Replacement of George Webster Elementary School Toronto District School Board
March 8, 2016
Replacement of George Webster Elementary School
AGENDA
1. Welcome & Introduction – Ward 16 Trustee Sheila Cary-Meagher (TDSB)
2. Project Overview – David Percival (TDSB)
3. Concept and Process – Leo Makrimichalos (MC Architects)
4. Comments and Questions
5. Adjournment and Invitation to view panels and discuss the
design with team members.
Replacement of George Webster Elementary School
1981: Leo Makrimichalos Architect 1982 to 1988: NQM Architects 1988 to 1992: NQMC Architects 1992 to 2015: Makrimichalos Cugini Architects 2015 to Present: MC Architects Inc.
16 Full Time Employees 5 Licensed Architects 7 Technologists/Grad.
Architects 1 Specifications/Codes 3 Administrative Staff
FIRM PROFILE
Replacement of George Webster Elementary School
Over 100 new Elementary Schools Over 15 new Secondary Schools Over 250 Additions and Renovations Design Excellence Awards for Schools
SCHOOL DESIGN EXPERIENCE
Replacement of George Webster Elementary School
DESIGN EXCELLENCE AWARDS
David Bouchard Public School Award of Excellence, City of Oshawa Urban Design Awards, 2014 Mount Pleasant Village Public School, Library and Community Centre Heritage Canada Foundation Achievement Award, 2012 American School and University Award for Outstanding Design in the Educational Interiors Showcase 2012 Brampton Urban Design Award 2012
Cedarbrae Library The Ontario Library Association 2012 Library Architectural and Design Transformation Award American School and University Award for Outstanding Design in the Educational Interiors Showcase 2012
Kleinburg Public School 2010 Masonry Award (from MCTA & OMCA)
Dufferin/St. Clair Library 2009 Heritage Toronto Award of Merit The Ontario Library Association 2010 Award of Excellence American School and University Award for Outstanding Design in the Educational Interiors Showcase 2010
Replacement of George Webster Elementary School
Brookhaven Public School (Replacement)
1991
Replacement of George Webster Elementary School
St. Edwards Catholic Elementary School
St. Andre Catholic Elementary School Replacement
2014
2015
Latest Toronto New Schools
Concept by M.H.K. Wong Architects
Replacement of George Webster Elementary School
Mount Pleasant Village Public School, Library and Community Centre
Replacement of George Webster Elementary School
Cedarbrae District Library
Replacement of George Webster Elementary School
UNDERSTANDING THE PROJECT
Diversity
• 30 languages Vision
• Equality, Inclusiveness, Community, Achievement
Other Services • Daycare operated by YMCA,
Parenting + Family Literacy Centre
GEORGE WEBSTER ELEMENTARY SCHOOL “Achieving Together to Build a Better World”
Replacement of George Webster Elementary School
KEY ISSUES
Phased Construction • Safe operation of existing
school during construction
Improve Safety • Clear sight lines
(interior/exterior) • View arrivals from Main Office • Separate vehicular and
pedestrian flow
Replacement of George Webster Elementary School
OPPORTUNITIES
Landscape • Existing tree / berm preservation • Outdoor primary play area consistent with existing • Adjacent Park open space
Community Connection • Entry sequence to reinforce image of caring + integrated institution • Zone school for Community after hours use
State-of-the-Art Building • Fully accessible, bright, comfortable, healthy and safe
Replacement of George Webster Elementary School
The 21st Century school should: 1. Enhance teaching and learning, and
accommodate the needs of all learners.
2. Serve as a centre of the community.
3. Result from a planning and design process that often involves community interests.
4. Make effective use of available resources.
5. Be flexible and adaptable.
6. Provide for health, safety and security of all its users.
OPPORTUNITIES
Replacement of George Webster Elementary School
An Accessible school should: 1. Be proactive in applying the latest
Accessibility Requirements
2. Provide barrier-free access to all visitors, staff and students
3. Enable the user to feel integrated in the school and community
4. Utilize the latest technology
ACCESSIBILITY
Replacement of George Webster Elementary School
EXISTING SITE PLAN 1. EXISTING BUILDING AND
PORTABLES TO BE FULLY OPERATIONAL DURING CONSTRUCTION AND DEMOLISHED UPON COMPLETION OF NEW SCHOOL
2. PROPOSED NEW SCHOOL
3. EXISTING PARKING
4. CONNECTION TO PUBLIC PARK FROM PLAYFIELD
5. VEHICLE ACCESS TO PARKING
6. PROPOSED STREETFRONT
Meeting the Ministry of Education’s requirements by modifying a new school design that has recently been built within the Benchmark Cost
Replacement of George Webster Elementary School
CONCEPT GROUND FLOOR PLAN
KINDERGARTEN
SPECIALTY CLASSROOMS
WASHROOMS
OFFICE / STAFF
GYMNASIUM / LIBRARY
Ross Drive Elementary School, Brampton Peel District School Board Completed Dec. 2014
Replacement of George Webster Elementary School
CONCEPT RENDERING
Replacement of George Webster Elementary School
PROPOSED SITE PLAN
Replacement of George Webster Elementary School
PROPOSED SITE PLAN
Replacement of George Webster Elementary School
SUSTAINABILITY
Building
Durability of Materials Low-VOC, local, renewable materials Recycled Content High-Performance Building Envelope Energy Efficiency
Ontario Building Code SB-10 compliance Zoning of building systems for future flexibility Optimized daylighting
Diffused light Demonstration Green Roof Toronto Green Standard – Tier 1
Replacement of George Webster Elementary School
SUSTAINABILITY
Physical Factors affecting Learning
Indoor Air Quality (IAQ) Temperature/Humidity Ventilation Lighting Daylighting Acoustics Class size Aesthetics
Replacement of George Webster Elementary School
PROGRAM
1. 26 CLASSROOMS 2. 4 FULL-DAY KINDERGARTEN
CLASSROOMS
3. 2 ART ROOMS
4. 2 SCIENCE ROOMS 5. 6 SPECIAL EDUCATION
ROOMS
6. TRIPLE GYMNASIUM/STAGE 7. INSTRUMENTAL MUSIC
ROOM
8. CHILD CARE 1. INFANT, TODDLER AND
PRESCHOOL 2. PEDIATRIC CLINIC 3. PATENT AND FAMILY
LITERACY ROOM
9. FULLY ACCESSIBLE
Replacement of George Webster Elementary School
SITE PLAN
Replacement of George Webster Elementary School
SITE PLAN
Replacement of George Webster Elementary School
GROUND FLOOR PLAN
Replacement of George Webster Elementary School
SECOND FLOOR PLAN
Replacement of George Webster Elementary School
ELEVATIONS
Replacement of George Webster Elementary School
TIMELINES
1. Tender March – May 2016
2. Site Plan Approval March – May 2016
3. Building Permit March – May 2016
4. EDU and TDSB Approvals March – May 2016
5. Construction Start June 2016
6. Construction Period for Replacement School 16 Months
7. Completion of Replacement School August 2017
8. Demolition of Existing School September 2017
9. Construction of Fields and Child Care Addition Fall 2017
10. Completion January 2018
Replacement of George Webster Elementary School
RENDERING
Replacement of George Webster Elementary School
THANK YOU
PLEASE STAY TO VIEW THE PANELS AND DISCUSS THE DESIGN WITH THE
TEAM MEMBERS. COMMENTS CAN BE EMAILED TO: