REPORT ON THE SUTTON PROPERTY MORRISETTE TOWNSHIP KIRKLAND LAKE, ONTARIO Submitted by: M.W. Sutton B.SG. Geology Honours Kirkland Lake, Ontario 42A01NE2049 2.26078 MORRISETTE 010

Upload: phamthuan

Post on 27-May-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

REPORT ON THE SUTTON PROPERTY

MORRISETTE TOWNSHIP KIRKLAND LAKE, ONTARIO

Submitted by:

M.W. SuttonB.SG. Geology HonoursKirkland Lake, Ontario

42A01NE2049 2.26078 MORRISETTE 010

Previous work

The Sutton claim units are located immediately north of the Kirana Mine. Although in close proximity to this mine, and along the same structure that mineralized it, the three claim units have no assessment work filed on them at the Mining Recorders office. The claims were patents until they came open in 2001 when I staked them. The only assessment work filed therefore was a more regional exploration programme carried out by Minnova in the period of 1987 to 1990. Minnova carried out extensive soil sampling, I.P. and magnetometer-VLF surveys, and did some drilling and trenching. They were focused on delineating gold zones such as the one at Kirana where 50,000 tons are reported to exist between surface and the top level at 0.48 ounce per ton (see Fig. #2, and #3). The shaft was reportedly sunk on a vein that returned "high values" in the shaft.

Minnova found difficulties in dealing with "cultural effects". Their geochemical soil surveys proved to be totally misleading due to the presence of wind-blown contaminants (tailings from nearby operations). They dropped the option due to overall unsatisfactory results. However, it appears that they did not drill the Kirana ore zone itself, and they did not follow up on some rather good individual results. Only one hole was drilled on the eastern part of the Kirana structure covering a one mile strike length; the hole they did drill is located on the Sutton claim. This hole, KIR-5, drilled in 1990, returned 6810 ppb (6.8 g/t) over 0.5 metre one one vein, and 1669 ppb (l .7 g/t) over 0.3 metre on another. The intersections are 164, and 204 metres downhole (@-50 degrees) respectively. This hole was drilled to follow up on a previously drilled hole, V-79-1, that had returned 11.8 g/t over 1.0 metre (see figures #4,#5,#6, #7, and #8). There is no record of this hole at the ministry office. There were no drill sections or plans provided for assessment purposes by Minnova either. The only location plan provided is at a poor scale (see fig.#9).

There was a trench completed beside the highway on a gossanous zone, with very coarse pyrite, that graded up to 1650 ppb gold. This outcrop appears to line up with the intersections in the two holes. The Kirana Break is in close proximity to these intersections, and a strong I.P. anomaly is coincident with them (see attached plans).

Proj ect/Rationale

The project consists of the drilling of one 386' hole to further the size of the zone identified by the previous holes described above. As there exists a strong east-west Break, co-incident I.P. anomaly, and only two drill holes over a mile strike length of promising geology, both of which intersected relatively good grading gold values (close to economic for mining), the property deserved follow-up. Indeed, Minnova recommended that this one area be the final focus for their work; however the property was apparently dropped without follow-up (see fig.#10). The hole was spotted by me to intersect the zone at 150 feet west of 79-1. It was designed to be as perpendicular to the zone as possible, while utilizing an existing skidder trail (from previous drilling), and while keeping within the claim boundary. A long section has been developed using a grid perpendicular to the zone at roughly 321 degrees (see fig.#l 1). The drilling was done by Heath and Sherwood for S12.95 per foot (all-inclusive), with no mod/demob due to the location so close to their operation.

Results

The hole successfully intersected the moly-pyrite zone at approximately the same location of the previous drill holes (79-1, and KIR 5). The zone is located in all three holes in highly pyritic basalt breccia (flow top?), prior to entering Feldspar-Quartz Porphyry. Several every strong faults were intersected, two of which had appreciable graphite associated with them (see fig.#12 and #13). Which structure may be the Kirana Break is a matter of conjecture-perhaps this entire zone (virtually the whole hole) represents the deformation. The hole has significant narrow pale grey to dull white, quartz to cherty quartz to quartz-ankerite veining at various angles to the core, most of which have significant concentrations of pyrite.

Conclusions

More drilling is definitely warranted, but the neighbouring claims should be acquired first, as mineralization may become stronger to the east. The intersection of this zone with the Porphyry would be a good target to evaluate. More sampling should be undertaken to ensure that nothing is missed. The question of whether this is basalt or andesite could be solved with whole-rock. The possibility of sphalerite in the core, or a near-by source for the extensive massive pyrite (VMS?), should be followed up with some whole-rock work.

Bibliography

Minnova-1987-1990- "Kirana Property"-Daniel Bernard-resident geologists office

Illustrations

Fig.#l Stratigraphic Succession of the Kirkland Lake AreaMap#3 Location of claims vis-a-vis stratigraphyFig.#2 Minnova-resource in areaFig.#3 Kirana Mine-veins in areaFig.#4 Minnova-KIR-5 assaysFig.#5 Minnova-79-1 assaysFig.#6 Minnova-KIR-5 zone descriptionFig.#7 Minnova-79-1 zone descriptionFig.#8 Minnova-KIR-5 rationaleFig.#9 Minnova-KIR-5 cfe 79-1 location mapFig.#10 Minnova-recommendationsFig.#l l Zone Longitudinal SectionFig.#12 Drill Hole MS-1 SectionFig.#13 Drill Hole MS-1 PlanFig.#14 Drill Hole Plan relative to highwayFig.#15 Drill Hole Plan relative to surface rights

TABLE 1: STRATIGRAPHIC SUCCESSION OF THE KIRKLAND LAKE AREA.

SOUTH LIMB OF SYNCLINORIUM Upper Supergroup

Timiskaming GroupVolcanic rocks: Mafic, intermediate, felsic trachyte, and K-rich dacite and rhyolite flows and tuffs.Sedimentary rocks: Fluvial conglomerate, sandstone, and argillite.Intrusions: Stocks and dikes of syenodiorite, syenite, quartz monzonite, and lamprophyre.

Blake River GroupVolcanic rocks: Calc-alkalic basalt, andesite dacite and rhyolite flows and tuffs. Sedimentary rocks: Volcaniclastic slump deposits.Intrusion: Stocks and dikes of gabbro, quartz gabbro, hornblende gabbro, diorite, quartz diorite,

and subvolcanic rhyolite domes.

Kinojevis GroupVolcanic rocks: Mg-rich and Fe-rich tholeiitic basalts, and tholeiitic andesite, dacite and rhyolite

flows and tuffs.Sedimentary rocks: Thin interflow argillite and chert. ' Intrusions: Sills of Mg-rich and Fe-rich gabbro.

Larder Lake GroupVolcanic rocks: Flows of peridotitic and basaltic komatiite, and Mg-rich tholeiitic basalt, and minor

Fe-rich tholeiitic basalt and minor Fe-rich tholeiitic basalts and interflow rhyolite tuff- breccias. Sedimentary rocks: Turbiditic conglomerate, greywacke and argillite, and iron formation chert

limestone, and dolostone. Intrusions: Sills and stocks of peridotite, pyroxenite, and gabbro.

Lower Supergroup(Unnamed Unit)

(Conglomerate with trachyte and syenodiorite pebbles).

Skead GroupVolcanic rocks: Mainly calc-alkalic rhyolite tuff-breccia with some calc-alkalic basalt, andesite and

dacite flows and tuff- breccias. Sedimentary rocks: Chert and cherty argillite. Intrusions: Stocks of feldspar porphyry and quartz diorite.

Catherine GroupVolcanic rocks: Mg-rich and Fe-rich tholeiitic basalts. Sedimentary rocks: Interflow chert Intrusions: (None mapped)

Wabewawa GroupVolcanic rocks: Peridotitic and basaltic komatiite, Mg-rich tholeiite basalt and minor Fe-rich

tholeiitic basalt and a few interflow rhyolite tuffs. Sedimentary rocks: (None mapped) Intrusions: Layer sills (possibly flows) of dunite, pyroxenite, and gabbro.

Pacaud Tuffs (Ridler 1970)Volcanic rocks: Calc-alkalic andesite, dacite, and rhyolite tuffs. Sedimentary rocks: Chert argillite, iron formation. Intrusions: Trondhjemite of Round Lake Batholith.

From: Jensen and Langford 1985

W.A. HDBACHECK CONSULTANTS LTD.

l <

H

Q ^JO

" h /- 7 '. T/,. C-*-? -f ; i" l y A 'i '' -ib- -- -~ -s- ^ii^--\ iT'—---' ,;V;--V/riM.- (^s^|;--.^,c s-^'^-r/--r ^ ;:^ '^yE-U L"'^^ r ^ ^"' !:^i^--:--V- -.••'•- ;:-——— - - ' - . - " '

S^&iSS^r'^^JL*^ty#?^':-. ;. ;, : ' J.;:- ;-;'

'•-:t^-: v iii/'^^ '-v S-v ; ' ; - :p s'^ E R

'iVii,.; ^ 1V "H co, a-'-*w'•j-iiiy .^•jn4 ?06 poBf^Tc^^iB !fi,;\7/. XI/^JS) iVLi. ^^T" tJ*-viSCV: 2. A,'-l^ 'bW I ,-,i L,^- :, .i7™f \ /-'J"l ..;—v .ilW

-ri !M"^ 1l -4l-|i'S Nb.3Sha lc f V . lrvlb'-I J 1 -c; ~2 T JUO'-t\VM^'!f ̂ ifi .Us*

S )2! K T" la', II - ^OOllJlillLM l}no^jL^r :̂ \~ - -,-;k. r^'-Y^ l

" l ' l kn T* *"*^^^

y* ' li

?SEV- k-.i^'^Ur.'^\ "•••.-'••J" J VC^.

S^-lsS:

- o/ -

KIRANA fPN 074)

P. Bertrand

INTRODUCTION

La propriety Kirana est situ^e b, 3km au Nord de Kirkland

Lake. Elle comprend quelques 670 hectares dans les cantons Teck,

Bernhardt, Morrisette et Lebel en Ontario.

Gette proprie'te',^ Nova BeaAic^i^e^ejLjJlSJTia e"te

tardivement en 1986. Les faits saillants sont un inven-

taire mineral de 50,000 tonnes a 0.48 oz/T Au et la presence de

six (6) pu its d'exploration peu prpfonds dans une ._zpne^.de

cisaillement virtuellement non testee sur plusieurs kilometres.

PROGRAMME D'EXPLORATION DE MINNOVA EN 1987

Coupe de lignes:

Geophysique:

Geochimie:

Geologic:

Decapage:

Phase 1: 25.32km, Phase 2: 39.2km, Total: 64.52km

Mag: 25.2kmVLF: 25.2kmSpectral IP "Test Survey": 1.7kmSpectral IP: 7.5km

Humus "Test Survey": 125 6chantillons Lithogeochimie: ~25km

~25km

87 heures de pelle mecanique.

Echantillonage (Scie a roche): 49 ech. totalisant 61.9m.

Forages: KIR-1 O - 181.4 = 181.4 metresKIR-2 O - 242.0 = 242.0 metresKIR-3 O - 181.1 = 181.1 metresKIR-4 O - 179.53 = 179.53 metres

Total 784 metres

-' .ti'is'w s y fr ,*ffw-y /'A t .-fciptf}' .-X '

* '-* .';*- '" ' V ^' * l* t*'* ''l I'fc A *'' * s *"-.......^Mv---X l\j ...-j- - - ~

M-.^, ' ,... *y-*\\fr'.tec.ttfc*\ "\ s

CCOLQCilCAL PLAN OF PROPEBTYor

KIRANJA KIRKLAND OOID MINES LIMIT HP

pCAWN rPQM ORIGINAL PLAN BV

GEOLOGIST A MININO

NUNERO DU TROU: K1R-5 RESUUATS D'ANALYSE DATE: 2-AVRIL-1990

Echant.

546B2546B3546B454685546B6546B7546BB546875469054671546725467354694544755469654697516785467954703547015470254703547045470554706547075470854709547105471154712547135471454715S471654717547185471954720i4721i47221472314724

De i Lau;, d) d) d)

16.30 16.7520.35 21.3533.55 33.9035.60 37.1044.20 44.6045.15 45.7045.85 48.1050.45 50.6061.40 61.7064.45 64.8565.80 66.1071.95 72.2576.60 77.1077.10 78.6096.70 78.4099.40 100.50

100.80 101.10110.75 111.40112.95 113.20120.20 120.40122.60 123.30125.40 125.70139.70 140.80140.80 142.00142.00 143.00155.75 156.70157.20 159.90157.90 160.70160.70 161.80161. BO 162.60162.60 163.40163.40 164.00164.00 164.50164.50 165.20165.20 166.70166.70 16B.70168.70 168.90168.70 170.40170.40 170.85170.85 171.70171.70 172.80188.70 189.50204.20 204.50

0.451.000.351.500.400.552.250.150.300.400.300,300.501.501.501.100.300.650.250.200.700.301.101.201.000.950.701.000.700.800.800.600.500.701.502.000.201.500.451.050.700.600.30

ANALYSES Cu In Ag Au

Z Z g/t g/t

.

..

.

.-.

--.-.-

--.

-.---..-..--.

-.-- '

--..-

- -.

.

.

.

BEOCHIHIE Cu Zn Ag Au As No

ppi ppi ppi ppb ppi ppi

- 1.555 119 1.3

- 1.1157 90 1.2120 53 1.0110 67 1.3

1.6- 1.0

1.11.1

- 2.2- 0.9

289 111 1.9153 126 1.3

- 1.1- 0.6- 0.8- 0.4- 1.0- 0.8

490 137 1.0- l.B- 1.4- 0.7- 0.9- 1.7- 1.0- 0.9- 1.0- 0.9

0.6- 0.5- 0.6

1.0- 0.8

1.0- 0.7

1.4- 0.8- 0.7

2.00.61.1

57638

64

101011154060271210

BB

127

19413539

439114110

11221

62520"-17

140130 . -

16B10 V230"' -148148

729994

107121129

-, 1669 N

\

f

,,,., ^''

f-

i/i ! '\V'- " ,

,, ( .

- .t^

COtlNENTAIRES

"i

- .

UhERD DU TROU: KIR-5 RESULTATS D'ANALYSE PAGE: l

'f- -J! '"'^

NUtlERO DU TRDU: 79-1 RESULTATS D'ANALYSE DATE: 30-HARS-1990

Echant.

5163965351834648634669518375193B5183965051B406585184161B6206565184264151B4360651B4463563663763B63964065765264260762166360B6645194551846518476176675184B66651849

De d)

10.6511.9014.6515.2516.0016.4517.9019.7026.752B.0530.4033.4034.5536.1037.3039.6041.2541.2541.7541.7542.7542.7543.4044.0044.8045.4046.0048.5049.1066.156B.9070.9074.0574.7075.3075.6079.70BO. 6081.40B1.9082.9083.5084.45

1 ( l

11.9012.2015.2516.0016.4517.3518.7520.0528.052B.6531.6533.8534. BS36.6337. W40.3541.7541.7542.7542.7543.4043.4044.0044.8045.4046.0046.3049.1049.7066.6569.3071.3074.7075.3075.6076.6080.6081.4081.7082.50B3.1083.8084.75

Long, (i)

1.250.300.600.750.450.900.850.351.300.601.250.450.300.550.650.750.500.501.001.000.650.650.60O.BO0.600.600.300.600.600.500.400.400.650.600.301.000.90O.BO0.300.600.200.300.30

AHALYSES Cu In Ag Au I l g/t q/t

.

.

.

.

.

.

.

.--

-.

.

.' -

- --~ ~ ----.

--

-.-.

--

--

.--.

---

-.

--

6EOCH1H1E Cu Zn Aq Au As No ppi ppi ppi ppb ppi ppi

- 1.0.

-1.0---

- 1.0- 1.0

51 - 1.0-50 - 0.9-

1140 - 1.0---

- 0.9 - .

- 10.4.

- 1.0-...-.-..--..-

1.0- 0.9

0.9-.

- 0.9.

- 0.7

35702070

34069011321B18

MILH70917070-

40 2.5 1.070 - -

Tiaasfm.o ""530024340J - 4900ISO 6.0 1403407017034034070.

340707070.

70-

12012567170

.16.

123

COKHEMTA1RES

NUHERD DU TRDU: 79-1 RESULTATS D'ANALYSE PAS!

NUHFRO DU IROU: Kit'H1NNOVA IN!

JOURNAL DE SONDAGE DATE: 5-JANVIER-1989

DE A

162.60 A

168.70

TYPE DE ROCHE TEXTURE ET STRUCTURE

ANGLE A/C ALTERATION

OY - ALT.i -Roche volcanite imive tres fineient grenue de couleur verdStre.-Noibreuses fractures reiplies de chlorite i qtz i Fe Dal.-Noibreuses veinules de quartz-Fe Dal. i pyrite.

J163.40-164.SOf: iFle 55'-VGiCisailleient intenstient silici- fie avec li sericite, fuchsite?, et doloiie ferrifere. Teinte bleutee est peut-ftre reliee a la presence de Molybdenite.

'Contact superieur net J 55' A.C. plans de sericite i 59* A.C. egaleient.

MINERALISATION

-Silicification avec peut-?tre sericite et fuchsite.

HO.90 - 162.601 Jusqu'l 201 de veinu- les et 2Z-3Z pyrite et tr. Aspy.

- 11-31 de pyrite fine irreguliere, tr. Aspy., tr. Cpy.

REHARQUES

140.70 - 141.80: LDZ - 54710.

161.80 - 162.60: LBI - 54711.

162.40 - 163.40: LOI - 54712.

/-Contient 21-31 de pyrite avec peut- flre Aspy. l 3 points d'or visible!.-Holybdenite?

164.50 - 165.20: Idei a 162.60 avec 51 de pyrite. Forte silicification.

16S.20 - 168.70: Dyke eoins alter*avec 3I-5Z de pyrite tres tres fine.

}168.70-168.90[j iFle 55'iCisailleeent inject* a BOX de quartz-Fe Dal. avec 31 pyrite (Aspy?)

163.40 - 164.00: LDI - 54713

Ltl - 54714.

164.50 - 165.20: LDZ - 54715.

165.20 - 146.70: LDZ - 54716.

166.70 a 168.70: LIZ - 94717.

168.70 - 148.90: LIZ - 54718.

168.90 A

172.80

iBAS BH (SIL!

-Basalte brechique probableient coussin* de couleur vert pile blafard.-Materiel hyaloclastite abondant entre les fragients.-Nan visiculiire.-Aphyrique.- 51-71 de veinules desordannees de quartz-Fe

Calcite t pyrite i Cpy.-Suite de la zone alteree tineralisee.-Contact inferieur s 55' A.C.

-Silicification forte avec probableient Uger 'bleaching* donnant la couleur blafarde.-Cjrbonatisation faible a iod*ree: Fe-Dol.

-Silicification et bleaching diiinue rapideient vers U fin.

- 31-51 de pyrite inter-hyaloclaitite et dans les veinules.

-Tr. Cpy. (Aspy?)

170.40 - 170.85: 5Z-7Z pyrite avec veinules de quartz- Fe Dol. de 5ci de large a 35* A.C.

171.90 - 172.8 Avec une veinuie de quartz-Fe Dol. de 5ct de large a 50' A.C.: 3Z-5Z pyrite, tr. Cpy Aspy?

168.90 - 170.40: LDI - 54719.

170.40 - 170.85: LW - 54720.

170.70 - 172.20: Litho LW - 53961.

170.85 - 171.90: LDJ - 54721.

171.90 - 172.80: LDJ - 54722.

NUHERO DU TRDU: KIR-5 JOURNAL DE 50NDA6E DECRIT PAR: DANIEL BERNARD PAGE:

MERO DO TROD: 79-1minim ne.

JOMIAt DE SOIDAGE DATE: 22-AmM988

yDE

A

21.00A

Si.60

THE D! 10CEE IEII0EE EI SIEOCMEE

1GIE WC ILimilO! RllEULISmOI EEHAESOES

Andesite Mtiititt (And. Bi)

in situ priuiit ITCC utitiel hjaloclastique. Vert nojen, lot. grisStre.•Fragnents de In i 7ci.•Aphanitique.•Peu fracture sauf localeieat.• 251 li m de frag, globaleuit.

•Eelatiyeieut pen alte're', un pen carbo- natisi.

•Ugireient chloritem.

-Pea liidalici sauf localeunt.

26.15 i 28.05: S! gti - calcite fines Teinules disotdonntec, tr. CM., Po (?),( n PI.ID! -51139.

30.40 i 31.(5: Siiilaiie i 5183). IDI - 51840.

34.55 i 34.85: Siiilaiie avec 0.31 Cpy Po? LDI - 51841.

41.25 i 41.75: l*g. silicifii. Eitn de particulier. ( It Solfnes. IDI - 51842.

21.00 i 24.00: G6o. LDI - 50867.

28.05 i 28.65: f 650. lil.

33.40 i 33.85: l 658, l sept. 0.002 Oz/T Aa

36.10 i 36.65: l (18. 19 aout 79,0.002 Oi/T Au

37.30 i 37.95: l 620. 0.002 Oi/T Au

39.60 a 40.35: l 656, sept, l, nil

41.25 a 41.75: l 6(1, 25 aofit 87,0.002 Oz/T AD

41.75 i 42.75: Eiche en Hos2, Py. en reiplissage et plaque1 dans les fractures, 51 a 71 PI., 71 i 101 Hos2, Pr. *ga- leieot diss. IDI - 51843.

————————————

42.75 i 43.40: Suilaire a 51842. li. Sulfures.

41.75 a 42.75: l 606, 19 aotit 79, 0.71 Oz/I Au

I Ag

42.75 a 43.40: l 635, 25 aodt 79, 0.01 Oz/T Au

43.40 a 44.00: 25 aout, l 636 0.002 Oz/T Au

44.00 i 44.8 l 637, 25 aout 79, 0.005 Oz/T Au

IMEEO DO IEOO: 19-1 JOUEflAL DE SOIDAGE DECEIT PAE: O All IE t BEEIABD PAGE: 3

ff t

p-SSSZ——

[ YEAR

1987

1988

1989

HOLE NUMBER

KIR-1

IIR-2

SIR-3

IIR-4

KIR-5

SIR-G

SIR-7

IIR-8

KIR-9

KIR-10

IIR-11

SIR-12

SIR-13

KIR-14

LOCATION

1+63 N 3+42 H

2+23 N 1+50 V

2+55 N 1 0+50 V

2+74 N 0+4G E

G+52 N 6+45 E

2+15 S 1+00 E

2*87 N 0*00 E

1*80 S 9*50 V

1*05 N 16+00 V

7+40 S 10+00 V

0+70 N 0+50 V

7+10 N 7+00 E

4 + 15 N 4+34 E

0+45 S 7+00 E

ORIENTATION

1807-45'

1807-60'

1807-45'

1807-45'

i n MM i m li i —"' mumii -H

1177-50'

1807-50'

2107-45*

2607-45*

0907-45*

1807-45*

1807-45'

1177-45'

1177-45*

1807-45'

LENGTH (a

181.40

242.00

181.10

179.55- — -

107.90

326.00

219.45

253.00

152.50

155.45

155.45

96.60

121.00

148.40

' TARGETS

down-dip extension of the no. 1 shaft liberalization.

saie as KIR-1.

saie as KIR-1.

sane as KIR-1.

down-dip extension of V-79-1 gold in- section (11.8 gr/1.0 it) and I. P. ano- j,-^ ——— — - ——— -—-Thuius and I. P anonalies.

follow-up on KIR-3 (21.0 gr/0.4 n) and to test a possible fault at 325*.

down-dip extension of the Fidelity shaft liberalization and the Py-Ho-Au showing.

intersection of two interpreted faults near a huius anosaly.

geophysically interpreted fault near a huius and I. P. anonalies.

stratigraphic drill hole near a VLF conductor.

follow -up on V-79-1 and KIR-5.

intersection of the "lajor" shear zone-with the QFP in a gold anonalous area.

south-west extension of the gold ano- lous area near an I. P. anomaly and a VLF conductor.

TABLE 4: List of holes drilled by MINNOVA on the Kirana property,

KIR-Z /RQF"o'

LEGENDEBASALTt PORPHYRrnoDE "' it ' BASAL TE APHYRIQUE f '

*^. CONTACTS GEOLOGIQUES ,- : CC ZONE DE CISAILLEMENT OU TAILLE fS, ANOMAUES D'HUMUS" Jr- ANOMAUES D' AXE I.P. B PU1TS ''- — i SONOAGES 1 989 4

PROPRIETE KIRANA (674)

Forages CiblesKIR-5 Anoma-lie P.P. et verifier l'intersection

aunfere de V-79-1 (11,8 gr/t sur 1,0 metre) KIR-6 Anomalies P.P. et d'humus KIR-7 Suivi sur KIR-3 (21,0 gr/t Au sur 0,4 metre)

et verifier une faille probable a N325" KIR-8 Tester la mineralisation du puits Fidelity et

1'indice Py-Mo-Au decouvert en 1988 KIR-9 Tester la rencontre de 2 failles pres d'un

secteur fortement carbonatise et d'une anoma-1 ~i e d ' humus

KIR-10 Verifier une faille geophysique pres d'uneanomalie d'humus et une falb!e anomalie P.P.

KIR-11 Forage geologique pres du puits #1 et testerun conducteur VLF

TOTAL

Longueur 307,9 m

326,0 m 219,5 m

253,0 m

152,5 m

155,5 m

155,5 m

1569,95 m

La campagne de forage de 1988 s'avere decevante; aucune intersection aurifere significative n'a ete rencontree dans les forages KIR 6-7-8-9-10 et 11. Seul le forage KIR-5 a recoupe des zones alterees et des zones de cisaillement auriferes avec presence d'or visible. La meilleure valeur obtenue a ete de 6,8 gr/t Au sur 0,5 metre, a 1'interieur d'une zone anomale de 13,6 metres titrant 241 ppb Au.

RECOMMANDATIONS

En 1989, 11 est recommande de terminer les travaux de- cartographie. Une attention particuliere sera portee au secteur de V-79-1 et KIR-5, oO les meilleurs resultats ont jusqu'a present ete obtenus. La presence d'un till de base enrichi en Au-As-Sb devra etre confirmee. Finalement, 600 metres de forages

iroposes dans les secteurs .iuaes favor;

79-1

337

aa D fi P

7

f/G uce,

i

/////x

of

x

RES- OJO Acs. ?f5- 1 1.29 Acs.

AND- 8.83 Acs. - 29 O3 Acs.

'"l O , ~) /~*s. s-U U

PART400' RES.- 3OC' RES.- HWY R/W.- REM LAND- TOTAL

3.Od 18.872.O9

32 57 56.61

Acs. Acs. Acs. Acs. Acs.

477265

V/fk ̂

Rec.u de Received from

Date Ji

.100 Dollars

OA/

N" d'enr. de taxe Tax Reg. No.: _

No.HEATH 4 SHERWOOD DRILLING (1986) INC.

Certification of Qualifications

l, Michael Sutton, do hereby certify:

1) that l am a Geologist and reside at Box 534, Kirkland Lake, Ontario, P2N3J5, (Crystal Lake)

2) that l graduated in 1984 from the University of Toronto, with an Honours Bachelor of Science Degree in Geology

3) that l have practiced my profession continuously since graduation, mostly related to gold mining or exploration; mines l have worked at include Witwatersrand Nigel (South Africa), Renabie (Missanabie, Ont.), Holt-McDermott (Kirkland Lake), and Macassa (Kirkland Lake)

4) that my report on this property is based on my experience and on my knowledge of the geology ofWfHff Township

Respectively submitted,

Michael Sutton Geologist/Prospector Sept. 14/98

1 V^^X 1 Northern Development C y V J and Mines G Ontario

Drilling Company Compagnie de forage

Date Hole Started Date de commencement du forage

........- — - uompiete tnis rorm and Jeveloppement du Nord [} r jj|j ng forage 3U related sketch in du P |ica*e. Fill in on every page

mes Loa diamant ~y ^~yO djy^f" -Remplir en deux exemplaires (a Remplir ces cases a 9 ^ L^^\ (—t^A^ presente formule et le croquis annexe chaque page

Collar Elevation Elevation du collier

^

Date Completed Date Logged Date d' achievement Date description au

, journal

Exploration Co., Owner or Optionee Date Submitted Compagnie d'expioration, proprietaire ou titulaire d'option Date de depat

Footage/A vancementFrom/Oe

^

~7,o

•^2 r-% Sis* L/

To/A

Z&

5g,C

9^5-

Rock TypeType de roche

^5M)A

Z^TVt-^/?^ f

v /^ ^ I^^O X/^ I\}T^)S

' 5/^5^7'(fei^^^TT)

v&st M^r-f^ fft&f* pf-fvt+tnrr,.*

Searing of hols from true i Total Footage Dip of Hole at " North/Position au forage j Avancement total du inciinaison du forage au par rapport au nord vrai forage

L4~-~7 ^ * -7*9 y -, i xt^C FT/fL^ J^^^.^J 1 Collar/colliar I*-S

Logged Dy " Inscrit par ^^ j r

fl~))C^hfci' "^^"T^f") jSuomittea by (Signature) F( ;pi

Fl./Pi

Description (Colour, grain size, texture, minerals, alteration, etc.) Description (Couleur, granulometrie, texture, mineraux, transformation, etc.)

/O^DfLV) gZZ&fi) y^2XD(^#M0Kil2..fZfc:AL'rt*\rn*

i^^mj&yxzf^': *r.^f-SfV QDhZTz, /JAiTz

MD ti ft A A/iE- "flu, , Uf&Kij jplfS? "* P'j'&s&tyflfyTEp

z^ xz&crfc *2rtALL.v S

\*S,7-n,7 flteWY ^\

s? JD/J^ UWrte-'Fyt^.ae'jFr.t&eAur6*uAerz.-Adarz77K v&ti^ te*. fa "-3*3 h.f Wa&tri/rr&xkjgZie&ce^'ZZ CszF*S^ LDCMl'S rsrt'tfl'rKfyrS3* hi Y*Ms'

Iffitfcfre 4?" ' -' ;* -TT? J"A ^3 *-7^ " u^tiy /f- z l fes?

37,7-2*7.*- .tmiwrfti*]?'- Mn srzv&nKZ i)S)fzut

A+.z-te.'S Mfizf^ m2S.D - 3^. 3 L i^^/'T/?}

t-Zt,*-**-.? tit*g*Z~' 2 *~~ j?'~7' "? f-v, ,, , , * t l.^r ^^X ' -^ -^ *' *-*-~ J*^ -? it-- A irff/i

C&rrfcrejnOAnc

vi-M ts. ticsf CM

i- C~v &V i-s 'A'torrW l^, -Z /^.^ * ,4/ *

^ * tiswrr^^ HSA-^L^' zrrw/z FMLT"TV fi f ' t.gffST' fa CUt ̂ C-&-3C-&

B /ODf^PT^ fiflicfKfTS:. l/fJ/.j fitrfJ- L&f&tKG'*— , f "^ &F'"

i

-iZ,f- 43, D ^ " -^ 'W j)V s/^-f " /,1/rV /*?/ C-;?~ F)^ ^ 5-4g,7^'?4-,cr Fos^'&is, l?

Isz.o-S+t- -?e Z FA, j r.

tytocjj&ft-s, Z-wf

^ y ^ t, c, ^-, * , t ^ ^7 J,^ ^rar fr s^^

Address/Location where core stored Adresse/endroit ou la carotte est stockee

fa/ZQ-^Jd-^ ^fc^

0H}fs

Planar feature AngM'/A/iglA das caractamtiauea

piams

•S5T3-75-'

^/*

Con Speomen Footage t /Longueur en fn&as QB3 cartxtes

X o ' r

^ Qr *S^*

^^

^o c

AS 0

O

tr^

?f,/.

* 7fZ,

4-5,b

55,3

Your Sample No. N" d'tosraition du prosoecteuf

1 Hole No. Page No. k Forage n 0 Page n"•T -^^ j : a

Map Reference No. Clasm No. N" de reference stir la carte N 0 de concession miniere

Location (Twp. Lot, Con. or Lat. and Long.) Emplacement (canton, lot, concession, ou latitude et longitude)

Property Name Nom de la propriete

Sampja Footage/Niveau ae pre- I6vecnem de i'6chantitton (en pisd^s

From/Oe ( To/A

Sf^fff

,, ,, ,, , , ., ,

^75-

Sample Lengtn longueur de

J. o'

Assays t /Analyses mineraiurgiques

An Av ^^i

,4^

0204(03/91) .por features such as foliation, bedding, schistosity, measured from the long axis of the core. t Additional credit available. See Assessment Work Regulation. •Exemples de caracteristiques : foliation, schistosity, stratification. L'angte est mesure par rapport a I'axe longitudinal de la carotte. t Des credits supplementaires sont offerts. Consulter ies regfements relatifs aux travaux devaluation.

rf-sw— - f~\ r v\if~f'^ \i trin) r^ ,,iv- N \^ -- Nota : Dans cette formula, lorstau'il desiqne des personnes, le mascuiin est utilise au sens neutre.SPV^i^UOCJZ. VZw HA'K^.'VraoTr C.^^^AJ^^ tf-^ ^ F"-?err?

42A01NE2049 2.26078 MORRISETTE 020

twill! QIIU

i -IT i — -— — .-..r . . ---—rr......... — ..W.W, nrillirm foraae an related sketch in duplicate. Fill in on every page Hole No. Page No. VV^ and Mines et des Mines J".limg ^^^ Remplir en deux exemp.aires la Remp.ir ces cases a L Forasa "' Pa9e "' Ontano 9 presente formule et le croquis annexe chaque page r ^w — J* 4

Drilling Company Compagnie de forage

Date Hole Started Date de commencement du forage

Date Completed Date d'achevement

Exploration Co., Owner or Optionee Compagnie d'exploration, proprietaire ou titulaire d'option

Footage/AvancementFrom/De

33. CTo/A

74.5-

Rock Type Type de roche

S'fashl-'

(P^l^tOfZ^

i.

1

Collar Elevation Elevation du collier

Date Logged Date (^inscription au journal

Date Submitted Date de depot

Bearing of hole from true Total Footage Dip of Hote at " North/Position du forage Avancement total du Inclinaison du forage au par rapport au nord vrai forage

CoHar/collierLogged by " Inscrit par

FUPi

Submitted by (Signature) Ft ,P, Deposd par (signature) ———— ——— '- ' ——————— -

Ft/Pi0

Ft./Pi

Description (Colour, grain size, texture, minerals, alteration, etc.) Description (Couleur, granulometric, texture, mineraux, transformation, etc.)

Ffrisf. G&fAJ. L&tbLLV si*.hc.}iet-?tefe'crnz*^ TK ifti-UW'**)??'&X /M -

J

t-iwrizzx*-m TzKzt&xtftiZ&FVfn^';

f'

Address/Location where core stored Adresse/endroit ou la carotte est stockee

PlMVFMlm

pttm

Fbottgtt/LonguMr •n piM dM c*MH

Your Sampte No.

du prospsctBur

Map Reference No. Claim No. N0 de reference sur la carte N 0 de concession miniere

Location (Twp. Lot, Con. or Lat. and Long.) Emplacement (canton, lot, concession, ou latitude et longitude)

Property Name Nom de la propriety

Sample FootagafldvMu d* prt- Mjvamtm d* I'WiandSon Im owdsl

From/Oe TOMSmpto Langtti Longueur* f'AcnandNon

Assays t /Analyses mineralurgiques

0204 (03191) *For features such as foliation, bedding, schistosity, measured from the long axis of the core. t Additional credit available. See Assessment Work Regulation. •Exemples de caracteristiques : foliation, schistosity stratification. L'angle est mesur6 par rapport a I'axe longitudinal de la carotte. t Des credits supplemental sent efforts. Consulter les reglements relatifs aux travaux devaluation.

i Nota : Dans cette formule, lorsqu'il designs des personnes, le masculin est utilise au sens neutre.

• veil IWI l VI Complete this form andIWJ Northern Development uw/eiuppwiwiii uu uuiu nrillinn foraae au related sketch In dupHcate. RI in on every page Hole No. Page NO \3J and Mines e, des Mines "filling S6 .3" Rempl.r en deux ex.mp.aires .a Remplir ces cases . F **"' **" Ontano L09 Qiamant prisente formule et le croquls annexe chaque page T /r)^-/ 3

Drilling Company Compagme de forage

Date Hole Started Date de commencement du forage

Collar Elevation Elevation du collier

Date Completed Date Logged Date d'aehevement Date description au

Journal

Exploration Co., Owner or Optionee Date Submitted Compagnie d'exploration, proprietaire ou titulaire d'optkm Date de depdt

Footage/AvancementFrom/De

Cf+tf

-

To/A

/2f,2

Rock Type Type de roche

BfrsfttfBlzcofi/fiiWr?

Beanng of hole from true Total Footage Dip of Hole at North/Position du forage Avancement total du Indinaison du forage au par rapport au nori vrai forage

Collar/collmLogged by Inscrit par

RTPiq

Submitted by (Signature) Fl /Pi

FtJPIo

FIVPI

Description (Colour, grain size, texture, minerals, alteration, etc.) Description (Couleur, granulometric, texture, mineraux, transformation, etc.)

;/ " f/ " /7/Vt? idfT/j fa " V* * ~ 2.i~fr'rfrjrt' IZbit'tStf @~AA)ie vtifjs *0f#

106 ^iu-^VVJAK fANtfV!yWfZ ,)

SX,*-*^,^ &1U1Z* cvu, WITS, towrn. VJSMI frjss-S+z-JA*' NO /5^5^ ',

s6*4-.^- 64-* 7 B* tint ID/

*to /pvs

? cse BLfg, fvSs'-t-^Z.rMr fris*, frz.*.*

Fbs&stV 52 'SPtf ' Jo Z /Or^ ' ^/o ^ A fi C ' s Z ^6f)c,nt

Z5.7- Zf,M tvLi kyr G?-A

PC'S&lR'f SA r^V 'Xsd *

/

'f '

rA/K MfJH ' /fs2-t'*e *w t*Z~ 5^ sfT^Tt

'fa'nAY A*tX*. fAMTe. 33 efiT -2?,.?'i/ TOAJC SK ftrAatffArr-; ofrfr z, M PMt-

(Ofr7f))f' J-CC&lif fitfL^F*? -f- "SfrtfsrpS

-n&Tf&ivFbip. AxxvAm?crr") saix*fz-AM Vfins^teaKbiMe. 42*: M*./fiO.7~ffiJ,,Z- fbVhKTZ-' fltf^C VfJuJ blt'ftt Z? foLV + Hs, -Aioif -*- c&e

frt^^1if}i.'W*f'tfr ff.'Sft ~ ftL^Z r-AuZTrlrtMWKTvLV T&tsvrt*

W S 'W' z*tL-Wk E* ^nv *s2 c*e. fct**'

'ff&irr fy \~ MfiP&ArZUr' /^//^,^KJh TT-, ft

15tf 3 C-)JL 5PC Z& ff\itfN(^-

VrfS' tP'S'it 4f)Z VAt-f CrKyy Mf&rV O-'^ET?, /y)rr~iJ /*Z Z --sr- fy'^-

Address/Location where core stored Adresse/endroit oil la carotte est stockee

cmMMquM (MM

tt*

rv*** 935"

5^5'

/^fVS/^J

^"

7J*

Jf 0

- Omananm

tt,f

6+J

-8), t 2*3

#-3,5

U0.7

tolfr

Jtti.t*

Your SmpH No.

dupmptctwr

6^3sz-

Map Reference No. Claim No. N" de reference sur la carte N" de concession miniere

Location (Twp. Lot, Con. or Lat. and Long.) Emplacement (canton, lot, concession, ou latitude et longitude)

Property Name Norn de la proprieW

SampM Foottgert*mu di prt- Ummnt d* I'MwHtton (m oMil

From/De

IDO.X

ToM

JDt'6

SampH LengOi Loigiwrdt rfchrtfcn

/,1

Assays f/Analyses mineralurgiquesf't"p-^

li

44733

hit pc?}?t '

4--7f~tft

0204 (03/91) *For features such as foliation, bedding, schistosity, measured from the long axis of the core. t Additional credit available. See Assessment Work Regulation. 'Examples de caracteristiques : foliation, schistosity, stratification. L'angle est mesure par rapport i I'axe longitudinal de la carotte. t Des credits supplementaires sont offerts. Consulter les reglements relatifs aux travaux devaluation.

Nota : Dans cette formule, lorsqu'il designe des personnes, le masculin est utilisd au sens neutre.

iNVI Northern Development ueveiupptiiiieni uu IMUIU nrillinn foraap au related sketch in duplicate. Fill in on every page Hole No. Page No. VsS; and Mines et des Mines ^"'""9 Wraga ,ail Remp.ir en deux exemp.alre, la Remplir ces cases a k ""- "' Ontano L09 aiamant presente formule et lecroquis annexe chaque page T fig-/ -f-

Drilling Company Compagnie de forage

Date Hole Started Date da commencement du forage

yollar Elevation Elevation du collier

Date Completed Date Logged Date d'achevement Date description au

journal

Exploration Co., Owner or Optionee Date Submitted Compagnie d'exploration, proprietaire ou titulaire d'option Date de depot

Footage/AvancementFrom/De

li?, 5

/6te

To/A

&4-S

237-?

Roct Type c

(Type le roche

A/rKSl^

5/teA^T"

BftG&A

i

Beanng of hole from true Total Footage Dip of Hole at " NorttvPositJon du forage Avancament total du Inclinaison du forage au par rapport au nord vrai forage

Collar/collierLogged by " Inscrit par

FUPi

Submitted by (Signature) n /pi Depose par (signature) -. . ————— -^- ——————— -

FUPIO

FITPi)

Description (Colour, grain size, texture, minerals, alteration, etc.) Description (Couleur, granulometric, texture, mineraux, transformation, etc.)

f)3J-n3,S ft,*zuL,l, M if? /2-ADV if*jAi jJ/TW^/^JW^sc

r&Si*

tyD.O-LJL.D VfU&f)-- f&ff I'/^A^KO ' tt&CJTlS tJi&tfiy hifElZFj.

ItirfH •S'^/^-^tFHtoGJOitfXD MbttMf

CbtiTht! *-)ZSt.Z '"S&JS&fL

' S

\Jlfdh]S "f ^ Sr ^Sf StZ-'^l* TjJjE&tZ&M&tJf

/Djf^/y/tl ^.K'ff'ft"1" Gj^ftf. Ir^fctLr*** l*} /TV-*

s

StfaZf H&UJ0& CcftT/lCfSNA+.Ofai) ftl~ #Z,*'rtDH fthfcNtrtfLt 'iftnH CfttfL

P& bSbVg' BUT ItidPKM 'UALV AiT^r^X^ T&ttti^iS Sftore. Z&Mte

T* tff~)ZKtx*ili*fb-K5tZwusrv /?L*erz* ^mZtejt ^S-\jAir^^y ^eAft^ff*irs /y^ rt?xrTrgxp' w^rj foteN&nt,' tiMtv flPaiKt*-

PrrtJ? ' '

ffi^-ltf,7 1 k* Hue &P 6)jfi?r Z? \teM urfp ^-^fcstfo'-Aft^ Fe.^

ftilftfffATflV t*!?L #t,\#I

ftZ,2-~ ftl. ? A&2, TfiH fi

/rer.s--/*^ -^-^e-t/:MiMeM.itt.* VMJ

/9A4-/FZ, l rvrrLL jlu&n

> ZP 1.2.' fif fT.Sts. f- fc -S 2- ^ ̂ 'i "-0 //l* ,

!V "- " ^ZCSe-^^r fe-LrtuXU^

^ZfV.*Jb2. c" *' ,'*1 V)CrZ. [///;V* * ̂ 2 05*v^- 5?

Ift) .^- /ft- b ff&Z mLJL &V O Ml).-** tifflt 'sZcz.e- ff^t.

Address/Location where core stored Adresse/androit ou la carotte est stockee

^(•^"(•4"

38*

4-3"

*t*

0

6-3*

^*

^5*57*7fi'

ConSpKmn

frttaj"*"

U3 J

Jtf.Z

lAKS

y y ^A ^^~ f^^ffjt

fit,*-

1*853

m.L/JSg

Your Sanpl* No.N- d'Mwittton au pnapacttur

i

N" de reference sur la carte N* de concession miniere

Location (Twp. Lot, Con. or Ut. and Long.) Emplacement (canton, lot, concession, ou latitude et longitude)

Property Name Norn de la propriete

Samprt FootagWNivMU d* prt- Itvmenl da r*dunt*jn (w oMsl

From/De To/A

SanpWUngmLongunrdi I'Wmilon

Assays t /Analyses mineralurgiques

0204 (03/91) *por features such as foliation, bedding, schistosity, measured from the long axis of the core. t Additional credit available. See Assessment Work Regulation. •Examples de caracteristiques : foliation, schistosity stratification. L'angle est mesure par rapport a I'axe longitudinal de la carotte. t Des credits supplementaires sont offerts. Consulter les reglements relatifs aux travaux devaluation.

Nota : Dans cotte formule, lorsqu'il designe des parsonnes, la masculin est utilise au sens neutra.

1 tV 1 l"wll"c" 1 wvBiuKiiin." i^.o.uHH'niio"' "" '""'" nHllinn foraae au related sketch m duplicate. Fill m on every page Hole NO. Page NO. \VJ and Mines et des Mines ur.l.mg g 1 u flemplir en deux exemp.aires .a Remplir ces cases a L Fora" "' Pa*' "' Ontano L09 uittiiidiH presente formule et le croquis annexe chaque page T /ffc-- l *5

Drilling Company Collar Elevation Rmmm *i hoi. imm M.* Tntai Pnntano r.,- -i u-.- -i " A-'-' — -" — *- — — - —— — - —— ' -- "' Compagnie de forage

Date Hole Started Date de commencement du forage

Collar Elevation Elevation du collier

Date Completed Date Logged Date d'achevement Date ^inscription au

journal

Exploration Co., Owner or Optionee Date Submitted Compagnie d'exploration, proprietaire ou titulaire d'option Date de depot

Footage/AvancementFrom/De

JM?

To/A

•W-3

Rocli Type c

' Type e roche

PcxrtwrY

Beanng of hole from true Total Footage Dip of Hole at " North/Position du forage Avancement total du Inclinaison du forage au par rapport au nord vrai forage

Collar/colliarlLogged by " Inscnt par i

FI./P1 10

Submitted by (Signature) R ,pj 1 Depose par (signature) —— ————— : — ' ——————— -

R./PI 1o

FtVPl|

Description (Colour, grain size, texture, minerals, alteration, etc.) Description (Couleur, granulometric, texture, mineraux, transformation, etc.)

IftA'Z&O.'S 6c*J*TrtLt CH? QTL ,.irrV- Z&2 C&* f&Sz-

Jct-.A-Ji&A &D2 " 'Alt. fi *-An. e W&LM

r*DLT Zertt

Jfr.S'-Ml fa?~ ASA

Ant zettejvori ^AAit&f&A *fa* MM /tftOAA

W, 3 '' * "

•f *' fi V if II

&CO&& e Jix*3 4 ^ 4 to. 5- : -wBPA)6r

fcS-L, M W: /i w 0rz-C#L*-tvM, MlTS,

ItrtC./tn f^KUT FZG**t!St't 5^ STH

fitoisr" * '

Jft.f -Jj/,3 *5*eAc vent, -ALL C#! **efr* AN*, -f /A^A* fs~-*

3A),2 -^3/.^ MUt- DL)MZ~

toer5feLSf-s ] nor /OJ&.^JS+S- fezhnrrz 2.

Gttffl'.Kfaa GDkzrz-'#2. t** fas? /x)r s

JtH- SA**^A

:^AJfi M /rf 4*2 fftit- QofiXr* *Jbtte?fr5't'

J3+Z W&Stirtint fAMT f* 6" " tvu. *W]7Z Bw+isif Amur*js+.f-te'?.? (M~ ^ -jwrr Ft** ^r or?-fokw*-F*vc*rf* f^r/^i

veufte f&Tfrbx w*Afcpywfr^Ass;jteKi AkP*

J??? '//A"eL*t /lev** **ML

T'C-V r Jr l '/z "mn cxtf &VK&T * &S, fa "x&ciCPffi', t* Ffttf, Vguc*) - AKfjFjo 3irtr!a mt-o

^r*e ;' ito'sw * fitanknMfn,rf

*?I?.3 s^t" MfaWtfii. tDtfTfc-r

Address/Location where core stored Adresse/endroit ou la carotte est stockee

PUrarFMun An^-lfcyj. ON anainmm

*m

*r&Tto*t*'

tt0tt*

*?S/.f

7(*fa*

ConSmomn FaougifUnguHr w pra an OOM

P**.

m*JD+,2.

J61.D

J/B.3,

JMA.J

JJ13

23*4*3*3

J&J

J&A

Your Sample No. N' d'*cfant*on du prospacteur

Map Reference No. Claim No. N' de reference sur la carte N 0 de concession miniere

Location (Twp. Lot, Con. or Lat. and Long.) Emplacement (canton, lot, concession, ou latitude et longitude)

Property Name Norn de la propriety

Sample FootaoMNiveau da ore- levament de l'4ctiam*on (en piads)

From/De To/A

Sample Length

I'eehantillon

Assays f 1 Analyses mmeralurgiques

0204(03/91) *For features such as foliation, bedding, schistosity, measured from the long axis of the core. t Additional credit available. See Assessment Work Regulation. •Exemples de caracteristiques : foliation, schistosite, stratification. L'angle est mesurS par rapport a I'axe longitudinal de la carotte. t Des credits supplementaires sont offerts. Consulter les reglements relatifs aux travaux d'evaluation.

Nota : Dans cette formule, lorsqu'H designe des personnes, le masculin est utilise au sens neutre.

1 *TV I '™ll "el " ueveiuH"""" L,ovB,uMMBintjiii uu uuiu nrillinn forpfip sil related sketch in duplicate. Rll in on every page Hole No. Page No. VV^ and Mines et des Mines Willing 9*?" Remplir en deux exemplars la Remplir ces cases a k, Fori*e "' Page n ' Ontario i-og uiaiuaiu presente formule et le croquis annexe chaque page T f^tt^l ^

Compagnie de forage

Date Hole Started Date de commencement du forage

Collar Elevation Bearing of hole from true Total Footage Dip of Hole at Elevation du collier North/Position du forage Avancement total du Inclinaison du forage au

par rapport au nord vrai forageCollar/collier |

Date Completed Date Logged Logged by " Date d'acnevement Date description au Inscrit par l

journal Ft./Pi |

Exploration Co., Owner or Optionee Compagnie d'exploration, proprietaire ou titulaire d'option

Footage/AvancementFrom/De

&IT.S

?3?,t5

rW/

To/A

W*

o"4 U

3ft.o

Rock Type Type de roche

S-fe^U-f

^r^vrf

5/ferV-rf&tervp&F

Date Submitted Submitted by (Signature) F, ,PI l Date de depot Depose par (signature) ——— - —— ̂ ^ ——————— -

FUPi jo

FL/Pi l

Description (Colour, grain size, texture, minerals, alteration, etc.) Description (Couleur, granulometric, texture, mineraux, transformation, etc.)

C#LP?"A-6?tiW'V extCClA-rri? GUFF - FA16 ilKez*) ZAzflLT* J-zJ/

^rf. FfSt.

-SAW* ftS ftS&VS

J37.Z -sHfrKP rifoozpds Cffftic-'

J4},! " CtfL ^Llf "

/OASSIV^ , "mg r-ZSV ISteArf ,"z H)G-Vi,*f iTAWCfX* 5V AKKr^rre-

Cifir?nt S*jr*Tfr q, "vfMSi} e-^ 0/*/^? lyft^i^ittM Mwfr-z

24-1. -f" ^ "G&fVng ftoiT te SmziriA

/4J. f "J+^.P " GrtTVrrZ /7p 2^*3*2 fi*K- Vixtrr? : ff&se. fez

MZA-Jtf'.? - /DAsstVJL fe^} cse ̂ 2^ fTz5*-, 5V 6t3r^'-r#}

teZfaKgariL-QnAtr*J&0- Jsu Sd^ *M*sue Z5& fez *Jt&X-Js?.) &IXUS1/ M/f wrre, AMisrz'fritlc MfejrvJ^/^ WZLA? bcvbZ fAD&r iM^S&IAT&v t&MXAeo &V*

rzzce&e^ tzr /"&ULUS/J XVLL IM/VB. p'Jh#r^~MK. V^/MSMM tlcs&jJtoiYe&z,

/ty.z.s fa"dLhf GtxjGe FtiL&r MiO, fou-tyjzp* gy/'-steArSseif****'(*3Zcsc. EUZE. fe-s*

Mx.7~4tf.4' K2fr*L BJ&, F^v *3"suu,z* a-Afc van

Adresse/endroit oil la carotte est stockee

ntnvFmun AngHVAngk IM arKtMMMi

(On,

MS4-**

97*

tt*

*-6j0

^*

M'

/ot-*

4*'

^B

fnr'

CortSpKimtn FoouqiT/Longwur mpiMidncvoaw

prMirtM

ten341)

JUX)M*-rJW

JrtfJ5U

j&'l

Ml,*

*fcX3

MM

Your Sample No. N* d'achantillon du prospect**

^

Sfsr*

s&st

M 0 de reference sur la carte N0 de concession miniere

Location (Twp. Lot. Con. or Lat. and Long.) Emplacement (canton, lot, concession, ou latitude et longitude)

Property Name Nom de la propriete

Sampla Footage/Nimau da pra- Mmmant da I'achanolan (an piads)

From/De

J&+

JSbX

To/A

W?

J&te

Sample Length Longueur da 1 flChflnMon

i,t'/,o'

Assays t/Analyses mineralurgiques

tfjxf?"

o?/?

-f-?7

0204 (03/91) .For features such as foliation, bedding, schistosity, measured from the long axis of the core. ' t Additional credit available. See Assessment Work Regulation. •Exemples de caracteristiques : foliation, schistosity stratification. L'angle est mesur6 par rapport a I'axe longitudinal de la carotte. t Des credits supplementaires sont offerts. Consulter les reglements relatifs aux travaux o" evaluation.

Nota : Dans cette formule, lorsqu'il designe des personnes, le masculin est utilise au sens neutre.

ixxnpieie mis torm anal \-y l Northern Development ueve.oppeii.eni au NUIU Dri|||no foraae au related sketch in duplicate. Fill in on every page Hole No. Page NO. V^/y and Mines ' et des Mines ""'""3 ^ " " Remplir en deux exemplaires la Remplir ces cases a L Forage "' Pa9e "' On I0 " presente formule et le croquis annexe chaque page r fjy^ -j -^

Drilling Company Collar Elevation Compagnie de forage Elevation du collier

Date Hole Started Date Completed Date Logged Date de commencement du forage Date d'achevement Date d 'inscription au

journal

Exploration Co., Owner or Optionee Date Submitted Compagnie d'exploration, propriataire ou titulaire d'option Date de ddpot

Footage/AvancementFrom/De

JTt.0

3fo,A

ST5,)

3/6, -5

To/A

to* A

&&J

3t6.t

326,0

Rock Type Type de roche

T^^veT

J&tiStftsT

XftJ^X^f^/V^'

72^/frY

e^^*^/*^/! t,/

A vO tf/* 1 ^ / A^^

Bearing of hole from true Total Footage Dip of Hole at ' North/Position du forage Avancement total du Inclinaison du forage au par rapport au nord vrai forage

Collar/collierLogged by Inscrit par

FUPi

Submitted by (Signature) f. ;pi Depose par (signature) —————— - —— 1 ——————— -

FtJPIe

Ft./PI

Description (Colour, grain size, texture, minerals, alteration, etc.) Description (Couleur, granulometric, texture, mineraux, transformation, etc.)

^eiz^rfa- fciMsrz. fhrrtiwt-frs. Azr\if &JT if Z 'k" ten*.*f1 A* MlfTZ, 'fa " FVfAXXX'&r-s ' H* NLlX TSlt ir*n*fto

r#Tg,S -ZtfAZF' rifrUZAL A

fatWLtb' sx umi .&S.A- 'k* FHUS. Gfv* 0\

#Z6,D 3*4-" "

/•s *i*f4^^t l*^^4f /** ^^^"f^**- ^ v"7^^ "7 ^^J 3 t ft ijj **^*rxjfyy/TC-i rZ^-C- i^uix^ c- *s/ /, s ^t? s c^ri^frfs.

Z2, Z*tL rr&t.

)HcrZ' UfW LWiJ/2 /fcufc rvss f^&s.

" * ^^ * " " usu.rf))tifK-Pi\MZ**

29D.oi *sfX)C-rrE' sti.tf3 CDA

#z Arj+j.l-JT&p firr

3/2, 1 SfJAKF flffTDISftL, G&i

}TKzri* Z&AKT

w '/7H 4nZ ̂ ( W2M& ' NO fe^J

fJTfivr

As trrJ)7Z,D~J?O.A

3/6. ̂ TstfAxy /VAffc^i, PC (/TAC~r

/OJ25f U^ &Z& r\ Aft Y Gf k "^tex* 6tf;W

S \, ^ttettfVlT?.

3lS".Z-S24,O J''fUU- WiTZ fi" fat VfisJ "GKAPV*? S* MTff ?^cse7fe5*3163- 53?^ f)*re- AfizsdrZ

26t?iS- .547- ^ '&LH-L W^rriZ.

B#sfieru,iv tot c*fc-AwPM Evfa^/Zrz v*W

52tli- — J? 5/7 Wl?frl*oCJ-tryT''fT?. tijiiTJ *yfc r^Cze, "fc^v c fib0

386.0 toti

Address/Location where core stored Adresse/endroit oil la carotte est stockee

FlnvFMun

cvtcMnHquM

tt"

t&E?

#7*

255 0

66'

0

/.S*

45*

W

ConSpKiiNn ftxngtt/Longu*.

•*rtT*"

J7&D

ifts.A

aM6J

3fo.3

315,1

21^8

3^.5-

5*7,7

32^2

Your SampK No. N* D'echanHlan

Map Reference No. Claim No. N" de reference sur la carte N" de concession minttre

Location (Twp. Lot, Con. or tat. and Long.) Emplacement (canton, lot, concession, ou latitude et longitude)

Property Name Norn de la propridte

Sampw FootagaMwau de prt- lemmnt M 1' fchanttlon In owBI

From/Oe TO/A

San*** LengthLongueur d* I'fcramnion

Assays f /Analyses mineralurgiques

0204(03/91) *For features such as foliation, bedding, schistosity, measured from the long axis of the core. t Additional credit available. See Assessment Work Regulation. *Exemples de caracteristiques : foliation, schistosity stratification. L'angle est mesure par rapport d I'axe longitudinal de la carotte. t Des credits supplemental sont offerts. Consutter les reglements relatifs aux travaux d'evaJuation.

Nota : Dans cette formule, lorsqu'il designe des personnes, le masculin est utilise au sens neutre.

RECEIVEDAU6 O 7 2003

GEOSCIENCE ASSESSMENT _____OFFICE

Swastika Laboratories LtdEstablished 1928 Assaying - Consulting - Representation

Geochemical Analysis Certificate 3W-2507-RG1Company: M. SUTTON Date: AUG-05-03Project:Attn: M. Sutton

We hereby certify the following Geochemical Analysis of 4 Core samples submitted AUG-01-03 by .

Sample Au Au Check Zn Number PPB PPB PPM

59351 146 -59352 46835 4704059353 525 49759354 219 -

Certified by-

l Cameron Ave., P.O. Box 10, Swastika, Ontario POK l TO Telephone (705) 642-3244 Fax (705) 642-3300

FORM 105 HEATH 81 SHERWOOD DRILLING (1986) INC.FORAGE HEATH 81 SHERWOOD (1986) INC.

DAILY REPORT - Rapport journalier

CONTRACTOR'S TIME/temps de ('entrepreneur Included in the Drilling Rate/Indus dans le tarif de forage

Date.y.^:./:.-?.^..... .Shift.......-.'!.'..... .......Machine No.... ...tL'.i..............Heure de travail # de la machine

Drilling at...................... .................Hole Angle..................................Lieu de forage Angle du trou Overburden:Hole No. From TO Total ft/mWdu trou De A Total de, pd/m•...::1:............ .......G......... .....z:........ .....z........Hole No. From To Total ft/m

( , ' V 1 .................................Z.............. ...../..':......................:.h:........

Z..2*A#.tt..:JJ..——^# de meche Sorte pd/m

Shell No..................................... Type......................... ft/m................if de la cartouche Sorte pd/m

TIME DISTRIBUTION/ Distribution de temps

Drilling/Forage......................................'^... Rhr. .........'f............... Mhr

OverburdenMortterrain............................'....Rhr..........":'.'............... Mhr

Moving7Deplacement....................,...............Rhr...........................Mhr

Walking Time/Tempsdemarche. . . . . . . . . . . . . . . . . . . . . . . Rhr. . . . . . . . . . . . . . . . . . . . . . . . . . Mhr

Repairing/Reparation................... ..................Rhr.......................... Mhr

(What?WQuoi?l.................................................................................

Other/Autre. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Rhr . . . . . . . . . . . . . . . . . . . . . . . . . . . Mhr

(What?KIQuoi?l.............................................................................

Casing Placed in Hole/ Tubage placer dans le trou:

AW BW NW HW

2'..............................................,............

ft 5'..................... ......................f...............

10'.........................................................

Casing Recovered/Tubage recuperer: AW BW NW HW

2'...........................................................

5'...........................................................

10'................................................-........4 ;

RUnner^Perateur...^^{..^f:.rl...^r.^. ;f.^.....Y.^..............Hrs

Runner^perateur.........................................................................Hrs

H.IP.rWssistant...^,U.L^........^:l^.^..^.....L^...............Hr.

Helper/Assistant.......................................................................... Mrs

Other/Autre................................................................................. Mrs

COMPANY TIME AND MATERIALSTemps et materiels de la compagnie Time Distribution/Distribution de temps

Drilling/Forage....... .............................................Hrs................... Mhr

Overburden From/Mort terrain de. . . . . . . . . . . . . . . . . . . . . . . .TO/a.

Bit No...................................... Type................. ft/m........................# de meche Sorte pd/m

Shoe No... .................................Type................... ft/m......................

Shell No. ....................................Type.................... ft/m....................# de la cartouche Sorte pd/rn

MovingyDeplacement.....,......................................Rhr.. ......... . Mhr

Pulling Casing/Retirer tubage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Rhr.. . . . . . . . . . . . . . . Mhr

Cemented At/Cimenter a......... ...............ft/m.... ........Rhr............... Mhr

Cement to set/Durcir le ciment..................................Rhr......... . Mtir

Drilling Cement/Forage du ciment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Rhr. . . . . . . . . . . . . . Mhr

FronVde...............................TO7a..................................

Reaming (Hole Conditionsl/l'etat du trou............ .........Rhr.............. Mhr

Waterline At/Ligne d'eau a. ..^.'.-.-.'.'.h........ ..ft/m. ..(J. .'.....Rhr.... Vi....... Mhr

Survey Testing At/Assessment a...... .........ft/m. ...........Rhr............ Mhr

Acid Testing At/Analyse (acide)............ .....ft/m... .........Rhr............ Mhr :

Delays/Retard I......................................)................... Rhr............ Mhr

Walking Time/Temps de mar one................................... Rhr........... Mhr

Wedging At/Coincer le trou a........... ...........ft/m... ........Rhr............ Mhr

Other/Autre.................................................... ...........Rhr............ Mhr

(What?)AQuoi?).................................. ...............................

Materials Used, Lost or Damaged ^^

Materiels utiliser, perdu ou endommaaer: ^,

GENERAL REMARKS/Observations g6n6ral:

*

APPROVED BY: 7. ''J /', i 'l rf lApprouver par:

CO. REP. /' '' (, . .., , , - .-;. ,V//;Co. Rep.

FOREMANCoiilicni.iilir

Whita-OfflM/Blanc Bureau Ysllow-Co. Rep./Jaune-Co Rap

FORM 105 HEATH 81 SHERWOOD DRILLING (1986) INC.FORAGE HEATH 81 SHERWOOD (1986) INC.

DAILY REPORT - Rapport journalier

CONTRACTOR'S TIME/temps de l 'entrepreneurIncluded in the Drilling Rate/Indus dans le tarif de forage

Oat** "V -^/^Shift /W Y Machine No "? @JHpure de travail # de la machine f i —

Drilling at ~f''i ,' feJii^^trW^!? . , . . . . . . . Hote Angle ~ ^Lieu de forage fT^"^// , S Angle du trou Overburden: ' ' " -x y-, -QHole No. From ' To Total ft/m*du trou De A Total de pd/m

Hole No. From/ ^ To ^ Total ft/m

s v ^ 7 M3P ^ ̂ p

BitNo 4-77 ,X/ Type /^ ̂ ' C -^^ ft/m

Shoe No........... ..........................Type......... ................ft/m................

Shell No.. ...................................Type...... ...................ft/m................# de la cartouche Sorte pd/m

TIME DISTRIBUTION/ Distribution de temps

Drilling/Forage..................:... ............../.-'....Rhr..... .............^.7.. ..Mhr

OverburdenMortterrain................................Rhr........................... Mhr

Repairing/Reparation... ..................................Rhr.......................... Mhr

Casing Placed in Hole/ Tubage placer dans le trou:

AW BW NW HW

2'...........................................................

5'...........................................................

10'.........................................................

Casing Racovered/Tubage recuperer: AW BW NW HW

2'...........................................................

5'........:..................................................

10'.........................................................

"~~\ r l |YA \\ 4A. \ iHelperWssistant.............wr*..0--"-\----'------'''-V.'iX..:*)fX...^....l.i^t,.....Hrs

Helper/Assistant.......................................................................... Hrs

Other/Autrqr"................................................................................ Hrs

COMPANY TIME AND MATERIALSTemps et mate'riels de la compagnie Time Distribution/Distribution de temps

Drilling/Forage.................................................... Hrs...............

Overburden7Mortterrain.......................................Hrs..

Overburden From/Mort terrain de....................'....TOVa...............

Bit No...................................... Type....... ..........ft/m...............# de meche Sorte pd/m

Shoe No.................................... Type................... ft/m............

Shell No..................................... Type.................... ft/m...........

Moving^eplacement............................................Rhr. .............

From/deft...... .....................TO/aff................... Distance............

Reaming (Hole Conditions)/!' etat du trou............ .........Rhr..........

Waterline At/Ligne d'eau a.............. .........ft/m. ...........Rhr.........

Survey Testing At/Assessment a..... ..........ft/m. ...........Rhr.........

Acid Testing At/Analyse (acide)......... ........ft/m.. ..........Rhr........

Delays/Retard l.....,................................)...................Rhr........

Wedging At/Coincer le trou a........... ...........ft/m. ..........Rhr.......

Materials Used. Lost or Damaged

Materials utiliser, perdu ou endommager:

•r ^

\ .

lt\

i '

*y V'

V

1

Mhr

....Mhr

.... Mhr

....Mhr

.... Mhr

....Mhr

....Mhr

... Mhr

... Mhr

... Mhr

... Mhr

... Mhr

... Mhr

....Mhr

....Mhr

—i

\

GENERAL REMARKS/Observations general:.

APPROVED BY:-—- Approuver par; fWhtte-Of f lce/Blan c- Bureau '

./i J I CO. REP.Co. Rep.

Yellow-Co. Rep./Jaune-Co -Rep

\ /FOREMAN^ - : ConVemaTtre

Pink-Fore mbiVRose-Ccf^tremaitre

FORM 105 HEATH k SHERWOOD DRILLING (1986) INC.FORAGE HEATH 81 SHERWOOD (1986) INC J

DAILY REPORT - Rapport journalierJ 4 i b

CONTRACTOR'S TIME/temps de ('entrepreneur Included In the Drilling Rate/Indus dans le tarif de forage

Date/*?. X. .?^...... .Shift.. ..^\............ .Machine No.....^r??...............Wgure.de travail # de la machine ^^

Drilling at.... ..../...'...V.ff.................Hole Angle....... ~..V^T.............Lieu de forage - Angle du trou Overburden:Hole No. From To Total ft/m#du trou De A Total de pd/m

Drilling: Hole No. From To Total ft/m

Bit *~1 ff de rffeche Sorte pd/m

Shoe No................. ....................Type.. .......................ft/m................

Shell No..................................... Type......................... ft/m................tt de la cartouche Sorte pd/m

TIME DISTRIBUTION/ Distribution de temps

Walking Time/Tempsdemarche. . . . . . . . . . . . . . . . . . . . . . .Rhr. . . . . . . . . . . . . . . . . . . . . . . . . . Mhr

Repairing/Reparation...................... ...............Rhr.......................... Mhr

Other/Autre................................................. Rhr...........................Mhr

Casing Placed in Hole/ Tubage placer dans le trou:

AW BW NW HW

2'...........................................................

5 1 ...........................................................

10'.........................................................

Casing Recovered/Tubage recuperer: AW BW NW HW

2'...........................................................

5 1 ...........................................................

10'.........................................................

Helper/Assistant.,^^*?.......^

Helper/Assistant............................................................... .'.......... Hr*

Other/Autre ............................................................................... Hrs

COMPANY TIME AND MATERIALSTemps et materials de la compagnie Time Distribution/Distribution de temps

Drilling/Forage........................................

Bit No...................................... Type......# de meche Sorte

Shell No..................... ................Type.....# de la cartouche Sorte

Pulling Casing/Retirer tubage

...........Hrs...............

..........TO/a...............

...........Hrs................

.......'..TO/a...............

...........ft/m...............pd/m

.............ft/m.............

...............ft/m...........pd/m

.............Rhr..............

.......Distance............

...............Hhr...........

Cemented At/Cimenter a........................ ft/m............ Rhr...........

Waterline At/Ligne d'eau a.......................

Survey Testing At/Assessment a . . . . . . . . . . . . . .

Wedging At/Coincer le trou a...................

Other/Autre...........................................

Materials Used, Lost or Damaged

Materials utiliser, perdu ou endommager:

................Rhr..........

.................Rhr..........

TO/a........................

.................Rhr..........

ft/m... .........Rhr.........

ft/m.. ..........Rhr.........

.ft/m, ..'.i—rV. Rhr.......'.

...................Rhr........

....................Rhr.......

..ft/m.... .......Rhr........

...................Rhr........

... Mhr

....Mhr

...Mhr

....Mhr

... Mhr

....Mhr

....Mhr

... Mhr

... Mhr

.. Mhr

... Mhr

... Mhr

... Mhr

....Mhr

....Mhr

.

............................l..............................i

, i

T . \vr

\

fact P6fltV To BfZtk 6*r

APPROVED BY: ^ ̂{(jfc\~ —— CO. REP.Approuver par: Co. Rep.

,. . J

V \ * FOREMAN. Contr^maTtre

4 l ; ^Whlte-Offtee/Blanc-Bureau YvHow-Co. Rsp./Jaune-Co.-Rep

FORM 106 .HEATH * SHERWOOD DRILLING (1986) INC.FORAGE HEATH b SHERWOOD (1986) INC.f

DAILY REPORT - Rapport journalier

CONTRACTOR'S TIME/temps de 1 'entrepreneur Included In the Drilling Rate/Indus dans le tarif de forage

n Tt// y 2 '%-^sh-f i}/} 1/ - 2^~' 'Heure de travail # de la machine

Drilling at. ..IW.JC&J...J!...... ...........Hole Angle..................................Lieu de forage . Angle du trou Overburden:Hole No. From To Total ft/m#du trou De A Total de pd/m

Drilling: Hole No. From To Total ft/m

*i'Cr

*7 JT~ X Z/'X "-7 1 iJr6ri* f /* No..^...J..,r...^..S..~^.....,...........T'Ype.'!,.{(r...tr...f..fr.....ftlm...............9 de meche Sorte pd/m

Shoe No.............. .......................Type. ........................ft/m................

Shell No............ .........................Type.......... ...............ft/m................# de la cartouche Sorte pd/m

TIME DISTRIBUTION/ Distribution de temps

Drillin^Forage......................................yjO.Rhr.....................j?y^?hr

OverburdenMortterrain................................Rhr........................... Mhr

Walking Timefi"empsdemarche.......................Rhr..........................Mhr

Other/Autre..................................... ............Rhr........ ...................Mhr

Casing, Placed in Hole/ Tubage placer dans le trou:

AW BW NW HW

2 1 ..............................................:'............

5'...........................................................

10'.........................................................

Gating Recovered/Tubagd recuperer: AW BW NW HW

2'...........................................................

5'.............................,,............................

10'.........................................................

J '")R.Foreman/Contremattre op6rateur..^7..r*rrTf!^^..(^..............V..u^Hr*

Runner/Operateur.............. ............................................................Hr*

Other/Autre .. . ...............................................................Hr*

COMPANY TIME AND MATERIALSTemps et matdriels de la compagnie Time Distribution/Distribution de temps

Drilling/Forage........................................

Drilling From/Forage de............................

Bit No...................................... Type......9 de meche Sorte

Shell No.......................... ...........Type.....n de la cartouche Sorte

Pulling Casing/Retirer tubage. .

...........Hr*..............

..........TO/a.............

.....'....TO/a..............

...........ft/m..............pd/m

.............ft/m...........

...............ft/m.........pd/m

.............Rhr............

...............Rhr..........

Cemented At/Cimenter a... .....................ft/m....... .....Rhr..........

Cement to set/Durcir le ciment..................................Rhr.........\

Drilling Cement/Forage du ciment ....';.......

Survey Testing At/Assessment a..............

Delayi/Retard I......................................1

Walking Time/Temps de marche...............

Other/Autre...........................................

Materials Used. Lost or Damaged

Materials utiliser, perdu ou endommager:

.................Rhr........

.................Rhr.........

ft/m. ...........Rhr........

ft/m.......... ..Rhr........

.ft/m.. ..........Rhr.......

...................Rhr......

....................Rhr......

..ft/m..... ......Rhr......

...................Rhr......

Mhr

.....Mhr

..... Mhr

......Mhr

.....Mhr

.....Mhr

.....Mhr

..... Mhr

..... Mhr

.... Mhr

.... Mhr

..... Mhr

..... Mhr

.....Mhr

.....Mhr

*

rf t^r? /r ^4r.frl0 l/U*/^

^(2 ' /^Y fa /7APPROVED BY:Approuver par:

,h')^^*'

CO. REP.Co. Rep.

j/ ) JTZr? ? '' FOREMANContremaTtre

Pink. Fora man/Rose-Contremalt reWhlta-Office/Blanc-Bureau ..,' J*t-Y*llow-Co. Rep./Jaune-Co.-Rep

MINISTRY OF NORTHERN DEVELOPMENT AND MINES

Transaction No: W0380.01258

Recording Date: 2003-AUG-05

Approval Date: 2003-AUG-08

Work Report Summary

Status: APPROVED

Work Done from: 2003-JUL-25

to: 2003-AUG-04

Client(s):

199177

Survey Type(s):

SUTTON, MICHAEL WILLIAM

PDRILL

Work Report Details:

Claim*

L 1186591

Perform Applied Assign ReservePerform Approve Applied Approve Assign Approve Reserve Approve

36,050 86,050 -- ---S6.050 56,050 SO SO

Due Date

SO 2008-AUG-03

S6,050 S6.050 56,050 S6.050 SO SO SO

External Credits:

Reserve:

so

SO Reserve of Work Report#: W0380.01258

SO Total Remaining

Status of claim is based on information currently on record.

42A01NE2049 2.26078 MORRISETTE 900

2003-Aug-13 13:34 Armstrong-d Page 1 of 1

Ministry ofNorther i Developmentand Mines

Date: 2003-AUG-11

Ministers du Developpement du Nord et des Mines Ontario

GEOSCIENCE ASSESSMENT OFFICE 933 RAMSEY LAKE ROAD, 6th FLOOR SUDBURY, ONTARIO P3E 6B5

MICHAEL WILLIAM SUTTON BOX 534KIRKLAND LAKE, ONTARIO P2N 3J5 CANADA

Tel: (888) 415-9845 Fax:(877)670-1555

Dear Sir or Madam

Submission Number: 2.26078 Transaction Number(s): W0380.01258

Subject: Approval of Assessment Work

We have approved your Assessment Work Submission with the above noted Transaction Number(s). The attached Work Report Summary indicates the results of the approval.

At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.

If you have any question regarding this correspondence, please contact PIERRE DESCOTEAUX by email at [email protected] or by phone at (705) 670-5858.

Yours Sincerely,

Sheila LessardActing Senior Manager, Mining Lands Section

Cc: Resident Geologist

Michael William Sutton (Claim Holder)

Assessment File Library

Michael William Sutton (Assessment Office)

Visit our wcbsite at http://www.gov.on.ca/MNDM/LANDS/mlsmnpge.htm Page: 1 Correspondence 10:18575

42A01NE2049 2.26078 MORRISETTE 200

5?DOOOt

5340000N-—

msaam

67CCOCE 675000E

UTM Zona 17 6000m srU

Thosa wlstiino to dak* mining claims should consull with the Provincial Mining RBCordars1 Officn of the Ministry of Northern Davwapnwit out Minx tx additional General Infofmalion and Limitations Thh map may no! (how unraglttareil land tenure and intarests ininformation on tha status of tha lands shown h*r*on. This mat) is not intended for navlgBtlonal, survey, or land tit!* determination purpo*8s**thft Information Contact Information- Tot! Fnt* Map Datum: HAD 63 }*niJ indudfng certain patantB, l*as*ft, easamant*. right of ways,shown on this mie Is compilod from various tourcet. Completenms and accuracy ire not guaranteed. Additional Information may also tie obtained through the Provincial Mining Recorder*' Office- Tel: 1 (888) 416-9845 ext 57IMbiectian: UTM (6 degree) flooding rights, licences, or other forms of disposition of rights andlocal Land Titles or Registry Office, or the Ministry of Natural Resource!!. Willet oteen Miller Centre 033 Rwnsey Luke Roed Fax: 11877) 670-1444 Topoawohlo tola Source: Lend Information Ontario Mere* from the Crown, Also certein lend tenure end lend uses

Sudbury ON P3E BBS Mining Land Tenure Source: Provincial Mining Recorders' Office th!l1 "X*11* w P'ohlblt free entry to itoke mining claims may not beThe Information shown Is dinved from digital date available In the Provincial Mining Recorders' OWc* st the time of downloading from the Ministry of Northern Home Page: wviw.mndm.gov.on.ra/MNDM/MIN6S/LANDS/mlsinnp8e.htm illustrated.

t anr! Mln*ft WM* dtM

ONTARIOCANADAMIHISTR V OF HOHTHEKH MVtLOPMENT MUD MIMBI

PROVINCIAL MIHINOMooMHr* OFFICE

Mining Land Tenure Map

Date l Time of Issue: Men Aug 11 14:51:49 EDT 2003

TOWNSHIP/AREA PLAN MORRISETTE G-3217

ADMINISTRATIVE DISTRICTS / DIVISIONSMining DivisionLand Titles/Registry DivisionMinistry of Natural Resources District

Larder Lake TIMISKAMING KIRKLAND LAKE

TOPOGRAPHIC| j Administrative Bocndurtw

n

Land Tenure

PjTj

Mi Provincial Park

t"""l Indian Rmerw Uftmhi*i Patent

r,

A

Contour

Min* Shall*

Surface And Mining Hlghta

Surface Night* Only

Trail

Natural BM Pip**

UtHSMS

Tower

Surface And Mining Rights

Surf** msl* O*

Una Uis Purmll

OWer IB Connell (Not open lw i

! :: ...taw..BW Only MMne Claims

LAND TENURE WITHDRAWALS

,:|:[^^jt j ; j Areas WtUidl'aWn tram OteposWon

WmiWaWm

WVtt W.Wm

OnWf In OcwrnKI WKimmwal T

IMPORTANT NOTICE

LAND TENURE WITHDRAWAL DESCRIPTIONSIrnntltof Type Dill DeiOipllon

W 20/7* Wm W 20/79 Wtm W 66/80 Wm

Warn Wsm Wm w*

W-LL-P1821 Wsm

W.L.31/96

Jin 1,2001 Jun 1,2001 M.rS, 2001 Jan 3,1980 M.y 27.2000 Apr 27. 2000 Auj 11,1998 Out 27,1998 Aug 29, 2002

20/1 1 Me S.R O. 185464SECTION 36(80 MR W 20/70 S-3-7B SR 4 MR 160705SECTION J6/80 NR W 20/79 6-3-79 SR t MR 190708SECTION 36/80 NR W 50/80 3-140 M.R.0. 160705SEC.35W-1.-17/00 2000/05/27 S+M 105130Sac, 3S VV-L-19/00 2000/04/27 Mf8195160SBC. S6W4.-31/B* 11/08/96 MROSEC.35 W-L J6/08 OCT 27/88 S.R.0. 1651 SOen hrerlz" hltpv/w**.mndm.gov on.ca/MNDM/WINES/LAMDS.llvleB/b,

IMPORTANT NOTICES

ta und*r which special fttouiatlon, limitations or conditions ftxist that aff*ct n , staking *nd