request for proposal (rfp) document for · request for proposal 1 ... iii sample forms of...
TRANSCRIPT
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 1
EAST DELHI MUNICIPAL CORPORATION
REQUEST FOR PROPOSAL (RFP) DOCUMENT
FOR
PROJECT MANAGEMENT CONSULTANCY
FOR PROPOSED MULTI-STORIED OFFICE COMPLEX BUILDING
AT KARKARDOOMA INSTITUTIONAL AREA
SHAHDARA (SOUTH) ZONE DELHI
OFFICE OF EXECUTIVE ENGINEER (PROJECT)
SHAHDARA SOUTH ZONE
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 2
TABLE OF CONTENTS
Section Title
PART A
I INVITATION FOR BIDS (IFB)
II INSTRUCTIONS TO CONSULTANTS
III SAMPLE FORMS OF ACCEPTANCE, CONTRACT
PART B
IV GENERAL CONDITIONS OF CONTRACT, ADDITIONAL
CONDITIONS & SCOPE OF WORK
V TECHNICAL BID FORMAT
VI FINANCIAL BID FORMAT
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 3
Part A
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 4
SECTION I
EAST DELHI MUNICIPAL CORPORATIOON
ENGINEERING DEPARTMMENT
OFFICE OF EXECUTIVE ENGINEER (PROJ.) SHAHDARA (SOUTH)
Notice Inviting Tender (NIT)
No. EE(Pr.)Shah.(S)/2012-13/TC/D-30 Dated : 28.12.2012
PROJECT MANAGEMENT CONSULTANCY
FOR
PROPOSED MULTI-STORIED OFFICE COMPLEX BUILDING
AT
KARKARDOOMA INSTITUTIONAL AREA SHAHDARA (SOUTH) ZONE
DELHI
1. The EAST DELHI MUNICIPAL CORPORATION (EDMC) invites sealed Proposals
from the eligible Consultants for Project Management consultancy for proposed Multi-
Storied Office Complex Building at Karkardooma Institutional area, Shahdara (South)
Zone. Delhi.
2. Interested eligible Consultants may obtain the Request for Proposal document from the
office of:
“Executive Engineer (Project) Shah. (South)
East Delhi Municipal Corporation
E-1/12, Krishna Nagar,
Delhi-110051”
Phone: 011-22092309
against bid document fee of Rs. 1000/- to be deposited in the shape of pay
order/demand draft in favour of Commissioner, EDMC. The RFP document can be
obtained on any working day from 01.01.13 to 15.01.13.
3. RFP document can also be downloaded from Municipal website
www.mcdonline.gov.in. However bid fee of Rs. 1000/- have to be deposited in the
shape of pay order/demand draft in favour of Commissioner EDMC along with the
tender bid document at time of submission.
4. Two sets (one marked "Original", and other marked "Duplicate") of the sealed
Proposals must be received at the above mentioned office only and accompanied by a
Earnest Money Deposit (EMD) of Rs 1,00,000/- ( Rs. One lacs only) to be deposited in
the shape of pay order/demand draft in favour of Commissioner EDMC so as to reach
before 03.00 P.M on [21.01.13] by post or by dropping in the Office of SE (Project),
Shah. (South) A1-104, Ist Floor, Udyog Sadan, Plot No. 419, Patparganj Industrial
Area, Delhi-110092.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 5
5. The Technical and Financial Proposals shall be submitted in two separate covers
(clearly marked “Technical bid” and “Financial bid”).
6. Cover-A (technical bid) will be opened on 21.01.13 in the presence of Consultant's
representatives who choose to attend at 4 p.m. in the Office of SE (Project), Shah.
(South) A1-104, Ist Floor, Udyog Sadan, Plot No. 419, Patparganj Industrial Area,
Delhi-110092. Bids not accompanied by EMD will be considered non- responsive.
7. Cover-B (financial bid) of only those Consultants who are found substantially suitable
in the technical bid on evaluation will be opened. Cover-B of those Consultants not
substantially responsive shall be returned to the Consultants unopened.
All the proposals will be assessed in accordance with good professional practice and will
involve both technical as well as financial evaluation. The weightages and associated
specific technical evaluation criteria are given as under:
Technical Bid
Experience in similar works (last seven years)
Annual turn over (last three years)
Key personnel proposed for the assignment – general qualifications,
appropriate experience and track record, experience in the region/state
20%
20%
20%
Financial Bid 40%
8. The successful Consultant will be chosen from the group of qualifying Consultants
(“eligible Consultants for financial bid”) achieving benchmark score after technical bid
evaluation as per the criteria set out by the evaluation committee as mentioned in
section 8 above. The final qualifying Consultant for the assignment will be the one
who scores highest cumulative marks from technical and financial evaluation.
All information contained in this package should be treated as confidential and you are
required to limit dissemination on a need-to-know basis.
Executive Engineer (Proj.) Shah. (South)
Engineering Department
East Delhi Municipal Corporation
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 6
SECTION II
INSTRUCTIONS TO CONSULTANTS
1. General
These instructions set out the requirements for the production of a proposal in a
form acceptable to the East Delhi Municipal Corporation (hereinafter referred to as
“EDMC”).
The consultants are invited to submit a technical and a financial proposal for
consulting services required for Project Management consultancy for proposed
Multi-Storied Office Complex Building at Karkardooma Institutional area,
Shahdara (South) Zone. Delhi. The EDMC will select a firm/ consortium from
among shortlisted firms in accordance with the method of selection indicated in
this Request for Proposal (RFP). The proposal will be the basis for contract
negotiations and ultimately signing the contract with selected firm/consortium.
2. Invitation to Submit a Proposal
This "Request for Proposal" comprises:
- Covering Letter
- Instructions to Consultants
- Standard Form of Contract
- Terms of Reference
- Forms of Proposal
3. Clarifications
A prospective Consultant requiring any clarification on the RFP document may
notify EDMC in writing or by facsimile within 7 days of close of date for obtaining
the RFP document. At its sole discretion, EDMC may forward to each Consultant,
a copy of EDMC response, including a description of the enquiry but without
identifying its source.
All correspondence / enquiries should be submitted to the following in writing by
fax/ registered post / courier:
SUPERINTENDING ENGINEER (Projects),
A1-104, Ist Floor, Udyog Sadan,
Plot No. 419, Patparganj Industrial Area,
Delhi-110092
4. Language and Currency
4.1 The Proposal and all related correspondence and documents shall be written in
the English language.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 7
4.2 The currency for the purpose of the Proposal shall be the Indian Rupee (INR).
4.3 The rates must be quoted in figures and words both. In case of any discrepancy in
rates quoted under words and figures, the rates quoted in words will prevail.
5. Validity of Proposal
5.1 The Proposal shall indicate that it would remain valid for a period not less than
ninety days (90) days from the Proposal Due Date. EDMC reserves the right to
reject any proposal that does not meet this requirement.
5.2 Prior to expiry of the Proposal Validity Period, EDMC may request the
Consultants to extend the period of validity for a specified additional period.
5.3 The Successful Consultant shall, where required, extend the Proposal Validity
Period till the date of execution of the consulting contract.
6 Site Visit
6.1 Consultants may carry out site visit at any time at their cost prior to preparation of
proposal.
6.2 The Consultant would be granted permission by EDMC for visit to the site on
receipt of a formal written request, reasonably in advance of the proposed date of
visit.
7. Preparation of Technical Proposal
While preparing the technical proposal, the consultant must give particular
attention to the following:
a. If a firm considers that it does not have all the expertise for the assignment, it
may obtain a full range of expertise by associating with any other individual
consultants and/or firms
b. If named personnel are not employees of the lead firm, or if the lead firm
intends to sub-contract some or all of the services, it must also include with its
proposal a letter from each such individual or sub-contractor confirming that
they have agreed in principle to do the job should the lead firm organisation
win the contract
c. The proposal should be based on the number of professional staff-days
estimated by the firm
d. It is desirable that the majority of key professional staff proposed be permanent
employees of the lead firm
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 8
The technical proposal must provide the following information:
i. Structure and organization of the firm with complete details as per Annexure-
A.
ii. Details of all building works completed in the last seven years as Project
Management Consultants as per Annexure-B.
iii. Details of all projects underway or awarded as Project Management
Consultants as per Annexure-C.
iv. Details of Technical and Administrative / Management Personnel as per
Annexure-D
v. Any additional information requested in this document
The technical proposal shall not include any financial information.
8. Preparation of Financial Proposal
In preparing the financial proposal, consultants are expected to take into account
the requirements and conditions of the RFP. The financial proposal shall include
all costs associated with the assignment.
Costs must be expressed (and will be paid) only in Indian Rupees (INR).
9. Submission of Proposal
9.1 Consultants would provide all the information as per this RFP and in the specified
format. EDMC reserves the right to reject any Proposal that is not in the specified
format.
9.2 The Proposal should be submitted in two covers:
Part I – Technical Bid
Technical Bid as per the format described in Section V, along with relevant
supporting documents
Part II - Financial Bid
Financial Submission as per the financial submission format described in Section
VI
9.3 The Consultant shall prepare one original copy of the Proposal, clearly marked
"ORIGINAL". In addition, the Consultant shall make one (1) copy of the Proposal,
clearly marked "DUPLICATE". In the event of any discrepancy between the
original and the copy, the original shall prevail.
9.4 If the proposal consists of more than one volume, Consultant must clearly number
the volumes and provide an indexed table of contents.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 9
9.5 The Proposal and its copy shall be typed or printed. All the alterations, omissions,
additions, or any other amendments made to the Proposal shall be initialed by the
person(s) signing the Proposal.
9.6 An authorized representative of the lead firm should initial all pages of the
proposal.
10 Sealing and Marking of Proposals
10.1 The Consultant shall seal the Part I and Part II of the Proposal in separate
envelopes, duly marking the envelopes as "PART I: TECHNICAL BID" and
"PART II: FINANCIAL BID".
10.2 The original and duplicate of the Proposal shall be provided in separate envelopes,
duly marking the outer envelopes as "ORIGINAL" and "DUPLICATE".
10.3 The original and duplicate of the Proposal should then be sealed in one common
envelope.
10.4 All the envelopes shall indicate the Name and Address of the Consultant.
10.5 All the envelopes shall clearly bear the following identification:
“Proposal for consulting services required for Project Management
consultancy for proposed Multi-Storied Office Complex Building at
Karkardooma Institutional area, Shahdara (South) Zone. Delhi”.
10.6 All the envelopes shall be addressed to:
SUPERINTENDING ENGINEER (Projects),
A1-104, Ist Floor, Udyog Sadan,
Plot No. 419, Patparganj Industrial Area,
Delhi-110092
10.7 If the envelopes are not sealed and marked as instructed above, the Proposal may
be deemed to be non-responsive and liable for rejection. EDMC assumes no
responsibility for the misplacement or premature opening of the Proposal submitted
if the same is not in accordance with the prescribed format.
11 Proposal Due Date
11.1 Proposals should be submitted before 03:00 PM on or before 21.01.13, at the
address provided in Clause 10.6, Section II in the manner and form as detailed in
this RFP. Proposals submitted by either facsimile transmission or telex or e-mail
will not be accepted.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 10
11.2 EDMC, at its sole discretion, may extend the Proposal Due Date by issuing an
Addendum.
12 Late Proposals
Any Proposal received by EDMC after the Proposal Due Date will be returned
unopened to the Consultant.
13 Modification and Withdrawal of Proposals
13.1 The Consultant may modify or withdraw its Proposal after submission, provided
that written notice of the modification or withdrawal is received by EDMC before
the Proposal Due Date. No Proposal shall be modified or withdrawn by the
Consultant after the Proposal Due Date.
13.2 The Consultant's modification or withdrawal notice shall be prepared, sealed,
marked and delivered in accordance with the provisions of Clause 10 with
envelopes additionally marked "MODIFICATION" or "WITHDRAWAL" and also
"PART I: TECHNICAL BID" or "PART II: FINANCIAL BID" as appropriate.
14 Bid Security/EMD
14.1 Each Project Proposal submitted by the Consultant shall be accompanied by Bid
Security of Rs.1,00,000/- (Rupees one lacs only) to be deposited in the shape of
pay order/demand draft in favour of Commissioner EDMC.
14.2 The Bid Security shall be kept valid throughout the Proposal Validity Period and
would need to be extended, if so required by EDMC, for any extension in Proposal
Validity Period.
14.3 The Bid Security shall be in the form of a DD/Cheque in favour of Commissioner
EDMC payable at Delhi.
14.4 The Bid Security of the selected applicant will be refunded/adjusted in final bill on
completion of the project.
14.5 The Bid Security of every unsuccessful Consultant would be returned within a
period of three (3) weeks from the date of announcement of the Successful
Consultant.
14.6 The Bid Security shall be forfeited in the following cases:
1. If the Consultant modifies/ withdraws its Proposal except as provided in
Clause 13;
2. If the Consultant withdraws its Proposal during the interval between the
Proposal Due Date and expiration of the Proposal Validity Period;
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 11
3. If any information or document furnished by the Consultant turns out to be
misleading or untrue in any material respect
15 Evaluation of Proposal
Proposals will be assessed in accordance with good practices and will involve
evaluation of both technical and financial submissions.
The specific evaluation criteria is given in para 8 Section 1.
Financial submission of only those consultants who achieve the Benchmark Score
for their technical proposal would be opened and ranked on pro rata basis as
defined in “financial bid evaluation” of clause 16.2.
16 Evaluation Methodology (100 marks)
16.1 Technical Bid Evaluation (60 marks)
a. This score shall be based on an assessment of the Technical Submission of the
consultant. The total maximum points under this evaluation of Technical
Proposal are 60 marks.
b. The computation of the Technical Status of Consultant Assessment would be
based on the details provided in Technical Bid.
c. The bidder should have an average turnover of Rs. 50 lacs. During the last 3
financial years (2008-09, 2009-10 & 2010-11). The turnover should not
include transactions with its subsidiary.
d. The bidder should have completed or currently executing at least one project of
similar nature of project management consulting value of not less than 2.5
crores or two similar projects for project management consulting value of not
less than Rs. 1.5 crores each or three similar projects for project management
consulting value of not less than Rs. 1.00 crores each in the last seven years.
e. The evaluation on the Present Technical Proposal would be qualitative & to the
best judgment & discretion of EDMC evaluation committee. The marks so
assigned by EDMC or its Consultant(s) or Advisor(s) would be final and
binding on the Consultant.
f. The composite score under the Technical Proposal would be the arithmetic
sum of the marks assigned to the Consultants under each of the parameters
listed above in clause 16.1.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 12
g. The Benchmark Score to be achieved for technical submissions will be
decided by the EDMC evaluation committee.
16.2 Financial Bid Evaluation - ( 40 marks)
a. Financial proposals shall be opened for only those consultants who would have
obtained benchmark (as per clause 16.1 of RFP) score in technical bid section.
b. EDMC shall notify in writing to the consultants that pass the minimum
technical score, and indicate the date and time for opening the financial
proposals. On opening the financial proposals, the EDMC will notify the
concerned consultants.
c. This score shall be based on an assessment of the Financial Submission of the
Consultant. The total maximum points under this evaluation of Financial
Submission are 40 marks.
d. The lowest financial quotation will be given a score of maximum 40 marks and
highest quotation will be given a score of 10 marks. The financial scores of the
other proposals will be computed on a pro-rata basis.
16.3 The scores assigned for each of the parameters would be rounded off to two
decimal places.
16.4 Proposals will be finally ranked according to their composite technical and
financial scores. The firm achieving the highest combined technical/financial score
will be invited for negotiation.
17 Negotiations
17.1 The objective of negotiations is to reach an agreement on all points and sign a
contract. The negotiations shall be held with the firm achieving the highest
combined technical/financial score.
17.2 Negotiations will include discussions on technical proposal, work plan, staffing
and on the financial bid.
17.3 In the event the negotiations fail with the firm achieving the highest composit
technical and financial score, EDMC will have liberty to negotiate with the second
ranked consultant.
18. Confidentiality
Information relating to the examination, clarification, evaluation and
recommendation for the short-listed Consultants would not be disclosed to any
person not officially concerned with the process. EDMC would treat all
information submitted as part of the Proposal in confidence and will ensure that all
who have access to such material treat it in confidence. EDMC would not divulge
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 13
any such information unless ordered to do so by any Government authority that has
the power under law to require its disclosure.
SECTION III
LETTER OF ACCEPTANCE
(Letterhead paper of Employer)
No. ___________ Date: ________________
To:
________________________
________________________
________________________
Dear Sirs,
1. This is to notify you that your bid dated for Carrying out
Project Management consultancy for proposed Multi-Storied Office Complex
Building at Karkardooma Institutional area, Shahdara (South) Zone. Delhi. for the
Contract Price of Rs __________ (Rupees amount in number and words), is hereby accepted by East Delhi Municipal Corporation.
We request that, within 15 days of the date ISSUE of this Letter of Acceptance, you
prepare the Advisory Services Agreement, in duplicate, on Government Stamp Paper and
meet with the undersigned at the address provided during normal office hours on any
working day to sign the said Agreement.
One copy of the signed Agreement will be provided to you for your files, while the
original copy will remain with us.
Yours faithfully,
Executive Engineer (Proj.), Shah. (South)
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 14
(STAMP TO BE INSERTED HERE)
AGREEMENT
PROJECT MANAGEMENT CONSULTANCY FOR PROPOSED MULTI-STORIED OFFICE
COMPLEX BUILDING AT KARKARDOOMA INSTITUTIONAL AREA, SHAHDARA (SOUTH)
ZONE. DELHI.
Contract Number:
This Agreement made this day of 20 between Executive
Engineer (Proj.) Shah. (South) on behalf of Commissioner EDMC (hereinafter called the
Employer) of the one part and ______________________________________________
(hereinafter called the Consultant) of the other part.
Whereas the Employer is desirous to hire Consulting services for Carrying out Project
Management consultancy for proposed Multi-Storied Office Complex Building at
Karkardooma Institutional area, Shahdara (South) Zone. Delhi. and has accepted a Bid by
the Consultant for the execution and completion of such works and the remedying of any
defects therein.
Now this Agreement witnesseth as follows:
1. The following documents shall be deemed to form and be read and construed as
part of this Agreement, viz.:
(a) The Letter of Acceptance;
(b) The Instruction to Consultants;
(c) The Technical Bid;
(e) General Conditions of the Contract & Schedule of Payment; and
(f) The Financial Bid
2. In consideration of the payments to be made by the Employer to the Consultant as
hereinafter mentioned, the Consultant hereby covenants with the Employer to carry
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 15
out the works and remedy any defects therein in conformity in all respects with the
provisions of the Contract.
3. The Employer hereby covenants to pay the Consultant in consideration of the
execution and completion of the works and the remedying of defects therein the
Contract Price or such other sum as may become payable under the provisions of
the Contract at the times and in the manner prescribed by the Contract.
In Witness whereof the parties hereto have caused this Agreement to be executed
on______ day of ___________month and year___________.
Signed, Sealed and Delivered in the presence of:
Binding Signature of Employer
Binding Signature of Consultant
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 16
PART B
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 17
SECTION IV
General Conditions of the Contract
1 LANGUAGE AND LAW
1.1 The language of the contract is English and the law governing the contract is that in force in
the State of Delhi, India.
2 DEFINITIONS
2.1 “EDMC” means the East Delhi Municipal Corporation
2.2 "the Consultants" means the firm or company with whom the Contract is placed.
2.3 "the Contract" means the contract between EDMC and the Consultants consisting of this
Contract and the documents listed therein.
2.4 "the Services" means those activities more particularly defined in Section IV (Terms of
Reference/Scope of Work) as referred to RfP document.
2.5 "the Contract Price" means the total Contract price to be paid by EDMC to the Consultants
for the performance of their obligations under this contract.
3 PREVIOUS COMMUNICATIONS
3.1 This Contract constitutes the entire agreement and supersedes all previous
communications between the parties.
4 NOTICE
4.1 Any notification under this Contract shall be served on the party concerned when
received by hand delivery, courier delivery, or registered letter at the addresses given
below:
“Executive Engineer (Project) Shah. (South)
East Delhi Municipal Corporation
E-1/12, Krishna Nagar,
Delhi-110051”
Phone: 011-22092309
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 18
5 DELEGATION
5.1 The Executive Engineer (Proj.) Shah. (South) of the Engineering Department of
EDMC or any other competent person appointed by the Employer and notified to the
Consultant, to act in replacement of the Executive Engineer (Proj.) Shah. (South), is
designated by the Employer to represent the Employer in all dealings with the Consultant
concerning the work, including administering the Contract, certifying payments due to the
Consultant, issuing and valuing variations to the Contract, awarding extensions of time,
and valuing the compensation Events.
5.2 The Consultant shall designate in writing to the Employer a representative, to be its
authorised representative in all dealings with the Employer concerning the work.
6 COMMUNICATIONS
6.1 Communications between parties, which are referred to in the conditions, are effective
only when in writing.
7 TIME PERIOD
7.1 The project is scheduled to be completed within a period of 36 months from the effective
date of construction contract. In case of delay not attributable to the consultant, the
completion period shall stand extended. However, the delay caused by consultant shall
qualify for penal action.
7.2 When there is an upward revision of time schedule of the project, the consultant shall seek
extension of time, well in advance from EDMC, bringing out reasons for the revision.
EDMC has the sole authority to accord extension of time, with or without compensation in
favour of EDMC or the consultant.
8 FEES
8.1 Payment shall be made in Indian Rupees.
9 ACKNOWLEDGEMENT
9.1 The Consultants shall confirm acceptance of the terms of this Contract by signing and
returning the duplicate copy enclosed herewith within a period of 15 days.
10 PERSONNEL
10.1 The Consultant shall employ the key personnel to carry out the assigned job as stated in
the Terms of Reference or such other personnel approved by the Employer. The Employer
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 19
will approve proposed replacement of key personnel only if their qualifications, abilities,
and relevant experience are equal or better than those of the personnel proposed to be
replaced.
10.2 If the Employer asks the Consultant to remove any of its or its Subcontractor's
personnel and states his reasons, the Consultant is to ensure that such personnel leaves the
Site and has no further connection with the work.
10.3 The Consultants are responsible for all acts and omissions of persons engaged by the
Consultants whether or not in the course of performing the services and for the health, safety
and security of such persons and their property and the Consultant shall indemnify EDMC in
respect of any claim (including legal costs incurred by EDMC in defending such claim)
made against EDMC.
11 SUBCONTRACTING
11.1 If the Consultant causes any part of the Work to be performed by a Subcontractor,
the provisions of this Contract shall apply to such Subcontractor or his employees as if he
or it were employees of the Consultant and the Consultant shall be liable for the work of
the Subcontractor. No subcontract shall be made without the prior written approval of the
EDMC.
12 INVOICING INSTRUCTIONS
12.1 Invoices for work undertaken by Consultants in respect of the Services must be presented in
duplicate.
12.2 Invoices should bear the Contract reference, be numbered sequentially and dated, and
marked "For the attention of the Executive Engineer (Proj.) Shah. (South)" named in Section
1 Clause 4 of the RFP.
12.3 All invoices should be signed by the Partner or Director in charge of the Consultants' team
or by the Project Leader.
12.4 Any invoice not presented in accordance with the above may be rejected and in any event
shall be liable to query and delay in payment.
13 CONTRACTOR'S RISKS
Except as in section 15 of this contract, consultant shall be solely responsible for all risks
of loss of or damage to physical property and of personal injury and death which arise
during and in consequence of its performance of the Contract.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 20
14 EMPLOYER'S RISKS
The Employer shall be responsible for excepted risks which are (a) insofar as they directly
affect the execution of the work in the Employer's country, the risks of war, hostilities,
invasion, act of foreign enemies, rebellion, revolution, insurrection or military or usurped
power, civil war, riot, commotion or disorder (unless restricted to the Contractor's
employees), and contamination from any nuclear fuel or nuclear waste or radioactive toxic
explosive.
15 INDEMNITIES
15.1 Each party shall be liable for and indemnify the other Party against losses,
expenses and claims for loss or damage to physical property, personal injury, and death
caused by his own acts or omissions
15.2 Notwithstanding Clause 16.1 above, the Consultant shall be solely responsible for
and shall indemnify and hold harmless the Employer from and against all claims,
liabilities and costs of action in respect of injury to or death of any person in the
employment of the Consultant or any of its Subcontractors.
15.3 The Consultant shall indemnify and hold the Employer harmless against all third-
party claims of infringement of industrial design or intellectual property rights arising
from the use or provision of the works, including any Plant, Construction Documents or
Materials, or any part thereof.
16 TERMINATION AND DISPUTE RESOLUTION
16.1 Each of the parties shall be entitled to terminate this assignment after providing
written notice of 30 days to the other party. In the event of such termination, the
Consultant shall be entitled to receive payment from EDMC in respect of all Services
performed up to the date of such termination, including payment for deliverables which
have been performed in part at the time of such termination and EDMC will be at liberty
to deduct all costs incurred by EDMC as a result of such termination.
16.2 The Employer and the Consultants shall make every effort to resolve amicably by
direct informal negotiation any disagreement or dispute arising between them under or in
connection with the Contract.
16.3 If the parties fail to resolve such a dispute or difference by mutual consultation
within twenty-eight (28) days from the commencement of such consultation, either party
may require that the dispute be referred to adjudication /arbitration in accordance with the
laws of land.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 21
17 CONFIDENTIALITY
The Consultant hereby undertakes to maintain secrecy and confidentiality of the
information / documents received by it and knowledge acquired by it from EDMC, in the
course of performance of the Services. This obligation shall not apply to information in the
public domain, already known/deemed to be known to the public or information acquired
from a third party or information required to be disclosed to a court or government agency
or pursuant to any statute. The Consultant shall wherever possible, inform EDMC before
submission of any information to a court or government agency pursuant to such statutory
obligation.
The Consultant and EDMC hereby agree and undertake to treat all correspondence
exchanged between the Consultant and EDMC with regard to the Services as confidential
and privileged, unless otherwise agreed to by the Parties.
18 Performance Guarantee Deposit (PGD)
The successful applicant shall deposit a bank guarantee issued from any
nationalized/scheduled bank to the tune of 5% of his quoted price (including earnest
money deposited) taking initial cost of the project as Rs. 87.00 crore in favour of
Commissioner, EDMC valid initially for a period of 3 years which can be extended
upto the completion of the project. In case of requirement of extension of bank
guarantee such extension will have to be submitted before one month of expiry of the
existing validity. This performance guarantee will have to be a submitted/deposited
within 14 days of issue of letter of award.
19 Terms of Payment
No advance payment of fee shall be made. Payment schedule will be as follows:-
Payment Stages and milestones Payment in percentage of total awarded
consultancy value
(1) Pre-construction stage 5%
-Checking of design, specifications,
analysis and justification. Bid evaluation
and selection of vendor
5%
(2) During Construction Stage
In proportion to accepted financial progress
70%
(3) Post Construction Stage 25%
On completion & commissioning of project
and certification of satisfactory defect
removal
15%
On submission of As-built drawings and
SMB and maintenance manual
10%
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 22
10% of the passed bill for consultancy fee will be deducted upto the extent of 5% of total
consultancy fee as security which will be released after completion of defect liability
period along with performance guarantee.
At pre construction stage the consultancy fee will be derived taking the estimated project
cost as Rs. 87.00 crore. During construction stage the contractual value of the execution
contract will be considered as project cost. During post construction stage the actual
completion contractual cost will be taken as reference for deriving consultancy fee.
However, the completion cost will not include any cost/compensation arising out of any
litigation or escalation as per clause 10-C and its sub clause i.e. 10-CA, 10-CC etc.
Excess or less already paid or to be paid in any stage will be adjusted in next stage in five
consecutive bill.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 23
Additional Conditions
1. Contractor shall and will well and truly execute and perform the contract
under the terms applicable to the satisfaction of EDMC and shall promptly
make payment to each and every person or partly entitled thereto of all the
schemes for work or labour performed and materials furnished in the
performance of this Contract.
2. The award of contract by EDMC does not grant permission to commercially
advertise such award unless specific authority is granted by EDMC
3. If Contractor shall fail to fully and completely performed the contract within
the time limited for the performance thereof, Contractor shall and will pay
the EDMC as liquidated damages for such default, the amount as indicated
in the RFP as an assessment for delay. In completing the said contract,
after the expiration of time limited for its completion.
4. Non discrimination:- In performing in accordance with the terms of the RFP
the Contractor agrees not to discriminate against any qualified employee or
qualified application for employment because of sex, race, religion, colour
and national origin etc.
5. Licenses and Permits:- Proposers shall have any and all licenses and
permits required to perform the work specified and furnish proof of such
licensing authorization and permits in their proposals, if required.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 24
SCOPE OF WORK
The Project Management Consultant shall provide services in a phased manner as under:
a) Pre-construction phase
b) Construction phase
c) Post construction phase
Pre-construction phase
During this phase the consultant shall provide services as under:
The consultant will be part of the bidding process facilitating the EDMC to decide
upon the best contractor for the project.
On receipt of architectural, structural, utility services and all other drawings the Consultant shall carry out proof checking to all drawings to ensure their soundness, completeness and correctness.
Phasing of finance requirement
Construction phase
The various responsibilities under the above job to be undertaken by PMC shall cover the following,
1. Scrutiny of the construction programme submitted by the contractors including offering comments on the same, and further recommendations to the employer for his approval.
2. Receive drawings from the design consultant and further distribution to the contractors for their usage.
3. Interaction /Coordination with the Architect/Design Consultant for timely receipt of drawings and other inputs, give clarifications on contractor’s queries pertaining to the interpretation of drawings, specifications and other contractual matters.
4. Day to day supervision of the contractor’s works to be in accordance with the drawings, specifications, scope etc as regards to quantity and quality and take suitable actions as deemed necessary for effecting the same including rejection of the various elements of work found wanting in the above and their consequent failure to meet the contractual requirements.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 25
5. Day to day monitoring of materials procured for works by the contractors, check for their conformity to meet the contractual requirements including directing for testing the same at required intervals of time by the contractor and take actions as required in accordance with the contract regarding their acceptance on works.
6. Ensure contractor’s conformance to the set out construction procedures, safety norms and practices, Statutory obligations, and every other obligation to be met by him under the contract for it’s proper fulfillment.
7. Maintain regular correspondence with all the contractors in the project on all matters for achieving proper contract management practices and appraise the EDMC on all such matters.
8. Interpretation and evaluation of contractor’s claims towards extra items of works and other contractual matters including forwarding the recommendations to EDMC, issuing of variation orders on quantities of work with EDMC’s approval.
9. Evaluation of the causes for delays in the completion of works if any, assign the reason, source of responsibility for the same including the quantum of such delays and forwarding the recommendation to EDMC for it’s implementation.
10. Scrutinizing and checking the detailed measurements, monthly bills of the contractors, certifying and giving recommendations to EDMC for payments as stipulated in the contract including quantitative and qualitative analysis.
11. Evaluate the progress of the contractor’s works with respect to the milestones set in the contract and give recommendations to EDMC on penalty as applicable to be levied.
12. Coordinate the activities of the various agencies in the project to ensure proper availability of scope and fronts to them in accordance with the approved construction schedule.
13. Coordinate with the architect/design consultant for according approvals for materials, technical competency of workmen and others in time and in accordance with the construction schedule/contract.
14. Convene weekly progress review meetings with the contractors and EDMC, review the progress, decide on action plans as required including circulating the minutes to all the participants.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 26
15. Submit detailed monthly progress reports of the works of various agencies to EDMC including remarks on the same.
16. Assisting EDMC in respect of all matters concerning resolution of disputes between EDMC and the contractor either through dispute resolution board or arbitration, including participating in such proceedings as and when called upon to do so.
17. Ensure and check the “As built ” drawings submitted by the contractors for their correctness and accuracy.
18. Conveying approvals for sub letting of any part of the works with prior approval from EDMC.
19. Assist EDMC in providing clarifications/explanations to observations made, from time to time by the auditors.
20. Ordering conductance of necessary tests on works during execution or on completion including uncovering of the same as required and give further instructions as per the terms of the contract.
21. Direct the contractors to carryout all such works or to do all such things as may be necessary in his opinion to avoid or reduce the risk in case of any emergency affecting the safety of life or of the works or of adjoining property and to advise EDMC thereof as soon thereafter as is reasonably practicable.
22. Maintenance of project diary containing all the details/events pertaining to the administration of the contract, requests forms and orders given to the contractors and any other information which may at a later date be of assistance in resolving queries/disputes which may arise then.
23. Submission of cash flow statement to EDMC based on the agreed construction schedule and progress of works.
24. Complete construction management services including day-to-day supervision, management of overall and intermediate schedules, weekly, monthly meetings, physical inspection, day-to-day approvals and certification of invoices.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 27
Post-construction phase
1. Issuing virtual completion certificates for the various buildings components and recommending for release of the contractor’s money held as per the contractual provisions to EDMC.
2. Rendering assistance to EDMC during the defects liability period as and when required, directing the contractors to undertake remedial measures as required on defective portions of work found and recommend for issue of defects liability certificate upon satisfactory performance by the contractor.
3. Organising as built drawings for the purpose of the records
4. Preparation of all operation and maintenance manual.
5. Preparation of final report which shall contain all technical and financial information of the project.
6. Assisting EDMC for settling the Audit observation and Arbitration cases.
7. Submitting all guarantees for performance from vendors /contractors to EDMC.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 28
SECTION –V
Technical Submission Format
The technical bid shall consist of the following documents:-
1. Structure and organization of the firm with complete details as per Annexure-A.
2. Details of all building works completed in the last seven years as Project
Management Consultants as per Annexure-B.
3. Details of Technical and Administrative / Management Personnel as per
Annexure-C
4. CVs of Technical and Administrative / Management Personnel (listed in
Annexure C) as per Annexure-D
5. Covering letter from tenderer detailing various considerations in the tender
without disclosing financial bid.
6. Registration of the Firm
7. Duly executed copy power of attorney in original along with its two certified copy
in the name of tenderer authorized representative to act on behalf of tenderer in
case of firm or partnership etc.
8. Document in support of payment of bid security.
9. Reference to or copy of detailed text/ literature if any which might have been
followed by the tenderer while making his proposal.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 29
SECTION –VI
Financial Submission Format
The Financial bid shall consist of the following documents:
1. Letter of Acknowledgement for receiving the tender document
2. Price schedule for the Project Management Consultancy.
3. Price break-up for the Project Management Consultancy
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 30
TENDER FORM PRICE SCHEDULE AND PRICE BREAKUP
Date :
Contract No. :
TO:
“Executive Engineer (Project) Shah. (South)
East Delhi Municipal Corporation
E-1/12, Krishna Nagar,
Delhi-110051”
Phone: 011-22092309
Sir,
Having examined the Request for Proposal, the receipt of which is hereby duly
acknowledged, I/we the undersigned, offer to carry out Project Management consultancy for
proposed Multi-Storied Office Complex Building at Karkardooma Institutional area,
Shahdara (South) Zone. Delhi as per the financial bid attached.
I/We undertake, if our Tender is accepted, to commence the operation within ____ days
calculated from the date of receipt of your Letter of Intent/Notification of Award of Contract.
I/We agree to abide by this proposal for a period of 90 day from the date fixed for Tender
opening under (Clause 12 of the Instructions to Consultants) and it shall remain binding upon
us and may be accepted at any time before the expiration of the period.
Until a formal contract is prepared and executed, this proposal, together with your written
acceptance thereof and your notification of award, shall constitute a binding contract between
us.
Dated this ………………………………. day of ……………………………. 200………
SEAL OF COMPANY .……………………………
Signature
.……………………………
(in the Capacity of)
Duly Authorized to Sign bid for and on behalf of
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 31
PRICE SCHEDULE
PROJECT MANAGEMENT CONSULTANCY
FOR
PROPOSED MULTI-STORIED OFFICE COMPLEX BUILDING
AT
KARKARDOOMA INSTITUTIONAL AREA SHAHDARA (SOUTH) ZONE
DELHI
a. Preliminary estimated Cost = Rs. 87.00 crore
b. Offered bid for Project Management Consultancy inclusive of all taxes, levies etc. in %
of Cost = .............. % (in figure)/ ........................... (in words)
c. Total consultancy fee inclusive of all taxes, levies etc. = ....... % × 87.00 crore =
................................. (in figure)/ ......................... (in words).
Signature .……………………………
Designation.…………………………
Date………………………………….
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 32
PRICE BREAKUP
Sr.
No
Description Man
hours
Amount
payable
(In Rs.)
1
Professional Staff
2. Supporting Staff
3. Collection of samples and
analysis
Lump sum
3. Report preparation and
Documentation
Lump sum
4. Conveyance and other
miscellaneous expenses
Lump sum
Signature .……………………………
Designation.…………………………
Date………………………………….
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 33
STAFF INPUTS AND FEE RATES
Name Description No. of
Days
Per Diem Cost in Rs.
Total
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 34
Annexure “A”
GENERAL INFORMATION
1. Name of the firm: …………………………………………………………
(Attach an attested photocopy of Certificate of Registration.) 2. Legal Status of the Firm: Individual/Association/Joint Venture/ 3. Registered Address, telephone, Tele-fax.
………………………………………………………………
………………………………………………………………
………………………………………………………………. 4. Contact Person, Designation and Address including email ID
…………………………………………………………………
………………………………………………………………….
………………………………………………………………….
5. Length of experience in the field of conducting concurrent evaluation
of schemes/projects
6. Names and Addresses of Associated Companies to be involved in the Project and whether Parent/Subsidiary/others. (The relationship to be indicated)
7. In case the company is subsidiary, the involvement, if any, of the Parent Company in
the project:
8. State whether the in-house expertise is available for all services/sub-systems. If not,
details of sub-consultants to be involved in the project.
9. Was the applicant ever required to suspend a project for a period of more than six months continuously after commencement?
10. Has the applicant or any constituent partner in case of partnership firm, ever been debarred/black listed for competing in any organization at any time? If so, give details
11. Has the applicant or any constituent partner in case of partnership firm, ever been
convicted?
Signature of the Bidder/Authorized representative
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 35
Annexure “B”
NUMBER AND DETAILS OF PROJECTS OF ALL BUILDING WORKS FOR WHICH COMPREHENSIVE CONSULTANCY WAS PROVIDED IN
THE LAST SEVEN YEARS
A) General Projects:
Sl. Name Name Details of the Nature of Year of Litigation/
No. and and Project consultancy Start & Arbitration, if any
location Address work with Completion with details
of the of the Specific of the
Project Client Area Project
highlighted
Built Cost*
up
area
*Value of the work for which services were provided by the consultant only need
to be provided.
The applicants are required to provide Proof of award of work & completion
certificate.
B) Institutions under Government
Sl. Name Name Details of the Nature of Year of Litigation/
No. and and Project consultancy Start & Arbitration, if any
location Address work with Completion with details
of the of the Specific of the
Project Client Area Project
highlighted
Built Cost*
up
area
Value of the work for which services were provided by the consultant only need to be provided.
The applicants are required to provide Proof of award of work & completion certificate.
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 36
Annexure “C”
S. No
Name of the Staff
Designation
Presently employed, if any
Years with the firm
describe degree of responsibility also
Qualifications
Membership in professional bodies Experience and Training
Relevant in the context of assignment
Employment record
RFP for PMC for proposed Multi-storied Office Complex Building at Karkardooma Institutional Area Shahdara (South) Zone Delhi
Request for proposal 37
Annexure “D”
CVs OF KEY STAFF
1. Name of the Staff :
2. Designation :
3.
Name and address of the firm
Presently employed, if any : :
4. Years with the firm :
5.
Position in the Proposed project
(describe degree of responsibility also) :
6. Qualifications (Technical and General) :
7. Membership in professional bodies :
8.
Experience and Training
(Relevant in the context of assignment) :
9. Employment record :
Name of the Firm Position Held Year of Employment