revised cwir format
DESCRIPTION
hiTRANSCRIPT
-
CWIR Ref. No.D09-C01-XXXX(TOWER NAME)-CWIR-XX(DISCIPLINE)-XXXX(Sequence Number i.e. 0001)
Indicate Nature of Inspection:
Date: Time :
Date: Time :
Date: Time :
POSITION SIGNATURE
Name SIGNATURE
Name SIGNATURE
LEGEND :
CONTRACTOR WORKS INSPECTION REQUEST (CWIR)
Details Of Inspection SECTION A
ALL INSPECTION REQUESTS SHOULD BE SUBMITTED TO PMC, AT LEAST 24 HRS BEFFORE ITS COMMENCEMENT.
Inspection Location :
Description of Works to be Inspected: (attach copy of the approved drawing highlighting the item/area offered for inspection )
Drawing(s) Ref: Specification Ref: IS Code Ref:
Inspection Schedule:
Submitted by:
Received by:
Clearances from various disciplines of the ContractorCOMMENTS DATE & TIME
CIVIL & SURVEY
ARCHITECTURAL
MEP WORKS
OTHERS (Specify)
Confirmation Of Contractor's QA/QC Final Inspection/Certification SECTION BWe certify that the work(s) for which the inspection of witness has beeen sought is being fully coordinated with other disciplines and is in
compliance with project specifications, approved drawings, Method Statement, Contract Documents and ITP. All necesssary action has been
taken to make the area safe. The formwork being used is designed by competent department of L & T, placed after. PMC & Consultants inspection
shall be as a witness to the execution of the works. We understand that checking and approval by the Consultants/PMC shall not relieve the
Contractor from his obligations to perform the work in accordance with the Contract Documents, Requirement of Safety, and Local Authorities
regulations.
If 'No' , report the NCR. NCR ref : ______________
Signed by the Contractor's QA/QC Manager : DATE:
Consultant's Comments: SECTION CCOMMENTS DATE & TIME
PMC (HILL) Comments: SECTION D
NOTES:
Section A to be completed by the Contractor before submission to PMC(HILL).
Consultants to complete Section C and return to PMC(HILL).
PMC(HILL) to complete Section D and return a copy of CWIR to the Contractor.
COMMENTS DATE & TIME
YES NO
H -Hold Point S - SurveillancePoint W -Witness Point
PT - Post-Tensioning
ME - Mechanical
ST - Structural
EL - Electrical
MP - Masonry/plaster AR - Architectural
PL - Plumbing
CI - Civil
LA - Landscaping
ITP Activity Ref :
ONE ICC & TWO ICC
OTH - Others, specify
A B C
A B C
A - Approved B - Approved with Comments C - Not Approved
A B C
Page 1 Form.Ref:D09-DCP-PMP-08-FM Rev.01