request for proposalpo box 8388, rpo csc halifax, nova scotia, b3k 5m1 will be received until 2:00...

321
Procurement Services 450 Cowie Hill Rd. Halifax, NS B3K 5M1 Telephone: (902) 490-4998 REQUEST FOR PROPOSAL #P09.2019 2019 Sewer Mainline Trenchless Lining Project – Phase 1 Sealed bids submitted on the included bid form on a vendor identified envelope marked: RFP# P09.2019 – “2019 Sewer Mainline Trenchless Lining Project – Phase 1” Addressed to: Halifax Water Attn: Brent Hickman Procurement Services 450 Cowie Hill Road PO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications and terms and conditions. Check for changes to this request – Before submitting your proposal, visit the Provincial Government Web Portal at www.novascotia.ca/tenders to see if any Addenda detailing changes have been issued on this proposal. Changes may be posted up until the proposal closing time. It is the bidders’ responsibility to acknowledge and take into account all Addenda. Bidders shall be solely responsible for the delivery of their proposals in the manner and time prescribed. Proposals received after the date and time specified shall be rejected. Electronic and facsimile proposals are not accepted. The lowest or any submission will not necessarily be accepted. RFP Issue Date – May 7th, 2019

Upload: others

Post on 14-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

Procurement Services 450 Cowie Hill Rd. Halifax, NS B3K 5M1 Telephone: (902) 490-4998

REQUEST FOR PROPOSAL

#P09.2019

2019 Sewer Mainline Trenchless Lining Project – Phase 1

Sealed bids submitted on the included bid form on a vendor identified envelope marked:

RFP# P09.2019 – “2019 Sewer Mainline Trenchless Lining Project – Phase 1”

Addressed to:

Halifax Water Attn: Brent Hickman Procurement Services 450 Cowie Hill Road

PO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1

Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications and terms and conditions.

Check for changes to this request – Before submitting your proposal, visit the Provincial Government Web Portal at www.novascotia.ca/tenders to see if any Addenda detailing changes have been issued on this proposal. Changes may be posted up until the proposal closing time.

It is the bidders’ responsibility to acknowledge and take into account all Addenda.

Bidders shall be solely responsible for the delivery of their proposals in the manner and time prescribed. Proposals received after the date and time specified shall be

rejected.

Electronic and facsimile proposals are not accepted.

The lowest or any submission will not necessarily be accepted.

RFP Issue Date – May 7th, 2019

Page 2: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 2

PROPONENT’S SUBMISSION SHEET

The undersigned hereby acknowledges that he/she, as an officer of the named company, has read and understands the specifications, requirements, and proposed agreement regarding 2019 Sewer Mainline Trenchless Lining Project – Phase 1 to Halifax Water. The undersigned further acknowledges that the seller’s proposed product, equipment, materials, and services fully meet or exceed those as specified in Halifax Water’s Proposal. Additionally, the Proponent undersigned agrees that all the Proponent’s bid documents and responses to the aforementioned Proposal will, at the option of Halifax Water, become a legally binding and essential portion of the final contract between the successful Proponent and Halifax Water.

The following information must be completed to ensure proposal acceptance.

*ADDENDA No. ______________ to ______________ INCLUSIVE WERE CAREFULLY EXAMINED.

DATED THIS DAY OF , 2019.

PROPONENT’S COMPANY NAME: _____________________________________________________________

ADDRESS: _____________________________________________________________

_____________________________________________________________

CITY/ PROVINCE: ____________________________ POSTAL CODE: ________________

PHONE NO.: ______________________ FAX NO.: ___________________________

EMAIL ADDRESS: _____________________________________________________________

WEBSITE: _____________________________________________________________

CONTACT NAME (please print): _________________________________________________________________

TITLE (please print): ________________________________ PHONE NO.: _____________________

AUTHORIZED SIGNATURE: ________________________________________________

HST REGISTRATION NO: _________________________________________________

NS WCB COVERAGE: YES NO

* The proponent shall list and initial all addenda received during the period and shall take them into considerationwhen preparing their proposal submission. A signed copy of each Addendum must be included with the proposal submission. Failure to comply may be cause for rejection of proposal submission.

HALIFAX WATER RESERVES THE RIGHT TO REJECT ANY OR ALL SUBMISSIONS. THE LOWEST OR ANY SUBMISSION WILL NOT NECESSARILY BE ACCEPTED.

This proposal will adhere to Halifax Water’s Standard Terms & Conditions. They can be found on our website at https://www.halifax.ca/home-property/halifax-water/about-your-water/procurement-tender-opportunities

Page 3: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 3

TABLE OF CONTENTS 1. INTRODUCTION .............................................................................................................. 6

2. BACKGROUND ................................................................................................................. 6 Background Information ........................................................................................... 6

2.2 Pre-Proposal Conference (Optional) ......................................................................... 6

3. SCOPE OF WORK ............................................................................................................ 7 General ...................................................................................................................... 7

4. GOALS AND SCHEDULE ............................................................................................... 9

5. SAFETY .............................................................................................................................. 9

6. INFORMATION FOR PROPONENTS .......................................................................... 9 Proposal Submission ................................................................................................. 9 Confidentiality ........................................................................................................ 10

Insurance ................................................................................................................. 10 Form of Agreement ................................................................................................. 10 Acknowledgement .................................................................................................. 10

Assumptions ............................................................................................................ 10 Technology Selection Process ................................................................................ 10

Hard Copies ............................................................................................................ 11 Informal or Unbalanced Proposals ......................................................................... 11

Late Submissions .................................................................................................... 11 Addendums to the Request for Proposal ................................................................. 11 Request for Clarification ......................................................................................... 11

Background Information ......................................................................................... 12 Tender Security ....................................................................................................... 12

Address for Submission .......................................................................................... 12 Negotiations ............................................................................................................ 13 Period of Submission Validity ................................................................................ 13 Award ...................................................................................................................... 13 The Contract ........................................................................................................... 14

7.0 PROPOSAL AND FINANCIAL EVALUATION CRITERIA .................................... 14 Stage 1: Evaluation of Technical Proposals ........................................................... 14

7.1.1 Evaluation Category A: Corporate Experience ........................................... 16 7.1.2 Evaluation Category B: Corporate Information and Resources (Equipment, Team Members, and Subcontractors) ..................................................................... 16 7.1.3 Evaluation Category C: Organization, Work Plan and Customer Service .. 16 7.1.4 Evaluation Category D: Materials and Method for Rehabilitation of Mainline Sewers ..................................................................................................................... 16 7.1.5 Evaluation Category E: CCTV Inspection of Mainline Sewers .................. 16 7.1.6 Evaluation Category F: Health and Safety .................................................. 17

Stage 2: Examination of Financial Proposals ......................................................... 17 Proposal Submission Debrief .................................................................................. 17

Page 4: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 4

RFP Checklist ......................................................................................................... 177.4.1 RFP Checklist Technical Proposal .............................................................. 187.4.2 RFP Checklist Financial Proposal ............................................................... 19

8.0 PROJECT ADMINISTRATION .................................................................................... 19Proponent Invoicing and Payment .......................................................................... 19

9.0 GENERAL INFORMATION ......................................................................................... 19Proponent Responsible for Proposal / No Reliance on Halifax Water ................... 19Rights of Halifax Water .......................................................................................... 19No Liability ............................................................................................................. 20Disclosure of Information and Communication Procedures ................................... 209.4.1 Disclosure by Halifax Water........................................................................ 209.4.2 Disclosure by the Proponent ........................................................................ 21Costs and Expenses of the Proponent ..................................................................... 21Clarification of Proposals ....................................................................................... 21No Conflict of Interest ............................................................................................ 21No Interest in another Proponent ............................................................................ 22Proponents to Ensure They Understand the Contract ............................................. 22Waiver / No Reliance .............................................................................................. 22False or Misleading Information ............................................................................. 22Compliance with Applicable Law .......................................................................... 22Time to be of the Essence ....................................................................................... 23Governing Law ....................................................................................................... 23Confidentiality ........................................................................................................ 23Police Record Check ............................................................................................... 24

APPENDIX A.1 – Statement A .................................................................................................. 25APPENDIX A.2 – Statement B .................................................................................................. 28APPENDIX A.3 – Statement C .................................................................................................. 34APPENDIX A.4 - Statement D ................................................................................................. 37APPENDIX A.5 - Statement E .................................................................................................. 49APPENDIX A.6 - Statement F .................................................................................................. 51APPENDIX B – Tender Document ........................................................................................... 53APPENDIX C - Candidate Street Set Sections ........................................................................ 54APPENDIX D - Site Location Drawings ................................................................................... 55APPENDIX E -Existing CCTV, Record Drawing and Lateral Cards , HRM Traffic Restrictions.................................................................................................................................. 56

Page 5: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 5

Staff Signature Date

Director of Engineering and IS May 6th, 2019

Director of Wastewater and Stormwater Services May 6th, 2019

Manager of Wastewater Engineering May 6th, 2019

Project Engineer May 6th, 2019

Original signed by Jamie Hannam

Original signed by Susheel Arora

Original signed by David Ellis

Original signed by Roger Levesque

Page 6: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 6

INTRODUCTION

The Halifax Regional Water Commission (Halifax Water) is soliciting proposals for a 2019 Sewer Mainline Lining Project – Phase 1 which includes the application of a cured-in-place pipe (CIPP) liner to rehabilitate aging wastewater, and combined (wastewater and stormwater) sewer mains. The detail project requirements are further defined in this document.

BACKGROUND

Background Information The use of trenchless rehabilitation technologies involves combining both construction and manufacturing practices into a single process. This integration of manufacturing and construction has evolved into a specialized industry with its own unique engineering principles and practices. As a result of this rapidly changing industry and the integration of manufacturing with construction, it is important to qualify the technologies and the installer (Proponent) of the technology. This ensures that the technology (design, installation method, etc.) can stand up to reasonable engineering scrutiny and the installation Proponent has satisfactorily demonstrated that they have the capacity, expertise, resources and established procedures, including Quality Assurance and Quality Control (QA/QC) to execute the rehabilitation effectively prior to contract award.

Interested proponents are required to submit a proposal in response to this RFP. At a minimum the information requested in Section 6 and the corresponding Appendix A is to be provided. Proponent proposal submissions will be evaluated. Those achieving a minimum technical score will have their financial submission reviewed. The financial submission is be a completed tender document included as Appendix B. Of the tenders reviewed the intent is to award to the Proponent who submits the lowest bid compliant tender. Further details are provided in this document.

2.2 Pre-Proposal Conference (Optional)

Each Proponent must completely satisfy itself as to the exact nature and existing conditions of the 2019 Mainline Trenchless Lining Project - Phase 1 requirements and for the extent and quality of work to be performed. Failure to do so will not relieve the successful Proponent of its obligation to carry out the provisions of the contract.

The successful proponent will be responsible to identify any locations along the sewer mains which require remedial work prior to the lining installation. Halifax Water (or others as appointed) will undertake the adjacent construction work in advance of the lining installation.

Page 7: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 7

Proponents are welcome to attend a Pre-Proposal conference to be held at the Halifax Water Cowie Hill Office on May 16, 2019 at 2:00pm AST. A conference call option will also be available for any proponents that are unable to attend in person. Halifax Water and consulting representatives will be on hand to address any questions pertaining to the project and to conduct any overview of the specification requirements of materials and work methods for rehabilitation of mainline sewers. Note: Separate individual conferences will not be granted. All proponents interested participating in this conference will be required to confirm by May 15, 2019 prior to attending by emailing [email protected]

SCOPE OF WORK

General

This contract requires the use of cured-in-place pipe (CIPP) technology for the completion of the sewer rehabilitation as identified within this document. The method of cure for the CIPP technology is open to any of the following methods; Hot Water, Steam, or UV cured CIPP products. The proponent shall identify within their submission their intended curing method for executing the Work.

Depending on the proposed method of cure, the proponents submission shall comply with the appropriate CIPP specification included within the tender document (see Appendix B). Specifically these tender specification sections are as follows:

1. Hot Water/Steam Cured (Section 33 11 05): Proponent must comply with thisspecification for any CIPP products that rely on hot water or steam cure methodsto achieve performance requirements.

2. UV-Cured (Section 33 11 10): Proponent must comply with this specificationfor any CIPP products that rely on UV cure methods to achieve performancerequirements.

Failure by the proponent to demonstrate they have abided by the correct specification may be grounds for non-compliant submission.

The scope of the 2019 Sewer Mainline Trenchless Lining – Phase 1 project includes all necessary design, labour, equipment, and materials required to successfully rehabilitate the wastewater sewer mains identified and in accordance with the requirements in this document. In general this includes sewer main lining, reinstatement and restoration of all disturbed areas, traffic control, overall management of the work including safe work practices and all approval, permissions and necessary permits.

Page 8: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 8

Description of the works:

The 2019 Phase 1 sewer wastewater main candidate set for lining includes the following thirty four (34) separate street sites located within HRM in various areas of Dartmouth, Halifax and Sackville:

1 Sinclair Street – Dartmouth, 13 MH –MH sections, 741 m length 2 High Street – Halifax, 6 MH –MH sections, 198 m 3 Drummond Street – Halifax, 7 MH –MH sections, 265 m 4 Leaman Street – Halifax, 12 MH –MH sections, 425 m 5 Dingle Road – Halifax, 27 MH –MH sections, 1078 m 6 Albion Road – Halifax, 9 MH –MH sections, 370 m 7 Burns Drive – Halifax, 8 MH –MH sections, 345 m 8 Flemming Drive – Halifax, 6 MH –MH sections, 380 m 9 Shaw Crescent – Halifax, 2 MH –MH sections, 133 m 10 Westgate Drive – Halifax, 11 MH –MH sections, 504 m 11 Kirk Road – Halifax, 7 MH –MH sections, 244 m 12 McManus Road - On Street – Halifax, 5 MH–MH sections, 165 m 13 McManus Road - Off Street – Halifax, 4 MH–MH sections, 185m 14 Parkhill Road – Halifax, 4 MH –MH sections, 232 m 15 Milton Drive – Halifax, 5 MH –MH sections, 55 m 16 Whimsical Lake Crescent - Halifax, 6 MH –MH sections, 220 m 17 Inverness Avenue - Halifax, 4 MH –MH sections, 256 m 18 Dunniker Road – Halifax, 1 MH –MH sections, 39 m 19 Joyce Avenue - Halifax, 7 MH –MH sections, 336 m 20 Aurora Avenue – Halifax, 4 MH –MH sections, 186 m 21 Circle Drive – Halifax, 5 MH –MH sections, 280 m 22 Twin Oaks Road – Halifax, 2 MH –MH sections, 92 m 23 Cherry Lane – Halifax, 4 MH –MH sections, 140 m 24 Hubley Drive (Offstreet) – Halifax, 1 MH –MH sections, 45 m 25 Newton Avenue – Halifax, 9 MH –MH sections, 467 m 26 Chebucto Road – Halifax, 4 MH –MH sections, 166 m 27 Connaught Avenue – Halifax, 3 MH –MH sections, 169 m 28 Dublin Street – Halifax, 4 MH –MH sections, 347 m 29 Cork Street – Halifax, 2 MH –MH sections, 83 m 30 Windsor Street – Halifax, 3 MH –MH sections, 151 m 31 Seawood Avenue – Sackville, 12 MH –MH sections, 584 m 32 Leaside Drive – Sackville, 4 MH –MH sections, 208 m 33 Leaside Drive Easement – Sackville, 3 MH –MH sections, 105 m 34 Sackville Drive - Sackville, 4 MH –MH sections, 163 m

The total length of lining over the entire project is approximately 9,486 meters. Within this candidate street set, the project scope includes the rehabilitation of wastewater collector sewers at two hundred fourteen (214) manhole to manhole sewer main sections. Refer to Appendix C for the detailed compilation of the candidate street set sections to be lined and Appendix D for drawings denoting the site locations which includes mainline sewer and

Page 9: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 9

manhole details.

Halifax Water also has CCTV, record drawings, lateral card information and a listing of HRM traffic restrictions which is included in Appendix E. We provide note that this information is not necessarily complete but is what is available. It will be up to the proponent to determine the actual sizes of the candidate section during the initial CCTV V1 process. Any changes will be brought to the owner’s attention at that time for review and, as required, changes will be made in accordance with the contract. It has been determine that there are approximately 590 lateral connections to the candidate set of sewer mains to be lined.

GOALS AND SCHEDULE The primary goals of the mainline sewer rehabilitation are to: provide and restore flow capacity; and restore structural integrity of the mainline sewer. The work is to be undertaken in 2019. More specific information is included in the tender document. It is noted that the award of a contract is anticipated by June 19, 2019 pending approval by the Nova Scotia Utility and Review Board (NSUARB)

SAFETY The health and safety of all personnel working on this project is of upmost importance to Halifax Water. The tender document contains more specific requirements with respect to safety.

INFORMATION FOR PROPONENTS

Proposal Submission The response to this RFP shall be submitted using the two-envelope system as follows:

The technical proposal shall include an unencrypted searchable PDFelectronic file, the hard copy original, bound and clearly marked “original”,and four (4) additional bound copies of the proposal. All copies of thetechnical proposal are to be clearly marked as “TECHNICAL” andFinancial information shall not be included in the Technical portion of thesubmission.

Although there is no page limit for the technical proposal, Proponents arerequested to be concise, and as appropriate, include supporting informationin appendices.

The financial proposal shall be submitted in a separate, sealed envelope (onecopy only) and clearly labeled “FINANCIAL”.

Page 10: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 10

The Financial submission shall consist of a completed Tender Form(Section 00 41 43 of the tender document included in Appendix B).

Confidentiality Submit confidentiality statement (See Section 9.15).

Insurance Insurance requirements shall be as per those stated in the tender document including the requirement for the Proponent’s design engineer to carry professional liability insurance covering the services described in the agreement and the insurance policy is to provide coverage for an amount not less than $2,000,000.

Form of Agreement Form of Agreement Section for any resulting contract shall be as per Section 00 53 43 of the tender document (Appendix B).

Acknowledgement A complete acknowledgement, in the form set forth in Proponent Submission Sheet confirming that the Proponent acknowledges and agrees to all the conditions of participation in the RFP.

Assumptions The Proponent shall clearly identify all assumptions made in the preparation of the proposal. Additionally, the Proponent is encouraged to outline other work considered by the proponent to be essential to the successful completion of this project that was not identified by Halifax Water in this RFP.

Technology Selection Process The selection process for the acceptance of rehabilitation technologies is based on the objectives of the rehabilitation, including stabilizing the pipe structure and eliminating the pipe and connection as a source of infiltration. These objectives are used to establish specifications and design criteria for the rehabilitation technologies to meet, including mainline cured-in-place pipe (CIPP).

The objectives for CIPP lining of mainline sewers are to prevent further structural deterioration, prevent corrosion, prevent root intrusion,

Page 11: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 11

prevent/reduce infiltration and improve flow characteristics. CIPP Lining will be a tight fit to the inside of the existing sewer and conform closely to the shape of the existing sewer without bridging, gaps, or voids. Design of CIPP liners shall be in accordance with the design specifications included in the tender document.

Hard Copies All proposals must be in hard copy form. No facsimile transmissions will be accepted. However, amendments to the original document will be accepted by facsimile, if received before the Submission Closing Date. Originals must be forwarded to Halifax Water so that they may be attached to the original hard copy for validity.

Informal or Unbalanced Proposals Proposal forms which in the opinion of the Owner are considered to be informal or unbalanced may be rejected.

Late Submissions The date and time of receipt of a Proposal shall be the date and time indicated by Halifax Water’s date and time stamped on the Proposal.

Addendums to the Request for Proposal All revisions to this RFP will be posted in the form of an addendum to the Nova Scotia Procurement Services Web Portal. Prior to the Submission Closing Date, Halifax Water may revise any provision or part of the RFP. Any changes or revisions to this RFP will be issued to all proponents in writing as a formal addendum to this RFP. Prior to the Submission Closing Date, Halifax Water may modify any provision or part of the RFP at any time upon notice in writing to the proponents. Halifax Water will provide a reasonable time for the proponents to respond to such modifications including, without limitation, the opportunity to make any necessary revisions to their respective proposals.

Request for Clarification Any Proponent who has questions as to the meaning or intent of any part of this RFP or of the project, or who believes this RFP contains an error, inconsistency or omission, should submit a request for clarification. All requests for clarification or inquiries concerning this RFP should be forwarded by email no later than one week prior to the Submission Closing Date, to the Halifax Water representative identified below:

Page 12: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 12

Brent Hickman, S.C.M.P. Halifax Water Procurement Officer

450 Cowie Hill Road PO Box 8388, RPO CSC

Halifax, Nova Scotia, B3K 5M1 Office: 902-490-4998

Email: [email protected]

All clarifications to this RFP will be posted to the Nova Scotia Procurement Services Web Portal.

Halifax Water will assume no responsibility for verbal instructions or suggestions. Halifax Water core hours of operation are Monday to Friday, 8:30 am to 4:30 pm.

Background Information Background information is available by contacting Brent Hickman by email at [email protected] or phone at 902-490-4998 for obtaining a Digital Drive containing the available data which will be couriered to proponents upon request. Any interpretation of the available information shall be at the Proponents risk and Halifax Water shall not be held responsible for the interpretation of the background information available from the Digital Drive. All Proponents shall be deemed to have reviewed the available background information and shall be deemed to have full knowledge of what was included in the Digital Drive: the available information files include Mainline CCTV, Record Drawings, and Lateral Cards and are included as part Appendix E.

Tender Security

Proponents are to provide Tender Security as per the requirements of Section 00 21 00 of the tender document. This is to be enclosed with the financial proposal.

Address for Submission The proposals shall be delivered in a sealed envelope marked “Request for Proposals - 2019 Sewer Mainline Trenchless Lining Project – Phase 1, P09.2019”, not later than 2:00 pm, Atlantic Time, May 29, 2019, to:

Page 13: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 13

Halifax Water Attn: Brent Hickman Procurement Services 450 Cowie Hill Road

PO Box 8383, RPO CSC Halifax, Nova Scotia B3K 5M1

Phone: (902) 490-4998

Under no circumstance will proposals received after the submission closing date be accepted.

Negotiations Halifax Water reserves the right to enter into negotiations with the Preferred Proponent regarding any and all aspects of their Proposal. Halifax Water is under no obligation whatsoever to enter into negotiations with either the Preferred Proponent, or any other Proponents who respond to this RFP.

Should negotiations with the Preferred Proponent fail to result in the formalization of an agreement, the HW may, in its sole and absolute discretion, enter into negotiations with the second ranked Proponent. Should those negotiations fail, the next ranked Proponent may be invited to participate in negotiations. This sequence could continue until either an agreement is finalized or HW decides not to proceed with the project.

Period of Submission Validity Proposals will be binding for ninety (90) Days: Unless otherwise specified, all formal proposals submitted shall be irrevocable for ninety (90) calendar days following proposal opening date, unless the Proponent(s), upon request of Halifax Water, agrees to an extension.

Award Provided that at least one of the received proposals meets the approval of the Evaluation Team, a recommendation on contract award will be made on the basis of the evaluation. All awards are subject to the approval of Senior Management and the availability of funds. No announcement concerning the successful proposal(s) will be made until a complete report is prepared and approved by the appropriate bodies. It is anticipated that the contract will be awarded by June 19, 2019 (pending NSUARB approval).The Financial submissions of the proposals that have met the minimum technical requirements as determined by the Halifax Water’s evaluation process will be opened (refer to Section 7.0). The successful Proponent’s

Page 14: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 14

submission price will be posted to the Nova scotia Procurement Services Web Portal.

Written communication to the Successful Proponent of notification of award before the time of expiration specified by Halifax Water shall result in a binding contract without further action by either party. Halifax Water may accept an offer whether or not there are negotiations after its receipt. Negotiations conducted after receipt of an offer do not constitute a rejection or counteroffer by Halifax Water.

Neither acceptance of a proposal nor execution of a contract will constitute approval of any activity or development contemplated in any proposal that requires any approval, permit or license pursuant to any federal, provincial, regional or municipal statute, regulation or by-law.

The Contract Should this RFP process result in a contract the contract document shall consist of the Tender Document and, as an attachment, the successful proponent’s proposal submission. Thus the information contained within the successful proponent’s proposal submission will be contractual.

7.0 PROPOSAL AND FINANCIAL EVALUATION CRITERIA

Responses to this RFP will be reviewed by Halifax Water in two stages.

Stage 1 will be the evaluation of the technical proposals to determine which proposals meet the minimum technical requirements as determined by the evaluation team. Only those proposals that have met the minimum technical requirements as determined by the Halifax Water’s evaluation process will proceed to Stage 2.

Stage 2 will be an examination of costs to determine the lowest Financial proposal for only those proposals that meet the minimum technical requirements as determined by the evaluation team.

Stage 1: Evaluation of Technical Proposals General All Proposals will be initially reviewed to determine compliance with the RFP requirements. Any Proposal not complying with the requirements of the RFP shall not be accorded any points or evaluated further, subject to the exercise by Halifax Water, in its absolute discretion, of any right or privilege it may have in this RFP, including without limitation its right to waive

Page 15: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 15

irregularities. Halifax Water may exercise its rights and privileges under the Proposal and reject a RFP in accordance with same notwithstanding that it may be compliant.

The Evaluation Team will evaluate compliant (or deemed compliant as a result of the waiver by the Halifax Water of any non-compliance) Technical Proposals, which have not been rejected by the Halifax Water in accordance with a right or privilege of the Halifax Water, and in the evaluation assign points up to a maximum of 100 points. All Proposals will be scored on the basis of their response to evaluation criteria. Proposals receiving an evaluation score of 80 points or higher and have attained the minimum scores required for certain criteria will proceed to Stage 2.

An initial determination of compliance (including deemed compliance at Stage 1) shall not preclude a finding by Halifax Water of non-compliance at Stage 2, particularly with respect to non-compliance with the requirements for the financial proposal (Stage 2) or any other discovered non-compliance with the Proposal requirements.

Evaluation Categories for Technical Proposal

The categories summarized in Table 1 will be used in the Evaluation of Technical Proposal.

Table 1: Evaluation Categories

Evaluation Category Maximum Possible

Score Score

Minimum Required

Score ScoreA Corporate Experience 20 16

B Corporate Information and Resources (Equipment, Personnel, and Subcontractors

10

C Organization, Work Plan, and Customer Service 25

D Materials and Method for Rehabilitation of Mainline Sewers

35 28

E CCTV Inspection of Mainline Sewers 5

F Health and Safety 5

Total Score for All Categories 100 80

Page 16: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 16

To proceed to Stage 2, Examination of Financial Proposals, the Technical Proposals must achieve the minimum required scores both in total and by individual category.

Proponents are to structure their submission so that there is a specific section which includes information on each one of these categories. Not following this identification and order creates the risk to the Proponent that, even if the information has been provided, it may be overlooked and consequently not considered in evaluation of the Proponent’s score.

The following subsections provide more specific information with respect to these evaluation categories.

7.1.1 Evaluation Category A: Corporate Experience Proponent submission shall contain a section titled “Evaluation Category A - Corporate Experience” The contents and layout shall be as per Statement “A” included in Appendix A.1.

7.1.2 Evaluation Category B: Corporate Information and Resources (Equipment, Team Members, and Subcontractors)

Proponent submission shall contain a section titled “Evaluation Category B – Corporate Information and Resources” The contents and layout shall be as per Statement “B” included in Appendix A.2.

7.1.3 Evaluation Category C: Organization, Work Plan and Customer Service

Proponent submission shall contain a section titled “Evaluation Category C – Organization, Work Plan and Customer Service”. The contents and layout shall be as per Statement “C” included in Appendix A.3.

7.1.4 Evaluation Category D: Materials and Method for Rehabilitation of Mainline Sewers

Proponent submission shall contain a section titled “Evaluation Category D – Materials and Method for Rehabilitation of Mainline Sewers”. The contents and layout shall be as per Statement “D” included in Appendix A.4.

7.1.5 Evaluation Category E: CCTV Inspection of Mainline Sewers Proponent submission shall contain a section titled “Evaluation Category E – CCTV Inspection of Mainline Sewers”. The contents and layout shall be as per Statement “E” included in Appendix A.5.

Page 17: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 17

7.1.6 Evaluation Category F: Health and Safety Proponent submission shall contain a section titled “Evaluation Category F – Health and Safety”. The contents and layout shall be as per Statement “F” included in Appendix A.6.

Stage 2: Examination of Financial Proposals Stage 2 is reserved for only those Proposals that have achieved the required minimum score of 80 in the Stage 1 evaluation of technical Proposals. No Stage 2 consideration will commence until all Stage 1 evaluation is final.

Submit the Financial Proposal in a separate, sealed envelope, clearly marked “Financial Proposal”.

Those Proponents whose Technical Proposals achieved the minimum required scores (both in total and by individual category) will have their Financial Proposal envelopes opened and the arithmetic checked/corrected.

The Financial Proposals including Form of Tender and other requirements of this RFP will be checked to ascertain compliance with the RFP requirements.

The successful Financial Proposal shall be the Financial Proposals with the lowest overall price that has passed Stage 1 Evaluation and is in compliance with the RFP/tender document requirements.

Halifax Water reserves the right not to award the contract to any Proponent and reserves the right not to award the work should the Financial proposal exceed the project funding.

Proposal Submission Debrief Upon request, Proponents can receive a debrief specific to their proposal evaluation criteria scoring and ranking of their proposal submission.

RFP Checklist The RFP shall be submitted in two-envelopes, clearly marked “Technical” and “Financial”.

Page 18: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 18

7.4.1 RFP Checklist Technical Proposal

The technical submission requirements shall be structured to include the following as described in detail in previous sections of the Proposal:

.1 Proponent’s Corporate Experience in Similar Work: includes the detailed description of past project experience similar in size and scope to the particular assignment for Halifax Water. This would also include project references, preferably from other municipalities or utilities, a corporate profile. Completed Statement “A” (see Appendix “A.1”);

.2 Proponent’s Corporate Information and Resources: includes the proponent’s financial backing and insurance underwriters. List of equipment and the identification of project personnel who will manage the various stages of the project, along with the experience and training related to their specific responsibilities on the project. List of Sub-s. Includes the names of all sub-contractors intended to be used in the execution of the work. Completed Statement “B” (see Appendix “A.2”);

.3 Organization, Work Plan and Customer Service: includes the proposed project schedule, resource allocation, organizational chart, approach to project management and customer communication protocol (e.g. notification and issues resolution policy). Completed Statement “C” (see Appendix “A.3”);

.4 Materials and Method for Rehabilitation of Mainline Sewers: includes the submission of the proposed mainline liner material specification, liner design. Completed Statements “D” (see Appendix A.4). It is important that this submission requirement is reviewed carefully against the technical specifications in the Proposal to ensure full compliance;

.5 CCTV Inspection of Mainline Sewers: includes description of the equipment and their methods of use for mainline inspections and record. Completed Statement “E” (see Appendix A.5); and

.6 Health and Safety: includes the standard health and safety policies and procedures, but also includes training records to ensure the proposed staff has had appropriate training with respect to the proposed materials and installation method. Completed Statement “F” (see Appendix A.6);

The Proposal shall also include the following completed items as part of the technical submission: • Proponent Submission Sheet, and• Confidentiality statement.

Page 19: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 19

7.4.2 RFP Checklist Financial Proposal The Financial submission shall consist of a completed Tender Form (Section 00 41 43 of Appendix B).

8.0 PROJECT ADMINISTRATION

Proponent Invoicing and Payment The successful Proponent shall submit invoice for services rendered and receive payment in accordance with the terms and conditions contained in the tender document (see Appendix B).

9.0 GENERAL INFORMATION

Proponent Responsible for Proposal / No Reliance on Halifax Water The Proponent accepts sole responsibility for the preparation and submission of its Proposal including satisfying itself as to the requirements of all documents and the submission of materials and the Proposal within the required time frames.

Rights of Halifax Water The issuance of this RFP constitutes only an invitation to submit Proposals. It does not commit Halifax Water to enter into an Agreement with any of the Proponents. Halifax Water is not bound to accept any Proposals and may proceed as it, in its sole discretion, determines on receipt of Proposals. The rights reserved by Halifax Water include the right at any time and for whatever reason and without liability to any Proponent to:

(a) conduct investigations with respect to the qualifications and experience of the Proponent and its members;

(b) require one or more Proponents to supplement, clarify, provide additional information in order for Halifax Water to evaluate the Proposal submitted;

(c) waive any defect or technicality in any Proposal received;

(d) reject the Proponent as organized and suggest changes to the Proponent's members prior to the execution of any Agreement;

(e) terminate, in its sole and absolute discretion, any and all subsequent consideration of, or Agreement with, any Proponent, if it believes a change in the membership of the Proponent, from that described in its Proposal, adversely affects the scoring of the Proponent's Proposal or the Proponent's ability to carry out the contract in accordance with the terms and conditions

Page 20: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 20

stated herein;

(f) supplement, amend, substitute or otherwise modify any part or all of this RFP including by extending any schedule or period of time;

(g) issue one or more addenda to this RFP;

(h) reject any or all Proposals or any portion thereof;

(i) disclose to the public information contained in the Proposals;

(j) suspend, postpone or cancel this RFP in whole or in part with or without substitution of another RFP or proposal process;

(k) take any action affecting this RFP, the RFP process or the contract that would be in the best interests of Halifax Water; and

(l) use any concept or approach suggested in any Proposal including its use in negotiating an agreement with the Successful Proponent or any other Proponent.

No Liability Halifax Water, its management, employees, Proponents and agents accepts no liability for any costs, expenses, damages or otherwise of any Proponent for the proposal response to this RFP.

Halifax Water, its Board of Directors, officers, employees, Proponents and agents accept no liability for any costs, expenses, damages or otherwise of any Proponent in the event the Successful Proponent selected fails to comply with any terms, conditions or requirements of the RFP, any addenda to the RFP or the contract Agreement.

Disclosure of Information and Communication Procedures 9.4.1 Disclosure by Halifax Water

Halifax Water will consider all Proposals as confidential, subject to the disclosure requirements imposed by applicable law. Halifax Water will, however, have the right to make copies of all Proposals received for its internal review process and to provide copies to its staff, technical and financial advisors and representatives.

Notwithstanding the foregoing, the Proponent acknowledges and agrees that Halifax Water will not be responsible or liable in any way for any losses that the Proponent may suffer from disclosure of information or materials to third parties.

Page 21: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 21

9.4.2 Disclosure by the Proponent The Proponent shall not disclose any details pertaining to its Proposal or any part of the selection process to anyone not specifically involved in its Proposal, without the prior approval of Halifax Water. The Proponent shall not issue a news release or other public announcement pertaining to details of its Proposal or the selection process without the prior approval of Halifax Water.

Costs and Expenses of the Proponent Halifax Water accepts no liability for any costs or expenses incurred by the Proponent in responding to this RFP, responses to clarification requests and re-submittals, potential meetings, tours and interviews, subsequent negotiations, or any other cost incurred prior to the execution of the Agreement by Halifax Water and the Successful Proponent. By submitting a Proposal, the Proponent agrees that it shall prepare the required materials and undertake the required investigations at its own expense and with the express understanding that it cannot make any claims whatsoever for reimbursement from Halifax Water for any costs and expenses associated with the RFP process in any manner whatsoever or under any circumstances including, without limitation, the rejection of all or any of the Proposals or cancellation of the RFP or the contract.

Clarification of Proposals Halifax Water is not obliged to seek clarification from the Proponent regarding any aspect of its Proposal. Halifax Water shall have the right to request the Proponent to submit information to clarify or interpret any matters contained in its Proposal and to seek the Proponent's written acknowledgement of that clarification or interpretation. In addition, Halifax Water may request supplementary documentation from the Proponent when there is an irregularity or omission in its Proposal or the documents submitted therewith. The Proponent should not assume Halifax Water will request clarifications. Supplementary documentation accepted by Halifax Water and written interpretations that have been supplied or acknowledged by the Proponent shall be considered to form part of the Proposal.

No Conflict of Interest The Proponent and members of the Proponent are requested to disclose any conflict of interest, real or perceived, which exists now or which may in the opinion of the Proponent exist in the future. Halifax Water reserves the right to disqualify the Proponent if, in the opinion of Halifax Water acting reasonably, it has a conflict of interest, whether such conflict exists now or arises in the future.

Page 22: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 22

No Interest in another Proponent The Proponent shall not have any interest whatsoever in any other Proponent or in the Proposal of any other Proponent nor enter into any arrangement, agreement or understanding either before or after the submission date that would have that result. Provided however, after the closing date, the unsuccessful Proponents or members of the unsuccessful Proponents may, with the consent of Halifax Water, become involved in the contract, provided such involvement is limited solely to acting as a subcontractor to the Successful Proponent.

Proponents to Ensure They Understand the Contract It is the Proponent's responsibility to ensure that it has all the necessary information concerning the intent and requirements of this RFP and the contract. The Proponent is solely responsible for examining and reviewing all documents and information provided or required pursuant to this RFP and for satisfying itself as to all other matters which may in any way affect the contract or the cost or time required to complete the contract.

Nothing contained in this RFP or in any communications from Halifax Water shall constitute any express or implied warranty or representation by Halifax Water, except as explicitly stated herein and therein.

Waiver / No Reliance Halifax Water does not accept responsibility for any information, advice, errors or omissions which may be contained in this RFP or its appendices or any addendum. Halifax Water makes no representation or warranty, either express or implied, in fact or in law, with respect to the accuracy or completeness of this RFP or its appendices or any addendum and Halifax Water shall not be responsible for any action, cost, loss or liability whatsoever arising from the Proponent's reliance on or use of such information or any other technical or historical schedules, data, materials or documents provided by Halifax Water. The Proponent is responsible for obtaining its own independent financial, legal, accounting, engineering and technical advice with respect to any information included in this RFP, its appendices or any addenda or in any documents provided by Halifax Water.

False or Misleading Information If there is any evidence of misleading or false information in any Proposal, Halifax Water may reject that Proposal.

Compliance with Applicable Law The Proponent shall be responsible, at its expense, for complying with all applicable laws relating to the contract and, except as explicitly stated in this RFP, for obtaining, maintaining and complying with all / any approvals required for the contract.

Page 23: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 23

Time to be of the Essence Time shall be of the essence of this RFP and all Proposals.

Governing Law This RFP and all activities connected therewith shall be governed in all respects by the laws of the Province of Nova Scotia and the laws of Canada applicable therein.

Confidentiality (a) "Confidential Information" means all information, whether transmitted

orally, electronically or in written form, which the Proponent or the Proponent's representatives have received and may receive from Halifax Water for the purposes of the Project and which may include, but is not limited to, all data, reports, interpretations, statements (financial or otherwise), specifications, performance information and records containing or otherwise reflecting information concerning Halifax Water's systems, proprietary designs, equipment, products and / or technical information which the Proponent or the Proponent's representatives have received and may receive in the course of completing the Project.

(b) Halifax Water may, at its sole discretion, disclose Confidential Information to the Proponent or the Proponent's representatives for the purposes of (1) the RFP process and / or (2) the project. Notwithstanding any such disclosure, the Confidential Information shall remain the sole and exclusive property of Halifax Water and Halifax Water shall retain all right, title and interest in and to the Confidential Information. The Proponent and the Proponent's representatives shall use the Confidential Information solely and exclusively for purposes of (1) the RFP process and / or (2) the Project.

(c) Without limiting the generality of the permitted use of the Confidential Information, neither the Proponent nor the Proponent's representatives shall use the Confidential Information for the purpose of achieving any commercial or financial benefit. In addition, neither the Proponent nor the Proponent's representatives shall publish, reproduce, copy, disseminate or disclose the Confidential Information to others without Halifax Water's prior written consent, which consent may be withheld for any reason.

(d) The Proponent's completed report shall be exempt from disclosure under the Freedom of Information and Protection of Privacy Act on the basis that it will include information about Halifax Water's security systems and its disclosure has the potential to pose a significant risk to public health and safety.

(e) The Proponent shall keep a record of all Confidential Information furnished to it and to its representatives and of the location of such Confidential

Page 24: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 24

Information. The Proponent shall make every reasonable effort to secure the Confidential Information and the Proponent shall return all Confidential Information provided to the Proponent and its representatives immediately to Halifax Water upon request and in any event immediately upon completion or cessation of the Project. The Proponent shall submit a statement in this RFP explicitly detailing the measures proposed to achieve this confidentiality and confirming a commitment to Halifax Water's information security. The Proponent's statement shall include a commitment to ensuring that all its representatives will comply with and are bound by the terms and conditions of this confidentiality commitment.

Police Record Check All contractors, Proponents and their employees working for Halifax Water must obtain a “Police Record Check” (PRC). Please note: The PRC’s are not to be submitted with the proposal submission. PRC’s will be required by the successful proponent upon award of the work. In the event that you are successful, the PRC’s will be required by yourself and the assigned subcontractors working at the site on Halifax Water infrastructure. Police checks are confidential information and when requested will only be forwarded directly to the Halifax Water Safety and Security Department for review.

The process for obtaining PRCs is outlined within the tender document.

Page 25: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 25

APPENDIX A.1 – Statement A

Page 26: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 26

Statement A – Corporate Experience

This Section is required to be completed at the time of the proposal submission with all information requested completed in full. Failure to submit the information requested in this Section will be cause for Halifax Water to treat your Proposal as non-compliant.

Proponents Experience in Similar Work

The Proponent is required to provide a list of at least three (3) similar projects of the same size, scope, and nature that were completed during the last consecutive five (5) years (this criteria may be relaxed for Halifax Water, given the lack of local contracting experience with trenchless rehabilitation). Proponents are to include clients' names, addresses and telephone numbers, contact persons, the dates and locations, and approximate value of the works performed. The tender award will be based on the extent to which these projects demonstrate the proponent’s ability to fulfil requirements and not on the number of projects listed. The proponent shall give a brief description of the project according to the work as described above. The description should include the proponent’s firm's involvement in the project, and any additional information which the proponent believes will assist Halifax Water in evaluating past performance. Prior to award of tender, Halifax Water may request the proponent provide video on CD documenting any of the listed projects. Halifax Water will select the projects to be included on the CD.

YEAR COMPLETED

DESCRIPTION OF WORK

FOR WHOM WORK PERFORMED VALUE

Page 27: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 27

Halifax Water may request the proponent to facilitate a site visit for its representatives to any of the proponent's on-going projects as selected by Halifax Water. Halifax Water may request the proponent facilitate a visit for its representatives to any manufacturing facility where the proponent’s materials for this contract will be fabricated.

The proponents will need to qualify their experience on these similar projects and demonstrate: .1 The proponent’s qualifications for the work on this contract; .2 The proponent’s ability to perform the work on this contract; .3 The proponent’s experience in inspection and rehabilitation of mainline sewers; .4 The proponent’s ability to work cooperatively with a client; .5 The proponent’s ability to identify and implement Halifax Water's technical requirements; .6 Evidence of past performance and ability to complete projects on time and within budget; .7 The proponent’s knowledge of the Halifax Water’s requirements and procedures; .8 The proponent’s ability to work with regulatory agencies; .9 The proponent’s knowledge of the standards, specifications, and repair methods required

in this proposal; and .10 The proponent’s ability to work co-operatively with the public.

Corporate History

List, if any, all previous corporate names and former legal alliances for partnerships / holding companies / subsidiaries, or entities in which your company was involved in the past five (5) years. Proponents with insufficient experience may not be considered for this project.

Page 28: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 28

APPENDIX A.2 – Statement B

Page 29: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 29

Statement B - Corporate Information and Resources (Equipment, Team Members, and Subcontractors)

1. This Section is required to be completed at the time of the proposal submission withall information requested completed in full. Failure to submit the informationrequested in this Section will be cause for Halifax Water to treat your Proposal asnon-compliant.

2. Submit with the RFP the following:

.1 Name and address of the chartered Canadian bank or reputable financialinstitutions to vouch for firm’s financial status.

.2 Name and address of the company who has agreed to underwrite the bonds for Performance and for Labour and Material Payment.

.3 Name and address of the company who will underwrite the contract insurance required.

.4 A list of equipment to be used for this project.

.5 A list of project personnel.

.6 A list of subcontractors.

3. Submittals

.1 Confirmation of Proponent’s financial status.

Name ___________________________________________________________

___________________________________________________________

Address ___________________________________________________________

___________________________________________________________

Contact Person Telephone

.2 Name and address of company who has agreed to underwrite the bonds for Performance and for Labour and Material Payment. These bonds shall be issued by a duly licensed surety company authorized to transact the business of the Province of Nova Scotia.

Page 30: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 30

Name ___________________________________________________________

___________________________________________________________

Address ___________________________________________________________

___________________________________________________________

Contact Person Telephone

.3 Name and address of company who has agreed to underwrite insurance, the type and amount. This insurance shall be issued by a company having insurance adjusting representation in the Halifax metropolitan area.

Name ___________________________________________________________

___________________________________________________________

Address ___________________________________________________________

___________________________________________________________

Contact Person Telephone

Type of Insurance Amount

Page 31: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 31

.4 List of Equipment to be used on this project.

.5 Team Members.

Identify each key team member to be assigned to this project. Describe the key team member’s function. Provide resumes for each key team member, outlining their previous projects and their role on the project (i.e. CCTV Foreman, Liner Prep Foreman, Etc.). Include any sub-contracted staff being proposed for the project as key team members.

Please note that key personnel proposed for the project shall not be removed or replaced without obtaining Halifax Water’s written consent at least thirty (30) days in advance. If any named key personnel shall be replaced for any reason, the proponent shall promptly assign an acceptable, equally qualified replacement. Failure to do so may result in the termination of the contract. Halifax Water shall have the right to interview and approve any replacement of key personnel.

Page 32: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 32

Name Position Related Experience

Page 33: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 33

.6 List of Sub Contractors

Enter the name and address of each Subcontractor used in making up this Proposal. Only name one Subcontractor for each part of the Work to be sublet.

Upon acceptance of a Proposal by the Commission, the Contractor shall not substitute another Subcontractor in place of the one named without the written approval from the Commission’s Representative.

Refer to Tender Document - Standard Specification Section 00 72 45 – General Conditions of the Civil Work Contract, Subsection GC 3.8 – SUBCONTRACTORS AND SUPPLIERS.

Subtrade Subcontractor Extent of Work Value of WorkName and Address

Page 34: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 34

APPENDIX A.3 – Statement C

Page 35: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 35

Statement C – Organization, Work Plan and Customer Service

This Section is required to be completed and submitted at the time of the proposal submission with all information requested completed in full. Failure to submit the information requested in this Section will be cause for Halifax Water to treat your Proposal as non-compliant. Organization Provide an overall organizational chart as it relates to this Contract, including names, roles and responsibilities of each key team member. Clearly identify the roles proposed for each key team member. Include work scope identification, liaison with Halifax Water, design, engineering, technical support, project management and supervision for this project. Where the proponent’s team includes sub-Proponents identify where the sub-Proponents fit into the organization chart. Fully describe the role proposed for sub-Proponents. Work Plan Provide an overall work plan chart as it relates to this Contract, including details that describes the proponent’s approach to all tasks it has determined to be necessary to complete the entire scope of work for this contract. Include details of bypass pumping where required providing a brief description of flow bypass equipment and arrangements (i.e., pump sizes and number, bypass line materials and sizes, etc.). The work plan shall identify how all works will be carried out and completed within the timeframe stated in the Tender. Plan for Utilization of Resources Provide the firm’s plan for utilization of its resources that will allow Halifax Water flexibility in scheduling of work and will accomplish rapid completion of the requested work after it is assigned, using the personnel proposed for this contract. Consortiums and Sub-Proponents Provide how the proponent’s firm intends to perform the project (i.e., as an independent company, a partnership, a joint venture, or a combination involving a prime and sub- Proponents). Provide an overall corporate organizational chart depicting the essential organizational elements and senior personnel of all proposed firms. Project Management Provide the proponent’s project team's project management methods to (i) manage coordination between the various aspects of the project, (ii) meet schedules, (iii) manage special requirements, and (iv) discuss the proponent’s capabilities to staff this project to ensure completion on schedule. Customer Service Provide a sample notification which the proponent’s firm would distribute to residents and businesses in the areas affected by the work.

Page 36: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 36

Submit a detailed description of the firm’s course of action pertaining to concerns and complaints of residents and businesses. Submit a detailed description of the firm’s course of action pertaining to failed liner installation and their effects on residents and businesses.

PROPONENT NAME:

Page 37: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 37

APPENDIX A.4 - Statement D

Page 38: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 38

Statement D – Materials and Method for Rehabilitation of Mainline Sewers

This Section is required to be completed and submitted at the time of the proposal submission with all information requested completed in full. Failure to submit the information requested in this Section will be cause for Halifax Water to treat your Proposal as non-compliant. The proponent shall complete this statement in full and is to be submitted once. Where more than one type of liner material is proposed, independent statement sheets shall be provided for each proposed material. Any modifications to this statement sheet may be grounds for disqualification. In addition to the information requested below proponents are also directed to refer to 33 11 05 (Steam and Hot Water ) or 33 11 10 (UV) Cured-In-Place Mainline specifications, Section 1.6 Information To Be Submitted With RFP for further details regarding the Proponent’s evaluation of Category 4: Materials and Method for Rehabilitation of Mainline Sewers. This statement shall be supported by the submission of preliminary designs for each sewer section to be lined. The Proponent shall provide preliminary designs, which will be stamped upon award by a professional engineer licensed in the province of Nova Scotia, for each sewer section to be

lined as described in this RFP for this contract. All preliminary designs shall be appended to this evaluation section and organized in the same order as Statement D, Appendix A.4. The appended preliminary design submissions shall clearly show the design method used, all the parameters specified in this RFP including, but not limited to, the short–term and long-term CIPP physical properties used in each preliminary design, along with actual field measured depths. The proponent is required to submit a detailed description of assemblies, installation methodology and materials to be used for mainline rehabilitation. Describe the key construction and performance elements of the product that are relevant to Halifax Water’s requirements. CIPP Cure Method: CIPP Materials

Component Insert Information Below Liner Tube (Bag): Manufacturer Resin: Type Resin: Manufacturer Resin: Manufacturer’s Number

CIPP Lining System Materials Physical Properties

Physical Property Insert Value Below Flexural Modulus, Short-term Per ASTM D790 or ISO 11296

MPa

Flexural Modulus, Long-term Per ASTM D2990 or ISO Equivalent

MPa

Page 39: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 39

Flexural Strength, Short-term Per ASTM D790 or ISO11296

MPa

Flexural Strength, Long-term Per ASTM D2990 or ISO Equivalent

MPa

Page 40: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 40

Preliminary Design Liners – State for each location and sewer design size:

Sewer Section Sewer Size

Minimum In Place Liner Thickness

(I.E. Design)

Corresponding Nominal Liner Tube

Thickness (I.E. Tube to be Used)

S-1, P4172, Sinclair Street 300 mm mm mm

S-2, P41727, Sinclair Street 300 mm mm mm

S-3, P41726, Sinclair Street 300 mm mm mm

S-4, P536722, Sinclair Street 300 mm mm mm

S-5, P41725, Sinclair Street 300 mm mm mm

S-6, P41724, Sinclair Street 300 mm mm mm

S-7, P41669, Sinclair Street 300 mm mm mm

S-8, P41668, Sinclair Street 300 mm mm mm

S-9, P41667, Sinclair Street 300 mm mm mm

S-10, P41666, Sinclair Street 250 mm mm mm

S-11, P41665, Sinclair Street 250 mm mm mm

S-12, P41664, Sinclair Street 300 mm mm mm

S-13, P42430, Sinclair Street 300 mm mm mm

H-1, P5033, High Street 375 mm mm mm

H-2, P5038, High Street 375 mm mm mm

H-3, P5043, High Street 375 mm mm mm

H-4, P4663, High Street 375 mm mm mm

H-5, P3677, High Street 375 mm mm mm

H-6, P3676, High Street 375 mm mm mm

D-1, P4753, Drummond Street 300 mm mm mm

D-2, P4023, Drummond Street 300 mm mm mm

D-3, P4388, Drummond Street 375 mm mm mm

D-4, P4392, Drummond Street 375 mm mm mm

D-5, P4750, Drummond Street 375 mm mm mm

D-6, P4747, Drummond Street 375 mm mm mm

D-7, P4746, Drummond Street 300 mm mm mm

L-1, P5177, Leaman Street 375 mm mm mm

L-2, P5176, Leaman Street 375 mm mm mm

Page 41: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 41

Sewer Section (con’t) Sewer Size

Minimum In Place Liner Thickness

(I.E. Design)

Corresponding Nominal Liner Tube

Thickness (I.E. Tube to be Used)

L-3, P5175, Leaman Street 375 mm mm mm

L-4, P5174, Leaman Street 375 mm mm mm

L-5, P5186, Leaman Street 375 mm mm mm

L-6, P5185, Leaman Street 375 mm mm mm

L-7, P4025, Leaman Street 300 mm mm mm

L-8, P4380, Leaman Street 375 mm mm mm

L-9, P4381, Leaman Street 375 mm mm mm

L-10, P4382, Leaman Street 375 mm mm mm

L-11, P4385, Leaman Street 375 mm mm mm

L-12, P4417, Leaman Street 375 mm mm mm

DI-1, P8730, Dingle Road 200 mm mm mm

DI-2, P8731, Dingle Road 200 mm mm mm

DI-3, P8733, Dingle Road 300 mm mm mm

DI-4, P8734, Dingle Road 300 mm mm mm

DI-5, P8735, Dingle Road 300 mm mm mm

DI-6, P8736, Dingle Road 300 mm mm mm

DI-7, P8737, Dingle Road 300 mm mm mm

DI-8, P8738, Dingle Road 300 mm mm mm

DI-9, P8739, Dingle Road 300 mm mm mm

DI-10, P8740, Dingle Road 300 mm mm mm

DI-11, P8741, Dingle Road 300 mm mm mm

DI-12, P8742, Dingle Road 300 mm mm mm

D1-13, P8743, Dingle Road 300 mm mm mm

DI-14, P8744, Dingle Road 300 mm mm mm

DI-15, P8745, Dingle Road 300 mm mm mm

DI-16, P8746, Dingle Road 300 mm mm mm

DI-17, P10210, Dingle Road 300 mm mm mm

DI-18, P10211, Dingle Road 300 mm mm mm

DI-19, P10212, Dingle Road 300 mm mm mm

Page 42: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 42

Sewer Section (con’t) Sewer Size

Minimum In Place Liner Thickness

(I.E. Design)

Corresponding Nominal Liner Tube

Thickness (I.E. Tube to be Used)

DI-20, P10213, Dingle Road 300 mm mm mm

DI-21, P10214, Dingle Road 300 mm mm mm

DI-22, P10215, Dingle Road 300 mm mm mm

DI-23, P10216, Dingle Road 300 mm mm mm

DI-24, P10217, Dingle Road 300 mm mm mm

DI-25, P10218, Dingle Road 300 mm mm mm

DI-26, P10240, Dingle Road 300 mm mm mm

DI-27, P10241, Dingle Road 300 mm mm mm

AL-1, P15280, Albion Road 200 mm mm mm

AL-2, P15281,Albion Road 250 mm mm mm

AL-3, P1,5282, Albion Road 250 mm mm mm

AL-4, P15283, Albion Road 200 mm mm mm

AL-5, P15284, Albion Road 200 mm mm mm

AL-6, P15286, Albion Road 200 mm mm mm

AL-7, P15286, Albion Road 200 mm mm mm

AL-8, P15287, Albion Road 200 mm mm mm

AL-9, P15288, Albion Road 200 mm mm mm

B-1, P8706, Burns Drive 200 mm mm mm

B-2, P8707,Burns Drive 200 mm mm mm

B-3, P8708, Burns Drive 200 mm mm mm

B-4, P8710, Burns Drive 200 mm mm mm

B-5, P8712, Burns Drive 300 mm mm mm

B-6, P8713, Burns Drive 300 mm mm mm

B-7, P8714, Burns Drive 300 mm mm mm

B-8, P8715, Burns Drive 300 mm mm mm

F-1, P8729, Flemming Drive 200 mm mm mm

F-2, P8728, Flemming Drive 200 mm mm mm

F-3, P8727, Flemming Drive 200 mm mm mm

F-4, P8721, Flemming Drive 200 mm mm mm

Page 43: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 43

Sewer Section (con’t) Sewer Size

Minimum In Place Liner Thickness

(I.E. Design)

Corresponding Nominal Liner Tube

Thickness (I.E. Tube to be Used)

F-5, P8722, Flemming Drive 200 mm mm mm

F-6, P8723, Flemming Drive 200 mm mm mm

SC-1, P8700, Shaw Crescent 200 mm mm mm

SC-2, P870, Shaw Crescent 200 mm mm mm

W-1, P8702, Westgate Drive 200 mm mm mm

W-2, P8703, Westgate Drive 200 mm mm mm

W-3, P8704, Westgate Drive 200 mm mm mm

W-4, P8705, Westgate Drive 200 mm mm mm

W-5, P8716, Westgate Drive 300 mm mm mm

W-6, P8717, Westgate Drive 300 mm mm mm

W-7, P8718, Westgate Drive 300 mm mm mm

W-8, P8719, Westgate Drive 300 mm mm mm

W-9, P8724, Westgate Drive 300 mm mm mm

W-10, P8725, Westgate Drive 300 mm mm mm

W-11, P8726, Westgate Drive 300 mm mm mm

K-1, P10236,Kirk Road 200 mm mm mm

K-2, P10237, Kirk Road 200 mm mm mm

K-3, P10238, Kirk Road 200 mm mm mm

K-4, P10239, Kirk Road 200 mm mm mm

K-5, P15291, Kirk Road 200 mm mm mm

K-6, P15292, Kirk Road 200 mm mm mm

K-7, P15289, Kirk Road 200 mm mm mm

MC-1, P10219, McManus Road 200 mm mm mm

MC-2, P10220, McManus Road 200 mm mm mm

MC-3, P10221, McManus Road 200 mm mm mm

MC-4, P10222, McManus Road 200 mm mm mm

MC-5, P10223, McManus Road 200 mm mm mm

MC-6, P10224, McManus Off Street 200 mm mm mm

MC-7, P10225, McManus Off Street 200 mm mm mm

Page 44: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 44

Sewer Section (con’t) Sewer Size

Minimum In Place Liner Thickness

(I.E. Design)

Corresponding Nominal Liner Tube

Thickness (I.E. Tube to be Used)

MC-8, P10226, McManus Off Street 300 mm mm mm

MC-9, P10227, McManus Off Street 300 mm mm mm

P-1, P10206, Parkhill Road 250 mm mm mm

P-2, P10207, Parkhill Road 250 mm mm mm

P-3, P10208, Parkhill Road 250 mm mm mm

P-4, P10209, Parkhill Road 250 mm mm mm

MD-1, P10247, Milton Drive 200 mm mm mm

MD-2, P10248, Milton Drive 200 mm mm mm

MD-3, P10243, Milton Drive 250 mm mm mm

MD-4, P542673, Milton Drive 250 mm mm mm

MD-5, P10242, Milton Drive 300 mm mm mm

WL-1, P9171, Whimsical Lake Cr 250 mm mm mm

WL-2, P9165, Whimsical Lake Cr 250 mm mm mm

WL-3, P9163, Whimsical Lake Cr 250 mm mm mm

WL-4, P9159, Whimsical Lake Cr 250 mm mm mm

WL-5, P9156, Whimsical Lake Cr 250 mm mm mm

WL-6, P9154, Whimsical Lake Cr 250 mm mm mm

I-1, P9142, Inverness Avenue 200 mm mm mm

I-2, P9143, Inverness Avenue 200 mm mm mm

I-3, P9144, Inverness Avenue 200 mm mm mm

I-4, P9145, Inverness Avenue 200 mm mm mm

DU-1,P9136,Dunniker Road 200 mm mm mm

J-1, P12189, Joyce Avenue 200 mm mm mm

J-2, P12195, Joyce Avenue 200 mm mm mm

J-3, P12198, Joyce Avenue 200 mm mm mm

J-4, P1220, Joyce Avenue 200 mm mm mm

J-5, P12880, Joyce Avenue 200 mm mm mm

J-6, P9138, Joyce Avenue 200 mm mm mm

J-7, P9139, Joyce Avenue 200 mm mm mm

Page 45: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 45

Sewer Section (con’t) Sewer Size

Minimum In Place Liner Thickness

(I.E. Design)

Corresponding Nominal Liner Tube

Thickness (I.E. Tube to be Used)

AU-1, P1239, Aurora Avenue 200 mm mm mm

AU-2, P12387, Aurora Avenue 200 mm mm mm

AU-3, P12385, Aurora Avenue 200 mm mm mm

AU-4, P12379, Aurora Avenue 200 mm mm mm

C-1, P12247, Circle Drive 200 mm mm mm

C-2, P12245, Circle Drive 200 mm mm mm

C-3, P12239, Circle Drive 200 mm mm mm

C-4, P12233, Circle Drive 200 mm mm mm

C-5, P12226, Circle Drive 200 mm mm mm

T-1, P12232, Twin Oaks Road 200 mm mm mm

T-2, P12231, Twin Oaks Road 200 mm mm mm

CH-1, P12260, Cherry Lane 200 mm mm mm

CH-2, P12258, Cherry Lane 200 mm mm mm

CH-3, P12257, Cherry Lane 200 mm mm mm

CH-4, P12256, Cherry Lane 200 mm mm mm

HU-1, P12216, Hubley (Off Street) 200 mm mm mm

NW-1, P24581, Newton Avenue 300 mm mm mm

NW-2, P24582, Newton Avenue 300 mm mm mm

NW-3, P24595, Newton Avenue 375 mm mm mm

NW-4, P24459, Newton Avenue 375 mm mm mm

NW-5, P24469, Newton Avenue 375 mm mm mm

NW-6, P24479, Newton Avenue 375 mm mm mm

NW-7, P24354, Newton Avenue 375 mm mm mm

NW-8, P24365, Newton Avenue 450 mm mm mm

NW-9, P24375, Newton Avenue 450 mm mm mm

CR-1, P24638, Chebucto Road 750 mm mm mm

CR-2, P24617, Chebucto Road 750 mm mm mm

CR-3, P24574, Chebucto Road 500 mm mm mm

CR-4, P24511, Chebucto Road 500 mm mm mm

Page 46: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 46

Sewer Section (con’t) Sewer Size

Minimum In Place Liner Thickness

(I.E. Design)

Corresponding Nominal Liner Tube

Thickness (I.E. Tube to be Used)

CA-1, P24976, Connaught Avenue 600 mm

CA-2, P25030, Connaught Avenue 750 mm

CA-3, P24490, Connaught Avenue 750 mm

DS-1, P1976, Dublin Street 375 mm

DS-2, P453, Dublin Street 375 mm

DS-3, P445, Dublin Street 375 mm

DS-4, P444, Dublin Street 375 mm

DS-5, P3000, Dublin Street 375 mm

DS-6, P437, Dublin Street 375 mm

DS-7, P433, Dublin Street 375 mm

DS-8, P428, Dublin Street 300 mm

DS-9, P730, Dublin Street 375 mm

CK-1, P1972, Cork Street 300 mm

CK-2, P1962, Cork Street 300 mm

WD-1, P1957, Windsor Street 375 mm

WD-2, P1975, Windsor Street 375 mm

WD-3, P1988, Windsor Street 375 mm

SE-1, P51647, Seawood Avenue 750 mm

SE-2, P516472, Seawood Avenue 750 mm

SE-3, P151673, Seawood Avenue 750 mm

SE-4, P518697, Seawood Avenue 250 mm

SE-5, P518696, Seawood Avenue 250 mm

SE-6, P518695, Seawood Avenue 250 mm

SE-7, P518694, Seawood Avenue 250 mm

SE-8, P518684, Seawood Avenue 250 mm

SE-9, P518683, Seawood Avenue 200 mm

SE-10, P51868, Seawood Avenue 200 mm

SE-11, P518681, Seawood Avenue 200 mm

SE-12, P518680, Seawood Avenue 200 mm

E-1, P38982, Leaside Drive 200 mm

mm mm

mm

mmmm

mm

mm

mmmm

mm

mmmm

mm

mmmmmmmm

mmmm

mmmmmm

mmmm

mm

mmmm

mmmmmm

mm

mm

mmmmmmmm

mmmm

mm

mmmm

mmmm

mmmm

mmmmmm

mm

mmmmmm

mm

mmmm

mm

mmmmmm

mm

Page 47: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 47

Sewer Section (con’t) Sewer Size

Minimum In Place Liner Thickness

(I.E. Design)

Corresponding Nominal Liner Tube

Thickness (I.E. Tube to be Used)

E-2, P518679, Leaside Drive 200 mm

E-3, P518690, Leaside Drive 200 mm

E-4, P518689, Leaside Drive 200 mm

LE-1, P518686,"Leaside Dr Easement" 250 mm

LE-2, P518685,"Leaside Dr Easement” 200 mm

LE-3, P518688,"Leaside Dr Easement" 200 mm

SA-1, P38981, Sackville Drive 200 mm

SA-2, P38980, Sackville Drive 200 mm

SA-3, P38979, Sackville Drive 200 mm

SA-4, P38978, Sackville Drive 200 mm

Note: The preliminary design sheets supporting the above Minimum In Place Thicknesses are to be submitted with the Proposal. Engineering stamped designs will only be required by the successful proponent upon award.

Submit a summary of the key design results for the preliminary designs described in this RFP for each sewer section to be lined as a clearly referenced appendix to this evaluation section. The appended preliminary design submissions for each sewer section to be lined shall clearly show the design method used, all the parameters specified in this RFP including but not limited to the short and long-term CIPP physical properties used in each design, along with actual field measured depths.

Provide third party testing or reports that will serve to substantiate CIPP properties or other parameters used in design or relevant to the product. Where bonding to the surface of the existing sewer is required, submit information on the bonding mechanism and performance. Identify typical installation time requirements, the type of cure process to be used and the typical cure time. Discuss any impacts the materials and in-sewer material processing may have on any building occupants and the measures that will be taken to abate any impact should it occur.

The proponent is to provide examples of all the QA/QC documents to be used for execution of the contract and indicate the intended quality control system to monitor all aspects of the rehabilitation work and what corrective measures you will take if there is a deficiency including in wet-out or UV methods, resin catalyst mix, CIPP installation, cured CIPP physical properties and fit/finish. It should be expected that the Proponent have the following, but not limited to, general components in their QA/QC documentation:

Policies and Procedures:

mmmm

mmmm

mmmm

mmmm

mmmm

mm

mmmmmmmm

mm

mmmmmm

mm

Page 48: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 48

- field records; - process tracking; - field reference documents; and - Liner Sample Chain of Custody (COD) form.

Installation and Product Realization:- site specific planning;- and sample testing.

Employee Responsibilities:- site and process management.

Resource Management:- Equipment quality;- Critical equipment redundancy; and- Appropriate staff deployment.

Training and Safety:- Training program; and- Training records.

While these are the expected minimum QA/QC components, each technology or Proponent may have additional components due to their unique technology or process. Proponents should provide any additional QA/QC components which may be unique to them.

Proponents with non-compliant submissions and/or insufficient information may not be considered for this project.

Proponent Name:

Page 49: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 49

APPENDIX A.5 - Statement E

Page 50: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 50

Statement E – CCTV Inspection of Mainline Sewers This Section is required to be completed and submitted at the time of the proposal submission with all information requested completed in full. Failure to submit the information requested in this Section will be cause for Halifax Water to treat your Proposal as non-compliant. Provide evidence of certified CCTV inspection staff that have successfully completed and currently maintain working status of the Pipeline Assessment Certification Program (PACP) proposed to perform the work. The successful Proponent shall be able to immediately provide upon request evidence of your firm’s ability to successfully perform all CCTV inspection work to meet the requirements of this contract. The proponent is required to describe and/or provide the details of your firm’s CCTV equipment and their methods of use and procedures pertaining to the nature of work as outlined in this proposal.

Proponent Name:

Page 51: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 51

APPENDIX A.6 - Statement F

Page 52: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 52

Statement F – Health and Safety This Section is required to be completed and submitted at the time of the proposal submission with all information requested completed in full. Failure to submit the information requested in this Section will be cause for Halifax Water to treat your Proposal as non-compliant. The proponent is required to describe and/or provide all of your firm’s Health and Safety policies and procedures pertaining to the nature of work as outlined in this proposal document, including but not limited to procedure for confined space entry and traffic safety. Company training programs should also be outlined. Provide evidence of confined space entry training for your personnel for this contract and any other relevant safety training and certificates. The successful Proponent shall provide a project specific safety plan in addition to existing corporate safety manuals. The Proponent shall provide the following Health and Safety related documents:

1(one) hard copy project specific safety plan 1 (one) hardcopy of all Corporate Health and Safety procedures 1 (one) electronic copy of all Corporate Health and Safety procedures.

Proponent Name:

Page 53: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 53

APPENDIX B – Tender Document

Page 54: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1 P09.2019

May 2019

Section No. of Pages

00 20 00 Overview ............................................................................................................... 1 Page

00 21 00 Information to Tenderers .................................................................................... 5 Pages

00 41 43 Tender Form...................................................................................................... 11 Pages

00 53 43 Form of Agreement ............................................................................................. 6 Pages

00 74 00 Supplementary Specifications ........................................................................... 20 Pages

01 22 00 Measurement and Payment ................................................................................. 6 Pages

33 11 05 Standard Specifications – Hot Water or Steam Cured-in-Place Pipe - Mainline ........ 64 Pages

33 11 10 Standard Specifications – Ultraviolet Light Cured-in-Place Pipe - Mainlined. 71 Pages

Appendix A – Halifax Water Contractor Health and Safety Forms ..................................... 9 Pages

Appendix B – Police Record Check ....................................................................................... 1 Page

*****

Page 55: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

Overview

Page 56: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Section: 00 20 00 Project - Phase 1 Page 1

Overview May 2019

OVERVIEW

This document is a Supplementary Specification to the Standard Specification for Municipal Services, developed by the Nova Scotia Roadbuilders - Consulting Engineers of Nova Scotia Joint Committee on Contract Documents.

The Halifax Regional Water Commission (“Halifax Water”), in response to a need to standardize their specification practices, reduce review and approval time, and regulate the specifications produced by their consultants, have adopted the Standard Specification for Municipal Services.

As an active member on the Joint Committee during the Standard Specification’s development, Halifax Water became familiar with, and contributed input to, the Standard Specification’s development.

Whereas the Standard Specification is intended for both sewer and water projects throughout the province of Nova Scotia, Halifax Water’s concern is limited to water and wastewater systems within the limits of the Halifax Regional Municipality, additional specification requirements will be provided as supplementary specifications.

These project documents have been prepared for use with and require being read in conjunction with The Standard Specifications for Municipal Services as published by the Nova Scotia Roadbuilders – Consulting Engineers of Nova Scotia Joint Committee on Contract Documents. Copies of The Standard Specification for Municipal Services are available from the Joint Committee on Contract Documents, 455 Colby Drive, Dartmouth, NS B2V 2K4; Telephone (902) 430-2534, (902) 492-6749 OR EMAIL: [email protected].

*****End of Section 00 20 00*****

Page 57: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

Information to Tenderers

Page 58: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Section: 00 21 00 Project - Phase 1 Page 1

Information to Tenderers May 2019

2019 Sewer Mainline Trenchless Lining Project – Phase 1

Owner: Halifax Regional Water Commission 450 Cowie Hill Road Halifax, Nova Scotia

1. Tender Submission .1 Submit completed Section 00 41 43 - Tender Form andSection 00 43 00 - Supplementary Tender Information for above project in sealed envelope marked as follows:

TENDER 2019 Sewer Mainline Trenchless Lining Project – Phase 1

P09.2019

Closing at 2:00 p.m., local time, May 29, 2019

and addressed to:

Halifax Water Attn: Brent Hickman Procurement Services

450 Cowie hill Road, P.O. Box 8388 RPO CSC Halifax, NS B3K 5M1

2. Tender Opening .1 Tenders will be opened immediately after closing, at the offices of the Halifax Regional Water Commission 450 Cowie Hill Road, Halifax, NS. Opening will be public.

3. Document Deposit .1 Deposit for Project Documents is non-refundable.

4. Accuracy ofReferencing .1 Indexing and cross-referencing are for convenience only.

5. Conditions ofTendering .1 Take full cognizance of content of all Contract Documents in

preparation of Tender. Refer to Section 00 41 43 – Tender Form, Subsection 3.10 for a complete list of Contract Documents.

6. Tenderers toInvestigate .1 Tenderers will be deemed to have familiarized themselves

with existing site and working conditions and all other conditions which may affect performance of the Contract. No plea of ignorance of such conditions as a result of failure

Page 59: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Section: 00 21 00 Project - Phase 1 Page 2

Information to Tenderers May 2019

to make all necessary examinations will be accepted as a basis for any claims for extra compensation or an extension of time.

7. Clarification andAddenda .1 Notification of omissions, errors or ambiguities found in the

Contract Documents must be sent in writing not less than two (2) working days before Tender Closing to:

Brent Hickman, S.C.M.P. Procurement Officer Halifax Water 450 Cowie Hill Road, P.O. Box 8388 RP0 CSC Halifax, Nova Scotia B3K 5M1 [email protected]

If it is deemed that correction, explanation or interpretation is necessary, a written addendum will be issued and distributed through the Provincial Procurement Web Portal (novascotia.ca/tenders). All addenda will form part of the Contract Documents.

.2 Confirm that all addenda have been received.

8. Preparation of Tender .1 Complete Tender Form provided with Project Documents inink or by typewriter. Tender all items and fill in all blanks. Have corrections initialed by person signing Tender.

9. Taxes .1 Include all taxes except Harmonized Sales Tax in tender unit prices.

.2 The Contractor will indicate on each application for payment, as a separate amount, the appropriate Harmonized Sales Tax the Owner is legally obliged to pay. This amount will be paid to the Contractor in addition to the amount certified for payment under the Contract.

10. Tender Security .1 Provide Tender Security in amount of 10% of the Estimated Contract Price with Tender, in the form of a Certified Cheque or Money Order payable to the Owner, or a Bid Bond on CCDC Form 220.

11. Contract Security .1 Refer to Section 00 74 00 Supplementary Specifications, GC11.2 – Contract Security.

Page 60: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Section: 00 21 00 Project - Phase 1 Page 3

Information to Tenderers May 2019

12. Insurance .1 Refer to Section 00 72 45 (General Conditions) subsection GC11.1 – Insurance and Section 00 73 00 (Supplementary General Conditions), for insurance required.

13. Agreement .1 Agreement is attached for information purposes only.

14. Return ofTender Security .1 Tender will be returned to:

.1 all except the three lowest acceptable Tenderers within 7 days of Tender Opening.

.2 two remaining unsuccessful Tenderers within 7 days of date of the executed Agreement.

.3 successful Tenderer following receipt by Owner of executed Agreement, specified Contract Security, and Insurance documents.

15. Amendment orWithdrawal of Tender .1 Tenders may be amended or withdrawn by email to

[email protected] or facsimile at 902-490-1583.

.2 Amendment of individual unit prices is the only acceptable price amendment. Amendments shall not disclose either original or revised total price.

.3 Head amendment or withdrawal as follows: “[Amendment]/[Withdrawal] of Tender for 2019 Sewer Mainline

Trenchless Lining Project – Phase 1 P09.2019 Sign and seal as required for Tender, and submit at address given for receipt of Tenders prior to time of Tender Closing.

16. Informal orUnbalanced Tenders .1 Tenders which in the opinion of the Owner are considered to

be informal or unbalanced may be rejected.

Page 61: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Section: 00 21 00 Project - Phase 1 Page 4

Information to Tenderers May 2019

17. Right to Accept orReject any Tender .1 Owner reserves right to accept or reject any or all Tenders,

including without limitation the lowest Tender, and to award the Contract to whomever OWNER in its sole and absolute discretion deems appropriate notwithstanding any custom of the trade nor anything contained in the Contract Documents or herein. OWNER shall not, under any circumstances, be responsible for any costs incurred by the Tenderer in preparing of its Tender.

Without limiting the generality of the foregoing, the OWNER reserves the right, in its sole and absolute discretion, to accept or reject any Tender which in the view of the OWNER is incomplete, obscure, or irregular, which has erasures or corrections in the documents, which contains exceptions and variations, which omits one or more prices, which contains prices the OWNER consider unbalanced, or which is accompanied by a Bid Bond or Consent or Surety issued by a surety not acceptable to the OWNER.

Criteria which may be used by the OWNER in evaluating tenders and awarding the Contract are in the OWNER’s sole and absolute discretion and, without limiting the generality of the foregoing, may include one or more of: price, total cost to OWNER; the amount of Nova Scotia content; the amount of Canadian content; reputation; claims history of Tenderer; qualifications and experience of the Tenderer and its personnel; quality of services and personnel proposed by the Tenderer; ability of the Tenderer to ensure continuous availability of qualified and experienced personnel; the Construction Schedule and Plan; the proposed Labour and Equipment; and the proposed Supervisory Staff.

Should the OWNER not receive any tender satisfactory to the OWNER in its sole and absolute discretion, the OWNER reserves the right to re-tender the Project, or negotiate a contract for the whole or any part of the Project with anyone or more persons whatsoever, including one or more of the Tenderers.

18. Safety Certification .1 Submit with Tender, a copy of Tenderer’s current and validLetter of Good Standing issued jointly by the Nova Scotia Construction Safety Association and the Province of Nova Scotia Department of Labour.

Page 62: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Section: 00 21 00 Project - Phase 1 Page 5

Information to Tenderers May 2019

.2 Out of province companies shall submit, with their Tender, a current and valid Letter of Good Standing from their province of origin or from a recognized Safety Association which utilizes an external audit element.

.3 Out of province companies may obtain a Letter of Good Standing from the Nova Scotia Construction Safety Association upon submission of documentation verifying training and compliance with the NS OH&S Act and Regulations.

.4 In any event, out of province Tenderers will have to satisfy the Nova Scotia Construction Safety Association in respect to their safety status prior to being awarded a contract.

19. SecurityClearance .1 The successful tenderer must submit proof of security

background clearances for all staff proposing to work on the project.

.2 The HRWC reserves the right not to award the contract based on the results of the security background clearance.

20. Workers’Compensation Board .1 The Contractor shall provide to the Commission’s

representative a clearance certificate from the Nova Scotia Workers’ Compensation Board at the following project milestones:

.1 Prior to award of the contract.

.2 Every month during the progress of the project.

.3 Prior to release of Holdback.

21. Disruption to ExistingWater Services .1 Tenderers are advised that disruption to existing water

services will have certain restrictions, and scheduling and sequencing requirements.

22. Tender Award .1 Award of the tender is contingent on project funding approval from the Nova Scotia Utility Review Board.

******End of Section 00 21 00*****

Page 63: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

Tender Form

Page 64: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project Phase 1

TENDER FORM

Section 00 41 43Page 1

May 2019

1 SALUTATION:

.1 To: Halifax Water P.O. Box 8388 RPO CSC, Halifax, NS B3K 5M1

.2 For: 2019 Sewer Mainline Trenchless Lining Project - Phase 1

.3 From:

2 PROPONENT DECLARES:

.1 That this Tender was made without collusion or fraud.

.2 That the proposed work was carefully examined.

.3 That the Proponent was familiar with local conditions.

.4 That Contract Documents and Addenda No. to inclusive were carefully examined.

.5 That all the above were taken into consideration in preparation of this Tender.

3 PROPONENT AGREES:

.1 To enter into a contract to supply all labour, materials and equipment and to do all work necessary to construct the Work as described and specified herein for the unit prices stated in Subsection 4 hereunder, Schedule of Quantities and Unit Prices.

.2 That the total proposed price shall be the sum of the products of the proposed unit prices times the estimated quantities in Subsection 4 hereunder.

.3 That this Tender is valid for acceptance for 90 days from the time of Tender Closing.

.4 That measurement and payment for items listed in Subsection 4 hereunder shall be in accordance with corresponding items in Section 01 22 00 Measurement and Payment.

.5 The value of the liquidated damages payable to the Owner for the duration of the Period of Delay is $1000.00 per day as detailed in Section 00 73 00 Supplementary Specifications, GC6.5.

Page 65: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project

Phase 1 TENDER FORM

Section 00 41 43Page 2

May 2019

.6 To provide evidence of ability and experience within 7 days of request, including: experience in similar work, work currently under contract, senior supervisory staff available for the project, equipment available for use on project, and financial resources.

.7 To execute in triplicate the Agreement and forward same together with the specified contract security and insurance documents to the Owner within 14 days of written notice of award.

.8 That failure to enter into a formal contract and give specified insurance documents and

contract security within time required will constitute grounds for forfeiture of certified cheque or enforcement of bid bond.

.9 That if certified cheque is forfeited, Owner will retain difference in money between

amount of Proposal and amount for which Owner legally contracts with another party to perform the Work and will refund balance, if any, to Proponent.

.10 That the Contract Documents include:

1. Standard Specifications for Municipal Services listed in Table of Contents Page

Dated JAN 2018 plus revisions. 2. The latest 2018 revision of the Halifax Regional Water Commission Design and

Construction Specification. 3. Project Documents:

.1 Overview

.2 Tender Form

.3 Form of Agreement

.4 Supplementary Specifications

.5 Drawings: Site Locations .1 Sinclair Street - Dartmouth .2 High Street – Halifax .3 Drummond Street – Halifax .4 Leaman Street – Halifax .5 Dingle Road – Halifax .6 Albion Road – Halifax .7 Burns Drive – Halifax .8 Flemming Drive – Halifax .9 Shaw Crescent – Halifax .10 Westgate Drive – Halifax .11 Kirk Road – Halifax .12 McManus Road - On Street – Halifax .13 McManus Road - Off Street – Halifax .14 Parkhill Road – Halifax .15 Milton Drive – Halifax .16 Whimsical Lake Crescent - Halifax

Page 66: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project

Phase 1 TENDER FORM

Section 00 41 43Page 3

May 2019

.17 Inverness Avenue - Halifax

.18 Dunniker Road – Halifax

.19 Joyce Avenue - Halifax

.20 Aurora Avenue – Halifax

.21 Circle Drive – Halifax

.22 Twin Oaks Road – Halifax

.23 Cherry Lane – Halifax

.24 Hubley Drive (Offstreet) – Halifax

.25 Newton Avenue – Halifax

.26 Chebucto Road – Halifax

.27 Connaught Avenue – Halifax

.28 Dublin Street – Halifax

.29 Cork Street – Halifax

.30 Windsor Street – Halifax

.31 Seawood Avenue – Sackville

.32 Leaside Drive – Sackville

.33 Leaside Drive Easement – Sackville

.34 Sackville Drive - Sackville .6 Existing Information as listed in Appendix E of the RFP. .7 Addenda as issued and as confirmed in subsection 2.4 of this section

Page 67: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project

Phase 1 TENDER FORM

Section 00 41 43Page 4

May 2019

4 SCHEDULE OF QUANTITIES AND UNIT PRICES

Item NO. 

Description Unit of Measurement 

Estimated Quantity 

Unit Price  $ Amount  

SANITARY SEWER 

23.  Manhole Replacement (provisional)  Ea  5       

MAINLINE SEWER LINING 

28.1 Mobilization, Demobilization, Bonds, Insurance 

L.S.  1     

28.2  Preconstruction Survey  L.S.  1       

28.3 Bypass  for diverting flow for any multi‐use dwellings which may be required (Provisional)  

Ea  6     

28.4 Mainline sewer bypass for up to an additional 63 L/s of flow beyond standard bypass requirement (Provisional) 

Ea  1     

28.5  CCTV Inspection (V1)  l.m.  9,500       

28.6  

Pre‐rehabilitation cleaning and preparation of existing sewers 

l.m.  9,500       

28.7  CCTV Inspection (V2)  l.m.  9,500       

28.8 CIPP Liner installation including standard sewer bypass of up to 63 L/s 

           

28.8.1  S‐1, P4172, Sinclair Street, 300mm  l.m.  66.9       

28.8.1 S‐2, P41727, Sinclair Street, 300mm  l.m.  11.6       

28.8.1 S‐3, P41726, Sinclair Street, 300mm  l.m.  65.5       

28.8.1 S‐4, P536722, Sinclair Street, 300mm  l.m.  24.2       

28.8.1 S‐5, P41725, Sinclair Street, 300mm  l.m.  13.3       

28.8.1 S‐6, P41724, Sinclair Street, 300mm  l.m.  99.6       

28.8.1 S‐7, P41669, Sinclair Street, 300mm  l.m.  115.6       

28.8.1 S‐8, P41668, Sinclair Street, 300mm  l.m.  62.7       

28.8.1 S‐9, P41667, Sinclair Street, 300mm  l.m.  38.0       

28.8.1 S‐10, P41666, Sinclair Street, 250mm  l.m.  68.0       

28.8.1 S‐11, P41665, Sinclair Street, 250mm  l.m.  68.5       

28.8.1 S‐12, P41664, Sinclair Street, 300mm  l.m.  59.0       

28.8.1 S‐13, P42430, Sinclair Street, 300mm  l.m.  48.0       

28.8.2 H‐1, P5033, High Street, 375mm  l.m.  13.1       

28.8.2 H‐2, P5038, High Street, 375mm  l.m.  68.5       

28.8.2 H‐3, P5043, High Street, 375mm  l.m.  34.0       

Page 68: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project

Phase 1 TENDER FORM

Section 00 41 43Page 5

May 2019

Item NO. 

Description Unit of Measurement 

Estimated Quantity 

Unit Price  $ Amount  

28.8.2 H‐4, P4663, High Street, 375mm  l.m.  38.4       

28.8.2 H‐5, P3677, High Street, 375mm  l.m.  21.7       

28.8.2 H‐6, P3676, High Street, 375mm  l.m.  21.8       

28.8.3 D‐1, P4753, Drummond Street, 300mm  l.m.  52.0       

28.8.3 D‐2, P4023, Drummond Stree, 300mm  l.m.  13.0       

28.8.3 D‐3, P4388, Drummond Street, 375mm  l.m.  14.4       

28.8.3 D‐4, P4392, Drummond Street, 375mm  l.m.  83.7       

28.8.3 D‐5, P4750, Drummond Street, 375mm  l.m.  12.4       

28.8.3 D‐6, P4747, Drummond Street, 375mm  l.m.  77.5       

28.8.3  D‐7, P4746, Drummond Street, 300mm  l.m.  11.5       

28.8.4 L‐1, P5177, Leaman Street, 375mm  l.m.  12.5       

28.8.4 L‐2, P5176, Leaman Street, 375mm  l.m.  45.5     

28.8.4 L‐3, P5175, Leaman Street, 375mm  l.m.  34.1       

28.8.4 L‐4, P5174, Leaman Street, 375mm  l.m.  68.8       

28.8.4 L‐5, P5186, Leaman Street, 375mm  l.m.  11.7       

28.8.4 L‐6, P5185, Leaman Street, 375mm  l.m.  59.6       

28.8.4 L‐7, P4025, Leaman Street, 300mm  l.m.  40.7       

28.8.4 L‐8, P4380, Leaman Street, 375mm  l.m.  49.4       

28.8.4 L‐9, P4381, Leaman Street, 375mm  l.m.  11.5       

28.8.4 L‐10, P4382, Leaman Street, 375mm  l.m.  11.3       

28.8.4 L‐11, P4385, Leaman Street, 375mm  l.m.  17.4       

28.8.4 L‐12, P4417, Leaman Street, 375mm  l.m.  63.1       

28.8.5 DI‐1, P8730, Dingle Road, 200mm  l.m.  70.6       

28.8.5 DI‐2, P8731, Dingle Road, 200mm  l.m.  5.8       

28.8.5 DI‐3, P8733, Dingle Road, 300mm  l.m.  37.0       

28.8.5 DI‐4, P8734, Dingle Road, 300mm  l.m.  60.4       

28.8.5 DI‐5, P8735, Dingle Road, 300mm  l.m.  20.7       

28.8.5 DI‐6, P8736, Dingle Road, 300mm  l.m.  28.3       

28.8.5 DI‐7, P8737, Dingle Road, 300mm  l.m.  29.1       

28.8.5 DI‐8, P8738, Dingle Road, 300mm  l.m.  55.4       

28.8.5 DI‐9, P8739, Dingle Road, 300mm  l.m.  55.9       

28.8.5 DI‐10, P8740, Dingle Road, 300mm  l.m.  23.6       

28.8.5 DI‐11, P8741, Dingle Road, 300mm  l.m.  51.2       

28.8.5 DI‐12, P8742, Dingle Road, 300mm  l.m.  27.5       

28.8.5 D1‐13, P8743, Dingle Road, 300mm  l.m.  50.0       

28.8.5 DI‐14, P8744, Dingle Road, 300mm  l.m.  41.7       

Page 69: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project

Phase 1 TENDER FORM

Section 00 41 43Page 6

May 2019

Item NO. 

Description Unit of Measurement 

Estimated Quantity 

Unit Price  $ Amount  

28.8.5 DI‐15, P8745, Dingle Road, 300mm  l.m.  38.7       

28.8.5 DI‐16, P8746, Dingle Road, 300mm  l.m.  48.8       

28.8.5 DI‐17, P10210, Dingle Road, 300mm  l.m.  22.0       

28.8.5 DI‐18, P10211, Dingle Road, 300mm  l.m.  49.7       

28.8.5 DI‐19, P10212, Dingle Road, 300mm  l.m.  57.8       

28.8.5 DI‐20, P10213, Dingle Road, 300mm  l.m.  63.2       

28.8.5 DI‐21, P10214, Dingle Road, 300mm  l.m.  19.5       

28.8.5 DI‐22, P10215, Dingle Road, 300mm  l.m.  46.7       

28.8.5 DI‐23, P10216, Dingle Road, 300mm  l.m.  21.2       

28.8.5 DI‐24, P10217, Dingle Road, 300mm  l.m.  57.4       

28.8.5 DI‐25, P10218, Dingle Road, 300mm  l.m.  40.7       

28.8.5 DI‐26, P10240, Dingle Road, 300mm  l.m.  39.7       

28.8.5 DI‐27, P10241, Dingle Road, 300mm  l.m.  14.7       

28.8.6 AL‐1, P15280, Albion Road, 200mm  l.m.  32.2       

28.8.6 AL‐2, P15281, Albion Road, 250mm  l.m.  57.5       

28.8.6 AL‐3, P1,5282, Albion Road, 250mm  l.m.  76.3       

28.8.6 AL‐4, P15283, Albion Road, 200mm  l.m.  41.2       

28.8.6 AL‐5, P15284, Albion Road, 200mm  l.m.  29.5       

28.8.6 AL‐6, P15286, Albion Road, 200mm  l.m.  36.5       

28.8.6 AL‐7, P15286, Albion Road, 200mm  l.m.  40.7       

28.8.6 AL‐8, P15287, Albion Road, 200mm  l.m.  23.7       

28.8.6 AL‐9, P15288, Albion Road, 200mm  l.m.  31.2       

28.8.7 B‐1, P8706, Burns Drive, 200mm  l.m.  75.9       

28.8.7 B‐2, P8707, Burns Drive, 200mm  l.m.  19.6       

28.8.7 B‐3, P8708, Burns Drive, 200mm  l.m.  14.0       

28.8.7 B‐4, P8710, Burns Drive, 200mm  l.m.  44.1       

28.8.7 B‐5, P8712, Burns Drive, 300mm  l.m.  37.8       

28.8.7 B‐6, P8713, Burns Drive, 300mm  l.m.  70.5       

28.8.7 B‐7, P8714, Burns Drive, 300mm  l.m.  49.7       

28.8.7 B‐8, P8715, Burns Drive, 300mm  l.m.  33.9       

28.8.8 F‐1, P8729, Flemming Drive, 200mm  l.m.  67.7       

28.8.8 F‐2, P8728, Flemming Drive, 200mm  l.m.  68.0       

28.8.8 F‐3, P8727, Flemming Drive, 200mm  l.m.  60.2       

28.8.8 F‐4, P8721, Flemming Drive, 200mm  l.m.  69.6       

28.8.8 F‐5, P8722, Flemming Drive, 200mm  l.m.  46.3       

28.8.8  F‐6, P8722, Flemming Drive, 200mm  l.m.  66.9     

28.8.9 SC‐1, P8700, Shaw Crescent, 200mm  l.m.  73.7       

Page 70: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project

Phase 1 TENDER FORM

Section 00 41 43Page 7

May 2019

Item NO. 

Description Unit of Measurement 

Estimated Quantity 

Unit Price  $ Amount 

28.8.9 SC‐2, P870, Shaw Crescent, 200mm  l.m.  59.0       

28.8.10 W‐1, P8702, Westgate Drive, 200mm  l.m.  48.5       

28.8.10 W‐2, P8703, Westgate Drive, 200mm  l.m.  33.8       

28.8.10 W‐3, P8704, Westgate Drive, 200mm  l.m.  64.4       

28.8.10 W‐4, P8705, Westgate Drive, 200mm  l.m.  63.0       

28.8.10 W‐5, P8716, Westgate Drive, 300mm  l.m.  66.8       

28.8.10 W‐6, P8717, Westgate Drive, 300mm  l.m.  30.6       

28.8.10 W‐7, P8718, Westgate Drive, 300mm  l.m.  29.6       

28.8.10 W‐8, P8719, Westgate Drive, 300mm  l.m.  53.4       

28.8.10 W‐9, P8724, Westgate Drive, 300mm  l.m.  50.5       

28.8.10  W‐10, P8725, Westgate Drive, 300mm  l.m.  43.5     

28.8.10 W‐11, P8726, Westgate Drive, 300mm  l.m.  19.6       

28.8.11 K‐1, P10236, Kirk Road, 200mm  l.m.  53.7       

28.8.11 K‐2, P10237, Kirk Road, 200mm  l.m.  16.6       

28.8.11 K‐3, P10238, Kirk Road, 200mm  l.m.  15.8       

28.8.11 K‐4, P10239, Kirk Road, 200mm  l.m.  45.1       

28.8.11 K‐5, P15291, Kirk Road, 200mm  l.m.  25.6       

28.8.11 K‐6, P15292, Kirk Road, 200mm  l.m.  7.1       

28.8.11 K‐7, P15289, Kirk Road, 200mm  l.m.  80.1       

28.8.12 MC‐1, P10219, McManus Road, 200mm  l.m.  26.6       

28.8.12 MC‐2, P10220, McManus Road, 200mm  l.m.  35.5       

28.8.12 MC‐3, P10221, McManus Road, 200mm  l.m.  40.1       

28.8.12 MC‐4, P10222, McManus Road, 200mm  l.m.  39.5       

28.8.12 MC‐5, P10223, McManus Road, 200mm  l.m.  23.6       

28.8.13 MC‐6, P10224, McManus Off Street, 200mm  l.m.  40.3       

28.8.13 MC‐7, P10225, McManus Off Street, 200mm  l.m.  57.9       

28.8.13 MC‐8, P10226, McManus Off Street, 300mm  l.m.  28.7       

28.8.13 MC‐9, P10227, McManus Off Street, 300mm  l.m.  57.8       

28.8.14 P‐1, P10206, Parkhill, 250mm  l.m.  46.03       

28.8.14 P‐2, P10207, Parkhill, 250mm  l.m.  42.22       

28.8.14 P‐3, P10208, Parkhill, 250mm  l.m.  53.65       

28.8.14 P‐4, P10209, Parkhill, 250mm  l.m.  89.78       

28.8.15 MD‐1, P10247, Milton Drive, 200mm  l.m.  14.3       

28.8.15 MD‐2, P10248, Milton Drive, 200mm  l.m.  6.6       

28.8.15 MD‐3, P10243, Milton Drive, 250mm  l.m.  19.8       

28.8.15 MD‐4, P542673, Milton Drive, 250mm  l.m.  10.8       

28.8.15  MD‐5, P10242, Milton Drive, 300mm  l.m.  2.9       

Page 71: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project

Phase 1 TENDER FORM

Section 00 41 43Page 8

May 2019

Item NO. 

Description Unit of Measurement 

Estimated Quantity 

Unit Price  $ Amount 

28.8.16  WL‐1, P9171, Whimsical Lake Cr, 250mm  l.m.  14.9       

28.8.16 WL‐2, P9165, Whimsical Lake Cr, 250mm  l.m.  23.7       

28.8.16 WL‐3, P9163, Whimsical Lake Cr, 250mm  l.m.  22.4       

28.8.16 WL‐4, P9159, Whimsical Lake Cr, 250mm  l.m.  71.9       

28.8.16 WL‐5, P9156, Whimsical Lake Cr, 250mm  l.m.  77.3       

28.8.16 WL‐6, P9154, Whimsical Lake Cr, 250mm  l.m.  24.3       

28.8.17 I‐1, P9142, Inverness Avenue, 200mm  l.m.  17.6       

28.8.17 I‐2, P9143, Inverness Avenue, 200mm  l.m.  59.3       

28.8.17 I‐3, P9144, Inverness Avenue, 200mm  l.m.  89.0       

28.8.17 I‐4, P9145, Inverness Avenue, 200mm  l.m.  90.4       

28.8.18 DU‐1, P9136, Dunniker Road, 200mm  l.m.  38.9       

28.8.19 J‐1, P12189, Joyce Avenue, 200mm  l.m.  71.9   

28.8.19 J‐2, P12195, Joyce Avenue, 200mm  l.m.  62.3       

28.8.19 J‐3, P12198, Joyce Avenue, 200mm  l.m.  51.1       

28.8.19 J‐4, P1220, Joyce Avenue, 200mm  l.m.  58.7       

28.8.19 J‐5, P12880, Joyce Avenue, 200mm  l.m.  6.9       

28.8.19 J‐6, P9138, Joyce Avenue, 200mm  l.m.  28.9       

28.8.19 J‐7, P9139, Joyce Avenue, 200mm  l.m.  55.9       

28.8.20 AU‐1, P1239, Aurora Avenue, 200mm  l.m.  36.4       

28.8.20 AU‐2, P12387, Aurora Avenue, 200mm  l.m.  65.7       

28.8.20 AU‐3, P12385, Aurora Avenue, 200mm  l.m.  45.6       

28.8.20 AU‐4, P12379, Aurora Avenue, 200mm  l.m.  37.8       

28.8.21 C‐1, P12247, Circle Drive, 200mm  l.m.  76.8       

28.8.21 C‐2, P12245, Circle Drive, 200mm  l.m.  26.9       

28.8.21 C‐3, P12239, Circle Drive, 200mm  l.m.  71.3       

28.8.21 C‐4, P12233, Circle Drive, 200mm  l.m.  48.1       

28.8.21 C‐5, P12226, Circle Drive, 200mm  l.m.  56.3       

28.8.22 T‐1, P12232, Twin Oaks Road, 200mm  l.m.  47.0       

28.8.22 T‐2, P12231, Twin Oaks Road, 200mm  l.m.  45.3       

28.8.23 CH‐1, P12260, Cherry Lane, 200mm  l.m.  27.2       

28.8.23 CH‐2, P12258, Cherry Lane, 200mm  l.m.  23.4       

28.8.23 CH‐3, P12257, Cherry Lane, 200mm  l.m.  28.6       

28.8.23 CH‐4, P12256, Cherry Lane, 200mm  l.m.  60.9       

28.8.24 HU‐1, P12216, Hubley (Off Street), 200mm  l.m.  44.6   

28.8.25 NW‐1, P24581, Newton Avenue, 300mm  l.m.  16.9   

28.8.25 NW‐2, P24582, Newton Avenue, 300mm  l.m. 11.1     

28.8.25  NW‐3, P24595, Newton Avenue, 375mm  l.m. 55.5     

Page 72: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project

Phase 1 TENDER FORM

Section 00 41 43Page 9

May 2019

Item NO. 

Description Unit of Measurement 

Estimated Quantity 

Unit Price  $ Amount 

28.8.25 NW‐4, P24459, Newton Avenue, 375mm  l.m. 79.1     

28.8.25 NW‐5, P24469, Newton Avenue, 375mm  l.m. 78.9     

28.8.25 NW‐6, P24479, Newton Avenue, 375mm  l.m. 78.9     

28.8.25 NW‐7, P24354, Newton Avenue, 375mm  l.m. 79.3     

28.8.25 NW‐8, P24365, Newton Avenue, 450mm  l.m. 9.4     

28.8.25 NW‐9, P24375, Newton Avenue, 450mm  l.m. 58.0     

28.8.26 CR‐1, P24638, Chebucto Road, 750mm  l.m. 68.3     

28.8.26 CR‐2, P24617, Chebucto Road, 750mm  l.m. 39.8     

28.8.26 CR‐3, P24574, Chebucto Road, 500mm  l.m. 9.6     

28.8.26 CR‐4, P24511, Chebucto Road, 500mm  l.m. 48.4     

28.8.27 CA‐1, P24976, Connaught Avenue, 600mm  l.m. 15.2     

28.8.27 CA‐2, P25030, Connaught Avenue, 750mm  l.m. 75.4     

28.8.27 CA‐3, P24490, Connaught Avenue, 750mm  l.m. 78.0     

28.8.28 DS‐1, P1976, Dublin Street, 375mm  l.m. 14.1     

28.8.28 DS‐2, P453, Dublin Street, 375mm  l.m. 24.8     

28.8.28 DS‐3, P445, Dublin Street, 375mm  l.m. 60.7     

28.8.28 DS‐4, P444, Dublin Street, 375mm  l.m. 13.5     

28.8.28 DS‐5, P3000, Dublin Street, 375mm  l.m. 79.4     

28.8.28 DS‐6, P437, Dublin Street, 375mm  l.m. 12.9     

28.8.28 DS‐7, P433, Dublin Street, 375mm  l.m. 49.2     

28.8.28 DS‐8, P428, Dublin Street, 300mm  l.m. 11.8     

28.8.28  DS‐9, P730, Dublin Street, 375mm  l.m.  80.1     

28.8.29  CK‐1, P1972, Cork Street, 300mm  l.m.  70.5     

28.8.29  CK‐2, P1962, Cork Street, 300mm  l.m.  12.7     

28.8.30  WD‐1, P1957, Windsor Street, 375mm  l.m.  10.4     

28.8.30  WD‐2, P1975, Windsor Street, 375mm  l.m.  61.9     

28.8.30  WD‐3, P1988, Windsor Street, 375mm  l.m.  78.6     

28.8.31  SE‐1, P51647, Seawood Avenue, 750mm  l.m.  33.6     

28.8.31  SE‐2, P516472, Seawood Avenue, 750mm  l.m.  66.4     

28.8.31  SE‐3, P151673, Seawood Avenue, 750mm  l.m.  55.0     

28.8.31  SE‐4, P518697, Seawood Avenue, 250mm  l.m.  47.7     

28.8.31  SE‐5, P518696, Seawood Avenue, 250mm  l.m.  42.9     

28.8.31  SE‐6, P518695, Seawood Avenue, 250mm  l.m.  41.2     

28.8.31  SE‐7, P518694, Seawood Avenue, 250mm  l.m.  37.3     

28.8.31  SE‐8, P518684, Seawood Avenue, 250mm  l.m.  38.7     

28.8.31  SE‐9, P518683, Seawood Avenue, 200mm  l.m.  53.5     

28.8.31  SE‐10, P51868, Seawood Avenue, 200mm  l.m.  50.1     

Page 73: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project

Phase 1 TENDER FORM

Section 00 41 43Page 10

May 2019

Item NO. 

Description Unit of Measurement 

Estimated Quantity 

Unit Price  $ Amount 

28.8.31  SE‐11, P518681, Seawood Avenue, 200mm  l.m.  50.4     

28.8.31  SE‐12, P518680, Seawood Avenue, 200mm  l.m.  66.4     

28.8.32  E‐1, P38982, Leaside Drive, 200mm  l.m.  16.79     

28.8.32  E‐2, P518679, Leaside Drive, 200mm  l.m.  66.98     

28.8.32  E‐3, P518690, Leaside Drive, 200mm  l.m.  61.09     

28.8.32  E‐4, P518689, Leaside Drive, 200mm  l.m.  63.58     

28.8.33  LE‐1, P518686, Leaside Dr Easement, 250mm  l.m.  16.79     

28.8.33  LE‐2, P518685, Leaside Dr Easement, 200mm  l.m.  52.01     

28.8.33  LE‐3, P518688, Leaside Dr Easement, 200mm  l.m.  35.69     

28.8.34  SA‐1, P38981, Sackville Drive, 200mm  l.m.  17.6     

28.8.34  SA‐2, P38980, Sackville Drive, 200mm  l.m.  6.7     

28.8.34  SA‐3, P38979, Sackville Drive, 200mm  l.m.  60.7     

28.8.34  SA‐4, P38978, Sackville Drive, 200mm  l.m.  77.7     

28.9  Reinstatement of service laterals  Ea  590       

28.10  CCTV Inspection (V3)  l.m.  9,500       

28.11  Sample removal and QA testing, reporting  Ea  107       

28.12  Special Cleaning and Preparation (Provisional)             

  .1      Removal of protruding pipe, calcite, grease,   roots, and other hardened debris 

Hr  10       

28.13 Additional cost for added liner thickness for special design 

           

  .1 – 1.0 to 1.5 mm for up to and including 300 mm diameter liners 

l.m.  100       

  .2 – 1.0 to 1.5 mm for greater than   300 mm diameter liners 

l.m.  100       

  .3 – 2.0 to 3.0 mm for up to and including 300 mm diameter liners 

l.m.  100       

 .4 – 2.0 to 3.0 mm for greater than   300 

mm diameter liners l.m.  100     

 .5 – 3.5 to 4.5 mm for up to and including 

300 mm diameter liners l.m.  100     

 .6 – 3.5 to 4.5 mm for greater than   300 

mm diameter liners l.m.  100     

Page 74: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project

Phase 1 TENDER FORM

Section 00 41 43Page 11

May 2019

Item NO. 

Description Unit of Measurement 

Estimated Quantity 

Unit Price  $ Amount 

28.14 

Excavated 2 m “Spot Repairs” including removal, replacement and reinstatement of damaged sewer sections to allow for lining (Provisional) 

           

          .1      up to and including 375 mm up to 3 m depth 

Ea  1     

  TOTAL   

SCHEDULE OF QUANTITIES AND UNIT PRICES

SUMMARY

Total Proposed Price (Excluding HST)

$

Add HST (15% of Total Proposed Price) $ Add Streets & Services Permit Fee * $ 1,000.00

Estimated Contract Price $ * The Streets & Services Permit Fee listed above is an estimate. Payment of this amount will be based

on the actual fee (as determined by HRM) which may be higher or lower than the estimate. Contractors are to submit a separate invoice for the actual fee. The invoice is to state that the fee is exempt of tax and shall be accompanied by the payment receipt.

Proponent’s HST Registration No. 4 COMPLETION TIME

.1 Proponent agrees to complete the Work by November 29, 2019.

Page 75: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project

Phase 1 TENDER FORM

Section 00 41 43Page 12

May 2019

SIGNATURE*

DATED THIS DAY OF , 2019 [Seal]

Name of Firm Proposing

Witness Signature of Signing Officer

Name and Title (printed)

Witness Signature of Signing Officer

Name and Title (printed) Company Address

Telephone No.

Fax No. *NOTE: Tenders submitted by or on behalf of any Corporation must be signed and sealed in the

name of such Corporation by a duly authorized officer or agent.

*****End of Section 00 41 43*****

Page 76: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

Form of Agreement

Page 77: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project - Phase 1

FORM OF AGREEMENT & GENERAL CONDITIONS

Section 00 53 43

Page 1 May 2019

FORM OF AGREEMENT AND GENERAL CONDITIONS This Agreement made on the day of in the year 2019. BY AND BETWEEN

Halifax Water, 450 Cowie Hill Road Halifax, Nova Scotia B3K 5M1

hereinafter called the “Owner”

and

hereinafter called the “Contractor”

The Owner and the Contractor agree as follows:

ARTICLE A1 – THE WORK

The Contractor shall:

.1 Perform the Work required by the Contract Documents for

2019 Sewer Mainline Trenchless Lining Project – Phase 1

located within the Halifax Regional Municipality

for which the Agreement has been signed by the parties, and for which

is acting as and is hereinafter called the “Owner” and .2 Do and fulfill everything indicated by this Agreement, and .3 Commence the work by the day of in the year 2019 and attain

Substantial Performance of the work as certified by the Engineer by the ____ day of in the year 2019.

Page 78: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project - Phase 1

FORM OF AGREEMENT & GENERAL CONDITIONS

Section 00 53 43

Page 2 May 2019

ARTICLE A2 – AGREEMENTS AND AMENDMENTS The Contract supersedes all prior negotiations, representations or agreements, either written or

oral, relating in any manner to the work, including the bidding documents that are not expressly listed in Article 3 of the Agreement.

ARTICLE A3 – CONTRACT DOCUMENTS The following is an exact list of the Contract Documents referred to in subsection 1.1 of this

Agreement and as defined in subsection 2 of Section 00 71 00 DEFINITIONS. This list is subject to subsequent amendments in accordance with the provisions of the Contract Documents.

.1 Standard Specifications for Municipal Services listed in Table of Contents Page Dated Jan

2018 plus revisions. .2 The latest revision of the Halifax Regional Water Commission’s Design Specification &

Supplementary Standard Specification. .3 Project Documents

.1 Request for Proposal #P09.2019

.2 Overview

.3 Tender Form

.4 Form of Agreement

.5 Supplementary Specifications

.6 Drawings

.7 Existing Information

.8 Addenda as issued and as confirmed in subsection 2.4 of this section

.9 Proponent response to the RFP #P09.2019 ARTICLE A4 – CONTRACT PRICE .1 The Estimated Contract Price is the sum of the products of the estimated quantities multiplied

by the appropriate Unit Prices in the Tender Form plus the amount of Harmonized Sales Tax. .2 The Estimated Contract Price is $ .3 The amount shall be subject to adjustment as provided in the Contract Documents. .4 The Contract Price shall be the sum of the products of the actual final quantities that are

incorporated in, or made necessary by the Work, as confirmed by count and measurement, multiplied by the appropriate Unit Prices from the Tender Form together with any adjustments that are made in accordance with the provisions of the Contract Documents plus the amount of Harmonized Sales Tax.

Page 79: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project - Phase 1

FORM OF AGREEMENT & GENERAL CONDITIONS

Section 00 53 43

Page 3 May 2019

ARTICLE A5 – PAYMENT .1 The Owner shall pay the Contractor in Canadian funds for the performance of the Contract. .2 The Owner shall make monthly payments on account to the Contractor for the Work

performed, as certified by the Engineer, subject to a 10% holdback. .3 The amount of the monthly payments shall be calculated as follows:

.1 The quantity for each pay item on which actual work has been performed shall be measured.

.2 For each Unit Price item this quantity shall be multiplied by the applicable Unit Price

as provided in the Tender Form. .3 For each lump sum item, multiply the percent complete by the value of the lump sum

item. .4 The total value of work completed for the payment period shall be calculated by

adding the total of the products for all pay items from subsection 3.2 and 3.3 of this section.

.5 The amount of the monthly payment shall be determined by deducting the 10%

holdback and the total of all previous payments from the total value of such completed work as determined under subsection 3.4 of this section.

.6 To the amount calculated above, the Harmonized Tax will be added. .4 The last day of the payment period shall be the last Friday of the month. .5 Upon Substantial Performance of the Work as certified by the Engineer the Owner shall pay

to the Contractor the holdback monies then due in accordance with the provisions of Section 00 72 45 – General Conditions, subsection GC5.8 – PAYMENT OF HOLDBACK UPON SUBSTANTIAL PERFORMANCE OF THE WORK.

.6 Upon the issuance of the final certificate for payment, the Owner shall pay to the Contractor

the balance of monies then due in accordance with the provision of Section 00 72 45 – General Conditions, subsection GC5.10 – FINAL PAYMENT, subject to the provisions of GC5.8 – PAYMENT OF HOLDBACK UPON SUBSTANTIAL PERFORMANCE OF THE WORK.

Page 80: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project - Phase 1

FORM OF AGREEMENT & GENERAL CONDITIONS

Section 00 53 43

Page 4 May 2019

.7 In the event of loss or damage occurring where payment becomes due under the property and boiler insurance policies, payment shall be made to the Contractor in accordance with the provisions of Section 00 72 45 – General Conditions, subsection GC11.1 INSURANCE.

.8 If the Owner fails to make payments to the Contractor as they become due under the terms of

the Contract, interest shall be payable as follows:

.1 The annual interest rate applicable to the contract is two percent (2%) compounded semi-annually.

.2 Interest shall be calculated on the overdue balance from the due date. ARTICLE A6 – RECEIPT OF AND ADDRESSES FOR NOTICES .1 Communications in writing between the parties or between them and the Engineer shall be

considered to have been received by the addressee on the date of delivery if delivered by hand to the individual, or to a member of the firm, or to an officer of the corporation for whom they are intended, or if sent by post or by facsimile, to have been delivered within five (5) working days of the date of the mailing, dispatch or of delivery to the company when addressed as follows:

.1 The Owner at 450 Cowie Hill Road, Halifax, Nova Scotia B3K 5M1

.2 The Contractor at

.3 The Engineer at ARTICLE A7 – QUANTITIES AND MEASUREMENT

.1 The quantities shown in Section 00 41 43 Tender Form – Schedule of Quantities and Unit Prices are estimated.

.2 Measurement for the actual quantities used to determine payments and Contract Price shall

be in accordance with Section 01 22 00 – Measurement and Payment.

Page 81: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project - Phase 1

FORM OF AGREEMENT & GENERAL CONDITIONS

Section 00 53 43

Page 5 May 2019

ARTICLE A8 – SUCCESSION

The aforesaid Contract Documents are to be read into and form part of the Agreement and the whole shall constitute the Contract between the parties and subject to law and the provisions of the Contract Documents shall ensure to the benefit of and be binding upon the parties hereto, their respective heirs, legal representatives, successors and assigns.

ARTICLE A9 – RIGHTS AND REMEDIES

No action or failure to act by the Owner, Engineer, or Contractor shall constitute a waiver of any right or duty afforded any of them under the Contract, nor shall any such action or failure to act constitute an approval of or acquiescence in any breach thereunder, except as may be specifically agreed in writing.

ARTICLE A10 – TIME Time shall be construed as being of the essence of the Contract.

In witness whereof the parties hereto have executed this Agreement and by the hands of their duly authorized representatives.

Page 82: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project - Phase 1

FORM OF AGREEMENT & GENERAL CONDITIONS

Section 00 53 43

Page 6 May 2019

SIGNED, SEALED AND DELIVERED CONTRACTOR [Seal]

in the presence of: company name

witness signature of signing officer

name and title (printed)

witness signature of signing officer

name and title (printed)

OWNER [Seal]

HALIFAX WATER company name

witness signature of signing officer

name and title (printed)

witness signature of signing officer

name and title (printed)

(Where either the Owner or Contractor calls for proof of authority to execute this document, proof

of such authority in the form of a certified copy of a resolution naming the person or persons in question as authorized to sign the Agreement for and on behalf of the corporation or partnership, parties to this Agreement, should be attached.)

*****End of Section 00 53 43*****

Page 83: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

Supplementary Specifications

Page 84: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 1 May2019

INTENT .1 The Work of this Contract is to be constructed in accordance with the Standard Specifications for

Municipal Services (2019 revision), as developed and published by the Nova Scotia Road Builders Association and Nova Scotia Consulting Engineers Association, Joint Committee on Contract Documents, except as modified herein.

.2 These Supplementary Specifications modify the specification sections to which they refer. .3 The Supplementary Specifications take precedence over the specifications and drawings to

which they refer. SECTION 00 21 00 – INFORMATION TO TENDERERS Delete in its entirety and replace with new section included in this document SECTION 00 41 43 – TENDER FORM Delete in its entirety and replace with new section included in this document. SECTION 00 53 43 – FORM OF AGREEMENT Delete in its entirety and replace with new section included in this document. SECTION 00 71 00 – DEFINITIONS Definition 12 – Place of the Work, add the following sentence: Any reference within the Contract Documents to the term “Site” shall be considered

interchangeable with the Definition “Place of the Work”. Add the following new Definition: 28. Period of Delay The period of time from the date of completion as stated in the Agreement, to the date of

Substantial Performance of the Work as determined by the Consultant, shall be termed the Period of Delay.

SECTION 00 72 45 – GENERAL CONDITIONS OF THE CIVIL WORKS CONTRACT GC 3.5 CONSTRUCTION SCHEDULE Page 13, in Sub-Clause 3.5.1.1, delete “prior to the first application for payment” and replace with “not later than two (2) weeks after receipt of the letter of authorization to proceed with the Works”. GC 3.14 CLEANUP Delete Sub-Clause 3.14.1 and replace with the following: 3.14.1 Maintain the Work in a safe and tidy condition and free from the accumulation of waste

products and debris, other than that caused by the Owner, other contractors or their employees. Site cleanup shall include, on a daily basis, or more frequently when required or directed; the following:

.1 Removal of gravel, soils and debris from paved and landscaped areas.

Page 85: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 2 May2019

.2 Disposal of waste materials, garbage, and surface grading if required on traveled

ways. .3 Application of approved dust control measures. .4 Maintenance of safety and traffic control equipment. Add to the following sentence to the end of Sub-Clause 3.14.2: The Consultant will inspect the Place of Work for acceptance before issuing the Certificate of

Substantial Performance of the Work. Add to the following sentence to the end of Sub-Clause 3.14.3: The Consultant will inspect the Place of Work for acceptance before evaluating the application

for Final Payment. GC 5.4 BASIS OF PAYMENT FOR COST PLUS WORK Add the following Sub-Clauses to 5.4.1 5.4.1.1 The fee for Contactor’s overhead and profit shall be 10% of the cost of the work. 5.4.1.2 The cost for Contactor’s equipment shall be the current published Nova Scotia

Transportation and Infrastructure rental rates. These rates are assumed to include overhead and profit and thus the percentage amount indicated in 5.4.1.1 shall not apply.

5.4.1.3 The successfully awarded proponent shall provide a detailed item breakdown including unit rates, item description, etc., associated with specialize equipment and man power specific to the proposed rehabilitation approach. This itemized breakdown shall be approved by Halifax Water prior to start of any work.

GC 5.5 APPLICATION FOR PROGRESS PAYMENT Add to the following sentence to the end of Sub-Clause 5.5.1: The basis of payment for this project will include Work performed and Products delivered to the

place of Work, to the terms and conditions contained in Clause GC 5.5. GC 5.6 PROGRESS PAYMENT Delete Sub-Clauses GC 5.6.1 and GC 5.6.2 and replace with the following: 5.6.1 The Owner will, no later than ten (10) days after receipt of an application for payment

from the Contractor submitted in accordance with GC 5.5 APPLICATIONS FOR PROGRESS PAYMENT, issue a progress payment certificate in the amount applied for or in such other amount deemed to be properly due. If the Owner amends the application, the Owner will promptly notify the Contractor in writing giving reasons for the amendment. Notwithstanding that the Contractor has not made application for payment, the Owner may measure and value the Work performed during a payment period, prepare and issue a progress payment certificate.

5.6.2 The Owner shall make payment to the Contractor on account no later than twenty (20) days after the issuance of a certificate for payment.

GC 5.7 SUBSTANTIAL PERFORMANCE OF THE WORK Add the following Sub-Clause to GC 5.7: 5.7.5 In addition to the requirements for Substantial Completion of the Work (see definition

20) the successful completion of all testing and CCTV inspection relating to water,

Page 86: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 3 May2019

sanitary sewer, and storm sewer infrastructure must also be achieved in order for substantial completion of the work to be deemed achieved.

GC 5.8 PAYMENT OF HOLDBACK UPON SUBSTANTIAL PERFORMANCE OF THE WORK Delete Sub-Clause 5.8.4 in its entirety and replace with the following: 5.8.4.1 Within sixty (60) days after the issue by the Consultant of the Certificate of Substantial

Performance of the Works, provided that the Contractor has by then signed the Final Measure, and has provided the Consultant with the following documents: 1. A statutory declaration to the effect that all expenses incurred by him in

carrying out the Contract have been paid and releasing the Owner from any and all further claims relating to the Contract.

2. A certificate from a barrister stating that there are no Mechanic’s Liens filed relating to the Contract Works.

3. A clearance certificate from the Worker’s Compensation Board. 4. Provision of all documentation regarding recoverable taxes.

Then the Owner shall release to the Contractor seventy-five percent (75%) of the

Holdback. If, however, the Final Measure is not signed within the sixty (60) days following the issue of the Certificate of Substantial Performance or if the Contractor has failed to provide the required documents as listed above, then the Owner shall release seventy-five percent (75%) of the Holdback within two (2) weeks following the date on which the Contractor meets these requirements.

5.8.4.2 The Owner will retain an amount equal to twenty-five (25%) of the Holdback as security and not as Holdback. The Owner will utilize this security towards rectification of deficiency or warranty items that have not been addressed prior to the end of the Warranty period. The use of these security funds does not relieve the Contractor from any obligations or requirements identified in GC 12.3 WARRANTY. Within twenty-one (21) days of the one (1) year anniversary date of Substantial Performance, the Owner will release to the Contractor all monies and surety still retained, less the amount of any funds utilized by the Owner to rectify deficiencies as noted above.

5.8.4.3 The Owner may retain out of the Holdback amount, any sums required by law to satisfy any liens against the Work or, if permitted by the lien legislation applicable to the Place of Work, other third party monetary claims against the Contractor which are enforceable against the Owner.

GC 5.12 – NON-CONFORMING WORK Add the following Sub-Clauses to GC5.12: 5.12.2 If the Contractor neglects to prosecute the Work properly or otherwise fails to comply with

the requirements of the Contract to a substantial degree and if the Consultant has given a written statement to the Owner and Contractor that sufficient cause exists to justify such action, the Owner may, without prejudice to any other right or remedy the Owner may have, give the Contractor Notice in Writing that the Contractor is in default of the Contractor's contractual obligations and instruct the Contractor to correct the default in the three (3) Working Days immediately following the receipt of such Notice in Writing.

Page 87: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 4 May2019

5.12.3 If the default cannot be corrected in the three (3) Working Days specified or in such

other time period as may be subsequently agreed in writing by the parties, the Contractor shall be in compliance with the Owner's instructions if the Contractor:

.1 commences the correction of the default within the specified time, and .2 provides the Owner with an acceptable schedule for such correction, and

corrects the default in accordance with the Contract terms and with such schedule.

5.12.4 If the Contractor fails to correct the default in the time specified or in such other time period as may be subsequently agreed in writing by the parties, without prejudice to any other right or remedy the Owner may have, the Owner may:

.1 correct such default and deduct the cost thereof from any payment then or thereafter due the Contractor provided the Consultant has certified such cost to the Owner and the Contractor, or

.2 terminate the Contractor's right to continue with the Work in whole or in part or terminate the Contract.

GC 6.5 DELAYS Add the following new Sub-Clauses: 6.5.6 Notwithstanding the above Sub-Clauses, time shall be construed as being of the essence

of the Contract. The date of the expiring of the time allowed in accordance with the contract for Substantial Performance of the Work shall be termed the Date for Completion. If the Contractor fails to substantially complete the Work by the agreed Date of Completion, the period of time from the Date of Completion to the Date of Substantial Performance of the Work as determined by the Consultant, shall be termed the Period of Delay.

6.5.7 In the event of there being a Period of Delay, the Contractor shall be liable for and shall pay to the Owner the cost of continuance of supervision during the Period of Delay, and all additional fees, disbursements and costs incurred by the Owner by reason of there being such Period of Delay. The said sum or sums in view of the difficulty of ascertaining the losses which the Owner may suffer by reason of delay in the performance of the said Works, is hereby agreed upon, fixed and determined by the parties hereto as Liquidated Damages that the Owner will suffer by reason of said delay and default and not as a penalty. The value of the Liquidated Damages shall be $1000.00 per day for the duration of the Period of Delay. The Owner may deduct the amount of any Liquidated Damages from any monies payable to the Contractor under the Contract.

GC 9.1 PROTECTION OF WORK AND PROPERTY Add to the following sentence to the end of Sub-Clause 9.1.3: Immediately inform Consultant of any damage or injury to any persons, property, services or

materials. Add the following new Sub-Clause: 9.1.5 Relocate survey markers, monuments, and survey pins disturbed during construction

activities under the direction of a qualified provincial land surveyor. Include costs for these services in Contract Price.

Page 88: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 5 May2019

GC 10.2 LAWS, NOTICES AND PERMITS Add the following new Sub-Clauses: 10.2.8 An exception is the Owner will pay for the non-refundable portion of HRM’s present

“Street and Services Permit” or a future variation of the charge, however the Contractor will be responsible for applying for and obtaining the necessary documentation and paying the refundable amounts.

10.2.9 The Contractor shall obtain and pay for Watercourse Alteration permits, as required, to complete the work, from Nova Scotia Environment.

Add new GC 10.5 as follows: GC 10.5 RIGHTS-OF-WAY AND EASEMENTS 10.5.1 The acquisition or obtaining of easements in respect of the lands comprising the Works

will be effected by the Owner. If the Contractor deems it advisable to acquire the rights or rights to use, enjoy or occupy any additional or adjacent land or lands in order to facilitate the execution of the Work, he shall obtain such right or rights at his own expense and shall, at all times, indemnify and save harmless the Owner from any and all claims arising from the acquisition of such right or rights or the use, enjoyment or occupancy of such lands or land.

10.5.2 No construction or grade changes will be permitted on Halifax Water easements without authorized written approval.

Add new GC 11.1.6 as follows: GC 11.1.6 PROFESSIONAL LIABILITY INSURANCE 10.1.6 The Contractor’s design engineer will carry professional liability insurance covering

the services described in the contract and the insurance policy is to provide coverage for an amount not less than $2,000,000. Coverage will be maintained continuously from the commencement of the Services until completion or termination of the Services and for two (2) years after the later of: (a) termination of the Services or (b) Substantial Completion.

GC 11.2 CONTRACT SECURITY Delete Sub-Clause 11.2 in its entirety and replace with the following: 11.2.1 The Contractor shall provide to the Owner within fourteen (14) days of acceptance of

his Tender, a Performance Bond and a Labour and Material Payment Bond each in the amount of fifty percent (50%) of the Estimated Contract Price, or alternatively, provide an unconditional irrevocable letter of credit for one hundred percent (100%) of the Estimated Contract Price.

11.2.2 The bonds shall be issued by a duly licensed surety company authorized to transact a business of suretyship in the Province of Nova Scotia and shall be maintained in good standing until the fulfillment of the contract. The form of the bonds shall be in accordance with the latest edition of the CCDC approved bond form.

11.2.3 The letter of credit shall be issued by a chartered Canadian bank and shall be valid until the conditions of Sub-Clause 5.8.4.1 of these Supplementary Specifications are fulfilled.”

Page 89: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 6 May2019

GC 12.3 WARRANTY Add the following new sub-clause: 12.3.7 The Contract requires an operational combination of several components comprising

the Work which are customarily guaranteed by their Suppliers. Under the terms of this Contract, the Contractor shall provide a Warranty for the Works for a period of one (1) year following the date of continuous operation. The terms of the Warranty shall be as follows:

.1 Where failure or incipient failure of the materials or equipment is apparent, the Contractor shall actively commence repair or other remedy not more than twenty-four (24) hours after receiving due notice of trouble.

.2 If the Contractor on being notified does not for any reason commence repairs within twenty-four (24) hours, the Owner shall have the right to have repairs made by others as necessary to restore or continue service. The cost of such repairs by others is to be borne by the Contractor. The Owner shall at all times inform or attempt to inform the Contractor before hiring others to effect any repairs and it shall be at all times the Contractor’s right to be informed as soon as possible of difficulties and proposed remedial action by others and to make and where practical to complete such repairs at any other time during the Warranty period in preference to others.

.3 The employment of some other person or persons for reasons set out shall in no wise affect the Contractor’s obligations or liability hereunder or relieve him of the performance and fulfillment of any or all of his covenants, undertakings, obligations, or duties under the Contract.

.4 After the acceptance by the Consultant and during the Warranty period, the burden of maintenance shall fall upon the Owner. In the event of damage, failure or incipient failure of any part or parts directly attributable to inadequate or improper maintenance, the Contractor shall be responsible for remedial action but the cost of all such repairs will be reimbursed by the Owner.

.5 If the Contractor arranges that the manufacturer of some component or some other party approved by the Consultant provide the Warranty on a Sub-Contract basis, he may designate the direct implementer of the Warranty as his agent under the Contract in which case due notice to the agent will be taken as due notice to the Contractor. This will be a matter for the Contractor’s convenience only, and shall in no wise affect the Contractor’s obligations and liabilities, hereunder or relieve him from the performance and fulfillment of any or all of his covenants, undertakings, or duties under this Contract.

.6 In emergency situations the Owner reserves the right to make appropriate repairs at the Contractor’s expense.

.7 All work of repair or replacement carried out during the Warranty period shall be maintained for a period of one (1) year from the date of the Consultant’s acceptance of the work of repair or replacement notwithstanding that the Warranty period expires before the expiration of the said year. This requirement does not apply to normal operational maintenance, which will be carried out by the Owner.”

Page 90: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 7 May2019

SECTION 01 10 00 – GENERAL REQUIREMENTS 2. SUMMARY OF WORK Delete Clause 2 in its entirety and replace with the following: 2.1 Work generally includes the trenchless rehabilitation of mainline sewers. The work also

includes CCTV inspections, cleaning and preparation, required “open-cut spot repair” work, service connection reinstatement, flow control, survey, QA/QC, communication with Public and residents all for a complete and operational system.

2.2 The Work includes Provisional Work for mainline sewer bypass and special cleaning and preparation.

2.3 The Work includes reinstatement and restoration of all disturbed areas to existing or better condition, including, but not limited to, topsoil and sodding, gravel, curbing, driveways, asphalt pavement, concrete and asphalt sidewalk, guardrail systems, and asphalt line painting.

2.4 The work includes the commissioning of constructed works and the provision of record information.

2.5 The work includes traffic control as per Halifax Regional Municipality requirements and the management of a safe work site.

2.6 The Work includes obtaining approval and necessary permits from the appropriate authorities of the Halifax Regional Municipality and their associated costs.

3. SCHEDULING AND COORDINATION Add the following new sub-clauses:

3.5 Coordinate progress of the Work, progress schedules, submittals, use of site, temporary utilities, and construction facilities.

3.6 Schedule is to be updated and e-mailed to the Owner on a bi-weekly basis. 3.7 Schedule Format: .1 Prepare schedule in form of horizontal bar chart. .2 Provide horizontal time scale identifying first work day of each week. .3 Schedule to be in PDF file format.

4. SETTING OUT THE WORK Delete Clause 4 in its entirety and replace with the following:

4.1 Survey requirements: establish lines and levels, locate and lay out, by instrumentation. 4.2 Records: maintain a complete, accurate log of control and survey work as it progresses. 4.3 Preconstruction survey to be performed prior to the commencement of any work. Existing

site conditions to be documented with photos and reports. Establish property lines. 4.4 Subsurface conditions:

.1 Promptly notify Owner in writing if subsurface conditions at Place of the Work differ materially from those indicated in Contract Documents, or reasonable assumption of probable conditions based thereon.

.2 After prompt investigation, should Owner determine that conditions do differ materially, instructions will be issued for changes in the Work.

Page 91: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 8 May2019

7. SUBMITTALS Delete Clause 7 in its entirety and replace with the following: 7.1 Administrative: .1 Submit to Owner submittals listed for all materials and procedures requiring Approval as indicated. Submit electronically (PDF file format) in a timely manner and orderly sequence so as to not cause delay in the Work. .2 Work affected by submittal shall proceed until review is complete. .3 Review submittals prior to submission to Owner. This review represents that

necessary requirements have been determined and verified, or will be, and that each submittal has been checked and coordinated with requirements of the Work and Contract Documents.

.4 Verify field measurements and affected adjacent Work is coordinated. 7.2 Shop Drawings: .1 "Shop drawings" means drawings, diagrams, illustrations, schedules,

performance charts, brochures and other data which are to be provided by Contractor to illustrate details of a portion of the Work.

.2 Indicate materials, methods of construction and attachment or anchorage, erection diagrams, connection, explanatory notes and other information necessary for completion of Work.

.3 Review submittals prior to submission to Owner. This review represents that necessary necessary requirements have been determined and verified, or will be, and that each submittal has been checked and coordinated with requirements of the Work and Contract Documents.

.4 This review shall not mean that the Owner approves the detailed design inherent in the shop drawings; this responsibility remains with the Contractor, and such review does not relieve the Contractor from his responsibility for meeting all requirements of the Contract Documents.

7.3 CIPP Samples: .1 Submit for review, samples in duplicate as requested in respective specification

Sections. .2 Ship all samples to Paragon Systems or an equivalent testing facility approved

by the Owner to undergo testing as requested in respective specification sections.

8. RECORD DRAWINGS Add the following new sub-clause: 8.4 Supply survey coordinates and elevations representative of all manholes, catch basins,

structures, pipework, and buried portions of the Work to the Owner one (1) month after Substantial performance of the Work.”

9. QUALITY CONTROL Add the following new sub-clauses: 9.8 Provide assistance, labour, and materials, as are normally required for examining, testing,

and measuring the quality, weight, or quantity of any material used and supply samples of material requested before incorporation into the Work.

Page 92: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 9 May2019

9.9 Include costs for providing assistance and samples for testing and arranging tests in

Contract Price. 9.10 Quality assurance of shall be in accordance with the requirements of Section 33 11 05

and 33 11 10, included within this Supplementary Specifications. 9.11 Provide the Owner with assistance for tests and inspections. 9.12 Inspection: .1 Halifax Water must have access to the Work at all times. .2 Give timely notice requesting inspection if Work is designated for special tests,

inspections or approvals by Halifax Water. .3 Provide equipment required for executing inspection and testing by appointed

agencies. 9.13 Independent Inspection Agencies: .1 The Contractor shall retain and make payment for the services of Paragon Systems

for testing of CIPP samples. .2 The Contractor shall arrange and make payment for the samples to be shipped to the

testing facility. .3 All test reports shall be submitted to Halifax Water directly from the testing agency. 9.14 Liner Sample Collection & Testing Frequency: .1 The contractor shall collect a sample from all CIPP installation completed under this

contract, as part of the CIPP installation payment. .2 The Contractor shall deliver and have tested by Paragon a minimum of 50% of the

collected samples, to be paid under the sample testing payment item. .3 At least one sample for each liner diameter installed shall be tested. .4 Halifax Water will provide direction regarding which CIPP samples are required to

be tested. .5 The contractor is required to store the untested samples or have them tested at no cost

to Halifax Water, such that Halifax Water may request additional samples to be tested beyond 50% of installations, as directed prior to the contract completion.

10. TEMPORARY SITE FACILITIES Delete Clause 10 in its entirety and replace with the following: 10.1 Installation/removal:

.1 Provide construction facilities and temporary controls in order to execute work expeditiously and safely.

.2 Remove from site all such work after use. 10.2 Dewatering: provide temporary drainage and pumping facilities to keep excavations and

free from standing water. 10.3 Sanitary bypass: provide temporary sanitary flow pumping facilities and piping to

maintain service during construction. 10.4 Site Storage/Loading:

.1 Confine the Work and operations of employees to limits indicated by Contract Documents. Do not unreasonably encumber premises with products or equipment.

.2 Do not load or permit to be loaded any part of the Work with a weight or force that will endanger the Work.

10.5 Project Cleanliness:

Page 93: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 10 May2019

.1 Maintain the Work in tidy condition, free from accumulation of waste products

and debris. .2 Remove waste material and debris from site at end of each working day.

12. TRAFFIC CONTROL Delete Clause 12 in its entirety and replace with the following: 12.1 Provide traffic control in accordance with Temporary Workplace Traffic Control Manual,

latest edition, as issued by the Nova Scotia Department of Transportation and Infrastructure Renewal. A traffic control plan is required for all Work performed within HRM and NSTIR rights-of-way. Contact HRM Traffic and Right of Way Services for traffic control requirements.

12.2 Traffic control plans shall be submitted to HRM for approval prior to commencement of the work and will be reviewed by HRM in a timely manner. A traffic control plan that does not include all of the required elements listed below will be found incomplete, and returned for revision and re-submittal. Proposed street closures will require approval from HRM.

.1 Traffic control plan shall indicate construction methods allowing work within rights-of-way to be completed efficiently and effectively, while maintaining a safe and organized movement of vehicles and pedestrians around and through temporary workplaces and, as well, to protect workers from errant vehicles. Traffic control plans to include details for controlling traffic at any signalized intersections and proposed lengths and estimated duration of each diversion. Traffic control plans to also indicate how vehicular access will be maintained for residents of the affected streets during construction.

.2 Pedestrian management plan shall indicate construction methods allowing work within rights-of-way to be completed efficiently and effectively, while maintaining a safe and organized movement of pedestrians around and through temporary workplaces and, as well, to protect and pedestrians from errant vehicles.

12.3 Prior to construction, the contractor shall survey all pavement markings within the project limits and submit a survey plan of existing markings to HRM for review. All affected pavement markings are to be reinstated as per the submitted plan or as per any modifications to the plan required by HRM Traffic Services.

12.4 Refer to the latest edition of HRM’s Traffic Control Manual Supplement for additional traffic control requirements when working in the Halifax Regional Municipality. This document can be found at

https://www.halifax.ca/sites/default/files/documents/business/doing-business-halifax/Traffic%20Control%20Manual%20Supplement.pdf

Should the Contractor wish to use more restrictive traffic control measures, the Contractor shall submit a request for approval to HRM a minimum of two (2) weeks in advance of the proposed work. Of note, some streets will have restrictions which could include “peak hour”, holiday and time of year (i.e school zone) restrictions. Further clarification if required can be obtained by contacting HRM Street ROW services at their general inquiry email address at: [email protected]

12.5 A full closure of streets will not be permitted unless approved in advance by HRM.

Page 94: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 11 May2019

12.6 All existing sidewalks must remain opened during construction. If a sidewalk must be

closed, the Contractor shall submit a temporary sidewalk closure plan to HRM for approval.

12.7 Maintain access to all properties. 12.8 All costs associated with traffic control and pedestrian management, permitting and

advertising will be borne by the Contractor. 12.9 HRM retains the right to deny requests made by the Contractor if such requests are not

considered appropriate by HRM. 12.10 It is to be assumed that for traffic control there will be a minimum 3 person flagging crew

for all work performed in the HRM right of way. 13. SUBSTITUITIONS Delete Clause 13 in its entirety and replace with the following: 13.1 Where a particular brand of manufactured item is described or specified, it is to be regarded as a standard. Other brands may be accepted by the Owner. 13.2 No equivalent or alternative products will be made before acceptance of bids. 13.3 After award of Contract, the Contractor may apply in writing for substitutions. Otherwise

the Contractor will be held to terms of specifications. No extra will be allowed for approved equivalents.

13.4 When Halifax Water is prepared to use a brand of manufactured article as an alternate to any specified item, although the alternate brand may not be equivalent to that specified, it may be used but only after price adjustments have been negotiated and approved.

13.5 If alternate requires modifications, adjustments or additions to the specified work, submit to Owner these modifications, adjustments, or additions in same detail as included in the Contract Documents.

13.6 Approval in principle by the Owner of these modifications, adjustments, or additions in no way relieves the Contractor of any obligation or liability under the Contract to provide a complete finished product.

13.7 No change or substitution can be made without written consent of the Owner. 13.8 Provide the Owner with a Fire Safety Plan at the pre-construction meeting. Add new Clauses as follows: 17. PHOTOGRAPHS 17.1 Prior to commencement of the works, the Owner may arrange for photographs to be

taken of the Site and those properties adjacent to the Site. 17.2 Accompany Owner during the taking of photographs to make any comments on the

conditions of the Site or adjacent properties, which shall be noted. 17.3 Owner will retain photographs, together with a written report on the condition of existing

roads and streets, sidewalks, trees, lawns, and adjacent properties as determined by mutual agreement as a record of existing conditions prior to proceeding with the Works.

18. NOISE 18.1 Operate construction equipment such that there is a minimum amount of noise and

vibration.

Page 95: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 12 May2019

18.2 Contractors working for Halifax Water may be permitted night and weekend work if

provisions are followed in accordance with the Noise By-Law (N-200). 19. FLOATATION AND FLOODING 19.1 Prevent floatation and flooding during construction of the Work. Make good any damage

to pipes or structures caused by floatation and flooding at no extra cost to the Contract. 19.2 De-water all excavations and remove accumulations of water prior to backfilling. 19.3 Dispose of water drained or pumped such that the Work and adjacent properties are not

damaged. 20. UTILITIES 20.1 Do not operate valves, electrical and telephone controls on existing utility systems. 20.2 Apply to the utility having jurisdiction for permission to operate such systems if it

becomes necessary, and only operate such system in accordance with, and in the presence of a representative of the utility company affected.

20.3 Provide a letter from the owner’s of any utility system damaged during construction, stating that all damages have been repaired and the systems are fully operational as accepted by the utility owner.

20.4 Include an amount in the Contract Price to cover the cost of having a utility company representative present when the Work passes under or in close proximity to underground cables, structures or utility poles.

21. DAMAGE AND INJURY 21.1 Protect the Work and adjacent property from damage and injury in accordance with

Section 00 72 45, General Conditions, Part 9 – GC 9.1 PROTECTION OF WORK AND PROPERTY.

21.2 Immediately inform Owner of any damage or injury to any persons, property, services or materials.

21.3 Relocate survey markers, monuments, and survey pins disturbed during construction under the direction of a qualified provincial land surveyor. Include costs in Contract Price.

22. HEALTH AND SAFETY 22.1 The Contractor and subcontractors, as applicable, shall at all times, have in effect a Letter

of Good Standing of the Certificate of Recognition Program from the Nova Scotia Construction Safety Association. The Letter of Good Standing shall indicate the Contractor’s or the Sub-Contractor’s current standing falls into one of the following categories:

Certificate of Recognition Audit Pending In the Process 22.2 Compliance with Section 5 (Contractor Health and Safety Policy) of Halifax Water’s

Occupational Health & Safety Manual is a project requirement. This document and related forms are included in Appendix A.

Page 96: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 13 May2019

22.3 Seven (7) days prior to the start of construction, the Contractor shall submit a Site Specific

Hazard Assessment, and copies of his Safe Work Practices, Utility Locates and Corporate Safety Policy to Halifax Water.

23. FIRE SAFETY PLAN 23.1 Provide the Owner with a Fire Safety Plan at the pre-construction meeting. 24. OCCUPATIONAL HEALTH AND SAFETY

24.1 In addition to other occupational health and safety requirements in the proposal documents, the following applies for sewer rehabilitation work. .1 Provide, at the scheduled preconstruction meeting, a list of all controlled

hazardous materials or products containing hazardous materials, all physical agents or devices or equipment producing or emitting physical agent and any substance, compound, product or physical agent that is deemed to be or contains a designated substance in accordance with the Workplace Hazardous Materials Information System (WHMIS) as defined under the Nova Scotia Occupational Health and Safety Act and shall provide appropriate Material Health and Safety Data Sheets for these substances used for the performance of the required work, all prior to the performance of the work.

.2 Where hazardous materials, physical agents and/or designated substances are used in the performance of the required work, ensure that the requirements of the Nova Scotia Occupational Health and Safety Act and associated regulations are complied with.

.3 Perform the Work so as to cause the public the least inconvenience possible. In particular, do not obstruct any street, thoroughfare, or foot-walk longer or to a greater extent than necessary.

.4 Take all reasonable precaution necessary to ensure the safety of the workers and the general public, particularly children who may play in the area of work.

25. CONFINED SPACE REQUIREMENTS

25.1 In addition to other occupational health and safety requirements in the proposal documents, the following applies for sewer rehabilitation work. .1 Meet or exceed the requirements of Confined Space Entry as outlined under the

Occupational Health and Safety Act. For all work in and around the sewer manholes, have a person qualified in Confined Space Entry present. Proof of atmospheric testing of each manhole, prior to initial entry and continuously while in the manhole where work was performed, shall be submitted to the Engineer on the Confined Space Entry form, with each progress payment certificate submission.

.2 The Contractor shall obtain all necessary permits, permissions and approvals for the work.

26. SCHEDULE OF WORKS

Page 97: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 14 May2019

26.1 Submit to Halifax Water, for their review and approval, a schedule of the proposed

specifically identified Works. All of the mainline sewer rehabilitation is to be completed in 2019. The schedule shall be reviewed with Halifax Water prior to commencement of the planned works.

26.2 Notify Halifax Water of specific start/finish times for all procedures in order that Halifax Water inspection staff may co-ordinate their schedules to ensure suitable levels of inspection. Give this notification a minimum of 48 hours prior to the start time of each phase of work.

26.3 The order of Work is, in general, the responsibility of the Contractor and will be as indicated in the detailed work plan and schedule. However, Halifax Water reserves the right to modify the order of work based on Halifax Water’s needs.

27. SITE INVESTIGATION

27.1 Investigate each site; determine the existing site conditions, any obstructions, or any other problem, which may affect the completion of the proposed Works. No additional payment will be made on account of difficulties to complete the Works because the Contractor failed to investigate the site prior to commencement of the Work.

28. POLICE RECORD CHECKS

28.1 All Contractor personnel who will be working for Halifax Water must obtain a “Police Record Check” (PRC). Refer to Appendix B. PRC shall be in place prior to an individual working on the project.

29. WEATHER CONDITIONS

29.1 Review the Environment Canada Weather forecast prior to commencement of lining operations. Where the anticipated weather conditions are such that anticipated sewer and/or sewer service flows may exceed the Contractor’s bypass pumping capacity or may cause potential basement flooding (blocked laterals due to the liner), commencement of construction shall be delayed until favourable weather is forecast.

30. FLOW CONTROL AND BYPASS

30.1 During lining, provide for bypassing and pumping of mainline sewage to maintain sanitary sewage flow in upstream sections of the sewer being lined.

30.2 During lining, make provisions to provide for building bypassing of multi-unit residential, commercial, and industrial buildings (as determined by the Engineer) from a clean out or property MH to maintain sanitary sewage services to the property if required.

30.3 Make all necessary arrangements with the owners of each building. Contact all property owners and/or tenants to co-ordinate the repair work to the sewer and minimize any impact on residents and/or businesses.

30.4 During the inspection and rehabilitation, shut off sewer flows in order to enable proper inspection of the pipe invert. After the work is completed, restore flows to normal. Transport excess sewage flows through a closed, leak tight pipeline or other method as approved by the Engineer to the nearest or most economical disposal area.

30.5 On all liner installation dates, maintain on site both a primary and stand-by by-pass pump and pump power supply. Sufficient power supply and hoses must be on site in

Page 98: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 15 May2019

order to allow the pump to discharge into the next appropriate downstream sewer section. The stand-by by-pass pump and power supply must be of an equal or better capability than the primary by-pass pump and power supply. Do not disconnect any by-pass pumps or related equipment or remove from the sewer or job site until after all service connections have been reinstated and the Contractor has recorded the post-installation video.

30.6 All by-pass pumping shall be in place and operation prior to the final pre-installation inspection.

30.7 Do not employ any flow control or bypass pumping that has insufficient capacity to maintain flow in the sewer system. It is the Contractor’s responsibility to employ flow control of sufficient capacity. Do not proceed with any work requiring flow control until flow control arrangements are in place that provide sufficient flow control capacity

30.8 All by-pass pumps and related equipment must be silenced equipment or contained within an acceptable sound reduction structure.

30.9 Event of Loss of Redundant Capacity: .1 When circumstances arise requiring the use of redundant capacity and therefore

redundant capacity no longer exists, take action immediately to restore the lost capacity to full function so that redundant capacity is fully restored. If redundant capacity cannot be restored, only critical work already in progress that must be completed (such as lining inversion, curing and liner end opening) will proceed and without delay. No other work continuation (such as lateral reinstatements or CCTV inspection) will take place without a fully functional redundant capacity.

.2 When it is known or suspected that redundant capacity is not or may not be fully functional, do not start work that requires bypass operation.

30.10 Bypass Coordination and Supervision: assign a Bypass Supervisor to manage all bypass pumping operations. Advise the Engineer of this person and provide with 24 hr contact information. When the bypass is required to operate, the supervisor will assure that the bypass system is in full function operation, including fully available 100% redundancy before any work is started for which the bypass is required. When the bypass is in operation, the bypass supervisor will assure that there is continuous presence by a competent person to watch over the bypass including manual checking of upstream levels, pump fuel levels and other indications of potential trouble such as at pump suctions and discharges, discharge conduits and redundancy availability.

30.11 Responsibility for Leaks, Spills and Back-ups: the Contractor shall be responsible for all leaks, spills and back-ups, should they occur and shall take immediate action to restore bypass integrity and make clean-up of any leak, spill or back-up.

30.12 Flow Control Included Limit Provision: .1 Unless specified otherwise in the contract documents (such as for site specific

flow control requirements) the following limit to flow control included in the CIPP lining applies.

.2 Limit of Flow Control Included with Lining Item.

.3 Provide flow control up to 63 litre/sec (1,000 USgpm) as part of the lining item. Such flow control shall include bypass pumping or other means of effecting flow control.

Page 99: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project Phase 1

SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00 Page 16

May2019

.4 Refer to contract documents site specific requirement(s) and corresponding pay item(s) for identified flow control requirements exceeding the flow control limit that are separate pay items.

31. EQUIPMENT RECOVERY WORKS31.1 In the event the equipment becomes stuck or jammed in a sewer line, immediately

notify Halifax Water’s representative. Provided the Contractor is not deemed responsible (e.g. negligent in the operation of the equipment), the removal of equipment shall be arranged by the Contractor and submitted for reimbursement to Halifax Water.

31.2 No claim for lost time will be considered due to this occurrence.

33. NOTIFICATIONS TO PUBLIC AND LOG RECORDS33.1 Prior to commencement of any work on the Contract the Contractor must deliver

written notices to all affected parties a minimum of one week and a maximum of two weeks prior to any work commencing. The Contractor must schedule the works accordingly. Such written notices shall consist of letters supplied by both Halifax Water and the Contractor and both must be delivered at the same time by the Contractor.

33.2 From time to time during the contract other notices, such as a Service Interruption Notice, shall be distributed by the Contractor in accordance with the requirements of the proposal.

33.3 Contractor's notices must be typed on the Contractor's letterhead and clearly indicate both daytime and after hours local contact telephone numbers. Telephone numbers shall be either local area code or toll free numbers. No work will be allowed to commence without such notices. All Contractor written notice(s) shall be submitted to Halifax Water for approval prior to notice delivery.

33.4 Where circumstances require or as directed by Halifax Water, the contractor is required to verbally advise house or building occupants or owners of work that will affect the occupants or owners and conduct any ongoing liaison that is required to resolve questions or other issues.

33.5 Service interruption notice: .1 Any time a sewer service will be interrupted or limited by rehabilitation

activities, the Contractor shall provide a 24-hour Service Interruption Notice to the affected property. The notice shall be typed on the Contractor's letterhead and clearly indicate both daytime and after hours local contact telephone numbers for the Contractor. The notice shall include notification to the property residents to limit their sewer use, including the use of any mechanical device(s) (e.g. sump or ejector pump, etc.) from discharging to the sewer service lateral, in a manner that may adversely affect the lining process. The Contractor must schedule the sewer service rehabilitation installation accordingly.

.2 No service interruption will be allowed without such 24-hour notification. In the event that the Contractor is unable to install the sewer service rehabilitation on the date stated in the Service Disruption Notice the Contractor must immediately provide written notification of the change of date including the new date for the sewer service rehabilitation installation. After the service line

Page 100: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 17 May2019

and connection has been fully returned to service the Contractor shall notify the property that the sewer service is returned to service.

.3 Log record: maintain a log of notices delivered by the Contractor and follow-up activities at each property throughout the Work.

33.6 Damage or loss due to failure to notify: in the event that damage/loss to person or property occurs as a result of the Contractor not notifying the public as per the notification protocol, all such liabilities will be fully borne by the Contractor.

34. PERMITS AND PERMISSIONS

34.1 Obtain any permits and permissions necessary for the Work including permits for disposal of cleaning water and cleaning debris removed from the lateral pipe or mainline sewer in the course of the work. Provide Halifax Water with a copy of the written permission or permit for the disposal of cleaning water or debris, clearly indicating the location and authority giving permission.

34.2 Contractor shall obtain street permits from HRM for all lining locations.

35. TEMPORARY SANITARY FACILITIES

35.1 Schedule the Works in such a way that provisions for portable sanitary facilities are not required for abutting residents and businesses. Minimize interruption of sewer services. For locations where interruption of sewer service for rehabilitation installation is not possible due to the nature of the service (high flows, type of property), sewer service shall be maintained by temporary bypassing or other means (such as collection by tank truck).

37. RESTORATION

37.1 Upon completion, clean up and restore the site to pre-existing or better condition and follow all applicable HRM and Halifax Water construction standards.

38. WARRANTY

38.1 Provide a two (2) year warranty that expressly states the finished pipe will be continuous over the entire length of a new installation and shall be free of dry spots, lifts, excessive wrinkling and folds, and delamination. If these conditions are present, repair the defects at own cost, to Halifax Water’s satisfaction. In the event C.I.P.P. does not fit tightly against the host pipe at its terminal points, seal the space between the pipes with a resin mixture compatible with the CIPP.

SECTION 01 22 00 – MEASUREMENT AND PAYMENT Delete this Section in its entirety and replace with new Section 01 22 00 – Measurement and Payment, included in this document. SECTION 03 30 00 - CONCRETE Delete Sub-Clause 1.4.1 and replace with the following: 1.4.1 Submit shop drawings including placing drawings for reinforcing steel in accordance

with Section 01 10 00.

Page 101: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 18 May2019

1.4.2 Prepare reinforcement drawings in accordance with Reinforcing Steel Manual of

Standard Practice; by Reinforcing Steel Institute of Canada. Delete Sub-Clause 2.2 in its entirety and replace with the following: 2.2 Concrete Mix Proportion normal density concrete in accordance with CSA A23.1, Alternate 1 to give the following properties for concrete used in sidewalks, curbs and gutters, pedestals and cast in place structures: .1 Cement: Type GU. .2 Minimum compressive strength at 28 days: 35MPa. .3 Class of exposure: C-2. .4 Nominal size of coarse aggregate: 20mm. .5 Slump at time and point of discharge: 80mm +/- 30mm. .6 Air content: 5 to 8%. .7 Chemical admixtures: type as approved, and in accordance with ASTM C494. .8 Maximum water cement ratio: 0.40. Add the following new Sub-Clause: 3.8.6 Curing or sealing of concrete to be carried out as directed by the Owner. SECTION 31 20 00 – EARTHWORK Delete Sub-Clause 2.1.1 in its entirety and replace with the following: 2.1.1 Selected Backfill: Common material from Site excavation, free from stumps, trees,

roots, sod, organics, rocks, boulders, masonry and any other deleterious materials. Material to be well graded having maximum particle size not exceeding 150mm with 40% to 60% of the material retained on 75mm sieve.

Delete Sub-Clause 2.1.8 in its entirety and replace with the following: 2.1.8 Pipe Bedding Material and Protection: Type 1 Gravel as specified is Sub-Clause

2.1.5.1 of this Section. Add the following new Sub-Clause: 2.1.10 Material Conversions: .1 Conversion of in-place pay volume; pay area times thickness; to unit tonnage

for gravel shall be at a rate of 2.2 tonnes per cubic metre. .2 Conversion of in-place pay volume; pay area times thickness; to unit Tonnage

for impacted soil shall be at a rate of 2.0 tonnes per cubic metre. Delete Sub-Clause 3.1.3, and replace with the following: 3.1.3 When rock is encountered, notify Owner for measurement. Use mechanically broken

rock as backfill as directed by the Owner if the material meets specified requirements. Reduce oversize rock, surface boulders within till to a size suitable for re-use and meeting the requirements for backfill requirements.

Add the following new Sub-Clauses:

Page 102: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 19 May2019

3.1.15 When granite curb is excavated, it shall remain the property of the Owner. Remove and

handle excavated granite curb in such manner as to avoid damage and deliver materials to a location as directed by the Owner.

3.1.16 Leave hydrants under pressure, valve pit covers, valve boxes, curb stop boxes, fire and police call boxes or other utility controls unobstructed and accessible at all times.

3.3.4 Excavating and handling of unsuitable material shall be done in a manner that does not impact other existing suitable materials.

Add the new Clauses: 3.12 Reinstatement .1 Reinstate all disturbed areas to condition, elevation and thickness equal to or better than

that which existed before excavation commenced, using the materials and as specified in Section 32 98 00.

3.13 Contaminated Soil .1 Notify Owner if during excavation, soil within the trench limits is suspected of being

contaminated. Immediately stop work in this area until Owner confirms findings by engaging a geotechnical engineer. Work will not commence until the Nova Scotia Department of Environment and Labour provides specific direction with respect to use or disposal of contaminated materials. All soil removed prior to official disposal notification will be Contractor’s responsibility.”

SECTION 32 12 16 - ASPHALT CONCRETE PAVING Delete 32 12 16 in its entirety and replace with the following: Asphalt concrete paving is to be in accordance with the latest editions of Section S-1 of HRM’s Specification for Hot Mix Asphaltic Concrete, Section S-2 of HRM’s Specification for Performance Graded Asphalt Binder, and Section S-4 of HRM’s Specification for Pavement Markings. Theses sections can be found at:

http://www.halifax.ca/procurement/UnitPriceContractsDesignConstructionServices.php\ SECTION 32 91 10 – PROTECTION OF EXISTING TREES Delete Clause 3.9 in its entirety and replace with the following: 3.9 Trees Damaged, Removed or Lost Due to Construction .1 Restrict tree removal to those areas indicated or as directed by Owner. Approval has to

be obtained from HRM (Contact: John Simmons – HRM Urban Forrester at 490-6186). .2 Trees removed without prior authorization from the Owner’s Representative or the

Owner shall be replaced at no additional cost to the Contract Price, at a rate of one tree for every 60mm (2½”) of trunk diameter measured at chest height. Location and species type to be determined by the Owner’s representative or delegate. Replacement trees are to be minimum 60mm (2½”) in diameter.

.3 If a tree is damaged during construction, the Owner may hold the Contractor responsible and levy a penalty. Damages may include but are not limited to: bark tear, limb and branch breakage, root damage, compaction of root area, removal of roots during excavation and loss of bark due to mechanical impacts. Where limbs and roots are involved, the penalty will be $100.00 per 2.5cm (1”) diameter measured at the attachment

Page 103: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 20 May2019

point between parent stem and damaged limb. In the case of roots, the measurement is taken at the point where the damaged root attaches to the parent. In the case of bark tear, the same penalty applies but the measurement is taken at widest point of affected area.

.4 In the event that trees that are larger than the maximum transplantable size, or in the opinion of the Owner, are no longer structurally sound or damaged beyond viability, then costs may be deducted from monies otherwise due.”

SECTION 32 91 19 – TOPSOILING AND FINISH GRADING Delete Sub-Clause 2.2.2 and replace with the following: .2 Topsoil to be rated to Landscape Nova Scotia Standard Topsoil Triangle, 1990, or latest

revision, rating A. Manufacture topsoil or topsoil derived from site sources is to be improved as necessary to meet topsoil qualifications above.

SECTION 32 92 00 – SEEDING AND SODDING Delete Sub-Clause 2.5.3 and replace with the following: .3 Ratio for year one maintenance applications: May 3:0:0, July 3:1:3, September 1:2:3, or

as recommended by the Nova Scotia Agriculture College Soils Department or by an approved soils lab. At the completion of the year one maintenance applications, provide HRM with a copy of maintenance records showing dates of performed maintenance and tasks performed.

SECTION 32 98 00 – REINSTATEMENT Delete Sub-Clause 2.1.2 and replace with the following: 2.1.2 Asphalt concrete materials to Section S-1 of HRM’s Specification for Hot Mix Asphaltic

Concrete, Section S-2 of HRM’s Specification for Performance Graded Asphalt Binder, and Section S-4 of HRM’s Specification for Pavement Markings. Theses sections can be found at: http://www.halifax.ca/procurement/UnitPriceContractsDesignConstructionServices.php

Delete Clause 3.3 and replace with the following: 3.3 Asphaltic concrete reinstatement shall conform to the latest edition of HRM’s Municipal

Design Guidelines. These guidelines can be found at http://www.halifax.ca/designcon/design/munservices.php

Add new Clause as follows: 3.9 Reinstatement Tape .1 All asphalt trench restoration shall include HRM approved reinstatement tape at all

asphalt joints. SECTION 39 00 00 – STANDARD DETAILS Delete Section 39 00 00 in its entirety. As required the contractor is to refer to the Standard Details incorporated within section 39 00 00 of the most recent edition of the latest revision of the Halifax Regional Water Commission’s Design Specification & Supplementary Standard Specification. ADD THE FOLLOWING NEW SECTIONS Section No. Title

Page 104: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 1 SUPPLEMENTARY SPECIFICATIONS

Section 00 74 00

Page 21 May2019

33 11 05 Hot Water or Steam - Cured-in-Place Pipe – Mainline 33 11 10 UV - Cured-in-Place Pipe – Mainline

******End of Section 00 74 00******

Page 105: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

Measurement and Payment

Page 106: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 2 MEASUREMENT AND PAYMENT

Section 01 22 00

Page 1 May 2019

GENERAL 1. Unit prices are full compensation for the work necessary to complete each item in the Contract and in

combination for all work necessary to complete the Work as a whole. 2. Include all of the following as required where individual quantities are not provided in the Schedule of

Quantities: traffic control, environmental protection, protection of existing trees, common excavation, shoring, dewatering, bedding, backfilling, compaction, disposal of surplus common, joint restraints and thrust blocks, thrust anchors, corrosion and moisture protection, testing, water truck and water supply (sourcing water from hydrants is not permitted), flushing and disinfection, dechlorination, marker stakes, tracer wire, reinstatement and all incidentals. Contractors are to provide their own water truck needs as an included component in all tasks for lining work. Water trucks will need to be inspected and certified by Halifax Water at their cost. Water is to be obtained at Halifax Water filling stations at the contractor’s cost.

3. All measurement shall be along a horizontal plane unless otherwise indicated. 4. The numbers of the items described below correspond to the numbers of the items in Section 00 41

43, subsection 4 - Schedule of Quantities and Unit Prices. 5. Provisional Items shall mean that the unit price as proposed shall be included in the Contract Price

and that the Owner reserves the right to delete all or portions of this item from the estimated Contract Price.

SANITARY SEWER 23. Manhole Replacement (Provisional) Unit of Measurement: Each (Ea)

This item includes: removal of existing manhole, supply/install of new precast manhole (MH) including frame, cover, grout, pipe reconnection, grade adjustment, backfill, and surface restoration. The unit price shall be based on the following parameters: the MH is located under asphalt, the nominal diameter of the MH is 1200mm or less, the MH is no more than 3.5 m in total height (measured from bottom of based to the top of cover), the MH has three or less connecting pipes, the nominal diameter of the connecting pipes are 300mm or less, the MH is not an external drop MH, and the MH is located on street which is not a “restricted street” (see schedule A of HALIFAX REGIONAL MUNICIPALITY TRAFFIC CONTROL MANUAL SUPPLEMENT) and no other utilities are located within the required excavation. This item is only payable as directed by Halifax Water when in Halifax Water’s opinion there are structural condition, infiltration and/or operational concerns with a MH which need to be addressed. This item will NOT be payable to facilitate any aspect of the instillation and associated work to line the sewer with CIPP.

Page 107: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 2 MEASUREMENT AND PAYMENT

Section 01 22 00

Page 2 May 2019

MAINLINE SEWER LINING 28.

.1 Mobilization, Demobilization, Bonds, Insurance Unit of Measurement: Lump Sum (L.S.)

This item includes: Mobilization and demobilization, and acquisition of bonds and insurance.

.2 Preconstruction Survey Unit of Measurement: Lump Sum (L.S.)

This item includes: Investigation of existing site conditions and documentation with photos and reports.

.3 Bypass for diverting flow for any Buildings or multi-use dwellings which may be required

(Provisional) Unit of Measurement: Each (Ea)

Method of Measurement: This provisional item is payable only when it is determined that bypass is required on a service lateral for any multi-use dwellings. This item includes: Locating, mobilization and demobilization, supply of bypass equipment (pumps, plugs, bypass lines etc.), setting up of equipment, operation of bypass, all material and consumables, all associated reinstatement, labour, supervision and technical support for the service lateral bypass.

.4 Mainline sewer bypass for additional 63 L/s of flow beyond standard bypass requirement (Provisional) Unit of Measurement: Each (Ea)

Method of Measurement: This provisional item is payable when up to an additional 63 L/s of bypass pumping is required above the standard 63 L/s (1000 USPM) included within item 28.4. This item includes: Locating, mobilization and demobilization, supply of bypass equipment (pumps, plugs, bypass lines etc.), setting up of equipment, operation of bypass, all material and consumables, all associated reinstatement, labour, supervision and technical support for mainline sewer flow bypass in the sizes indicated in the individual items.

Page 108: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 2 MEASUREMENT AND PAYMENT

Section 01 22 00

Page 3 May 2019

.5 CCTV Inspection (V1)

Unit of Measurement: Lineal Metre (l.m.)

This item includes: Locating, mobilization and demobilization, setting and maintaining detours, maintaining traffic, setting up equipment, supply of water truck and water, normal flow control (not including pump and bypass), CCTV inspection and report, confirmation of necessity for rehabilitation, determination of suitability for rehabilitation, determination of suitability of standard rehabilitation.

.6 Pre-rehabilitation Cleaning and Preparation of Existing Sewers

Unit of Measurement: Lineal Metre (l.m.)

This item includes: all necessary work to prepare the sewer for CIPP rehabilitation, including any MH replacement or modifications need to facilitate the work, supply of water truck and water, high pressure sewer jet cleaning of mainline sewer or by other method as required to prepare sewers for CIPP liner. This item does not include any preparation work covered under provisional items.

.7 CCTV Inspection (V2)

Unit of Measurement: Lineal Metre (l.m.)

This item includes: Locating, mobilization and demobilization, setting and maintaining detours, maintaining traffic, supply of water truck and water, setting up equipment, normal flow control (not including pump and bypass), CCTV inspection and report, determination of suitability for rehabilitation, determination of suitability of standard rehabilitation.

.8 CIPP Liner

.1 200 mm Unit of Measurement: Lineal Metre (l.m.) This item includes: Locating, mobilization and demobilization, liaison with property

owner/occupants, all equipment and setting up of equipment, supply of water truck and water, cleaning and preparation of mainline sewer, removal and disposal of debris, supply and installation of CIPP, labour, supervision, design, engineering, technical support, lateral

Page 109: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 2 MEASUREMENT AND PAYMENT

Section 01 22 00

Page 4 May 2019

and mainline sewer flow control, CCTV inspection, return to service and record keeping.

.2 250 mm Unit of Measurement: Lineal Metre (l.m.) This item includes: Locating, mobilization and demobilization, liaison with property

owner/occupants, all equipment and setting up of equipment, supply of water truck and water, cleaning and preparation of mainline sewer, removal and disposal of debris, supply and installation of CIPP, labour, supervision, design, engineering, technical support, lateral and mainline sewer flow control, CCTV inspection, return to service and record keeping.

.3 300 mm

Unit of Measurement: Lineal Metre (l.m.) This item includes: Locating, mobilization and demobilization, liaison with property

owner/occupants, all equipment and setting up of equipment, supply of water truck and water, cleaning and preparation of mainline sewer, removal and disposal of debris, supply and installation of CIPP, labour, supervision, design, engineering, technical support, lateral and mainline sewer flow control, CCTV inspection, return to service and record keeping.

.4 375 mm

Unit of Measurement: Lineal Metre (l.m.) This item includes: Locating, mobilization and demobilization, liaison with property

owner/occupants, all equipment and setting up of equipment, supply of water truck and water, cleaning and preparation of mainline sewer, removal and disposal of debris, supply and installation of CIPP, labour, supervision, design, engineering, technical support, lateral and mainline sewer flow control, CCTV inspection, return to service and record keeping.

.5 600 mm

Unit of Measurement: Lineal Metre (l.m.) This item includes: Locating, mobilization and demobilization, liaison with property

owner/occupants, all equipment and setting up of equipment, supply of water truck and water, cleaning and preparation of mainline sewer, removal and disposal of debris, supply and installation of CIPP, labour, supervision, design, engineering, technical support, lateral and mainline sewer flow control, CCTV inspection, return to service and record keeping.

.9 Reinstatement of Service Laterals

Page 110: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 2 MEASUREMENT AND PAYMENT

Section 01 22 00

Page 5 May 2019

Unit of Measurement: Each (Ea)

This item includes: reinstatement of lateral connection to sewer main via CCTV monitored robotic cutting equipment.

.10 CCTV Inspection (V3)

Unit of Measurement: Lineal Metre (l.m.)

This item includes: Locating, mobilization and demobilization, setting and maintaining detours, maintaining traffic, setting up equipment, supply of water truck and water, normal flow control (not including pump and bypass), CCTV inspection and report, to confirm success of rehabilitation.

.11 Sample Removal and QA Testing, Reporting

Unit of Measurement: Each (Ea)

Method of Measurement: This item is payable when samples are requested from the contractor via above ground installation or from a mainline liner installation. This does not include removal of samples via excavation.

This item includes: all costs associated with providing samples and the testing of the sample per the proposal specification.

.12 Special Cleaning and Preparation (Provisional)

.1 Removal of Protruding Pipe Material and Excessive Mainline CIPP Material at the Mainline to Lateral Connection and Calcite, Grease, Roots, and Other Hardened Debris

Unit of Measurement: Hour (Hr) Method of Measurement: This item is payable where mainline to lateral connections require

additional preparation due to protruding materials such as lateral pipe and when normal pipe debris clearing operations and industry standard high pressure sewer jet cleaning methods will not adequately prepare the rehabilitation location and jeopardize the existing condition of the mainline sewer. Any work to be performed and paid under this item shall be approved by Halifax Water before the work commences.

This item includes: Locating, mobilization and demobilization, equipment and equipment set

up (including, flailing, reaming and CCTV monitored robotic cutting equipment), supply of water truck and water, removal and disposal of debris.

Page 111: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Project Phase 2 MEASUREMENT AND PAYMENT

Section 01 22 00

Page 6 May 2019

.13 Additional Cost for Added Liner Thickness for Special Design as defined in the Standard

Specification Sections 33 11 05 and 33 11 10

.1 1.0 to 1.5 mm

Unit of Measurement: Lineal Meter (l.m.)

This item includes: All additional costs for added liner thickness for special design.

.2 2.0 to 3.0 mm Unit of Measurement: Lineal Meter (l.m.) This item includes: All additional costs for added liner thickness for special design.

.3 3.5 to 4.5 mm Unit of Measurement: Lineal Meter (l.m.) This item includes: All additional costs for added liner thickness for special design.

.14 Excavated 2m “Spot Repairs” including removal, replacement and reinstatement of damaged

sewer sections to allow for lining (Provisional)

.1 Up to and including 375 mm up to 3 m depth Unit of Measurement: Each (Ea)

Method of Measurement: This item is payable as approved by the Owner when a short section of the candidate sewer main is deemed in too poor of condition to be CIPP lined and will require to be excavated and replaced with a new section of replacement pipe to allow for lining.

This item includes: all costs associated with excavating, removal of the poor condition pipe section with replacement of pipe of equal diameter and reinstatement. The maximum length of “spot repair” is 3m.

******End of Section 01 22 00******

Page 112: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

Standard Specifications - Hot Water or Steam Cured-in-Place Pipe - Mainline

Page 113: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 1 May 2019

PART 1 - GENERAL ................................................................................................................................... 3

1.1 INTRODUCTION ................................................................................................................................ 3

1.2 TERMINOLOGY AND ABBREVIATIONS ........................................................................................ 3

1.3 REFERENCE STANDARDS ............................................................................................................... 4

1.4 SCOPE OF WORK .............................................................................................................................. 5

1.5 INFORMATION TO BE REVIEWED PRIOR TO PROPOSAL SUBMISSION ................................. 6

1.6 INFORMATION TO BE SUBMITTED ............................................................................................... 6

1.7 OCCUPATIONAL HEALTH AND SAFETY ...................................................................................... 7

1.8 CONFINED SPACE REQUIREMENTS .............................................................................................. 8

1.9 PERMITS AND APPROVALS ............................................................................................................ 8

1.10 WORK PRIORITIES ......................................................................................................................... 8

1.11 SCHEDULE OF WORKS .................................................................................................................. 9

1.12 SITE INVESTIGATION .................................................................................................................... 9

1.13 NOTIFICATION TO PUBLIC ........................................................................................................... 9

1.14 PROVISIONS FOR TRAFFIC .......................................................................................................... 10

1.15 EXISTING VIDEO INSPECTION RECORDS AND DRAWINGS ................................................... 10

1.16 WEATHER CONDITIONS ............................................................................................................... 12

PART 2 - PRODUCTS ............................................................................................................................... 12

2.1 SEWER SIZES – NOMINAL VERSUS ACTUAL .............................................................................. 12

2.2 SEWER SIZE INSIDE DIAMETER TOLERANCES ......................................................................... 12

2.3 OBJECTIVES FOR CIPP LINING ..................................................................................................... 14

2.4 CIPP LINER SIZING ......................................................................................................................... 15

2.5 EVALUATION OF MH-MH SECTIONS FOR LINING .................................................................... 17

2.6 PROPOSAL DESIGN LINER VERSUS SPECIAL DESIGN LINERS ............................................... 18

2.7 LINER THICKNESS INCREASE....................................................................................................... 19

PART 3 - EXECUTION ............................................................................................................................. 20

3.1 FLOW CONTROL AND BYPASS ...................................................................................................... 20

3.2 CCTV INSPECTIONS ........................................................................................................................ 24

Page 114: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 2 May 2019

3.3 PRELIMINARY CCTV INSPECTION – V1 ...................................................................................... 27

3.4 FILLING OF VOIDS .......................................................................................................................... 28

3.5 CLEANING AND PREPARATION OF EXISTING SEWERS FOR CIPP LINING .......................... 29

3.6 IDENTIFICATION OF SERVICE CONNECTIONS .......................................................................... 31

3.7 POST CLEANING AND PREPARATION CCTV INSPECTION – V2. ............................................. 32

3.8 CIPP LINER – TYPE AND MATERIAL ............................................................................................ 33

3.9 CIPP LINING – STEAM CURING ..................................................................................................... 34

3.10 CIPP LINER MINIMUM PHYSICAL PROPERTIES ...................................................................... 35

3.11 CIPP LINER DESIGN ...................................................................................................................... 36

3.12 CIPP LINER MINIMUM THICKNESS ............................................................................................ 43

3.13 CIPP LINING – RESIN IMPREGNATION ...................................................................................... 43

3.14 CIPP LINER INSTALLATION ........................................................................................................ 43

3.15 CIPP LINER ODOUR CONTROL ................................................................................................... 44

3.16 SERVICE CONNECTIONS REINSTATEMENT ............................................................................. 45

3.17 MANHOLE BENCHING AND RESTORATION ............................................................................. 47

3.18 POST CIPP LINING COMPLETED CCTV INSPECTION (V3) ...................................................... 47

3.19 INSTALLED CIPP LINER THICKNESS, FIT & FINISH REQUIREMENTS ................................ 48

3.20 LINER WALL THICKNESS AND TOLERANCE ........................................................................... 50

3.21 INSTALLED CIPP LINER PHYSICAL PROPERTIES REQUIREMENTS .................................... 50

3.22 SAMPLES AND TESTING OF INSTALLED CIPP LINER ............................................................. 51

3.23 LINER DEFICIENCIES AND REMEDIAL MEASURES ................................................................ 59

3.24 WARRANTY..................................................................................................................................... 61

3.25 EXCAVATED REPAIR .................................................................................................................... 61

3.26 WORK EASEMENTS ....................................................................................................................... 64

3.27 EXCAVATION FOR RETRIEVAL OF EQUIPMENT OR OTHER PURPOSES ............................ 64

3.28 WORKSITE CLEANUP AND RESTORATION ............................................................................... 64

Page 115: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 3 May 2019

PART 1 - GENERAL

1.1 INTRODUCTION

.1 This Standard Specification for Sewer Rehabilitation using Hot Water or Steam Cured-in-Place Pipe (herein referred to as CIPP) is intended to be used in conjunction with site specific requirements as outlined in the contract documents. This standard covers the lining requirements for Halifax Water’s 2019 Sewer Rehabilitation Program. Each CIPP liner run to be installed must be evaluated by the Contractor with respect to this standard in order to ensure site specific considerations to the standard are identified for which additional requirements in the contract documents apply. Inherent in this specification are Specific Liners, which have a suitable design for specific sections of pipe that are identified in the proposal (i.e. Each pipe section will have its own specific design) and Special Liners, which are required when installation conditions are more onerous than covered by the Specific design.

1.2 TERMINOLOGY AND ABBREVIATIONS

.1 A brief listing of terminology and abbreviation used in this document is provided below. Where terms or abbreviations are not on this list or may require further clarification, questions should be addressed to the Owner.

ENS Engineers Nova Scotia

CCTV Closed Circuit Television

CIPP Cured-in-Place Pipe

DSMH Downstream Manhole

H2S Hydrogen Sulphide

HW Halifax Water

LSR Liner Sections Record

LCR Lateral Connections Record

MH Maintenance Hole or Manhole

NSRBA Nova Scotia Road Builders Association

USMH Upstream Manhole

Page 116: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 4 May 2019

V1 Preliminary CCTV inspection prior to cleaning and preparation

V2 Post cleaning and preparation CCTV inspection before lining

V3 Final CCTV inspection of the completed lining installation

1.3 REFERENCE STANDARDS

.1 This specification references the following standards, specifications or publications:

ASTM American Society for Testing and Materials

D790-10 Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials

D5813-04(2008) Standard Specification for Cured-In-Place Thermosetting Resin Sewer Piping Systems

D2990-09 Standard Test Methods for Tensile, Compressive, and Flexural Creep and Creep-Rupture of Plastics

F1216-07a Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube

F2019-11 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP)

ISO 11296-4 Plastics piping systems for renovation of underground non-pressure drainage and sewage networks- Part 4: Lining with cured-in-place pipes (Test method for short-term Flexural Modulus and Flexural Strength)

ISO 7685 Plastics piping systems - Glass-reinforced thermosetting plastics (GRP) pipes – Determination of initial specific ring stiffness (Method for determining structural thickness of reinforced liners)

ISO/IEC 13818-1:2018

Information technology - Generic coding of moving pictures and associated audio information

Page 117: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 5 May 2019

1.4 SCOPE OF WORK

.1 This Standard applies to the structural rehabilitation of circular gravity sewers (sanitary, storm or combined) using Hot Water or Steam Cured-In Place Pipe (CIPP), including cleaning, preparation and CCTV inspections of existing sewers and all other work required for CIPP lining. CIPP curing methods other than Hot Water or Steam are not applicable to this standard. CIPP liners will include Specific Liners for each sewer section and Special Liners where Specific Liner information provided in the proposal is not consistent with actual sewer parameters found in the field. A Special Liner requires a site-specific design that differs from information provided in the proposal (i.e. Special Design) to determine the increased wall thickness versus the proposed Specific Liner (Specific Design).

.2 The work involved requires special equipment to be handled by persons experienced in all phases of the work. All work shall be done in a quick and efficient manner and to the satisfaction of the Owner.

.3 The work to be performed shall include all labour, equipment, tools, materials, engineering design, testing and supervision to structurally rehabilitate the sewers by Hot Water or Steam Cured-in-Place Pipe (CIPP) method including reinstatement of service connections.

.4 In general, work includes:

Notifications to the public

Flow control and/or flow bypass

Traffic control

Liaison and other measures for properties connected to the sewer that will be affected by the work

Confirmation of existing sewer conditions

Measuring the size and length of sewers sections to confirm /determine the liner design parameters

Liner design (in accordance with ASTM F216-07a Appendix X1 design method and not later versions for F1216.)

Preliminary CCTV inspection of the sewer sections, V1

Cleaning and preparation of sewer sections

Page 118: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 6

May 2019

CCTV after cleaning and preparation and before lining, V2

Installation and curing of CIPP lining

Reinstatement of service connections

CCTV inspection of completed sewer section rehabilitation, V3

Obtaining and testing samples of the completed CIPP

All associated work required in the course of and for therehabilitation

1.5 INFORMATION TO BE REVIEWED PRIOR TO PROPOSAL SUBMISSION

.1 The Contractor shall review all information in the proposal package including and not limited to this specification, Special Provisions, Drawings and CCTV Inspections of the existing sewers.

.2 The Contractor shall investigate the site of the work.

.3 If, for proposal purposes, the Contractor is of the opinion further inspection is required in order to properly assess the work to be undertaken, the Contractor will be responsible to perform such additional inspection. Permission to enter the Halifax Water sewer system for inspection purposes must be obtained from the Owner.

.4 Where a Contractors’ site meeting is scheduled during the proposal period, as described in the proposal documents, the Contractor shall attend.

1.6 INFORMATION TO BE SUBMITTED

.1 The Proposal document requires certain information to be submitted with the proposal and also some information prior to award including and not limited to the following information to be submitted for the review and acceptance of the Owner. (Further information submission is, or may be, required elsewhere in the Proposal documents).

.2 The following shall be submitted with the Proposal:

.1 The name of a professional engineer licensed in the Province of Nova Scotia who will provide the stamped CIPP liner engineering designs required in accordance with the liner design requirements in this standard. The professional engineer shall be authorized to perform such work by Engineers Nova Scotia (ENS).

Page 119: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 7

May 2019

.2 Material specifications and structural details of the proposed sewer liner in sufficient detail to enable confirmation by the Owner that the CIPP liner proposed will meet the requirements as specified in this standard. Include the proposed resin (manufacturer, resin type and manufacturer’s resin identification number. Include the proposed liner tube (manufacturer and type of tube).

.3 A summary of the Contractor’s proposed CIPP liner installation procedure. Include one example of the liner wet-out facility processing sheet and one example of the liner curing process summary sheet to be used for the work.

.4 A certified original copy (complete with supporting literature) from the resin manufacturer of the Infrared Spectrograph of the catalyzed resin mixture proposed for this Contract.

.5 Engineering designs for Specific Liners in accordance with the liner design requirements in this specification for the sizes/sewers listed in the Proposal. Note: The Contractor shall be required to re-submit these designs stamped by a professional engineer authorized to perform such work by Engineers Nova Scotia after award but prior to commencement of work.

.6 Contractor’s quality control procedures including copy of all QA/QC record sheets used.

1.7 OCCUPATIONAL HEALTH AND SAFETY

.1 In addition to other occupational health and safety requirements in the proposal documents, the following shall apply for sewer rehabilitation work.

Page 120: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 8

May 2019

.2 The Contractor shall provide, at the scheduled preconstruction meeting, a list of all controlled hazardous materials or products containing hazardous materials, all physical agents or devices or equipment producing or emitting physical agent and any substance, compound, product or physical agent that is deemed to be or contains a designated substance in accordance with the Workplace Hazardous Materials Information System (WHMIS) as defined under the Nova Scotia Occupational Health and Safety Act, and shall provide appropriate Material Health and Safety Data Sheets for these substances used for the performance of the required work, all prior to the performance of the work.

.3 Where hazardous materials, physical agents and/or designated substances are used in the performance of the required work, the Contractor shall ensure that the requirements of the Nova Scotia Occupational Health and Safety Act and associated regulations are complied with.

.4 The Contractor shall perform the work so as to cause the public the least inconvenience possible. In particular, the Contractor shall not obstruct any street, thoroughfare, or foot-walk longer or to a greater extent than necessary.

.5 The Contractor shall take all reasonable precaution necessary to ensure the safety of the workers and the general public, particularly children who may play in the area of work.

1.8 CONFINED SPACE REQUIREMENTS

.1 In addition to other occupational health and safety requirements in the proposal documents, the following shall apply for sewer rehabilitation work.

.2 The Contractor will meet or exceed the requirements of Confined Space Entry as outlined under the Occupational Health and Safety Act. For all work in and around the sewer manholes, a person qualified in Confined Space Entry shall be present. Proof of atmospheric testing of each manhole, prior to initial entry and continuously while in the manhole where work was performed, shall be submitted to the Owner on the Confined Space Entry form, with each progress payment certificate submission.

1.9 PERMITS AND APPROVALS

.1 The Contractor shall obtain all necessary permits, permissions and approvals for the work.

1.10 WORK PRIORITIES

Page 121: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 9

May 2019

.1 The Owner will assign priorities to sewer locations to be rehabilitated at the Owner’s discretion. The Contractor shall undertake the work in the order of the Owner’s priority. All work that the Owner has set as Priority 1 shall proceed before any other work. The Owner’s Priority 1 work shall be followed by the Owner’s Priority 2 work. Any work that does not have a Owner designated priority may commence after all Priority work is substantially completed, unless otherwise approved by the Owner.

1.11 SCHEDULE OF WORKS

.1 The Contractor shall submit to the Owner, for their review and approval, a schedule for the works. The schedule shall be reviewed with the Owner prior to commencement of the works.

.2 The Contractor shall notify the Owner of specific start/finish times for all procedures in order that Halifax Water’s inspection staff may co-ordinate their schedules to ensure suitable levels of inspection. This notification shall be given a minimum of 48 hours prior to the start time.

.3 The order of work is, in general, the responsibility of the Contractor and shall be as indicated in the Contractor’s work schedule subject to priorities that may be assigned by the Owner.

1.12 SITE INVESTIGATION

.1 Prior to commencement of the Work, the Contractor shall investigate each site; determine the existing site conditions, any obstructions, or any other problem, which may affect the completion of the proposed Works. No additional payment shall be made on account of difficulties to complete the Works because the Contractor failed to investigate the site prior to commencement of the Work.

1.13 NOTIFICATION TO PUBLIC

.1 The Contractor shall advise all residents, industrial, commercial and institutional establishments connected to the sewer scheduled to be lined, 48 hours in advance of the impending sewer lining works and sewer service interruption (if applicable) for the duration of the process. The notice shall include names and phone numbers of the Contractor’s personnel (including an after-hours local emergency number). Halifax Water is to receive a copy of the notice for approval prior to delivery to the affected residents and businesses. The Owner may also choose to provide the Contractor with the Municipality’s project notice for delivery by the Contractor at the same time.

Page 122: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 10

May 2019

.2 Should a closure request for any access be accepted and approved by Halifax Water, all required notification shall be distributed and posted prior to commencement of work.

1.14 PROVISIONS FOR TRAFFIC

.1 General

.1 Supply all labour, sign, delineators, etc. Set and maintain required detours at work sites. All provisions for traffic shall conform to the latest edition of the manual of Uniform Traffic Control Devices and all applicable sections of the tender document.

.2 Cost to meet the requirements of this clause shall be included as outlined in the Schedule of Quantities & Prices.

.2 Provisions for Access

.1 The Contractor shall provide vehicular access at all times to all properties with existing access. Where blocking of access is unavoidable, the Contractor shall notify all residents affected and shall work to keep the period of inconvenience to a minimum.

.3 Pedestrian Traffic

.1 The Contractor shall provide for safe pedestrian movement from all houses and businesses along the site at all times. Walkways shall not be obstructed at any time.

.4 Work on Major Arterials

.1 No work shall be performed on major arterial roads during Peak Hour Traffic (6:00 am – 8:00am and 3:00pm – 6:00pm) without the written consent from the Traffic Authority. Refer to the Transportation Association of Canada (TAC) Manual for road classifications and traffic volumes.

1.15 EXISTING VIDEO INSPECTION RECORDS AND DRAWINGS

.1 CCTV Inspections

Page 123: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 11

May 2019

.1 Any CCTV inspection surveys provided by the Owner with the Proposal or later, while believed to be accurate, may contain errors or approximations in sewer sizes, lengths and other information. Where sizes, lengths, or depths are required by the Contractor for the proper execution of the CIPP lining work, the Contractor shall verify dimensions by field measurement and shall not rely on the existing CCTV inspection surveys.

.2 Any CCTV surveys provided by the Owner at time of proposal represent the internal condition of the sewers for proposal purposes. Where, in the course of the work, the Contractor has reason to believe that the internal condition of the sewers has changed and such change materially and significantly negatively impacts the execution of the work, the CCTV surveys provided by the Owner at time of proposal shall represent the baseline condition for comparison to determine a changed condition. Refer to available list of CCTV videos provided in the Special Provisions – General section.

.2 Drawings

.1 Drawings provided by the Owner with the proposal or later, while believed to be accurate, may contain errors or approximations in sewer sizes, lengths and other information. Where sizes, lengths, or depths are required by the Contractor for the proper execution of the CIPP lining work, the Contractor shall verify dimensions by field measurement and shall not rely on the drawings. Refer to available list of drawings provided in the Special Provisions – General section.

.2 The Contractor shall review the inspection information and drawings prior to undertaking any work in the sewer sections.

.3 The Contractor shall have reviewed, prior to proposal submission, Halifax Water’s inspection information that is available prior to proposal closing.

Page 124: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 12

May 2019

1.16 WEATHER CONDITIONS

.1 The Contractor shall monitor the local weather, including reviewing the Environment and Climate Change Canada Weather forecast prior to commencement of lining operations. Where the anticipated weather conditions are such that anticipated sewer/drain flows may exceed the Contractor’s bypass pumping capacity or may cause potential service backups, the contractor shall notify the Owner and commencement of any work that impedes sewer flow shall be delayed until favourable weather is forecast.

.2 This clause applies to all sewers (storm, sanitary and combined) to be lined.

PART 2 - PRODUCTS

2.1 SEWER SIZES – NOMINAL VERSUS ACTUAL

.1 The Contract Documents generally refer to nominal sizes for sewers and not the actual inside diameter sizes. The actual inside diameters will typically be slightly different (typically larger) than the nominal value. It is the Contractor’s responsibility to use the sewer size dimensions that are appropriate and proper for rehabilitation purposes including CIPP liner design.

2.2 SEWER SIZE INSIDE DIAMETER TOLERANCES

.1 General

.1 Sewer sizes shown in Proposal and Contract documents are nominal metric sizes. For the purpose of the contract, a nominal sewer size shall include actual sizes within the range shown below.

Page 125: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 13

May 2019

Nominal Size (mm)

Lower Limit of Actual ID

(mm)

Upper Limit of Actual ID

(mm)

200 > 178 ≤ 216

225 > 216 ≤ 241

250 > 241 ≤ 279

300 > 279 ≤ 343

375 > 343 ≤ 419

450 > 419 ≤ 483

500 > 483 ≤ 521

525 > 521 ≤ 572

600 > 572 ≤ 648

675 > 648 ≤ 724

750 > 724 ≤ 800

825 > 800 ≤ 876

900 > 876 ≤ 953

975 > 953 ≤ 1029

1050 > 1029 ≤ 1105

1125 > 1105 ≤ 1181

1200 > 1181 ≤ 1295

Page 126: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 14

May 2019

.2 Where the inside diameter fits within the range for a nominal size, the sewer shall be deemed to be that nominal size for payment purposes. For example, a sewer identified in as a 900 mm that has an actual inside diameter up to 953 mm shall be deemed to be a 900 mm sewer. Whereas a sewer identified in the contract documents as a 900 mm that has an actual inside diameter above 953 mm shall be deemed to be a 975mm sewer.

.3 The applicable sewer size for payment shall be based on the inside diameter that has been determined, by measurement, to be the diameter to be used for sizing the CIPP liner.

.2 Sewer Size for Lining Increased by H2S Corrosion

.1 The sewer sections for rehabilitation by CIPP lining may be internally corroded by H2S induced corrosion. In some sections the corrosion is severe with exposed reinforcing steel. Some sections have exposed gaskets. In determining the inside diameter of the sewer for sizing of the liner, the Contractor shall take into account that most, if not all H2S corroded sections will have enlarged inside diameters, especially after cleaning and preparation. Refer to Section 2.4 on measurements.

2.3 OBJECTIVES FOR CIPP LINING

.1 The objectives for CIPP lining of sewers are to prevent further structural deterioration, prevent corrosion, prevent root intrusion, prevent/reduce infiltration and improve flow characteristics.

.2 CIPP Lining shall be a tight fit to the inside of the existing sewer and conform closely to the shape of the existing sewer without bridging, gaps, or voids.

.3 CIPP lining shall be installed without excavation by installation into existing pipelines through MH access. Exception shall be made when existing MH access is of insufficient size or existing MH location is inadequate.

.4 CIPP liners shall be designed in accordance with the Design Section of this specification.

.5 The term liner means a continuous reach of lining extending over the section to be lined, beginning and ending at manhole inside walls.

Page 127: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 15

May 2019

2.4 CIPP LINER SIZING

.1 General

.1 It is the responsibility of the Contractor to obtain and confirm the necessary lengths and interior dimensions of the sewers to be lined and obtain the appropriate measurements. Size information provided on the drawings or in the Request for Proposal documents are typically nominal sizes and are not necessarily the correct sizes.

.2 The Contractor’s method for obtaining and confirming sizes shall, at a minimum, include measuring the inside diameter of the existing sewer at all manholes (MHs) in the section. Measurement method shall take into account the possibility that the exposed sewer end is a bell and does not represent the inside diameter of the sewer pipe itself. Measurement method shall take into account any debris, encrustation, or other build up in the sewer that could result in an incorrect sizing measurement. The contractor shall also take into account any change in pipe characteristics such as offset joints, change in ovality, partial collapse, broken pipe, etc., which could result in incorrect sizing measurement.

.2 Measurements for Liner Sizing

.1 The Contractor is responsible for the correct diameter sizing and length of the CIPP liners. The Contractor shall not rely on dimensions provided in the proposal documents including drawings or CCTV inspection.

.2 The actual inside size(s) of the sewers for lining shall be verified by measurement prior to any fabrication of the liners. The dimensions used for sizing the liner tubes circumference/perimeter shall take into account potential increase in the sewer inside diameter due to the cleaning and preparation of the sewers for lining.

.3 The length of the liner shall be verified by measurement of the section(s) of sewer to be lined. A sufficient length safety margin shall be added to the measured length to assure that the liner extends from beginning of the MH to the end MH over the length of the installed liner run.

.4 Measurements shall be provided to the Owner on request.

.3 Liner Sizing Measurements Made Prior to Cleaning and Preparation

Page 128: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 16

May 2019

.1 Where the sewer inside diameter is measured for sizing the CIPP liner prior to cleaning and preparation, the measurement method shall employ using sizing rods, mandrels or other device that can penetrate through or scrape away any material buildup (e.g. corrosion deterioration) in order to obtain the inside diameter that is expected to occur after cleaning and preparation of the sewer. Measurements by tape measure shall not be acceptable.

.2 Measurements shall be taken at both ends of all USMH-DSMH sewer sections to be CIPP lined.

.3 Where flow control is required to obtain proper measurements, the Contractor shall provide flow control.

.4 Variable Sewer Inside Diameter for Lining

.1 In the event that an inside diameter variance exists along the sewer section to be lined to the extent that the liner may be oversized or undersized for zones of the lining run, the Contractor shall present the liner sizing situation and anticipated lining results (regarding fit and finish) along with a recommendation for liner sizing for the MH-MH section to the Owner. The Owner shall discuss the situation with the Contractor and in conjunction with the Contractor determine and approve the sizing of the liner for the installation.

.2 It is understood that in zones of the sewer where a liner may be oversized, there will be excess material in the form of wrinkles and fins in the finished liner. In zones of the sewer where the liner is undersized, the finished liner may stretch out resulting in a decrease in wall thickness. The Owner shall take the foregoing into account in the determination of the approved liner sizing.

.3 The determination of the sewer sizing for lining will consider the best compromise between zones of excess liner material and zones where the liner could be thinned out by stretching or where the stretch may not be sufficient resulting in a liner that is not tight fitting.

Page 129: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 17

May 2019

.5 Pipe Size for Payment

.1 Payment for CIPP lining shall be based on the nominal size that has a size range that includes the inside diameter after cleaning and preparation. Refer Section 2.2 for size ranges. The inside diameter after cleaning and preparation shall be the dimension used to size the CIPP liner for payment purposes.

.2 For example where the contract identifies the nominal size as 825 mm and the actual inside diameter for lining after cleaning and preparation is within the range shown in Section 2.2 for nominal 825 mm, payment will be made for a nominal 825 mm. However if for a contract nominal 825 mm, the actual inside diameter for lining after cleaning and preparation is greater than the maximum inside diameter for nominal 825 mm shown in Section 2.2 , payment will be made based on the nominal size with a range containing the final inside diameter for lining.

.6 Substantiation for Increase in Nominal Size for Payment

.1 Where an increase in nominal size for payment is warranted, the Contractor shall provide substantiation of the final size for lining that verifies the final size for lining based on measurements of the sewer or other substantiation method that is acceptable to the Owner.

2.5 EVALUATION OF MH-MH SECTIONS FOR LINING

.1 Prior to any liner preparation, the Contractor shall evaluate each MH-MH sewer section to be lined. This evaluation shall determine whether the Proposal Liner Design submitted with the proposal submission yields a liner that is suitable for the MH-MH sewer section being evaluated or whether a Special Liner Design is required.

.2 This evaluation shall also determine whether any excavated repairs are required before lining and whether the sewer section, overall, is a suitable candidate for lining.

.3 The Contractor’s evaluation shall include field identification and CCTV review identification for when one or more of the following installation parameters are in exception to the Specific Design parameters.

Page 130: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 18

May 2019

Parameter Exception to Proposal Design

Ovality Greater than 3%

Water Table Location

Less than 1.0 m below ground surface

Sewer Invert Deeper than Proposal Liner Design

Size Different than the Proposal Liner Design

Live Load Greater than the Proposal Liner Design

.4 From the evaluations of all MH-MH sewer sections to be lined, the Contractor shall prepare and maintain a Liner Sections Record (LSR) of every MH-MH section for lining. The LSR shall show whether the MH-MH section is suitable for a Proposal Design Liner or whether a Special Design Liner is required. When a Special Design Liner is required the LSR shall show the existing sewer parameters that are in exception to the Specific Liner Parameters.

.5 The LSR shall use an Excel spreadsheet and called the Liner Sections Record. The contractor shall utilize Halifax Water’s MH identification (ID) numbers. When requested, the Contractor shall provide an updated LSR to the Owner.

.6 The LSR shall be constructed in such a way that all MH-MH sections to be lined can be readily identified along with the exceptions to Specific Design Parameters for that section. When a Special Design is made for a MH-MH section the liner design thickness shall be identified in the LSR along with the Special Design parameters.

.7 The format of the LSR shall be as determined by the needs of the Contractor to record and track the evaluation process and the needs of the Owner for use of this data.

2.6 PROPOSAL DESIGN LINER VERSUS SPECIAL DESIGN LINERS

.1 For each sewer section for lining identified in the proposal there will be an approved Proposal Liner Design for each MH-MH section of lining and a corresponding Proposal Liner. The Proposal Liner Design shall be submitted by the Contractor with the proposal submission. See Sections 3.10 and 3.11 .

Page 131: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 19

May 2019

.2 Where it is determined that a Proposal Design Liner has insufficient thickness for the intended MH-MH section of lining, the Contractor shall provide a Special Design which takes into account the changed parameters that made the Proposal Design Liner unsuitable for the location. On the approval of the Owner, the Contractor shall install the Special Design Liner and be paid accordingly.

.3 The determination of whether a Special Design and correspondingly a Special Design Liner are required shall flow from the Contractor’s Evaluation of MH-MH Sections for lining work.

2.7 LINER THICKNESS INCREASE

.1 Where a Proposal liner design thickness is insufficient for the installation as determined by a Special Design, the liner thickness shall be increased to satisfy the Special Design thickness. The thickness increase shall be the minimum required incremental thickness of the liner tube to satisfy the Special Design thickness. Thickness increments shall be as per the Schedule of Quantities and as set forth below.

Increment # Thickness Increment

1 1.0 mm

2 > 1.0 mm ≤ 2.0 mm

3 > 2.0 mm ≤ 3.0 mm

4 > 3.0 mm ≤ 4.0 mm

5 > 4.0 mm ≤ 5.0 mm

Page 132: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 20

May 2019

.2 A thickness increment pay item only applies when the Contractor was required to increase the nominal liner tube thickness over the Specific Design liner to achieve the additional thickness required by the Special Design.

.3 In the proposal response, the Contractor shall, for each sewer section, list the specific nominal tube size to be used for the Specific Design Liner. See Statement E in the Request for Proposal.

.4 Where the Contractor considers that the increased in-place thickness necessitated by a Special Design can be achieved without increasing the nominal tube thickness over the specific nominal tube thickness, then the installation may be made with the specific nominal tube thickness at the Contractor’s discretion. However regardless of the nominal tube used, the in-place liner thickness shall meet the requirements of the Special Design. In the case where the Contractor opts to use the Proposal Design nominal tube thickness, there will not be a thickness increment change for the nominal tube thickness and no increased thickness payment will apply.

.5 Where the Special Design Liner has been approved by the Owner, the Contractor will be paid for the liner thickness increase in accordance with the appropriate item in the Schedule of Quantities and Prices. Compensation for extra thickness will not be given in cases where liners are installed without prior approval by the Owner, through corresponding certified design approved by the Owner.

PART 3 - EXECUTION

3.1 FLOW CONTROL AND BYPASS

.1 Purpose

.1 Provide for bypassing and pumping of mainline sewage to maintain sanitary sewage flow in upstream sections of the sewer being lined. The contractor shall not let the upstream sewers surcharge beyond a reasonable amount, so as not to create any issues.

.2 During the CCTV inspection of pre and post rehabilitation, sewer flows shall be bypassed in order to enable proper inspection of the pipe invert.

Page 133: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 1

HOT WATER OR STEAM CURED-IN-PLACE PIPE - MAINLINE

Section 33 11 05 Page 21

May 2019

.2 General

.1 Flow Control means reducing or eliminating flow in the sewer section or sewer sections where lining is to be installed for the purpose of allowing the liner installation and facilitating associated activities, such as CCTV inspections. The method of achieving flow control is the responsibility of the Contractor subject to approval by the Owner.

.2 For the mainline sewer, flow control may include: Complete bypass pumping of the sewer section(s) requiring flow control, plugging and back-up of the upstream mainline sewer, pick-up of flows by vacuum tanker truck.

.3 For service connections, flow control may include: Temporarily backing up the service connections during lining installation (with notice and instructions to property occupants), bypass pumping of flows from service MHs, pick-up of service flows at service MHs (or other intercept points) by vacuum tanker truck.

.3 Complete Flow Control Required For:

CCTV inspection V2

Insertion and Curing of the CIPP liner until flow through thelined sewer section can be restored when the liner ends areopened for flow.

CCTV inspection V3

.1 Complete flow control means that there shall be no flow in the sewer section(s) and any fluid remaining in the sewer section shall be insignificant to the point that it will not interfere with or negatively affects the process underway during flow control, such as liner installation, liner cure or CCTV inspections.

.2 No flow control or bypass pumping shall be employed that has insufficient capacity to maintain flow in the sewer system. It is the Contractor’s responsibility to employ flow control of sufficient capacity. No work requiring flow control shall proceed until flow control arrangements are in place that provide sufficient flow control capacity

.4 Flow Control During Other Work

Page 134: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 22 May 2019

.1 Partial or complete flow control may be required during other work when the presence of flow in the pipe negatively affects the quality of that work. In general, the use and amount of flow control for other work will be at the Contractor’s discretion except when in the opinion of the Owner flow control is necessary for the Contractor to properly perform the work and obtain required results. Other work includes:

.1 Cleaning and preparation of the sewer section(s) to be lined

.2 Reinstatement of service connections into the lined sewer

.3 Any extra CCTV inspections required by the Owner

.5 Bypass Pumping

.1 When bypass pumping is employed for flow control, the Contractor shall meet the following requirements:

.1 Any surcharging of upstream sewer(s) shall not create any upstream problems such as property flooding or impeded mainline flow or impeded service flow.

.2 Flows shall be transported through a closed, leak tight pipeline or other method as approved by the Owner to the nearest or most economical disposal area.

.3 On all liner installation time periods, the Contractor must maintain on site both a primary and stand-by by-pass pump and pump power supply as required to ensure sufficient flow control. The stand-by by-pass pump and power supply shall be of an equal or better capability than the primary by-pass pump and power supply. No by-pass pumps or related equipment shall be disconnected or removed from the sewer or job site until after all service connections have been reinstated, all by-pass equipment has been flushed/cleaned as approved by the Owner, and the Contractor has recorded the V3 CCTV inspection.

.4 All by-pass pumping shall be in place and operational prior to the final pre-installation inspection.

.5 All by-pass pumps and related equipment must be silenced equipment or contained within an acceptable sound reduction structure.

Page 135: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 23 May 2019

.6 Flow Control for Service Connections on the Sewer Being Lined

.1 When service connection flow control is employed, the Contractor shall meet the following requirements:

.1 When private service back-up is used, advise building occupants of out-of service date and duration. Provide building occupants with instructions to limit water use.

.2 When private service back-up is used, the maximum out of service time shall be 8 hours.

.3 Make provisions to provide for residential bypassing as well as building bypassing of multi-unit residential, commercial, and industrial buildings (as determined by the Owner) from a clean out or property MH to maintain sanitary and storm sewage services to the property if required.

.4 Make all necessary arrangements with the owners of each residence and/or building. The Contractor shall contact all property owners and/or tenants to co-ordinate the repair work to the sewer and minimize any impact on residents and/or businesses.

.7 Event of Loss of Redundant Capacity

.1 When circumstances arise requiring the use of redundant capacity and therefore redundant capacity no longer exists, action shall be undertaken immediately to restore the lost capacity to full function so that redundant capacity is fully restored. If redundant capacity cannot be restored, only critical work already in progress that must be completed (such as lining inversion, curing and liner end opening) shall proceed and without delay. No other work continuation (such as CCTV inspection) shall take place without a fully functional redundant capacity.

.2 When it is known or suspected that redundant capacity is not or may not be fully functional, no work shall be started that requires bypass operation.

Page 136: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 24 May 2019

.8 Bypass Coordination and Supervision

.1 A Bypass Supervisor shall be assigned to manage all bypass pumping operations. The Owner shall be advised of this person and be provided with 24 hr contact information. When the bypass is required to operate, the supervisor shall assure that the bypass system is in full function operation, including fully available 100% redundancy before any work is started for which the bypass is required. When the bypass is in operation, the bypass supervisor will assure that there is continuous presence by a competent person to watch over the bypass including manual checking of upstream levels, pump fuel levels and other indications of potential trouble such as at pump suctions and discharges, discharge conduits and redundancy availability.

.9 Responsibility for Leaks, Spills and Back-ups

.1 The Contractor shall be responsible for all leaks, spills and back-ups, should they occur and shall take immediate action to restore bypass integrity and make clean-up of any leak, spill or back-up.

.10 Flow Control Included Limit Provision

.1 Unless specified otherwise in the contract documents (such as for site specific flow control requirements) the following limit to flow control included in the CIPP lining applies.

.2 Limit of Flow Control Included with Lining Item

.3 The Contractor shall provide minimum flow control as part of the lining item, up to 63 litre/sec (1,000 usgpm) or up to the maximum flow volumes required facilitating the liner installation (as provided in the proposal information), whichever is greater. Such flow control shall include bypass pumping or other means of effecting flow control.

.4 Refer to contract documents site specific requirement(s) and corresponding pay item(s) for identified flow control requirements exceeding the flow control limit that are separate pay items.

3.2 CCTV INSPECTIONS

.1 General

.1 All required CCTV inspection shall be in accordance with the following requirements.

Page 137: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 25 May 2019

.2 The CCTV camera equipment shall be of a self-propelled type with colour pan, tilt and zoom camera or equivalent capability with a range of at least 200 m from the insertion location. The minimum resolution shall be 400 lines on the live picture and at least 250 lines on any recording. The camera equipment shall be capable of correctly focusing on locations being viewed and shall be equipped with adjustable focusing capability. The camera equipment shall be suitable for the size of the sewer. The picture on the CCTV monitor shall be an accurate representation of the inspection and shall have no on screen distortion such as vertical flattening or horizontal widening.

.3 The camera shall be located closely in the center of the pipe and shall provide a picture that properly and fully shows the full circumference of the pipe in sufficient detail to verify the interior details and features of the existing sewer or lined sewer meet with requirements (Cleaning and Preparation requirements, CIPP liner requirements and service connection reinstatement requirements). The camera equipment shall be provided with sufficient lighting of the viewing zone so that all details and features can be seen clearly and are not obscured by insufficient lighting or shadows both on the perimeter of the picture and in the direction of the view down the pipe. CCTV inspections with insufficient lighting will not be accepted.

.4 The view shall not be obscured by any vapour in the pipe. Where steam or other vapour obscures or otherwise interferes with the view, the Contractor shall take necessary action required to eliminate steam or vapour that interferes with the view.

.5 Where and when required for CCTV inspection, the pipe shall be sufficiently free of flow or standing water so that all surfaces can be fully inspected without any areas or features being obscured by water in the pipe. This will require flow control of flow during post cleaning and preparation CCTV inspection, CCTV monitored service connection reinstatement and final CCTV inspection of the completed CIPP liner.

.6 The speed of inspection shall allow for proper viewing and inspection and shall not exceed 10 m per minute subject to requirements for pausing at service connections or other features, or as may be required by the Owner for specific situations.

Page 138: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 26 May 2019

.7 CCTV inspections shall be recorded on flash drive in a non-proprietary format compatible with Halifax Water’s CCTV viewing equipment and software. Each flash drive shall be clearly marked as to contents and date. One copy of each flash drive shall be provided to the Owner.

.8 The initial screen of any inspection shall record the inspection date, Contractor name, Contract identification information, location of the inspection, MH-MH section number(s), start and end MH numbers and the inspection type (e.g. Post Cleaning and Preparation, Final Inspection after Lining) and any other information routinely required for sewer CCTV inspections. The distance counter meters shall be zeroed at the starting MH and run continuously throughout the inspection. The section number shall appear continuously along with the distance count.

.9 At each service connection, the camera shall view the entire opening and up the service connection pipe (pan and tilting as required) for a minimum of 10 seconds or longer as necessary to view and record the complete details of the service connection.

.10 A computer generated written report shall accompany the CCTV inspections detailing features (e.g. service connections etc.) and their locations (distance from starting MH). The location information shall include the clock position.

.11 CCTV vehicle shall have sufficient space to accommodate the Owner for live viewing as well as the CCTV operator.

.2 Digital Video Files of the CCTV Inspection

.1 The compression or other technology used in making digital representation of the CCTV image shall not reduce the useable clarity of the image and shall not result in visible pixels on the computer screen when viewing the CCTV inspection in actual size (not full screen size). The digital format shall be MPEG-2 (Moving Pictures Expert Group - 2 and ISO/IEC 13818) standard or equivalent. The digital format shall not make computer playback dependent on a particular computer operating system or specific video player for full function playback. The digital recording shall play with full function in:

Windows Media Player Windows,

QuickTime Player Windows,

Page 139: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 27 May 2019

QuickTime Player Mac,

VLC Player Windows

VLC Player Mac

.2 Where these video players are properly configured for the MPEG-2 format. Video recordings that will not play back properly in all the above players will not be accepted and will require re-doing the CCTV inspection (or other corrective procedure).

3.3 PRELIMINARY CCTV INSPECTION – V1

.1 The Contractor shall make a preliminary CCTV inspection (called the V1) of the sewer section before undertaking any work required for the CIPP lining of the section. The purpose of the V1 is to determine and record the initial condition of the sewer section and to determine if a significant changed condition exists versus the CCTV inspection provided to the Contractor by the Owner. Significant changed condition means a condition that will prevent lining of the section, require an unexpected excavated repair before lining, require a change in the liner design resulting in an increased liner thickness to deal with the changed condition or any other situation, which in the Owner’s opinion, is a significant changed condition.

.2 Where a significant changed condition is encountered, the Contractor shall immediately inform the Owner.

.3 In making the V1, the Contractor shall employ only such preliminary cleaning that is necessary to obtain a CCTV inspection sufficient to record the initial condition including a count and condition of service connections.

.4 De-watering of the sewer shall be sufficient for V1 inspection purposes and bypassing of the sewer flow shall be done where the sewer is not sufficiently clear for V1 inspection purposes.

.5 Sewer defect coding is not required for the V1.

.6 The V1 CCTV inspections shall be submitted to the Owner in accordance with the requirements of this standard

Page 140: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 28 May 2019

3.4 FILLING OF VOIDS

.1 Void Definition

.1 A void is a volume of space starting at the outside wall surface of the existing sewer where there is an absence of soil or ground material. Depending on its size and geometry the void may represent a structural weakness in the pipe/soil system that may continue after lining of the sewer. A void will often by evidenced by missing sewer pipe wall that has allowed the ground material to escape into the sewer, exacerbated by ground water infiltration. Where a void is deemed to create a significant structural weakness in the lined pipe, the void requires filling to re-establish the soil/ground support around the sewer.

.2 Voids Identified for Filling in the Contract

.1 The Contractor shall fill voids as specified for filling in the Proposal documents. Void filling shall ensure structural integrity of the lined sewer and prevent bridging by the liner. The Contractor shall submit for the approval of the Owner a detailed method statement outlining the procedures and materials to be used in filling the voids. The method statement shall correspond with requirements that may be specified for void filling in the Proposal document.

.3 Voids Requiring Filling Not Identified in the Contract

.1 If, during the course of the work (such as during the V1 or cleaning and preparation), the Contactor identifies voids that require filling to ensure the structural integrity of the liner and to prevent bridging by the liner, the Contractor shall advise the Owner of these voids. Where the filling of such voids is required by the Owner, the Contractor shall submit a detailed method statement outlining the procedures and materials to be used in filling the voids. Where the Owner requires filling of the voids, the cost shall be negotiated. However, this provision shall not apply to any voids created as a result of the Contractor’s work unless, and at the discretion of the Owner, the creation of such voids was an unavoidable repercussion of the work.

Page 141: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 29 May 2019

3.5 CLEANING AND PREPARATION OF EXISTING SEWERS FOR CIPP LINING

.1 General

.1 The sewer sections to be lined shall be cleaned and prepared to meet the requirements for lining including as follows.

.2 Precaution for Cleaning and Preparation

.1 The contractor shall take all reasonable steps to prevent the collapse or irreparable damage to the pipe wall (which would create the need for an open cut repair prior to lining) during the cleaning and preparation of the sewer sections. Should the contractor identify areas within the sewer sections which present a high risk for this situation to occur during cleaning and preparation, they shall notify the Owner and present their recommended approach to avoid the potential collapse or damage.

.2 The sewer sections to be CIPP lined shall be cleaned and prepared to meet the requirements for lining including as follows.

.3 Soft Deposits and Loose Debris

.1 All soft deposits shall be removed by suitable cleaning methods such as water jet sewer cleaning sized and rated for the sewer being cleaned. Soft deposits include such deposits as slime, grease and soft corrosion products. Loose debris includes such as soil, sand and contents of the sewer flow that have settled out of the flow.

.4 Corrosion Soft Deposits

.1 If the sewer is experiencing signs of corrosion, it may have areas of corrosion soft deposits. The severity of this corrosion and the type and depth of the corrosion products layers vary at different locations in the sewer sections. Where the depth of this layer is such that cleaning will cause exposure of the reinforcing steel (or where it is already exposed), the cleaning process shall be checked by CCTV to gauge the degree of removal and penetration into the pipe wall from the cleaning process.

Page 142: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 30 May 2019

.2 Where CCTV checking of the cleaning process indicates that full removal of soft corrosion layers is resulting in or may result in under-cutting of the reinforcing steel, soft layer removal operations shall be limited to not deeper than the outer surface of the reinforcing steel. The Contractor shall advise the Owner when cleaning and preparation operations in corroded sewers are creating, or will create a situation where it is advisable to scale back or halt such operations. On such advice, the Owner will advise the Contractor regarding the necessity for further cleaning and preparation.

.5 Hard Deposits

.1 Hard deposits, such as hard calcite shall be removed if they result in a diametric reduction of the sewer exceeding 15 mm. No hard deposits shall remain in place with sharp or ragged edges that will cause sharp indentations into the liner regardless of the diametric condition.

.2 Hard deposits shall be removed using suitable equipment such as flailing or robotic cutting/grinding. The method of removal shall be such that no damage is caused to the pipe that will compromise the long-term structural performance of the rehabilitation.

.6 Tree Roots

.1 Any tree roots protruding into the inside of the pipe shall be sufficiently removed so that they do not interfere with the CIPP lining installation and the finished liner.

.7 Protruding Service Connections

.1 Any service connection to the sewer that protrudes into the inside of the sewer shall be trimmed back if the protrusion exceeds 12 mm. Regardless of the protrusion length, any sharp or ragged edged protrusions shall be trimmed smooth. Trimming shall be done with a method that does not damage either the service connection pipe or the mainline pipe. Robotic cutting is an acceptable method. Flailing with knocking devices is not an acceptable method.

Page 143: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 31 May 2019

.8 Disposal of Cleaning and Preparation Debris

.1 All debris, deposits etc. resulting from cleaning and preparation operations shall be removed from the sewer and not allowed to pass downstream or upstream from the sections to be rehabilitated. Disposal of cleaning debris and other waste products at an approved location is the responsibility of the Contractor.

.2 At the conclusion of cleaning and preparation, a CCTV inspection shall be made (the V2) and provided to the Owner for review and approval of the cleaning and preparation at least 2 days before lining installation. Refer to Section 3.7 .

3.6 IDENTIFICATION OF SERVICE CONNECTIONS

.1 All live service connections shall be re-instated into the liner. The Contractor shall identify all live and capped service connections prior to lining (during V1 and V2 work) and submit a Service Connection Report (SCR) to the Owner containing the following information at a minimum:

.1 US MH and DS MH IDs for sewer section under review

.2 Mainline Sewer Section ID

.3 Date of Survey

.4 Mainline Sewer Size

.5 Contract Number

.6 Survey Operator Name

.7 Location

.8 Pipe Length

.9 Direction of Survey

.10 Distance of Service from beginning MH

.11 Description of Service (e.g. active, collapse, abandoned)

.12 Diameter of Service pipe

.13 Clock position of service in pipe (e.g. 2 O’clock)

.14 Total number of service connections

Page 144: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 32 May 2019

.2 The Owner reserves the right to not reinstate capped services.

.3 The SCR shall be updated during service connections reinstatement to show service connections have been reinstated with date and time of reinstatement.

.4 All measurements for the location of service connections will be obtained from a steel tape measure and will be taken from a convenient, fixed and permanent reference point.

.5 The SCR shall be provided to the Owner.

3.7 POST CLEANING AND PREPARATION CCTV INSPECTION – V2.

.1 After completion of the cleaning and preparation of the sewer section (including all reaming, cutting, grinding and void filling) of the sewer section, a CCTV inspection (called the V2) of the full length of the sewer section shall be done. The V2 shall be done in accordance with the requirements of this standard.

.2 Flows for V2 shall be at a level that allows for visual confirmation that the preparation work was completed adequately.

.3 Sewer defect coding is not required for the V2.

.4 The V2 complete with all reports shall be provided to the Owner at least 48 hours prior to lining for the Owner’s approval of the cleaning and preparation.

.5 On its discretion, the Owner may waive the requirement for the V2 to be submitted for approval 48 hours prior to lining, such as when approval for lining was provided at a live viewing of the V2 by a Halifax Water representative. However, in such cases the V2 submission shall always be submitted at a later time.

.6 Lining shall not commence until acceptance of the cleaning and preparation has been provided by the Owner to the Contractor.

.7 In the event that, after the V2, a deficiency in the cleaning and preparation is identified that requires correction, the V2 shall be redone after the correction has been done and the redone V2 submitted to the Owner.

Page 145: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 33 May 2019

.8 At the completion of cleaning and preparation for all sections, the CCTV inspections shall be consolidated on to one USB flash drive (or more than one as needed) and shall be in sequential order from upstream to downstream starting with the most upstream section. A USB flash drive shall also be provided to the Owner.

3.8 CIPP LINER – TYPE AND MATERIAL

.1 The CIPP lining shall be in accordance with and meet the requirements of referenced standards or the properties used in the liner designs, whichever are higher. (Designs shall not use properties lower than those in the reference standards).

.2 The CIPP liner to be installed by the Contractor shall have a substantial history of successful application in similar size sewers. This history of application shall include: installations throughout Canada in sanitary sewers, storm sewers, and culverts; include all sizes required in the work for this contract. Prior to award of contract, the Owner will request the history of use and assess whether the proposed CIPP liner meets requirements for approval.

.3 Materials shall be in accordance with the requirements of ASTM D5813-04(2008) and ASTM F1216-16, ASTM F1743 and ASTM F2019 as applicable to the type of CIPP liner used.

.4 Where reinforced CIPP liners are used, they shall be in accordance with ASTM F2019-03(2009) and where applicable with ASTM D5813-04(2008) and ASTM F1216-16.

.5 The quantity of resin used in the liners and its impregnation shall meet with the requirements of ASTM F1216-16, section 7.2.

.6 Where, in the course of work, the Contractor has reason to use materials that differ from the original materials proposed for this contract the Contractor shall make a written request to the Owner detailing the proposed changes and reasons for the requested change. Any proposed different materials shall meet the above standards (as applicable to the type of liner) and require the written approval of the Owner prior to substitution.

.7 Where, in the opinion of and at the sole discretion of the Owner, confirmation of use of the proper material is required, appropriate procedures such as an IR scan (Infrared Spectroscopy) for resin may be used. If required, a baseline IR scan of the resin to be used on this contract shall be provided to the Owner. The baseline IR scan shall be made on the resin after catalyst addition and before any curing.

Page 146: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 34 May 2019

3.9 CIPP LINING – STEAM CURING

.1 In addition to temperature sensors being placed at the upstream and downstream MHs during the curing of the CIPP liner, steam curing of CIPP liners shall include a monitoring system capable of recording temperatures along the entire length of the CIPP installation to verify proper curing temperatures. Temperature sensors shall be placed between the host pipe and the liner within the invert (bottom) of the host pipe throughout the full length of the liner installation. The system shall be capable of recording the temperature at the invert throughout the entire length of the installation. The sensors shall be spaced apart at intervals no greater than 5 meters for pipe sizes up to 375 mm in diameter; and no greater than 3 meters for pipe sizes 450 mm and larger. Additionally, sensors shall be strategically placed at points where a significant heat sink is likely to be anticipated (e.g. sag in the host pipe, active infiltration, etc.). The monitoring and recording of these sensors shall be by a small computer which can record the temperatures throughout the processing of the CIPP and be available for viewing on site by the Owner during the cure process. Upon completion of the liner installation, the temperature data shall be submitted to the Owner as part of the overall final QA/QC submittal requirement.

.2 Acceptable temperature sensor monitoring systems include:

ZIA Systems (www.ziasystems.com/) or

Owner approved equivalent.

.3 Prior to installing the liner in the host pipe, the temperature monitoring system’s proper functioning shall be confirmed by hooking it up to the computer and ensuring that the sensors are reporting the ambient sewer temperatures. No more than two sensors in sequence can be found faulty during this test. If three or more sensors in sequence are discovered faulty, a new sensor array shall be pulled into the host pipe replacing the previously installed array; and the new array shall be again tested for its proper functioning.

.4 The sensor array’s computer database shall have an output report that identifies each sensor by its station over the length of the CIPP installation. The maximum temperature achieved during the steam cure process and the time sustained at or above the required curing temperature shall be recorded and submitted for each sensor.

Page 147: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 35 May 2019

3.10 CIPP LINER MINIMUM PHYSICAL PROPERTIES

.1 The minimum in-place physical properties for the CIPP liners shall be:

Property Required Minimum Value (non-Reinforced)

Required Minimum Value (Reinforced)

Test Method Note

Flexural Modulus

2,400 MPa initial with 50 year retention of at least 50%

8000 MPa initial with 50 year retention of at least 50%

ASTM D790 or ISO 11296

ASTM D2990 or ISO Equivalent

ASTM F1216 minimum of 1724 MPa is not applicable.

Flexural Strength

31 MPa initial with 50 year retention of at least 50%

150 MPa initial with 50 year retention of at least 50%

ASTM D790 or ISO 11296

ASTM D2990 or ISO Equivalent

Page 148: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 36 May 2019

.2 The Contractor may provide CIPP liners with in-place properties greater than the required minimum values above. Increased properties will normally be reflected in decreased liner thickness requirements. CIPP liners installed with physical properties below the minimum required property values shown above will be considered non-compliant, regardless of the any design reconciliation outcome.

.3 The short-term test values of flexural modulus and flexural strength used as the starting values from which the long-term design values are derived shall be values that have been and will be reliably and repeatedly obtained by the Contactor in installations of the same liner material and be substantiated by a history of testing of samples. These short-term test values shall be identified in any liner designs. The retention value to be used in design shall be based on ASTM D2290 (or equivalent as acceptable to the Owner) testing for the liner material that substantiates the derivation of the retention value used.

.4 Also see Section 3.22 on liner samples and testing.

3.11 CIPP LINER DESIGN

.1 General

.1 The wall thickness for CIPP liners shall be determined in accordance with the design method set out in ASTM F1216-07a, Appendix X1 for Fully Deteriorated Gravity Pipe Condition as per Section X1.2.2. The design method in later versions of F1216 is not acceptable.

.2 The thickness determined by design shall be the minimum thickness of the completed CIPP liner in the sewer, subject to design reconciliation of sample test results. Where design reconciliation based on as tested properties is performed by the Owner the minimum structural thickness may increase or decrease.

.3 The Contractor shall provide liner designs for each MH-MH section of lining. The Contractor shall provide Proposal Designs and when required, Special Designs.

.4 A Special Design is required during the work if and where a Proposal Design is found to be unsuitable for the field verified conditions based on the Contractor’s Evaluation of MH-MH lining sections.

.2 Proposal Designs – To be Submitted with Proposal

Page 149: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 37 May 2019

.1 Proposal Designs for each sewer section (MH-MH) listed in the Proposal shall be submitted with the proposal submission. The Proposal Designs shall be based on Pipe Section Specific Installation parameters detailed below in conjunction with the physical properties of the CIPP as submitted by the Contractor for the liner product being used.

PROPOSAL DESIGNS – DESIGN INFORMATION AND PARAMETERS

Parameter Requirement

When Required

To be submitted with PROPOSAL submission.

Design Method

ASTM F1216-07a, Appendix XI. Design by later versions of F1216 is not acceptable.

Design Life 50 years

Pipe Condition

Fully Deteriorated Gravity Pipe Condition

Size As identified for lining in the Proposal/Contract documents. Use Nominal size.

Sewer Invert Depth

As per PROPOSAL information. See Special Provisions

Water Table Location

1.0 m below ground surface

Ovality 3%

Soil Density 18.83 kN/m3 (1920 kg/m3)

Soil Modulus 6.9 MPa

Traffic Loading

AASHTO HS-20

Enhancement Factor

7.0

Factor of Safety

2.0

Page 150: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 38 May 2019

CIPP Liner

Flexural Modulus Used for Design

The value of flexural modulus used for design shall take into account the expected long-term creep behaviour of the CIPP liner so that the use of the design value in the design formula(s) will yield a liner thickness that will perform as required for the design life. The flexural modulus design value shall be the short-term test flexural modulus reduced by the Creep Retention Factor (CRF) for the liner material. The CRF shall be established by ASTM D2990 (or equivalent) long-term testing. The short-term test flexural modulus used as the starting value before reduction shall be the value that will be reliably and repeatedly achieved in short-term testing of installation samples of the same liner material. The CRF shall be derived from long-term testing and be appropriate for stress and stress duration in the installed liner. Independent third party test data shall be available to substantiate the short-term test and CRF values used in design. Liner designs shall identify the short-term test value, the CRF and the long-term design values. If these values are not clearly identified the designs shall be rejected by the Owner.

CIPP Liner

Flexural Strength Used for Design

The value of flexural strength used for design shall take into account the expected long-term creep behaviour of the CIPP liner so that the use of the design value in the design formula(s) will yield a liner thickness that will perform as required for the design life. The flexural strength design value shall be the short-term test flexural strength reduced by the Creep Retention Factor (CRF) for the liner material. The CRF shall be established by ASTM D2990 (or equivalent) long-term testing. The short-term test flexural strength used as the starting value before reduction shall be the value that will be reliably and repeatedly achieved in short-term testing of installation samples of the same liner material. The CRF shall be derived from long-term testing and be appropriate for stress and stress duration in the installed liner. Independent third party test data shall be available to substantiate the short-term test and CRF values used in design. Liner designs shall identify the short-term test value, the CRF and the long-term design values. If these values are not clearly identified the designs shall be rejected by the Owner.

Page 151: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 39 May 2019

.3 Special Designs – To Be Submitted If and When Required During the Work

.1 Where the Contractor’s Evaluation of the MH-MH section for lining finds that the Proposal Design Liner is not suitable for the section, the Contractor shall advise the Owner of this finding. On the Owner’s instruction, the Contractor shall provide a Special Design for the MH-MH section(s) in question.

.2 Special Designs shall be submitted to the Owner for review and approval.

.3 Generally, when the Owner accepts and approves the findings of the MH-MH section evaluation, which indicates a Proposal Liner is not suitable for installation, moving directly to a Special Design and corresponding Special Design Liner is anticipated.

.4 A Special Design shall be clearly indicated as such on the design submission to differentiate from the Proposal Designs.

.5 Where an approved Special Design results in an increased liner thickness, the thickness increase will be paid as per the Contract Price in the Schedule of Quantities & Prices, upon approval of the Owner.

.6 Special Designs not for Submission with the Proposal.

.7 Special designs are not part of the Proposal submission. When Special Designs may be required, this will occur during the course of the work.

.8 Special Designs shall be based on the design parameters detailed below.

Field actual and not lower than 1.0 m below ground surface.

SPECIAL DESIGNS – DESIGN INFORMATION AND PARAMETERS

Parameter Requirement

When Required During the course of the work should a Special Design become necessary

Design Method ASTM F1216-07a, Appendix XI. Design by later versions of F1216 is not acceptable.

Page 152: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 40 May 2019

Design Life 50 years

Pipe Condition Fully Deteriorated Gravity Pipe Condition

Size Actual inside diameter of the existing sewer from field evaluation

Sewer Invert Depth

Actual invert depth from field evaluation and not less than Proposal Design value

Water Table Location

1.0 m below ground surface

Ovality 3% , or as outlined in Proposal, whichever is greater

Soil Density 18.83 kN/m3 (1920 kg/m3)

Soil Modulus 6.9 MPa

Traffic Loading AASHTO HS-20 (always apply except when greater live load is required)

Railway Loading

As field identified. Use Cooper E-80 where RR crossing identified.

Enhancement Factor

7.0 for CIPP liners that are tight fitting to existing sewer.

Factor of Safety 2.0

CIPP Liner

Flexural Modulus Used for Design

The value of flexural modulus used for design shall take into account the expected long-term creep behaviour of the CIPP liner so that the use of the design value in the design formula(s) will yield a liner thickness that will perform as required for the design life. The flexural modulus design value shall be the short-term test flexural modulus reduced by the Creep Retention Factor (CRF) for the liner material. The CRF shall be established by ASTM D2990 (or equivalent) long-term testing. The short-term test flexural modulus used as the starting value before reduction shall be the value that will be reliably and repeatedly achieved in short-term testing of installation samples of the same liner material. The CRF shall be derived from long-term testing and be appropriate for stress and stress duration in the installed liner. Independent third party test data shall be available to substantiate the short-term test and CRF values used in design. Liner designs shall identify the short-term test value, the CRF and the long-term design values. If these values are not clearly identified the designs shall be rejected by the Owner.

Page 153: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 41 May 2019

CIPP Liner

Flexural Strength Used for Design

The value of flexural strength used for design shall take into account the expected long-term creep behaviour of the CIPP liner so that the use of the design value in the design formula(s) will yield a liner thickness that will perform as required for the design life. The flexural strength design value shall be the short-term test flexural strength reduced by the Creep Retention Factor (CRF) for the liner material. The CRF shall be established by ASTM D2990 (or equivalent) long-term testing. The short-term test flexural strength used as the starting value before reduction shall be the value that will be reliably and repeatedly achieved in short-term testing of installation samples of the same liner material. The CRF shall be derived from long-term testing and be appropriate for stress and stress duration in the installed liner. Independent third party test data shall be available to substantiate the short-term test and CRF values used in design. Liner designs shall identify the short-term test value, the CRF and the long-term design values. If these values are not clearly identified the designs shall be rejected by the Owner.

Page 154: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 42 May 2019

.4 General Requirements for Designs

.1 Design Certification and Clarity

.2 All designs shall be approved and stamped by a professional engineer licensed and authorized in the Province of Nova Scotia.

.3 All designs shall provide sufficient detail and clarity to allow for straightforward identification of the liner location (when for specific location) and design parameters used in the design. The design shall clearly identify whether it is a Proposal Design or a Special Design.

.4 Designs that are confusing or fail to properly identify the required design parameters will not be accepted.

.5 Design Thickness is the Minimum Required Finished In Place Structural Thickness.

.6 The CIPP liner wall thickness determined by design shall be the in place, completed liner thickness. Liner thickness measurements, either from samples or in ground, shall be compared to the design thickness for acceptance. Acceptance of final liner thickness shall be subject to reconciliation of actual required thickness based on tested liner properties. Where tested liner properties are different from the properties assumed in the liner design, the required thickness shall be determined by design reconciliation. Such reconciliation may change the required thickness for the final completed liner based on as tested properties. However in no case shall the required thickness be based on properties that are less than the minimum required properties or result in a required thickness that is less than the minimum thickness specified in the specification.

.7 Liner wall thickness measurements and determination of the actual effective thickness shall be in accordance with ASTM D5813-04(2008). Measurements of the actual installed liner wall thickness shall not include the thickness of any non-structural components.

.5 Short-term Flexural Modulus and Short-term Flexural Strength

.1 The short-term values of flexural modulus and flexural strength (as per D790) used as the starting values from which the long-term design values are derived shall be values that will be reliably and repeatedly obtained in the installed liners as substantiated by testing samples from installed liners. These short-term values shall be identified in the liner design.

Page 155: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 43 May 2019

.6 Substantiation of Liner Physical Properties Used for Design

.1 It is the responsibility of the Contractor to obtain third party testing of the CIPP liner sufficient to substantiate the liner material properties used in design. Once a liner installation has been completed, the Contractor shall provide the substantiated test results and other information to the Owner for review and approval within ten (10) business days of the liner installation (i.e. date sample is signed by the Owner).

.2 Substantiation, at a minimum, will include ongoing third party testing results for short-term properties of flexural modulus and flexural strength on installed liners showing that the properties assumed in design are routinely achieved in the field for the same materials being used for this contract. Substantiation must also include the basis for long-term properties including, at a minimum, long-term (10,000 hr) testing on the resin being used for flexural strength and flexural modulus. For reinforced liners, long-term testing must be on the complete liner product itself, not just for the resin element.

3.12 CIPP LINER MINIMUM THICKNESS

.1 All CIPP liners shall achieve the minimum in place final completed thickness of at least the design thickness or 4.5 mm, whichever is greater.

.2 Where a design thickness is lower than the minimum thickness, the design shall note this and indicate that the minimum thickness is the required liner thickness for the liner installation covered by the design. This applies to both Proposal Designs and Special Designs.

.3 A design reconciliation based on installed liner test properties (such as from testing field samples of liners) shall not overrule the requirement for minimum thickness.

3.13 CIPP LINING – RESIN IMPREGNATION

.1 The liner shall be impregnated with resin at the liner manufacturer’s factory.

.2 The resin impregnation shall comply with ASTM F1216.

3.14 CIPP LINER INSTALLATION

.1 General

Page 156: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 44 May 2019

.1 The installation of the CIPP liner shall be the responsibility of the Contractor subject to the following.

.2 The lining installation procedure shall be in accordance with the submission prior to award. Any proposed deviation from the submitted procedure shall be submitted, with explanation, to the Owner for approval and the submission shall include the approval of the lining manufacturer or senior licensor.

.3 The liner and its resin should be protected during the installation into the sewer. No significant amount of resin shall be lost by contact with manhole walls or the sewer pipe during the installation. The liner should not be contaminated or diluted by exposure to dirt, debris, or water during the pull.

.4 The Contractor shall ensure that all required equipment (including as required by the Contract) is on site and in satisfactory working order prior to commencing the installation of a lining section.

.2 Quality Assurance Deliverables

.1 CIPP liner quality assurance deliverable include installed liner sample test reports, post installation final CCTV inspection (V3) and the curing report documented on site by appointed field staff.

3.15 CIPP LINER ODOUR CONTROL

.1 General

.1 The Contractor shall provide notice to the affected residents indicating possible odour resulting from sewer lining and curing process. The notice shall indicate to the residents what to expect and typical procedures to alleviate odour.

.2 The Contractor is responsible to respond, investigate and act immediately on any odour complaint that may occur. Actions to be taken by the Contractor to alleviate an odour problem within a property shall include:

.1 Seeking permission to enter the property,

.2 Filling of any dry traps,

.3 Preventing air flow from any traps which to do not function properly (i.e. will not water seal),

.4 Ventilating the property via open window and doors,

Page 157: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 45 May 2019

.5 Ventilating the property with fans/blowers and;

.6 Other actions that are useful in alleviating the odour problem.

.3 The Contractor shall provide adequate sewer ventilation and odour mitigation during the sewer lining process. At the minimum the following steps shall be taken:

.2 Exhaust Fans for Sewer

.1 Two MH exhaust fans with a minimum capacity of 2,100 cfm each shall be used to exhaust air from the sewer via MHs. One fan shall be located at an adjacent MH immediately downstream of the sewer section being lined. The second fan shall be employed at the tail end MH as soon as access for the fan is available following removal of the liner tail. If the second fan cannot be readily employed at the tail end MH, it shall be employed at the closest possible adjacent MH that will permit air to be exhausted from the sewer being lined. In the event that odour control becomes a problem, the Contractor shall provide additional exhaust ventilation of the sewer to alleviate odour.

.3 Steam Curing

.1 The venting of steam from liner curing shall be located to prevent odour in or around the steam, steam/air, or airflow from entering buildings through openings including openings for heating ventilation and air conditioning purposes.

.4 Cool Down

.1 In the case of hot water curing, prior to release into the sewer, the cure water shall be cooled to the ambient temperature of the sewer into which it will drain.

3.16 SERVICE CONNECTIONS REINSTATEMENT

.1 Reinstatement of existing service connections on the sewer shall start immediately following opening of the liner after cool down is completed. The method of reinstatement, either remote robotic reinstatement or man-entry reinstatement shall be at the contractor’s discretion. Where man-entry is used, safety procedures and restrictions on man-entry procedures must be submitted to the Owner.

Page 158: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 46 May 2019

.2 Prior to lining, the Contractor shall locate all service connections with a suitable measuring and locating method that will allow for the timely location of the service connection openings that will be covered by the liner. Flow control shall be maintained as required during service connection reinstatement to prevent flow delaying or hindering the reinstatement.

.3 All service connections are to be reinstated without excavation. Reinstatement of service laterals shall commence as soon as the liner has cooled and been opened to upstream flow.

.4 All service connections shall be opened to flow (at least 50 mm approximate diameter) within eight (8) hours of the completion of liner cure. All service connections shall be fully opened and trimmed within forty-eight (48) hours of opening the liner to upstream flow.

.5 Where service connection reinstatement is delayed the Contractor shall advise the affected service owners and provide temporary measures to these owners as may be required.

.6 Service connection openings in the liner shall match the size and shape of the existing service connection in the mainline sewer. Openings shall be smooth and clean. Finished openings shall be without protrusions, hanging material, shavings, lips or obstructions to sewage flow from the service connection into the interior of the liner. Over-cutting shall be avoided. Service connections, that in the Owner’s opinion, are over-cut may be deemed defective and require a CIPP sleeve spot repair followed by reinstatement of the service connection by the Contractor as remedial action, at no cost to Halifax Water.

.7 The existing service connections shall not be damaged. The Contractor shall repair any damage to the existing service connections that occurs during the reinstatement, to the satisfaction of the Owner, at no cost to Halifax Water.

.8 Where a service connection is visibly fully plugged and is an apparent dead connection, the Contractor shall advise the Owner of this finding. With the approval of the Owner, such connections will not be reinstated.

.9 Reinstated service connections shall be recorded on the SCS with the dates and times of partial and complete reinstatement.

Page 159: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 47 May 2019

3.17 MANHOLE BENCHING AND RESTORATION

.1 All affected manholes shall be re-benched, where required, to conform to the dimensions and positions of liners.

.2 Where a liner has been placed continuously through a manhole, the benching shall be made to conform to the exterior of the liner. The liner shall be opened the full width of the manhole (from pipe entrance to exit) for the top half diameter of the liner. Finished liner and benching in manhole shall provide a smooth, uniform flow path from entrance to exit at uniform grade.

.3 Where lining work necessitated or resulted in damage to the manhole or the manhole benching, it shall be restored to equal or better than original condition and shall meet the requirements for benching as previously specified.

.4 Material for benching work shall be Speedcrete, 20 MPa or approved equal.

3.18 POST CIPP LINING COMPLETED CCTV INSPECTION (V3)

.1 After completion of a sewer section rehabilitation (including reinstatement of service connections and MH benching) the Contractor shall complete a full CCTV inspection of the sewer section (called the V3).

.2 Where MH rehabilitation is being completed in coordination with CIPP Lining, the V3 shall include the complete upstream (US) and downstream (DS) MH rehabilitation liners. The V3 video will pan around the rehabilitated US MH and DS MH ensuring that the complete MH liner is visible. The pan around of the MHs will include visibility of the MH walls, benching, and the finished seal (i.e. interface) between the CIPP Liner and MH Liner material.

.3 Each reinstated service connection shall be viewed in its entirety for 10 seconds, or a sufficient time for properly judging the re-instatement.

.4 The CCTV inspection shall be provided on a flash drive that shall be clearly identified with Contract Number, street name, section number, beginning/ending manhole numbers and date of the CCTV inspection.

.5 In the event that a deficiency in the sewer section rehabilitation is identified after a Post Rehabilitation CCTV Inspection (V3) that requires any repair of remedial works to the section, the V3 Post Rehabilitation CCTV Inspection shall be repeated after the repairs or remedial action have taken place.

Page 160: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 48 May 2019

.6 Flow control shall be required as such to ensure a clear view of the installed liner during the V3.

.7 Sewer defect coding is required for the V3.

3.19 INSTALLED CIPP LINER THICKNESS, FIT & FINISH REQUIREMENTS

.1 The finished lining shall fit neatly and tightly to the existing sewer without significant fins or excessive wrinkling. Any annulus gap between the liner and the existing sewer inside surface shall be in accordance with industry standard shrinkage characteristics for properly installed, cured and cooled CIPP. Annulus gap which is due to improper liner sizing, inadequate preparation of the existing sewer, improper installation, curing or cooling, or the effect of ground water pressure will not be accepted.

.2 The liner shall extend continuously from MH to MH starting and ending at the inside walls of the MH (except where lining is made through intermediate MHs).

.3 The completed installed liners shall conform to the following requirements.

Continuity of Liner

The finished liner shall be continuous over the entire length of the liner installation from MH to MH without any breaks, separations or joints.

Liner Fit to Existing Sewer Liner

The outside surface of the finished liner shall be in contact with the inside surface of the existing sewer subject to the contact tolerance. The inside surface of the existing sewer is the surface after the sewer has been cleaned and prepared for lining in accordance with the cleaning and preparation requirements. The contact tolerance is 1.0 mm. Where any space of gap between the outside surface of the liner and the inside surface of the existing sewer line exceeds 1.0 mm, the liner fit will be deficient, subject to exceptions noted below.

The liner should also be able to negotiate vertical/horizontal elbows and bends with various degrees (angles ranging from 0 to 45 degrees).

Exception to Liner Fit at Existing Sewer Line Irregularities

Existing sewer line irregularities include off set joints, protrusions, bumps or other similar situations in the existing sewer that remain after the sewer has been prepared in accordance with the cleaning and preparation requirements. Neither ovalisation of the existing sewer nor curves made by joint deflection are irregularities in this context. Where an irregularity exists, The contractor shall inform the Owner prior to lining and an exception to the liner contact tolerance requirements will be allowed in the irregularity zone. The irregularity zone is defined as a zone extending a distance of up to ¼ of the liner inside diameter in

Page 161: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 49 May 2019

any direction from the irregularity as measured along the inside surface of the liner.

A liner fit exception at an existing sewer irregularity shall not present an obstruction to sewage flow whether or not it complies with the allowed exceptions.

Liner Shape

The liner shape will be as defined by liner fit to existing sewer line. In general the liner shape shall conform to the shape of the existing sewer line inside surface after its cleaning and preparation in accordance with requirements. However, where the existing sewer line shape is not defined (missing pieces of sewer line) the liner may either bridge the missing wall section or indent into the missing wall section. Where the liner bridges, the shape of the liner shall match the shape of adjacent sewer line and the inside diameter of the liner shall be as required for Contact Tolerance for the adjacent sewer line. Where the liner indents, the depth of the indent shall not reduce the liner wall thickness below the Wall Thickness Tolerance.

Liner Wall

The liner wall shall be free of any interior bulges, ribs, ripples, folds or other irregularities except where these irregularities comply with the Liner Wall Thickness Tolerance, fit, shape and wall thickness given above. The wall of the liner shall be free of any voids (dry spots), cavities or bubbles.

Liner Terminations

At manhole entrances and exits the interface between the exterior surface of the liner and the manhole shall be watertight to the requirements for external hydrostatic pressure. The finished ends of the liner shall be neat and smoothly cut. The benching in the manholes shall be modified where required to conform to liner dimensions.

The liner shall extend into each MH a minimum of 12 mm (½”) and a maximum of 25 mm (1”), such that the MH liner material application can be applied to the back (outer surface) of the liner, creating a seal around the CIPP liner, pipe and MH interface.

Bulges, including Lifts and Sags

There shall be no bulges in the liner that are not consistent with the surface profile of the existing sewer before lining. Such bulges will be considered an indication of a major structural deficiency in the liner and will require major remedial action to the satisfaction of the Owner. Where bulges are suspected or proven to contain internal separations within the wall of the liner, remedial action up to and including removal and replacement of the liner will be required. This applies to bulges that may be called lifts or sags.

Page 162: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 50 May 2019

3.20 LINER WALL THICKNESS AND TOLERANCE

.1 General

.1 The liner's finished structural wall thickness shall be as specified in the applicable liner design approved by the Owner. The required structural wall thickness may also be determined by a design reconciliation using test properties done by the Owner.

.2 The effective liner wall thickness shall be determined in accordance with ASTM D5813-04(2008).

.3 The wall thickness tolerance is:

Minus 0%

Plus 25%.

.4 The wall thickness under consideration is the final cured-in-place thickness and shall not include any layers or material that does not contribute to the structural rating of the liner.

.2 Liner Thickness

.1 Finished liner thickness shall be no less than the design thickness or specified minimum thickness, whichever is greater. Thickness shall be determined in accordance with the provisions of ASTM D5813-04 (2008). The effective thickness of the liner shall be either the average thickness or the minimum thickness multiplied by 0.875, whichever is less.

.2 Required liner thickness shall be subject to design reconciliation based on CIPP properties determined in as installed liner sample testing. Such design reconciliation may require a different liner thickness (versus the original design thickness) to correspond with design based on as installed sample tested properties. In no case shall a design reconciliation result in a required liner thickness that is less than the specified minimum thickness.

3.21 INSTALLED CIPP LINER PHYSICAL PROPERTIES REQUIREMENTS

.1 The complete installed liner shall have the following required physical properties:

.1 Short-term Test Flexural Modulus: Shall meet or exceed the value used in the applicable liner design

Page 163: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 51 May 2019

.2 Flexural Strength: Shall meet or exceed the value used in the applicable liner design

.2 In the case of long-term design values of flexural modulus and flexural strength used in design, the liner shall possess the required long-term retention characteristics such that the long-term values used in design will be met by the liner over its design life.

3.22 SAMPLES AND TESTING OF INSTALLED CIPP LINER

.1 General

.1 The Contractor shall provide and have tested samples of the liner installations at the sampling rate indicated below. The testing shall be done at an independent testing agency experienced in testing CIPP samples and approved by the Owner.

.2 Testing will determine the short-term test flexural strength, the short-term test flexural modulus, structural thickness and any other relevant properties of the cured liner as represented by the samples. Test results must meet the values of short-term test flexural modulus and flexural strength used in the applicable liner design provided by the Contractor and the thickness determined by that design.

.3 Unless otherwise approved by the Owner, one sample per continuous liner installation is required to be collected and tested. Each sample must be identified, dated and signed by the Owner prior to leaving the project site. Payment for samples will be made per the payment item.

.4 Samples shall be delivered to the independent testing agency designated below in a timely manner, such that test results are provided to the Owner within 10 business days after liner installation. Should samples not be submitted; the Owner, at their discretion, may issue a suspension of work order for CIPP lining until such time that the test reports are submitted.

.5 Testing Agency to be Used: Paragon Systems, Concord, Ontario. 905-738-0447

.2 Type of Samples

Page 164: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 52 May 2019

.1 CIPP liner samples shall be restrained formed cylindrical pipe type samples. The Owner will not accept plate type samples unless the Contractor can demonstrate to the satisfaction of the Owner that a restrained pipe samples cannot be done for a specific installation. Plate type samples will only be considered for sewer sizes greater than nominal 525 mm. In instances, as approved by the Owner, where plate type samples are accepted, a derate percentage of 15% and 18% will be respectively applied to the flexural modulus and flexural strength values obtained from the sample test result(s), in accordance with the North American Society for Trenchless Technology (NASTT’S) Cured-In-Place Pipe (CIPP) Good Practices Guideline First Edition. The derated flexural modulus and flexural strength values will be used to verify the Contractor’s compliance with the contract specifications. Refer to ASTM F1216-16 for further information on sampling methodology.

.2 Restrained cylindrical pipe type samples shall be made by inserting the liner through a form with an inside diameter as close as possible to the inside diameter of the sewer being lined. The samples shall be taken at the end MH or an intermediate MH. The length of the form shall be sufficient to prevent edge effects on the sample coupons cut from the sample and provide the sufficient length of good sample as required for test coupons. The form shall be sufficiently strong to prevent the form expanding during liner installation and processing. In making the sample the Contractor shall use heat containment provisions, such as felt insulation with sandbags over and around the sample, so that the thermal environment during the sample cure is similar to the thermal environment within the sewer during the liner cure. For large size sewers the form can be a multi-piece form assembled within the MH.

.3 Sample Length

.1 The length and size of any sample shall be sufficient to obtain at least 5 test specimens for ASTM D790 testing.

.2 The sample from which the test specimens are cut shall be sufficiently large so that sample edge effects can be eliminated from the test specimens. Sample size shall allow test specimen length of 16 times liner thickness for non-reinforced CIPP and 32 times thickness for reinforced CIPP plus at least 100 mm additional sample length to eliminate edge effects. For example a sample for a 300 mm by 6 mm thick non-reinforced liner shall be at least 16 x 6 = 96 mm + 100 mm = 196 mm long.

Page 165: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 53 May 2019

.4 Sample Identification

.1 Before or immediately upon removal, the samples shall be clearly marked with the following identification information.

.1 Contract Number

.2 Client Information

.3 Installation Date

.4 Street Name

.5 Sewer Size

.6 MH numbers delineating sewer section lined

.7 MH number where sample was taken

.8 Crown position

.9 Special Design if applicable

.2 Samples shall be removed from the installation under the direct supervision of the Owner. All samples and test results remain the property of Halifax Water. The test reports will be provided to the Contractor on request.

.5 Testing of Cured Liner Samples

.1 The Contractor shall provide for testing of samples of cured liner at an independent testing agency. The testing agency shall be subject to the approval of the Owner. The Contractor shall authorize the testing agency to forward the test reports directly to the Owner and communicate with the Owner concerning the testing and results. Samples shall be tested for flexural modulus and flexural strength as per ASTM D790 and thickness as per ASTM D5813-04(2008). The provision of testing service shall allow for the obtaining of test reports within 10 days of delivery of the sample to the testing agency.

.2 Delamination testing may also be performed in accordance with ASTM F-1216 specifications, at the Owner’s discretion.

Page 166: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 54 May 2019

.3 The Contractor shall provide for the testing agency to forward test reports by email to the Owner and provide the testing agency permission to communicate with the Owner in regard to all testing on the Contract.

.4 The Contractor shall provide the test agency with the design parameters for the liner corresponding with the sample as follows:

Flexural Strength Short-term

Flexural Modulus Short-term

Original Design Thickness

.5 These values shall have been identified in the Contactor’s liner design. The testing agency’s report shall reference these values as the specified values.

.6 All test reports received shall at a minimum include the following;

.1 Header information identifying the sample as described on the sample in addition to HW contract number.

.2 Date sample was received and date when sample was tested.

.3 Photograph of the sample as received, both side and end profile

.4 Identification of each test performed and its associated results

.5 Graphical presentation of the flexural property test from beginning of applied loads to end of test.

.6 Photograph of each broken specimen identified by the specimen number used to report the test result.

.7 Signature of technician who completed the test and signature of report reviewer.

.8 Copy of the Chain of Custody (COC) form

.7 Summary sheet of all samples taken and tests completed under the contract (referenced by the HW Contract Number) shall be provided with the final delivery of test reports.

.6 Design Reconciliation for Sample Test Results

Page 167: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 55 May 2019

.1 Where the test results do not meet or exceed the required physical properties, the liner shall be deemed deficient subject to design reconciliation of the test results.

.2 A liner deemed deficient based on sample test results shall be reconciled for true deficiency by repeating the design for the liner using the test results for flexural modulus and flexural strength while keeping all other design parameters the same.

.3 Where the repeated design (the reconciliation) shows that the combination of test results (flexural modulus, flexural strength and thickness) provides a liner that meets the reconciled design requirements, the liner shall not be deemed deficient.

.4 Such design reconciliation shall not be permitted when test results do not meet the minimum requirements for flexural modulus and flexural strength in the ASTM F1216 in which case the liner will be deficient.

.5 In no case shall design reconciliation yield a required liner thickness that is less than the specified minimum thickness.

.6 The Owner shall make or otherwise approve any design reconciliation. Two examples of design reconciliations are shown below.

.7 Reconciliation Example #1 (Restrained Sample)

.1 For a 450 mm installation the required liner thickness is 7.6 mm designed at flexural modulus of 2413 MPa and flexural strength of 31 MPa. Tested results show thickness is 7.2 mm, flexural modulus is 2995 MPa and flexural strength is 38.9 MPa. There is an apparent deficiency in liner thickness. Reconciliation of apparent deficiency is shown below.

Design Parameter As designed Reconciliation

Design Condition Fully Deteriorated Fully Deteriorated

Sewer Size 450 mm 450 mm

Invert Depth 3.5 m 3.5 m

Page 168: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 56 May 2019

Design Parameter As designed Reconciliation

Water table below ground surface 2.0 m 2.0 m

Ovality 3% 3%

Soil Density 18.85 KN/m3 18.85 KN/m3

Soil Modulus 6.89 MPa 6.89 MPa

Live Load HS-20 HS-20

Other Load 0 0

Flexural Modulus Short-term 2413 MPa 2995 MPa (test result)

Long-term Retention for Flexural Modulus

50% 50%

Flexural Modulus Long-term for design 1206.5 MPa 1497.5 MPa

Flexural Strength Short-term 31 MPa 38.9 MPa (test result)

Long-term Retention for Flexural Strength

50% 50%

Flexural Strength Long-term for design 15.5 MPa 19.45 MPa

Enhancement Factor 7 7

Poisson’s Ratio 0.3 0.3

Safety Factor 2 2

Required Liner Thickness 7.6 mm 7.1 mm

Tested Thickness 7.2 mm 7.2 mm

Conclusion on Liner Thickness Deficiency

Thickness is deficient based on design properties

Thickness is not deficient based on test result properties

Page 169: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 57 May 2019

.2 In this example the reconciliation shows that the as tested thickness of 7.2 mm is sufficient when the tested properties are taken into account. Therefore, the liner would not be deficient based on test thickness.

.8 Reconciliation Example #2 (Plate Sample)

.1 For a 600 mm installation, the required liner thickness is 9.6 mm designed at flexural modulus of 2758 MPa and flexural strength of 31 MPa. Tested results show flexural modulus is 2465 MPa and flexural strength is 35.6 MPa. Due to this being a plate sample a derate percentage of 15% and 18% is respectively applied to the flexural modulus and flexural strength values obtained from the sample test results. These derated values are used to determine specification compliance. Derated test results for flexural modulus and flexural strength values are 2095 MPa and 29.2 MPa respectively. The field determined thickness of the liner is 10 mm. There is an apparent deficiency in flexural modulus and flexural strength. Reconciliation of apparent deficiency is shown below.

Design Parameter As designed Reconciliation

Design Condition Fully Deteriorated Fully Deteriorated

Sewer Size 600 mm 600 mm

Invert Depth 3.6 m 3.6 m

Water table below ground surface 2.0 m 2.0 m

Ovality 3% 3%

Soil Density 18.85 KN/m3 18.85 KN/m3

Soil Modulus 6.89 MPa 6.89 MPa

Live Load HS-20 HS-20

Other Load 0 0

Flexural Modulus Short-term 2758 MPa Tested value 2465 MPa

Derated value 2095 MPa (used for reconciliation)

Page 170: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 58 May 2019

Long-term Retention for Flexural Modulus

50% 50%

Flexural Modulus Long-term for design 1379 MPa Tested Value 1232.5 MPa .

Derateed value 1047.5 MPa (used for reconciliation)

Flexural Strength Short-term 31MPa Tested Value 36.6 MPa

Derate value 29.2 MPa (used for reconciliation)

Long-term Retention for Flexural Strength

50% 50%

Flexural Strength Long-term for design 15.5 MPa 14.6 MPa (from Derated value)

Enhancement Factor 7 7

Poisson’s Ratio 0.3 0.3

Safety Factor 2 2

Required Liner Thickness 9.6 mm 10.6 mm

Tested Thickness 10 mm 10 mm

Conclusion on Liner Thickness Deficiency

Flexural Modulus and Flexural Strength are deficient based on design properties

Flexural Modulus and Flexural Strength remain deficient based on derated test result properties

Page 171: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 59 May 2019

.2 In this example the reconciliation shows that the as tested thickness of 10 mm is not sufficient when the tested properties are taken into account. Therefore, the liner is deficient based on test properties.

.3 In the case where samples test results may not meet requirements in thickness, flexural strength or flexural modulus, the Owner may choose to confirm the test results using options such as testing of another sample (to be cut from the liner by the Contractor), measuring of in-place liner thickness at the MHs to confirm thickness results. Where in Halifax Water’s opinion the test results and any further investigation as above indicate that the installed liner is not compliant, the Contractor shall take remedial action acceptable to the Owner without cost to Halifax Water.

3.23 LINER DEFICIENCIES AND REMEDIAL MEASURES

.1 General

.1 When the Contractor is aware of any deficiencies in the work or in the results of the work, the Contractor shall advise the Owner of these deficiencies within 48 hours including situations where the deficiency has already been rectified.

.2 Where a liner is deficient, the Contractor shall rectify the deficiency(s) with a remedial method that is acceptable to the Owner. Where there is no remedial method acceptable to the Owner, the liner shall be removed and replaced at no cost to Halifax Water.

.3 The specific deficiencies addressed below are examples and do not represent all the deficiencies that may occur.

.2 Thickness Less than Required Thickness:

.1 Refer Section 3.11 3.11 .4.

.3 Physical Properties Less than Required Properties

.1 Refer Section 3.10 .

.4 Dry Spots, Lifts, Delamination and Other Deficiencies

Page 172: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 60 May 2019

.1 The finished pipe shall be continuous over the entire length of a new installation and shall be free of dry spots, lifts and delamination. If these or other conditions, which are not in compliance with this specification, are present, the Contractor shall repair the defects at their own cost, to the Owner’s satisfaction. In the event the CIPP does not fit tightly against the host pipe at its terminal points, the space between the pipes shall be sealed with a resin mixture compatible with CIPP.

.5 Excessive Fining or Wrinkling

.1 Excessive liner material shall be removed to the acceptance of the Owner. Where excessive material cannot be removed without compromising the structural integrity of the liner, the Contractor shall take other remedial action as acceptable to the Owner.

.6 Bulges, Lifts and Sags

.1 There shall be no bulges in the liner that are not consistent with the surface profile of the existing sewer before lining. Such bulges will be considered an indication of a major structural deficiency in the liner and will require major remedial action. Where bulges are suspected or proven to contain internal separations within the wall of the liner, remedial action up to and including removal and replacement of the liner will be required. This applies to bulges that are may be called lifts or sags.

.7 Remedial Action

.1 Where deficiencies are identified, the Contractor shall perform the accepted remedial action in a timely manner without unreasonable delay.

.2 Where a deficiency will seriously impact sewer or service connection flow capacity and are considered likely to cause sewer back-ups onto properties or other overflows, the Contractor shall take immediate action to prevent such problems without waiting for acceptance of remedial method from the Owner. In such case, the final resolution of a deficiency, if required, shall be by a method acceptable to the Owner.

Page 173: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 61 May 2019

.3 The contractor shall provide the Owner with a list of all the identified deficiencies prior to any remedial action. The list shall include the location of the deficiency and the remedial action required to rectify the deficiency, along with the associated CCTV video inspection.

.4 The cost of any work to rectify a deficiency is the responsibility of the Contractor.

3.24 WARRANTY

.1 General

.1 All materials and workmanship shall be under warranty as per the contract requirements, starting on the date Halifax Water accepts the Works performed under the contract. All CIPP lined sewers shall be re-inspected via CCTV one month prior to the end of the one year maintenance period.

.2 Warranty Exclusions

.1 In the event that the Contractor determines that the condition of the existing pipe, or the expected condition after cleaning and preparation will result in a liner installation that cannot be warranted, the Contractor shall advise the Owner of this determination. In this advice, the Contractor shall specify the reasons why the CIPP liner cannot be warranted. Unless the Owner determines otherwise, the Contractor shall provide a Warranty Exclusion Letter to the Owner and shall obtain the Owner’s approval for (such as signing of the Warranty Exclusion Letter by the Owner) for the warranty exclusion.

.2 Warranty exclusion will not be accepted by the Owner if the request for warranty exclusion is submitted after the liner has been installed.

3.25 EXCAVATED REPAIR

.1 General

.1 In the course of the CIPP rehabilitation of sewers, excavated repairs may be necessary to repair or replace excessively deteriorated locations in a sewer prior to CIPP lining. The required repair locations in sewers to be CIPP lined, or other locations, shall be identified by the Contractor in the course of inspection and cleaning activities. The Contractor shall advise the Owner of the location, necessity for and extent of the repairs.

Page 174: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 62 May 2019

.2 Such repairs will typically (but not exclusively) include excavating to the repair zone, replacing existing deteriorated sewer pipe with new pipe, backfill and full surface restoration of roadways, boulevards, etc.

.3 Where and when approved by the Owner, the Contractor shall undertake the repairs. The cost of the repairs shall be paid under the appropriate provisional item payment item in the Schedule of Quantities.

.2 Applicable Specifications and Provisions

.1 Materials and installation shall be in accordance with this specification and all Halifax Water’s Standard Contract Specifications and General Conditions.

.3 Provide Description and Cost Estimate

.1 Where the Contractor or the Owner has identified a need for an excavated repair, the Contractor shall advise the Owner of:

Location

Sewer size

Sewer depth

Length or limits of repair

Crew complement needed for the repair

Equipment needed for the repair

Sub-contractor(s) to be used

Time necessary to complete the repair

Estimated cost of repair

.4 Approval for Contractor to Make Repair

.1 The Contractor shall proceed with the repair after the Owner has provided approval for the repair to be done.

.5 Materials

Page 175: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 63 May 2019

.1 The Contractor shall use materials that are in accordance with this Proposal and all other applicable Halifax Water standards and specifications. This includes all pipe, fittings, manholes, related materials, bedding, backfill and restoration materials for roadways, sidewalks, boulevards and off road areas. Materials shall be paid in accordance with the schedule of quantities in the form of proposal.

.6 Installation

.1 The Contractor shall make the installation in accordance with this Proposal and all other applicable Halifax Water standards for sewer installation and, where applicable, for manholes and sewer service connections. All restoration shall be in accordance with Halifax Water standards, including restoration of roadways, sidewalks, boulevards and off road areas.

.7 Equipment

.1 Equipment used specifically in the undertaking of an excavated repair shall be paid in accordance with the rates stipulated in NSRBA Suggested Rental Rates for Construction Equipment. The Contractor shall utilize only the equipment necessary for the repair work. Equipment shall be paid in accordance with the Schedule of Quantities and Prices.

.8 Labour

.1 The Contractor shall use competent and skilled labour as required for the Work including supervisor, foreman, operators and other labour as necessary for proper and correct execution of the Work. The labour used shall be only the labour necessary for the Work.

.9 Sub-Contracted Work

.1 In the case where the Contractor may use a sub-contractor for the Work, it remains the Contractor’s responsibility to ensure that the Work carried out by the sub-contractor is in accordance with the specifications and requirements. Halifax Water reserves the right to accept or reject the selection of sub-contractor(s).

Page 176: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 HOT WATER OR STEAM CURED-IN-

PLACE PIPE - MAINLINE

Section 33 11 05

Page 64 May 2019

3.26 WORK EASEMENTS

.1 In addition to the cleaning, the work easements will require restoration to the satisfaction of the Owner. The Contractor shall obtain all necessary permits and permissions, including from the Owner to carry out the works in easements or on flood plains and where restoration is deemed necessary by the Owner. The Contractor shall make the appropriate arrangements and submit associated costs to Halifax Water for reimbursement consideration.

3.27 EXCAVATION FOR RETRIEVAL OF EQUIPMENT OR OTHER PURPOSES

.1 Where the retrieval of lodged equipment is required by open-cut excavation, the Contractor shall provide for retrieval including any excavation, maintenance of flow, repair, backfill and restoration (as per Contract requirements) as required. However, if the equipment became lodged in a portion of a sewer section for which no previous CCTV inspection or other advice was provided to the Contractor by the Owner then the Owner will pay the Contractor for 75% of the total above noted cost only if such cost occurs during the preliminary video inspection (V1) or during preliminary cleaning operations for the V1. However, the Owner will not approve any other associated cost related to this work.

.2 If it is necessary to excavate for any reason such as repair of defective liner, reinstatement of service connections, by-pass of flow, etc., the Contractor shall provide such excavation, repair, backfill and restoration (as per the Contract requirements) as required. However dependent on the reason why an excavation is required and at the discretion of the Owner, additional payment for such work may be negotiated with the Contractor. In such case where the work is determined by the Owner to be extra to the contract, the work shall not proceed without the approval of the Owner prior to the work.

.3 All such work shall be performed by an approved sub-Contractor (when required by the Owner) and shall be completed in accordance with the Contract specifications.

.4 No claim for lost time will be considered as a result of any occurrence in which previous information was provided (i.e. conditions in CCTV video were provided).

3.28 WORKSITE CLEANUP AND RESTORATION

.1 Upon completion, clean and restore the site to existing or better, condition.

******End of Section 33 11 05******

Page 177: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

Standard Specifications - Ultraviolet Light Cured-in-Place Pipe - Mainline

Page 178: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 1 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page i May 2019

PART 1 - GENERAL ................................................................................................................................... 1

1.1 INTRODUCTION ................................................................................................................................ 1

1.2 TERMINOLOGY AND ABBREVIATIONS ........................................................................................ 1

1.3 REFERENCED STANDARDS ............................................................................................................. 2

1.4 SCOPE OF WORK .............................................................................................................................. 4

1.5 INFORMATION TO BE REVIEWED PRIOR TO PROPOSAL SUBMISSION ................................. 5

1.6 INFORMATION TO BE SUBMITTED ............................................................................................... 6

1.7 OCCUPATIONAL HEALTH AND SAFETY ...................................................................................... 7

1.8 CONFINED SPACE REQUIREMENTS .............................................................................................. 8

1.9 PERMITS AND APPROVALS ............................................................................................................ 8

1.10 WORK PRIORITIES ......................................................................................................................... 8

1.11 SCHEDULE OF WORKS .................................................................................................................. 8

1.12 SITE INVESTIGATION .................................................................................................................... 9

1.13 NOTIFICATION TO PUBLIC ........................................................................................................... 9

1.14 PROVISIONS FOR TRAFFIC ........................................................................................................... 9

1.15 EXISTING VIDEO INSPECTION RECORDS AND DRAWINGS ................................................... 10

1.16 WEATHER CONDITIONS ............................................................................................................... 11

PART 2 - PRODUCTS ............................................................................................................................... 12

2.1 SEWER SIZES – NOMINAL VERSUS ACTUAL .............................................................................. 12

2.2 SEWER SIZE INSIDE DIAMETER TOLERANCES ......................................................................... 12

2.3 OBJECTIVES FOR UV CIPP LINING .............................................................................................. 14

2.4 CIPP LINER SIZING ......................................................................................................................... 15

2.5 EVALUATION OF MH-MH SECTIONS FOR LINING .................................................................... 18

2.6 PROPOSAL DESIGN LINER VERSUS SPECIAL DESIGN LINERS ............................................... 20

2.7 LINER THICKNESS INCREASE....................................................................................................... 21

PART 3 - EXECUTION ............................................................................................................................. 22

3.1 FLOW CONTROL AND BYPASS ...................................................................................................... 22

3.2 CCTV INSPECTIONS ........................................................................................................................ 27

Page 179: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page ii April 2019

3.3 PRELIMINARY CCTV INSPECTION – V1 ...................................................................................... 31

3.4 FILLING OF VOIDS .......................................................................................................................... 32

3.5 CLEANING AND PREPARATION OF EXISTING SEWERS FOR CIPP LINING .......................... 33

3.6 IDENTIFICATION OF SERVICE CONNECTIONS .......................................................................... 36

3.7 POST CLEANING AND PREPARATION CCTV INSPECTION – V2. ............................................. 37

3.8 CIPP LINING – TYPE AND MATERIALS ........................................................................................ 38

3.9 CIPP LINING ULTRAVIOLET LIGHT CURING ............................................................................. 39

3.10 CIPP LINER – MINIMUM PHYSICAL PROPERTIES ................................................................... 40

3.11 CIPP LINER DESIGN ...................................................................................................................... 41

3.12 CIPP LINER MINIMUM THICKNESS ............................................................................................ 49

3.13 CIPP LINING – RESIN IMPREGNATION ...................................................................................... 49

3.14 CIPP LINER INSTALLATION ........................................................................................................ 49

3.15 SERVICE CONNECTIONS REINSTATEMENT ............................................................................. 50

3.16 MANHOLE BENCHING AND RESTORATION ............................................................................. 51

3.17 CIPP LINING COMPLETED CCTV INSPECTION (V3) ................................................................ 52

3.18 INSTALLED CIPP LINER FIT AND FINISH REQUIREMENTS ................................................... 52

3.19 LINER WALL THICKNESS AND TOLERANCE ........................................................................... 55

3.20 INSTALLED CIPP LINER PHYSICAL PROPERTIES REQUIREMENTS .................................... 56

3.21 SAMPLES AND TESTING OF INSTALLED CIPP LINERS ........................................................... 56

3.22 SAMPLE TESTING, RESULTS AND RECONCILIATION ............................................................ 59

3.23 LINER DEFICIENCIES AND REMEDIAL MEASURES ................................................................ 63

3.24 WARRANTY..................................................................................................................................... 64

3.25 EXCAVATED REPAIR .................................................................................................................... 65

3.26 WORK EASEMENTS ....................................................................................................................... 68

3.27 EXCAVATION FOR RETRIEVAL OF EQUIPMENT OR OTHER PURPOSES ............................ 69

3.28 WORKSITE CLEANUP AND RESTORATION ............................................................................... 69

Page 180: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 1 April 2019

PART 1 - GENERAL

1.1 INTRODUCTION

.1 This Standard Specification for Sewer Rehabilitation using Sewer Rehabilitation by Cured-in-Place Pipe using Ultraviolet light cure (herein referred to as UV CIPP) is intended to be used in conjunction with site specific requirements as outlined in the contract documents. This standard covers the lining requirements for Halifax Water’s 2019 Sewer Rehabilitation Program. Each CIPP liner run to be installed must be evaluated by the Contractor with respect to this standard in order to ensure site specific considerations to the standard are identified for which additional requirements in the contract documents apply. Inherent in this specification are Specific Liners, which have a suitable design for specific sections of pipe that are identified in the proposal (i.e. Each pipe section will have its own specific design) and Special Liners, which are required when installation conditions are more onerous than covered by the Specific design.

1.2 TERMINOLOGY AND ABBREVIATIONS

.1 A brief listing of terminology and abbreviation used in this document is provided below. Where terms or abbreviations are not on this list or may require further clarification, questions should be addressed to the Owner.

ENS Engineers Nova Scotia

ASTM American Society for Testing and Materials

CCTV Closed Circuit Television

CIPP Cured-in-Place Pipe

DSMH Downstream Manhole

H2S Hydrogen Sulphide

HW Halifax Water

Page 181: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 2 April 2019

LSR Liner Sections Record

MH Maintenance hole or Manhole

NSRBA Nova Scotia Road Builders Association

O-S1, O-S2... MH to MH section for UV CIPP lining as in S1, S2, S3…

SC Service Connection

SCR Service Connections Record

SCS Service Connection Statement

USB Universal Serial Bus

USMH Upstream Manhole

UV Ultraviolet Light

UV CIPP Ultraviolet Light Cured Cured-in-Place Pipe

V1 Preliminary CCTV inspection prior to cleaning and preparation

V2 Post Cleaning and preparation CCTV inspection before lining

V3 Final CCTV inspection of the completed lining installation

1.3 REFERENCED STANDARDS

.1 This specification references the following standards, specifications or publications:

ASTM American Society for Testing and Materials

D790-10 Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials

D5813-04(2008)

Standard Specification for Cured-In-Place Thermosetting Resin Sewer Piping Systems

D2990-09 Standard Test Methods for Tensile, Compressive, and Flexural Creep and Creep-Rupture of Plastics

Page 182: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 3 April 2019

F1216-07a Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube

F2019-11 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP)

ISO 11296-4 Plastics piping systems for renovation of underground non-pressure drainage and sewage networks- Part 4: Lining with cured-in-place pipes (Test method for short-term Flexural Modulus and Flexural Strength)

ISO 7685 Plastics piping systems - Glass-reinforced thermosetting plastics (GRP) pipes – Determination of initial specific ring stiffness (Method for determining structural thickness of reinforced liners)

ISO/IEC 13818-1:2018

Information technology - Generic coding of moving pictures and associated audio information

Page 183: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 4 April 2019

1.4 SCOPE OF WORK

.1 This Standard applies to the structural rehabilitation of circular gravity sewers (sanitary, storm or combined) using UV CIPP including cleaning, preparation and CCTV inspections of existing sewers and all other work required for UV CIPP lining. CIPP curing methods other than Ultraviolet (UV) Light are not applicable to this standard UV CIPP liners will include Specific Liners for each sewer section and Special Liners where Specific Liner information provided in the proposal is not consistent with actual sewer parameters found in the field. A Special Liner requires a site-specific design that differs from information provided in the proposal (i.e. Special Design) to determine the increased wall thickness versus the proposed Specific Liner (Specific Design).

.2 The work involved requires special equipment to be handled by persons experienced in all phases of the work. All work shall be done in a quick and efficient manner and to the satisfaction of the Owner.

.3 The work to be performed shall include all labour, equipment, tools, materials, UV CIPP liner design, testing and supervision to structurally rehabilitate the sewers by Ultraviolet Light Cured-in-Place Pipe (UV CIPP) method including reinstatement of service connections. Service connections are identified as all connections to the sewer which include but are not limited to, catch basin leads and service connections from residential, commercial, and industrial buildings.

.4 In general, work includes:

Notifications to the public

Flow control and/or flow bypass

Traffic control

Liaison and other measures for properties connected to the sewer that will be affected by the work

Confirmation of existing sewer conditions

Page 184: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 5 April 2019

Measuring the size and length of sewers sections to confirm/determine the liner design parameters

Liner design (in accordance with ASTM F216-07a)

Preliminary CCTV inspection of the sewer sections, V1

Cleaning and preparation of sewer sections

CCTV after cleaning and preparation and before lining, V2

Installation and curing of UV CIPP lining

Reinstatement of service connections

CCTV inspection of completed sewer section rehabilitation, V3

Obtaining and testing samples of the completed UV CIPP

All associated work required in the course of and for the rehabilitation

1.5 INFORMATION TO BE REVIEWED PRIOR TO PROPOSAL SUBMISSION

.1 The Contractor shall review all information in the proposal package including and not limited to this specification, Special Provisions, Drawings and CCTV Inspections of the existing sewers.

.2 The Contractor shall investigate the site of the work.

.3 If, for proposal purposes, the Contractor is of the opinion further inspection is required in order to properly assess the work to be undertaken, the Contractor will be responsible to perform such additional inspection. Permission to enter Halifax Water’s sewer system for inspection purposes must be obtained from the Owner.

.4 Where a Contractors’ site meeting is scheduled during the proposal period, as described in the proposal documents, the Contractor shall attend.

Page 185: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 6 April 2019

1.6 INFORMATION TO BE SUBMITTED

.1 The Proposal document requires certain information to be submitted with the proposal and also some information prior to award including and not limited to the following information to be submitted for the review and acceptance of the Owner. (Further information submission is, or may be, required elsewhere in the Proposal documents).

.2 The following shall be submitted with the Proposal:

.1 The name of a professional engineer licensed in the Province of Nova Scotia who will provide the stamped CIPP liner engineering designs required in accordance with the liner design requirements in this standard. The professional engineer shall be authorized to perform such work by Professional Engineers Nova Scotia (APENS).

.2 Material specifications and structural details of the proposed sewer liner in sufficient detail to enable confirmation by the Owner that the UV CIPP liner proposed will meet the requirements as specified in this standard. Include the proposed resin (manufacturer, resin type and manufacturer’s resin identification number. Include the proposed liner tube (manufacturer and type of tube).

.3 A summary of the Contractor’s proposed UV CIPP liner installation procedure. Include one example of the liner wet-out facility processing sheet and one example of the liner curing process summary sheet to be used for the work.

.4 A certified original copy (complete with supporting literature) from the resin manufacturer of the Infrared Spectrograph of the catalyzed resin mixture proposed for this Contract.

Page 186: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 7 April 2019

.5 Engineering designs for Specific Liners in accordance with the liner design requirements in this specification for the sizes/sewers listed in the Proposal. Note: The Contractor shall be required to re-submit these designs stamped by a professional engineer authorized to perform such work by Engineers Nova Scotia after award but prior to commencement of work.

.6 Contractor’s quality control procedures including copy of all QA/QC record sheets used.

1.7 OCCUPATIONAL HEALTH AND SAFETY

.1 In addition to other occupational health and safety requirements in the proposal documents, the following shall apply for sewer rehabilitation work.

.2 The Contractor shall provide, at the scheduled preconstruction meeting, a list of all controlled hazardous materials or products containing hazardous materials, all physical agents or devices or equipment producing or emitting physical agent and any substance, compound, product or physical agent that is deemed to be or contains a designated substance in accordance with the Workplace Hazardous Materials Information System (WHMIS) as defined under the Nova Scotia Occupational Health and Safety Act and shall provide appropriate Material Health and Safety Data Sheets for these substances used for the performance of the required work, all prior to the performance of the work.

.3 Where hazardous materials, physical agents and/or designated substances are used in the performance of the required work, the Contractor shall ensure that the requirements of the Nova Scotia Occupational Health and Safety Act and associated regulations are complied with.

.4 The Contractor shall perform the work so as to cause the public the least inconvenience possible. In particular, the Contractor shall not obstruct any street, thoroughfare, or foot-walk longer or to a greater extent than necessary.

.5 The Contractor shall take all reasonable precaution necessary to ensure the safety of the workers and the general public, particularly children who may play in the area of work.

Page 187: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 8 April 2019

1.8 CONFINED SPACE REQUIREMENTS

.1 In addition to other occupational health and safety requirements in the Proposal documents, the following shall apply for sewer rehabilitation work.

.2 The Contractor will meet or exceed the requirements of Confined Space Entry as outlined under the Occupational Health and Safety Act. For all work in and around the sewer manholes, a person qualified in Confined Space Entry shall be present. Proof of atmospheric testing of each manhole, prior to initial entry and continuously while in the manhole where work was performed, shall be submitted to the Owner on the Confined Space Entry form, with each progress payment certificate submission.

1.9 PERMITS AND APPROVALS

.1 The Contractor shall obtain all necessary permits, permissions and approvals for the work.

1.10 WORK PRIORITIES

.1 The Owner will assign priorities to sewer locations to be rehabilitated at the Owner’s discretion. The Contractor shall undertake the work in the order of the Owner’s priority. All work that the Owner has set as Priority 1 shall proceed before any other work. The Owner’s Priority 1 work shall be followed by the Owner’s Priority 2 work. Any work that does not have a Owner designated priority may commence after all Priority work is substantially completed, unless otherwise approved by the Owner.

1.11 SCHEDULE OF WORKS

.1 The Contractor shall submit to the Owner, for review and approval, a schedule for the works. The schedule shall be reviewed with the Owner prior to commencement of the works.

.2 The Contractor shall notify the Owner of specific start/finish times for all procedures in order that Halifax Water’s inspection staff may co-ordinate their schedules to ensure suitable levels of inspection. This notification shall be given a minimum of 48 hours prior to the start time.

Page 188: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 9 April 2019

.3 The order of work is, in general, the responsibility of the Contractor and shall be as indicated in the Contractor’s work schedule subject to priorities that may be assigned by the Owner.

1.12 SITE INVESTIGATION

.1 Prior to commencement of the Work the Contractor shall investigate each site; determine the existing site conditions, any obstructions, or any other problem, which may affect the completion of the proposed Works. No additional payment shall be made on account of difficulties to complete the Works because the Contractor failed to investigate the site prior to commencement of the Work.

1.13 NOTIFICATION TO PUBLIC

.1 The Contractor shall advise all residents, industrial, commercial and institutional establishments connected to the sewer scheduled to be lined, 48 hours in advance of the impending sewer lining works and sewer service interruption (if applicable) for the duration of the process. The notice shall include names and phone numbers of the Contractor’s personnel (including an after-hours local emergency number). Halifax Water is to receive a copy of the notice for approval prior to delivery to the affected residents and businesses. The Owner may also choose to provide the Contractor with the Municipality’s project notice for delivery by the Contractor at the same time.

.2 Should a closure request for any access be accepted and approved by Halifax Water, all required notification shall be distributed and posted prior to commencement of work.

1.14 PROVISIONS FOR TRAFFIC

.1 General

.1 Supply all labour, sign, delineators, etc. Set and maintain required detours at work sites. All provisions for traffic shall conform to the latest edition of the manual of Uniform Traffic Control Devices and all applicable sections of the tender document. .

Page 189: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 10 April 2019

.2 Cost to meet the requirements of this clause shall be included as outlined in the Schedule of Quantities & Prices.

.2 Provisions for Access

.1 The Contractor shall provide vehicular access at all times to all properties with existing access. Where blocking of access is unavoidable, the Contractor shall notify all residents affected and shall work to keep the period of inconvenience to a minimum.

.3 Pedestrian Traffic

.1 The Contractor shall provide for safe pedestrian movement from all houses and businesses along the site at all times. Walkways shall not be obstructed at any time.

.4 Work on Major Arterials

.1 No work shall be performed on major arterial roads during Rush Hour Traffic (6:00 am – 8:00am and 3:00pm – 6:00pm) without the written consent from the Traffic Authority. Refer to the Transportation Association of Canada (TAC) Manual for road classifications and traffic volumes.

1.15 EXISTING VIDEO INSPECTION RECORDS AND DRAWINGS

.1 CCTV Inspections

.1 Any CCTV inspection surveys provided by the Owner with the Proposal or later, while believed to be accurate, may contain errors or approximations in sewer sizes, lengths and other information. Where sizes, lengths or depths are required by the Contractor for the proper execution of the UV CIPP lining work, the Contractor shall verify dimensions by field measurement and shall not rely on the existing CCTV inspection surveys.

Page 190: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Phase 2

ULTRAVIOLET LIGHT CURED-IN-PLACE PIPE – MAINLINE

Section 33 11 10 Page 11

April 2019

.2 Any CCTV surveys provided by the Owner at time of proposal represent the internal condition of the sewers for proposal purposes. Where, in the course of the Work, the Contractor has reason to believe that the internal condition of the sewers has changed and such change materially and significantly negatively impacts the execution of the work, the CCTV surveys provided by the Owner at time of proposal shall represent the baseline condition for comparison to determine a changed condition. Refer to available list of CCTV videos provided in the Special Provisions – General section.

.2 Drawings

.1 Drawings provided by the Owner with the proposal or later, while believed to be accurate, may contain errors or approximations in sewer sizes, lengths and other information. Where sizes, lengths or depths are required by the Contractor for the proper execution of the UV CIPP lining work, the Contractor shall verify dimensions by field measurement and shall not rely on the drawings. Refer to available list of drawings provided in the Special Provisions – General section.

.2 The Contractor shall review the inspection information and drawings prior to undertaking any work in the sewer sections.

.3 The Contractor shall have reviewed, prior to proposal submission, Halifax Water’s inspection information that is available prior to proposal closing.

1.16 WEATHER CONDITIONS

.1 The Contractor shall monitor the local weather, including reviewing the Environment and Climate Change Canada Weather forecast prior to commencement of lining operations. Where the anticipated weather conditions are such that anticipated sewer/drain flows may exceed the Contractor’s bypass pumping capacity or may cause potential service backups, the Contractor shall notify the Owner and commencement of any work that impedes sewer flow shall be delayed until favorable weather is forecast.

Page 191: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 12 April 2019

.2 This clause applies to all sewers (storm, sanitary and combined) to be lined.

PART 2 - PRODUCTS

2.1 SEWER SIZES – NOMINAL VERSUS ACTUAL

.1 The Contract Documents generally refer to nominal sizes for sewers and not the actual inside diameter sizes. The actual inside diameters will typically be slightly different than the nominal value. It is the Contractor’s responsibility to use the sewer size dimensions that are appropriate and proper for rehabilitation purposes including UV CIPP liner design.

2.2 SEWER SIZE INSIDE DIAMETER TOLERANCES

.1 General

.1 Sewer sizes shown in proposal and contract documents are nominal metric sizes. For the purpose of the contract, a nominal sewer size shall include actual sizes within the range shown below.

Nominal Size (mm)

Lower Limit of Actual ID

(mm)

Upper Limit of Actual ID

(mm)

200 > 178 ≤ 216

225 > 216 ≤ 241

250 > 241 ≤ 279

300 > 279 ≤ 343

375 > 343 ≤ 419

450 > 419 ≤ 483

500 > 483 ≤ 521

525 > 521 ≤ 572

600 > 572 ≤ 648

Page 192: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 13 April 2019

Nominal Size (mm)

Lower Limit of Actual ID

(mm)

Upper Limit of Actual ID

(mm)

675 > 648 ≤ 724

750 > 724 ≤ 800

825 > 800 ≤ 876

900 > 876 ≤ 953

975 > 953 ≤ 1029

1050 > 1029 ≤ 1105

1125 > 1105 ≤ 1181

1200 > 1181 ≤ 1295

Page 193: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 14 April 2019

.2 Where the inside diameter fits within the range for a nominal size, the sewer shall be deemed to be that nominal size for payment purposes. For example, a sewer identified in as a 900 mm that has an actual inside diameter up to 953 mm shall be deemed to be a 900 mm sewer. Whereas a sewer identified in the contract documents as a 900 mm that has an actual inside diameter above 953 mm shall be deemed to be a 975 mm sewer.

.3 The applicable sewer size for payment shall be based on the inside diameter that has been determined, by measurement, to be the diameter to be used for sizing the UV CIPP liner.

.2 Sewer Size for Lining Increased by H2S Corrosion

.1 The sewer sections for rehabilitation by CIPP lining may be internally corroded by H2S induced corrosion. In some sections the corrosion is severe with exposed reinforcing steel. Some sections have exposed gaskets. In determining the inside diameter of the sewer for sizing of the liner, the Contractor shall take into account that most, if not all H2S corroded sections will have enlarged inside diameters, especially after cleaning and preparation. Refer to Section 2.4 on measurement.

2.3 OBJECTIVES FOR UV CIPP LINING

.1 The objectives, over the design life of lining, for the UV CIPP lining of sewers are to prevent further structural deterioration, prevent corrosion, prevent root intrusion, prevent/reduce infiltration, prevent offset joints and improve flow characteristics for the sewer.

.2 UV CIPP Lining shall be a tight fit to the inside of the existing sewer and conform closely to the shape of the existing sewer without bridging, gaps, or voids.

.3 UV CIPP lining shall be installed without excavation by installation into existing pipelines through MH access. Exception shall be made when existing MH access is of insufficient size or existing MH location is inadequate.

Page 194: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 15 April 2019

.4 UV CIPP liners shall be designed in accordance with the Design Section of this specification.

.5 The term liner means a continuous reach of lining extending over the section to be lined, beginning and ending at manhole inside walls.

.6 The short-term objectives for using UV CIPP lining are to prevent any significant escape of styrene from the liner into or out of the sewer being lined and to prevent any significant styrene odour issues at any locations.

2.4 CIPP LINER SIZING

.1 General

.1 It is the responsibility of the Contractor to obtain and confirm the necessary lengths and interior dimensions of the sewers to be lined and obtain the appropriate measurements. Size information provided on the drawings or in the proposal documents are typically nominal sizes and are not necessarily the correct sizes.

.2 The Contractor’s method for obtaining and confirming sizes shall, at a minimum, include measuring the inside diameter of the existing sewer at all manholes (MHs) in the section. Measurement method shall take into account the possibility that the exposed sewer end is a bell and does not represent the inside diameter of the sewer pipe itself. Measurement methods shall take into account any debris, encrustation, or other build up in the sewer that could result in an incorrect sizing measurement. The contractor shall also take into account any change in pipe characteristics such as offset joints, change in ovality, partial collapse, broken pipe, etc., which could result in incorrect sizing measurement.

.2 Measurements for Liner Sizing

.1 The Contractor is responsible for the correct diametric sizing and length of the UV CIPP liners. The Contractor shall not rely on dimensions provided in the proposal documents including drawings or CCTV inspection.

Page 195: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 16 April 2019

.2 The actual inside size(s) of the sewers for lining shall be verified by measurement prior to any fabrication of the liners. The dimensions used for sizing the liner tubes circumference/perimeter shall take into account potential increase in the sewer inside diameter due to the cleaning and preparation of the sewers for lining.

.3 The length of the liner shall be verified by measurement of the section(s) of sewer to be lined. A sufficient length safety margin shall be added to the measured length to assure that the liner extends from begin MH to end MH over the length of the installed liner run.

.4 Measurements shall be provided to the Owner on request.

.3 Liner Sizing Measurements Made Prior to Cleaning and Preparation

.1 Where the sewer inside diameter is measured for sizing the CIPP liner prior to cleaning and preparation, the measurement method shall employ using sizing rods, mandrels or other device that can penetrate through or scrape away any material buildup in order to obtain the inside diameter that is expected to occur after cleaning and preparation of the sewer. Measurements by tape measure shall not be acceptable.

.2 Measurements shall be taken at both ends of all USMH-DSMH sewer sections to be UV CIPP lined.

.3 Where flow control is required to obtain proper measurements, the Contractor shall provide flow control.

.4 Variable Sewer Inside Diameter for Lining

Page 196: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 17 April 2019

.1 In the event that an inside diameter variance exists along the sewer section to be lined to the extent that the liner may be oversized or undersized for zones of the lining run, the Contractor shall present the liner sizing situation and anticipated lining results (regarding fit and finish) along with a recommendation for liner sizing for the MH-MH section to the Owner. The Owner shall discuss the situation with the Contractor and in conjunction with the Contractor determine and `approve the sizing of the liner for the installation.

.2 It is understood that in zones of the sewer where a liner may be oversized, there will be excess material in the form of wrinkles and fins in the finished liner. In zones of the sewer where the liner is undersized, the finished liner may stretch out resulting in a decrease in wall thickness. The Owner shall take the foregoing into account in the determination of the approved liner sizing.

.3 The determination of the sewer sizing for lining will consider the best compromise between zones of excess liner material and zones where the liner could be thinned out by stretching or where the stretch may not be sufficient resulting in a liner that is not tight fitting.

.5 Pipe Size for Payment

.1 Payment for CIPP lining shall be based on the nominal size that has a size range that includes the inside diameter after cleaning and preparation. Refer Section 2.2 for size ranges. The inside diameter after cleaning and preparation shall be the dimension used to size the UV CIPP liner for payment purposes.

Page 197: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 18 April 2019

.2 For example where the contract identifies the nominal size as 825 mm and the actual inside diameter for lining after cleaning and preparation is within the range shown in Section 2.2 for nominal 825 mm, payment will be made for a nominal 825 mm. However if for a contract nominal 825 mm, the actual inside diameter for lining after cleaning and preparation is greater than the maximum inside diameter for nominal 825 mm shown in Section 2.2 , payment will be made based on the nominal size with a range containing the final inside diameter for lining.

.6 Substantiation for Increase in Nominal Size for Payment

.1 Where an increase in nominal size for payment is warranted, the Contractor shall provide substantiation of the final size for lining that verifies the final size for lining based on measurements of the sewer or other substantiation method that is acceptable to the Owner.

2.5 EVALUATION OF MH-MH SECTIONS FOR LINING

.1 Prior to any liner preparation, the Contractor shall evaluate each MH-MH sewer section to be lined. This evaluation shall determine whether the Proposal Liner Design submitted with the proposal submission yields a liner that is suitable for the MH-MH sewer section being evaluated or whether a Special Liner Design is required.

.2 This evaluation shall also determine whether any excavated repairs are required before lining and whether the sewer section, overall, is a suitable candidate for lining.

.3 The Contractor’s evaluation shall include field assessment and CCTV review assessment for when one or more of the following installation parameters are in exception to the Specific Design parameters.

Parameter Exception to Proposal Design

Ovality Greater than 3%

Page 198: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 19 April 2019

Water Table

Location

Less than 1.0 m below ground surface

Sewer Invert Deeper than Proposal Liner Design

Size Different than the Proposal Liner

Design

Live Load Greater than the Proposal Liner Design

Page 199: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 20 April 2019

.4 From the evaluations of all MH-MH sewer sections to be lined, the Contractor shall prepare and maintain a Liner Sections Record (LSR) record of every MH-MH section for lining. The LSR shall show whether the MH-MH section is suitable for a Proposal Design Liner or whether a Special Design Liner is required. When a Special Design Liner is required the LSR shall show the existing sewer parameters that are in exception to the Specific Liner Parameters.

.5 The LSR shall use an Excel spreadsheet to track the Liner Sections Records. The Contractor shall utilize Halifax Water’s MH identification (ID) numbers. When requested, the Contractor shall provide an updated LSR to the Owner.

.6 The LSR shall be constructed in such a way that all MH-MH sections to be lined can be readily identified along with the exceptions to Specific Design Parameters for that section. When a Special Design is made for a MH-MH section the liner design thickness shall be identified in the LSR along with the Special Design parameters.

.7 The format of the LSR shall be as determined by the needs of the Contractor to record and track the evaluation process and the needs of the Owner for use of this data.

2.6 PROPOSAL DESIGN LINER VERSUS SPECIAL DESIGN LINERS

.1 For each sewer section for lining identified in the proposal there will be an approved Proposal Liner Design for each MH-MH section of lining and a fully Where design reconciliation based on as tested properties is performed by Where design reconciliation based on as tested properties is performed by Liner. The Proposal Liner Design shall be submitted by the Contractor with the proposal submission. See Sections 1.6 3.11 .

.2 Where it is determined that a Proposal Design Liner has insufficient thickness for the intended MH-MH section of lining, the Contractor shall provide a Special Design which takes into account the changed parameters that made the Proposal Design Line unsuitable for the location. On the approval of the Owner, the Contractor shall install the Special Design Liner and be paid accordingly.

Page 200: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 21 April 2019

.3 The determination of whether a Special Design and correspondingly a Special Design Liner are required shall flow from the Contractors Evaluation of MH-MH Sections for lining work.

2.7 LINER THICKNESS INCREASE

.1 Where a Proposal design thickness liner is insufficient for the installation as determined by a Special Design, the liner thickness to be installed shall be increased to satisfy the Special Design thickness. The thickness increase shall be the minimum required incremental thickness of the liner tube to satisfy the Special Design thickness. Thickness increments shall be as per the Schedule of Quantities and as set forth below.

Increment # Thickness Increment

1 1.0 mm

2 > 1.0 mm ≤ 2.0 mm

3 > 2.0 mm ≤ 3.0 mm

4 > 3.0 mm ≤ 4.0 mm

5 > 4.0 mm ≤ 5.0 mm

Page 201: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 22 April 2019

.2 A thickness increment pay item only applies when the Contractor was required to increase the nominal liner tube thickness over the Specific Design liner to achieve the additional thickness required by the Special Design.

.3 In the proposal response, the Contractor shall, for each sewer section, list the specific nominal tube size to be used for the Specific Design Liner. See Statement E in the Request for Proposal.

.4 Where the Contractor considers that the increased in-place thickness necessitated by a Special Design can be achieved without increasing the nominal tube thickness over the specific nominal tube thickness, then the installation may be made with the specific nominal tube thickness at the Contractor’s discretion. However regardless of the nominal tube used, the in-place liner thickness shall meet the requirements of the Special Design. In the case where the Contractor opts to use the Proposal Design nominal tube thickness, there will not be a thickness increment for the nominal tube thickness and no increased thickness payment will apply.

.5 Where the Special Design Liner has been approved by the Owner, the Contractor will be paid for the liner thickness increase in accordance with the appropriate item in the Schedule of Quantities and Prices. Compensation for extra thickness will not be given in cases where liners are installed without prior approval by the Owner, through corresponding certified design approved by the Owner.

PART 3 - EXECUTION

3.1 FLOW CONTROL AND BYPASS

.1 Purpose

.1 Provide for bypassing and pumping of mainline sewage to maintain sanitary sewage flow in upstream sections of the sewer being lined. The contractor shall not let the upstream sewers surcharge beyond a reasonable amount, so as not to create any issues.

Page 202: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 23 April 2019

.2 During the CCTV inspection of pre and post rehabilitation, sewer flows shall be bypassed in order to enable proper inspection of the pipe invert.

.2 General

.1 Flow Control means reducing or eliminating flow in the sewer section or sewer sections where lining is to be installed for the purpose of allowing the liner installation and facilitating associated activities, such as CCTV inspections. The method of achieving flow control is the responsibility of the Contractor subject to approval by the Owner.

.2 For the mainline sewer, flow control may include: Complete bypass pumping of the sewer section(s) requiring flow control, plugging and back-up of the upstream mainline sewer, pick-up of flows by vacuum tanker truck.

.3 For service connections, flow control may include: Temporarily backing up the service connections during lining installation (with notice and instructions to property occupants), bypass pumping of flows from service MHs, pick-up of service flows at service MHs (or other intercept points) by vacuum tanker truck.

.3 Complete Flow Control Required For:

CCTV inspection V2

Insertion and Curing of the CIPP liner until flow through the lined sewer section can be restored when the liner ends are opened for flow.

CCTV inspection V3

.1 Complete flow control means that there shall be no flow in the sewer section(s) and any fluid remaining in the sewer section shall be insignificant to the point that it will not interfere with or negatively affects the process underway during flow control, such as liner installation, liner cure or CCTV inspections.

Page 203: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 24 April 2019

.2 No flow control or bypass pumping shall be employed that has insufficient capacity to maintain flow in the sewer system. It is the Contractor’s responsibility to employ flow control of sufficient capacity. No work requiring flow control shall proceed until flow control arrangements are in place that provide sufficient flow control capacity

.4 Flow Control During Other Work

.1 Partial or complete flow control may be required during other work when the presence of flow in the pipe negatively affects the quality of that work. In general the use and amount of flow control for other work will be at the Contractor’s discretion except when in the opinion of the Owner flow control is necessary for the Contractor to properly perform the work and obtain required results. Other work includes:

.1 Cleaning and preparation of the sewer section(s) to be lined

.2 Reinstatement of service connections into the lined sewer

.3 Any extra CCTV inspections required by the Owner

.5 Bypass Pumping

.1 When bypass pumping is employed for flow control, the Contractor shall meet the following requirements:

.1 Any surcharging of upstream sewer(s) shall not create any upstream problems such as property flooding or impeded mainline flow or impeded service flow.

.2 Flows shall be transported through a closed, leak tight pipeline or other method as approved by the Owner to the nearest or most economical disposal area.

Page 204: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 25 April 2019

.3 On all liner installation time periods, the Contractor must maintain on site both a primary and stand-by by-pass pump and pump power supply as required to ensure sufficient flow control. The stand-by by-pass pump and power supply shall be of an equal or better capability than the primary by-pass pump and power supply. No by-pass pumps or related equipment shall be disconnected or removed from the sewer or job site until after all service connections have been reinstated, all by-pass equipment has been flushed/cleaned as approved by the Owner, and the Contractor has recorded the V3 CCTV inspection.

.4 All by-pass pumping shall be in place and operational prior to the final pre-installation inspection.

.5 All by-pass pumps and related equipment must be silenced equipment or contained within an acceptable sound reduction structure.

.6 Flow Control for Service Connections on the Sewer Being Lined

.1 When service connection flow control, the Contractor shall meet the following requirements:

.1 When private service back-up is used, advise building occupants of out-of service date and duration. Provide building occupants with instructions to limit water use.

.2 When private service back-up is used, the maximum out of service time shall be 8 hours.

.3 Make provisions to provide for residential bypassing as well as building bypassing of multi-unit residential, commercial, and industrial buildings (as determined by the Owner) from a clean out or property MH to maintain sanitary and storm sewage services to the property if required.

Page 205: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 26 April 2019

.4 Make all necessary arrangements with the owners of each residence and/or building. The Contractor shall contact all property owners and/or tenants to co-ordinate the repair work to the sewer and minimize any impact on residents and/or businesses.

.7 Event of Loss of Redundant Capacity

.1 When circumstances arise requiring the use of redundant capacity and therefore redundant capacity no longer exists, action shall be undertaken immediately to restore the lost capacity to full function so that redundant capacity is fully restored. If redundant capacity cannot be restored, only critical work already in progress that must be completed (such as lining inversion, curing and liner end opening) shall proceed and without delay. No other work continuation (such as lateral reinstatements or CCTV inspection) shall take place without a fully functional redundant capacity.

.2 When it is known or suspected that redundant capacity is not or may not be fully functional, no work shall be started that requires bypass operation.

.8 Bypass Coordination and Supervision

.1 A Bypass Supervisor shall be assigned to manage all bypass pumping operations. The Owner shall be advised of this person and be provided with 24 hr contact information. When the bypass is required to operate, the supervisor shall assure that the bypass system is in full function operation, including fully available 100% redundancy before any work is started for which the bypass is required. When the bypass is in operation, the bypass supervisor will assure that there is continuous presence by a competent person to watch over the bypass including manual checking of upstream levels, pump fuel levels and other indications of potential trouble such as at pump suctions and discharges, discharge conduits and redundancy availability.

.9 Responsibility for Flow Control Leaks, Spills and Back-ups

Page 206: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 27 April 2019

.1 The Contractor shall be responsible for all leaks, spills and back-ups, should they occur and shall take immediate action to restore bypass integrity and facilitate cleanup of any leak, spill or back-up.

.10 Flow Control Included Limit Provision

.1 Unless specified otherwise in the contract documents (such as for site specific flow control requirements) the following limit to flow control included in the CIPP lining applies.

.2 Limit of Flow Control Included with Lining Item

.3 The Contractor shall provide minimum flow control as part of the lining item, up to 63 litre/sec (1,000 usgpm) or up to the maximum flow volumes required facilitating the liner installation (as provided in the proposal information), whichever is greater. Such flow control shall include bypass pumping or other means of effecting flow control.

.4 Refer to contract documents site specific requirement(s) and corresponding pay item(s) for identified flow control requirements exceeding the flow control limit that are separate pay items.

3.2 CCTV INSPECTIONS

.1 General

.1 All required CCTV inspection shall be in accordance with the following requirements.

Page 207: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 28 April 2019

.2 The CCTV camera equipment shall be of a self-propelled type with colour pan, tilt and zoom camera or equivalent capability with a range of at least 200 m from the insertion location. The minimum resolution shall be 400 lines on the live picture and at least 250 lines on any recording. The camera equipment shall be capable of correctly focusing on locations being viewed and shall be equipped with adjustable focusing capability. The camera equipment shall be suitable for the size of the sewer. The picture on the CCTV monitor shall be an accurate representation of the inspection and shall have no on screen distortion such as vertical flattening or horizontal widening.

.3 The camera shall be located closely in the center of the pipe and shall provide a picture that properly and fully shows the full circumference of the pipe in sufficient detail to verify the interior details and features of the existing sewer or lined sewer meet with requirements (Cleaning and Preparation requirements, UV CIPP liner requirements and service connection reinstatement requirements). The camera equipment shall be provided with sufficient lighting of the viewing zone so that all details and features can be seen clearly and are not obscured by insufficient lighting or shadows both on the perimeter of the picture and in the direction of the view down the pipe. CCTV inspections with insufficient lighting will not be accepted.

.4 The view shall not be obscured by any vapour in the pipe. Where steam or other vapour obscures or otherwise interferes with the view, the Contractor shall take necessary action required to eliminate steam or vapour that interferes with the view.

.5 Where and when required for CCTV inspection, the pipe shall be sufficiently free of flow or standing water so that all surfaces can be fully inspected without any areas of features being obscured by water in the pipe. This will require flow control of flow during post cleaning and preparation CCTV inspection, CCTV monitored service connection reinstatement and final CCTV inspection of the completed UV CIPP liner.

Page 208: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 29 April 2019

.6 The speed of inspection shall allow for proper viewing and inspection and shall not exceed 10 m per minute subject to requirements for pausing at service connections or other features, or as may be required by the Owner for specific situations.

.7 CCTV inspections shall be recorded on flash drive in a non-proprietary format compatible with Halifax Water’s CCTV viewing equipment and software. Each flash drive shall be clearly marked as to contents and date. One copy of each flash drive shall be provided to the Owner.

.8 The initial screen of any inspection shall record the inspection date, Contractor name, Contract identification information, location of the inspection, MH-MH section number(s), start and end MH numbers and the inspection type (e.g. Post Cleaning and Preparation, Final Inspection after Lining) and any other information routinely required for sewer CCTV inspections. The distance counter meters shall be zeroed at the starting MH and run continuously throughout the inspection. The section number shall appear continuously along with the distance count.

.9 At each service connection, the camera shall view the entire opening and up the service connection pipe (pan and tilting as required) for a minimum of 10 seconds or longer as necessary to view and record the complete details of the service connection.

.10 A computer generated written report shall accompany the CCTV inspections detailing features (e.g. service connections etc.) and their locations (distance from starting MH). The location information shall include the clock position.

.11 CCTV vehicle shall have sufficient space to accommodate the Owner for live viewing as well as the CCTV operator.

.2 Digital Video Files of the CCTV Inspection

Page 209: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 30 April 2019

.1 The compression or other technology used in making digital representation of the CCTV image shall not reduce the useable clarity of the image and shall not result in visible pixels on the computer screen when viewing the CCTV inspection in actual size (not full screen size). The digital format shall be MPEG-2 (Moving Pictures Expert Group - 2 and ISO/IEC 13818) standard or equivalent. The digital format shall not make computer playback dependent on a particular computer operating system or specific video player for full function playback. The digital recording shall play with full function in:

Windows Media Player Windows,

QuickTime Player Windows,

QuickTime Player Mac,

VLC Player Windows

VLC Player Mac

.2 Where these video players are properly configured for the MPEG-2 format. Video recordings that will not play back properly in all the above players will not be accepted and will require re-doing the CCTV inspection (or other corrective procedure).

Page 210: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 31 April 2019

3.3 PRELIMINARY CCTV INSPECTION – V1

.1 The Contractor shall make a preliminary CCTV inspection (called the V1) of the sewer section before undertaking any work required for the UV CIPP lining of the section. The purpose of the V1 is to determine and record the initial condition of the sewer section and to determine if a significant changed condition exists versus the CCTV inspection provided to the Contractor by the Owner. Significant changed condition means a condition that will prevent lining of the section, require an unexpected excavated repair before lining, require a change in the liner design resulting in an increased liner thickness to deal with the changed condition or any other situation, which in the Owner’s opinion, is a significant changed condition.

.2 Where a significant changed condition is encountered, the Contractor shall immediately inform the Owner.

.3 In making the V1, the Contractor shall employ only such preliminary cleaning that is necessary to obtain a CCTV inspection sufficient to record the initial condition including a count and condition of service connections.

.4 De-watering of the sewer shall be sufficient for V1 inspection purposes and bypassing of the sewer flow shall be done where the sewer is not sufficiently clear for V1 inspection purposes.

.5 Sewer defect coding is not required for the V1.

.6 The V1 CCTV inspections shall be submitted to the Owner in accordance with the requirements of this specification.

Page 211: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 32 April 2019

3.4 FILLING OF VOIDS

.1 Void Definition

.1 A void is a volume of space starting at the outside wall surface of the existing sewer where there is an absence of soil or ground material. Depending on its size and geometry the void may represent a structural weakness in the pipe/soil system that may continue after lining of the sewer. A void will often by evidenced by missing sewer pipe wall that has allowed the ground material to escape into the sewer, exacerbated by ground water infiltration. Where a void is deemed to create a significant structural weakness in the lined pipe, the void requires filling to re-establish the soil/ground support around the sewer.

.2 Voids Identified for Filling in the Contract

.1 The Contractor shall fill voids as specified for filling in the Proposal documents. Void filling shall ensure structural integrity of the lined sewer and prevent bridging by the liner. The Contractor shall submit for the approval of the Owner a detailed method statement outlining the procedures and materials to be used in filling the voids. The method statement shall correspond with requirements that may be specified for void filling in the Proposal document.

.3 Voids Requiring Filling Not Identified in the Contract

Page 212: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 33 April 2019

.1 If, during the course of the work (such as during the V1 or cleaning and preparation), the Contactor identifies voids that require filling to ensure the structural integrity of the liner and to prevent bridging by the liner, the Contractor shall advise the Owner of these voids. Where the filling of such voids is required by the Owner, the Contractor shall submit a method statement outlining the procedures and materials to be used in filling the voids. Where the Owner requires filling of the voids, the cost shall be negotiated. However, this provision shall not apply to any voids created as a result of the Contractor’s work unless, and at the discretion of the Owner, the creation of such voids was an unavoidable repercussion of the work.

3.5 CLEANING AND PREPARATION OF EXISTING SEWERS FOR CIPP LINING

.1 General

.1 The sewer sections to be lined shall be cleaned and prepared to meet the requirements for lining including as follows.

.2 Precaution for Cleaning and Preparation

.1 The contractor shall take all reasonable steps to prevent the collapse or irreparable damage to the pipe wall (which would create the need for an open cut repair prior to lining) during the cleaning and preparation of the sewer sections. Should the contractor identify areas within the sewer sections which present a high risk for this situation to occur during cleaning and preparation, they shall notify the owner and present their recommended approach to avoid the potential collapse or damage.

.2 The sewer sections to be UV CIPP lined shall be cleaned and prepared to meet the requirements for lining including as follows.

.3 Soft Deposits and Loose Debris

Page 213: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 34 April 2019

.1 All soft deposits shall be removed by suitable cleaning methods such as water jet sewer cleaning sized and rated for the sewer being cleaned. Soft deposits include such deposits as slime, grease and soft corrosion products. Loose debris includes such as soil, sand and contents of the sewer flow that have settled out of the flow.

.4 Corrosion Soft Deposits

.1 If the sewer is experiencing signs of corrosion, it may have areas of corrosion soft deposits. The severity of this corrosion and the type and depth of the corrosion products layers vary at different locations in the sewer sections. Where the depth of this layer is such that cleaning will cause exposure of the reinforcing steel (or where it is already exposed), the cleaning process shall be checked by CCTV to gauge the degree of removal and penetration into the pipe wall from the cleaning process.

.2 Where CCTV checking of the cleaning process indicates that full removal of soft corrosion layers is resulting in or may result in under-cutting of the reinforcing steel, soft layer removal operations shall be limited to not deeper than the outer surface of the reinforcing steel. The Contractor shall advise the Owner when cleaning and preparation operations in corroded sewers are creating, or will create a situation where it is advisable to scale back or halt such operations. On such advice, the Owner will advise the Contractor regarding the necessity for further cleaning and preparation.

.5 Hard Deposits

.1 Hard deposits, such as hard calcite shall be removed if they result in a diametric reduction of the sewer exceeding 15 mm. No hard deposits shall remain in place with sharp or ragged edges that will cause sharp indentations into the liner regardless of the diametric condition.

Page 214: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 35 April 2019

.2 Hard deposits shall be removed using suitable equipment such as flailing or robotic cutting/grinding. The method of removal shall be such that no damage is caused to the pipe that will compromise the long-term structural performance of the rehabilitation.

.6 Tree Roots

.1 Any tree roots protruding into the inside of the pipe shall be sufficiently removed so that they do not interfere with the UV CIPP lining installation and the finished liner.

.7 Protruding Service Connections

.1 Any service connection to the sewer that protrudes into the inside of the sewer shall be trimmed back if the protrusion exceeds 12 mm. Regardless of the protrusion length, any sharp or ragged edged protrusions shall be trimmed smooth. Trimming shall be done with a method that does not damage either the service connection pipe or the mainline pipe. Robotic cutting is an acceptable method. Flailing with knocking devices is not an acceptable method.

.8 Disposal of Cleaning and Preparation Debris

.1 All debris, deposits etc. resulting from cleaning and preparation operations shall be removed from the sewer and not allowed to pass downstream or upstream from the sections to be rehabilitated. Disposal of cleaning debris and other waste products at an approved location is the responsibility of the Contractor.

.2 At the conclusion of cleaning and preparation, a CCTV inspection shall be made (the V2) and provided to the Owner for review and approval of the cleaning and preparation at least 2 days before lining installation. Refer to Section 3.7 .

Page 215: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 36 April 2019

3.6 IDENTIFICATION OF SERVICE CONNECTIONS

.1 All live service connections shall be re-instated into the liner. The Contractor shall identify all live and capped service connections prior to lining (during V1 and V2 work) and submit a Service Connection Report (SCR) to the Owner containing the following information at a minimum:

.1 US MH and DS MH IDs for sewer section under review

.2 Mainline Sewer Section ID

.3 Date of Survey

.4 Mainline Sewer Size

.5 Contract Number

.6 Survey Operator Name

.7 Location

.8 Pipe Length

.9 Direction of Survey

.10 Distance of Service from beginning MH

.11 Description of Service (e.g. active, collapse, abandoned)

.12 Diameter of Service pipe

.13 Clock position of service in pipe (e.g. 2 O’clock)

.14 Total number of service connections

.2 The Owner reserves the right to not reinstate capped services.

.3 The SCR shall be updated during service connections reinstatement to show service connections have been reinstated with date and time of reinstatement.

.4 All measurements for the location of service connections will be obtained from a steel tape measure and will be taken from a convenient, fixed and permanent reference point.

.5 The SCR shall be provided to the Owner.

Page 216: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 37 April 2019

3.7 POST CLEANING AND PREPARATION CCTV INSPECTION – V2.

.1 After completion of the cleaning and preparation of the sewer section (including all reaming, cutting, grinding and void filling) of the sewer section, a CCTV inspection (called the V2) of the full length of the sewer section shall be done. The V2 shall be done in accordance with the requirements of this standard.

.2 For the CCTV V2 inspection, the pipe shall have no active flow and any standing flow shall not impede assessing the post cleaning and preparation condition of the sewer. Complete flow control is required for the V2.

.3 Sewer defect coding is not required for the V2.

.4 The V2 complete with all reports shall be provided to the Owner at least 48 hours prior to lining for the Owner’s approval of the cleaning and preparation.

.5 On its discretion, the Owner may waive the requirement for the V2 to be submitted for approval 48 hours prior to lining, such as when approval for lining was provided at a live viewing of the V2 by a Halifax Water representative. However, in such cases the V2 submission shall always be submitted at a later time.

.6 Lining shall not commence until approval of the cleaning and preparation has been provided by the Owner to the Contractor.

.7 In the event that, after the V2, a deficiency in the cleaning and preparation is identified that requires correction, the V2 shall be redone after the correction has been done and the redone V2 submitted to the Owner.

.8 At the completion of cleaning and preparation for all sections, the CCTV inspections shall be consolidated on to one USB flash drive (or more than one as needed) and shall be in sequential order from upstream to downstream starting with the most upstream section. A USB flash drive shall also be provided to the Owner.

Page 217: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 38 April 2019

3.8 CIPP LINING – TYPE AND MATERIALS

.1 The CIPP lining shall be UV CIPP lining incorporating reinforcing materials, such as fibreglass. UV CIPP means Ultraviolet light cured Cured-in-Place Pipe.

.2 The UV CIPP lining shall be in accordance with and meet the requirements of the ASTM Standard Practice F2019-11.

.3 The UV CIPP liner to be installed by the Contractor shall have a substantial history of successful application in similar size sewers. This history of application shall include: installations throughout Canada in sanitary sewers, storm sewers, and culverts; include all sizes required in the work for this contract. Prior to award of contract, the Owner will request the history of use and assess whether the proposed UV CIPP liner meets requirements for approval.

.4 The UV CIPP lining product to be used shall have had long-term testing (ASTM D2990-09 or equivalent) to establish long-term (50 year minimum) physical properties performance. The testing shall have been done by a qualified independent testing agency. Prior to award of contract, the Owner will request the testing data and assess whether the test results meet requirements for approval.

.5 The quantity of resin used in the liners and its impregnation into the liner tube shall meet with the requirements of the applicable ASTM standard.

.6 Where, in the course of work, the Contractor has reason to use materials that differ from the original materials proposed for this contract the Contractor shall make a written request to the Owner detailing the proposed changes and reasons for the requested change. Any proposed different materials shall meet the above standards (as applicable to the type of liner) and require the written approval of the Owner prior to substitution.

Page 218: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 39 April 2019

.7 Where, in the opinion of and at the sole discretion of the Owner, confirmation of use of the proper material is required, appropriate procedures such as an IR scan (Infrared Spectroscopy) for resin may be used. If required, a baseline IR scan of the resin to be used on this contract shall be provided to the Owner. The baseline IR scan shall be made on the resin after catalyst addition and before any curing.

3.9 CIPP LINING ULTRAVIOLET LIGHT CURING

.1 All steps, processes and duration of the cure shall be in complete accordance with the UV CIPP manufacturer’s recommended process and procedures.

.2 UV curing of CIPP liners shall include a monitoring system capable of recording the duration of the liners’ exposure to UV light to ensure adequate curing of the resin. The system shall be capable of recording the light train speed throughout the entire duration of the installation. All UV cure technology shall be operated in accordance with the manufacture’s requirements and recommendations.

.3 Prior to installing the liner in the host pipe, the UV cure monitoring system’s proper functioning shall be confirmed by hooking it up to the computer and ensuring that the sensors are reporting the UV light output. No more than two sensors in sequence can be found faulty during this test. If three or more sensors in sequence are discovered faulty, a new sensor array shall be pulled into the host pipe replacing the previously installed array; and the new array shall be again tested for its proper functioning.

.4 The sensor array’s computer database shall have an output report that identifies each sensor by its station over the length of the UV CIPP installation. The maximum temperature achieved during the steam cure process and the time sustained at or above the required curing temperature shall be recorded and submitted for each sensor.

Page 219: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 40 April 2019

3.10 CIPP LINER – MINIMUM PHYSICAL PROPERTIES

.1 The minimum in-place physical properties for the UV CIPP liners shall be:

Property Required Minimum Value Test Method

Flexural Modulus

8000 MPa Short-term Test

With 50 year retention of at least 65%

ASTM D790 or ISO 11296

ASTM D2990 or ISO Equivalent

Flexural Strength

150 MPa Short-term Test

With 50 year retention of at least 65%

ASTM D790 or ISO 11296

ASTM D2990 or ISO Equivalent

Page 220: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 41 April 2019

.2 The Contractor may provide UV CIPP liners with in-place properties greater than the required minimum values above. However in no case will UV CIPP liners be accepted by the Owner with properties less than the required minimum values shown above.

.3 The short-term test values of flexural modulus and flexural strength used as the starting values from which the long-term design values are derived shall be values that have been and will be reliably and repeatedly obtained by the Contactor in installations of the same liner material and be substantiated by a history of testing of samples. These short-term test values shall be identified in any liner designs. The retention value to be used in design shall be based on ASTM D2290 (or equivalent as acceptable to the Owner) testing for the liner material that substantiates the derivation of the retention value used.

.4 Also see section on liner samples and testing.

3.11 CIPP LINER DESIGN

.1 General

.1 The wall thickness for UV CIPP liners shall be determined by the Contractor in accordance with the design method set out in ASTM F1216-07a, Appendix X1 for Fully Deteriorated Gravity Pipe Condition as per Section X1.2.2. The design method in later versions of ASTM F1216 is not acceptable.

.2 The thickness determined by liner design shall be the minimum structural thickness of the completed UV CIPP liner in the sewer, subject to design reconciliation of sample test results. Where design reconciliation based on as tested properties is performed by the Owner the minimum structural thickness may increase or decrease.

.3 The Contractor shall provide liner designs for each MH-MH section of lining. The Contractor shall provide Proposal Designs and when required, Special Designs.

Page 221: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 42 April 2019

.4 A Special Design is required during the work if and where a Proposal Design is found to be unsuitable for the field verified conditions based on the Contractor’s Evaluation of MH-MH lining sections.

.2 Proposal Designs – To be Submitted with Proposal

.1 Proposal Designs for each sewer section (MH-MH) listed in the Proposal shall be submitted with the proposal submission. Proposal Designs shall be based on the design parameters detailed below in conjunction with the physical properties of the CIPP as submitted by the Contractor for the liner product being used.

PROPOSAL DESIGNS – DESIGN INFORMATION AND PARAMETERS

Parameter Requirement

When Required To be submitted with PROPOSAL submission.

Design Method ASTM F1216-07a, Appendix XI. Design by later versions of F1216 is not acceptable.

Design Life 50 years

Pipe Condition Fully Deteriorated Gravity Pipe Condition

Size As identified for lining in the Proposal/Contract documents. Use Nominal size.

Sewer Invert Depth

As per PROPOSAL information. See Special Provisions

Water Table Location

1.0 m below ground surface

Ovality 3%

Soil Density 18.83 kN/m3 (1920 kg/m3)

Soil Modulus 6.9 MPa

Traffic Loading AASHTO HS-20

Page 222: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 43 April 2019

Enhancement Factor

7.0

Factor of Safety 2.0

CIPP Liner

Flexural Modulus Used for Design

The value of flexural modulus used for design shall take into account the expected long-term creep behaviour of the CIPP liner so that the use of the design value in the design formula(s) will yield a liner thickness that will perform as required for the design life. The flexural modulus design value shall be the short-term test flexural modulus reduced by the Creep Retention Factor (CRF) for the liner material. The CRF shall be established by ASTM D2990 (or equivalent) long-term testing. The short-term test flexural modulus used as the starting value before reduction shall be the value that will be reliably and repeatedly achieved in short-term testing of installation samples of the same liner material. The CRF shall be derived from long-term testing and be appropriate for stress and stress duration in the installed liner. Independent third party test data shall be available to substantiate the short-term test and CRF values used in design. Liner designs shall identify the short-term test value, the CRF and the long-term design values. If these values are not clearly identified the designs shall be rejected by the Owner.

CIPP Liner

Flexural Strength Used for Design

The value of flexural strength used for design shall take into account the expected long-term creep behaviour of the CIPP liner so that the use of the design value in the design formula(s) will yield a liner thickness that will perform as required for the design life. The flexural strength design value shall be the short-term test flexural strength reduced by the Creep Retention Factor (CRF) for the liner material. The CRF shall be established by ASTM D2990 (or equivalent) long-term testing. The short-term test flexural strength used as the starting value before reduction shall be the value that will be reliably and repeatedly achieved in short-term testing of installation samples of the same liner material. The CRF shall be derived from long-term testing and be appropriate for stress and stress duration in the installed liner. Independent third party test data shall be available to substantiate the short-term test and CRF values used in design. Liner designs shall identify the short-term test value, the CRF and the long-term design values. If these values are not clearly identified the designs shall be rejected by the Owner.

Page 223: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 44 April 2019

.3 Special Designs – To Be Submitted If and When Required During the Work

.1 Where the Contractor’s evaluation of the MH-MH section for lining finds that the Proposal Design Liner is not suitable for the section, the Contractor shall advise the Owner of this finding. On the Owner’s instruction, the Contractor shall provide a Special Design for the MH-MH section(s) in question.

.2 Special Designs shall be submitted to the Owner for review and approval.

.3 Generally when the Owner accepts and approves the findings of the MH-MH section evaluation, which indicates a Proposal Liner is not suitable for installation, moving directly to a Special Design and corresponding Special Design Liner is anticipated.

.4 A Special Design shall be clearly indicated as such on the design submission to differentiate from the Proposal Designs.

.5 Where an approved Special Design results in an increased liner thickness, the thickness increase will be paid as per the Contract Price in the Schedule of Quantities and Prices, upon approval of the Owner.

.6 Special Designs are not for Submission with the Proposal.

.7 Special designs are not part of the Proposal submission. When Special Designs may be required, this will occur during the course of the work.

.8 Special Designs shall be based on the design parameters detailed below.

SPECIAL DESIGNS – DESIGN INFORMATION AND PARAMETERS

Parameter Requirement

When Required During the course of the work should a Special Design become necessary

Page 224: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 45 April 2019

Design Method ASTM F1216-07a, Appendix XI. Design by later versions of F1216 is not acceptable.

Design Life 50 years

Pipe Condition Fully Deteriorated Gravity Pipe Condition

Size Actual inside diameter of the existing sewer from field evaluation

Sewer Invert Depth

Actual invert depth from field evaluation and not less than Proposal Design value

Water Table Location

1.0 m below ground surface

Ovality 3% , or as outlined in Proposal, whichever is greater

Soil Density 18.83 kN/m3 (1920 kg/m3)

Soil Modulus 6.9 MPa

Traffic Loading AASHTO HS-20 (always apply except when greater live load is required)

Railway Loading

As field identified. Use Cooper E-80 where RR crossing identified.

Enhancement Factor

7.0 for UV CIPP liners that are tight fitting to existing sewer.

Factor of Safety 2.0

CIPP Liner

Flexural Modulus Used for Design

The value of flexural modulus used for design shall take into account the expected long-term creep behaviour of the CIPP liner so that the use of the design value in the design formula(s) will yield a liner thickness that will perform as required for the design life. The flexural modulus design value shall be the short-term test flexural modulus reduced by the Creep Retention Factor (CRF) for the liner material. The CRF shall be established by ASTM D2990 (or equivalent) long-term testing. The short-term test flexural modulus used as the starting value before reduction shall be the value that will be reliably and repeatedly achieved in short-term testing of installation samples of the same liner material. The CRF shall be derived from long-term testing and be appropriate for stress and stress duration in the installed liner. Independent third party test data shall be available to substantiate the short-term test and

Page 225: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 46 April 2019

CRF values used in design. Liner designs shall identify the short-term test value, the CRF and the long-term design values. If these values are not clearly identified the designs shall be rejected by the Owner.

CIPP Liner

Flexural Strength Used for Design

The value of flexural strength used for design shall take into account the expected long-term creep behaviour of the CIPP liner so that the use of the design value in the design formula(s) will yield a liner thickness that will perform as required for the design life. The flexural strength design value shall be the short-term test flexural strength reduced by the Creep Retention Factor (CRF) for the liner material. The CRF shall be established by ASTM D2990 (or equivalent) long-term testing. The short-term test flexural strength used as the starting value before reduction shall be the value that will be reliably and repeatedly achieved in short-term testing of installation samples of the same liner material. The CRF shall be derived from long-term testing and be appropriate for stress and stress duration in the installed liner. Independent third party test data shall be available to substantiate the short-term test and CRF values used in design. Liner designs shall identify the short-term test value, the CRF and the long-term design values. If these values are not clearly identified the designs shall be rejected by the Owner.

Page 226: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 47 April 2019

.4 General Requirements for Designs

.1 Design Certification and Clarity

.2 All designs shall be approved and stamped by a professional engineer licensed and authorized in the Province of Nova Scotia.

.3 All designs shall provide sufficient detail and clarity to allow for straightforward identification of the liner location (when for specific location) and design parameters used in the design. The design shall clearly identify whether it is a Proposal Design or a Special Design.

.4 Designs that are confusing or fail to properly identify the required design parameters will not be accepted.

.5 Design Thickness is the Minimum Required Finished In Place Structural Thickness.

.6 The UV CIPP liner wall thickness determined by design shall be the in place, completed liner thickness. Liner thickness measurements, either from samples or in ground, shall be compared to the design thickness for acceptance. Acceptance of final liner thickness shall be subject to reconciliation of actual required thickness based on tested liner properties. Where tested liner properties are different from the properties assumed in the liner design, the required thickness shall be determined by design reconciliation. Such reconciliation may change the required thickness for the final completed liner based on as tested properties. However in no case shall the required thickness be based on properties that are less than the minimum required properties or result in a required thickness that is less than the minimum thickness specified in the specification.

.7 Liner wall thickness measurements and determination of the actual effective thickness shall be in accordance with ASTM D5813-04(2008) or ISO 7685. Measurements of the actual installed liner wall thickness shall not include the thickness of any non-structural components.

Page 227: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 48 April 2019

.5 Short-term Flexural Modulus and Short-term Flexural Strength

.1 The short-term values of flexural modulus and flexural strength (as per D790) used as the starting values from which the long-term design values are derived shall be values that will be reliably and repeatedly obtained in the installed liners as substantiated by testing samples from installed liners. These short-term values shall be identified in the liner design.

.6 Substantiation of Liner Physical Properties Used for Design

.1 It is the responsibility of the Contractor to obtain third party testing of the CIPP liner sufficient to substantiate the liner material properties used in design. Once a liner installation has been completed, the Contractor shall provide the substantiated test results and other information to the Owner for review and approval within ten (10) business days of the liner installation (i.e. date sample is signed by the Owner).

.2 Substantiation, at a minimum, will include ongoing third party testing results for short-term properties of flexural modulus and flexural strength on installed liners showing that the properties assumed in design are routinely achieved in the field for the same materials being used for this contract. Substantiation must also include the basis for long-term properties including, at a minimum, long-term (10,000 hr) testing on the resin being used for flexural strength and flexural modulus. For reinforced liners, long-term testing must be on the complete liner product itself, not just for the resin element.

Page 228: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 49 April 2019

3.12 CIPP LINER MINIMUM THICKNESS

.1 All UV CIPP liners shall achieve the minimum in place final completed thickness of at least the design thickness or 4.0 mm, whichever is greater.

.2 Where a design thickness is lower than the minimum thickness, the design shall note this and indicate that the minimum thickness is the required liner thickness for the liner installation covered by the design. This applies to both Proposal Designs and Special Designs.

.3 A design reconciliation based on installed liner test properties (such as from testing field samples of liners) shall not overrule the requirement for minimum thickness.

3.13 CIPP LINING – RESIN IMPREGNATION

.1 The liner shall be impregnated with resin at the liner manufacturer’s factory. The resin impregnated liner shall be stored and shipped in a UV light proof container.

.2 The resin impregnation shall comply with ASTM F2019.

.3 The Contractor shall not install any liner that has expired, normally 6 months from date of resin impregnation.

3.14 CIPP LINER INSTALLATION

.1 General

.1 The installation of the UV CIPP liner shall be the responsibility of the Contractor subject to the following.

.2 The lining installation procedure shall be in accordance with the submission prior to award. Any proposed deviation from the submitted procedure shall be submitted, with explanation, to the Owner for approval and the submission shall include the approval of the lining manufacturer or senior licensor.

.3 The liner and its resin should be protected during the installation into the sewer. No tares or damage shall occur due to contact with manhole walls or the sewer pipe during the installation.

Page 229: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 50 April 2019

.4 The Contractor shall ensure that all required equipment (including as required by the Contract) is on site and in satisfactory working order prior to commencing the installation of a lining section.

.2 Quality Assurance Deliverables

.1 CIPP liner quality assurance deliverable include installed liner sample test reports, post installation final CCTV inspection (V3) and the curing report output from the UV light train monitoring system used in the control of the curing process.

3.15 SERVICE CONNECTIONS REINSTATEMENT

.1 Reinstatement of existing service connections on the sewer shall start immediately following opening of the liner after cool down is completed. The method of reinstatement, either remote robotic reinstatement or man-entry reinstatement shall be at the contractor’s discretion. Where man-entry is used, safety procedures and restrictions on man-entry procedures must be submitted to the Owner.

.2 Prior to lining, the Contractor shall locate all service connections with a suitable measuring or locating method that will allow for the timely location of the service connection openings that will be covered by the liner. Flow control shall be maintained as required during service connection reinstatement to prevent flow delaying or hindering the reinstatement.

.3 All service connections are to be reinstated without excavation. Reinstatement of service laterals shall commence as soon as the liner has cooled and been opened to upstream flow.

.4 All service connections shall be opened to flow (at least 50 mm approximate diameter) within eight (8) hours of the completion of liner cure. All service connections shall be fully opened and trimmed within forty-eight (48) hours of opening the liner to upstream flow.

.5 Where service connection reinstatement is delayed the Contractor shall advise the affected service owners and provide temporary measures to these owners as may be required.

Page 230: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 51 April 2019

.6 Service connection openings in the liner shall match the size and shape of the existing service connection in the mainline sewer. Openings shall be smooth and clean. Finished openings shall be without protrusions, hanging material, shavings, lips or obstructions to sewage flow from the service connection into the interior of the liner. Over-cutting shall be avoided. Service connections, that in the Owner’s opinion, are over-cut may be deemed defective and require a UV CIPP sleeve spot repair followed by reinstatement of the service connection by the Contractor as remedial action, at no cost to Halifax Water.

.7 The existing service connections shall not be damaged. The Contractor shall repair any damage to the existing service connections that occurs during the re-instatement, to the satisfaction of the Owner, at no cost to Halifax Water.

.8 Where a service connection is visibly fully plugged and is an apparent dead connection, the Contractor shall advise the Owner of this finding. With the approval of the Owner, such connections will not be reinstated.

.9 Reinstated service connections shall be recorded on the SCS with the dates and times of partial and complete reinstatement.

3.16 MANHOLE BENCHING AND RESTORATION

.1 All affected manholes shall be re-benched, where required, to conform to the dimensions and positions of liners.

.2 Where a liner has been placed continuously through a manhole, the benching shall be made to conform to the exterior of the liner. The liner shall be opened the full width of the manhole (from pipe entrance to exit) for the top half diameter of the liner. Finished liner and benching in manhole shall provide a smooth, uniform flow path from entrance to exit at uniform grade.

.3 Where lining work necessitated or resulted in damage to the manhole or the manhole benching, it shall be restored to equal or better than original condition and shall meet the requirements for benching as previously specified.

.4 Material for benching work shall be Speedcrete, 20 MPa or approved equal.

Page 231: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 52 April 2019

3.17 CIPP LINING COMPLETED CCTV INSPECTION (V3)

.1 After completion of a sewer section rehabilitation (including reinstatement of service connections and MH benching) the Contractor shall complete a full CCTV inspection of the sewer section (called the V3).

.2 Where MH rehabilitation is being completed in coordination with UV CIPP Lining, the V3 shall include the complete upstream (US) and downstream (DS) MH rehabilitation liners. The V3 video will pan around the rehabilitated US MH and DS MH ensuring that the complete MH liner is visible. The pan around of the MHs will include visibility of the MH walls, benching, and the finished seal (i.e. interface) between the UV CIPP Liner and MH Liner material.

.3 Each reinstated service connection shall be viewed in its entirety for 10 seconds, or a sufficient time for properly judging the re-instatement.

.4 The CCTV inspection shall be provided on a flash drive that shall be clearly identified with Contract Number, street name, section number, begin/end manhole numbers and date of the CCTV inspection.

.5 In the event that a deficiency in the sewer section rehabilitation is identified after a Post Rehabilitation CCTV Inspection (V3) that requires any repair of remedial works to the section, the V3 Post Rehabilitation CCTV Inspection shall be repeated after the repairs or remedial action have taken place.

.6 Flow control shall be required as such to ensure a clear view of the installed liner during the V3.

.7 Sewer defect coding is required for the V3.

3.18 INSTALLED CIPP LINER FIT AND FINISH REQUIREMENTS

Page 232: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 53 April 2019

.1 The finished lining shall fit neatly and tightly to the existing sewer without significant fins or excessive wrinkling. Any annulus gap between the liner and the existing sewer inside surface shall be in accordance with industry standard shrinkage characteristics for properly installed and curedUV CIPP. Annulus gap which is due to improper liner sizing, inadequate preparation of the existing sewer, improper installation, curing or cooling, or the effect of ground water pressure will not be accepted.

.2 The liner shall extend continuously from MH to MH starting and ending at the inside walls of the MH (except where lining is made through intermediate MHs).

.3 The completed installed liners shall conform to the following requirements.

Continuity of Liner

The finished liner shall be continuous over the entire length of the liner installation from MH to MH without any breaks, separations or joints.

Liner Fit to Existing Sewer Liner

The outside surface of the finished liner shall be in contact with the inside surface of the existing sewer subject to the contact tolerance. The inside surface of the existing sewer is the surface after the sewer has been cleaned and prepared for lining in accordance with the cleaning and preparation requirements. The contact tolerance is 1.0 mm. Where any space of gap between the outside surface of the liner and the inside surface of the existing sewer line exceeds 1.0 mm, the liner fit will be deficient, subject to exceptions noted below.

The liner should also be able to negotiate vertical/horizontal elbows and bends with various degrees (angles ranging from 0 to 45 degrees).

Exception to Liner Fit at Existing Sewer Line Irregularities

Existing sewer line irregularities include off set joints, protrusions, bumps or other similar situations in the existing sewer that remain after the sewer has been prepared in accordance with the cleaning and preparation requirements. Neither ovalisation of the existing sewer nor curves made by joint deflection are irregularities in this context. Where an irregularity exists, exception to the liner contact tolerance requirements will be allowed in the irregularity zone. The irregularity zone is defined as a zone extending a distance of up to ¼ of the liner inside diameter in any direction from the irregularity as measured along the inside surface of the liner.

Page 233: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 54 April 2019

A liner fit exception at an existing sewer irregularity shall not present an obstruction to sewage flow whether or not it complies with the allowed exceptions.

Liner Shape

The liner shape will be as defined by liner fit to existing sewer line. In general the liner shape shall conform to the shape of the existing sewer line inside surface after its cleaning and preparation in accordance with requirements. However, where the existing sewer line shape is not defined (missing pieces of sewer line) the liner may either bridge the missing wall section or indent into the missing wall section. Where the liner bridges, the shape of the liner shall match the shape of adjacent sewer line and the inside diameter of the liner shall be as required for Contact Tolerance for the adjacent sewer line. Where the liner indents, the depth of the indent shall not reduce the liner wall thickness below the Wall Thickness Tolerance.

Liner Wall

The liner wall shall be free of any interior bulges, ribs, ripples, folds or other irregularities except where these irregularities comply with the Liner Wall Thickness Tolerance, fit, shape and wall thickness given above. The wall of the liner shall be free of any voids (dry spots), cavities or bubbles.

Liner Terminations

At manhole entrances and exits the interface between the exterior surface of the liner and the manhole shall be watertight to the requirements for external hydrostatic pressure. The finished ends of the liner shall be neat and smoothly cut. The benching in the manholes shall be modified where required to conform to liner dimensions.

The liner shall extend into each MH a minimum of 12 mm (½”) and a maximum of 25 mm (1”), such that the MH liner material application can be applied to the back (outer surface) of the liner, creating a seal around the CIPP liner, pipe and MH interface.

Bulges, including Lifts and Sags

There shall be no bulges in the liner that are not consistent with the surface profile of the existing sewer before lining. Such bulges will be considered an indication of a major structural deficiency in the liner and will require major remedial action. Where bulges are suspected or proven to contain internal separations within the wall of the liner, remedial action up to and including removal and replacement of the liner will be required. This applies to bulges that may be called lifts or sags.

Page 234: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 55 April 2019

3.19 LINER WALL THICKNESS AND TOLERANCE

.1 General

.1 The liner's finished structural wall thickness shall be as specified in the applicable liner design approved by the Owner. The required structural wall thickness may also be determined by a design reconciliation using test properties done by the Owner.

.2 The effective liner wall thickness shall be determined in accordance with ASTM D5813-04(2008) or ISO 7685.

.3 The wall thickness tolerance is:

Minus 0%

Plus 25%.

.4 The wall thickness under consideration is the final cured-in-place thickness and shall not include any layers or material that does not contribute to the structural rating of the liner.

.2 Liner Thickness

.1 Finished liner thickness shall be no less than the design thickness or specified minimum thickness, whichever is greater. Thickness shall be determined in accordance with the provisions of ASTM D5813-04 (2008) or ISO 7685. The effective thickness of the liner shall be either the average thickness or the minimum thickness multiplied by 0.875, whichever is less.

.2 Required liner thickness shall be subject to design reconciliation based on UV CIPP properties determined in as installed liner sample testing. Such design reconciliation may require a different liner thickness (versus the original design thickness) to correspond with design based on as installed sample tested properties. In no case shall a design reconciliation result in a required liner thickness that is less than the specified minimum thickness.

Page 235: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 56 April 2019

3.20 INSTALLED CIPP LINER PHYSICAL PROPERTIES REQUIREMENTS

.1 The complete installed liner shall have the following required physical properties:

.1 Short-term Test Flexural Modulus: Shall meet or exceed the value used in the applicable liner design

.2 Flexural Strength: Shall meet or exceed the value used in the applicable liner design

.2 In the case of long-term design values of flexural modulus and flexural strength used in design, the liner shall possess the required long-term retention characteristics such that the long-term values used in design will be met by the liner over its design life.

3.21 SAMPLES AND TESTING OF INSTALLED CIPP LINERS

.1 General

.1 The Contractor shall provide and have tested samples of the liner installations at the sampling rate indicated below. The testing shall be done at an independent testing agency experienced in testing UV CIPP samples and approved by the Owner.

.2 Testing will determine the short-term test flexural strength, the short-term test flexural modulus, structural thickness and any other relevant properties of the cured liner as represented by the samples. Test results must meet the values of short-term test flexural modulus and flexural strength used in the applicable liner design provided by the Contractor and the thickness determined by that design.

.3 Unless otherwise approved by the Owner, liner samples and testing shall be required for all liner run installations. Each sample must be identified, dated and signed by the Owner prior to leaving the project site. Payment for samples will be made per the payment item.

Page 236: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 57 April 2019

.4 Samples shall be delivered to the independent testing agency designated below in a timely manner, such that test results are provided to the Owner within 10 business days after liner installation. Should samples not be submitted; the Owner, at their discretion, may issue a suspension of work order for UV CIPP lining until such time that the test reports are submitted.

.5 Testing Agency to by Used: Paragon Systems, Concord, Ontario. 905-738-0447

.2 Sample Requirements

Sample Quantity One sample per continuous liner installation, unless otherwise approved by the Owner.

Sample Type Restrained for sizes up to 375 mm. Plate or other sample type (including a sample cut out from inside the lined sewer) for sizes greater than 375 mm.

Sample Length To be confirmed with Paragon Systems for the liner diameter & thickness

Identification Contractor Name, Contract Number, US MH Number, DS MH Number, Sewer Section S#, MH location, Shot #, Section #, Size and date made to be marked on samples with indelible marker

Location Upstream MH, downstream MH, intermediate MH or other location that yields a suitable sample

Page 237: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 58 April 2019

.1 Where space prevents a single piece form, a multi-piece form shall be used that can be assembled and dis-assembled in the MH.

.2 Where a multi-piece form is impractical or impossible, samples taken from pieces of liner removed in the liner opening process may be suitable for testing purposes.

.3 Sampling Methodology

.1 The sample size shall be suitable to obtain sufficient test coupons for either ISO 11296 or ASTM D790 testing (as applicable to sample type) for flexural strength, flexural modulus and for measuring liner thickness around the circumference depending on the type of sample and how it is tested.

.2 For sewer sizes up 375 mm the sample type shall be restrained cylindrical samples made in full circumference forms positioned in a MH, through which is run an extension of the liner being installed. The inside diameter of the forms shall be the same as the inside diameter of the sewer being lined. The form shall have sufficient strength such that it does not expand under the heat and pressure of the liner installation and cure process. The length of the form shall be sufficient to provide a sample of liner 400 mm long. The forms shall be covered with material to maintain a cure heat environment similar to the cure heat environment for the liner within the sewer pipe.

.3 For sewer sizes larger than 375 mm, if it is not possible or practical (due to space, access or safety limitations) to obtain formed cylindrical sample, then samples taken from pieces of cured liner removed in the liner opening process may be suitable for testing purposes.

.4 When samples from pieces of cured liner are not suitable or are not representative of the liner within the sewer, then a sample shall be cut from the liner within the sewer.

.5 Samples Cut From Liner Inside the Sewer

Page 238: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 59 April 2019

.6 Where a test sample is required and there is no other method of obtaining it, a sufficiently large sample shall be cut out from the liner within the pipe. The configuration of the cut out sample shall allow for ISO 11296 test method (curved test coupons from around the circumference of the liner). The removed section of liner shall be repaired with a fibre reinforced cementitious rehabilitation product such as Centri Pipe PL 8000 or approved equivalent.

.4 Deficient Sample

.1 In the event a sample is deemed deficient, either by the Owner or by the Contractor, because they are either inadequate for testing or considered not representative of the liner within the sewer, the Contractor shall obtain a new sample of the liner that is not deemed deficient either by the Owner or the Contractor. All costs associated with the provision of such a further sample shall be the responsibility of the Contractor including any costs incurred by the Owner such as for inspection during obtaining of the new sample, testing and design calculation reconciliation for the new sample.

.2 Where obtaining such new samples requires repairs or restoration to be made to the liner or sewer (such as a sample removed from within the lined sewer) the Contractor shall provide a plan for making such repairs or restoration that is acceptable to the Owner. It shall be at the Owner’s sole discretion whether such a plan is acceptable. The cost of making any such repairs shall be paid by the Contractor.

3.22 SAMPLE TESTING, RESULTS AND RECONCILIATION

.1 Sample Testing

.1 The Contractor will have testing done by Paragon Systems, Concord Ontario, 905-738-0447. Copies of all test reports will be provided to the Owner.

Page 239: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 60 April 2019

.2 The Contractor shall arrange that the Owner may speak with Paragon Systems about the samples and sample testing and samples and arrange with Paragon to allow Paragon to send the test reports to the Owner.

.3 The sample test results shall meet or exceed to the values for thickness, short-term test flexural strength and short-term test flexural modulus in the approved applicable liner design for the sample location liner.

.4 When any of the sample test results (Flexural Modulus, Flexural Strength or Thickness) are not in accordance with the applicable design submission values, then the liner shall be deemed apparently deficient until the sample test results are reconciled.

.5 In the event that sample test results do not meet requirements, the procedure for reconciling sample test results shall be used by the Owner for determining whether the corresponding installed liner is acceptable. Should the liner not be acceptable, the Contractor shall provide a plan for remedial action that is acceptable to the Owner.

.2 ISO Methods Testing

.1 The ISO testing methods shall be used for all restrained cylindrical samples and any samples cut out from the liner within the sewer.

.2 The ISO 11296 is the preferred test method for flexural properties of reinforced UV CIPP as it better captures the effect of the reinforcing than the ASTM D790 method.

.3 The ISO 11296 method tests curved coupon that is cut out around the circumference of liner sample. This requires either a restrained cylindrical sample of liner, which is made in a cylindrical form with a form inside diameter very similar to the inside diameter of the sewer being lined or a sample cut out of the liner within the sewer.

.4 When the ISO 11296 test method is used, the structural thickness shall be determined by ISO 7685

Page 240: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 61 April 2019

.3 ASTM Methods Testing

.1 The ASTM testing methods shall be used for any samples from which it is not possible to obtain the test coupon configuration required for the ISO testing methods.

.2 The ASTM D790 tests straight and flat coupons cut from the liner sample along its length. This type of coupon can be cut from a cylindrical formed restrained sample or other available pieces of liner large enough for obtaining test coupons. When using the ASTM D790 method, a cylindrical restrained sample is the preferred sample as it better represents the liner inside the sewer than either random pieces of liner or formed flat plate samples.

.3 The ASTM D790 test method tends to produce lower results than the ISO 11296 method because the ISO method using the curved sample captures the effect of the liner reinforcing better than the ASTM method.

.4 When the ASTM D790 test method is used, the structural thickness shall be determined by ASTM 5813

.4 Test Results Requirements

.1 The test results for short-term test flexural modulus and short-term test flexural strength shall meet or exceed the values for these parameters used in the applicable liner design.

.2 The test result for structural thickness shall meet or exceed the minimum structural thickness determined by the applicable liner design.

.3 When sample test results do not meet requirements the liner will be deemed deficient subject to Design Reconciliation.

.5 Sample Test Reports

.1 All test reports received shall at a minimum include the following;

Page 241: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 62 April 2019

.2 Header information identifying the sample as described on the sample in addition to HW contract number.

.3 Date sample was received and date when sample was tested.

.4 Photograph of the sample as received, both side and end profile

.5 Identification of each test performed and its associated results

.6 Graphical presentation of the flexural property test from beginning of applied loads to end of test.

.7 Photograph of each broken specimen identified by the specimen number used to report the test result.

.8 Signature of technician who completed the test and signature of report reviewer.

.9 Copy of the Chain of Custody (COC) form

.6 Summary sheet of all samples taken and tests completed under the contract (referenced by the HW Contract Number) shall be provided with the final delivery of test reports.

.7 Design Reconciliation for Sample Test Results

.1 The applicable liner design will be recalculated using the test values for short-term flexural modulus and short-term flexural strength. All other input parameters remain the same. This is known as Reconcile Design at Test Properties (RDATP). An RDATP is not applicable if properties are below any minimum requirements in this specification or in the applicable ASTM Standard for the liner.

.2 If the test thickness meets or exceeds the reconciled thickness, the liner is not deficient regarding sample test results. Otherwise the liner is deemed deficient.

.3 Proceeding with Reconciliation requires that sample be, in the opinion of the Owner, representative of the liner in the sewer.

Page 242: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 63 April 2019

3.23 LINER DEFICIENCIES AND REMEDIAL MEASURES

.1 General

.1 When the Contractor is aware of any deficiencies in the work or in the results of the work, the Contractor shall advise the Owner of these deficiencies within 48 hours including situations where the deficiency has already been rectified.

.2 Where a liner is deficient, the Contractor shall rectify the deficiency(s) with a remedial method that is acceptable to the Owner. Where there is no remedial method acceptable to the Owner, the liner shall be removed and replaced at no cost to Halifax Water.

.3 The specific deficiencies addressed below are examples and do not represent all the deficiencies that may occur.

.2 Thickness Less than Required Thickness:

.1 Refer Section 3.11 .

.3 Physical Properties Less than Required Properties

.1 Refer Section 3.10 .

.4 Dry Spots, Lifts, Delamination and Other Deficiencies

.1 The finished pipe shall be continuous over the entire length of a new installation and shall be free of dry spots, lifts and delamination. If these or other conditions, which are not in compliance with this specification, are present, the Contractor shall repair the defects at their own cost, to the Owner’s satisfaction. In the event the CIPP does not fit tightly against the host pipe at its terminal points, the space between the pipes shall be sealed with a resin mixture compatible with CIPP.

.5 Excessive Fining or Wrinkling

Page 243: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 64 April 2019

.1 Excessive liner material shall be removed to the acceptance of the Owner. Where excessive material cannot be removed without compromising the structural integrity of the liner, the Contractor shall take other remedial action as acceptable to the Owner.

.6 Bulges, Lifts and Sags

.1 There shall be no bulges in the liner that are not consistent with the surface profile of the existing sewer before lining. Such bulges will be considered an indication of a major structural deficiency in the liner and will require major remedial action. Where bulges are suspected or proven to contain internal separations within the wall of the liner, remedial action up to and including removal and replacement of the liner will be required. This applies to bulges that are may be called lifts or sags.

.7 Remedial Action

.1 Where deficiencies are identified, the Contractor shall perform the accepted remedial action in a timely manner without unreasonable delay.

.2 Where a deficiency will seriously impact sewer or service connection flow capacity and are considered likely to cause sewer back-ups onto properties or other overflows, the Contractor shall take immediate action to prevent such problems without waiting for acceptance of remedial method from the Owner. In such case, the final resolution of a deficiency, if required, shall be by a method acceptable to the Owner.

.3 The contractor shall provide the Owner with a list of all the identified deficiencies prior to any remedial action. The list shall include the location of the deficiency and the remedial action required to rectify the deficiency, along with the associated CCTV video inspection.

.4 The cost of any work to rectify a deficiency is the responsibility of the Contractor.

3.24 WARRANTY

Page 244: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 65 April 2019

.1 General

.1 All materials and workmanship shall be under warranty for one year, starting on the date Halifax Water accepts the Works performed under the contract. All UV CIPP lined sewers shall be re-inspected via CCTV one month prior to the end of the one year maintenance period.

.2 Warranty Exclusions

.1 In the event that the Contractor determines that the condition of the existing pipe, or the expected condition after cleaning and preparation will result in a liner installation that cannot be warranted, the Contractor shall advise the Owner of this determination. In this advice, the Contractor shall specify the reasons why the UV CIPP liner cannot be warranted. Unless the Owner determines otherwise, the Contractor shall provide a Warranty Exclusion Letter to the Owner and shall obtain the Owner’s approval for (such as signing of the Warranty Exclusion Letter by the Owner) for the warranty exclusion.

.2 Warranty exclusion will not be accepted by the Owner if the request for warranty exclusion is submitted after the liner has been installed.

3.25 EXCAVATED REPAIR

.1 General

.1 In the course of the UV CIPP rehabilitation of sewers, excavated repairs may be necessary to repair or replace excessively deteriorated locations in a sewer prior to UV CIPP lining. The required repair locations in sewers to be UV CIPP lined, or other locations, shall be identified by the Contractor in the course of inspection and cleaning activities. The Contractor shall advise the Owner of the location, necessity for and extent of the repairs.

Page 245: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 66 April 2019

.2 Such repairs will typically (but not exclusively) include excavating to the repair zone, replacing existing deteriorated sewer pipe with new pipe, backfill and full surface restoration of roadways, boulevards, etc.

.3 Where and when approved by the Owner, the Contractor shall undertake the repairs. The cost of the repairs shall be paid under the appropriate provisional item payment item in the Schedule of Quantities.

.2 Applicable Specifications and Provisions

.1 Materials and installation shall be in accordance with this specification and all Halifax Water Standard Contract Specifications and General Conditions.

.3 Provide Description and Cost Estimate

.1 Where the Contractor or the Owner has identified a need for an excavated repair, the Contractor shall advise the Owner of:

Location

Sewer size

Sewer depth

Length or limits of repair

Crew complement needed for the repair

Equipment needed for the repair

Sub-contractor(s) to be used

Time necessary to complete the repair

Estimated cost of repair

.4 Approval for Contractor to Make Repair

.1 The Contractor shall proceed with the repair after the Owner has provided approval for the repair to be done.

.5 Materials

Page 246: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 67 April 2019

.1 The Contractor shall use materials that are in accordance with this Proposal and all other applicable Halifax Water standards. This includes all pipe, fittings, manholes, related materials, bedding, backfill and restoration materials for roadways, sidewalks, boulevards and off road areas. Materials shall be paid in accordance with the schedule of quantities in the form of proposal.

.6 Installation

.1 The Contractor shall make the installation in accordance with this Proposal and all other applicable Halifax Water standards for sewer installation and, where applicable, for manholes and sewer service connections. All restoration shall be in accordance with Halifax Water standards, including restoration of roadways, sidewalks, boulevards and off road areas.

.7 Equipment

.1 Equipment used specifically in the undertaking of an excavated repair shall be paid in accordance with the rates stipulated in the NSRBA Suggested Rental Rates for Construction Equipment. The Contractor shall utilize only the equipment necessary for the repair work. Equipment shall be paid in accordance with the Schedule of Quantities and Prices.

.8 Labour

.1 The Contractor shall use competent and skilled labour as required for the Work including supervisor, foreman, operators and other labour as necessary for proper and correct execution of the Work. The labour used shall be only the labour necessary for the Work.

.9 Sub-Contracted Work

.1 In the case where the Contractor may use a sub-contractor for the Work, it remains the Contractor’s responsibility to ensure that the Work carried out by the sub-contractor is in accordance with the specifications and requirements. Halifax Water reserves the right to accept or reject the selection of sub-contractor(s).

Page 247: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 68 April 2019

3.26 WORK EASEMENTS

.1 In addition to the cleaning, the work easements will require restoration to the satisfaction of the Owner. The Contractor shall obtain all necessary permits and permissions, including from the Owner to carry out the works in easements or on flood plains and where restoration is deemed necessary by the Owner. The Contractor shall make the appropriate arrangements and submit associated costs to Halifax Water for reimbursement consideration.

Page 248: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining

Phase 2 ULTRAVIOLET LIGHT CURED-IN-PLACE

PIPE – MAINLINE

Section 33 11 10

Page 69 April 2019

3.27 EXCAVATION FOR RETRIEVAL OF EQUIPMENT OR OTHER PURPOSES

.1 Where the retrieval of lodged equipment is required by open-cut excavation, the Contractor shall provide for retrieval including any excavation, maintenance of flow, repair, backfill and restoration (as per Contract requirements) as required. However, if the equipment became lodged in a portion of a sewer section for which no previous CCTV inspection or other advice was provided to the Contractor by the Owner then the Owner will pay the Contractor for 75% of the total above noted cost only if such cost occurs during the preliminary video inspection (V1) or during preliminary cleaning operations for the V1. However, the Owner will not approve any other associated cost related to this work.

.2 If it is necessary to excavate for any reason such as repair of defective liner, reinstatement of service connections, by-pass of flow, etc., the Contractor shall provide such excavation, repair, backfill and restoration (as per the Contract requirements) as required. However dependent on the reason why an excavation is required and at the discretion of the Owner, additional payment for such work may be negotiated with the Contractor. In such case where the work is determined by the Owner to be extra to the contract, the work shall not proceed without the approval of the Owner prior to the work.

.3 All such work shall be performed by an approved sub-Contractor (when required by the Owner) and shall be completed in accordance with the Contract specifications.

.4 No claim for lost time will be considered as a result of any occurrence in which previous information was provided (i.e. conditions in CCTV video were provided).

3.28 WORKSITE CLEANUP AND RESTORATION

.1 Upon completion, clean and restore the site to existing or better, condition.

******End of Section 33 11 10******

Page 249: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 54

APPENDIX C - Candidate Street Set Sections

Page 250: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

1‐ Sinclair Street ‐ DartmouthStreet MH‐MH Length Laterals

Sewer Section Information Note any PVC Tees, Capped or not in service

Left DS Right DS

S‐1 P41728 MH17831 MH17832 Sinclair Street 300 Vitrified Clay 66.9 3 2 7.2 29.09 24.26 Civic #4 has 2 laterals, one is PVCS‐2 P41727 MH17830 MH17831 Sinclair Street 300 Vitrified Clay 11.6 0 1 3.3 29.49 29.11S‐3 P41726 MH17829 MH17830 Sinclair Street 300 Concrete 65.5 4 3 0.3 29.71 29.49 Civic #11 stub disconnected, Civic #12 has no connectionS‐4 P536722 MH58031 MH17829 Sinclair Street 300 Concrete 24.2 2 0 11.1 32.38 29.71 Ciivic #19, 21 and 23 have no lateralsS‐5 P41725 MH17817 MH58031 Sinclair Street 300 Concrete 13.3 0 0 10.1 33.74 32.39S‐6 P41724 MH17816 MH17817 Sinclair Street 300 Concrete 99.6 5 0 2.9 36.59 33.74 Civic #25 has no lateralS‐7 P41669 MH17795 MH17816 Sinclair Street 300 Concrete 115.6 6 0 4.3 41.57 36.59 A manhole is buried within this section located 25.6m downstream of MH 17795S‐8 P41668 MH17794 MH17795 Sinclair Street 300 Concrete 62.7 2 0 9.7 47.69 41.62S‐9 P41667 MH17793 MH17794 Sinclair Street 300 Concrete 38.0 2 0 8.9 48.14 44.75 Civic#52 has 3 laterals, 2 PVC and 1 NCS‐10 P41666 MH17791 MHxxxxx Sinclair Street 250 Concrete 68.0 3 4 10.7 44.75 37.47 Civic #63 abandoned and cappedS‐11 P41665 MH17789 MH17791 Sinclair Street 250 Concrete 68.5 5 3 11.3 37.47 29.74 Civic #65 and #67 abandoned and capped,  Civic #69 possibly abandoned S‐12 P41664 MH17790 MH17789 Sinclair Street 300 Concrete 59.0 1 2 13.8 29.53 21.40S‐13 P42430 MH18206 MH17790 Sinclair Street 300 Concrete 48.0 0 0 2.0 21.38 20.43 Street MH‐MH Length Laterals

Totals (m) 740.9 33 15 1 13 740.9 48No. of  Section and Lengths 2 250mm 136.5 Total Laterals

11 300mm 604.4

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH17832 300 26.66 2.67 24.26MH17831 300 32.71 3.62 29.11MH17830 300 33.16 3.71 29.49MH17829 300 31.90 2.20 29.71MH58031 300 34.57 2.20 32.39MH17817 300 36.26 2.61 33.74MH17816 300 39.56 3.22 36.59MH17795 300 43.83 2.29 41.62MH17794 300 50.07 2.39 47.73MH17792 300 47.65 2.90 44.75MH17791 300 39.97 2.44 37.53MH17789 300 32.41 2.87 21.40MH17790 300 24.30 2.90 20.43MH18206 300 22.00 2.90 19.12

Note: Elevations are to ATS 77 datum

2 ‐ High Street ‐ Halifax

Sewer Section Information

Left DS Right DS

H‐1 P5033 MH4649 MH4648 High Street 375 V.Clay 13.1 0 0 5.4 62.5 61.8H‐2 P5038 MH4650 MH4649 High Street 375 V.Clay 68.5 4 3 2.6 64.3 62.5H‐3 P5043 MH67059 MH4650 High Street 375 V.Clay 34.0 3 2 2.0 65.1 64.4H‐4 P4663 MH60533 MH4507 High Street 375 V.Clay 38.4 3 1 0.3 59.3 59.2H‐5 P3677 MH4507 MH4169 High Street 375 V.Clay 21.7 2 1 3.4 59.2 58.5H‐6 P3676 MH4169 MH67060 High Street 375 V.Clay 21.8 0 0 3.4 58.2 57.5 Street MH‐MH Length Laterals

Totals (m) 197.5 12 7 2 6 197.5 19No. of  Section and Lengths 6 375mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH4648 375 64.07 2.2 61.8MH4649 375 64.84 2.3 62.5MH4650 375 67.29 2.9 64.4MH67059 375 67.98 2.9 65.1MH60533 375 62.60 3.3 59.3MH4507 375 61.57 2.4 59.2MH4169 375 61.32 2.9 58.5MH67060 375 60.30 2.8 57.5

Note: Elevations are to ATS 77 datum

DS elev. (m) Confirmed during 

Lateral Comments

19

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

Downstream Elev (m)

DS elev. (m) Confirmed during 

Lateral Comments

48

Confirmed during Lining

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

during LiningSECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

PIPE DIA (mm)

US elev. (m) Confirmed 

during LiningDownstream Elev (m)

Page 1 of 17

Page 251: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

3 ‐ Drummond Street ‐ Halifax

Sewer Section Information

Left DS Right DS

D‐1 P4753 MH4537 MH4538 Drummond Street 300 V.Clay 52.0 5 2 2.3 66.24 65.04D‐2 P4023 MH4538 MH4450 Drummond Street 300 V.Clay 13.0 0 0 3.3 65.01 64.58D‐3 P4388 MH4414 MH4413 Drummond Street 375 V.Clay 14.4 0 2 2.3 62.34 62.01D‐4 P4392 MH4536 MH4414 Drummond Street 375 V.Clay 83.7 2 6 3.2 65.08 62.37D‐5 P4750 MH4535 MH4536 Drummond Street 375 V.Clay 12.4 0 2 2.5 65.39 65.08D‐6 P4747 MH4534 MH4535 Drummond Street 375 V.Clay 77.5 4 6 2.1 67.16 65.56D‐7 P4746 MH4533 MH4534 Drummond Street 300 V.Clay 11.5 0 3 0.3 67.22 67.19 Street MH‐MH Length Laterals

Totals (m) 264.5 11 21 3 7 264.5 32No. of  Section and Lengths 4 375mm 188.0 Total Laterals

3 300mm 76.5

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH4537 300 68.81 2.6 66.24MH4538 300 67.66 2.6 65.01MH4450 375 67.06 2.5 64.58MH4413 375 64.60 2.6 62.01MH4414 375 65.14 2.8 62.37MH4536 375 67.55 2.5 65.08MH4535 375 67.96 2.4 65.56MH4534 375 69.27 2.1 67.19MH4533 300 69.47 2.3 67.22

Note: Elevations are to ATS 77 datum

4 ‐ Leaman Street ‐ Halifax

Sewer Section Information

Left DS Right DS

L‐1 P5177 MH4708 MH4694 Leaman Street 375 V.Clay 12.5 0 0 1.7 63.29 63.08L‐2 P5176 MH4709 MH4708 Leaman Street 375 V.Clay 45.5 2 3 2.5 64.43 63.29L‐3 P5175 MH4710 MH4709 Leaman Street 375 V.Clay 34.1 2 3 2.9 65.41 64.43L‐4 P5174 MH4711 MH4710 Leaman Street 375 V.Clay 68.8 5 6 0.9 66.06 65.41L‐5 P5186 MH4717 MH4714 Leaman Street 375 V.Clay 11.7 0 0 1.2 66.08 65.94L‐6 P5185 MH4718 MH4717 Leaman Street 375 V.Clay 59.6 5 4 0.5 66.36 66.08L‐7 P4025 MH4719 MH4450 Leaman Street 300 V.Clay 40.7 3 1 2.0 65.52 64.70L‐8 P4380 MH4450 MH4410 Leaman Street 375 V.Clay 49.4 4 4 4.1 64.54 62.51L‐9 P4381 MH4410 MH4411 Leaman Street 375 V.Clay 11.5 0 1 4.4 62.47 61.97L‐10 P4382 MH4412 MH4411 Leaman Street 375 V.Clay 11.3 0 1 1.3 61.69 61.54L‐11 P4385 MH4413 MH4412 Leaman Street 375 V.Clay 17.4 1 1 1.6 61.99 61.71 Street MH‐MH Length LateralsL‐12 P4417 MH4411 MH4417 Leaman Street 375 V.Clay 63.1 1 2 2.3 61.48 60.02

Totals (m) 425.4 23 26 4 12 425.4 49No. of  Section and Lengths 11 375mm 384.8 Total Laterals

1 300mm 40.7Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH4694 450 66.01 2.9 63.08MH4708 375 66.28 3.0 63.29MH4709 375 67.39 3.0 64.43MH4710 375 67.71 2.3 65.41MH4711 375 68.33 2.3 66.06MH4714 375 67.88 1.9 65.94MH4717 375 68.31 2.2 66.08MH4718 300 68.17 1.8 66.36MH4719 375 68.03 2.5 65.52MH4450 375 67.06 2.4 64.70MH4410 375 64.75 2.2 62.51MH4411 375 64.55 2.6 61.97MH4412 375 64.49 2.8 61.69MH4413 375 64.60 2.6 61.99MH4417 375 62.58 2.6 60.02

Note: Elevations are to ATS 77 datum

DS elev. (m) Confirmed during 

Lateral Comments

49

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

Downstream Elev (m)

DS elev. (m) Confirmed during 

Lateral Comments

32

Confirmed during Lining

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

during LiningSECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

PIPE DIA (mm)

US elev. (m) Confirmed 

during LiningDownstream Elev (m)

Page 2 of 17

Page 252: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

5 ‐ Dingle Road ‐ Halifax

Sewer Section Information

Left DS Right DS

DI‐1 P8730 MH6122 MH6123 Dingle Road 200 Concrete 70.6 0 3 5.6 44.43 40.51DI‐2 P8731 MH6123 MH6133 Dingle Road 200 Concrete 5.8 0 0 0.2 40.39 40.38DI‐3 P8733 MH6133 MH6134 Dingle Road 300 Concrete 37.0 0 0 1.7 40.38 39.76DI‐4 P8734 MH6134 MH6135 Dingle Road 300 Concrete 60.4 0 2 8.1 39.76 34.85DI‐5 P8735 MH6135 MH6136 Dingle Road 300 Concrete 20.7 0 1 0.5 34.85 34.74DI‐6 P8736 MH6136 MH6137 Dingle Road 300 Concrete 28.3 0 0 0.5 34.74 34.60DI‐7 P8737 MH6137 MH6138 Dingle Road 300 Concrete 29.1 0 1 4.8 34.60 33.20DI‐8 P8738 MH6138 MH6139 Dingle Road 300 Concrete 55.4 0 2 3.7 33.20 31.15DI‐9 P8739 MH6139 MH6140 Dingle Road 300 Concrete 55.9 0 3 4.6 31.15 28.60DI‐10 P8740 MH6140 MH6141 Dingle Road 300 Concrete 23.6 0 1 6.0 28.60 27.18DI‐11 P8741 MH6141 MH6142 Dingle Road 300 Concrete 51.2 0 2 5.2 27.18 24.51DI‐12 P8742 MH6142 MH6143 Dingle Road 300 Concrete 27.5 1 2 2.7 24.51 23.76D1‐13 P8743 MH6143 MH6144 Dingle Road 300 Concrete 50.0 0 1 3.0 23.76 22.28DI‐14 P8744 MH6144 MH6145 Dingle Road 300 Concrete 41.7 0 2 6.6 22.28 19.54DI‐15 P8745 MH6145 MH6146 Dingle Road 300 Concrete 38.7 0 0 5.5 19.21 17.07 Drop manhole?DI‐16 P8746 MH6146 MH6147 Dingle Road 300 Concrete 48.8 0 0 6.7 17.07 13.78DI‐17 P10210 MH6147 MH6706 Dingle Road 300 Concrete 22.0 0 0 11.2 13.12 10.67 Drop manhole?DI‐18 P10211 MH6706 MH6707 Dingle Road 300 Concrete 49.7 0 0 2.5 10.67 9.44DI‐19 P10212 MH6707 MH6708 Dingle Road 300 Concrete 57.8 0 0 6.8 9.44 5.48DI‐20 P10213 MH6708 MH6709 Dingle Road 300 Concrete 63.2 0 0 2.4 4.97 3.48 Drop manhole?DI‐21 P10214 MH6709 MH6710 Dingle Road 300 Concrete 19.5 0 0 0.5 3.37 3.28DI‐22 P10215 MH6710 MH6711 Dingle Road 300 Concrete 46.7 0 0 0.5 3.28 3.04DI‐23 P10216 MH6711 MH6712 Dingle Road 300 Concrete 21.2 0 0 0.6 3.04 2.92DI‐24 P10217 MH6712 MH6713 Dingle Road 300 Concrete 57.4 1 0 0.5 2.92 2.61DI‐25 P10218 MH6713 MH6705 Dingle Road 300 Concrete 40.7 0 0 0.5 2.61 2.42DI‐26 P10240 MH6705 MH6728 Dingle Road 300 Concrete 39.7 0 1 1.0 2.18 1.79DI‐27 P10241 MH6728 MH6729 Dingle Road 300 Concrete 14.7 0 0 1.6 1.77 1.53 Street MH‐MH Length Laterals

Totals (m) 1077.2 2 21 5 27 1077.2 23No. of  Section and Lengths 24 300mm 961.2 Total Laterals

1 250mm 39.72 200mm 76.4

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH6122 200 47.54 3.1 44.43MH6123 200 42.88 2.5 40.39MH6133 300 42.88 2.5 40.38MH6134 300 42.01 2.3 39.76MH6135 300 37.46 2.6 34.85MH6136 300 37.36 2.6 34.74MH6137 300 37.29 2.7 34.60MH6138 300 35.56 2.4 33.20MH6139 300 34.38 3.2 31.15MH6140 300 31.09 2.5 28.60MH6141 300 29.59 2.4 27.18MH6142 300 27.08 2.6 24.51MH6143 300 26.41 2.7 23.76MH6144 300 24.56 2.3 22.28MH6145 300 21.46 2.3 19.21MH6146 300 19.60 2.5 17.07MH6147 300 15.76 2.6 13.12MH6706 300 13.17 2.5 10.67MH6707 300 11.71 2.3 9.44MH6708 300 7.89 2.9 4.97MH6709 300 5.83 2.5 3.37MH6710 300 5.31 2.0 3.28MH6711 300 5.13 2.1 3.04MH6712 300 5.03 2.1 2.92MH6713 300 5.86 3.3 2.61MH6705 250 6.70 4.5 2.18MH6728 300 4.11 2.3 1.77MH6729 300 3.66 2.1 1.53

Note: Elevations are to ATS 77 datum

MH6728 Flow meter

                                                                                                                                                                                                                                                                                                                                                                                                                           

Downstream Elev (m)

DS elev. (m) Confirmed during 

Lateral Comments

23

Confirmed during Lining

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

during LiningSECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

PIPE DIA (mm)

Page 3 of 17

Page 253: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

6 ‐ Albion Road ‐ Halifax

Sewer Section Information

Left DS Right DS

AL‐1 P15280 MH8371 MH8372 Albion Road 200 Concrete 32.2 2 2 1.0 29.72 29.41AL‐2 P15281 MH8372 MH8373 Albion Road 250 Concrete 57.5 2 1 0.9 29.26 28.75AL‐3 P15282 MH8373 MH8374 Albion Road 250 Concrete 76.3 2 6 1.1 28.61 27.79AL‐4 P15283 MH8374 MH8375 Albion Road 200 Concrete 41.2 1 0 0.5 27.72 27.52AL‐5 P15284 MH8375 MH8376 Albion Road 200 Concrete 29.5 2 2 0.7 27.50 27.29AL‐6 P15286 MH8376 MH8377 Albion Road 200 Concrete 36.5 1 1 0.4 27.29 27.15AL‐7 P15286 MH8377 MH8378 Albion Road 200 Concrete 40.7 0 2 0.4 27.15 26.97AL‐8 P15287 MH8378 MH8379 Albion Road 200 Concrete 23.7 1 0 0.7 26.97 26.80AL‐9 P15288 MH8379 MH8380 Albion Road 200 Concrete 31.2 0 1 11.9 26.80 23.08 Street MH‐MH Length Laterals

Totals (m) 368.8 11 15 6 9 368.8 26No. of  Section and Lengths 2 250mm 234.9 Total Laterals

7 200mm 133.8

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH8371 200 32.88 3.2 29.72MH8372 250 33.89 4.6 29.26 Check DiaMH8373 250 31.25 2.6 28.61 Check DiaMH8374 200 31.73 4.0 27.72MH8375 200 31.59 4.1 27.50MH8376 200 30.67 3.4 27.29MH8377 200 29.67 2.5 27.15MH8378 200 29.8 2.8 26.97MH8379 200 29.62 2.8 26.80MH8380 200 25.81 2.7 23.08

Note: Elevations are to ATS 77 datum

7 ‐ Burns Drive ‐ Halifax

Sewer Section Information

Left DS Right DS

B‐1 P8706 MH6110 MH6111 Burns Drive 200 Concrete 75.9 4 2 2.8 40.26 38.10B‐2 P8707 MH6111 MH6112 Burns Drive 200 Concrete 19.6 1 1 0.5 38.10 38.00B‐3 P8708 MH6113 MH6112 Burns Drive 200 Concrete 14.0 0 0 4.3 38.60 38.00B‐4 P8710 MH6112 MH6114 Burns Drive 200 Concrete 44.1 1 0 0.6 38.00 37.72B‐5 P8712 MH6115 MH6116 Burns Drive 300 Concrete 37.8 0 0 0.4 38.26 38.12B‐6 P8713 MH6116 MH6114 Burns Drive 300 Concrete 70.5 0 1 0.6 38.12 37.72B‐7 P8714 MH6114 MH6117 Burns Drive 300 Concrete 49.7 0 2 0.4 37.72 37.50B‐8 P8715 MH6117 MH6118 Burns Drive 300 Concrete 33.9 0 0 0.6 37.50 37.31 Street MH‐MH Length Laterals

Totals (m) 345.5 6 6 7 8 345.5 12No. of  Section and Lengths 4 300mm 153.6 Total Laterals

4 200mm 191.9

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH6110 200 42.71 2.5 40.26MH6111 200 40.20 2.1 38.10MH6112 200 40.25 2.3 38.00MH6113 200 40.85 2.3 38.60MH6114 300 39.31 1.6 37.72MH6115 300 39.80 1.5 38.26MH6116 300 40.01 1.9 38.12MH6117 300 42.10 4.6 37.50 check depthMH6118 300 40.30 3.0 37.31

Note: Elevations are to ATS 77 datum

Downstream Elev (m)

DS elev. (m) Confirmed during 

Lateral Comments

12

Confirmed during Lining

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

during LiningSECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

PIPE DIA (mm)

DS elev. (m) Confirmed during 

Lateral Comments

26

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETUS elev. (m) Confirmed 

during LiningDownstream Elev (m)

Page 4 of 17

Page 254: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

8 ‐ Flemming Drive ‐ Halifax

Sewer Section Information

Left DS Right DS

F‐1 P8729 MH6124 MH6123 Flemming Drive 200 Concrete 67.7 3 0 1.3 41.72 40.84F‐2 P8728 MH6125 MH6124 Flemming Drive 200 Concrete 68.0 3 2 0.5 42.06 41.72F‐3 P8727 MH6126 MH6125 Flemming Drive 200 Concrete 60.2 3 3 0.9 44.42 43.89F‐4 P8721 MH6127 MH6128 Flemming Drive 200 Concrete 69.6 3 3 7.2 44.43 39.45F‐5 P8722 MH6128 MH6129 Flemming Drive 200 Concrete 46.3 2 2 11.7 39.45 34.02F‐6 P8723 MH6129 MH6130 Flemming Drive 200 Concrete 66.9 3 2 5.8 34.02 30.14 Street MH‐MH Length Laterals

Totals (m) 378.7 17 12 8 6 378.7 29No. of  Section and Lengths 6 200mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH6123 200 42.88 2.0 40.84MH6124 200 45.44 3.7 41.72 Drop MH?MH6125 200 46.42 2.5 43.89 Drop MH?MH6126 200 48.02 3.6 44.42MH6127 200 47.54 3.1 44.43MH6128 200 42.61 3.2 39.45MH6129 200 36.92 2.9 34.02MH6130 300 33.65 3.5 30.14

Note: Elevations are to ATS 77 datum

9 ‐ Shaw Crescent ‐ Halifax

Sewer Section Information

Left DS Right DS

SC‐1 P8700 MH6100 MH6106 Shaw Crescent 200 Concrete 73.7 1 2 3.6 48.36 45.72SC‐2 P8701 MH6106 MH6107 Shaw Crescent 200 Concrete 59.0 2 1 1.5 45.72 44.83 Street MH‐MH Length Laterals

Totals (m) 132.7 3 3 9 2 132.7 6No. of  Section and Lengths 2 200mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH6100 200 50.85 2.5 48.36MH6106 200 48.76 3.0 45.72MH6107 200 47.03 2.2 44.83

Note: Elevations are to ATS 77 datum

Downstream Elev (m)

DS elev. (m) Confirmed during 

Lateral Comments

6

Confirmed during Lining

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

during LiningSECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

PIPE DIA (mm)

DS elev. (m) Confirmed during 

Lateral Comments

29

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETUS elev. (m) Confirmed 

during LiningDownstream Elev (m)

Page 5 of 17

Page 255: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

10 ‐ Westgate Drive ‐ Halifax

Sewer Section Information

Left DS Right DS

W‐1 P8702 MH6105 MH6107 Westgate Drive 200 Concrete 48.5 1 1 0.5 44.07 43.81W‐2 P8703 MH6107 MH6108 Westgate Drive 200 Concrete 33.8 1 0 10.0 43.81 40.43W‐3 P8704 MH6108 MH6109 Westgate Drive 200 Concrete 64.4 1 0 1.0 40.43 39.76W‐4 P8705 MH6109 MH6118 Westgate Drive 200 Concrete 63.0 3 0 2.0 39.76 38.51W‐5 P8716 MH6118 MH6119 Westgate Drive 300 Concrete 66.8 3 0 2.5 37.28 35.60W‐6 P8717 MH6119 MH6120 Westgate Drive 300 Concrete 30.6 0 0 6.8 35.60 33.52W‐7 P8718 MH6120 MH6121 Westgate Drive 300 Concrete 29.6 0 0 3.4 33.51 32.50W‐8 P8719 MH6121 MH6130 Westgate Drive 300 Concrete 53.4 0 0 4.8 32.50 29.95W‐9 P8724 MH6130 MH6131 Westgate Drive 300 Concrete 50.5 1 0 8.8 29.95 25.48W‐10 P8725 MH6131 MH6132 Westgate Drive 300 Concrete 43.5 0 0 2.0 25.48 24.63W‐11 P8726 MH6132 MH6145 Westgate Drive 300 Concrete 19.6 0 0 25.9 24.63 19.54 Street MH‐MH Length Laterals

Totals (m) 503.6 10 1 10 11 503.6 11No. of  Section and Lengths 7 300mm 294.0 Total Laterals

4 200mm 209.6

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH6105 200 48.03 4.0 44.07MH6107 200 47.03 3.2 43.81MH6108 200 43.37 2.9 40.43MH6109 200 42.17 2.4 39.76MH6118 300 40.87 3.6 37.28MH6119 300 37.64 2.0 35.60MH6120 300 34.93 1.4 33.51MH6121 300 34.04 1.5 32.50MH6130 300 33.65 3.7 29.95MH6131 300 27.57 2.1 25.48MH6132 300 26.39 1.8 24.63MH6145 300 21.46 1.9 19.54

Note: Elevations are to ATS 77 datum

11 ‐ Kirk Road ‐ Halifax

Sewer Section Information

Left DS Right DSK‐1 P10236 MH6736 MH6737 Kirk Road 200 Concrete 53.7 3 2 2.3 31.27 30.06K‐2 P10237 MH6737 MH6738 Kirk Road 200 Concrete 16.6 1 1 8.0 30.06 28.73 Drp mh?K‐3 P10238 MH6738 MH6739 Kirk Road 200 Concrete 15.8 1 0 2.5 28.27 27.88K‐4 P10239 MH6739 MH8383 Kirk Road 200 Concrete 45.1 2 2 9.0 27.88 23.83K‐5 P15291 MH8383 MH8382 Kirk Road 200 Concrete 25.6 1 0 9.7 23.83 21.34K‐6 P15292 MH8382 MH8381 Kirk Road 200 Concrete 7.1 0 0 4.1 21.34 21.05K‐7 P15289 MH8380 MH8381 Kirk Road 200 Concrete 80.1 3 2 2.9 23.08 20.79 Street MH‐MH Length Laterals

Totals (m) 244.0 11 7 11 7 244.0 187 200mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH6736 200 34.18 2.9 31.27MH6737 200 32.74 2.7 30.06MH6738 200 31.90 3.6 28.27MH6739 200 30.67 2.8 27.88MH8383 200 26.70 2.9 23.83MH8382 200 24.05 2.7 21.34MH8381 200 23.56 2.8 20.79MH8380 200 25.81 2.7 23.08

Note: Elevations are to ATS 77 datum

Downstream Elev (m)

DS elev. (m) Confirmed during 

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

No. of  Section and Lengths 18

Confirmed during Lining

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

11

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETPIPE DIA (mm)

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET Lateral CommentsUS elev. (m) Confirmed 

during Lining

Page 6 of 17

Page 256: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

12 ‐ McManus Road ‐ On Street ‐ Halifax

Sewer Section Information

Left DS Right DSMC‐1 P10219 MH8381 MH6714 McManus Road 200 Concrete 26.6 1 1 1.0 21.1 20.8MC‐2 P10220 MH6714 MH6715 McManus Road 200 Concrete 35.5 3 1 8.5 18.3 15.3MC‐3 P10221 MH6715 MH6716 McManus Road 200 Concrete 40.1 0 1 10.7 15.3 11.0MC‐4 P10222 MH6716 MH6717 McManus Road 200 Concrete 39.5 1 2 6.9 11.0 8.3MC‐5 P10223 MH6717 MH6718 McManus Road 200 Concrete 23.6 0 0 13.2 7.9 4.8 Street MH‐MH Length Laterals

Totals (m) 165.3 5 5 12 5 165.3 10No. of  Section and Lengths 5 200mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH8381 200 23.56 2.5 21.1MH6714 200 20.84 2.5 18.3 Drop Mh?MH6715 200 17.66 2.4 15.3MH6716 200 13.39 2.4 11.0MH6717 200 10.87 3.0 7.9MH6718 200 7.18 2.4 4.8

Note: Elevations are to ATS 77 datum

13 ‐ McManus Road ‐ Off Street ‐ Halifax

Sewer Section Information

Left DS Right DSMC‐6 P10224 MH6718 MH6719 McManus Off Street 200 Concrete 40.3 5.2 4.80 2.69MC‐7 P10225 MH6719 MH6720 McManus Off Street 200 Concrete 57.9 0.3 2.69 2.49MC‐8 P10226 MH6720 MH6721 McManus Off Street 300 Concrete 28.7 0 0 0.6 2.49 2.33MC‐9 P10227 MH6721 MH6732 McManus Off Street 300 Concrete 57.8 0 0 0.5 2.33 2.05 Street MH‐MH Length Laterals

Totals (m) 184.7 0 0 13 4 184.7 0No. of  Section and Lengths 2 300mm 86.5 Total Laterals

2 200mm 98.2

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH6718 200 7.18 2.4 4.80MH6719 200 4.26 1.6 2.69MH6720 300 4.96 2.5 2.49MH6721 300 3.83 1.5 2.33MH6732 250 3.56 1.5 2.05

Note: Elevations are to ATS 77 datum

DS elev. (m) Confirmed 

Lateral Comments

0

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

10

Confirmed during Lining

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETPIPE DIA (mm)

US elev. (m) Confirmed 

Downstream Elev (m)

Page 7 of 17

Page 257: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

14 ‐ Parkhill Road ‐ Halifax

Sewer Section Information

Left DS Right DSP‐1 P10206 MH6701 MH6702 Parkhill 250 Concrete 46.03 2 1 8.2 37.04 33.28P‐2 P10207 MH6702 MH6703 Parkhill 250 Concrete 42.22 3 2 12.8 32.64 27.24 Drop ?P‐3 P10208 MH6703 MH6704 Parkhill 250 Concrete 53.65 0 2 11.9 27.04 20.66P‐4 P10209 MH6704 MH6705 Parkhill 250 Concrete 89.78 1 3 20.4 20.64 2.29 Street MH‐MH Length Laterals

Totals (m) 231.7 6 8 14 4 231.7 14No. of  Section and Lengths 4 250mm 0 Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH6701 250 39.46 2.4 37.04MH6702 250 35.58 2.9 32.64MH6703 250 29.33 2.3 27.04MH6704 250 23.42 2.8 20.64MH6705 250 6.70 4.4 2.29

Note: Elevations are to ATS 77 datum

15 ‐ Milton Drive ‐ Halifax

Sewer Section Information

Left DS Right DSMD‐1 P10247 MH6734 MH6735 Milton Drive 200 Concrete 14.3 1 0 16.3 6.06 3.73MD‐2 P10248 MH6735 MH6731 Milton Drive 200 Concrete 6.6 0 0 26.0 3.73 2.02MD‐3 P10243 MH6731 MH67711 Milton Drive 250 Concrete 19.8 0 0 0.8 1.75 1.59MD‐4 P5426739 MH67711 MH67709 Milton Drive 250 Concrete 10.8 0 0 1.1 1.59 1.47MD‐5 P10242 MH67709 MH6729 Milton Drive 300 Concrete 2.9 0 0 0.7 1.47 1.45 Street MH‐MH Length Laterals

Totals (m) 54.3 1 0 15 5 54.3 1No. of  Section and Lengths 1 300mm 2.9 Total Laterals

1 250mm 19.82 200mm 20.81 Unknown 10.8

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH6734 200 9.05 3.0 6.06MH6735 200 6.24 2.5 3.73MH6731 250 5.16 3.4 1.75MH67711 250 4.3 2.7 1.6MH67709 300 3.68 2.2 1.47MH6729 300 3.67 2.2 1.45

Note: Elevations are to ATS 77 datum

MH67709 Flow Meter

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

1

Confirmed during Lining

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETPIPE DIA (mm)

DS elev. (m) Confirmed 

Lateral Comments

14

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET US elev. (m) Confirmed 

Downstream Elev (m)

Page 8 of 17

Page 258: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

16 ‐ Whimsical Lake Crescent  ‐ Halifax

Sewer Section Information

Left DS Right DSWL‐1 P9171 MH6295 MH6279 Whimsical Lake Cr 250 AC 14.9 0 0 2.8 40.14 39.72WL‐2 P9165 MH6293 MH6295 Whimsical Lake Cr 250 AC 23.7 1 0 2.5 40.80 40.20WL‐3 P9163 MH6291 MH6293 Whimsical Lake Cr 250 AC 22.4 2 0 2.0 41.29 40.85WL‐4 P9159 MH6289 MH6291 Whimsical Lake Cr 250 AC 71.9 4 2 0.5 41.66 41.30WL‐5 P9156 MH6287 MH6289 Whimsical Lake Cr 250 AC 77.3 5 4 2.7 43.79 41.71WL‐6 P9154 MH6285 MH6287 Whimsical Lake Cr 250 AC 24.3 2 1 6.4 45.37 43.82 Street MH‐MH Length Laterals

Totals (m) 219.6 14 7 16 6 219.6 21No. of  Section and Lengths 6 250mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH6279 200 42.74 3.0 39.72MH6295 250 42.87 2.7 40.20MH6293 250 43 2.2 40.85MH6291 250 43.2 1.9 41.30MH6289 250 43.9 2.2 41.71MH6287 250 46.2 2.4 43.82MH6285 250 47.4 2.0 45.37

Note: Elevations are to ATS 77 datum

MH6279 Flow Meter

17 ‐ Inverness Avenue  ‐ Halifax

Sewer Section Information

Left DS Right DSI‐1 P9142 MH6278 MH18583 Inverness Avenue 200 AC 17.6 0 0 1.1 38.89 38.69I‐2 P9143 MH6279 MH6278 Inverness Avenue 200 AC 59.3 0 1 1.4 39.73 38.89I‐3 P9144 MH6280 MH6279 Inverness Avenue 200 AC 89.0 5 4 4.7 43.90 39.73I‐4 P9145 MH6281 MH6280 Inverness Avenue 200 AC 90.4 4 3 3.4 46.72 43.66 Street MH‐MH Length Laterals

Totals (m) 256.3 9 8 17 4 256.3 17No. of  Section and Lengths 4 200mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH6278 200 41.86 3.0 38.89MH18583 200 41.94 3.3 38.69MH6279 200 42.74 3.0 39.73MH6280 200 46.64 2.7 43.90MH6281 200 49.03 1.3 47.72

Note: Elevations are to ATS 77 datum

MH6278/79 Flow Meters

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

17

Confirmed during Lining

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETPIPE DIA (mm)

DS elev. (m) Confirmed 

Lateral Comments

21

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET US elev. (m) Confirmed 

Downstream Elev (m)

Page 9 of 17

Page 259: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

18 ‐ Dunniker Road ‐ Halifax

Sewer Section Information

Left DS Right DSDU‐1 P9136 MH6416 MH242 Dunniker Road 200 Concrete 38.9 0 0 6.2 43.11 40.69 Street MH‐MH Length Laterals

Totals (m) 38.9 0 0 18 1 38.9 0No. of  Section and Lengths 1 200mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH242 200 43.80 3.1 40.69MH6416 200 45.15 2.0 43.11

Note: Elevations are to ATS 77 datum

19 ‐ Joyce Avenue  ‐ Halifax  

Sewer Section Information

Left DS Right DSJ‐1 P12189 MH237 MH238 Joyce Avenue 200 Concrete 71.9 4 0 6.1 63.15 58.76J‐2 P12195 MH238 MH239 Joyce Avenue 200 Concrete 62.3 3 0 11.8 58.76 51.39J‐3 P12198 MH239 MH240 Joyce Avenue 200 Concrete 51.1 3 1 7.2 51.39 47.70J‐4 P12200 MH240 MH241 Joyce Avenue 200 Concrete 58.7 3 0 10.2 47.70 41.70J‐5 P12880 MH241 MH242 Joyce Avenue 200 Concrete 6.9 0 0 9.2 41.70 41.06J‐6 P9138 MH242 MH6275 Joyce Avenue 200 Concrete 28.9 1 1 3.6 41.06 40.02J‐7 P9139 MH6275 MH6276 Joyce Avenue 200 Concrete 55.9 2 1 ‐0.2 40.02 40.11 Street MH‐MH Length Laterals

Totals (m) 335.6 16 3 19 7 335.6 19No. of  Section and Lengths 7 200mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH237 200 65.59 2.4 63.15MH238 200 60.96 2.2 58.76MH239 200 53.98 2.6 51.39MH240 200 50.29 2.6 47.70MH241 200 44.74 3.0 41.70MH242 200 44.04 3.0 41.06MH6275 200 42.48 2.5 40.02MH6276 375 42.00 1.9 40.11

Note: Elevations are to ATS 77 datum

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

19

Confirmed during Lining

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETPIPE DIA (mm)

DS elev. (m) Confirmed 

Lateral Comments

0

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET US elev. (m) Confirmed 

Downstream Elev (m)

Page 10 of 17

Page 260: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

20 ‐ Aurora Avenue ‐ Halifax

Sewer Section Information

Left DS Right DSAU‐1 P12391 MH281 MH280 Aurora Avenue 200 Concrete 36.4 2 3 3.8 73.61 72.22AU‐2 P12387 MH280 MH279 Aurora Avenue 200 Concrete 65.7 3 3 7.0 72.19 67.57AU‐3 P12385 MH279 MH278 Aurora Avenue 200 Concrete 45.6 2 3 4.2 67.57 65.65AU‐4 P12379 MH278 MH277 Aurora Avenue 200 Concrete 37.8 3 3 16.4 65.65 59.46 Street MH‐MH Length Laterals

Totals (m) 185.4 10 12 20 4 185.4 22No. of  Section and Lengths 4 200mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH281 200 76.17 2.6 73.61MH280 200 75.13 2.9 72.19MH279 200 71.54 4.0 67.57MH278 200 67.79 2.1 65.65MH277 300 61.64 2.2 59.46

Note: Elevations are to ATS 77 datum

21 ‐ Circle Drive ‐ Halifax

Sewer Section Information

Left DS Right DSC‐1 P12247 MH293 MH292 Circle Drive 200 Concrete 76.8 4 5 7.7 70.32 64.37C‐2 P12245 MH292 MH291 Circle Drive 200 Concrete 26.9 2 0 1.4 64.37 64.00C‐3 P12239 MH291 MH290 Circle Drive 200 Concrete 71.3 3 4 1.9 64.00 62.64C‐4 P12233 MH258 MH290 Circle Drive 200 Concrete 48.1 1 1 2.0 63.92 62.94C‐5 P12226 MH259 MH258 Circle Drive 200 Concrete 56.3 2 4 10.9 70.07 63.92 Street MH‐MH Length Laterals

Totals (m) 279.3 12 14 21 5 279.3 26No. of  Section and Lengths 5 200mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH293 200 72.66 2.3 70.32MH292 200 66.78 2.4 64.37MH291 200 67.08 3.1 64.00MH290 200 65.52 2.6 62.94MH258 200 66.98 3.1 63.92MH259 200 71.90 1.8 70.07

Note: Elevations are to ATS 77 datum

22 ‐ Twin Oaks Road ‐ Halifax

Sewer Section Information

Left DS Right DST‐1 P12232 MH263 MH262 Twin Oaks Road 200 Concrete 47.0 2 0 1.1 67.52 67.01T‐2 P12231 MH262 MH258 Twin Oaks Road 200 Concrete 45.3 1 1 6.8 67.01 63.92 Street MH‐MH Length Laterals

Totals (m) 92.3 3 1 22 2 92.3 4No. of  Section and Lengths 2 200mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH263 200 69.78 2.9 66.90MH262 200 69.53 2.5 67.01MH258 200 66.98 3.7 63.29

Note: Elevations are to ATS 77 datum

DS elev. (m) Confirmed 

Lateral Comments

4

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

26

Confirmed during Lining

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETPIPE DIA (mm)

US elev. (m) Confirmed 

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

22

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET US elev. (m) Confirmed 

Downstream Elev (m)

Page 11 of 17

Page 261: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

23 ‐ Cherry Lane ‐ Halifax

Sewer Section Information

Left DS Right DSCH‐1 P12260 MH10462 MH296 Cherry Lane 200 Unknown  27.2 1 0 2.2 67.3 66.70CH‐2 P12258 MH296 MH295 Cherry Lane 200 Unknown  23.4 1 0 0.4 66.70 66.61CH‐3 P12257 MH295 MH294 Cherry Lane 200 Unknown  28.6 1 1 4.0 66.61 65.47CH‐4 P12256 MH294 MH291 Cherry Lane 200 Unknown  60.9 2 4 2.4 65.47 64.00 Street MH‐MH Length Laterals

Totals (m) 140.1 5 5 23 4 140.1 10No. of  Section and Lengths 4 200mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH10462 200 70.3 3.0 67.3MH296 200 70.20 3.5 66.70MH295 200 69.60 3.1 66.50MH294 200 68.90 3.4 65.47MH291 200 67.09 3.1 64.00

Note: Elevations are to ATS 77 datum

24 ‐ Hubley Drive (Offstreet) ‐ Halifax

Sewer Section Information

Left DS Right DSHU‐1 P12216 MH290 MH289 Hubley (Off Street) 200 Concrete 44.6 0 1 12.3 62.60 57.12 Street MH‐MH Length Laterals

No. of  Section and Lengths 1 200mm Total Laterals 24 1 44.6 1

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH289 200 59.47 2.4 57.12MH290 200 65.52 2.9 62.60

Note: Elevations are to ATS 77 datum

DS elev. (m) Confirmed 

Lateral Comments

1

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

10

Confirmed during Lining

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETPIPE DIA (mm)

US elev. (m) Confirmed 

Downstream Elev (m)

Page 12 of 17

Page 262: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

25 ‐ Newton Avenue ‐ HalifaxNote any PVC Tees, Capped or not in service

Sewer Section Information

Left DS Right DSNW‐1 P24581 MH2196 MH2197 Newton Avenue 300 concrete 16.9 2 0 1.5 44.66 44.41NW‐2 P24582 MH2197 MH2198 Newton Avenue 300 concrete 11.1 0 0 1.1 44.38 44.26NW‐3 P24595 MH2198 MH1839 Newton Avenue 375 vitrified clay 55.5 4 0 1.0 44.17 43.63NW‐4 P24459 MH1839 MH1840 Newton Avenue 375 vitrified clay 79.1 6 0 0.9 43.58 42.87NW‐5 P24469 MH1840 MH1841 Newton Avenue 375 vitrified clay 78.9 6 6 0.5 42.68 42.27NW‐6 P24479 MH1841 MH1842 Newton Avenue 375 vitrified clay 78.9 7 6 2.3 42.27 40.45NW‐7 P24354 MH1842 MH1536 Newton Avenue 375 vitrified clay 79.3 6 6 2.6 40.45 38.36NW‐8 P24365 MH1535 MH1536 Newton Avenue 450 concrete 9.4 0 0 0.0 38.48 38.47NW‐9 P24375 MH1536 MH1537 Newton Avenue 450 concrete 58.0 3 0 2.9 38.13 36.46 Street MH‐MH Length Laterals

Totals (m) 467.1 34 18 25 9 467.1 52No. of  Section and Lengths 2 450mm  67.4 Total Laterals

5 375mm 371.72 300mm 28.0

Manhole Information

MH IDD/S Size (mm)

MH Depth (m)

Cover Elev (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH2196 300 1.6 46.02 44.41MH2197 300 2.2 46.44 44.26MH2198 375 3.1 46.70 43.63MH1839 375 3.3 46.12 42.87MH1840 375 3.1 45.37 42.27MH1841 375 4.5 44.98 40.45MH1842 375 4.7 43.03 38.36MH1535 450 2.5 41.01 38.48MH1536 450 4.6 43.03 38.47MH1537 450 2.4 38.85 36.46

Note: Elevations are to ATS 77 datum

26  ‐ Chebucto Road ‐ HalifaxNote any PVC Tees, Capped or not in service

Sewer Section Information

Left DS Right DSCR‐1 P24638 MH2193 MH2210 Chebucto Road 750 concrete 68.3 2 0 2.0 44.81 43.45CR‐2 P24617 MH2194 MH2193 Chebucto Road 750 concrete 39.8 0 0 2.7 45.68 44.59CR‐3 P24574 MH2192 MH2193 Chebucto Road 500 concrete 9.6 0 0 3.5 45.22 44.88CR‐4 P24511 MH2191 MH2192 Chebucto Road 500 concrete 48.4 2 2 3.9 47.21 45.31 Street MH‐MH Length Laterals

Totals (m) 166.1 4 2 26 4 166.1 6No. of  Section and Lengths 2 750mm  108.1 Total Laterals

2 500mm 58.0

Manhole Information

MH IDD/S Size (mm)

MH Depth (m)

Cover Elev (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH2210 750 2.2 45.67 43.45MH2193 750 3.1 47.68 44.59MH2194 750 2.6 48.3 45.68MH2192 500 2.9 48.1 45.22MH2191 500 2.1 49.3 47.21

Note: Elevations are to ATS 77 datum

DS elev. (m) Confirmed 

Lateral Comments

6

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m) No. of Laterals per  Slope % Upstream Elev (m)

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

52

Confirmed during Lining

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

MAT'L LENGTH (m) No. of Laterals per  Slope % Upstream Elev (m)

US elev. (m) Confirmed 

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETPIPE DIA (mm)

US elev. (m) Confirmed 

Downstream Elev (m)

Page 13 of 17

Page 263: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

27  ‐ Connaught Avenue ‐ HalifaxNote any PVC Tees, Capped or not in service

Sewer Section Information

Left DS Right DSCA‐1 P24976 MH2165 MH2166 Connaught Avenue 600 concrete 15.2 0 0 0.7 46.39 46.28CA‐2 P25030 MH2164 MH2165 Connaught Avenue 750 concrete 75.4 7 0 0.3 46.28 46.02CA‐3 P24490 MH2194 MH2164 Connaught Avenue 750 concrete 78.0 5 0 0.4 46.02 45.72 Street MH‐MH Length Laterals

Totals (m) 168.6 12 0 27 3 168.6 12No. of  Section and Lengths 2 750mm  153.4 Total Laterals

1 600mm 15.2

Manhole Information

MH IDD/S Size (mm)

MH Depth (m)

Cover Elev (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH2166 600 1.9 48.2 46.28MH2165 750 1.3 47.7 46.39MH2164 750 1.6 47.9 46.28MH2194 750 2.3 48.3 46.02

Note: Elevations are to ATS 77 datum

28 ‐ Dublin Street ‐ HalifaxNote any PVC Tees, Capped or not in service

Sewer Section Information

Left DS Right DSDS‐1 P1976 MH3409 MH2758 Dublin Street 375 vitrified clay 14.1 0 0 1.3 59.41 59.23DS‐2 P453 MH2759 MH2758 Dublin Street 375 vitrified clay 24.8 0 0 0.8 59.58 59.38DS‐3 P445 MH2760 MH2759 Dublin Street 375 vitrified clay 60.7 5 3 2.2 61.20 59.85DS‐4 P444 MH2761 MH2760 Dublin Street 375 vitrified clay 13.5 0 0 1.4 61.60 61.41DS‐5 P3000 MH2776 MH2760 Dublin Street 375 vitrified clay 79.4 4 2 2.2 63.13 61.41DS‐6 P437 MH2775 MH2776 Dublin Street 375 vitrified clay 12.9 0 0 1.0 63.43 63.30DS‐7 P433 MH2779 MH2776 Dublin Street 375 vitrified clay 49.2 2 2 1.5 64.04 63.30DS‐8 P428 MH2782 MH2783 Dublin Street 300 vitrified clay 11.8 0 0 7.5 64.91 64.03DS‐9 P730 MH2783 MH2913 Dublin Street 375 vitrified clay 80.1 2 2 0.6 63.51 63.05 Street MH‐MH Length Laterals

Totals (m) 346.5 13 9 28 4 346.5 22No. of  Section and Lengths 8 375mm  334.7 Total Laterals

1 300mm 11.8

Manhole Information

MH IDD/S Size (mm)

MH Depth (m)

Cover Elev (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH3409 375 2.6 62.05 59.41MH2758 375 2.5 61.71 59.23MH2759 375 2.5 62.12 59.58MH2760 375 2.4 63.59 61.20MH2761 375 2.6 64.20 61.60MH2776 375 2.2 65.51 63.30MH2775 375 2.2 65.60 63.43MH2779 375 2.0 66.08 64.04MH2782 300 1.8 66.66 64.91MH2783 375 2.9 66.37 63.51MH2913 375 2.5 65.53 63.05

Note: Elevations are to ATS 77 datum

DS elev. (m) Confirmed 

Lateral Comments

22

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m) No. of Laterals per  Slope % Upstream Elev (m)

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

12

Confirmed during Lining

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

MAT'L LENGTH (m) No. of Laterals per  Slope % Upstream Elev (m)

US elev. (m) Confirmed 

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETPIPE DIA (mm)

US elev. (m) Confirmed 

Downstream Elev (m)

Page 14 of 17

Page 264: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

29 ‐ Cork Street ‐ Halifax

Sewer Section Information

Left DS Right DSCK‐1 P1972 MH3405 MH3404 Cork Street 300 vitrified clay 70.5 0 0 60.00 57.79CK‐2 P1962 MH3404 MH3402 Cork Street 300 vitrified clay 12.7 6 5 57.37 56.42 Street MH‐MH Length Laterals

Totals (m) 83.2 6 5 29 2 83.2 11No. of  Section and Lengths 2 300mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

MH Depth (m)

Cover Elev (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH3405 300 2.3 62.29 60.00MH3404 300 2.1 59.85 57.79MH3402 600 2.8 59.26 56.42

Note: Elevations are to ATS 77 datum

30  ‐ Windsor Street ‐ HalifaxNote any PVC Tees, Capped or not in service

Sewer Section Information

Left DS Right DSWD‐1 P1957 MH3407 MH3399 Windsor Street 375 concrete 10.4 0 0 56.72 55.26WD‐2 P1975 MH3406 MH3407 Windsor Street 375 concrete 61.9 3 0 59.68 57.31WD‐3 P1988 MH3411 MH3406 Windsor Street 375 concrete 78.6 7 3 62.30 59.82 Street MH‐MH Length Laterals

Totals (m) 150.9 7 3 30 3 150.9 10No. of  Section and Lengths 3 375mm  Total Laterals

Manhole Information

MH IDD/S Size (mm)

MH Depth (m)

Cover Elev (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH3399 600 4.7 59.93 55.26MH3407 375 3.4 60.09 56.72MH3406 375 2.8 62.47 59.68MH3411 375 2.8 65.06 62.3

Note: Elevations are to ATS 77 datum

DS elev. (m) Confirmed 

Lateral Comments

10

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m) No. of Laterals per  Slope % Upstream Elev (m)

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

11

Confirmed during Lining

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

MAT'L LENGTH (m) No. of Laterals per  Slope % Upstream Elev (m)

US elev. (m) Confirmed 

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETPIPE DIA (mm)

US elev. (m) Confirmed 

Downstream Elev (m)

Page 15 of 17

Page 265: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

31 ‐ Seawood Avenue ‐ Sackville

Sewer Section Information

Left DS Right DSSE‐1 P516471 MH23066 MH23065 Seawood Avenue 750 Concrete 33.6 0 1 0.5 25.42 25.26SE‐2 P516472 MH23065 MH23064 Seawood Avenue 750 Concrete 66.4 0 3 0.5 25.26 24.94SE‐3 P151673 MH23064 MH23063 Seawood Avenue 750 Concrete 55.0 0 0 0.4 24.94 24.73SE‐4 P518697 MH24235 MH23064 Seawood Avenue 250 Concrete 47.7 2 2 1.8 25.80 24.94SE‐5 P518696 MH24234 MH24235 Seawood Avenue 250 Concrete 42.9 3 2 1.0 26.23 25.80SE‐6 P518695 MH24233 MH24234 Seawood Avenue 250 Concrete 41.2 2 2 0.9 26.60 26.23SE‐7 P518694 MH24232 MH24233 Seawood Avenue 250 Concrete 37.3 1 3 1.6 27.18 26.60SE‐8 P518684 MH24231 MH24232 Seawood Avenue 250 Concrete 38.7 0 0 1.8 27.87 27.18SE‐9 P518683 MH24230 MH24231 Seawood Avenue 200 Concrete 53.5 2 3 4.6 30.32 27.87SE‐10 P518682 MH24229 MH24230 Seawood Avenue 200 Concrete 50.1 3 2 3.6 32.12 30.32SE‐11 P518681 MH24228 MH24229 Seawood Avenue 200 Concrete 50.4 3 0 1.8 33.04 32.12SE‐12 P518680 MH24227 MH24228 Seawood Avenue 200 Concrete 66.4 3 3 0.8 33.55 33.04 Street MH‐MH Length Laterals

Totals (m) 583.4 19 21 31 12 583.4 40No. of  Section and Lengths 3 750mm 155.0 Total Laterals

5 250mm 207.94 200mm 220.4

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH23066 750 29.75 4.3 25.42MH23065 750 28.95 3.7 25.26MH23064 750 29.06 4.1 24.94MH23063 750 29.75 5.0 24.73MH24235 250 29.16 3.4 25.80MH24234 250 28.96 2.7 26.23MH24233 250 28.98 2.4 26.60MH24232 250 29.50 2.3 27.18MH24231 250 30.48 2.6 27.87MH24230 200 33.12 2.8 30.32MH24229 200 34.82 2.7 32.12MH24228 200 35.74 2.7 33.04MH24227 200 35.22 1.7 33.55

Note: Elevations are to ATS 77 datum

MH23064 Flow Meter

32 ‐ Leaside Drive ‐ Sackville

Sewer Section Information

Left DS Right DSE‐1 P38982 MH16236 MH16235 Leaside Drive 200 Concrete 16.79 0 0 2.0 34.42 34.09E‐2 P518679 MH16235 MH24224 Leaside Drive 200 Concrete 66.98 2 0 5.7 34.09 30.26 Drop ?E‐3 P518690 MH24225 MH24224 Leaside Drive 200 Concrete 61.09 5 2 3.8 32.61 30.26E‐4 P518689 MH24226 MH24225 Leaside Drive 200 Concrete 63.58 1 3 2.4 34.11 32.61 Street MH‐MH Length Laterals

Totals (m) 208.4 8 5 32 4 208.4 13No. of  Section and Lengths 4 200mm Total Laterals

Manhole Information 0.00

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH16236 200 36.82 2.4 34.42MH16235 200 36.49 2.4 34.09MH24224 200 33.11 2.8 30.27MH24225 200 34.98 2.4 32.61MH24226 200 36.38 2.3 34.11

Note: Elevations are to ATS 77 datum

DS elev. (m) Confirmed 

Lateral Comments

13

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

40

Confirmed during Lining

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETPIPE DIA (mm)

US elev. (m) Confirmed 

Downstream Elev (m)

Page 16 of 17

Page 266: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

RFP/Tender P09.2019  ‐  2019 Sewer Mainline Trenchless Lining Project – Phase 1

33 ‐ Leaside Drive Easement ‐ Sackville

Sewer Section Information

Left DS Right DSLE‐1 P518686 MH24823 MH24232 Leaside Dr, Easement 250 Concrete 16.79 0 0 6.4 28.25 27.18LE‐2 P518685 MH24822 MH24223 Leaside Dr, Easement 200 Concrete 52.01 0 0 1.5 29.01 28.25LE‐3 P518688 MH24224 MH24822 Leaside Dr, Easement 200 Concrete 35.69 0 0 3.5 30.27 29.01 Street MH‐MH Length Laterals

Totals (m) 104.5 0 0 34 3 104.5 0No. of  Section and Lengths 1 250mm 16.8 Total Laterals

2 200mm 87.7

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH24232 200 29.50 2.3 27.18MH24823 200 29.65 1.4 28.25MH24222 200 32.46 3.5 29.01MH24224 200 33.11 2.8 30.27

Note: Elevations are to ATS 77 datum

34 ‐ Sackville Drive ‐ Sackville

Sewer Section Information

Left DS Right DSSA‐1 P38981 MH16237 MH16236 Sackville Drive 200 Concrete 17.6 0 0 1.5 34.69 34.42SA‐2 P38980 MH16238 MH16237 Sackville Drive 200 Concrete 6.7 0 1 2.4 34.85 34.69SA‐3 P38979 MH16239 MH16238 Sackville Drive 200 Concrete 60.7 0 1 1.1 35.52 34.85SA‐4 P38978 MH16240 MH16239 Sackville Drive 200 Concrete 77.7 0 1 3.3 38.05 35.52 Street MH‐MH Length Laterals

Totals (m) 162.8 0 3 35 4 162.8 3No. of  Section and Lengths 4 200mm Total Laterals

Manhole Information

MH IDD/S Size (mm)

Cover Elev (m)

MH Depth (m) MH Invert (m) Northing EastingMH Depth 

(m)Cover Elev 

(m)Invert Elev (m)

Manhole Size

MH16236 200 36.82 2.4 34.42MH16237 200 36.85 2.2 34.69MH16238 200 36.93 2.1 34.85MH16239 200 38.02 2.5 35.52MH16240 200 39.78 1.7 38.05

Note: Elevations are to ATS 77 datum

Totals Streets MH‐MH Length Laterals35 214 9485.8 587

DS elev. (m) Confirmed 

Lateral Comments

3

Confirmed during Lining

PIPE DIA (mm)

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

Downstream Elev (m)

DS elev. (m) Confirmed 

Lateral Comments

0

Confirmed during Lining

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREET

MAT'L LENGTH (m)No. of Laterals per 

Slope % Upstream Elev (m)

US elev. (m) Confirmed 

SECTION # ASSET ID U/S MH ID D/S MH ID ROAD/STREETPIPE DIA (mm)

US elev. (m) Confirmed 

Downstream Elev (m)

Page 17 of 17

Page 267: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 55

APPENDIX D - Site Location Drawings

Page 268: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

EXPOSED MH - No Information

DATE: APRIL. 2019SCALE: NTSDWG NO:

1 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\201

9 SI

NCL

AIR

STRE

ET.D

WG

2018 SEWER MAINLINE TRENCHLESS LINING PROJECT - PHASE 1RFP/TENDER - P01.2019

SINCLAIR STREET- HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONS-1

HA

WT

HO

RN

E S

TR

EE

T

MH17832

MH17831 MH17830

MH17829

MH58031

MH17817

MH17816

MH17795

S-8

S-7

S-6

S

-

5

S

-

4

S

-3

S-2

S-1

SIN

CLA

IR S

TR

EE

T

BE

RW

IC

K S

TR

EE

T

HIG

HW

OO

D S

TR

EE

T

M

ED

FO

RD

S

TR

EE

T

Page 269: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

2 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\201

9 SI

NCL

AIR

STRE

ET.D

WG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT - PHASE 1RFP/TENDER - P01.2019

SINCLAIR STREET- HALIFAX

EXPOSED MH - No Information

MH17795

S-8

S-7

M

ED

FO

RD

S

TR

EE

T

JO

FFR

E S

TR

EE

T

LO

RN

E A

VE

.

R

I

X

D

A

L

E

D

R

.

P

R

I

N

C

E

A

L

B

E

R

T

R

D

.

MH17794

MH17793

MH17791

MH17789

MH17790

MH18206

MH17792

S-9

S-1

0

S-1

1

S-1

2

S

-

1

3

SIN

CLA

IR

ST

RE

ET

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONS-1

Page 270: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\201

9 HI

GH S

TREE

T.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT - PHASE 1RFP/TENDER - P01.2019HIGH STREET- HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONH-1

MH4648

MH4649

MH4650

MH4659

MH60533MH4507

MH4169

MH67060

H

-

1

H-2

H-3

H-4

H

-

5

H

-

6

HIGH STREET

L

A

D

Y

H

A

M

M

O

N

D

S

R

O

A

D

NO

RM

AN

DY

D

RIV

E

LE

ED

S S

TR

EE

T

Page 271: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\DRU

MM

ON

D CO

URT

.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT - PHASE 1RFP/TENDER - P01.2019

DRUMMOND COURT- HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIOND-1

MH4533

MH4534

MH4535 MH4536

MH4414

MH4415

MH4450

MH4538

MH4537

I

S

L

E

V

I

L

L

E

S

T

R

E

E

T

L

E

A

M

A

N

S

T

R

E

E

T

M

E

R

S

O

N

S

T

R

E

E

T

D

R

U

M

M

O

N

D

C

R

T

D

R

U

M

M

O

N

D

C

R

T

D

R

U

M

M

O

N

D

C

R

T

D

-

1

D

-2

D-7

D

-

6

D-5

D

-

4

D

-3

Page 272: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

2 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITY TO KEEP ALLDETAILS AND DIMENSIONSOF THE WORK AND REPORT ANY DISCREPANCIES PRIOR TOWORK.

2. WHEREVER EXCAVATIONS ARE REQUIRED THE CONTRACTORSHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS, WATER, ELECTRICAL,ETC) PRIOR TO MAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITH ANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\LEA

MAN

STR

EET.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT - PHASE 1RFP/TENDER - P01.2019

LEAMAN STREET- HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONL-1

NO

RM

AN

DY

D

RIV

E

LEAMAN STREET

MH4714

MH4717

MH4718

MH4719

MH4450

MH4410

MH4411

MH4412

MH4413

L-11

L

-

1

0

L

-

9

L-8

L-7

L-6

L

-

5

DR

UM

MO

ND

CR

T

MH4417

L-12

MH4711

L-4

NOVALEA STREET

Page 273: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

1 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\LEA

MAN

STR

EET.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT - PHASE 1RFP/TENDER - P01.2019

LEAMAN STREET- HALIFAX

NO

RM

AN

DY

D

RIV

E

LEAMAN STREET

MH4714

MH4717

L

-

5

MH4711

L-4

MH4710

MH4709

MH4708

MH4694

L

-3

L-2L

-

1

LE

ED

S S

TR

EE

T

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITY TO KEEP ALLDETAILS AND DIMENSIONSOF THE WORK AND REPORT ANY DISCREPANCIES PRIOR TOWORK.

2. WHEREVER EXCAVATIONS ARE REQUIRED THE CONTRACTORSHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS, WATER, ELECTRICAL,ETC) PRIOR TO MAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITH ANY UTILITIES

LEGEND

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONL-1

Page 274: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: JAN. 2019SCALE: NTSDWG NO:

1 OF 4

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\DIN

GLE

ROAD

.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

DINGLE ROAD- HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONDI-1

D

I

N

G

L

E

R

O

A

D

MH6122

MH6123

MH6133

MH6134

MH6135

MH6136

MH6137

MH6138

D

I

-

1

D

I

-

2DI-3 DI-4

DI-5

D

I

-

6

D

I

-

7

DINGLE ROAD

Page 275: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: JAN. 2019SCALE: NTSDWG NO:

2 OF 4

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\DIN

GLE

ROAD

.DW

G

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONDI-1

DIN

GLE

RO

AD

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

DINGLE ROAD- HALIFAX

MH6136

MH6137

MH6138

D

I

-

5

D

I

-

6

DI-7

MH6139

MH6140

MH6141

MH6142

MH6143

MH6144

MH6145

DI-8

D

I-9

D

I

-

1

0

D

I

-

1

1

D

I

-

1

2

D

I

-

1

3

D

I

-1

4

Page 276: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: JAN. 2019SCALE: NTSDWG NO:

3 OF 4

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\DIN

GLE

ROAD

.DW

G

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONDI-1

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

DINGLE ROAD- HALIFAX

MH6145

D

I

-1

4

MH6146

MH6147

MH6706

MH6707

MH6708

MH6709

MH6710

MH6711

MH6712

D

I

-

1

5

D

I-1

6

D

I-1

7

D

I-1

8

D

I

-

1

9

D

I

-2

0

D

I

-

2

1

D

I

-

2

2

D

I

-

2

3

DI-24

Page 277: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: JAN. 2019SCALE: NTSDWG NO:

4 OF 4

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\DIN

GLE

ROAD

.DW

G

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONDI-1

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

DINGLE ROAD- HALIFAX

MH6709

MH6710

MH6711

MH6712

D

I

-2

0

D

I

-

2

1

D

I

-

2

2

D

I

-

2

3

DI-24

MH6713

MH6705

MH6728

MH6729

D

I

-

2

5

D

I

-

2

6

D

I

-

2

7

Page 278: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: JAN. 2019SCALE: NTSDWG NO:

1 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\ALB

ION

RO

AD.D

WG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

ALBION ROAD- HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONAL-1

A

L

B

IO

N

R

O

A

D

MH8371

MH8372

MH8373

MH8374

MH8375

MH8376

A

L

-1

A

L

-

2

A

L

-

3

AL-4

AL-5

A

L-6

P

U

R

C

E

L

L

S

C

O

V

E

R

O

A

D

Page 279: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: JAN. 2019SCALE: NTSDWG NO:

2 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\ALB

ION

RO

AD.D

WG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

ALBION ROAD- HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONAL-1

ALBION ROAD

MH8374

MH8375

MH8376

AL-4

AL-5

A

L-6

MH8377

MH8378

MH8379

MH8380

A

L

-7

A

L

-8

A

L

-

9

K

I

R

K

R

O

A

D

Page 280: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: JAN. 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\BU

RNS

DRIV

E.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

BURNS ROAD - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONB-1

MH6110

MH6111

MH6112

MH6113

MH6114

MH6115

MH6116

MH6117

MH6118

B-1

B-2B-3

B-4

B-5 B-6

B-7

B

-

8

BURNS DRIVE

P

U

R

C

E

L

L

S

C

O

V

E

R

O

A

D

MABOU AVE.

W

E

S

T

G

A

T

E

D

R

IV

E

F

L

E

M

IN

G

D

R

IV

E

Page 281: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: JAN. 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\FLE

MIN

G DR

IVE.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

FLEMING DRIVE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONF-1

D

I

N

G

L

E

R

O

A

D

FLE

MIN

G D

RIV

E

MH6123

MH6124

MH6125

MH6126

MH6127

MH6128

MH6129

MH6130

F-1

F

-2

F-3

F-4

F-5

F-6

Page 282: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\SHA

W C

RES.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

SHAW CRESCENT - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONSC-1

SH

AW

CR

ES

CE

NT

MH6100

MH6106

MH6107

SC

-1

SC

-2

WE

ST

GA

TE

DR

IVE

Page 283: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

1 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\WES

TGAT

E DR

IVE.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

WESTGATE DRIVE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONW-1

W

-

1

SH

AW

CR

ES

CE

NT

W

E

S

T

G

A

T

E

D

R

I

V

E

WE

ST

GA

TE

DR

IVE

MH6105

MH6107

MH6108

MH6109

MH6118

MH6119MH6120

MH6121

W

-

2

W-3

W

-4

W-5

W-6

W

-

7

B

U

R

N

S

D

R

I

V

E

Page 284: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

2 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\WES

TGAT

E DR

IVE.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

WESTGATE DRIVE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONW-1

W

E

S

T

G

A

T

E

D

R

I

V

E

MH6119

MH6120

MH6121

W

-

6

F

L

E

M

I

N

G

D

R

I

V

E

W

-

7

MH6130

MH6121

MH6121

MH6121

D

I

N

G

L

E

R

O

A

D

W-8W-9

W-10W-11

Page 285: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\KIR

K RO

AD.D

WG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

KIRK ROAD - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONK-1

K-1

MH6736

MH6737

MH6738

MH6739

MH8383

MH8382

MH8381

MH8380

K-2

K

-3

K

-

4

K-5

K

-

6

K

-

7

P

A

R

K

H

I

L

L

R

O

A

D

KIRK ROAD

K

I

R

K

R

O

A

D

A

L

B

I

O

N

R

O

A

D

M

C

M

A

N

U

S

R

O

A

D

Page 286: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\MCM

ANU

S RO

AD.D

WG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

MCMANUS ROAD - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONMC-1

M

C-1

MH8381

MH6714

MH6715

MH6716

MH6717

MH6718

M

C

-2

M

C

-3

MC-4

MC-5

K

I

R

K

R

O

A

D

M

C

M

A

N

U

S

R

O

A

D

K

IR

K

R

O

A

D

Page 287: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

2 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\MCM

ANU

S RO

AD.D

WG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

MCMANUS ROAD - OFF STREET - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONMC-1

M

C

M

A

N

U

S

R

O

A

D

M

I

L

T

O

N

D

R

I

V

E

MH6718

MH6719

MH6720

MH6721

MH6732

M

C

-

6

MC-7

MC

-8

MC-9

Page 288: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\PAR

KHIL

L RO

AD.D

WG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

PARKHILL ROAD - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONP-1

P-1

P

A

R

K

H

IL

L

R

O

A

D

MH6701

MH6702

MH6703

MH6704

MH6705

P-2

P-3

P

-4

P

A

R

K

H

IL

L

R

O

A

D

M

I

L

T

O

N

D

R

I

V

E

Page 289: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\MIL

TON

DRI

VE.D

WG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

MILTON DRIVE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONMD-1

M

ILT

O

N

D

R

IV

E

MH6734

MH6735

MH6731

MH67711

MH67709

MH6729

MD

-1

M

D

-

2

M

D

-

3

M

D

-

4

M

D

-5

Page 290: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\WHI

MSI

CAL

LAKE

CRE

SCEN

T.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

WHIMSICAL LAKE CRESCENT - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONW-1

INVERNESS AVE.

W

-

6

MH6279

MH6295

MH6293

MH6291

MH6289

MH6287

MH6285

W-5

W

-

4

W

-

3

W-2

W

-

2

W

H

I

M

S

I

C

A

L

L

A

K

E

C

R

E

S

C

E

N

T

Page 291: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\IN

VERN

ESS

AVE.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

INVERNESS AVE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONI-1

INVERNESS AVE.

W

H

I

M

S

I

C

A

L

L

A

K

E

C

R

E

S

C

E

N

T

MH6289

MH6289

MH6289

MH6289

MH6289

MH6289

MH6289

I

-

1

I

-

2

I-3

I-4

I-5

I-6

R

ED

W

O

O

D

A

V

E.

J

O

Y

C

E

A

V

E

.

Page 292: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\DU

NN

IKER

RO

AD.D

WG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

DUNNIKER ROAD - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONDU-1

DUNNIKER ROAD

J

O

Y

C

E

A

V

E

.

MH6416MH242

DU

-1

R

A

V

E

N

S

C

R

A

I

G

D

R

I

V

E

Page 293: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\JO

YCE

AVE.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

JOYCE AVE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONJ-1

D

U

N

N

I

K

E

R

R

O

A

D

J

O

Y

C

E

A

V

E

.

J

-

9

MH237

MH238

MH239

MH240

MH241

MH6275

MH6276

MH40607

MH40606

MH242

J

-

8

J

-

7

J

-6

J

-5

J-4

J

-3

J

-

2

J

-

1

H

U

B

L

E

Y

S

D

R

I

V

E

Page 294: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\AU

RORA

AVE

.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

AURORA AVE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONA-1

AURORA AVE.

MH281

MH280

MH279

MH278

MH277

A-1

A-2

A-3

A-4

S

E

A

V

IE

W

A

V

E

.

Page 295: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\CIR

CLE

DRIV

E.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

CIRCLE DRIVE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONC-1

MH293

MH292

MH291

MH290

MH258

MH259

C

-1

C-2

C-3

C

-4

C-5

CIR

CLE

DR

IV

E

C

H

E

R

R

Y

L

A

N

E

T

W

IN

O

A

K

S

R

D

.

ID

A

S

T

R

E

E

T

J

O

Y

C

E

A

V

E

Page 296: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\TW

IN O

AKS

ROAD

.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

TWIN OAKS RD- HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONT-1

T-1

TWIN OAKS RD.

MH263

MH262

MH258

T-2

C

I

R

C

L

E

D

R

I

V

E

H

E

R

R

I

N

G

C

O

V

E

R

O

A

D

Page 297: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\CHE

RRY

LAN

E.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

CHERRY LANE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONCH-1

CH

-1

CH

ER

RY

LA

NE

C

IR

C

L

E

D

R

IV

E

H

E

R

R

I

N

G

C

O

V

E

R

O

A

D

MH291

MH294

MH295

MH296

MH10462 CH

-2

CH-3

CH

-4

Page 298: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\HU

BLEY

OFF

STR

EET.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

HUBLEYS DRIVE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONHU-1

CIR

CLE

D

RIV

E

MH289

MH290

H

U

-1

HUBLEYS DRIVE

Page 299: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\NEW

TON

AVE

.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

NEWTON AVENUE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONNW-1

NEWTON AVENUE

MH2196

MH2197

MH2198 MH1839

MH1840

MH1841

NW-1N

W

-

2

NW-3

NW-4

NW-5

NW-6

C

H

E

B

U

C

T

O

R

O

A

D

FO

UR

TH

S

TR

EE

T

TH

IR

D S

TR

EE

T

TH

IR

D S

TR

EE

T

Page 300: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

2 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\NEW

TON

AVE

.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

NEWTON AVENUE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONNW-1

NEWTON AVENUE

MH1841

NW-5

NW-6

TH

IR

D S

TR

EE

T

TH

IR

D S

TR

EE

T

MH1842MH1536

MH1537

MH1535

NW-7 NW-9

N

W

-

8

SE

CO

ND

S

TR

EE

T

FIR

ST

S

TR

EE

T

FIR

ST

S

TR

EE

T

QU

IN

PO

OL R

OA

D

Page 301: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\CHE

BUCT

O R

OAD

.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

CHEBUCTO ROAD - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONCR-1

CHEBUCTO ROAD

MH2210

MH2193

MH2194

MH2191

CR

-1

C

R

-

2

CR

-4

MH2192

C

R

-3

C

H

E

B

U

C

T

O

R

O

A

D

N

E

W

T

O

N

A

V

E

N

U

E

C

O

N

N

A

U

G

H

T A

V

E

Page 302: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\CO

NN

AUGH

T AV

E.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019CONNAUGHT AVENUE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONCA-1

CH

EB

UC

TO

R

OA

D

BE

RL

IN

ST

RE

ET

CONNAUGHT AVE

MH2165

MH2166

MH2164

MH2194

C

A

-

1

CA-2

CA-3

BE

RL

IN

ST

RE

ET

Page 303: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\DU

BLIN

STR

EET.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

DUBLIN STREET - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONDS-1

DUBLIN STREET

BE

RL

IN

ST

RE

ET

MH3409

MH2758

MH2759

MH2760

MH2761

MH2776

MH2775

MH2779

MH2782

MH2783

MH2913

DS

-1

D

S

-

2DS-3

D

S

-

4

DS-5

D

S

-

6

DS-7

D

S

-

8

DS-9

LIV

ER

PO

OL

ST

RE

ET

LO

ND

ON

ST

RE

ET

ED

IN

BU

RG

H

ST

RE

ET

AL

MO

N

ST

RE

ET

Page 304: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\CO

RK S

TREE

T.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

CORK STREET - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONCK-1

CORK STREET

MH3402

MH3404

MH3405

CK-2

C

K

-

1

DU

BL

IN

ST

RE

ET

Page 305: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\WIN

DSO

R ST

REET

.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT -PHASE 1 RFP/TENDER - P01.2019

WINDSOR STREET - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONWD-1

MH3399

MH3407

MH3406

MH3411

W

D

-

1

WD-2 WD-3

WINDSOR STREET

CO

RK

S

TR

EE

T

YO

UN

G

ST

RE

ET

YO

UN

G

ST

RE

ET

LIV

ER

PO

OL

ST

RE

ET

Page 306: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

1 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\SEA

WO

OD

AVE.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT - PHASE 1RFP/TENDER - P01.2019

SEAWOOD AVE. - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONSW-1

MH23066

MH23065

MH23064

MH24235

MH24234

MH24233

SE

AW

OO

D A

VE

.

S

A

C

K

V

I

L

L

E

C

R

O

S

S

R

D

.

S

E

-

1

MH23063

SE

-2

SE

-4

SE

-3

S

E

-

5

S

E

-6

S

E

-7

Page 307: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

2 OF 2

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\SEA

WO

OD

AVE.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT - PHASE 1RFP/TENDER - P01.2019

SEAWOOD AVE. - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONSW-1

S

E

A

W

O

O

D

A

V

E

.

MH24234

MH24233

MH24232

MH24231

MH24230

MH24229

MH24228

MH24227

L

E

A

S

I

D

E

D

R

I

V

E

S

E

-

6

S

E

-

7

S

E

-

8

S

E

-

9

S

E

-

1

1

S

E

-

1

0

S

E

-

1

2

S

E

A

W

O

O

D

A

V

E

.

Page 308: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\LEA

SIDE

DR.

DWG

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT - PHASE 1RFP/TENDER - P01.2019

LEASIDE DRIVE EASEMENT - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONLE-1

S

E

A

W

O

O

D

A

V

E

.

L

E

A

S

I

D

E

D

R

I

V

E

S

A

C

K

V

I

L

L

E

D

R

I

V

E

MH16236

MH16235

MH24224

MH24225

MH24226

E

-

4

E

-

3

E

-

2

E-1

Page 309: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\LEA

SIDE

DR

EASE

MEN

T.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT - PHASE 1RFP/TENDER - P01.2019

LEASIDE DRIVE EASEMENT - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONLE-1

S

E

A

W

O

O

D

A

V

E

.

L

E

A

S

I

D

E

D

R

I

V

E

S

A

C

K

V

I

L

L

E

D

R

I

V

E

MH24232

MH24823

MH24822

MH24224

L

E

-

1

L

E

-

2 L

E

-

3

Page 310: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

DATE: APRIL. 2019SCALE: NTSDWG NO:

1 OF 1

REVISION 1. DRAWINGS DO NOT SHOW ALL EXISTING UTILITIES ANDOTHER FEATURES. THE CONTRACTOR SHALL OBTAIN ANDPROVE THE LOCATION OF UTILITIES AND SHALL BERESPONSIBLE FOR ADEQUATE PROTECTION FOR DAMAGE.DO NOT USE DRAWINGS FOR ANY EXCAVATION.

DATE BY. . .

DRAWN:

DESIGNED:

CHECKED:

ST

RL

DE

GENERAL NOTES

1. IT IS THE CONTRACTORS RESPONSIBILITYTO KEEP ALL DETAILS AND DIMENSIONSOF THE WORK AND REPORT ANYDISCREPANCIES PRIOR TO WORK.

2. WHEREVER EXCAVATIONS ARE REQUIREDTHE CONTRACTOR SHALL LOCATEANY EXISTING UTILITIES (SUCH AS GAS,WATER, ELECTRICAL, ETC) PRIOR TOMAKING ANY EXCAVATION AND SHALL NOTDAMAGE OR OTHERWISE INTERFERE WITHANY UTILITIES

LEGEND

PATH

: K:\

ENGI

NEE

RIN

G DE

PT\C

OM

MO

N\C

APIT

ALPR

OJE

CTSP

ENDI

NG\

2019

MAI

NLI

NE

LIN

ING\

DRAW

INGS

FO

R RF

P\ST

EVE

TEM

CHU

K CA

D DR

AWIN

GS\C

APIT

AL(2

019)

\SAC

KVIL

LE D

RIVE

.DW

G

2019 SEWER MAINLINE TRENCHLESS LINING PROJECT - PHASE 1RFP/TENDER - P01.2019

SACKVILLE DRIVE - HALIFAX

SEWER SECTIONS FOR REHABILITATION

ASSET SECTIONLE-1

LEASIDE

DRIVE

SACKVILLE

DRIVE

SA-4

MH16236

MH16237

MH16238

MH16239

MH16240

SA-3

SA-2

SA-1

Page 311: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 56

APPENDIX E -Existing CCTV, Record Drawing, Lateral Cards and HRM Traffic Restrictions

Page 312: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 57

To assist with proposal preparation, the following additional information in digital format is available to proponents by contacting Brent Hickman by email at [email protected] or phone at 902-490-4998 for receipt of a digital thumb drive storage device which will contain the following data. CCTV

Street Files Folder Years

1 – Sinclair Street Various VIDEO_TS Disc 1 and 2 (included for reference) 2017

1 – Sinclair Street Various VIDEO_TS Sinclair St - Post Construction Vids 2018

2 – High Street Various VIDEO_TS High VIDEO_TS 2011

3 – Drummond Street Various MP4 and pdf files Drummond Crt_2018_WW 2018

4 – Leaman Street Various MP4 and pdf files Leaman St_2018_WW Dr_WWSW_C_01 Dr_WWSW_C_01

2018

4 – Leaman Street Various MP4 and pdf files Leaman St_2018_WW_01 Dr_WWSW_C_01 Dr_WWSW_C_01

2018

5 – Dingle Road Various MP4 and pdf files Dingle Rd_2019_WW 2019

6 – Albion Road Various MP4 and pdf files Albion Rd2_2018_WW 2018

7 – Burns Drive Various MP4 and pdf files Burns Dr2_2018_WW 2018

8 – Flemming Drive Various MP4 and pdf files Fleming Dr_2018_WW 2018

9 – Shaw Crescent Various MP4 and pdf files Shaw Cres_2018_WW 2018

10 - Westgate Drive Various MP4 and pdf files Westgate Dr2_2018_WW 2018

11 – Kirk Road Various MP4 and pdf files Kirk Road_WW_C_01 2018

11 – Kirk Road Various MP4 and pdf files Kirk Rd_2019_WW 2019

12 – McManus Road Various MP4 and pdf files McManus Rd_2019_WW 2019

13 – McManus Road -Off Various MP4 and pdf files McManus Road to PS offstreet 2019

14 – Parkhill Road Various MP4 and pdf files Parkhill Rd_2019_WW 2019

15 – Milton Drive Various MP4 and pdf files Milton Dr2_2018_WW 2018

16 – Whimsical Lake Cr Various MP4 and pdf files Whimsical Lake Cres2_2018_WW 2018

17 – Inverness Avenue Various MP4 and pdf files Inverness Ave2_2018_WW 2018

17 – Inverness Avenue Various MP4 and pdf files Inverness Avenue_13-14 2013

18 – Dunniker Road Various MP4 and pdf files Dunniker Rd_2019_WW 2019

19 – Joyce Avenue Various MP4 and pdf files Joyce Ave_2019_WW 2019

Page 313: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 58

Street Files Folder Years

20 – Aurora Avenue Various MP4 and pdf files Aurora Ave_WWSW_C_01 2017

21 – Circle Drive Various MP4 and pdf files Circle Dr_2018_WW 2018

22 – Twin Oaks Road Various MP4 and pdf files Twin Oaks Rd_2019_WW 2019

23 – Cherry Lane Various MP4 and pdf files Cherry Ln_2019_WW 2019

24 – Hubley Drive - Off Various MP4 and pdf files Hubleys Dr_2018_WW 2018

25 – Newton Avenue Various MP4 and pdf files Newton Avenue June 24 2014 2014

25 – Newton Avenue Various MP4 and pdf files Newton Avenue_13-127 2013

26 – Chebucto Road Various MP4 and pdf files Chebucto Rd_2019_WWSW 2019

27 – Connaught Avenue Various MP4 and pdf files Connaught Ave_2019_WWSW 2019

28 – Dublin Street Various MP4 and pdf files Dublin St_2019_WWSW 2019

29 – Cork Street Various MP4 and pdf files Cork St_2019_WWSW 2019

30 – Windsor Street Various MP4 and pdf files Windsor St_2019_WWSW 2019

31 – Seawood Avenue Various MP4 and pdf files 2018_02_Seawood Ave_WW_C_01 2018

31 – Seawood Avenue Various MP4 and pdf files Seawood Ave _2019_WW 2019

32 – Leaside Drive Various MP4 and pdf files Leaside Dr_2019_WW 2019

34 – Sackville Drive Various MP4 and pdf file Sackville Dr_2019_WW 2019

Page 314: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 59

Record Drawing Information

Street Drawing No. Drawing Information Issued by Date

1 – Sinclair Street 17-152, 21-455, 21-456

Various Water and Sewer Plan and Profiles City of Dartmouth 1962, 1968

2 – High Street D88 and D1916 Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works 1947, 1948

3 – Drummond Street Field Book 44 Page 3

Field book page City of Halifax, Unknown Inspector 1948

4 – Leaman Street D103, D139 Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works 1947

5 – Dingle Road D973, D1079, D1228, D2253

Water and Sewer Plan and Profile

Public Service Commission, Halifax Water Works,

Halifax Water 1965, 1966, 2015

6 – Albion Road D1078,D1584, TT-21-21633R

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works,

City of Halifax 1966, 1976

7 – Burns Drive

D1069, TT-18-20313, TT-25-23226, TT-28-26007R, VV-2-

353

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works,

City of Halifax 1966, 1978

8 – Flemming Drive D1080,

VV-2-348, VV-2-349

Street and Traffic Renewal, Water and

Sewer Plan and Profiles

Public Service Commission of Halifax and City of

Halifax 1966

Page 315: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 60

Folder Drawing No. Drawing Information Issued by Date

9 – Shaw Crescent D1073, VV-2-354

Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works, City of

Halifax 1966

10 - Westgate Drive D1072,

VV-2-350, VV-2-351

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works and

City of Halifax 1966, 1967

11 – Kirk Road

D1077, D1072, VV-2-343, VV-2-367, VV-2-368

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works and

City of Halifax, Halifax Water

1966, 1967

12 – McManus Road D1074, D1229, VV-2-341

Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works and City of Halifax, Halifax

Water 1966, 1967

13 – McManus Road –Off Street

D1229, OO-11-19645,

VV-2-339, VV-2-340, VV-2-341, VV-3-381

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works, City of

Halifax 1966, 1967

14 – Parkhill Road D973, D1229, D2253, D5206

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works,

Halifax Water 1965, 2004

15 – Milton Drive D1070, D1081 Water and Sewer Plan and Profiles

City of Halifax, Clayton Development 1973, 1976

16 – Whimsical Lake Cr

D1749, D1752, D8379, D8380,

D8857

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works,

Halifax Water, AECOM 1980

17 – Inverness Avenue

040491102R, D8379,

TT-10-17859R, TT-47-31572, TT-51-32582, VV-2-

215

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works, City of Halifax Water, Crocker Engineering

1969, 2010

Page 316: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 61

Folder Drawing No. Drawing Information

Issued by Date

18 – Dunniker Road 07066404R D6148

Water and Sewer Plan and Profiles KVM Engineering 2005

19 – Joyce Avenue

02022001, 07010701R, 07066405R,

D1132, D2262, D7767,

TT-18-20599A-I, TT-30-26724,

TT-34-27621R, TT-39-29335R

VV-3-407, VV-3-408, VV-3-697

Various Water and Sewer Plan and Profiles

KVM Engineering, Public Service Commission,

Halifax Water Works, Halifax Water, City of

Halifax, County of Halifax

1967, 1974, 1984, 1996,

2004, 2006, 1965

20 – Aurora Avenue

09042501R, D1100, D1465, D1481, D6177, TT-23-22193, TT-23-22194, TT-23-22201, TT-23-22282,

TT-23-22283, TT-23-22490, TT-23-

22698, TT-23-22699, VV-2-280

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water, City of

Halifax, Eastpoint

1967, 1972, 1973, 1976, 2004, 2014,

21 – Circle Drive

D1102,

TT-30-26723, TT-34-27623,

VV-1-57, ,VV-2-279, VV-2-281, VV-2-283, VV-3-409, VV-3-411

Various Water and Sewer Plan and Profiles

County of Halifax, Service Commission, Halifax Water,

City of Halifax

1964, 1967,

1977

22 – Twin Oaks Road

D1103, D1234,

Water and Sewer Plan and Profiles

County of Halifax, , Public Service Commission, Halifax

Water 1967, 1968

23 – Cherry Lane

D1136, D1234,

D6177, TT-34-27623R,

VV-2-282, VV-3-412

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works,

Eastpoint, City of Halifax 1967, 1985,

Page 317: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 62

Folder Drawing No. Drawing Information

Issued by Date

24 – Hubley Drive - Off

D6177,

TT-34-27622, TT-34-27622R, TT-39-29334R

Various Water and Sewer Plan and Profiles City of Halifax, Eastpoint 1988, 2004

25 – Newton Avenue

JJ-6-8867,

TT-37-28540R, TT-41-29792R, TT-43-30398R

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works, City of

Halifax, HRM 1940, 1985,

2014,

26 – Chebucto Road D89,

TT-24-22895, TT-24-22896R

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works, 1947, 1976

27 – Connaught Avenue

D89, D129,

SS-2-14351a, TT-24-22895, TT-24-22896R

Various Water and Sewer Plan and Profiles

Public Service Commission, Halifax Water Works, 1947, 1976

28 – Dublin Street D76, D267, D506, D507, D771, D775, GG-4-6778

Various Water and Sewer Plan and Profiles

City of Halifax, Public Service Commission, Halifax

Water Works 1940, 1954,

29 – Cork Street D234, D248,

D771, GG-4-6778

Various Water and Sewer Plan and Profiles

City of Halifax, Public Service Commission, Halifax

Water Works 1930, 1949

30 – Windsor Street

D538, D9726,

Sewer Plan and Profiles Public Service Commission,

Halifax Water Works, Halifax Water

1955, 2015

31 – Seawood Avenue A19R, A41, A48, C13R,

C14R, C15R,

Various Water and Sewer Plan and Profiles County of Halifax 1970, 1975

32 – Leaside Drive

A19R, B62

Sewer Plan and Profiles County of Halifax 1970

34 – Sackville Drive A7R Sewer Plan and Profile County of Halifax 1973

Page 318: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 63

Lateral Cards Folder No. Year

1 – Sinclair Street Various

2 – High Street Various

3 – Drummond Street Various

4 – Leaman Street Various

5 – Dingle Road Various

6 – Albion Road Various 7 – Burns Drive Various

8 – Flemming Drive Various

9 – Shaw Crescent Various

10 - Westgate Drive Various

11 – Kirk Road Various 12 – McManus Road Various

13 – McManus Road –Off Street Various

14 – Parkhill Road Various

15 – Milton Drive Various

16 – Whimsical Lake Cr Various

17 – Inverness Avenue Various

18 – Dunniker Road Various

19 – Joyce Avenue Various

20 – Aurora Avenue Various

21 – Circle Drive Various

22 – Twin Oaks Road Various

23 – Cherry Lane Various

24 – Hubley Drive - Off Various

25 – Newton Avenue Various

26 – Chebucto Road Various

27 – Connaught Avenue Various

28 – Dublin Street Various

29 – Cork Street Various

Page 319: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 64

30 – Windsor Street Various

31 – Seawood Avenue Various

32 – Leaside Drive Various

34 – Sackville Drive Various

Page 320: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Sewer Mainline Trenchless Lining Project – Phase 1

May 2019

P09.2019 Page No. 65

HRM Traffic Control Requirements

Page 321: REQUEST FOR PROPOSALPO Box 8388, RPO CSC Halifax, Nova Scotia, B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Wednesday, May 29, 2019 for the above RFP as per the specifications

2019 Trenchless Relining Program ‐ Traffic Control Requirements

Street Name RestrictionsDetailed TCP Required? Notes

1 Sinclair St none Prince Albert RdGrahams Grove to Sinclair = 2 lanes at all times, PHRSinclair to Alderney = PHR

Yes (S‐13)Bus routeS‐1 to 13 between Hawthorne and Prince Albert

2 High St (Halifax) none Lady Hammond Rd Mackintosh to Robie = PHR Yes (H‐5 and 6)H‐1 to 5 between Leeds and Lady HammondH‐6 on Lady Hammond

3 Drummond Crt none none D‐1 to 7 between Leaman and Leaman

4 Leaman St none noneL‐1 to 11 between Leeds and Drummond (S)L‐12 between Leaman and Novalea (private property)

5 Dingle Rd none Purcells Cove Rd Herring Cove to John Brackett = PHRDI‐1 to 13 between Purcells Cove and endDI‐14 to 27 on Park property

6 Albion Rd none Purcells Cove Rd Herring Cove to John Brackett = PHR AL‐1 to 9 between Purcells Cove and Kirk

7 Burns Dr none Purcells Cove Rd Herring Cove to John Brackett = PHRB‐1 to 3 between Purcells Cove and WestgateB‐4 to 8 on Park and private property

8 Flemming Dr none none F‐1 to 6 between Dingle and end9 Shaw Cres none none SC‐1 and 2 between Westgate and Westgate

10 Westgate Dr none Purcells Cove Rd Herring Cove to John Brackett = PHRW‐1 to 4 between Shaw (S) and endW‐5 to 11 on Park property

11 Kirk Rd none none K‐1 to 7 between Parkhill and Albion (some private property)

12 McManus Rd none none MC‐1 to 5 between Kirk and end (some private property)13 McManus Rd (off‐street) N/A N/A MC‐6 to 9 private property14 Parkhill Rd none Purcells Cove Rd Herring Cove to John Brackett = PHR P‐1 to 4 between Kirk and Dingle15 Milton Dr none none MD‐1 to 5 Parkhill to end (private property)16 Whimsical Lake Cres none none W‐1 to 6 between Inverness and Inverness

17 Inverness Ave none Purcells Cove Rd Herring Cove to John Brackett = PHR I‐1 to 6 between Joyce and Whimsical Lake (N) (private property)

18 Dunniker Rd none none DU‐1 between Ravenscraig and Joyce19 Joyce Ave none none J‐1 to 9 between Circle and end20 Aurora Ave none none A‐1 to 4 between Seaview and end21 Circle Dr none Herring Cove Rd Highfield to Greystone = 2 lanes at all times C‐1 to 5 between McMullen and Ida22 Twin Oaks Rd none Herring Cove Rd Highfield to Greystone = 2 lanes at all times T‐1 and 2 between Herring Cove and Circle23 Cherry Lane none Herring Cove Rd Highfield to Greystone = 2 lanes at all times CH‐1 to 4 between Herring Cove and Circle24 Hubleys Dr none none HU‐1 between Circle and Hubleys (private property)

25 Newton Ave noneChebucto RdQuinpool Rd

Mumford to North = 2 lanes at all times, PHRCivic 7121 to Robie = 2 lanes at all times, PHR

Yes (NW‐1, NW‐9)NW‐1 to 9 between Chebucto and QuinpoolPlanned work should be delayed due to Quinpool closure

26 Chebucto RdArmdale to Mumford = 2 lanes at all times, evening/weekend onlyMumford to North = 2 lanes at all times, PHRNorth to Windsor = PHR

Connaught Ave Windsor to Jubilee = 2 lanes at all times, PHR in peak direction YesBus routeCR‐1 to 4 between Newton and ConnaughtPlanned work should be delayed due to Quinpool closure

27 Connaught Ave Windsor to Jubilee = 2 lanes at all times, PHR in peak direction Chebucto Rd Mumford to North = 2 lanes at all times, PHR YesBus route (Windsor to Bayers, Chebucto to Quinpool)CA‐1 to 3 between Berlin and ChebuctoPlanned work should be delayed due to Quinpool closure

28 Dublin St none none DS‐1 to 9 between Liverpool and Berlin29 Cork St none none CK‐1 and 2 near Dublin

30 Windsor StBedford Hwy to Connaught = 2 lanes at all times, PHRConnaught to Quinpool = PHR

Young StBayers Rd

Windsor to Robie = 2 lanes at all times, PHRConnaught to Windsor = 2 lanes at all times, PHR

YesBus route (Bedford Hwy to Cunard)WD‐1 to 3 between Young and Liverpool

31 Seawood Avenue ‐ Sackville none none SE‐1 to  12 between Sackville Cross rd and Leaside Dr

32‐33

Leaside Drive ‐ Sackville none Sackville Dr Millwood to Bedford Hwy = 2 lanes at all times, PHR LE‐1 to 3 Between Seawood and Leaside (Some private property)

34 Sackville Drive ‐ SackvillePatton Road (North Intersection) to Millwood Dr = PHRMillwood to Bedford Hwy = 2 lanes at all times, PHR

none YesBus routeSA‐1 to 4E‐1 to 4 (between Seawood & Sackville dr)

Cross Street Restrictions

Phase 1