Prague, 8-11 June 2009

Distributed generationDistributed generationrelationship between relationship between producersproducers, DNO, TSO, DNO, TSO

Jean-luc FRAISSE-ERDF- FR-session 4_paper 0872

Prague, 8-11 June 2009

CONTENTS

WHY RTE (French TSO) INITIATED THE « IPES »PROJECT (Intégration de la Production Eolienne dans le Système

électrique) ?

OBSERVABILITY (Monitoring) OF THE MV WIND FARMS

BEYOND OBSERVABILITY, COMMANDABILITY (control)

OVERVIEW OF THE DG CONNECTED TO THE MV NETWORK

Prague, 8-11 June 2009

Overview Overview of of the distributed generationthe distributed generation connectedconnectedto to thethe distribution network in Francedistribution network in France

13954754173Others767193077015034PV34544374WASTE698813771710HYDRO40252225663CHP

45154773520554WIND

Power (MW)

No.Power (MW)

No.

Connection requests

Connectedat the end of march

2009

Prague, 8-11 June 2009

785 MW

673 MW

150 MW

613 MW

442 MW

306 MW169 MW

0,1 MW

3140 MW 494 sites

98 % of wind farmpower plants in France are connected to theMV distribution network

Windfarms connected Windfarms connected to to the ERDFthe ERDF’’

distribution networkdistribution network31/12/200831/12/2008

Prague, 8-11 June 2009

47,72 MW 10543 sites

15,7 MW

10,1 MW

9,4 MW

4,6 MW

3,5 MW

2,24 MW

1,05 MW

1,02 MW

Photovoltaic Photovoltaic installations installations connected connected

to to the ERDFthe ERDF’’ distribution distribution networknetwork

31/12/200831/12/2008

Prague, 8-11 June 2009

WHY RTE INITIATED THE WHY RTE INITIATED THE «« IPESIPES »» PROJECT?PROJECT?

Potential security troubles beyond a threshold of 3 GW of wind power connected to the network (3.5 GW reached in April 2009 with 98% MV connected).

Controlling the risks requires, at first, a real-time monitoring of wind generation and the ability to make forecasts, in order:

To ensure the production-consumption balance

To manage margins

To check and to forecast transits on the transmission network

Prague, 8-11 June 2009

WHY RTE INITIATED WHY RTE INITIATED «« IPESIPES »»??

Urgency to have tools to integrate the specificities Urgency to have tools to integrate the specificities of the wind generation in the operation of of the wind generation in the operation of electrical systemelectrical system

In May 2007, RTE decided to launch a projectIn May 2007, RTE decided to launch a project

«« IPESIPES »»

Tools for Wind Tools for Wind Generation Generation

OBSERVABILITYOBSERVABILITY

Tools for automatic Tools for automatic action action

«« CONTROLLABILITYCONTROLLABILITY »»

Wind Farms Wind Farms Techniques Techniques ReferencesReferences

Prague, 8-11 June 2009

OBSERVABILITY (monitoring) OF THE MV OBSERVABILITY (monitoring) OF THE MV WIND FARMSWIND FARMS

On December 2007 , agreement between RTEOn December 2007 , agreement between RTE--ERDF for ERDF for ““observabilityobservability”” of of MV wind generationMV wind generation

Beginning of 2008, RTE installed an experimental platform Beginning of 2008, RTE installed an experimental platform

Test a predictive model of wind generation (PREOLE) Test a predictive model of wind generation (PREOLE)

Observe, analyse and learn how to integrate wind power in the opObserve, analyse and learn how to integrate wind power in the operating erating decisionsdecisions

In September 2008, active power measurements of 80% of wind frenIn September 2008, active power measurements of 80% of wind french ch generation were transmitted to the IPESgeneration were transmitted to the IPES platformplatform

OneOne--minute real time measurements minute real time measurements

Issued from ERDF control systems for the wind generation sites cIssued from ERDF control systems for the wind generation sites connected to onnected to dedicated MV feeders.dedicated MV feeders.

Prague, 8-11 June 2009

1 1 stst stepstep: DNO : DNO andand TSO data TSO data exchange exchange

HV/MV substation

DNO dispatching

Windfarm

CaractéristiquesAgrégationsHistoriques

Prévisions,…

TSOdispatching

Power sensorsP mesuré ou P calculé

MV feeder dedicated to

Wind generation

CEI 60870-5-104

Prague, 8-11 June 2009

Wind forecastWind forecastAgreement with Météo France (50 sites of wind measurement) 3-days ahead forecast

²

Prague, 8-11 June 2009

ExamplesExamples of output ofof output of thethe TSO pilot systemTSO pilot system

Prague, 8-11 June 2009

HV/MV substation

DNO dispatching

2 2 ndnd stepstep: DNO : DNO andand TSO data TSO data exchange exchange

Windfarm

Information requested by DNO

CaractéristiquesAgrégationsHistoriques

Prévisions,…

Producer dispatching

TSOdispatching

R T E©RTE(EDF)-CN2i 2002

Data from SCADA

system

Power, wind speed, availability

CEI 60870-5-104

Power sensorsP mesuré ou P calculéCEI 60870-5-104

Prague, 8-11 June 2009

BEYOND OBSERVABILITY (Monitoring), BEYOND OBSERVABILITY (Monitoring), CONTROLLABILITY (Control)CONTROLLABILITY (Control)

““ControllabilityControllability””:: 2nd stage of the IPES project. 2nd stage of the IPES project.

On transmission grid, issue of congestion due to DG On transmission grid, issue of congestion due to DG connection. connection.

Action to avoid MV line tripping mainly on the wind Action to avoid MV line tripping mainly on the wind farms connected to the distribution network.farms connected to the distribution network.

ERDF, RTE and the producers work on the ERDF, RTE and the producers work on the elaboration of requirements and procedure to addresselaboration of requirements and procedure to addressthis issuethis issue..