REFERENDUM 2014Building Maintenance
![Page 2: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/2.jpg)
Referendum 2014
• Focused on providing a safe and healthy learning environment for students
• Fiscally responsible:– Zero increase in taxes
– Long-term energy cost savings
• Responsive to community’s concerns: small projects funded through operating budget - increased in 2010 from $660K to $3.5M
![Page 3: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/3.jpg)
Capital Improvement
Project Needs
![Page 4: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/4.jpg)
Create Long-Term Savings
• Upgrades to aging systems at the end of their useful life - some are over 50 years old
• Replacements to aging systems such as HVAC units and replacing windows will create long-term energy savings for the district
![Page 5: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/5.jpg)
HVAC is More Than Just Air Conditioning
• Benefits of upgraded HVAC systems:– Maintains the air temperature throughout the
year– Controls humidity – Reduces the possibility of mold issues
![Page 6: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/6.jpg)
Benefits for Students
• Provides a safe and healthy learning environment throughout the year
• Provides optimal air quality that research shows can result in:
– Increased ability to focus and concentrate
– Increased productivity of staff and students
– Potential reduction of symptoms of asthma
![Page 7: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/7.jpg)
Use of Schools Year Round
• Many schools in the district are used 12 months of the year
• In 2013, more than 8,000 students attended summer school
![Page 8: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/8.jpg)
Capital Improvement Projects 2014
• Washington Middle School $6.7M
– Heating, Ventilation, Air Conditioning (HVAC)
– Energy efficient lighting
– Energy efficient windows
– Renovation
– Asbestos removal
– Security Upgrade
![Page 9: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/9.jpg)
Capital Improvement Projects 2014
• Franklin Middle School $7.2M
– Heating, Ventilation, Air Conditioning (HVAC)
– Electrical renovation
– Refurbish auditorium seating
– Window replacement
– Asbestos removal
![Page 10: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/10.jpg)
Capital Improvement Projects 2014
• Fort Howard Elementary $ 1.2M• Tank Elementary $ 2.5M• Nicolet Elementary $ 2.5M• Chappell Elementary $ 2.0M
$ 8.2M
– Heating, Ventilation, Air Conditioning (HVAC); Renovation
![Page 11: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/11.jpg)
Capital Improvement Projects 2014
• Washington Middle School $ 6.7M• Franklin Middle School $ 7.2M• Elementary Schools $ 8.2M
$ 22.1M• Use of the District Fund Balance $ - 2.1M
Referendum Total $ 20.0M
![Page 12: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/12.jpg)
Fiscally Responsible
• Zero increase to taxpayers, due to retiring debt• Paid off in 10 years• No small projects • Create long-term savings through energy
savings• If referendum does not pass - homeowners pay
$34 less per $100,000
![Page 13: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/13.jpg)
Why Not District Funded?
• Revenue Limit per Student– Green Bay - $9,292
– Madison - $11,227
– State Average - $9,884
– If Green Bay was at the state average, we
would have $12M of additional revenue
each year
![Page 14: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/14.jpg)
Why Not District Funded?
• Fund Balance– Green Bay - $41.4M
– Green Bay - 19.0% of expenditures
– State Average - 22.6% of expenditures
– Needed for cash flow borrowing due to delay in equalized aid and property tax revenues
– Reduced borrowing amount from $25M to 10M
![Page 15: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/15.jpg)
Why a Referendum?
• Wisconsin law requires school districts to hold a referendum in order to bond for capital projects of $1M or more
• City of Green Bay and Brown County do not have same restriction
![Page 16: REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:](https://reader036.vdocument.in/reader036/viewer/2022062407/56649ca25503460f949619ad/html5/thumbnails/16.jpg)
Referendum 2014• Focused on providing a safe and healthy
learning environment for students• Fiscally responsible:
– Zero increase in taxes
– Long-term energy cost savings
• Responsive to community’s concerns: small projects funded through operating budget - increased in 2010 from $660K to $3.5M