Eastern Cape Development Corporation invites developers to submit proposal calls with concept, designs and funding. All the proposals must be submitted in a sealed envelope clearly marked with RFP number as stipulated above and submitted at ECDC offices, Ocean Terrace Park, Moore Street, Quigney, East London not later than the above mentioned date & time. Developers should ensure that the proposals are delivered on time to the correct address. Proposals received after the indicated time closing date & time are not going to be accepted. ECDC will apply Leasing Policy and does not bind itself to accept the developer who does not have confirmed funds and capacity, tenant and suitable concept. The vacant sites are zoned residential and ECDC intends provide a densely populated rental stock. Nothing in this notice or in the actions of ECDC, its board of trustees, agents or employees must be construed as creating any expectation, legitimate or otherwise regarding matters dealt with in this notice. Information for site and proposal evaluation criteria will be available on ECDC website: www.ecdc.co.za on Monday, 18th June 2018. All quires related to this proposal call must be directed in writing and addressed to: Contact Person: Ms Pamela Mfingwana at pmfi[email protected] RFP Reference Number Description Briefing Meeting Closing Date/Time ECDC/022/VLH/06/2018 Vacant Land in Hillcrest and Motor Town Land No briefing 20th July 2018 at 15:00 ECDC/023/VLH/06/2018 Vacant Land in Blakeway, Mthatha ECDC/024/VLH/06/2018 Elliot Building ECDC/025/VLH/06/2018 Vacant Land in Southernwood REQUEST FOR PROPOSAL

Upload: phamkhanh

Post on 07-Mar-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly

Eastern Cape Development Corporation invites developers to submit proposal calls with concept, designs and funding.

All the proposals must be submitted in a sealed envelope clearly marked with RFP number as stipulated above and submitted at ECDC offices, Ocean Terrace Park, Moore Street, Quigney, East London not later than the above mentioned date & time.

Developers should ensure that the proposals are delivered on time to the correct address. Proposals received after the indicated time closing date & time are not going to be accepted.

ECDC will apply Leasing Policy and does not bind itself to accept the developer who does not have confirmed funds and capacity, tenant and suitable concept. The vacant sites are zoned residential and ECDC intends provide a densely populated rental stock.

Nothing in this notice or in the actions of ECDC, its board of trustees, agents or employees must be construed as creating any expectation, legitimate or otherwise regarding matters dealt with in this notice.

Information for site and proposal evaluation criteria will be available on ECDC website: www.ecdc.co.za on Monday, 18th June 2018.All quires related to this proposal call must be directed in writing and addressed to:Contact Person: Ms Pamela Mfingwana at [email protected]

RFP Reference Number

Description Briefing Meeting

Closing Date/Time

ECDC/022/VLH/06/2018 Vacant Land in Hillcrest and Motor Town Land

No briefing 20th July 2018 at 15:00

ECDC/023/VLH/06/2018 Vacant Land in Blakeway, Mthatha

ECDC/024/VLH/06/2018 Elliot Building

ECDC/025/VLH/06/2018 Vacant Land in Southernwood

REQUEST FOR PROPOSAL

Page 2: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly
Page 3: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly
Page 4: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly
Page 5: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly
Page 6: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly
Page 7: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly
Page 8: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly

Property:

Transido Motor Town, Mthatha

REPORT OVERVIEW

The Property In Perspective

This report overview is a summary of the assessment and is not to be used alone. The attached

report is intended to be read in its entirety.

Definitions of the terms used in the Report Overview to describe average or overall conditions include

the following: Excellent – In “like new” condition and/or high quality materials used.

Good – no remedial work is recommended;

Fair – system is aging and/or minor remedial work is recommended; and

Poor – replacement or major remedial work is recommended.

Page 9: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly

The table displays the conditions of the property according to our visual assessment.

ITEM EXCELLENT GOOD FAIR POOR

Storm water Drain System X

Parking Pavement, Curbs & Gutters X

Utilities X

Landscaping X

Site Lighting X

Structural System Including Floors X

Exterior Walls, Patch & Paint X

Windows & Frames X

Exterior/Interior Doors & Frames X

Roof Coverings X

Rainwater Goods X

Common Area Accessibility

X

Parking, Signage & Ramps X

Unexpected deteriorations should still be anticipated. The assessment should not be considered a

guarantee or warranty of any kind. Each component of the report should be thoroughly examined as

many issues arise within the course of the inspection which limits the visual inspection.

The Scope Of The Assessment

Purpose

The purpose of this assessment was to provide an observation and report on the physical condition

and maintenance of the property and its improvements. This report addresses items that we believe

are significant for the continued operation of this facility in its current usage and occupancy,

consistent with comparable properties of similar nature.

Scope

Page 10: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly

Structure & Site’s scope of services for this assessment included a visit to the property with

observations of the property and its improvements, reviews of available construction and maintenance

documents, and interviews with various persons. The purpose of these observations was to assess

the general physical condition and maintenance status of the property and to recommend repair and

operation and/or to be restored to a good condition consistent with comparable properties of similar

age.

Opinions of cost for recommended repairs have been prepared and divided into two categories:

Immediate repair needs and Short term needs. Immediate Repair Needs are those repairs that are

beyond the scope of regular maintenance that should be performed within one year of the date of the

report. Short-term needs are those items needing repair or replacement to remedy physical

deficiencies, such as deferred maintenance, that are beyond the scope of regular maintenance that

should be undertaken on a priority basis within one to two years.

Overall General Description

The subject property, developed in approximately over two decades ago for use as an industrial motor

workshop facility. The complex consisting of multiple single story workshop flatlats is approximately

5000m2 in size.

STRUCTURE OBSERVATIONS

The building walls of the Transido Motor Town properties are in extremely bad conditions.

Page 11: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly

Common major settlement cracks were observed in the building walls. This could imply that some structural movement of the building has occurred. Cracks of this type should be watched for any sign of additional movement. In the absence of any sign of ongoing movement, repair should not be necessary.

As seen above, one of the structures in the property, approximately 250m2 has collapsed walls and

the roof has been blown away by heavy winds.

ROOFING OBSERVATIONS

Many factors influence the longevity of roofs including; weather, quality of shingle and installation

method, proximity of tree limbs, degree of slope and amount of rooftop ventilation. Roofs with multiple

Page 12: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly

layers of cover typically have a shorter life span and require additional costs for removal when re-

roofing becomes necessary. Properly sloped roofs usually last longer than flat roofs.

Repairs to the roofing are needed. Damaged or missing roofing material should be repaired. All roof penetrations should be examined and sealed as necessary. Prior repairs to the roofing are evident. This would suggest that problems have been experienced in the past. This area should be monitored.

EXTERIOR OBSERVATIONS

Page 13: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly

The above deterioration was observed in all the buildings on the property. Localized pointing of

deteriorated mortar between the bricks of the exterior walls is advisable to prevent further

deterioration. The block should be painted to preserve the material.

Water reticulation system is constantly heavily leaking; the water runs through the mechanic tenant’s

workshops and moves with the oil grease to near vegetation.

ELECTRICAL SYSTEM OBSERVATION

Page 14: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly

The electrical system is live and working properly on most of the buildings on site. However, the

cables are exposed as seen above on the electrical mains. With the constant leaking water in the

property, this is dangerous.

PLUMBING / SANITARYFITTINGS OBSERVATION

Water closets and showers look like they have not been maintained in years. All the sanitary in the

property are deteriorated and not in a healthy condition for use by tenants.

ACCESS TO THE PROPERTY

Page 15: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly

The property is fairly accessible. Parking is provided externally, however it is impossible to park

outside due large number of dysfunctional vehicles in the property yard.

LIMITATIONS OF THE ASSESSMENT

Evidence of prior leaks may be disguised by interior finishes.

Estimates of remaining roof life are approximations only and do not preclude the possibility of

leakage.

Leakage can develop at any time and may depend on rain intensity, wind direction and other

factors.

Roof inspection may be limited by access, condition, weather, or other safety concerns.

A representative sample of exterior components was inspected rather than every occurrence

of components.

The inspection does not include an assessment of geological, geotechnical, or hydrological

conditions, or environmental hazards.

BUILDING AREAS

Page 16: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly

Motor Industry Flatlats (Identical Structures) – 9No x 250m2 floor area

Motor Industry Flatlats (Identical as above structures but roof blown away by wing, walls have

collapsed) -1No x 250m2 floor area

Rectangular shaped motor workshop factory (Smaller Block) – 308 m2

Rectangular shaped motor workshop factory (Middle Sized Block) – 510 m2

Rectangular shaped motor workshop factory (Bigger Block) – 650 m2

Workshops with ablution facilities – 320 m2

Smaller Ablution facility block - 26 m2

COST ESTIMATE FOR MAINTENANCE

Page 17: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly

REPAIRS AND REFURBISHMENT TO TRANSIDO

MOTO TOWN IN MTHATHA

Ref Description Unit Quantity Rate Amount

1 PRELIMINARIES AND GENERAL R 1 504 951.80

2 ALTERATIONS

2.1 Motor Industry Flatlats m2 2250 2 500.00 5 625 000.00

2.2 Motor Industry Flatlats (Major Damage) m2 250 3 000.00 750 000.00

2.3 Factory Workshops m2 1468 2 500.00 3 670 000.00

2.4 Factory Workshops with Ablution Facilities m2 320 2 650.00 848 000.00

2.5 Ablution Facilities m2 26 2 650.00 68 900.00

2.6 External(verandah area) area of all buildings m2 345 1 500.00 517 680.00

3 External works

3.1 Undercover parking m2 100 1 000.00 100 000.00

3.2 Take down and remove existing fencing m 576 100.00 57 600.00

3.3 Erect High Security Alluminium-Zinc fencing m 576 1 950.00 1 123 200.00

3.4 Erection of Guardhouse with Boomgate no 1 400 000.00 400 000.00

3.5 Kerbing to and around parking area m 100 210.00 21 000.00

3.6 Roads, surfaces etc. Item 1 500 000.00 500 000.00

4 Provisional Sums

4.1 Electrical Works - Upgrading Item 1 2 250 000.00 2 250 000.00

4.2 Stormwater Reticulation Item 1 700 000.00 700 000.00

4.3 Water Reticulation Item 1 100 000.00 100 000.00

4.4 Signage Item 1 75 000.00 75 000.00

Sub-Total R 18 311 331.80

Contingencies Item 1 R 915 566.59

Pre Contract Escalation @ 8% R 366 226.64

Post Contract Escalation @ 8% R 933 877.92

Sub-Total R 20 527 002.95

Professional Fees @ 18% R 3 694 860.53

Sub-Total R 24 221 863.48

Project Management Fee (ECDC @ 8%) R 1 937 749.08

Disbursements @ 2% R 484 437.27

Sub-Total R 26 644 049.83

VAT @ 14% R 3 730 166.98

GRAND TOTAL R 30 374 216.81

31 August 2017

Page 18: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly
Page 19: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly
Page 20: REQUEST FOR PROPOSAL - ecdc.co.zaecdc.co.za/media/3798/rfp_property-development.pdf · The block should be painted to preserve the material. Water reticulation system is constantly