Page 1: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Restoration Alternatives Development and Evaluation

West Branch

Grand Calumet River

By

Dan Sparks, USFWS, BFO

Presented by

Jim Smith, IDEM, OLQ

Page 2: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 3: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 4: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 5: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 6: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 7: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 8: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 9: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 10: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 11: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 12: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 13: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 14: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 15: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 16: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 17: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 18: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 19: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ
Page 20: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Scope of Work

• Phase 1 - Project Orientation• Task 1. Site Visit

• Task 2. Literature and Data Review

• Task 3. Data Gaps

• Task 4. Local Support

• Phase 2 - Fieldwork• Task 5. Work Plans

• Task 6. Bathymetric and Topographic Survey

• Task 7. Sediment Sampling and Testing

Page 21: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Scope of Work

• Phase 3 - Analysis and Report• Task 8. Data Analysis and Alternatives

Development– No Action

– Natural Recovery with Monitoring

– Dredging w/ confined aquatic, nearshore, or upland disposal

– Dredging w/ dewatering and treatment

– Dredging and capping

– Capping

Page 22: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Scope of Work

• Phase 3 - Analysis and Report• Task 9. Restoration Alternatives Report

– Introduction

– Physical Setting

– Sediment Properties

– Potential Sediment Remediation Technologies

– Screening of Sediment Remediation Technologies

– Development of Detailed Restoration Alternatives

– Evaluation of Restoration Alternatives

– Appendices, etc.

Page 23: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Scope of Work

• Phase 3 - Analysis and Report• Task 10. Meetings

– Site Visit

– Public Meetings

• Task 11. Project Management– Coordination

– Correspondence

– Subcontractor’s management, oversight

– Billings

– etc.

Page 24: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Results of Phase I

Technical Memorandum

Restoration Alternatives Development and Evaluation

West Branch Grand Calumet River

January 2002

Page 25: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Results of Phase I

• December 11, 2001 Site Visit

• Reviewed Literature and available data

• Recommended Project Reaches

• Identified 6 Data Gaps

Page 26: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

ap

Indianapolis Blvd.

White O

ak A

ve.

Colum

bia A

ve

Calum

et A

ve.

Hohm

an Ave.

State L

ine

Sohl R

oad

Railroad

Bridge

Proposed Project Reaches and

Past Sample Points

Page 27: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Burton & Dorkin, 1994

Page 28: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Data Gap 1Bathymetric / Topographic Survey

• Establish Riverbed Topography & Core Sample Elevations

• Develop Remedial Alteratives & Establish Dredging / Capping Quantities

• Assess Potential Disposal Sites

• Evaluate Potential Access to River

• Aid in Preparation of Final Restoration Plans

Page 29: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Data Gap 2Need Engineering Base Drawings

• Historical Sampling Locations

• Proposed Sampling Locations

• Show Contaminated Sediment Sections

• Lay Out Preliminary Dredge / Capping Prisms & Materials

• Preliminary Locate & Lay Out Access Sites & Potential Disposal Areas

Page 30: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Data Gap 3 Transfer Sediment Core Data to Base Drawings

• Calculate (X,Y,Z) Sediment Core Data Locations Based on Bathymetric

Survey

• Place Data on Base Maps

Page 31: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Data Gap 4 Proposed Additional Core Boring,

Sediment Chemical / Physical Properties

• Between Indianapolis Blvd & White Oak

• Between White Oak & Columbia Ave.

• Between Columbia Ave. & Calumet Ave.

• Between Calumet Ave & Sohl Road

• Between Sohl Road & Hohman Ave.

• Between Railroad Bridge & State Line

Page 32: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Proposed Sampling

Page 33: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Data Gap 5Need Information on Access Sites

• Very Shallow Water

• Limited Access and Bank Stability for Equipment Insertion, Dewatering, Hauling

• Bridges have no Horizontal or Vertical Clearance for Equipment Movement from River Reach to River Reach

Page 34: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

Data Gap 6Local Sources of Services & Material

• Information is needed on:– Local Labor– Dredging Equipment– Construction Equipment– Fleet Vehicles– Aggregate & Sand– Concrete– Related Services

Page 35: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ

What’s Next

• Do we Proceed with Phase 2?

• Do we do all proposed sampling or reduce number?

• Are all parameters identified?

• Should we do additional Toxicity Sampling?

• Do we obtain New Aerial Photos to develop topographic base maps or can we use some flown in 1994 or 1995?

Page 36: Restoration Alternatives Development and Evaluation West Branch Grand Calumet River By Dan Sparks, USFWS, BFO Presented by Jim Smith, IDEM, OLQ