Corporate Environmental Programs General Electric Company 100 Woodlawn Avenue, Pittsfield, MA 01201 Transmitted via Federal Express June 22,2004 Mr. Dean Tagliaferro On-Scene Coordinator U.S. Environmental Protection Agency c/o Weston Environmental Engneering One Lyman Street Pittsfield, MA 01201 Re: GE-Pittsfield/Housatonic River Site Newel1 Street Area I (GECD440) Restoration of Parcel 59-23-22 Dear Mr. Tagliaferro: As you are aware, the General Electric Company (GE) is currently involved in the performance of EPA- approved removal actions at the Newel1 Street Area I Removal Action Area located in Pittsfield, Massachusetts. As part of the access negotiations prior to the initiation of removal actions at Parcel J9- 23-22, GE agreed to certain owner-requested modifications concerning the final restoration surfaces for this property. This letter presents a brief summary of the proposed modifications to the EPA-approved Technical Drawings and an evaluation of the potential impact such changes may have on site drainage. Prior to the initiation of the removal actions at Parcel J9-23-22, several existing surface cover types were present at that property, including the following: A gravel drivewaylparking lot which extended from Newel1 Street to approximately 50 feet northwest of the rear building. Miscellaneous bituminous asphalt and concrete pads. Compacted earth, including a drainage swale located along the property line between Parcel J9- 23-22 and 59-23-23 which extended from just south of the rear building to a riprap outlet channel at the rear of the property. Following performance of the required soil removal activities and placement of backfill (as required), the final surface cover for the property will be restored as follows: The portion of the property located between the northern building and Newel1 Street will be restored with a compacted 12-inch processed gravel base followed by a two-inch layer of asphalt pavement. The portion of the previously unlined drainage swale extending from just south of the rear building to the riprap drainage swale at the rear of the property will be restored with six inches of compacted gravel and a two-inch layer of asphalt.

Upload: others

Post on 11-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RESTORATION OF PARCEL J9-23-22, NEWELL STREET AREA 1 · 2020. 7. 7. · j9-23-25 contractor shall excavate this area to achieve required final surface contours tor shall place 6-inch

Corporate Environmental Programs General Electric Company 100 Woodlawn Avenue, Pittsfield, MA 01201

Transmitted via Federal Express

June 22,2004

Mr. Dean Tagliaferro On-Scene Coordinator U.S. Environmental Protection Agency c/o Weston Environmental Engneering One Lyman Street Pittsfield, MA 01201

Re: GE-Pittsfield/Housatonic River Site Newel1 Street Area I (GECD440) Restoration of Parcel 59-23-22

Dear Mr. Tagliaferro:

As you are aware, the General Electric Company (GE) is currently involved in the performance of EPA- approved removal actions at the Newel1 Street Area I Removal Action Area located in Pittsfield, Massachusetts. As part of the access negotiations prior to the initiation of removal actions at Parcel J9- 23-22, GE agreed to certain owner-requested modifications concerning the final restoration surfaces for this property. This letter presents a brief summary of the proposed modifications to the EPA-approved Technical Drawings and an evaluation of the potential impact such changes may have on site drainage.

Prior to the initiation of the removal actions at Parcel J9-23-22, several existing surface cover types were present at that property, including the following:

A gravel drivewaylparking lot which extended from Newel1 Street to approximately 50 feet northwest of the rear building.

Miscellaneous bituminous asphalt and concrete pads.

Compacted earth, including a drainage swale located along the property line between Parcel J9- 23-22 and 59-23-23 which extended from just south of the rear building to a riprap outlet channel at the rear of the property.

Following performance of the required soil removal activities and placement of backfill (as required), the final surface cover for the property will be restored as follows:

The portion of the property located between the northern building and Newel1 Street will be restored with a compacted 12-inch processed gravel base followed by a two-inch layer of asphalt pavement.

The portion of the previously unlined drainage swale extending from just south of the rear building to the riprap drainage swale at the rear of the property will be restored with six inches of compacted gravel and a two-inch layer of asphalt.

CCURTIS
Rectangle
Page 2: RESTORATION OF PARCEL J9-23-22, NEWELL STREET AREA 1 · 2020. 7. 7. · j9-23-25 contractor shall excavate this area to achieve required final surface contours tor shall place 6-inch

r Mr. Dean Tagliaferro

June 22,2004 Page 2 of 3

The restored surface cover for the remainder of the property -- which includes the engineered barrier area -- will consist of a minimum six-inch compacted gravel layer. However, the area over the barrier will be restored with an 18-inch compacted gravel layer including a layer of geotextile located approximately six inches below grade, to serve as an indication when six inches of gravel have been displaced and maintenance activities are necessary.

To reflect these changes, Technical Drawings 6, 12, 13, and 14 of the August 2003 Final RD/RA Work Plan have been revised and included herein. In addition to these revisions, Technical Drawing 12A was developed to present certain restoration details associated with the drainage swale, among others.

Based on the owner-requested modifications to the surface cover types at Parcel 59-23-22 and as requested by EPA, GE has performed additional evaluations to determine the impact (if any) during future precipitation events, with an emphasis on the existing riprap outlet channel at the rear of the property and the recently restored riverbank. GE has analyzed the pre-construction and post-removal action hydraulic runoff conditions for this property to determine whether changes to the existing riprap outlet channel are appropriate.

Prior to the recently initiated soil removal activities, stormwater runoff from Parcel J9-23-22, along with runoff from adjacent contributing watershed areas, flowed to an unlined drainage swale located along the property boundary between Parcel J9-23-22 and 59-23-23. Flow conveyed by this swale continued into a riprap swale located at the northeast comer of the property. The riprap swale then conveyed the runoff to the aforementioned riprap outlet channel constructed within the southem riverbank of the East Branch of the Housatonic River.

As previously indicated, the final restoration surfaces at Parcel J9-23-22 will consist of compacted gravel and, in some areas (including a portion of the restored drainage swale), asphalt pavement. To determine the drainage impacts (if any) to the riprap outlet channel as a result of the proposed surface cover modifications, the 2-, lo-, and 25-year, 24-hour storm events were analyzed under existing (i.e., pre- construction) and post-restoration conditions for the watershed dischargng to the riprap outlet channel. The following table summarizes this analysis:

As indicated above, the change in surface cover conditions associated with site restoration will result in a minor increase in peak discharge runoff to the riprap outlet channel. Based on site conditions observed on June 17, 2004, the riprap channel constructed within the riverbank (i.e., the portion located below the crest of the riverbank) appears to be well established with no apparent signs of instability. Considering the current condition of the outlet channel and the anticipated minimal increase in peak discharge, the bank portion of the outlet channel should remain stable following completion of the site restoration activities. However, GE proposes to restore the riprap swale upgradient of the outlet channel (i.e., the portion located above the crest of the riverbank) in accordance with Detail D on Technical Drawing 12A to better contain and convey runoff to the riprap outlet channel. Finally, to further improve flow control within the riprap swale and outlet channel, GE proposes to install a check dam at a location approximately 5 feet upgradient of the riverbank crest. The cross-section of this check dam is also included in Detail D on Technical Drawing 12A

Page 3: RESTORATION OF PARCEL J9-23-22, NEWELL STREET AREA 1 · 2020. 7. 7. · j9-23-25 contractor shall excavate this area to achieve required final surface contours tor shall place 6-inch

Mr. Dean Tagliaferro June 22,2004

Page 3 of 3

Please feel fi-ee to contact me with any questions or comments regarding the information provided herein.

Sincerely,

&chard W. Gates u I

Remediation Project Manager

CRA/csc Attachments V:\GE~Pittsfield~CD_Newell-SttAreaArnCo~espondence\41342196Ltr,doc

cc: Susan Steenstrup, MDEP (2 copies) Anna Symington, MDEP* Rose Howell, EPA* Holly Inglis, EPA Dawn Jarnros, Weston Michael Carroll, GE* Andrew Silfer, GE Rod McLaren, GE James Nuss, BBL Corey Averill, BBL James Bieke, Shea & Gardner Public Information Repositories GE Internal Repository

* (cover letter only)

Page 4: RESTORATION OF PARCEL J9-23-22, NEWELL STREET AREA 1 · 2020. 7. 7. · j9-23-25 contractor shall excavate this area to achieve required final surface contours tor shall place 6-inch

PHASE IV(REFER TO DRAWING 12 FORSITE RESTORATION PLAN)

CONTRACTOR SHALL REMOVE ADDITIONAL SOILAS NECESSARY IN THIS AREA TO ACCOMODATEINSTALLATION OF MANHOLE. OUTLET PIPE ANDRIP RAP APRON (SEE DRAWING 12)

PHASE III(REFER TO DRAWING 5FOR EXCAVATION LIMITSAND DRAWING 11 FOR SITERESTORATION PLAN)

ELEV.CONTRACTOR SHALL NOTDAMAGE MONITORING WELLDURING PERFORMANCE OFEXCAVATION ACTIVITIES

CONTRACTOR SHALL REMOVESTORAGE TRAILER TO FACILITATEEXCAVATION ACTIVITIES AND RESETAS PART OF SITE RESTORATION

LAKEWOODPLAYGROUNDJ9-23-26

CONTRACTOR SHALL REMOVE AND DISPOSE OFBITUMINOUS PAVEMENT IN ITS ENTIRETY. CONTRACTORSHALL DISPOSE OF ALL REMOVED MATERIALS ALONGWITH ADJACENT EXCAVATED SOILS (SEE NOTE 3 )

X 10112X00, X01.0WGL: 0N=«, OFT=REF»P: PAGESET/PLT-CDL6/22/04 SYR-85-KMD KMD NESC/10112003/CONTRACT/10112G09.DWG

273NEWELL ST.

J9-23-25

CONTRACTOR SHALLEXCAVATE THIS AREA TOACHIEVE REQUIRED FINALSURFACE CONTOURS

TOR SHALLPLACE 6- INCH

•COMPACTED PROCESSEDGRAVEL LAYER TO THEUMITS SHOWN'Ss

NL/.LLL ST.J9-23-24

ELEV.BITPARKING

NEWELLST.

J9-23-22

LEGEND:

APPROXIMATE RAA BOUNDARY

PARCEL BOUNDARY

PHASE BOUNDRY

CONTRACTOR SHALL EXCAVATE THIS AREA TO ACHIEVE THEREQUIRED BURIAL DEPTH FOR ENGINEERED BARRIER AS NECESSARYTO ACHIEVE FINAL SURFACE CONTOURS SPECIFIED ON DRAWING 12

CONTRACTOR SHALL PROVIDE APPROPRIATEEXCAVATION CONTROLS TO ENSURESTRUCTURAL STABILITY OF BUILDING

CONTRACTOR SHALL REMOVE AND REPLACEGRAVEL DRIVE TO THE UMITS SHOWN.CONTRACTOR SHALL DISPOSE OF ALLREMOVED MATERIALS ALONG WITHADJACENT EXCAVATED SOILS (SEE NOTE 3 )

CONTRACTOR SHALL PROVIDEAPPROPRIATE EXCAVATIONCONTROLS TO ENSURE STRUCTURALSTABILITY OF BUILDING

TOP OF BANK

. WIRE FENCE

INDEX CONTOUR

INTERMEDIATE CONTOUR

J9-23-26 PARCEL ID

$8*^ RIP RAP

* LIGHT POLE

- o - SIGN

Q DECIDUOUS TREE

< m m m a > EDGE OF BUSHES/HEDGE

*Cf WATER SHUTOFF

® DRAIN MANHOLE

• CATCH BASIN

& GAS METER

© SANITARY MANHOLE

<T1> UTILITY POLE

FW-16R © MONITORING WELL

° ° » DRAIN UNE

" ™ OVERHEAD WIRES

• • • GAS SERVICE

• • WATER SERVICE

s s SANITARY SEWER

I BUILDING

! FORMER BUILDING LOCATION

UMITS OF TSCA MATERIAL

DEPTH OF EXCAVATION

BOTTOM ELEVATION OF EXCAVATION

NOTES:

FILL AND VENT PIPES FOR UST.CONTRACTOR SHALL PROVIDEAPPROPRIATE EXCAVATION CONTROLS TOENSURE STRUCTURAL STABILITY OF UST.

CONTRACTOR SHALL REMOVE GRAVEL DRIVE WITHIN HATCHED AREAS. CONTRACTORSHALL DISPOSE OF ALL REMOVED MATERIALS ALONG WITH ADJACENT EXCAVATEDSOILS (SEE NOTE 3 ) . CONTRACTOR SHALL RESTORE THIS AREA WITH A 1 FOOTCOMPACTED PROCESSED GRAVEL BASE AND A 2- INCH THICK NON-RESIDENTIALASPHALT WEARING COURSE. CONTRACTOR SHALL RESTORE AREA TO ALLOWPOSITIVE DRAINAGE OF SURFACE WATER TOWARD DRAINAGE SWALE LOCATEDADJACENT TO EAST/SOUTHEAST CORNER OF REAR BUILDING. A CONTRACTORSHALL RESTORE REMAINDER OF PROPERTY FROM SIDE OF REAR BUILDING TO REARPROPERTY UNE WITH A SIX-INCH COMPACTED GRAVEL LAYER. (SEE TECHNICALDRAWINGS 12 , 12A, 13, AND 14 FOR ADDITIONAL RESTORATION DETAILS INENGINEERED BARRIER AND DRAINAGE SWALE AREAS. ^

CONTRACTOR SHALL REMOVE AND DISPOSE OF BITUMINOUSPAVEMENT/CONCRETE IN ITS ENTIRETY. CONTRACTOR SHALL DISPOSE OF ALLREMOVED MATERIALS ALONG WITH ADJACENT EXCAVATED SOILS (SEE NOTE 3 ) A

CONTRACTOR SHALL PROVIDE APPROPRIATE EXCAVATIONCONTROLS TO ENSURE STRUCTURAL STABIUTY OF BUILDING

CONTRACTOR SHALL REMOVE ANDREPLACE BITUMINOUS PARKINGAREA IN ITS ENTIRETY

CONTRACTOR SHALL ENSURE NOINTERRUPTION OF ELECTRIC SERVICE TORECEIVING PARTIES ON J 9 - 2 3 - 2 2

CONTRACTOR SHALL ARRANGEAND PAY FOR ABANDONMENT OFUTILITIES SERVICING J 9 - 2 3 - 2 3

1. BASE MAP MODIFIED FROM SURVEY BY HILL ENGINEERS, ARCHITECTS &PLANNERS. DATED 8 / 1 5 / 0 1 . CONTOUR INTERVAL IS 1 FOOT.

2. UTILITY LOCATIONS ARE APPROXIMATE AND ALL UTILITIES MAY NOT BE SHOWN.PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT "DIG-SAFE"AND HAVE ALL UNDERGROUND UTILITIES LOCATED.

3. EXCAVATIONS SHALL BE COMPLETED TO DEPTH OR ELEVATION INDICATED WITHINSPECIFIED LIMITS. ALL EXCAVATED MATERIALS TO BE DISPOSED OF AT THEAPPROPRIATE OPCA.

4. CONTRACTOR SHALL RELOCATE CARS AND MISCELLANEOUS VEHICLES WITHINTHE PROPERTY IN QUESTION PRIOR TO INITIATION OF EXCAVATION ACTIVITIESAND RETURN SUCH VEHICLES UPON COMPLETION OF SITE RESTORATIONACTIVITIES. CONTRACTOR SHALL DOCUMENT (BY PHOTOGRAPHY OR VIDEOTAPE)EXISTING CONDITION OF ALL VEHICLES SUBJECT TO RELOCATION AND WILL BERESPONSIBLE FOR ANY DAMAGE RESULTING FROM RELOCATION OF THEVEHICLES.

5. THE CONTRACTOR SHALL INVENTORY ALL TREES AND SHRUBS LOCATED WITHINTHE UMITS OF EXCAVATION. THE CONTRACTOR SHALL THEN REMOVE ANDDISPOSE OF ALL TREES AN SHRUBS (INCLUDING ROOT SYSTEMS).ABOVE-GRADE PORTIONS OF TREES AND SHRUBS TO BE DISPOSED OF AT ALOCAL PERMITTED RESOURCE RECOVERY FACILITY. PORTIONS OF TREES ANDSHRUBS IN CONTACT WITH SITE SOILS WILL BE DISPOSED OF ALONG WITHADJACENT EXCAVATED SOILS (SEE NOTE 3) .

6. THE DRAWING DOES NOT REFLECT ALL NEWLY RESTORED VEGETATION ONJ 9 - 2 3 - 1 2 . CONTRACTOR IS REQUIRED TO INVENTORY ALL PREVIOUSLYRESTORED TREES AND SHRUBS PRIOR TO PERFORMANCE OF SOIL REMOVALACTIVITIES. CONTRACTOR SHALL THEN REMOVE AND DISPOSE OF ALL TREESAND SHRUBS IN ACCORDANCE WITH NOTE 5. ALSO, THE CONTRACTOR ISRESPONSIBLE FOR RESTORING ANY OTHER RIVERBANK RESTORATION MATERIALSIMPACTED DURING PERFORMANCE OF SOIL REMOVAL ACTIVITIES.

CONFIDENTIALGraphic Scale

30'

iS DRAWING WAS PREPARED AT THE SCALE INDICATED IN THETITLE BLOCK. INACCURACIES IN THE STATED SCALE MAY BE

INTRODUCED WHEN DRAWINGS ARE REPRODUCED BY ANYMEANS. USE THE GRAPHIC SCALE BAR IN THE TTTLE BLOCK TO

DETERMINE THE ACTUAL SCALE OF THIS DRAWING.

.A.

6/22/04 ADDED NOTE REGARDING RESTORED SURFACE COVER

5/26/04 MISCELLANEOUS RESTORATION-RELATED CHANGES

1 0 / 1 5 / 0 3 DELETED NOTE REGARDING FUTURE BUILDING

DEMOUTION ACTIVITIES.

WRFTTEN PERMISSION OF BLASLAND. BOUCK & LEE. INC.

Project Mgr. CBA

Designed by _CRA/EjSS_ _

Drawn by KMD

Checked by _ JMN/WAR/CRA

Prof. Eng.

PE License

BBCBLASLAND. BOUCK & LEE, INC.engineers, scientists, economists

GENERAL ELECTRIC COMPANY • PITTSFIELD, MASSACHUSETTSNEWELL STREET AREA I RAA REMEDIAL ACTION

PHASE IVEXCAVATION LIMITS

TECHNICAL DRAWINGS

File Number101.12

DateJULY 2003

Blasland, Bouck & Lee, Inc.Corporate Headquarters6723 Towpath RoodSyracuse, NY 13214315-446-9120

6

Page 5: RESTORATION OF PARCEL J9-23-22, NEWELL STREET AREA 1 · 2020. 7. 7. · j9-23-25 contractor shall excavate this area to achieve required final surface contours tor shall place 6-inch

1 ^ABOVE-GRADETERMINATION

SEEDETAILBSHECT12A

W 980.50-0 \N

PROPOSED rsMANHOLE

\ INV. 680.50SEE DETAILS A A M n n c u r r r 12* A A

\ _ L ABOVE-GRADEX 14 TrRLIIKIATiriM

\

\

TERMINATION 14

-GRACTERMINATION

12' VEGETATIVEENGINEERED BARRIER

AT-GRADEz-iANCHOR L - i 3 ~ l -TRENCH

GRAVEL-COVERED1 3 / ENGINEERED BARRIER

- L &EOMEMBRANE/!? CONCRETE ANCHOR

B_\AT-GRADE1 3 , ANCHOR TRENCH

P>IASE III(REFER TO DRAWING 11 FORENGINEERED BARRIER P U N )

7, GEOMEMBRANE/1 3 CONCRETE ANCHOR ABOVE-GRADE

TERMINATION

J9-23-23

o

LEGEND:

- PARCEL BOUNDARY

• PHASE BOUNDARY

- EASEMENT

- SANITARY SEWER

- WOODEN FENCE

- WIRE FENCE

PARCEL ID

DECIDUOUS TREE

RIP RAP

" 1 BUILDING

ENGINEERED BARRIER (SEE NOTE 5)

PROPOSED CONTOUR (SEE NOTE 3)

EXISTING CONTOUR

PROPOSED COLLECTION PIPE AND FLOW DIRECTION (SEE NOTE 7 )

PROPOSED OUTLET PIPE AND a O W DIRECTION (SEE NOTE 8)

TEMPORARY EROSION CONTROL MAT (INSTALL PER

MANUFACTURER'S RECOMMENDATIONS)

NOTES:

1 . BASE MAP MODIFIED FROM SURVEY BY HILL ENGINEERS. ARCHITECTS k PLANNERS, DATED 8 / 1 5 / 0 1 .

2 . THIS DRAWING ONLY PRESENTS RESTORATION DETAILS ASSOCIATED WITH INSTALLATION OF THE ENGINEEREDBARRIER. REFER TO DRAWING S FOR OTHER PROPERTY SPECIFIC RESTORATION DETAIL

3. PROPOSED CONTOUR INTERVAL IS 0 . 5 FOOT. EXISTING CONTOUR INTERVAL IS 1 FOOT. PROPOSED CONTOURSREPRESENT TOP OF FINAL GRADE. CONTRACTOR SHALL ESTABLISH UNER GRADING BASED ON TOP OF FINALGRADE AND REQUIRED COVER THICKNESS. UNER GRADING IN DRAINAGE ANCHOR TRENCHES SHALL BE ADJUSTEDAS NECESSARY TO ACHIEVE PIPE INVERT ELEVATIONS.

4. UT1UTY LOCATIONS ARE APPROXIMATE AND ALL UTILITIES MAY NOT BE SHOWN. PRIOR TO ANY CONSTRUCTION.

THE CONTRACTOR SHALL CONTACT "DIG-SAFE" AND HAVE ALL UNDERGROUND UTILITIES LOCATED.

5. EDGE OF ENGINEERED BARRIER REPRESENTS OUTER UMIT OF ANCHOR TRENCH.

6. LOCATION OF DOWNSTREAM TERMINATIONS AND INVERT ELEVATIONS OF OUTLET PIPE ARE APPROXIMATE ONLY.THE CONTRACTOR SHALL ADJUST BOTH AS NECESSARY SO THAT A MINIMUM 1 % INVERT SLOPE IS MAINTAINEDFROM THE EDGE OF THE ENGINEERED BARRIER TO THE DOWNSTREAM TERMINATIONS.

7 . COLLECTION PIPES SHALL BE 4"» PERFORATED SMOOTH-BORE CORRUGATED HDPE. MINIMUM PIPE SLOPE SHALLBE 0.5%.

8 . OUTLET PIPE FROM MANHOLE SHALL BE 15"» SOLID WALL CORRUGATED SMOOTH-BORE HDPE. OTHER OUTLET

PIPES SHALL BE 4"» SOUD WALL CORRUGATED SMOOTH-BORE HDPE.

9. CULVERT SHALL BE 15"0 SOUD WALL CORRUGATED SMOOTH-BORE HDPE. PIPE SHALL BE INSTALLED BELOWGE0SYN1HE11C COVER. GE0SYNTHET1C PENETRATIONS BY THE CULVERT SHALL BE CONSTRUCTED AS SHOWN ONDRAWING 14.

10. ENGINEERED BARRIER ON LOT J 9 - 2 3 - 2 2 SHALL BE EITHER GRAVEL-COVERED OR VEGETATED TO MATCHEXISTING SURFACE TYPE.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING APPROPRIATE PIPE FITTINGS AT BENDS. CONNECTIONS.AND/OR INTERSECTIONS.

12. UTILIZE ABOVE-GRADE COVER TERMINATIONS AS SHOWN ON DRAWING 14.

13. RIP RAP APRON SHALL USE TYPE 2 RIP RAP. APRON SHALL BE 10 FEET IN LENGTH. 4 FEET IN WIDTH ATUPSTREAM END AND 12 FEET IN WIDTH AT DOWNSTREAM END.

14. CONTRACTOR SHALL REPLACE AN EQUAL NUMBER AND TYPE OF TREES AND SHRUBS AS REMOVED DURING SITEPREPARATION ACTIVITIES. ALL RESTORED TREES AND SHRUBS MUST BE INSTALLED AT LEAST 10 FEET OUTSIDETHE UMITS OF THE ENGINEERED BARRIERS.

10112x00,L: ON=», OFF-REF*P: PAGESET/PLT-COL6/22/04 SYR-85-KMD KMO NESC/10112003/C0NTRACT/10112G13. DWG Vw ' CONFIDENTIALGraphic Scale

[HIS DRAWING WAS PREPARED AT THE SCALE INDICATED IN TOETTTl£ BLOCK. INACCURACIES IN TOE STATED SCALE MAY BE

INTRODUCED WHEN DRAWINGS ARE REPRODUCED BY ANYMEANS. USE THE GRAPHIC SCALE BAR IN THE TTTLE BLOCK TO

DETERMINE THE ACTUAL SCALE OF THIS DRAWING.

6/22/04 JELETED VEGETATIVE ENGINEERED BARRIER ON PARCEL

J 9 - 2 3 - 2 2 . ADDED REFERENCE TO TECHNICAL DWG 12A

5/26/04

"DatT

REVISED CULVERT REFERENCE REVISED DRAINAGE SWALE

DETAIL AND ADDED REFERENCES TO TECHNICAL DWG 12A

1 0 / 1 5 / 0 3 REVISED NOTE REGARDING RIP RAP RESTORATION.

RevisionsTHIS DRAWING IS IHE PROPERTY OF BLASLAND. BOUCK St LEE. INC. AND MAY NOT

BE REPRODUCED OR ALTERED IN WHOLE ori IN PART WITHOUT THE EXPRESSWRITTEN PERMISSION OF BLASLAND. BOUCK A LEE. INC.

Project Mgr. CBA. _

Designed by BMS7QAA

Drown by KMD_ _

Checked by WAR./PHB

Prof. Eng.

PE License

BBUBLASLAND. BOUCK & LEE, INC.

engineers, scientists, economists

GENERAL ELECTRIC COMPANY • PITTSFIELD, MASSACHUSETTS

NEWELL STREET AREA I RAA REMEDIAL ACTION

PHASE IVENGINEERED BARRIER PLAN

TECHNICAL DRAWINGS

File Number101.12

DateJULY 2003

Blasland, Bouck & Lee, Inc.Corporate Headquarters6723 Towpath RoadSyracuse. NY 13214315-446-9120

12

Page 6: RESTORATION OF PARCEL J9-23-22, NEWELL STREET AREA 1 · 2020. 7. 7. · j9-23-25 contractor shall excavate this area to achieve required final surface contours tor shall place 6-inch

OUTLET INV. 979.79(SEE NOTES 6 AND 8) .CONTRACTOR SHALLRESTORE RIP RAP AFTERINSTALLATION OF OUTLETPIPE

1 \ ABOVE-GRADETERMINATION

ANCHORTRENCH

/ ' CONTRACTOR SHALLRESTORE TOP EIGHTINCHES OF HATCHED AREAWITH 6-INCH GRAVELLAYER AND 2- INCH

/BITUMINOUS ASPHALT/ LAYER. CONTRACTOR SHALL

CONSTRUCT NEW DRAINAGE«" SWALE TO MATCH SLOPES\ AND DIMENSIONS SPECIFIED

V - ' O N DETAIL 2 OFy \ TECHNICAL DRAWING 14.

\ \

•OUTLET; INV. 977.00\ (SEE NOTE 6)

1 CONTRACTOR SHALLINSTALL DRAIN LINE INACCORDANCE WITH NOTE 8 '

PROPOSED14 7MANH0LE

INV. 979.08

\ INV. &80.50V \ \ 982.5

\

247-249 NEWELL ST.J9-23-22

CONTRACTOR SHALLRESTORE TOP EIGHTINCHES OF HATCHED AREAWITH 6- INCH GRAVELLAYER AND 2- INCHBITUMINOUS ASPHALTLAYER. CONTRACTORSHALL CONSTRUCT NEWDRAINAGE SWALE TOMATCH SLOPES ANDDIMENSIONS SPECIFIED ONDETAIL 2 OF TECHNICALDRAWING 14.

J_\ABOVE-GRADE^TERMINATION

261 NEWELL ST.J9-23-23

CONTRACTOR SHALL RESTORE AREATO ALLOW POSITIVE DRAINAGE OFSURFACE WATER TOWARD DRAINAGESWALE LOCATED ADJACENT TOEAST/SOUTHEAST CORNER OF REARBUILDING.

DETAIL C

DETAIL B

DETAIL A

1. BASE MAP MODIFIED FROM SURVEY BY HILL ENGINEERS.ARCHITECTS 4 PLANNERS, DATED 8/15/01.

2. THIS DRAWING ONLY PRESENTS RESTORATION DETAILSASSOCIATED WITH INSTALLATION OF THE ENGINEEREDBARRIER. REFER TO DRAWING 6 FOR OTHER PROPERTYSPECIFIC RESTORATION DETAIL

3. PROPOSED CONTOUR INTERVAL IS 0.5 FOOT. EXISTINGCONTOUR INTERVAL IS 1 FOOT. PROPOSED CONTOURSREPRESENT TOP OF FINAL GRADE. CONTRACTOR SHALLESTABLISH UNER GRADING BASED ON TOP OF FINAL GRADEAND REQUIRED COVER THICKNESS. UNER GRADING INDRAINAGE ANCHOR TRENCHES SHALL BE ADJUSTED ASNECESSARY TO ACHIEVE PIPE INVERT ELEVATIONS.

4. UTILITY LOCATIONS ARE APPROXIMATE AND ALL UTILITIESMAY NOT BE SHOWN. PRIOR TO ANY CONSTRUCTION, THECONTRACTOR SHALL CONTACT "DIG-SAFE" AND HAVE ALLUNDERGROUND UTILITIES LOCATED.

5. EDGE OF ENGINEERED BARRIER REPRESENTS OUTER UMIT OFANCHOR TRENCH.

6. LOCATION OF DOWNSTREAM TERMINATIONS AND INVERTELEVATIONS OF OUTLET PIPE ARE APPROXIMATE ONLY. THECONTRACTOR SHALL ADJUST BOTH AS NECESSARY SO THATA MINIMUM 1% INVERT SLOPE IS MAINTAINED FROM THEEDGE OF THE ENGINEERED BARRIER TO THE DOWNSTREAMTERMINATIONS.

7. COLLECTION PIPES SHALL BE 4"« PERFORATEDSMOOTH-BORE CORRUGATED HDPE. MINIMUM PIPE SLOPE

X: 10112X00, X01.DWG SHALL BE 0.5JtL: 0N=*, OFF=REF*P: PAGESET/PLT-CDL6/22/04 SYR-85-KMD KMD NESC/101I2003/CONTRACT/10112G17.DWG

S. OUTLET PIPE FROM MANHOLE SHALL BE 15"0 SOLID WALLCORRUGATED SMOOTH-BORE HDPE. OTHER OUTLET PIPESSHALL BE 4"» SOLID WALL CORRUGATED SMOOTH-BOREHDPE.

9. CULVERT SHALL BE 15"» SOUD WALL CORRUGATEDSMOOTH-BORE HDPE. PIPE SHALL BE INSTALLED BELOWGE0SYN1HET1C COVER. GEOSYNTHETIC PENETRATIONS BYTHE CULVERT SHALL BE CONSTRUCTED AS SHOWN ONDRAWING 14.

10. ENGINEERED BARRIER ON LOT J9-23-22 SHALL BE EITHERGRAVEL-COVERED OR VEGETATED TO MATCH EXISTINGSURFACE TYPE.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMININGAPPROPRIATE PIPE FITTINGS AT BENDS. CONNECTIONS,AND/OR INTERSECTIONS.

12. UTILIZE ABOVE-GRADE COVER TERMINATIONS AS SHOWN ONDRAWING 14.

13. RIP RAP APRON SHALL USE TYPE 2 RIP RAP. APRONSHALL BE 10 FEET IN LENGTH. 4 FEET IN WIDTH ATUPSTREAM END AND 12 FEET IN WIDTH AT DOWNSTREAMEND.

14. CONTRACTOR SHALL REPLACE AN EQUAL NUMBER ANDTYPE OF TREES AND SHRUBS AS REMOVED DURING SITEPREPARATION ACTIVITIES. ALL RESTORED TREES ANDSHRUBS MUST BE INSTALLED AT LEAST 10 FEET OUTSIDETHE LIMITS OF THE ENGINEERED BARRIERS.

FINAL GRADE DRAINAGE SWALEA INVERT (SEE NOTE 1)

FINAL GRADE CHECK DAM CRESTN. (SEE NOTE 2)

3 (TYP.)

NON-WOVENGEOTEXTILE

NOTES:

1. CHECK DAM TO BE INSTALLED APPROXIMATELY 5'UPGRADIENT OF THE RIVER BANK CREST.

2. CHECK DAM CREST TO HAVE A MINIMUM TOP LENGTHOF 12" AND A MINIMUM BOTTOM LENGTH OF 3".

CHECK DAM CROSS-SECTION

RIPRAP DMAX = 6" D50 = 4 " DM1N - 3 "

VARIES(MAINTAIN 3" MINIMUM,

SEE NOTE 3)

ENGINEERED BARRIERC0LLET10N PIPE

NOTES:

1. DITCH SHALL HAVE A MINIMUM SLOPE OF 1%.

2. GEOTEXTILE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'SSPECIFICATIONS. GEOTEXTILE TO BE OVERLAPPED ONTO EXISTINGGEOTEXTILE AT RIVER BANK CREST A MINIMUM OF 18".

3. CONTRACTOR SHALL ENSURE THAT THE DRAINAGE PIPE FOR THEENGINEERED BARRIER IS NOT DAMAGED DURING CONSTRUCTION OF THEDRAINAGE SWALE.

DRAINAGE SWALE CROSS-SECTION

- NON-WOVENGEOTEXTILE(SEE NOTE 2)

J9- 23-23

o

LEGEND:

PARCEL BOUNDARY

PHASE BOUNDARY

EASEMENT

SANITARY SEWER

WOODEN FENCE

WIRE FENCE

PARCEL ID

DECIDUOUS TREE

RIP RAP

987.5

-987-

DETAIL D ANOT TO SCALE

] BUILDING

ENGINEERED BARRIER (SEE NOTE 5)

PROPOSED CONTOUR (SEE NOTE 3)

EXISTING CONTOUR

PROPOSED COLLECTION PIPE AND FLOW DIRECTION (SEE NOTE 7 )

PROPOSED OUTLET PIPE AND FLOW DIRECTION (SEE NOTE 8)

TEMPORARY EROSION CONTROL MAT (INSTALL PERMANUFACTURER'S RECOMMENDATIONS)

CONFIDENTIAL

Graphic Scale

10' p

PHIS DRAWING WAS PREPARED AT THE SCALE INDICATED IN THETITLE BLOCK. INACCURACIES IN THE STATED SCALE MAY BE

INTRODUCED WHEN DRAWINGS ARE REPRODUCED BY ANYMEANS. USE THE GRAPHIC SCALE BAR IN THE TITLE BLOCK TO

DETERMINE THE ACTUAL SCALE OF THIS DRAWING.

.A. 6/22/04 ADDED DETAIL D.

THIS DRAWING IS THE PROPERTY OF BLASLAND. BOUCK & LEE, INC. AND MAY NOTBE REPRODUCED OR ALTERED IN WHOLE OR IN PART WITHOUT THE EXPRESS

WRTTTEN PERMISSION OF BLASLAND. BOUCK & LEE. INC.

Project Mgr. CBA

Designed by BMS/CAA

Drawn by KMD. _

Checked by _ _ J W R / P H B

Prof. Eng.

PE License

BBCBLASLAND, BOUCK & LEE, INC.engineers, scientists, economists

GENERAL ELECTRIC COMPANY • PITTSFIELD, MASSACHUSETTS

NEWELL STREET AREA I RAA REMEDIAL ACTION

PHASE IVDRAINAGE SWALE AND OUTLET PIPE DETAILS

TECHNICAL DRAWINGS

File Number101.12

DateJULY 2003

Blastand, Bouck <Sc Lee, Inc.Corporate Headquarters6723 Towpath RoadSyracuse, NY 13214315-445-9120

12A

Page 7: RESTORATION OF PARCEL J9-23-22, NEWELL STREET AREA 1 · 2020. 7. 7. · j9-23-25 contractor shall excavate this area to achieve required final surface contours tor shall place 6-inch

_#

NOTES:

6" VEGETATIVE TOPSOIL (SEE NOTE 3)

12" SOIL FILL MATERIAL(SEE NOTE 2)

GEOCOMPOSITE DRAINAGE NET

HDPE GEOMEMBRANE UNER

NON-WOVEN CUSHIONGEOTEXTILE (SEE NOTE 1)

EXISTING SOIL

1. CUSHION GEOTEXTILE IS REQUIRED WHERE COVER IS INSTALLEDABOVE UNCOMPACTED NATIVE MATERIAL

2. AT CONTRACTOR'S DISCRETION, SOIL FILL MATERIAL MAY BEREPLACED WITH TOPSOIL

A 3. 5 INCH VEGETATIVE TOPSOIL LAYER TO BE REPLACED BY 4INCH TOPSOIL LAYER AND SOD WHERE NOTED.

VEGETATIVE ENGINEERED BARRIER,NOT TO SCALE

NOTES:

1. CUSHION GEOTEXTILE IS REQUIRED WHERE COVER ISINSTALLED ABOVE UNCOMPACTED NATIVE MATERIAL.

2" BITUMINOUS ASPHALT WEARING SURFACE

4" BITUMINOUS ASPHALT BASE COURSE

12" SUBBASE COURSE

GEOCOMPOSITE DRAINAGE NET

HDPE GEOMEMBRANE LINER

NON-WOVEN CUSHION GEOTEXTILE (SEE NOTE 1)

EXISTING SOIL

— EXISTING PAVEMENT SECTION (THICKNESS UNKNOWN)SAWCUT EXISTING EDGEOF ASPHALTTACK COAT SAWCUT EDGE

ASPHALT-COVERED ENGINEERED BARRIERNOT TO SCALE

NOTES:

1. CUSHION GEOTEXTILE IS REQUIRED WHERE COVER ISINSTALLED ABOVE UNCOMPACTED NATIVE MATERIAL.

18" GRAVEL FILLMATERIALNON-WOVEN GEOTEXTILEDEMARCATION LAYER) A

GEOCOMPOSITE DRAINAGE NET

HDPE GEOMEMBRANE UNER

NON-WOVEN CUSHIONGEOTEXTILE (SEE NOTE 1)

EXISTING SOIL

GRAVEL-COVERED ENGINEERED BARRIER.

NOTES:

1. CUSHION GEOTEXTILE IS REQUIRED WHERE COVER ISINSTALLED ABOVE UNCOMPACTED NATIVE MATERIAL.

2. AT CONTRACTOR'S DISCRETION, SOIL FILL MATERIAL MAYBE REPLACED WITH TOPSOIL.

3. PRIOR TO INSTALLATION OF THIS TYPE OF BARRIER, THECONTRACTOR SHALL REMOVE AND DISPOSE OF EXISTINGVEGETATION.

12" VEGETATIVE ENGINEERED BARRIER,NOT TO SCALE

3" VEGETATIVE TOPSOIL (SEE NOTE 3)

9" SOIL FILL MATERIAL(SEE NOTE 2)

GEOCOMPOSITE DRAINAGE NET

HDPE GEOMEMBRANE UNER

NON-WOVEN CUSHIONGEOTEXTILE (SEE NOTE 1)

EXISTING SOIL

NOT TO SCALE

1 /4 " X 2 " POWDERDRIVEN NAIL ANCHORPLACED EVERY 61

TOPSOIL, GRAVEL OR ASPHALT

SOIL FILL, GRAVEL OR SUBBASE

COLLECTION PIPE(SEE NOTE 2 ) -

NON-WOVEN GEOTEXTILEANCHOR TRENCHBACKFILL(SEE NOTE 3)

EXISTING SOIL

MINIMUM LENGTHOF LINER PLACEDAGAINSTCONCRETE

EXISTINGCONCRETESTRUCTURE

NOTES:

STAINLESS STEEL BATTEN

TOPSOIL, GRAVEL OR ASPHALT

SOIL FILL, GRAVEL OR SUBBASE

GEOCOMPOSITE DRAINAGE NET

HDPE GEOMEMBRANE UNER

CUSHION GEOTEXTILE (SEE

NOTE 2)

EXISTING SOIL

1. THIS DETAIL APPUCABLE TO COVER TERMINATIONS ADJACENT TO BUILDINGS, MANHOLESOR CONCRETE SLABS.

2. CUSHION GEOTEXTILE IS REQUIRED WHERE COVER IS INSTALLED ABOVE UNCOMPACTEDNATIVE MATERIAL

3. CONTRACTOR SHALL EVALUATE THE FEASIBIUTY OF USING THIS BATTEN STRIP METHODON THE MANHOLE PRIOR TO PROCEEDING.

GEOMEMBRANE/CONCRETE ANCHORNOT TO SCALE

GENERAL NOTES:

GEOCOMPOSITE DRAINAGENET

HDPE GEOMEMBRANE LINER -

CUSHION GEOTEXTILE(SEE NOTE 4)

EXISTING SOIL

NOTES:

1. THIS DETAIL APPLICABLE TO AT-GRADE COVER TERMINATIONS WITH COLLECTION PIPES.

2. COLLECTION PIPE SHALL BE 4"» PERFORATED SMOOTH-BORE CORRUGATED HDPE.

3. ANCHOR TRENCH SHALL BE BACKFILLED WITH FILTER STONE WRAPPED IN NON-WOVEN GEOTEXTILE.

4. CUSHION GEOTEXTILE IS REQUIRED WHERE COVER IS INSTALLED ABOVE UNCOMPACTED NATIVE MATERIAL

5. ANCHOR TRENCH DEPTH MAY EXCEED 12-INCH MINIMUM AS NECESSARY TO ACHIEVE COLLECTION PIPE INVERTSSHOWN ON DRAWINGS 9 THROUGH 12.

AT-GRADE DRAINAGE ANCHOR TRENCH,NOT TO SCALE

1. GEOSYNTHETICS ARE SHOWN AT AN EXAGGERATED SCALE FOR CLARITY.

* ON" "OFT2SREF« 2- "AT-GRADE" REFERS TO ENGINEERED BARRIERS THAT ARE RECESSED INTOP: PAGESET/PLT-CDL EXISTING GRADE.6/22/04 SYR-B5-KMD ROC-85-SLM SYR-S5-GMS. NESC/l 0112003/C0NTRACT/10112G05.D WG

2" BITUMINOUSASPHALT WEARING SURFACE

4" BITUMINOUSASPHALT BASE COURSE

12" SUBBASE COURSE

GEOCOMPOSITE DRAINAGE NET

HDPE GEOMEMBRANE LINER

CUSHION GEOTEXTILE (SEE NOTE 1)

EXISTING SOIL

NOTES:

1. CUSHION GEOTEXTILE IS REQUIRED WHERE COVER IS INSTALLEDABOVE UNCOMPACTED NATIVE MATERIAL

AT-GRADE ASPHALT COVER TIE-IN,NOT TO SCALE

TOPSOIL. GRAVEL OR ASPHALT

SOIL FILL, GRAVEL OR SUBBASE

GEOCOMPOSITE DRAINAGE NET

ANCHOR TRENCHEXISTING SOIL

HDPE GEOMEMBRANE LINER

CUSHION GEOTEXTILE(SEE NOTE 2)

EXISTING SOIL

NOTES:

1. THIS DETAIL APPLICABLE TO AT-GRADE COVER TERMINATIONS WITHOUT COLLECTION PIPES.

2 . CUSHION GEOTEXTILE IS REQUIRED WHERE COVER IS INSTALLED ABOVE UNCOMPACTED NATIVEMATERIAL.

AT-GRADE ANCHOR TRENCH,NOT TO SCALE

TOPSOIL, GRAVEL OR ASPHALT

SOIL FILL, GRAVEL OR SUBBASE

GEOCOMPOSITE DRAINAGE NET-

HDPE GEOMEMBRANE UNER

CUSHION GEOTEXTILE(SEE NOTE 2)

EXISTING SOIL

V•TEMPORARY ANCHOR TRENCH (SEE NOTE 3)

.—TEMPORARY GEOCOMPOSITE/ TERMINATION /s^

CONFIDENTIAL

8 " _ M J N | . , _ - . . . _ ,.. . , _

EXISTING SOILN 0 T E S : ^ — PROTECTION GEOTEXTILE

1. THIS DETAIL APPUCABLE TO TEMPORARY AT-GRADE COVER TERMINATIONS.

2. CUSHION GEOTEXTILE IS REQUIRED WHERE COVER IS INSTALLED ABOVE UNCOMPACTED NATIVE MATERIAL

3. UPON CONTINUATION OF ENGINEERED BARRIER CONSTRUCTION, THE CONTRACTOR SHALL CAREFULLYEXCAVATE TEMPORARY ANCHOR TRENCH BACKFILL, DISCARD PROTECTION GEOTEXTILE. AND BACKFILLTEMPORARY ANCHOR TRENCH.

4. IT IS RECOMMENDED THAT THE CONTRACTOR MARK OR RECORD THE LOCATION OF THE TEMPORARYANCHOR TRENCH TO MINIMIZE DAMAGE TO THE GEOSYNTHETICS FOR FUTURE CONTINUATION OFENGINEERED BARRIER.

TEMPORARY AT-GRADE TERMINATION,NOT TO SCALE

Graphic Scale

NOT TO SCALE

THIS DRAWING WAS PREPARED AT THE SCALE INDICATED IN THETITIE BLOCK. INACCURACIES IN THE STATED SCALE MAY BE

INTRODUCED WHEN DRAWINGS ARE REPRODUCED BY ANYMEANS. USE THE GRAPHIC SCALE BAR IN THE TITLE BLOCK TO

DETERMINE THE ACTUAL SCALE OF THIS DRAWING.

AREVISED DETAIL 4REVISED DETAIL 1 AND DETAIL 5.

WRFTTEN PERMISSION OF BLASLAND. BOUCK 4 LEE. INC.

P r o j e c t Mgr . CBA

Des igned b y ? M S / C A A _ _

Drawn b y JER

C h e c k e d b y _ !MNZ_WAR_/PHB

P r o f . E n g .

PE L i cense

BBUBLASLAND, BOUCK & LEE. INC.engineers, scientists, economists

GENERAL ELECTRIC COMPANY • PITTSF1ELD, MASSACHUSETTS

NEWELL STREET AREA I RAA REMEDIAL ACTION

COVER DETAILSTECHNICAL DRAWINGS

File Number101.12

DateJULY 2003

Blasland, Bouck & Lee, Inc.Corporate Headquarters6723 Towpath RoadSyracuse, NY 13214315-446-9120

13

Page 8: RESTORATION OF PARCEL J9-23-22, NEWELL STREET AREA 1 · 2020. 7. 7. · j9-23-25 contractor shall excavate this area to achieve required final surface contours tor shall place 6-inch

TOPSOIL OR ASPHALT

SOIL FILL OR SUBBASE

GEOCOMPOSITE DRAINAGENET

HDPE FLAP (SEE NOTE 3)

EXISTING GRADE •ANCHOR TRENCHEXISTING SOIL

HDPE GEOMEMBRANELINER

CUSHION GEOTEXTILE(SEE NOTE 1)

EXISTING SOIL

NOTES: TYPE 1 RIPRAPJ

1. THIS DETAIL APPLICABLE TO ABOVE-GRADE COVER TERMINATIONS.

2. CUSHION GEOTEXTILE IS REQUIRED WHERE COVER IS INSTALLED ABOVE NATIVE MATERIAL.

3. THE CONTRACTOR SHALL INSTALL AN HDPE FLAP TO THE TOP OF THE LINER TO MINIMIZEPONDING WATER IN THE ANCHOR TRENCH. THE FLAP SHALL BE OF THE SAME MATERIAL AS THELINER, BE LARGE ENOUGH TO SPAN THE ANCHOR TRENCH, AND BE CONTINUOUSLY WELDED TOTHE TOP OF THE LINER. PRIOR TO INSTALLING THE FLAP, THE CONTRACTOR SHALL TERMINATETHE LINER IN THE ANCHOR TRENCH AND BACKFILL THE ANCHOR TRENCH.

: ABOVE-GRADE TERMINATIONNOT TO SCALE

NON-WOVEN GEOTEXTILE (SEE NOTE 2 )DRAINAGE TRENCH BACKFILL(SEE NOTE 2)

COLLECTION PIPE(SEE NOTE 1)

*wi

HDPE GEOMEMBRANE LINER

NOTES:

1. COLLECTION PIPE SHALL BE 4"«S PERFORATED SMOOTH BORE CORRUGATED HDPE.

2. DRAINAGE TRENCH TO BE BACKFILLED WITH FILTER STONE WRAPPED INNON-WOVEN GEOTEXTILE. GEOTEXTILE SEAM TO BE SEWN.

3 CUSHION GEOTEXTILE IS REQUIRED WHERE COVER IS INSTALLED ABOVE NATIVEMATERIAL.

LATERAL COLLECTION PIPENOT TO SCALE

ASPHALT

SUBBASE

GEOCOMPOSITE DRAINAGENET

HDPE GEOMEMBRANELINER

CUSHION GEOTEXTILE(SEE NOTE 2)

EXISTING SOIL-

GEOCOMPOSITEDRAINAGE NET

CUSHIONGEOTEXTILE(SEE NOTE 4)

. AT-GRADE) ENGINEERED —

BARRIER

BITUMINOUS ASPHALT

GRAVEL •TEMPORARY EROSIONCONTROL MAT

ABOVE-GRADEENGINEEREDBARRIER f^\

, \ _ .•TOPSOIL

SOIL FILL

DRAINAGE TRENCH BACKFILL (SEE NOTE

COLLECTION PIPE

N O T E S : V (SEE NOTE 2)

1. THIS DETAIL APPLICABLE TO DRAINAGE SWALES WITH A COLLECTION PIPE.

2. COLLECTION PIPE SHALL BE 4 "0 PERFORATED SMOOTH-BORE CORRUGATED HDPE.

3. DRAINAGE TRENCH SHALL BE BACKFILLED WITH FILTER STONE WRAPPED IN NON-WOVEN GEOTEXTILE.GEOTEXTILE SEAM TO BE SEWN.

4. CUSHION GEOTEXTILE IS REQUIRED WHERE COVER IS INSTALLED ABOVE NATIVE MATERIAL.

5. PAVED PORTION OF DRAINAGE SWALE SHALL BE FIVE FEET IN WIDTH AND CENTERED ON COLLECTION

DRAINAGE SWALE/LATERAL COLLECTION PIPENOT TO SCALE

3)

PIPE.

GRATED INLET AND FRAME(SEE NOTE 4 )

EXISTING GRADE EL. 982.5 ± A .

PRECAST CONCRETECATCH BASIN(SEE NOTE 2 )

4 " SMOOTH-BORECORRUGATED HDPEPIPE (SEE NOTE 3 )

15"« SMOOTH-BORECORRUGATED HDPECULVERT PIPE (SEENOTE )

15"B SMOOTH-BORECORRUGATED HDPEOUTLET(SEE NOTE 3)

LADDER RUNG (ASREQUIRED)

ANNULAR SPACESEALED WITHNON-SHRINK GROUT(TYP.)

NOTES:

1. REFER TO DRAWING 12 FOR APPROXIMATE LOCATION OF CATCH BASIN.

2. PRECAST CONCRETE MANHOLE SHALL BE RATED FOR H - 2 0 LOADING.

3. REFER TO DRAWING 12 FOR INVERT ELEVATIONS.

4 GRATED INLET AND FRAME SHALL BE RATED FOR H - 2 0 LOADING. CONTRACTOR TO DETERMINEGRAVEL-COVERED APPROPRIATE SIZE AND CONFIGURATION. GRATE SHALL BE CAPABLE OF PASSING 1 CFS WITH 1ENGINEERED BARRIER | N C H 0 F H E m T O p 0 F GRATE SHALL BE LOCATED APPROXIMATELY 2 INCHES ABOVE GRADE. A .

MANHOLE DETAIL

NOTES:

1. SOIL BERM SHALL BE COMPOSED OF TOPSOIL AND SOD.

2. CUSHION GEOTEXTILE IS REQUIRED WHERE COVER IS INSTALLED ABOVEMATERIAL.

SOIL BERMNOT TO SCALE

X: 10112X00.DWGL ON-*, OFF=REF«P: PAGESET/PLT-CDL5/27/04 SYR-85-KMD R0C-85-SLM SYR-85-GMS LAF KMDC/10112003/CONTRACT/10112G11 .DWG

NOT TO SCALE

GENERAL NOTES:

1. GEOSYNTHETICS ARE SHOWN AT AN EXAGGERATED SCALE FOR CLARITY.

2. "ABOVE-GRADE" REFERS TO ENGINEERED BARRIERS THAT ARE CONSTRUCTED ONTOP OF EXISTING GRADE.

3. "AT-GRADE" REFERS TO ENGINEERED BARRIERS THAT ARE RECESSED INTOEXISTING GRADE.

GEOCOMPOSITE DRAINAGENET (SEE NOTE

SEWN PRAYER SEAM(SEE NOTE 2)

HDPE GEOMEMBRANE LINER

ZIP TIE (SEE NOTE 4)

NOTES:

1. ALL GEOCOMPOSITE SHALL SHINGLE DOWNSLOPE.

2. THE TOP GEOTEXTILE COMPONENTS OF THE TWO GEOCOMPOSITE LAYERS SHALL BE PEELED BACKSO THAT A PRAYER SEAM MAY BE SEWN ABOVE THE GEOCOMPOSITE OVERLAP.

3. IF GEOTEXTILE IS UNABLE TO BE PEELED BACK WITHOUT CAUSING DAMAGE, A PATCH OFGEOTEXTILE SHALL BE HEAT BONDED TO THE TOP GEOTEXTILE LAYER OF THE OVER THE SEAM.

4. ZIP TIES SHALL BE PLACED EVERY 5' ALONG ADJACENT PANELS AND EVERY 6" ALONG BUTTSEAMS AND IN ANCHOR TRENCHES.

TYPICAL GEOCOMPOSITE SEAMNOT TO SCALE

MONITORING WELL, ELECTRIC RISER, FENCEPOST, ETC. (DIAMETER VARIES, SEE NOTE 2)

MASTIC SEAL FULL CIRCUMFERENCEOF PIPE

3 / 8 " THICK NEOPRENE GASKETBETWEEN PIPE AND CANOPY

STAINLESS STEEL BAND (2 )

HDPE CANOPY

GEOCOMPOSITE DRAINAGE NET

HDPE GEOMEMBRANE LINER

CUSHION GEOTEXTILE (SEE NOTE 1)

EXTRUSION WELD-FULL CIRCUMFERENCEOF CANOPY (TYP.)

NOTES:

1. CUSHION GEOTEXTILE IS REQUIRED WHERE COVER IS INSTALLED ABOVE NATIVE MATERIAL.

2. THIS DETAIL MAY BE USED FOR OTHER PENETRATIONS THROUGH THE GEOSYNTHETICS.

GEOSYNTHETICS PENETRATION SEALNOT TO SCALE

UPPER GEOTEXTILE -Z IP TIE(SEE NOTE 3)

DRAINAGE NET

NOTES:

1. THIS DETAIL APPLICABLE TO TEMPORARY TERMINATION OF GEOSYNTHETICS. WHERE NECESSARY.

2. DRAINAGE NET AND LOWER GEOTEXTILE SHALL BE CUT SO THAT THE UPPER GEOTEXTILE MAY BEWRAPPED AROUND THE END OF THE GEOCOMPOSITE.

3. ZIP TIES SHALL BE PLACED EVERY 5' ALONG THE EDGES OF THE GEOCOMPOSITE.

TEMPORARY GEOCOMPOSITE TERMINATIONNOT TO SCALE

CONFIDENTIALGraphic Scale

NOT TO SCALE

FHIS DRAWING WAS PREPARED AT THE SCALE INDICATED IN THETITLE BLOCK. INACCURACIES IN THE STATED SCALE MAT BE

INTRODUCED WHEN DRAWINGS ARE REPRODUCED BY ANYMEANS. USE THE GRAPHIC SCALE BAR IN THE TTTLE BLOCK TO

DETERMINE THE ACTUAL SCALE OF THIS DRAWING.

AA.A. Date

REVISED DETAILS 2 AND 5.

1 0 / 1 5 / 0 3 REVISED DETAIL 7.

9 / 2 4 / 0 3 REVISED DETAIL 1 AND ADDED NOTE 3.Revis ions

THIS DRAWING IS THE PROPERTY OF BLASLANO. BOUCK & LEE. INC. AND MAY NOTBE REPRODUCED OR ALTERED IN WHOLE OR IN PART WITHOUT THE EXPRESS

WRITTEN PERMISSION OF BLASLAND, BOUCK & LEE. INC.

Project Mgr. GBA

Designed by BM_S/CAA_ _

Drawn by JER

Checked by _ JMNZWAR/PHB

Prof. Eng.

PE License

BBLBLASLAND, BOUCK & LEE, INC.engineers, scientists, economists

GENERAL ELECTRIC COMPANY • PITTSFIELD, MASSACHUSETTS

NEWELL STREET AREA I RAA REMEDIAL ACTION

COVER DETAILSTECHNICAL DRAWINGS

File Number101.12

DateJULY 2003

8lasland, Bouck & Lee, Inc.Corporate Headquarters6723 Towpath RoadSyracuse, NY 13214315-446-9120

14