renewable energy system rosenhaus residence€¦ · rosenhaus residence installation of renewable...
TRANSCRIPT
-
SHEET NO:
PUBLISHED:
SHEET NAME:
DRAWN: CHECKED:DP AG
ENLA
RGED
VIE
WIN
G &
HYP
ERLI
NKS
:PR
INT
VERS
ION
OF
THIS
PLA
N P
ROVI
DES
MIN
IMU
M IN
FORM
ATIO
N N
EEDE
D BY
USE
RS.
ELEC
TRO
NIC
VER
SIO
N (E
V) P
ROVI
DES
MAG
NIF
IED
VIEW
ING
UP
TO 6
400%
. EV
ALSO
PRO
VIDE
S HY
PERL
INK
ACCE
SS T
O O
EM M
ANU
ALS
AND
ABU
NDA
NT
OTH
ER S
UPP
LEM
ENTA
RY IN
FORM
ATIO
N.E
V M
AY B
EAC
CESS
ED A
T: W
WW
.GEZ
ELM
ANPE
.CO
M/P
V/03
83ST
.LE.
ROSE
NHA
US_
PALM
.BCH
_FL.
dwg
REVISIONS:
I CERTIFY THAT THE FRAMING OF THIS STRUCTURE WILL SAFELY ACCOMMODATE CALCULATED WIND UPLIFT AND LATERAL FORCES ANDEQUIPMENT DEAD LOADS. THIS IS ATTESTED TO BY MY SIGNATURE AND SEAL ON THIS DRAWING AT THE UPPER RIGHT.ELECTRICAL SPECIFICATIONS: CONFORMS TO THE REQUIREMENTS OF THE 2008 NATIONAL ELECTRICAL CODE. CERTAIN DETAILS OF THIS PROJECTMAY DIFFER, REFER TO OEM LITERATURE WHICH SHALL PREVAIL.
CONTRACTOR RESPONSIBLE TO VERIFY THE FIT OF THIS ARRAY PRIOR TO INSTALLATION: THE SOLAR MODULE ARRAY SHOWNHERE IS BASED ON THE FIELD DATA PROVIDED BY THE CONTRACTOR. CONTRACTOR SHALL CONTACT THE ENGINEER IF THEARRAY MAY NOT FIT AS PROJECTED. SATELLITE IMAGERY SHOWN MAY NOT CORRECTLY INDICATE POTENTIAL CURRENT SHADINGOF PROPERTY. CONTRACTOR RESPONSIBLE TO VERIFY SUN EXPOSURE AND SHADING OF INSTALLATION PRIOR TO INSTALLATION!
CO
PY R
IGHT
& IN
TELL
ECTU
AL P
ROPE
RTY
NO
TICE
THIS
PLA
N S
ET IS
CO
PY R
IGHT
PRO
TECT
ED A
ND
CON
TAIN
S IN
TELL
ECTU
AL P
ROPE
RTY
WHI
CH B
ELO
NGS
TO
ALL
EN G
EZEL
MAN
PE.
ACCE
SS IS
GIV
EN T
O T
HE IN
FORM
ATIO
N H
EREO
N S
OLE
LY F
OR
THE
PURP
OSE
OF
COM
PLET
ION
OF
THE
PRO
JECT
FO
R W
HICH
IT IS
INTE
NDE
D.N
O O
THER
USE
MAY
BE
MAD
E O
F TH
E IN
FORM
ATIO
N, D
RAW
INGS
, OR
IDEA
S HE
REO
N W
ITHO
UT
THE
EXPR
ESS,
WRI
TTEN
, PER
MIS
SIO
N O
F AL
LEN
GEZ
ELM
AN P
E
ALL AFFIDAVITS, DESIGNS, OPINIONS, CALCULATIONS & OTHER ENGINEERING SERVICES PROVIDED BY ALLEN GEZELMAN PE AND HIS ASSOCIATES ON ANY AND ALL PROJECTS ARE SUBJECT TO THE PROVISIONS OF EJCDCC-700 (ENGINEERS JOINT CONSTRUCTION DOCUMENT COMMITTEE - STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT) CURRENT AT THE TIME. THOSE OBJECTING TO SAID EJCDC C-700 ORPROVISIONS THEREOF ARE DIRECTED NOT TO USE THE AFFIDAVIT, DESIGN, OPINION, CALCULATION OR OTHER ENGINEERING SERVICE OFFERED BY ALLEN GEZELMAN PE AND HIS ASSOCIATES ON THE PROJECT. EJCDCC-700 MAY BE VIEWED AT: HTTP://GEZELMANPE.COM/REFERENCE/AG/C-700.PDF
OWNER OF RECORD:
8389 Butler Greenword dr Royal Palm Beach FL Brett Rosenhaus THIS PLAN IS ONLINE FOR REVIEW @
WWW.GEZELMANPE.COM/PV/0383ST.LE.ROSENHAUS_PALM.BCH_FL.PDF
CON
TACT
DES
IGN
GRO
UP
@w
ww
.Gez
elm
anPE
.com
ALLEN GEZELMAN16502 HANNA RD.LUTZ, FLORIDA 33549
PH. 813 650 7246FX. 866 397 9050Allen@Gezelman PE.COMwww.GezelmanPE.com
FBC2010
INST
ALLA
TIO
N O
F
REN
EWAB
LE E
NER
GY S
YSTE
MRO
SEN
HAU
S RE
SIDE
NCE
Wind: Vult 170mph Vasd 131.7mphRisk Category B Exposure Category IIPZ2 width 4-ft Uplift (PSF) PZ1-26.4, PZ2-42.3, PZ3-68.7CO
DE
VERI
FY
MODULE# SW 280 MONO FSEC: SW14-NT90-0419
DESIGNED PER: ASCE 7-10, FBC 2010
WIN
D
Royal Palm Beach FL , PARCEL ID#
2/5/15
CONTRACTOR:
INSTALLATION LOCATIONS
INSTALLATION NOTES - THIS PROJECT INVOLVES TWO SEPARATE SYSTEMS ON A STANDING SEAM METAL ROOF -
SOLAR DOMESTIC HOT WATER (SDHW) & PHOTO-VOLTAIC (PV) (SEE LAYOUT SKETCH).
SDHW SYSTEM SHALL BE INSTALLED IAW (IN ACCORDANCE WITH) MY GENERIC PLANhttp://www.gezelmanpe.com/generic/AS.1.3.WH-10.pdfNOTE THAT THERE SHALL BE A TOTAL OF SIX-S-5 CLAMPS ATTACHING THE 4-FT BY 10-FT SDHW COLLECTOR IN LANDSCAPEON THE ROOF, E.G. PERDENDICULAR TO THE STANDING SEAMS WITH THREE S-5 CLAMPS EVENLY SPACED ALONG EACHLONG SIDE.
PV INSTALLATION SHALL BE MADE IAW THE FOLLOWING SITE-SPECIFIC INSTRUCTIONS:
JURISDICTION) AND INSTALLERS. USERS ARE ENCOURAGED TO ACCESS EV (ELECTRONIC VERSION) OF THIS PLAN. ACTIVEHYPERLINKS ON EV PROVIDE EASY ACCESS TO SUPPLEMENTAL INFORMATION. EV ALSO ALLOWS VIEWER TO STUDY THE PLANAND OEM (ORIGINAL EQUIPMENT MANUFACTURER) DETAILS AT MAGNIFICATIONS OF VIEWER CHOICE UP TO 6400%. IF ACONFLICT SHOULD OCCUR BETWEEN A DRAWING AND/OR SPECIFICATION HEREON AND AN OEM DETAIL, OEM SHALLPREVAIL.SOLAR EQUIPMENT ADDS LESS THAN 4-PSF GRAVITY LOAD TO STRUCTURE.THIS PLAN PROVIDES SPECIFIES SITE-SPECIFIC INSTALLATION OF PV MODULES ON A STANDING SEAM METAL ROOF USING S-5CLAMPS. MUCH USEFUL SUPPLEMENTAL INFORMATION IS AVAILABLE ON THE S-5 WEBPAGEHTTP://WWW.S-5.COM/HOME/INDEX.CFMTHERE SHALL BE A PV MODULE-TO-RAIL MOUNTING CLAMP AT EVERY RAIL/MODULE CROSSING POINT. ADJOININGMODULES MAY SHARE CLAMPS. CONTRACTOR TO ENSURE CONTINUITY OF ALL METAL PARTS AND CONNECTIONS OF THISINSTALLATION TO BE ELECTRICALY GROUNDED AND BONDED TOGETHER. REFER TO ELECTRICAL DRAWING OF THIS PERMITFOR DETAILS. TORQUE ALL S-5 SET SCREWS TO 115-INCH-POUNDS.PV RACK ATTACHMENT TO STANDING SEAMS,
ROOF PRESSURE ZONE 1 (PZ1) - MAX S-5 SPACING, 6-FT CENTER-CENTERROOF PRESSURE ZONE 2 (PZ2) - MAX S-5 SPACING, 4-FT CENTER-CENTERROOF PRESSURE ZONE 3 (PZ3) - MAX S-5 SPACING, 2-FT CENTER-CENTER
ENGINEER OF RECORD (EOR) PREFERS EMAIL FOR PLAN PROBLEMS OR QUESTIONS: [email protected]
8389
But
ler G
reen
wor
d dr
Roy
al P
alm
Bea
ch F
L
DjImage
DjImage
DjImage
DjTypewritten TextS-5 clamps ready for rails
DjTypewritten Text Typical Rail & Clamp
DjTypewritten TextTypical outside end condition
DjTypewritten Text S-5 CLAMP
DjTypewritten Text GOOGLE IMAGE
DjImage
DjSnapshot
DjSnapshot
DjSnapshot
DjSnapshot
DjSnapshot
DjSnapshot