PurposePurpose Consider the current status and future access needs in the Consider the current status and future access needs in the
vicinity of the two stations vicinity of the two stations Provide pedestrian and bicycle access, and effective bus feeder Provide pedestrian and bicycle access, and effective bus feeder
service, and service, and Manage vehicular traffic projected in the area of the stationsManage vehicular traffic projected in the area of the stations
Study AreaStudy Area Reston-Wiehle Avenue and Reston Town Center station areasReston-Wiehle Avenue and Reston Town Center station areas
Design PeriodsDesign Periods Wiehle Ave Station – 2013 Wiehle Ave Station – 2013 Reston Town Center Station – 2017Reston Town Center Station – 2017 Other conditions - 2030 Other conditions - 2030
RMAG Status ReportRMAG Status Report
Public input was developed through the Public input was developed through the RMAG monthly meetings RMAG monthly meetings
Four public meetings:Four public meetings: Initiation of the studyInitiation of the study Existing conditionsExisting conditions Preliminary findingsPreliminary findings Final recommendationsFinal recommendations
Priority at station areas was given to:Priority at station areas was given to: PedestriansPedestrians BicyclistsBicyclists Transit Users (buses)Transit Users (buses) Private Vehicles (drivers and carpools)Private Vehicles (drivers and carpools)
RMAG Status ReportRMAG Status Report
RMAG Status ReportRMAG Status Report
RMAG Status ReportRMAG Status Report
Northside bus routingNorthside bus routing
Southside bus routingSouthside bus routing
Proposed Street Grid at Wiehle Avenue Station Proposed Street Grid at Wiehle Avenue Station
RMAG Status ReportRMAG Status Report
RMAG Status ReportRMAG Status Report
Project PrioritizationProject Prioritization
Based on Metrorail Opening DateBased on Metrorail Opening Date Reston-Wiehle Ave – December 2013Reston-Wiehle Ave – December 2013 Reston Town Center – early 2017Reston Town Center – early 2017
Projects required by the Record of DecisionProjects required by the Record of Decision Project required by Comstock developmentProject required by Comstock development Linkage between projectsLinkage between projects Availability of fundsAvailability of funds Longer term needsLonger term needs
RMAG Status ReportRMAG Status ReportProject Prioritization Matrix
Board Approved Funded ProjectsBoard Approved Funded Projects Sunrise Valley Drive, add curb-abutted sidewalk on south side Sunrise Valley Drive, add curb-abutted sidewalk on south side
from Soapstone Drive to South Lakes Drive - - 5,000 feetfrom Soapstone Drive to South Lakes Drive - - 5,000 feet Sunrise Valley Drive, upgrade asphalt sidewalk on north side Sunrise Valley Drive, upgrade asphalt sidewalk on north side
from Soapstone Drive to South Lakes Drive - - 4,500 feetfrom Soapstone Drive to South Lakes Drive - - 4,500 feet Wiehle Ave, upgrade to curb abutted sidewalk on west side Wiehle Ave, upgrade to curb abutted sidewalk on west side
from Sunrise Valley Drive to Station entrance - - 500 feetfrom Sunrise Valley Drive to Station entrance - - 500 feet Wiehle Ave and Isaac Newton Square South, add signalized Wiehle Ave and Isaac Newton Square South, add signalized
crosswalks and mediancrosswalks and median Isaac Newton Square West and WO&D Trail, upgrade and add Isaac Newton Square West and WO&D Trail, upgrade and add
asphalt sidewalk on west side to Sunset Hills Road asphalt sidewalk on west side to Sunset Hills Road Wiehle Avenue, add sidewalk along east side from Chestnut Wiehle Avenue, add sidewalk along east side from Chestnut
Grove Square to North Shore Drive (south) - - in designGrove Square to North Shore Drive (south) - - in design
RMAG Status ReportRMAG Status Report
RMAG Status ReportRMAG Status Report
Improvements Required by Record of DecisionImprovements Required by Record of Decision
Additional left turn lane from Wiehle Ave northbound at Additional left turn lane from Wiehle Ave northbound at station entrystation entry
Additional left turn lane from DTR eastbound ramp at Wiehle Additional left turn lane from DTR eastbound ramp at Wiehle Ave and the addition of interim bus baysAve and the addition of interim bus bays
Widen Sunset Hills Rd from Wiehle Ave to Isaac Newton Sq Widen Sunset Hills Rd from Wiehle Ave to Isaac Newton Sq and install left turn lane from Sunset Hills Rd westbound to and install left turn lane from Sunset Hills Rd westbound to Isaac Newton Sq (south)Isaac Newton Sq (south)
New entry from Isaac Newton Sq (south) into station areaNew entry from Isaac Newton Sq (south) into station area Intersection and pedestrian improvements at Wiehle Ave and Intersection and pedestrian improvements at Wiehle Ave and
Sunset Hills RoadSunset Hills Road Improvements to right turn lane from Sunrise Valley Dr Improvements to right turn lane from Sunrise Valley Dr
(westbound) to Wiehle Ave (northbound)(westbound) to Wiehle Ave (northbound)
RMAG Status ReportRMAG Status Report
Project Funding for RMAG RecommendationsProject Funding for RMAG Recommendations Total RMAG funding requirement is approximately $111 millionTotal RMAG funding requirement is approximately $111 million
Roadway improvements:Roadway improvements: $74 million$74 million Pedestrian/bike improvements:Pedestrian/bike improvements: $29 million$29 million Transit improvements:Transit improvements: $ 8 million$ 8 million
Currently $4 million in Congestion Mitigation and Air Quality Currently $4 million in Congestion Mitigation and Air Quality (CMAQ) fund for the previously mentioned projects(CMAQ) fund for the previously mentioned projects
$21 million in Regional Surface Transportation Program (RSTP) $21 million in Regional Surface Transportation Program (RSTP) funds are programmed through FY 2017 for additional RMAG funds are programmed through FY 2017 for additional RMAG projectsprojects
Future redevelopment in the Reston area may generate developer Future redevelopment in the Reston area may generate developer contributions toward the RMAG projectscontributions toward the RMAG projects
Additional federal, state, regional and local funding opportunities Additional federal, state, regional and local funding opportunities will be explored as they become availablewill be explored as they become available