REMOVAL NOTES SHORE EXISTING PORCH ROOF AS REQUIRED TO COMPLETE ALL WORK NOTED. REMOVE AND DISPOSE OF EXISTING WOOD RAILINGS. REMOVE AND DISPOSE OF EXISTING METAL RAILINGS. REMOVE AND DISPOSE OF TONGUE & GROOVE DECKING. REMOVE AND DISPOSE OF LATTICE AND FASCIA BOARDS. REMOVE AND DISPOSE OF STAIR TREADS, RISERS, STRINGERS AND STAIR FRAMING. REMOVE AND DISPOSE OF COLUMN BASES (TOTAL OF 6 - SEE PHOTO BELOW FOR CLARIFICATION). REMOVE AND DISPOSE OF EXISTING METAL POSTS AND FOOTINGS CURRENTLY SUPPORTING PORCH. REMOVE AND DISPOSE OF EXISTING PORCH FRAMING DISCONNECT EXISTING WATER SPOUT AT THE EAST SIDE AND SALVAGE FOR REINSTALLATION AT THE SOUTH SIDE. NEW PORCH INSTALLATION NOTES CONTRACTOR SHALL INCLUDE THE COST TO INSTALL (6) SIX NEW – 8” DIAMETER CONCRETE FOOTINGS. PROVIDE NEW PRESSURE TREATED SUPPORT POSTS AS REQUIRED. INSTALL NEW 2X10 PRESSURE TREATED FRAMING. REPLICATE EXISTING PORCH FOOTPRINT. NEW FRAMING SHALL BE INSTALLED SO THAT THE NEW DECKING AND COLUMN BASES MATCH THE EXISTING ELEVATION. INSTALL NEW COLUMN BASES TO MATCH EXISTING. (REFERENCE PHOTO ‘A’ FOR REPLACEMENT SECTION CLARIFICATION). MAINTAIN EXISTING COLUMNS. REPAIR AND PATCH ALL COLUMNS WITH EPOXY CONSOLIDANT AS REQUIRED. INSTALL 1” ROUND MINI COLUMN VENTS, THREE (3) AT COLUMN BOTTOM AND TWO (2) AT COLUMN TOP – TYPICAL FOR ALL FULL COLUMNS. VENTS BY MC MASTER CARR – ITEM #2016K11, WHITE PAINTED ALUMINUM. DRILL/CORE COLUMN AS REQUIRED FOR INSTALLATION. INSTALL NEW COMPOSITE PORCH AND STAIR RAILING SYSTEM. RAILING SYSTEM SHALL BE ‘LEGENDS VINYL BALUSTRADE’ BY FAIRWAY VINYL SYSTEMS http://www.fairwayvinyl.com/sv_legends.html RAILINGS SHALL BE 36” HIGH – BALUSTERS SHALL BE 32” TURNED ‘LEGENDS’ BY FAIRWAY VINYL SYSTEMS. INSTALL NEW COMPOSITE STAIR SYSTEM. PROVIDE NEW PRESSURE TREATED FRAMING FOR STAIRS. INSTALL NEW AZEK TONGUE & GROOVE DECKING AND TREADS. INSTALL NEW COMPOSITE SQUARE PRIVACY LATTICE AND COMPOSITE FASCIA BOARDS. RE-INSTALL / RE-LOCATE EXISTING WATER SPOUT TO THE SOUTH SIDE OF THE PORCH. PROVIDE ALL REQUIRED PLUMBING WORK. PREP, PRIME AND PAINT ALL PREVIOUSLY PAINTED SURFACES INCLUDING ALL COLUMNS, SOFFITS, BOX BEAMS ALONG THE CEILING, DENTIL MOLDINGS AND BEADBOARD CEILING. DO NOT PAINT ANY COMPOSITE MATERIALS INSTALLED. LOAM, SEED AND REGRADE DISTURBED AREA AROUND PORCH UPON COMPLETION OF THE PROJECT. NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-105-1 MAJOR MAINTENANCE FY 14 BID PACKAGE #19 47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING SECTION 00020 - EXISTING CONDITION PHOTOS SCOPE OF WORK IS LIMITED TO THE FRONT & REAR PORCHES DATE: 06/11/13

Upload: ori-meadows

Post on 01-Jan-2016

17 views

Category:

Documents


0 download

DESCRIPTION

REMOVAL NOTES SHORE EXISTING PORCH ROOF AS REQUIRED TO COMPLETE ALL WORK NOTED. REMOVE AND DISPOSE OF EXISTING WOOD RAILINGS. REMOVE AND DISPOSE OF EXISTING METAL RAILINGS. REMOVE AND DISPOSE OF TONGUE & GROOVE DECKING. REMOVE AND DISPOSE OF LATTICE AND FASCIA BOARDS. - PowerPoint PPT Presentation

TRANSCRIPT

REMOVAL NOTES

• SHORE EXISTING PORCH ROOF AS REQUIRED TO COMPLETE ALL WORK NOTED.

• REMOVE AND DISPOSE OF EXISTING WOOD RAILINGS.• REMOVE AND DISPOSE OF EXISTING METAL RAILINGS.• REMOVE AND DISPOSE OF TONGUE & GROOVE DECKING.• REMOVE AND DISPOSE OF LATTICE AND FASCIA BOARDS.• REMOVE AND DISPOSE OF STAIR TREADS, RISERS, STRINGERS AND

STAIR FRAMING.• REMOVE AND DISPOSE OF COLUMN BASES (TOTAL OF 6 - SEE PHOTO

BELOW FOR CLARIFICATION). • REMOVE AND DISPOSE OF EXISTING METAL POSTS AND FOOTINGS

CURRENTLY SUPPORTING PORCH.• REMOVE AND DISPOSE OF EXISTING PORCH FRAMING• DISCONNECT EXISTING WATER SPOUT AT THE EAST SIDE AND

SALVAGE FOR REINSTALLATION AT THE SOUTH SIDE.

NEW PORCH INSTALLATION NOTES• CONTRACTOR SHALL INCLUDE THE COST TO INSTALL (6) SIX NEW – 8”

DIAMETER CONCRETE FOOTINGS. PROVIDE NEW PRESSURE TREATED SUPPORT POSTS AS REQUIRED.

• INSTALL NEW 2X10 PRESSURE TREATED FRAMING. REPLICATE EXISTING PORCH FOOTPRINT. NEW FRAMING SHALL BE INSTALLED SO THAT THE NEW DECKING AND COLUMN BASES MATCH THE EXISTING ELEVATION.

• INSTALL NEW COLUMN BASES TO MATCH EXISTING. (REFERENCE PHOTO ‘A’ FOR REPLACEMENT SECTION CLARIFICATION).

• MAINTAIN EXISTING COLUMNS. REPAIR AND PATCH ALL COLUMNS WITH EPOXY CONSOLIDANT AS REQUIRED.

• INSTALL 1” ROUND MINI COLUMN VENTS, THREE (3) AT COLUMN BOTTOM AND TWO (2) AT COLUMN TOP – TYPICAL FOR ALL FULL COLUMNS. VENTS BY MC MASTER CARR – ITEM #2016K11, WHITE PAINTED ALUMINUM. DRILL/CORE COLUMN AS REQUIRED FOR INSTALLATION.

• INSTALL NEW COMPOSITE PORCH AND STAIR RAILING SYSTEM. RAILING SYSTEM SHALL BE ‘LEGENDS VINYL BALUSTRADE’ BY FAIRWAY VINYL SYSTEMS http://www.fairwayvinyl.com/sv_legends.html RAILINGS SHALL BE 36” HIGH – BALUSTERS SHALL BE 32” TURNED ‘LEGENDS’ BY FAIRWAY VINYL SYSTEMS.

• INSTALL NEW COMPOSITE STAIR SYSTEM. PROVIDE NEW PRESSURE TREATED FRAMING FOR STAIRS.

• INSTALL NEW AZEK TONGUE & GROOVE DECKING AND TREADS.• INSTALL NEW COMPOSITE SQUARE PRIVACY LATTICE AND COMPOSITE

FASCIA BOARDS.• RE-INSTALL / RE-LOCATE EXISTING WATER SPOUT TO THE SOUTH SIDE

OF THE PORCH. PROVIDE ALL REQUIRED PLUMBING WORK.• PREP, PRIME AND PAINT ALL PREVIOUSLY PAINTED SURFACES

INCLUDING ALL COLUMNS, SOFFITS, BOX BEAMS ALONG THE CEILING, DENTIL MOLDINGS AND BEADBOARD CEILING. DO NOT PAINT ANY COMPOSITE MATERIALS INSTALLED.

• LOAM, SEED AND REGRADE DISTURBED AREA AROUND PORCH UPON COMPLETION OF THE PROJECT.

NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS).

PHOTO. NO.

REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459

WESLEYAN U N I V E R S I T Y P-105-1

MAJOR MAINTENANCE FY 14 BID PACKAGE #19

47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING

SECTION 00020 - EXISTING CONDITION PHOTOS

SCOPE OF WORK IS LIMITED TO THE FRONT & REAR PORCHES

DATE: 06/11/13

PHOTO. NO.

REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459

WESLEYAN U N I V E R S I T Y P-105-2

MAJOR MAINTENANCE FY 14

PHOTO ‘A’

MAINTAIN EXISTING COLUMN – REPAIR ALL COLUMNS WITH EPOXY CONSOLIDANT AS REQUIRED.

REPLACE EXISTING COLUMN BASES – TYPICAL OF 6. REPLICATE EXISTING SHAPES AND PROFILES.

DATE: 06/11/13

BID PACKAGE #19

47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING

SECTION 00020 - EXISTING CONDITION PHOTOS

PHOTO. NO.

REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459

WESLEYAN U N I V E R S I T Y P-105-3

MAJOR MAINTENANCE FY 14DATE: 06/11/13

BID PACKAGE #19

47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING

SECTION 00020 - EXISTING CONDITION PHOTOS

PHOTO. NO.

REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459

WESLEYAN U N I V E R S I T Y P-105-4

MAJOR MAINTENANCE FY 14DATE: 06/11/13

REPLACE EXISTING COLUMN BASES – TYPICAL OF 6. REPLICATE EXISTING SHAPES AND PROFILES.

BID PACKAGE #19

47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING

SECTION 00020 - EXISTING CONDITION PHOTOS

PHOTO. NO.

REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459

WESLEYAN U N I V E R S I T Y P-105-5

DATE: 06/11/13

BID PACKAGE #19

47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING

SECTION 00020 - EXISTING CONDITION PHOTOS

PHOTO. NO.

REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459

WESLEYAN U N I V E R S I T Y P-105-6

SCOPE OF WORK IS LIMITED TO THE FRONT & REAR PORCHES

DATE: 06/11/13

BID PACKAGE #19

47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING

SECTION 00020 - EXISTING CONDITION PHOTOS

PHOTO. NO.

REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459

WESLEYAN U N I V E R S I T Y P-105-7

DATE: 06/11/13

BID PACKAGE #19

47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING

SECTION 00020 - EXISTING CONDITION PHOTOS

PHOTO. NO.

REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459

WESLEYAN U N I V E R S I T Y P-105-8

REMOVAL NOTES

• SHORE EXISTING PORCH ROOF AS REQUIRED TO COMPLETE ALL WORK NOTED – MAINTAIN PORCH ROOF.

• REMOVE AND DISPOSE OF EXISTING SUPPORT POSTS• REMOVE AND DISPOSE OF EXISTING WOOD RAILINGS.• REMOVE AND DISPOSE OF TONGUE & GROOVE DECKING.• REMOVE AND DISPOSE OF LATTICE AND FASCIA BOARDS.• REMOVE AND DISPOSE OF EXISTING FRAMING• REMOVE AND DISPOSE OF STAIR TREADS, RISERS, STRINGERS

AND STAIR FRAMING.• REMOVE AND DISPOSE OF EXISTING POSTS AND FOOTINGS

CURRENTLY SUPPORTING PORCH.• SAWCUT & REMOVE SECTION OF ASPHALT PAVING TO THE

EDGE OF THE EXISTING DRIVEWAY.• REMOVE AND DISPOSE OF EXISTING T-111 PERIMETER SKIRT

DATE: 06/11/13

REMOVE AND DISPOSE OF EXISTING T-111 PERIMETER SKIRT

REMOVE ALL PORCH COMPONENTS AS NOTED.

BID PACKAGE #19

47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING

SECTION 00020 - EXISTING CONDITION PHOTOS

PHOTO. NO.

REVISIONSConstruction Services170 Long LaneMiddletown, CT 06459

WESLEYAN U N I V E R S I T Y P-105-9

NEW PORCH INSTALLATION NOTES• SHORE EXISTING PORCH ROOF AS REQUIRED TO COMPLETE ALL

WORK NOTED.• THE CONTRACTOR SHALL MAINTAIN THE EXISTING ROOF AND

PROVIDE A NEW CONCRETE LANDING AND STAIRS AT THE SOUTH SIDE. NO STAIRS SHALL BE INSTALLED AT THE NORTH SIDE.

• CONTRACTOR SHALL INCLUDE THE COST TO INSTALL (5) NEW – 8” DIAMETER CONCRETE FOOTINGS AND A CONCRETE LANDING TO MATCH THE WIDTH OF THE STAIRS AND EXTEND TO THE EDGE OF THE ASPHALT DRIVEWAY. COORDINATE FOOTING LOCATIONS WITH OWNER.

• CONTRACTOR SHALL INSTALL NEW 4”X4” COMPOSITE STRUCTURAL POSTS TO REPLACE THE POSTS REMOVED. POSTS SHALL BE BY FAIRWAY VINYL SYSTEMS.

• CONTRACTOR SHALL INSTALL NEW COMPOSITE PORCH AND STAIR RAILING SYSTEM. RAILING SYSTEM SHALL BE ‘LANDMARK’ BY FAIRWAY VINYL SYSTEMS. BALUSTERS SHALL BE SQUARE. http://www.fairwayvinyl.com/lm_vinyl_rail.html

• RAILINGS SHALL BE 36” HIGH.• INSTALL NEW COMPOSITE STAIR SYSTEM. PROVIDE NEW

PRESSURE TREATED FRAMING FOR STAIRS. PROVIDE COMPOSITE RISER FASCIA BOARDS.

• INSTALL NEW TREX DECKING AND TREADS – COLOR SHALL BE GREY.

• INSTALL NEW COMPOSITE SQUARE PRIVACY LATTICE AND COMPOSITE FASCIA BOARDS.

• INSTALL NEW T-111 SKIRT BOARDS AROUND THE PERIMETR OF THE PORCH TO REPLACE THE EXISTING T-111. PROVIDE PRESSURE TREATED SUPPORT FRAMING AS REQUIRED. INSTALL HINGED ACCESS DOOR WITH LATCH.

• PREP, PRIME AND PAINT ALL PREVIOUSLY PAINTED PORCH AREAS INCLUDING ALL SOFFITS, BOX BEAMS ALONG THE CEILING, EXPOSED PORCH ROOF JOISTS, NEW T-111 SKIRT BOARDS AND THE PORCH CEILING IN ITS ENTIRETY. DO NOT PAINT ANY COMPOSITE MATERIALS INSTALLED.

• LOAM, SEED AND REGRADE DISTURBED AREA AROUND PORCH UPON COMPLETION OF THE PROJECT.

THIS GRAPHIC REPRESENTATION IS FOR INFORMATION ONLY AND IS BEING PROVIDED TO SHOW THE LAYOUT INTENT OF THE NEW PORCH LANDING AND STAIRS – REFER TO INSTALLATION NOTES FOR SPECIFICATIONS AND PORCH REQUIREMENTS.

DATE: 06/11/13

INSTALL NEW T-111 SKIRT BOARDS AROUND THE PERIMETR OF THE PORCH TO REPLACE THE EXISTING T-111. PROVIDE PRESSURE TREATED SUPPORT FRAMING AS REQUIRED. INSTALL HINGED ACCESS DOOR WITH LATCH.

BID PACKAGE #19

47 BRAINERD AVENUE – EAST, WEST PORCH REPLACEMENTS / PAINTING

SECTION 00020 - EXISTING CONDITION PHOTOS