resume of tom edwards pe

2

Click here to load reader

Upload: tom-edwards

Post on 14-Apr-2017

75 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Resume of Tom Edwards PE

E‐mail address (W): [email protected]         3660 Gladman Way                             

Home Phone: (859) 224‐8555     Lexington, KY  40503                  

Mobile Phone (859) 595‐4618    

Thomas Andrew Edwards, PE  

Objective:    

Employment:  May, 2000 – Present    East Kentucky Power Cooperative   Winchester, KY 

July 2011 – present 

Moved to the System Protection Group of EKPC.  Duties included the setting and installation of Generation Protection Relays, Transmission Line Protection Relays, and Distribution Protection Relays.    Major responsibilities: generation protection settings and generation relay upgrades, transmission settings, and distribution coordination. 

June, 2007 – July 2011 

Due to re‐organization at EKPC moved to the Construction Department.   Protect Manager of JK Smith CT Units 9 and 10. 

May, 2000 –  June, 2007 

The electrical engineer for the Production Department at EKPC.  Duties included resolving normal day to day electrical issues inside the power plants, upgrading generation protection, and project management for large projects.  The typical role for the project manager at EKPC is to assist in the development of all specification for bid documents and for major BOP equipment associated with the project.  Plus, the project manager is responsible for managing and reporting the budget for the project, performing daily and weekly safety audits; and supervising day to day task of contract inspectors, manufacture technical advisories, plant personnel and administrative assistants/accountants while construction and commissioning is going on.   

Major work completed while at EKPC 

Produced EKPC’s first Generation Protective Relay Setting Criteria 

Extensively modified EKPC’s Transmission Line Protective Relay Setting Criteria 

Initiated the utilization S&C cooling curve method and modified EKPC’s distribution transformer protection to improve EKPC’s coordination between EKPC’s highside distribution transformer protection and the local coop distribution reclosers. 

Project Manager for the installation of Units 9 and 10 at JK Smith Power Plant.  This project consisted in the installation of two GE LMS100 gas turbines.  Developed the specification and purchased a three winding GSU transformer for this project.   The approximate cost for this project was $154 million. 

Project Manager for the installation of the building over Units 4 and 5 at JK Smith.  The approximate cost for this project was $2.5 million. 

 Project Manager for the installation of a 20 inch, high‐pressure natural gas transmission system between JK Smith and Texas Eastern (Duke Energy).  This natural gas system included the installation of 6.3 miles of gas pipeline, a meter yard, and a regulation yard and resolving outstanding land acquisition for the project.  The approximate cost for this project was $8 million. 

Project Manager for the installation of Units 6 and 7 at JK Smith.  This project entailed the installation of two GE 7EA Frame CTGs.  Purchased the two needed GSU transformers for this project.  The approximate cost for this project was $52.5 million. 

Electrical Project Manager for Units 4 & 5 at JK Smith.  This project entailed the installation of two GE 7EA Frame CTGs.  Purchased the two needed GSU transformers for this project.  The approximate budget for this project was $48 million. 

Electrical Project Manager for a Demin (NOX) water system and the building over this Demin water system at JK Smith.  The approximate cost for this project was $5 million. 

Designed and purchased all components needed for controlling, protecting and housing two CAT 3516 Diesel generator units; including the foundation for these units.  Supervised the   installation of these components, and performed final field inspection on the Two BlackStart Diesel Units and their associated equipment at JK Smith.  The approximate budget for this project was $745,000. 

Page 2: Resume of Tom Edwards PE

E‐mail address (W): [email protected]         3660 Gladman Way                             

Home Phone: (859) 224‐8555     Lexington, KY  40503                  

Mobile Phone (859) 595‐4618    

Thomas Andrew Edwards, PE  

Major work completed while at EKPC (cont.) 

Purchased, supervised the installation, and commissioned several line‐ups of switchgear and their associated non‐segregated bus duct. 

Designed, calculated the settings and supervised the installation of several different generator protection relays on several of EKPC’s existing generators.    

Developed initial standards for SERC/NERC compliance documents for the power plants. 

Miscellaneous duties inside in the power plants – installation of new relays, calculation of settings for relays, consultant with power plant personnel on electrical problems they encounter on a day to day basis and developed resolutions to issues that the would improve or enhance the power plants operations or performance.  

 Previous 

Employment: Kentucky Utilities,  Lexington, KY  

Jan 1986 –  May, 2000         

Electrical Engineer in the Transmission Substation Department 

Major work completed while at KU 

Supervised the installation, and performed final field checks on numerous pieces of transmission substation equipment to entire substations: relay panels, breakers, transformers, PTs, RTUs, etc. 

Performed all transmission and generation relay calculations for KU 

Maintained the fault study for KU 

Maintained the ECAR fault models for KU and EKPC combined 

Developed KU’s EKPC's System Protection philosophy from the guidelines of the ECAR relaying philosophy 

1991 to 2000 wrote a report for every transmission failure or undesirable breaker operation on KU’s transmission system 

Commissioned the relaying on the first four gas turbine generators at Brown CT 

Commissioned the 5kV switchgear and other electrical equipment associated with installation of scrubber on Ghent Unit 2. 

Developed a maintenance procedure for the inspection of transformer temperature gauges.  

Created a combined KU, EKPC, and LGE fault utilizing GE’s PSLF software.  GE’s PSLF software is a PC based load flow package, which at that time could not accurately by itself calculate currents without some major finagling by utilizing sub routines. 

Programs Proficient with

ASPEN Oneliner, AutoCad, Microstation, and most Microsoft Office programs

Education 1980 – 1985 University of Kentucky Lexington, KY Receiving a BSEE in Dec of 1985

A member of Eta Kappa Nau

Professional memberships

A registered Professional Engineer in the Commonwealth of Kentucky

National Society of Professional Engineer

References:  Upon Request