![Page 1: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation](https://reader036.vdocument.in/reader036/viewer/2022081501/56649c775503460f9492c343/html5/thumbnails/1.jpg)
REPUBLIKA SLOVENIJA
MINISTRSTVO ZA PROMET
DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V
JAVNO ŽELEZNIŠKO INFRASTRUKTURO
118.04.23
Presentation by: Mitja Kosec – Project Manager
Zagreb , 9th November 2009
CHALLENGES OF THE
AGENCY OF REPUBLIC OF SLOVENIA FOR THE MANAGEMENT OF PUBLIC RAILWAY
INFRASTRUCTURE INVESTMENT
![Page 2: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation](https://reader036.vdocument.in/reader036/viewer/2022081501/56649c775503460f9492c343/html5/thumbnails/2.jpg)
REPUBLIKA SLOVENIJA
MINISTRSTVO ZA PROMET
DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V
JAVNO ŽELEZNIŠKO INFRASTRUKTURO
218.04.23
DEVELOPMENT OF SLOVENIAN RAILWAY INFRASTRUCTURE
CORRIDORSV.th and X.th corridor
Lenght of railway lines
total: 1228 km single track lines: 330 km duble track lines: 898 km
![Page 3: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation](https://reader036.vdocument.in/reader036/viewer/2022081501/56649c775503460f9492c343/html5/thumbnails/3.jpg)
REPUBLIKA SLOVENIJA
MINISTRSTVO ZA PROMET
DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V
JAVNO ŽELEZNIŠKO INFRASTRUKTURO
318.04.23
THE GOALS WE WANT TO ACHIEVE • Abandoning of bottle-necks, completing of the missing sections and the construction of main lines;
• Connecting of the railway transport with air and maritime transport;
• Improvement of transport safety;
• Acceleration of the national economic development;
• Reduction of the negative impact on environment;
• Assuring of the allowed axle load min. D3 (225 kN/axle and 72 kN/m);
• Increasing of the maximal allowed line speed on main lines, which coincide with corridors V and X on 160 km/h or more and
• Assuring of the renovation of safety signalling devices and the up-to date remote control of traffic on main lines of public railway infrastructure.
![Page 4: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation](https://reader036.vdocument.in/reader036/viewer/2022081501/56649c775503460f9492c343/html5/thumbnails/4.jpg)
REPUBLIKA SLOVENIJA
MINISTRSTVO ZA PROMET
DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V
JAVNO ŽELEZNIŠKO INFRASTRUKTURO
418.04.23
ESTABLISHED: 1.8.2007
No. of Employees: 30
BUDGET IN 2009: 300 mio EUR
ADDRESS:Kopitarjeva ulica 52000 MARIBORSLOVENIJA
PHONE: +386 2 234 14 21
E-MAIL: [email protected]
![Page 5: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation](https://reader036.vdocument.in/reader036/viewer/2022081501/56649c775503460f9492c343/html5/thumbnails/5.jpg)
REPUBLIKA SLOVENIJA
MINISTRSTVO ZA PROMET
DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V
JAVNO ŽELEZNIŠKO INFRASTRUKTURO
518.04.23
RUNNING PROJECTS
•International projects (co-financed from European funds)The Republic of Slovenia is entitled to co-financing of projects by means of the European Union, namely with the aid of:
• Financial TEN-T funds, within this at present nine projects are implemented;
• ISPA 2000-2004, within this at present two projects are still implemented;• Cohesion fund 2004-2006, within this two projects are still implemented;
•Cohesion fund 2007-2013, within this four projects are running in the moment.
•Domestic projects (financed by the means of the Republic of Slovenia)
![Page 6: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation](https://reader036.vdocument.in/reader036/viewer/2022081501/56649c775503460f9492c343/html5/thumbnails/6.jpg)
REPUBLIKA SLOVENIJA
MINISTRSTVO ZA PROMET
DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V
JAVNO ŽELEZNIŠKO INFRASTRUKTURO
618.04.23
TEN-T PROJECTS• Technical studies for the construction of the second track of the railway line Divača-Koper;• Plan for obtaining the building permit for the reconstruction and electrification of the existing railway line Pragersko – Hodoš;• Preparing of legal expertise and the feasibility study for the development of the railway infrastructure on the area of the Ljubljana junction; • Main solution of the airport Ljubljana including the railway line connection with Ljubljana and Kranj (new railway line connection Ljubljana-Jesenice); • Implementation of system GSM-R on Slovenian railway network; • Cross-border railway line Trieste-Divača: Study and the plan of the cross-border railway line Trieste-Divača-Ljubljana-Budapest-border with Ukraine; • Implementation of ERTMS system on the Vth railway corridor (Valencia-Budapest);• Preparing of the preliminary study for the construction of the new high capacity line / high speed line Divača-Ljubljana;• Preparing of the preliminary study for the construction of the new high capacity line / high speed line Ljubljana - Zidni Most.
![Page 7: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation](https://reader036.vdocument.in/reader036/viewer/2022081501/56649c775503460f9492c343/html5/thumbnails/7.jpg)
REPUBLIKA SLOVENIJA
MINISTRSTVO ZA PROMET
DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V
JAVNO ŽELEZNIŠKO INFRASTRUKTURO
718.04.23
Within the period of the Cohesion fund 2004-2006 two projects are implemented, namely:
1-Modernization of the railway line Pragersko-Ormož (A);
2-Remote control of electrical traction
Within the period of the Cohesion 2007-2013 the next projects are implemented:
1-New railway line connection Divača-Koper;
2-Reconstruction, electrification and upgrading of the line Pragersko-Hodoš;
3-Modernization of the existing railway line Divača-Koper;
4-Modernization of level crossings
Within the period of ISPA 2000-2004 two projects are in implementation, namely:
1-Modernisation of SS devices on the line Divača-Koper;
2-Modernisation of SS devices in the line Pragersko – Ormož
![Page 8: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation](https://reader036.vdocument.in/reader036/viewer/2022081501/56649c775503460f9492c343/html5/thumbnails/8.jpg)
REPUBLIKA SLOVENIJA
MINISTRSTVO ZA PROMET
DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V
JAVNO ŽELEZNIŠKO INFRASTRUKTURO
818.04.23
DOMESTIC PROJECTS
1-Preparing and management of projects;
2-Modernization of the railway line Grosuplje-Kočevje;
3-Abandoning of slow drives on the section of the line Košana-Gornja Ležeče;
4-Environment protection and noise barriers;
5-Protection of railway level crossings;
6-Updating of SS protection on the railway station Kamnik;
7-Modernization of SS and TC devices on the railway line Ormož-Murska Sobota
![Page 9: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation](https://reader036.vdocument.in/reader036/viewer/2022081501/56649c775503460f9492c343/html5/thumbnails/9.jpg)
REPUBLIKA SLOVENIJA
MINISTRSTVO ZA PROMET
DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V
JAVNO ŽELEZNIŠKO INFRASTRUKTURO
918.04.23
WE ARE DELIGHTED ABOUT THE CHALLENGES
![Page 10: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation](https://reader036.vdocument.in/reader036/viewer/2022081501/56649c775503460f9492c343/html5/thumbnails/10.jpg)
10
MINISTRSTVO ZA PROMETDIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE
INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO
18.04.23
THANK YOU FOR YOUR ATTENTION!
Presentation by: Mitja Kosec – Project Manager
Zagreb , 9th November 2009
![Page 11: REPUBLIKA SLOVENIJA MINISTRSTVO ZA PROMET DIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO 1 14.4.2015 Presentation](https://reader036.vdocument.in/reader036/viewer/2022081501/56649c775503460f9492c343/html5/thumbnails/11.jpg)
11
MINISTRSTVO ZA PROMETDIREKCIJA REPUBLIKE SLOVENIJE ZA VODENJE
INVESTICIJ V JAVNO ŽELEZNIŠKO INFRASTRUKTURO
18.04.23
QUESTIONS?
Presentation by: Mitja Kosec – Project Manager
Zagreb , 9th November 2009