PERSONAL DETAILSName : Manvendra Kumar
Date of Birth : March 26, 1984
Qualification : B E (Mechanical Engineering)
University : Rajiv Gandhi Proudyogiki Vishvavidyalaya (R.G.P.V.), Bhopal, M.P., India
Year of Graduation: July, 2005
Total Experience: 10.5 Years
Passport No : G-1694703 (Valid up to Year 2017)
Current Address : Salgu Byeokdol House – Unit A 503, Dungcheon Dong, Gangseo-Gu, Seoul, South KoreaPin Code – 157583Mobile No: +82-1040699364
Permanent Address: Flat no. C-102, Haverest residency, Opp. Yash complex, Gotri Road, Vadodara - 390023
E-mail Address : [email protected]
WORK EXPERIENCE
WORK PROFILE : Sheet 1 of 6
document.doc6
![Page 2: RESUME- Manvendra_Mechanical Engineer](https://reader036.vdocument.in/reader036/viewer/2022083117/588142f91a28abf65a8b69ff/html5/thumbnails/2.jpg)
My Job Responsibilities include -
Engineering of Static equipment such as Pressure Vessels, Columns, Reactors, Heat Exchangers, Air Coolers, Deaerators, Electrical Heaters, Filters, Silencers and other Static Equipment used in Petrochemical plants and Refineries.
Package Handling & Engineering like Produced Water treatment package, Feed Filter Package, Amine Filtration Package, Nitrogen PSA Package, Water Treatment Package etc.
Engineering of Combustion Equipment like Fired Heater, Elevated Flares, SRU Reaction Furnaces, Burners etc.
Present Work Activities include the following:
Review of Client Specifications and Clarifications with Client. Review of ITB Package provided by Client Preparation of Engineering deliverables such as Datasheet,
Material / Purchase Requisitions, Bill of Materials etc.. Providing inputs for preparation of Technical proposal Review/Clarification of Vendor Offers Technical/Commercial Bid Evaluation of Vendor offers Review/Approval of Drawings, Design Calculations. Vendor Drawing Review & Approval Interface Engineering with other departments (Process, Piping,
Instrumentation, Electrical, and Civil etc) Technical support for Site erection and fabrication activities Supervision of 3-D Model preparation and review of Equipment /
Package
EMPLOYMENT HISTORY
CURRENT -
Company : DAELIM Industrial Company, Seoul, South Korea. Sheet 2 of 6
document.doc6
![Page 3: RESUME- Manvendra_Mechanical Engineer](https://reader036.vdocument.in/reader036/viewer/2022083117/588142f91a28abf65a8b69ff/html5/thumbnails/3.jpg)
Total Experience : (~)2Years (July 2014 – Present), on Contractual assignment
Designation : Asst. Manager (Static Equipment Engineering Department)
MAJOR PROJECTS / ASSIGNMENTS:
Engineering for Static Equipment in OMSK Refinery, Russia Deep Conversion Complex Project
Engineering for Static Equipment in S-Oil Refinery upgradation Project
Proposal Engineering for Static Equipment and Packages in KNPC New Refinery Project (NRP) - Package 3 – Utilities and Offsites
Proposal Engineering for Static Equipment and Packages in KNPC Gas Train 5 proposal
Proposal Engineering for Static Equipment in RAPID Malaysia Project – Package 26 – Polycarbonates
Proposal Engineering for Static Equipment and Packages in KOC MGT & NWC Proposal
Proposal Engineering for Static Equipment and Packages in KLPE IPC GSU & SCU PE Proposal
PREVIOUS –
Company : L&T Chiyoda Limited, Vadodara, India.
Total Experience : (~)Four (4) Years, Aug 2010 – Jul 2014
Designation : Assistant Manager (Package and Combustion Department)
MAJOR PROJECTS / ASSIGNMENTS:
Detail Engineering Project
Detail Engineering for RHDS (Refinery Hydro De-Sulphurization) unit of Nghi-Son Refinery project, Vietnam for the following packages :
o Reactor Feed Furnace (Fired Heater)o Feed Filter Packageo Membrane Hydrogen Recovery Package
Detail Engineering Project for IOCL-FCC Unit of IOCL Paradip Project as Engineer for following items :
Sheet 3 of 6document.doc6
![Page 4: RESUME- Manvendra_Mechanical Engineer](https://reader036.vdocument.in/reader036/viewer/2022083117/588142f91a28abf65a8b69ff/html5/thumbnails/4.jpg)
o Reactor-Regenerator Package comprising FCC Reactor, Regenerator, Orifice Chamber, Hopper, Stand-pipes.
o Direct Fired Air Heatero Flue Gas Stack
Proposal (Estimation) Engineering
Proposal Engineering for Thermal Reaction Systems etc. in Jazan Refinery IGCC Project – Sulphur Recovery Unit
Proposal Engineering for Packages in Jazan Refinery Sour Water Stripper Unit
Proposal Engineering for Thermal Reaction systems in Oman Refinery Improvement project - Sulphur recovery unit
Proposal Engineering for Packages in Satah Al Razboot Onshore plant for ADMA-OPCO
Proposal Engineering for KNPC Mina Al-Ahmadi Refinery FCC Revamp project
FEED Engineering Activities for Packages in Onshore LNG Processing Plant of Woodside Energy Limited, Western Australia (Thro’ Chiyoda Corporation, Japan)
Company : Reliance Engg. Associates Limited, Jamnagar, India (EPC arm of Reliance Industries Limited, Refinery Division, Jamnagar)
Total Experience : (~) Five (5) Years (Worked with Reliance Engg. Associates Limited from Sep, 2005 till Aug, 2010)
Designation : Manager (Static Equipment Department)
MAJOR PROJECTS / ASSIGNMENTS:
Jamnagar Export Refinery Project (JERP) – Various Process Units
Detail Engineering including Preparation of Requisition, Evaluation of Vendor offers, Vendor print review etc. for Static Equipment such as Pressure Vessels, Columns, Air Cooled Exchangers, Filters etc. for various Process units of Reliance Industries Limited – Jamnagar Refinery
Vendor Co-ordination, Control and Monitoring of Vendor documents
Interface and Co-ordination with other related disciplines such as Piping / Instrumentation / Civil for engineering issues
Sheet 4 of 6document.doc6
![Page 5: RESUME- Manvendra_Mechanical Engineer](https://reader036.vdocument.in/reader036/viewer/2022083117/588142f91a28abf65a8b69ff/html5/thumbnails/5.jpg)
Preparation of Fabrication / Modification drawings for activities like Nozzle size change, Tray replacement, Tube bundle replacement, New nozzle addition etc. for Pressure Vessels & Exchangers.
Site Engineering Query Resolution and Trouble-shooting Site activities related to erection, hydrotesting, mechanical
clearance and box up of Piping loops
Jamnagar Refinery (Existing Unit ) – Detail Engineering for Static Equipment modifications for Refinery
Revamp / Plant Change Orders Preparation of Site modification drawings Engineering support & Troubleshooting for revamp / modification
activities
OVERSEAS DEPUTATIONS :
FEED Engineering activities for LNG Plant of Woodside Energy Limited at Chiyoda Corporation, Japan (Aug. 2011 till Mar. 2012)
Junior Project Engineer for STARR project of Chevron’s Salt Lake City, Utah refinery (Aug 2007 till Nov. 2007)
CODES AND STANDARDS : Well conversant with following National / International Codes / Standards ASME Section VIII, Div. 1 API 660/661/662 API 560/530/535 API 537 TEMA WRC-107/297 ASTM Codes for Materials ASCE-7 Code
COMPUTER SKILLS :
Well conversant with following Design Software / Supporting Tools
PV Elite / COMPRESS for Pressure Vessel Design HTRI for Exchanger Design FEA analysis using software like Nozzle Pro.
Sheet 5 of 6document.doc6
![Page 6: RESUME- Manvendra_Mechanical Engineer](https://reader036.vdocument.in/reader036/viewer/2022083117/588142f91a28abf65a8b69ff/html5/thumbnails/6.jpg)
3-D Model Review using Autodesk Navisworks / Smart Plant Review (SPR)
MS Office (Including Power Point Presentations)
TRAININGS ATTENDED
Training session conducted by HRTI Inc. for Thermal design of Heat Exchangers
PV Elite for Pressure Vessel Calculations
EDUCATIONAL BACKGROUND B.E. (Mechanical Engineering) – RGPV, Bhopal - 2005 – 77.5% AISSC (CBSE – Delhi Public School, Ranchi) – 2001 – 71% AIHSC (CBSE – SDS High School, Patna) – 1999 – 83%
ABOUT MYSELF :
Open minded with “Self Motivated” attitude. Highly Team Oriented. Adaptive and Adjusting Nature. Fairly Good in Presentations and Extempore. Considerably Good at Effective Interfacing. Can understand the
criticality of Input / Output Impacts of each Functional Disciplines on the Overall Project Schedule.
Good understanding of Refinery Process. Cost & Schedule Consciousness while working on alternative
solutions. Familiar with Refinery site and experience of Field erection
activities for Piping of Refinery units