGHT 1999 - FIREHOUSE DESIGNS
existing hedges (part)
COPYRIGHT 1999 - FIREHOUSE DESIGNS
09
proposedparking area - site
entrance improvements
1:100 at A1 28.06.2017
retreat farm (tamba park)la rue de la frontierest. lawrence/st. mary
JE3 3EG
JAJ Properties Limited
17003-129
drawing number revision
status
scale
originarchitecture studio
date
drawing title
project details
client
'the beach hut'two watkin villavictoria avenue
st helier JE2 3LUe: [email protected]
m: 07797757922t: 01534 484658
figured dimensions only are to be taken from thisdrawingall dimensions are to be checked on site beforeany work is put in hand, if in doubt seekconfirmationthis drawing must be read in conjunction with allother architects detail drawings, schedules andspecificationsall drawings are to be read in conjunction withrelevant drawings from other consultants, in caseof inconsistencies seek clarificationthis drawing must not be copied in whole or in partwithout the prior written permission of originarchitecture studio
copyright - origin architecture studio
notes
revision description date
planning
PLAN C (POA) proposed 0917003-129
01 first issue for information 28.06.17
site access at 1:100 at A1
N
site road access as existing site road access as proposed
02 first issue for P+E application 10.07.1703 issue for P+E application -
changes to visibility splay in linewith DfI requirements
07.09.17
04 issue for P+E application -land to be ceded to DfI tofacilitate road realignmentidentifiedboundary clarifiedclient detail amended
06.10.17
05 additional highways commentsincorporated - footpath widenedfrom bus shelter into sitebus shelter relocated back forincreased access width
11.12.17
06 POA Plan Cadditional notes added todescribe pedestrian crossingdelineation of boundaries (linestyle) coordinated
24.01.18
07 POA Plan Csite access width reduced /planting further enhanced toacknowledge inspectorscomments
05.03.18
08 POA Plan Cadditional notes added forclarification
06.03.18
73 metre visibility splayexisting accessopening amended
road widening to 6000mm at bus stop
73 metre visibility splay
bollards
1500mm wide pedestrian refuge(raised 125mm above road surface)
north bound bus drop off
south bound bus drop off
existing trees removed and replaced
new hedge / fence to field perimeter
pedestrian road crossingwith surface treatment
1800mm wide footpath to Tamba Park
field access point retained
edge planting
1800mm wide footpath to Tamba Park
footpath to Tamba Park
field retained as existing - no change to use
no change to this roadside edge - Outside ownership boundary
vegetation retained to max 900mm high within visibility zone
(shown hatched)
location for percentage forart installation
bus shelter/seating
bollards
western edge of existing carriagewayremains unchanged
inclusive accessible ramp
inclusive accessible ramp
painted chevron surface
painted chevron surface
existing kerbline
refer drawing 17003 142 for detail of bus shelter/seating
BUS
BUSadvance notice signage location to be agreedsubject to landowner / DfI agreements
exist
ing ac
cess
open
ing w
idth =
17.1m
etres
prop
osed
acce
ss
open
ing w
idth =
14.2m
etres
proposed kerbline
proposed kerbline
existing kerbline09 POA Plan C
additional notes added forclarification
08.03.18