Report of Iranian Railways The 4 th Meeting of the Working Group on Trans-Asian Railway Network 23-24 November 2015, Bangkok ********** Страновой отчет РАИ 4-ое совещание Рабочей Группы Транс -Азиатской железнодорожной Сети 23-24 ноября 2015г., Бангкок 4 th Meeting of the Working Group on Trans-Asian Railway Network

Upload: others

Post on 09-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Report of Iranian Railways

The 4th Meeting of the Working Group on

Trans-Asian Railway Network

23-24 November 2015, Bangkok

**********

Страновой отчет РАИ

4-ое совещание Рабочей Группы Транс-Азиатской

железнодорожной Сети

23-24 ноября 2015г., Бангкок

4th Meeting of the Working Group on Trans-Asian Railway Network

Page 2: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

RAI Rail Network:

Length of the lines: 10500 km

Under construction: 9500 km

8000 km under TAR Network

coverage

Passenger cars: 2000

Freight cars: 22000

Passengers carried: 26 M to 40

M per annum (up to 2017)

Ton-carried: 33 MT to 70 MT

annually (up to 2017)

Железнодорожная сеть

Ирана:

• Длина линий: 10500 км

• В процессе строительства:9500 км

• под покрытия сети TAR: 8000 км

• Количество пассажирских

вагонов: 2000

• Количество грузовых вагонов:

22000

• Перевезенные пассажиры: 28

млн. ежегодно (до 2017г.)

• Превезенные грузы: 33 млн.

тон. Ежегодно (до 2017г.)

4th Meeting of the Working Group on Trans-Asian Railway Network

Page 3: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

RAI routes under coverage of TAR Network

Page 4: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

.

Rail and rail-sea-road entrance and exit borders of Iran

• Bandar Abbas and Imam Khomeini port in the south

• Amirabad in the north

• Rail border of Razi and Jolfa in the west

• Sarakhs in the northeast

• Mirjaveh in the southeast

Железнодорожный и стыковые границы железнодорожно-море-

автотранспорт Ирана

•Бандар аббас и порт Имам Хомейни на юге

•Амирабад на севере

•Железнодорожная граница Рази и Джулфа на западе

•Сарахс на Северо-Востоке

•Мирджаве на Юго-Востоке

12th Meeting of the Heads of ECO Railway Authorities 4th Meeting of the Working Group on Trans-Asian Railway Network

Page 5: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Bandar

Abbas

Amir Abad

Bandar Abbas-Amir Abad Ports

Page 6: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Corridors passing through Iran

Page 7: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Russia

Gorgan

Incheh Bron

Etrek

Bereket

Gyzlgaya

Aktau

Uzen

Bandar Abbas

Iran-Turkmenistan-Kazakhstan Corridor (East of Caspian Sea)

Route: Kazakhstan – Turkmenistan – Iran (Gorgan – Incheh Borun) Length: 928.5 km (inside Iran: 80 km)

Missing link: none Launched: 03 Dec. 2014

Маршрут: Казахстана- Туркменистан-Иран (Горган-Инчеборун) длина: 928,5 км (в Иране: 80 км.)

Отрывы: нет Запущенный: 3 декабря 2014г.

Page 8: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

A trilateral meeting on 15 Oct. 2015 in Tehran resulted in signing a protocol. The

parties agreed on:

Establishing a competitive price fo cargo carriage from Uzen to Inchehbrun

Reducing tariff rate of grain and flour from Kazakhstan via Turkmenistan to Iran

Establishing a uniform rate from Uzen to Inchehbrun

Next meeting in second half of Dec. 2015 in Ashgabat (Turkmenistan)

Трехсторонняя встреча, состоивщаяся 15 октября 2015 г. в Тегеране, в результате

которой был подписан протокол. Стороны договорились о следующем:

Установка конкурентоспособной цене для перевозки грузов из Узень в

Inchehbrun

Снижение тарифной ставки зерна и муки из Казахстана через Туркменистан

в Иран

Установление единой сквозной ставки от Узень в Inchehbrun

Rail Connection through North-South Corridor

Iran-Turkmenistan-Kazakhstan (East of Caspian Sea)

4th Meeting of the Working Group on Trans-Asian Railway Network

Page 9: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном
Page 10: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Construction of Qazvin- Rasht-

Astara route (West of Caspian Sea)

Page 11: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Rail Connection with Azerbaijan

1. A meeting held on 10 Oct 2015 in Astara resulted in signing a protocol :

Stage by stage operation

Completion of Astara-Astara line by AZ and RAI by the end of 2016

Bridge over Astara Chai River by AZ & terminal by RAI

Completion of Qazvin-Rasht by the end of 2016

2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues.

Железнодорожная связь с Азербайджаном

1. Встреча, состоивщаяся 10 октября 2015 года в Астаре в результате которой

подписан протокол

Реализация операции поэтапно

Завершение Астара-Астара линии АЗ и РАИ в конце 2016 года

Мост через реку Астара Чай с АЗ & терминала по РАИ

Завершение Казвин-Решт в конце 2016 года

2. Совещание в 3 ноября 2015 года в Баку с фокусом на технические вопросы.

4th Meeting of the Working Group on Trans-Asian Railway Network

Page 12: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Solutions for cargo carriage before completion of the missing

link in Iran along N-S Corridor 1-Bandar Abbas Port to Sarakhs (all rail connection)

2-Bandar Abbas Port to Incheh-brun towards the CIS countries (all rail connection)

3- Bandar Abbas Port to Amirabad by Rail and from there by ship

4-Bandar Abbas to Qazvin by rail, then to Astara by road (combined transport)

Решение для перевозки грузов до завершения недостающего

звена в Иране по С. Коридора

1.Порт Бандар Аббас до Сарахс (ж.д. транспорт)

2.Порт Бандар Аббас до Инчебурун в сторону стран СНГ (ж.д. транспорт)

3.Порт Бандар Аббас до Амирабад ж.д. Транспортом и с порта морской

перевозкой

4. Порт Бандар Аббас до Казвин ж.д. Транспортом, из Астары автотранспортом

(комбинированная перевозка)

4th Meeting of the Working Group on Trans-Asian Railway Network

Page 13: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Mumbai

Bandar

Abbas

Cargo transport routes before missing link completion along N-S Corridor

Page 14: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Discounts by RAI in different routes along with the North- South corridor

No. Route Distance (km)

General cargo Tariff in charter wagon (per ton)

Container tariff (20

ft)

Container tariff (40 ft)

Remarks

1 Banadar Abbas-

Sarakhs

1619 98.52 747 1093 For all transit goods (15%), fertilizer and

sulphur (30 & 35%), wheat (step discount up

to 25%). A discount for transit goods from/to

Tajikistan as much as 26 % will be applied.

2 Banadar Abbas-

Incheh Borun

1972 37.53 773 1131 15 % discount for all transit cargos

3 Banadar Abbas-

Amir Abad

1795 81.50 758 1109 15 % discount for all transit cargos from/to

CIS countries

4 Banadar Abbas-

Ghazvin (transit)

1518 63.47 740 1082 Ready to offer discounts

5 Ghazvin- Anzali

(road)

215 -------------- 295 295

Amounts are in CHF (Swiss Franc)

The discounts are applicable until the end of 2015 and may be renewed for the next years

Page 15: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

RAI Discount Policy for development of

rail transit

•30% on cotton transit

•35% on transit Sulphur

•30% on the fertilizers transited towards

the southern sea ports of the country

•50% for the freight transported

to/from Turkey

•Special discount for ITI route

containers

Скидки для развития

железнодорожного транзита

•30% для транзита хлопка

• 35% для транзита серы

• 30% для транзитного удобрения в

южние порты страны

•50% для транзита грузов из Турции

•Особая скидка для контейнеров

маршрута Ислам абад- Тегеран -

истамбул

4th Meeting of the Working Group on Trans-Asian Railway Network

Page 16: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Iran-Afghanistan-Tajikistan-Kyrgyzstan-China

Herat

Sangan

Page 17: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Rail Connection with Afghanistan

Construction of Sangan-Khaf –Herat section (229 km in length)

Sangan-Khaf (43 km) (completed and will be shortly opened)

Sangan-Shamtigh (34 km)

Shamtigh-Gurian (62 km)

Geno-Herat (87 km)

Железнодорожная связь с Авганистаном

Строительство участка Санган – Хаф – Херат (протяженностью 229 км)

Санган – Хаф (43 км)

Санган – Шамтиг (34 км)

Шамтиг – Гуриян (62 км)

Гено – Херат (87 км)

Page 18: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Iran-Iraq Rail Connection

Route:

a) China, countries of the CIS, Iran, Iraq, Syria,

the Mediterranean Sea, Greece, Europe

Маршрут:

А) Китай, страны СНГ, Иран, Ирак, Сирия,

Средиземное Море, Греция, Европа

b) China - Myanmar - Bangladesh - India –

Pakistan - Iran, Iraq - Syria – Europe

Б) Китай- Мьянма – Бангладеш – Индия – Пакистан – Иран –

Ирак – Сирия - Европа

Connection points in Iran:

Arak – Kermanshah – Khosravi: 536 km

Page 19: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Linking Chabahar Port to the Rail Network

Page 20: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Equipping ports to Develop and

Facilitate

Transit Multimodal Transport:

Total capacity of Irans’port in 2015:

200 M.T.

The transit capacity of Iran's ports in

2015: around 30 M.T.

RAI Ports located in the Persian Gulf

:4 ports:

1. Shahid Rajaei,

2. Imam Khomeini,

3. Khorramshahr,

4. Bushehr.

82% of our transit is made on

Sarakhs – Bandar Abbas and vice-versa

Оснащение портов для развития и

облегчения мультимодального

тарнзитного транспорта

•Полный объем портов Ирана в 2015г. .: 200 млн. тонн •Транзитный объем в Иранских портах в 2015г.: 30 млн. тонн Порты РАИ в Персидском Заливе: 4 порта 1. Шахид Раджаи 2. Имам Хомейни 3. Хоррамшахр 4. Бушехр

•82% наш транзит по маршруту Сарахс-Бандар аббас и наоборот

4th Meeting of the Working Group on Trans-Asian Railway Network

Page 21: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Shahid Rajaee Port:

• Construction of bulk rail

terminal in 2013: unloading

capacity: 2.5 MT per year

Bandar Abbas Port:

• Construction of container rail

terminal in 2013: 5 tracks each

1000m.

• Loading/unloading capacity:

350 000 container per year

Bandar Amir Abad Port:

• Completion of ferry boat

wharf.

Порт Шахид Раджаи:

• Создание Железнодорожного

терминала в 2013г.

• Объем выгрузки: 2.5 млн тонн в

год

•Порт Бандар Аббас:

• Создание Железнодорожного

контейнерного терминала в 2013г.:

5 линий протяженностью 1000

метров

• Объем погрузки и выгрузки:

350000 контейнеров в год

•Порт Амирабад:

• Соверщание пристани паром.

4th Meeting of the Working Group on Trans-Asian Railway Network

Page 22: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Sarakhs Border:

• Bogies capacity increase: from

85 to 200 per day

• Wagon exchange: from 200 to

400

• Parking capacity: 6000 bogies

Граница Сарахс:

•Повышение объема перестановки

тележек из 85 на 200 на сутки

•Обмен вагонами: из 200 на 400

•Объем парка: 6000 тележек

Border Facilitation along TAR Network

Page 23: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

CIM/SMGS Common Consignment note

RAI applies:

- SMGS with CIS countries

- CIM with Turkey, Syria and the European countries

Pakistan is a member of COTIF, it will be subject to CIM

OTIF-OSJD Joint cooperation on CIM/SMGS common consignment:

Iran is ready to apply the CIM/SMGS Common Consignment note

Совместная накладная ЦИМ / СМГС РАИ выполняет и применяет:

-СМГС в отношении со странами СНГ

-ЦИМ в отношении с Турцией, Сирией и европескими странами

Пакистан является участником КОТИФА, и поэтому применяет ЦИМ.

Совместная сотрудничество ОТИФ и ОСЖД на подготовке совместной накладной ЦИМ/ СМГС:

РАИ готов применять накладную ЦИМ/ СМГС.

Page 24: Report of Iranian Railways The 4th Meeting of the Working ...2. A meeting on 3 Nov. 2015 in Baku focusing on technical issues. Железнодорожная связь с Азербайджаном

Thank you Огромное Вам спасибо