Relieving Congestion at European Interconnectors
Christian Todem
13th April 2007
2Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
AgendaAgenda
Background (legal framework, liberalisation,...)
Current Congestion Management Situation
Problems?
Regional Approach
Methods for congestion management
Load Flow Based Auctions
Theoretical Comparison of Models Outlook
Concept of Open Market Coupling (OMC)
Possible Development Paths
Ongoing development in different Regions
3Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
BackgroundBackground
Liberalisation of European Electricity Markets with the aim to create one integrated (internal) electricity market (IEM)
Shutdown of uneconomical power plants Purely market (price) based unit commitment Further (and still) increasing demand of electricityIncreasing commissioning of volatile production units (e.g. WindPower)
Lead to an increased system usage, and also to more volatile system usage!
4Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
BackgroundBackground
Transmission systems were originally planned and developed for emergency situation (and of course to avoid over investment for local peak capacity).Transmission system was originally not planned and developed as a market platform for interregional electricity trading activities.
- Market reaction is much faster than the provision of relevant infrastructure (difficult and long authorization processes for building infrastructure)!
- More often congestion occurs which could endanger the security of supply (blackouts)!
The need for managing congestion become more and more important.
5Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Current Congestion Management SituationCurrent Congestion Management Situation
Nearly every border within Nearly every border within Europe is congested.Europe is congested.
Power trading companies need Power trading companies need to participate in several to participate in several (different) auctions to gain the (different) auctions to gain the relevant transmission rights. relevant transmission rights.
Inconsistent regulations and Inconsistent regulations and systems in use.systems in use.
Physical Physical „„realitiesrealities““ are not are not taken into consideration!taken into consideration!
Insufficient contribution for Insufficient contribution for guaranteeing the security of guaranteeing the security of supply!supply!
Source: according to ETSO (2006)
6Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Impact of currently used allocation systems (NTC-based)Impact of currently used allocation systems (NTC-based)
-- YearYear 20032003-- CZ CZ APGAPG-- Off PeakOff Peak-- WeekendsWeekends
7Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Regional ApproachRegional Approach
Decision of the 11th Florence Forum (Sept. 2004):Organisation of 7 Mini Fora on a regional basis with on major task:
to develop common congestion management systems at a regional level.
NE
GBI
CSESWE
BC
NWE CEE
SEE
8Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Regional ApproachRegional Approach
Establishment of IEM in one step was too optimistic (different starting points, different level of market opening and harmonisation).Electricity Regional Initiative (ERI): to make concrete improvements in the development of a single energy market in Europe by first integrating national markets.Electricity Regional Energy Markets (REM): definition of seven regions with their own implementation processes per region.All relevant stakeholders are includes in that processes.Coordination is a precondition.
9Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Implementation Process in each RegionImplementation Process in each Region
Guidelines Congestion Management
Regulators Coordination
Committee(Regulators)
ImplementationGroup
(Regulators, TSOs, Market Participants)
Stakeholders Group Meeting
(Regulators, TSOs, Market Participants, EC,…)
Florence Forum(yearly, EC, europ. Stakeholder associations)
10Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Regulation (EC) 1228/2003*Regulation (EC) 1228/2003*
Regulates charges for access to network, regulates Inter-TSO-compensation mechanism and cross border congestion managementRecently adopted Guidelines on Congestion management (annex of Regulation 1228/2003) oblige TSOs to coordinate their cross border congestion management efforts and further coordinated methods (in terms of capacity calculation and allocation) are mandatoryDirect applicable law
Deadlines: 1.1.2007: coordinated congestion management procedure (at
least on yearly, monthly and day-ahead level)1.1.2008: Intraday congestion management
*...”on conditions for access to the network for cross-border exchanges in electricity”
11Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Methods for capacity allocation and developmentsMethods for capacity allocation and developments
* Also non flow-based methods are imaginable. Source: according to SETSO.
NTC (ATC) based Flow-based
Coordinated
Explicit implicit, hybrid
Coordinated explicit auctions
Open-Market-Coupling*
Explicit Implicit
Multilateral (Scan-dinava)
Bilateral implicit
Auctions
First come/ First
served
Pro-rata Explicit Auctions
Bilateral(common)
Coordinated (Cz, P, D, Sk)
Dry-run in SEE-Region
Development in CEE und CWE
Market based methods: “Auctions“Administrative
Development, Trend
TLC
FR, NL, BE
CEE - Central Eastern EuropeCWE - Central Western EuropeSEE - South Eastern EuropeTLC - Trilateral Market Coupling
12Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
explicit vs. implicit Auctionsexplicit vs. implicit Auctions
Costs of Energy
(location A)
Price of Energy
(location A)
Implicit AuctionPrice of Capacity (auctions)
(loco A loco B)„complete”costs
of Energy (location B)
Explicit Auction1. Step:CAPACITY (A B)e.g.: bilateral explicit
auctions
2. Step:ENERGY (location A)e.g.: bilateral (OTC) or
power exchanges
Cost of Cross Border
Capacity(loco A loco B)
Hybrid Auctions: Hybrid Auctions: Both, implicit and explicit auctions simultaneously possible!
13Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Load Flow Based AuctionsLoad Flow Based Auctions
-Weak interconnection capacity
Loop Flows may endangersecurity of supply and reduce trading possibilities
Commercial contract path
Physical flow
14Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
A B
C D
E
Program1 [MW]Exchange program between A and BExchange program between A and B
30%30%
55%55%
15%
15%
45%
45%
45%45%
15%15%
Corresponding distribution of Corresponding distribution of ““realreal””(estimated) power flows(estimated) power flows i.e.i.e.PPowerower TTransferransfer DDistributionistribution FFactorsactors
PTDF factors can be defined between PTDF factors can be defined between each pair of zones, thus forming each pair of zones, thus forming PTDF MATRIXPTDF MATRIX
Load Flow Based Auctions, exampleLoad Flow Based Auctions, example
PTDF matrix is calculated by the PTDF matrix is calculated by the TSOsTSOs involved based on a common involved based on a common grid model of the respective region!grid model of the respective region!
Source: according to SETSO and EKC-Serbia
15Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Why Load Flow Based Auctions?Why Load Flow Based Auctions?
Bilateral auctions are imprecise tools; they relay on worst cases and so some TSOs have to adopt conservative hypothesis by calculating the available capacities (NTCs) due to unexpected loop flows.Without “coordination” of such bilateral NTC based auctions loopholes may exist; i.e. also at borders without physical congestion auctions have to be installed in order to avoid by-passing of congestions.Effect of bilateral auctions is sometime questionable; e.g. in a worst case NTC is set equal to zero and still congestion may exist.Load flow based (explicit and/or implicit) allocation methods - by (regional) coordinated capacity assessment and capacity allocation -tend to optimise the usage of available transmission resources.Load flow based (explicit and/or implicit) allocation methods tend to increase the security of supply because of taken (estimated) physical flows into consideration.
16Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
0,00
5,00
10,00
15,00
20,00
25,00
1
A->CZCZ->A
A->HUHU->A
SI>A
CZ->EONA->SI
EON->CZ
PSE->CZ
CZ->PL
VET->CZ
CZ->VET
PL->SL
SL->PL
VET->PL
PL->VET
CZ->SL
SL>CZ
B->NLNL->
B
RWE>NL
NL->RWE
E.ON-> N
L
NL-> E.O
NF-> B
B-> F
Own source, picture shows yearly auctions results from 2006
€/M
Wh
APG CEE-Region CWE-Region
Specific willingness to pay on selected bordersSpecific willingness to pay on selected borders
17Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Theoretical Comparison of ModelsTheoretical Comparison of Models
Flow based modelling maximises the security domain allowing for more cross-border trade opportunities.
A=>C
A=>B
flow-based
Security domain
Coordinated ATC assessment max(A=>B+A=>C)
Coordinated Technical profiles assessment
BA
C
100
160 170
* Mini Forum Central Western REM, 20. June 2006.
18Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Explicit Auction (direct to Auction Office)
Concept from EEX for hybrid Auctions: OMC (Open Market Coupling)Concept from EEX for hybrid Auctions: OMC (Open Market Coupling)
Auction Office
EinzelstundengeboteKombinationsgebote
PowerExchangesTraders
Source: according to EEX/ Moser (2005)
Implicit Auction (via Power Exchanges)
Hybridauction
+
Additional business
Central Counterpart for the regional market!
EinzelstundengeboteKombinationsgebote
PowerExchanges
Aggregated ‘Order Books’
Implicit Bids
Explicit Bids for Capacity
settled Capacity
TSOs
Max. Cross Border Capacity
Load Flow (PTDF-Matrix)‘Clearing’
19Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Possible Development PathsPossible Development Paths
Source: ETSO, as presented at the CW MF.
Flow-Based
Technical Profiles
Coordinated ATC assess.
UnilateralATC assess.
Market CouplingMultilateral AuctionsBilateral AuctionsUnilateral Auctions
Sharing bidsSharing bids
path #1
path #2
Two path towards social welfare maximization for regional capacity allocation:
- market coupling first (sharing energy bids)- flow-based modelling first (optimal use of the system)
Gri
d m
odel
sG
rid
mod
els
20Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Ongoing development in different RegionsOngoing development in different Regions
-
CWE-Region:
- Trilateral Market Coupling (non flow-based) (established between Fr, Be, Nl in 2006)
- investigating coordinated explicit and implicit flow-based auctioning (MC)
CEE-Region:
- Coordinated ex. flow-based auctioning
SEE-Region:
- Coordinated ex. flow-based auctioning
- Dry-run with participation of Traders
21Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Involvement of Verbund APG in such developmentsInvolvement of Verbund APG in such developments
7 7 Regionale MRegionale Määrkte:*rkte:*
Nordic, Nordic, CEECEE, , BalticBaltic, , ItalyItaly, , IberianIberian, , Western EuropeWestern Europe, , UK/IRLUK/IRL
APG supports in SEE - Region the implementation and testing of such flow based auctions (APG has developed and provided a software tool for the „Dry-Run“ in SEE).
*) schematic picture – some countries take part in more than one region.
Strong movement toward flow based auctions in Europe (due to Guidelines for Congestion Management).
APG has to take part in two regions, CEE -Region and Italy -Region.
CEE.. Central East Europe (A, D, PL, CZ, HU, SK, Sl)
Italy.. Italy Region (A, I, D, SI, Fr)
APG together with 7 other TSOs from CEE -Region intend to implement a (explicit) flow based allocation system. It is also envisaged to establish a common coordinated Auction in Freising/Germany for CEE-Region.
22Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
CEE - RegionCEE - Region
SLO
Creation of a common regional coordinated (explicit) flow based auction system for the entire region.Enhancements of models for further increasing of efficiency (e.g. Market Coupling,...).
8 Partners TSOs: APG, CEPS, ELES, E.ON, MAVIR, PSE-O, SEPS, VET
ObjectiveObjective::
Establishment of a common coordinated Auction Office in Germany/Freising (May 2007 envisaged).Start operation with day-ahead explicit auctions (2008).
Next stepsNext steps::
23Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Dry-run in SEE in 2006Dry-run in SEE in 2006
PowerExchanges
Auction Office
TSOsTrader(TSOs)
‘Settlement’
Participating Parties Participating TSOs in Dry-Run
Explicit Bids for
Capacity
settled Capacity
Max. Cross Border Capacities
Load Flow (PTDF-Matrix)
No legal entity, each month another TSO performed the “role” of the coordinated Auction Office!
(www.DrCAT.at) 8 SEE-TSOs and Turkey have performed that Dry-run in 2006.
24Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Dry-run in SEE in 2007Dry-run in SEE in 2007
Auction Office
TSOsTrader
PTDF-calculation
Auctioning
BC-coordination
BillingRisk-Management SchedulingSecondary Trading
„NACM PF“
Financial
flow
Fina
ncia
l flo
w
Bids
ClearingTe
chni
cal i
nput
Results R
esul
ts,
Bids
Regulators
ConsultantSETSO
EFET
Nec
essa
ry fo
r the
Dry
-run
!
Not necessary for the Dry-run, but precondition for “real” run!
25Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Some results Dry-run 2007Some results Dry-run 2007
More than 40 traders are taking More than 40 traders are taking part at the Drypart at the Dry--run in SEE!run in SEE!Additional benefit:Additional benefit:--““ValuesValues”” of congestion at of congestion at
interconnectorsinterconnectors are calculated are calculated (based on physical models and (based on physical models and market prices).market prices).
-- Values addresses the need of Values addresses the need of investments (investment investments (investment decisions)decisions)
26Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
The recent approaches and developments towards regional coordination have shown first promising results.Such approaches will optimise the use of the existing infrastructure by taking security of supply issues directly into account.Such methods also have some positive side effects like achieving(relevant) investment signals (as a “by-product”).Complex interdisciplinary problem (technical and economical) with less experience in continental Europe.Also from academic point of view this is a topic with potential for R&D.
ConclusionConclusion
The recent regional approaches/developments show that the active work done so far by TSOs seems to be the right basis for further improvement of the European Electricity market.
27Verbund – Austrian Power Grid AGVerbund – Austrian Power Grid AG
Thank you for your attention!