Prague, 8-11 June 2009
Distributed generationDistributed generationrelationship between relationship between producersproducers, DNO, TSO, DNO, TSO
Jean-luc FRAISSE-ERDF- FR-session 4_paper 0872
Prague, 8-11 June 2009
CONTENTS
WHY RTE (French TSO) INITIATED THE « IPES »PROJECT (Intégration de la Production Eolienne dans le Système
électrique) ?
OBSERVABILITY (Monitoring) OF THE MV WIND FARMS
BEYOND OBSERVABILITY, COMMANDABILITY (control)
OVERVIEW OF THE DG CONNECTED TO THE MV NETWORK
Prague, 8-11 June 2009
Overview Overview of of the distributed generationthe distributed generation connectedconnectedto to thethe distribution network in Francedistribution network in France
13954754173Others767193077015034PV34544374WASTE698813771710HYDRO40252225663CHP
45154773520554WIND
Power (MW)
No.Power (MW)
No.
Connection requests
Connectedat the end of march
2009
Prague, 8-11 June 2009
785 MW
673 MW
150 MW
613 MW
442 MW
306 MW169 MW
0,1 MW
3140 MW 494 sites
98 % of wind farmpower plants in France are connected to theMV distribution network
Windfarms connected Windfarms connected to to the ERDFthe ERDF’’
distribution networkdistribution network31/12/200831/12/2008
Prague, 8-11 June 2009
47,72 MW 10543 sites
15,7 MW
10,1 MW
9,4 MW
4,6 MW
3,5 MW
2,24 MW
1,05 MW
1,02 MW
Photovoltaic Photovoltaic installations installations connected connected
to to the ERDFthe ERDF’’ distribution distribution networknetwork
31/12/200831/12/2008
Prague, 8-11 June 2009
WHY RTE INITIATED THE WHY RTE INITIATED THE «« IPESIPES »» PROJECT?PROJECT?
Potential security troubles beyond a threshold of 3 GW of wind power connected to the network (3.5 GW reached in April 2009 with 98% MV connected).
Controlling the risks requires, at first, a real-time monitoring of wind generation and the ability to make forecasts, in order:
To ensure the production-consumption balance
To manage margins
To check and to forecast transits on the transmission network
Prague, 8-11 June 2009
WHY RTE INITIATED WHY RTE INITIATED «« IPESIPES »»??
Urgency to have tools to integrate the specificities Urgency to have tools to integrate the specificities of the wind generation in the operation of of the wind generation in the operation of electrical systemelectrical system
In May 2007, RTE decided to launch a projectIn May 2007, RTE decided to launch a project
«« IPESIPES »»
Tools for Wind Tools for Wind Generation Generation
OBSERVABILITYOBSERVABILITY
Tools for automatic Tools for automatic action action
«« CONTROLLABILITYCONTROLLABILITY »»
Wind Farms Wind Farms Techniques Techniques ReferencesReferences
Prague, 8-11 June 2009
OBSERVABILITY (monitoring) OF THE MV OBSERVABILITY (monitoring) OF THE MV WIND FARMSWIND FARMS
On December 2007 , agreement between RTEOn December 2007 , agreement between RTE--ERDF for ERDF for ““observabilityobservability”” of of MV wind generationMV wind generation
Beginning of 2008, RTE installed an experimental platform Beginning of 2008, RTE installed an experimental platform
Test a predictive model of wind generation (PREOLE) Test a predictive model of wind generation (PREOLE)
Observe, analyse and learn how to integrate wind power in the opObserve, analyse and learn how to integrate wind power in the operating erating decisionsdecisions
In September 2008, active power measurements of 80% of wind frenIn September 2008, active power measurements of 80% of wind french ch generation were transmitted to the IPESgeneration were transmitted to the IPES platformplatform
OneOne--minute real time measurements minute real time measurements
Issued from ERDF control systems for the wind generation sites cIssued from ERDF control systems for the wind generation sites connected to onnected to dedicated MV feeders.dedicated MV feeders.
Prague, 8-11 June 2009
1 1 stst stepstep: DNO : DNO andand TSO data TSO data exchange exchange
HV/MV substation
DNO dispatching
Windfarm
CaractéristiquesAgrégationsHistoriques
Prévisions,…
TSOdispatching
Power sensorsP mesuré ou P calculé
MV feeder dedicated to
Wind generation
CEI 60870-5-104
Prague, 8-11 June 2009
Wind forecastWind forecastAgreement with Météo France (50 sites of wind measurement) 3-days ahead forecast
²
Prague, 8-11 June 2009
ExamplesExamples of output ofof output of thethe TSO pilot systemTSO pilot system
Prague, 8-11 June 2009
HV/MV substation
DNO dispatching
2 2 ndnd stepstep: DNO : DNO andand TSO data TSO data exchange exchange
Windfarm
Information requested by DNO
CaractéristiquesAgrégationsHistoriques
Prévisions,…
Producer dispatching
TSOdispatching
R T E©RTE(EDF)-CN2i 2002
Data from SCADA
system
Power, wind speed, availability
CEI 60870-5-104
Power sensorsP mesuré ou P calculéCEI 60870-5-104
Prague, 8-11 June 2009
BEYOND OBSERVABILITY (Monitoring), BEYOND OBSERVABILITY (Monitoring), CONTROLLABILITY (Control)CONTROLLABILITY (Control)
““ControllabilityControllability””:: 2nd stage of the IPES project. 2nd stage of the IPES project.
On transmission grid, issue of congestion due to DG On transmission grid, issue of congestion due to DG connection. connection.
Action to avoid MV line tripping mainly on the wind Action to avoid MV line tripping mainly on the wind farms connected to the distribution network.farms connected to the distribution network.
ERDF, RTE and the producers work on the ERDF, RTE and the producers work on the elaboration of requirements and procedure to addresselaboration of requirements and procedure to addressthis issuethis issue..