revision date: prepared by: checked by: approved by ... · pdf filerevision date: prepared by:...

26

Upload: hoangtruc

Post on 09-Mar-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of
Page 2: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Revision Date: Prepared by: Checked by: Approved by: Reason for Issue:

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail

Document History Continued:

Page 2 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

Crossrail Limited RESTRICTED

Page 3: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

(Crossrail J Contents

1 Introduction 4

2 Scope of Works 4

2.1 Aims and objectives of the investigation 4

2.2 Summary of results from Crossrail archaeology works 5

3 General requirements 7

4 Specific methodology for archaeological works 7

4.2 Interfaces 7

4.3 Documentation and management 7

4.4 C503 Procedure for detailed archaeological excavation 8

4.5 C503 Procedure for archaeological general watching brief and targeted watching brief 11

5 Instructions to C257 Archaeological Contractor and Specification 12

5.1 Detailed excavation and general watching brief 12

5.2 Deliverables 13

5.3 Site Archives 13

5.4 Post-excavation 13

6 Provisional Timetable 14

Appendix A — Drawings 15

Drawing 1: Location of archaeological investigations. From C257 Fieldwork Report: C257-MLA-X-XCS-CRG02-5001 16

Drawing 2: C257 sketch phase diagram for utilities corridor archaeological work 17

Drawing 3: C138-MMD-C-DDA-C101 Z-89001 Broadqate Ticket Hall - Enabling Works Utilities Corridor Site Plan 18

Drawing 4: MCN12-007-1011 Liverpool Street Station Enabling Works Phase 2 Temporary Works Design For Utility Corridor Section B-B and Section C-C 19

Drawing 5: C138-MMD-U-DDA-C101-50052 100 Liverpool Street Sewer Proposed Diversion Plan 20

Table 1 Summary of archaeological events relating to the utilities corridor 4

Table 2 Provisional programme — utilities corridor 14

Table 3 Provisional programme- other 0503 activities 14

Figure 1 Utilities corridor sequence. 6

Figure 2 0257 planned sequence for archaeological excavation of the utilities corridor (phases 7-9) 10

Page 3 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited

Page 4: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

1Crossrail

1 Introduction

1.1.1 This document provides details of the programme of archaeological investigation required to mitigate the impact of construction of the Liverpool Street utilities corridor and other 0503 works on archaeological deposits. It is an addendum to the Written Scheme of Investigation for Liverpool Street Station (0138-MMD-T1-RST-C101-00001) and should be read in conjunction with that document.

1.1.2 The archaeological mitigation works relating to 0503 activities (comprising the construction of the utilities corridor, the sewer shafts: MHS1 (west) and MHS2 (east), 100 Liverpool Street diversion and Phase 3 utilities diversions) set out in this document supersede those in the previous WS! addendum (C138-MMD-T1-RST-C101-00004).

1.1.3 This document outlines the requirements for the Principal Contractor (0503) that will be undertaking civils works on the site in liaison with the Crossrail Project Archaeologist and the 0257 Archaeology Contractor (Museum of London Archaeology - MoLA).

2 Scope of Works

2.1 Aims and objectives of the investigation

2.1.1 The aim of archaeological mitigation is to preserve by record surviving archaeological deposits to be affected by 0503 activities (comprising the construction of the utilities corridor, the sewer shafts: MHS1 (west) and MHS2 (east), 100 Liverpool Street diversion and Phase 3 utilities diversions). The two key phases of archaeology positively identified in Crossrail evaluation (XSM10) relate to the Roman period and post-medieval burials from the Bedlam burial ground.

2.1.2 Mitigation will be achieved through a programme of archaeological investigation to be conducted by the 0257 Archaeology Contractor in liaison with the 0503 Principal Contractor in accordance with the Site-Specific Written Scheme of Investigation for Liverpool Street (C138-MMD-T1-RST-C101-00001) and the Crossrail Generic WS! (CR-XRL-T1-GST-CR001-00003) and the standards listed therein.

2.1.3 A summary of the archaeological work carried out to date and the scope of further work is set out in Table 1 below:

Table 1 Summary of archaeological events relating to the utilities corridor

Event Type Type Event Code

Progress Principal

Contractor C257 report reference

Test pit and core in basement of RailwayTavern

General watching brief

S X M10 Complete JB Riney C257-MLA-X-RGN-CRG02-50064

1.25m piles and guide walls for utilities corridor

general

Sample excavation and

watching brief

XSM10 Complete C503 C257-MLA-X-RGN-CRG02-50113

Diversion of utilities in footprint of Broadgate ticket hall and utilities corridor

General watching brief

S X M10 Complete C503 C257-MLA-X-RGN-CRG02-50113

Page 4 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited

Page 5: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail

Excavation of utilities corridor and MHS1 (western sewer shaft)

Trial trench evaluation

XSM10 Complete C503 C257-MLA-X-RGN-CRG02-50113

C257-MLA-X-RGN-CRG02-50064

Detailed excavation to 107mATD (up to 106mATD at the western end)

XSM10 Planned 0503 Report to be prepared on completion of fieldwork.

Excavation of MHS2 (eastern sewer shaft)

General and targeted watching brief

XSM10 Planned 0503 Report to be prepared on completion of fieldwork.

100 Liverpool Street sewer diversion

General watching brief

XSM10 Ongoing C503 Report to be prepared on completion of fieldwork.

Phase 3 utilities diversions

General and targeted watching brief

XSM10 Planned 0503 Report to be prepared on completion of fieldwork.

Page 5 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited

Page 6: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail

2.2 Summary of results from Crossrail archaeology works

2.2.1 A general watching brief on an exploratory test pit in the Railway Tavern to determine the location of a coal cellar in advance of pile design, determined that all archaeology at that location was truncated by the construction of the building in the 1870s.

2.2.2 Evaluation trial trenches 1, 1A and 2 were located partially within the northern pile line of the utilities corridor. Trial trenches 1 and 2 were excavated to the base of archaeological deposits and 1A was stopped at approximately 1.5m below ground level due to the high concentration of services restricting access.

2.2.3 Evaluation trial trench 1A exposed 20th century utilities that had truncated burials along the length of Liverpool Street within the pile line and northern part of the utilities corridor. These utilities were located adjacent to the backfilled cellars of former buildings at 1-14 Liverpool Street. Consequently the likelihood of encountering in situ burials during the excavation of the utilities corridor is very low. However, disarticulated human bone may be present in the made ground.

2.2.4 A series of pits were also excavated along the length of the 1250mm pile line to approximately 109.5mATD to remove human remains. Refer to Appendix A, Drawing 1 for the location of previous investigations.

2.2.5 An area of higher archaeological survival 600mm wide is present intermittently along the northern edge of the corridor from approximately 109.3m ATD — c. 107.8mATD, refer to Figure 1 and Drawing 2 — Appendix A.

2.2.6 Roman archaeological deposits are predicted from 107.8m ATD down to 107m ATD along the length of the corridor. Deposits deepen (to approximately 106mATD) in the western 15m of the utilities corridor towards the course of the former River Walbrook.

2.2.7 Evaluation trial trench 5 and pile line pit 1 both encountered the backfilled remains of a 20th century below ground lavatory to 108.17mATD. Roman archaeology may survive in pockets beneath the lavatory, but a tunnelled sewer that also passes beneath it has removed large areas of Roman deposits across the length of the site. The extent of the lavatory is uncertain, however, all archaeological remains in its footprint have been removed to 107.17mATD.

2.2.8 Exploratory test pits to identify existing utilities were excavated at the planned locations of the MHS1 and MHS2 at either end of the utilities corridor. At the western end (MHS1) excavation to a depth of 1.2m below ground level showed total truncation of archaeology to that depth by existing utilities. The made ground contained disarticulated human bone, inferring that the burial ground continues beyond the western edge of the Broadgate Station Ticket Hall. The test pit in the planned location of MHS2 (the eastern end) was also excavated to 1.2m below ground level, and no archaeological deposits were encountered. Additionally no disarticulated human bone was identified, which confirms that the boundary of the burial ground lies further west than MHS2.

2.2.9 The western extent of the utilities corridor and MHS1 are located in proximity to the former Walbrook channel. As such, the depth of alluvial deposits in the western end of the worksite is expected to be down to approximately 106mATD.

2.2.10In the footprint of the Broadgate ticket hall human burials survive across the majority of the site beneath a significant number of utilities. Burials are present between 111.52mATD and 109.45mATD but the upper level of the burials varies across the site.

Figure 1 Utilities corridor sequence.

Page 6 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited

Page 7: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Made ground

109.2mATD

107.8mATD

107mATD

106mATD

Walbrook Alluvium

112.3mATD Ground level

ra

\Northern pile line

Deeper alluvium in western extent of w orksiti

Natural gravel\

Southern pile line

C.) —

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail

nb. The above diagram is based on the levels from the various investigations carried at the site. The diagram is not to scale and the locations of deposits are indicative.

Page 7 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited

Page 8: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

1Crossrail J 3 General requirements

3.1.1 0503 to provide the attendances and facilities required to complete the specialist archaeological works agreed in the 0503 Method Statement (C503-VIN-C-GMS-C101- 50108) and 0257 Method Statement (C257-MLA-X-GMS-C101-50001).

3.1.2 0503 will manage the Exhumation Contractor (TCS) as per the C503 Method Statement (C503-VIN-C-GMS-C101-50108), and in accordance with the Ministry of Justice Burial License.

4 Specific methodology for archaeological works

4.1.1 0503 will be responsible for facilitating the following archaeological works relating to the construction of the utilities corridor:

• General watching brief at removal of modern backfill within the utilities corridor.

• Detailed archaeological excavation within the utilities corridor.

• Detailed archaeological excavation of MHS1.

• General and targeted watching brief at the excavation of MHS2.

• General watching brief at the 100 Liverpool Street sewer diversion.

• General and targeted watching brief during Phase 3 utility diversions.

4.2 Interfaces

4.2.1 0503 will have the following interfaces for the specialist archaeological works:

C257 Archaeology Contractor: Museum of London Archaeology (MoLA)

Elaine Eastbury - Contract Manager

M: 07730 646063 I E: eeastburymuseumoflondon.org.uk

Nick Elsden - Assistant Contract Manager

M: 07872 127296 I E: nelsdenmuseumoflondon.org.uk

Employers Archaeologist: Crossrail Ltd

Jay Carver — Project Archaeologist

M: 07870 191705 I E: iaycarvercrossrail.co.uk

Mike Court — Assistant Project Archaeologist

M: 07745 428117 I E: mikecourtcrossrail.co.uk

Page 8 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited RESTRICTED

Page 9: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

1Crossrail

4.3 Documentation and management

4.3.1 0503 will organise weekly progress meetings at 1-14 Liverpool Street throughout the duration of the archaeological works. The meetings will discuss safety, progress against programme and any other matters arising in relation to the archaeological works. Attendance is required from 0503, the groundworks contractor, 0257, a representative of the Crossrail site team and a representative of the Crossrail archaeology team.

4.3.2 Upon completion of the archaeological excavation the 0257 Archaeology Contractor will issue a signed completion form countersigned by the Employers Archaeologist to 0503.

4.4 C503 Procedure for detailed archaeological excavation

4.4.1 Refer to 0257 Method Statement (C257-MLA-X-GMS-C101-50001) for the detailed excavation methodology.

4.4.2 Use of excavators or other plant within the area shown on drawing C138-MMD-C-DDA-C101 Z-89001 (Drawing 3 - Appendix A) shall only be undertaken with the agreement and under the observation of the 0257 Archaeology Contractor.

Utilities corridor (Appendix A — Drawing 3: C138-MMD-C-DDA-C101_Z-89001)

4.4.3 Refer to 0257 deposit sketch (Drawing 2 - Appendix A) for locations of the phases used in the following sequence.

4.4.4 0503 will allow for up to 10 No. archaeologists to be on site during detailed excavation.

4.4.5 The following sequence for archaeological excavation has been agreed with 0257 and is the result of a series of meetings between Crossrail, 0503 and their sub-contractors, and 0257:

Phase 1

4.4.6 0503 excavate modern material down to construction level for 1st props (109.2mATD), under general watching brief by 0257 to record the predicted upper 100mm of archaeological deposits against the northern side of the corridor.

4.4.7 If disarticulated human remains are identified in the made ground they will be removed by the 0257 Archaeology Contractor and 0503 will store them securely on site and provide them to the Exhumation Contractor in accordance with the Ministry of Justice burial license.

Phase 2

4.4.8 0503 insert first level of props at approximately 109.2mATD.

Phase 3

Page 9 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

Crossrail Limited

Page 10: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

1Crossrail

4.4.1 Where archaeological deposits have been truncated, 0503 will excavate the modern material under 0257 supervision using a smooth-edged ditching bucket down to a maximum of depth of 107.8mATD. Please note that the surface of archaeological deposits survives at different levels. The attending 0257 archaeologist will supervise the machining process during this phase.

Phase 4

4.4.2 Where archaeological deposits have not been truncated, 0257 will hand excavate and record down to a depth of approximately 107.8mATD.

4.4.3 Phases 3 and 4 will be conducted as a rolling programme of targeted watching brief along the corridor, with a safe demarcated distance between machine operations and areas for archaeological work.

Phase 5

4.4.4 0503 machine and/or hand excavate (as appropriate) any remaining modern material to approximately 107.8mATD under archaeological supervision.

Phase 6

4.4.5 0503 Insert second level of props at 107.8mATD.

4.4.6 The insertion of the second level of props creates a series of twelve/thirteen 3.2m x 2m areas along the length of the utilities corridor. These areas will be hand excavated by 0257 in two stages (Figure 2): Stage 1: areas 1, 3, 4, 6, 7, 9, 10 and 12; Stage 2:2, 5, 8 and 11. During Stage 1 the Stage 2 areas will be used for spoil removal and vice versa in Stage 2.

4.4.7 The following phases (7 to 9) set out the 0257 excavation process within each 3.2m x 2m area. These phases will be facilitated by 0503:

Phase 7

4.4.8 0503 facilitate the 0257 excavation and recording of Roman archaeological deposits.

Phase 8

4.4.9 0503 facilitate the 0257 excavation and recording of the northern half of the Roman archaeological deposits, to produce a composite East—West section.

Phase 9

4.4.100503 facilitate the 0257 excavation and recording of the northern half of the alluvial deposits, continuing the composite East—West section. Where the section is more than c. 1.2m deep or is unstable, it will be carried out in 2+ stages (and/or hand augered).

4.4.11 If Roman structures/features are identified in the alluvial deposits which continue into the unexcavated half, these will be locally excavated by 0257.

Phase 10

Page 10 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

Crossrail Limited

Page 11: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

8

1 1

12

9

10

6

7

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail

4.4.1 0503 remove remaining alluvial deposits under 0257 general watching brief and then, once the 0257 hand excavation completion certificate is signed off, continue with bulk excavation with no further archaeological requirements.

Figure 2 C257 planned sequence for archaeological excavation of the utilities corridor (phases 7- 9)

Excavated in Stage 1; can be used for Spoil Skips in Stage 2 as required

Used for Spoil Skip etc in Stage 1; Excavated in stage 2

East 32m x 2m areas

2

3

4

5

64/est

MHS1 excavation (Appendix A— Drawing 4)

4.4.2 The procedure for 0503 regarding archaeological excavation of the MHS1 area differs from the above due to the likely presence of in situ and disarticulated human remains relating to the Bethlem burial ground.

4.4.3 Where works involve the exposure and exhumation of human remains by 0257, 0503 will provide covering for the exposed area to prevent public observation of the works, these should be:

large enough to allow safe working;

Page 11 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited

Page 12: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail

• waterproof;

• translucent (to provide sufficient light); and

• be of a type that can be quickly erected and removed to facilitate access for plant when required.

4.4.4 Ground level (112.76m to 112.28m ATD) to surface of burial ground (111.52m to 110.70m ATD)

4.4.5 Remove, under supervision of the 0257 Archaeology Contractor the road surface and modern overburden, to the predicted level of cemetery deposits. The surface of cemetery deposits is present at an average depth of 1.34m below ground level (highest level identified in trial trench evaluation: 111.52mATD).

4.4.6 If disarticulated human remains are identified in the made ground they will be removed by the C257 Archaeology Contractor and C503 will store them securely on site and provide them to the Exhumation Contractor in accordance with the burial license.

4.4.7 The burial ground (from c.111.52m to 109.45m ATD)

4.4.8 C503 will facilitate the excavation of the burial ground (present from approximately 111.52m to 109.45m ATD) by the C257 Archaeology Contractor.

4.4.9 Deeper archaeological deposits (c.110.64m ATD to 105.00m ATD)

4.4.10Following the removal of cemetery deposits by the C257 Archaeology Contractor, C503 will facilitate the further excavation of archaeological deposits by the C257 Archaeology Contractor until the full sequence of deposits has been excavated. Due to the location of these works on the conjectured route of the River Wa!brook the base of archaeological deposits may be as deep as 106-105mATD.

4.4.11Upon completion of the archaeological excavation, and when the completion certificate has been signed off, bulk excavation by C503 may commence.

4.5 C503 Procedure for archaeological general watching brief and targeted watching brief

4.5.1 The removal of made ground by C503 will be carried out under archaeological observation (general watching brief) by the C257 Archaeology Contractor.

4.5.2 The C257 Archaeology Contractor will advise C503 if and when archaeological deposits are encountered. C503 will allow for archaeological deposits to be hand excavated/machined (as appropriate) in stages (targeted watching brief) by the C257 Archaeology Contractor to the maximum depth of impact (It is estimated that the trigger point will be at approximately 1.3-1.5m below ground level). NB. Human remains are likely to be encountered.

4.5.3 Where the construction methodology involves timber-headed tunnelling, C503 will allow access for the C257 Archaeology Contractor to record archaeological deposits in section where possible.

4.5.4 Material excavated by C503, which contains disarticulated human remains will be stored securely on site by C503 and provided to the Exhumation Contractor in accordance with the Ministry of Justice Burial License.

Page 12 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited

Page 13: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail J 5 Instructions to C257 Archaeological Contractor and

Specification

5.1 Detailed excavation and general watching brief

5.1 .1 A programme of archaeological investigation comprising detailed archaeological excavation and targeted and general watching brief will be carried out on 0503 construction activities comprising the construction of the utilities corridor, the sewer shafts: MHS1 (west) and MHS2 (east), 100 Liverpool Street diversion and Phase 3 utilities diversions.

5.1.2 Further details on the required standards for excavation and recording for the Archaeological Contractor are to be found in the Written Scheme of Investigation for Liverpool Street Station (C138-MMD-T1-RST-C101-00001).

5.1.3 The 0257 Archaeology Contractor will ensure that the burial license for archaeological works is current and update the license as required.

5.1.4 The C257 Archaeology Contractor will, in liaison with C503, produce a programme for the archaeological works to be included in the C257 Method Statement.

5.1.5 Prior to commencing works on site the C257 Archaeology Contractor will provide a Method Statement inclusive of risk assessment and safe method of working, prepared in liaison with and countersigned by C503 and approved by Crossrail.

5.1.6 The C257 Archaeology Contractor will provide a team of suitably qualified archaeologists, experienced in archaeological site investigation and the nature of archaeological deposits which are expected on this site.

5.1.7 The C257 Archaeology Contractor will shall provide a suitably qualified buildings archaeologist as required.

5.1.8 During the excavation of in situ burials by C257 (MH-S1), the Archaeology Contractor shall give consideration to the osteo-archaeologist being present for the duration of the works to provide on-site assessment, thereby enabling the sampling and excavation strategy to be modified on-the-ground as required.

5.1.9 During detailed excavation, following the initial overall strip and clean, individual features are to be hand cleaned and defined by the C257 Archaeology Contractor, sufficient to determine type, plan form and relationships (e.g. for structures and rebuilds); and recorded. Sufficient archaeological features/structures are to be sample excavated either using a smaller machine with graded digging bucket (by C503 under archaeological supervision) or hand dug if appropriate.

5.1.10During the excavation of the utilities corridor staffing levels will be based on one archaeologist per 3.2m x2m areas shown in figure 2. Staffing for targeted watching brief at MHS1 and MHS2 to be determined when the scope of works is available from C503.

5.1.11The C257 Archaeology Contractor will develop a strategy for archaeological science in liaison with EH Regional Science advisor as appropriate. The strategy will be presented in the Method Statement and approved by the Employers Archaeologist.

Page 13 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited RESTRICTED

Page 14: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

1Crossrail

5.1.12The 0257 Archaeology Contractor will carry out metal detector survey of archaeological features and spoil excavated by C503 from archaeological deposits.

5.1.13The C257 Archaeology Contractor will give consideration to an appropriate methodology to retrieve worked bone waste (e.g. sample and sieve).

5.1.14The C257 Archaeology Contractor will ensure that all site staff attend the C503 site induction a suitable period of time prior to the start of site works.

5.1.15The C257 Archaeology Contractor will attend weekly progress meetings each week at 1-14 Liverpool Street to discuss safety during the works; progress against programme; and to discuss any other matters arising.

5.1.16The requirement for extended hours working will be assessed throughout the duration of the archaeological works and instructed to C257 via a Project Managers Communication.

5.2 Deliverables

5.2.1 The fieldwork activities relating to the utilities corridor will be reported in an interim report. The fieldwork report will be produced at a later date and will comprise a combined report with further archaeological works being undertaken in relation to the Broadgate Ticket Hall.

5.3 Site Archives

5.3.1 Refer to the Site Specific Written Scheme of Investigation.

5.4 Post-excavation

5.4.1 Refer to the detail set out within the C257 Works Information and the Written Scheme of Investigation for Liverpool Street Station.

Page 14 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited

Page 15: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail J 6 Provisional Timetable

Table 2 Provisional programme — utilities corridor

Phase Organisation Description Start Date Duration C257 Staffing

1

C503

(0257 general watching brief)

Excavate down to construction level for 1st props. 4th March 1 week

[1]

1 Senior Archaeologist

2 0503 Insert 1st level of props -

3

C503

(C257 supervision)

Excavate modern material in southern c.1400mm

11th March

2 weeks

[3]

1 Senior Archaeologist + 1 to 2 Archaeologists

4 C257 Record and excavate area of higher archaeology in rolling programme with above

5

0503

(0257 supervision)

Excavate remaining modern material to surface of archaeology in rolling programme with above

6 0503 Insert 2nd level of props -

7-9 0257 excavation

Excavate and record Roman features (Phase 7), northern half of Roman dumps (Phase 8), & northern half of alluvium (Phase 9)

Approx. 25th March (TBC)

3 to 4 weeks

[7]

1 Senior Archaeologist + 6 Archaeologists

10

0503

(0257 watching brief)

Removal of rest of alluvium and natura l geology

Approx. 22nd April

[1 to 2]

1 Senior Archaeologist + 1 Archaeologist as required

NB. The above provisional programme is based on discussions between Crossrail, C503 and C257.

Table 3 Provisional programme- other C503 activities

Activity Archaeology required Start End C257 attendance

Construction of MHS1 and MHS2 and 100 Liverpool Street sewer diversion

General watching brief and targeted watching brief

2012 May 2013 Intermittent attendance during diversion works

Demolition of QVT and Broad St Station ticket hall

Level 2 English Heritage Survey

Sept 2013

Sept 2013 1-2 days

Phase 3 utilities diversion (Diversion of utilities in footprint of Broadgate ticket hall)

General watching brief and targeted watching brief

Aug 2013

Aug 2014 Intermittent attendance during diversion works

Page 15 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited RESTRICTED

Page 16: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail J Appendix A — Drawings

Drawing List

1. Location of archaeological investigations. From C257 Fieldwork Report: C257-MLA-X-XCS-CRG02-50015

2. C257 sketch phase diagram for utilities corridor archaeological works

3. C138-MMD-C-DDA-C101_Z-89001 Broadgate Ticket Hall - Enabling Works Utilities Corridor Site Plan

4. MCN12-007-1011 Liverpool Street Station Enabling Works Phase 2 Temporary Works Design For Utility Corridor Section B-B and Section C-C

5. C138-MMD-U-DDA-C101-50052 100 Liverpool Street Sewer Proposed Diversion Plan

Page 16 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

Crossrail Limited RESTRICTED

Page 17: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail

Drawing 1: Location of archaeological investigations. From C257 Fieldwork Report: C257-MLA-X-XCS-CRG02-5001

Page 17 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited RESTRICTED

Page 18: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail

Drawing 2: C257 sketch phase diagram for utilities corridor archaeological work

Page 18 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited RESTRICTED

Page 19: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail

Drawing 3: C138-MMD-C-DDA-C101_Z-89001 Broadgate Ticket Hall - Enabling Works Utilities Corridor Site Plan

Page 19 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

Crossrail Limited RESTRICTED

Page 20: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail

Drawing 4: MCN12-007-1011 Liverpool Street Station Enabling Works Phase 2 Temporary Works Design For Utility Corridor Section B-B and Section C-C

Page 20 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

@ Crossrail Limited RESTRICTED

Page 21: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

Addendum to WSI: Liverpool Street Utilities Corridor C503-XRL-T1-RGN-C101-50001 - Revision 1.0

Crossrail

Drawing 5: C138-MMD-U-DDA-C101-50052 100 Liverpool Street Sewer Proposed Diversion Plan

Page 21 of 21

Document uncontrolled once printed. All controlled documents are saved on the CRL Document System

Crossrail Limited RESTRICTED

Page 22: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

www.crossrail.co.uk

Rev :

E14 5LQ

London

Canary Wharf

25 Canada Square

Crossrail Limited

Notes

Originator :

Location :

Scale : Drawing and CAD file No :

Title :

Suitability :

DateRev. Description By Chkd App

' Crossrail

Co

py

Ap

pr

ove

d f

or

Desi

gn -

Create

d:

20-

SE

P-

20

11

By :

Auth :

Contract :

@ A1

Chk :

App :

Auth

15

13

14

11

LB

LBPHSB

100

TCB

15

35

5

31 to 33

Place

6

BLO

MFIE

LD S

T

12.8m

1

LIVERPOOL STREET

Liverpool St Station

Hope Square4 to 10

Ward B

dy

Ward Bdy

I.

L. 106.372

I.

L. 106.732

I.

L.106.702

I.

L. 106.637

I.

L. 106.668

(5) 225

V.

C. I.

L.106.479

I.

L. 106.513

I.

L. 106.137

S.

L. 107.354

I.

L. 106.429

I.

L. 106.427

(9) 300

V.

C. I.

L. 106.342

(10) 450

C.I. I.

L. 106.327

I.

L. 106.302

(12) 300

V.

C.

+ I.

L. 105.807

I.

L. 106.254

(14) 150

V.

C.

I.

L. 106.090

(1) 225

C.I.

(2) 225

V.

C.

(3) 225

V.

C.

(4) 150

V.

C.

(6) 225

V.

C.

(7) 225

V.

C.

(8) 225

V.

C.

(11) 225

V.

C.

I.

L. 106.333

(13) 225

V.

C.

I.

L. 106.105

(15) 150

V.

C.

BRICK EGG CLASS A ENG BRICK (1230 X 750)

(

16) 225 C

.

I. I.L.

10

6.003

I.L. SE

WER 105.653

(17) 225 C.I. I.L. 106.095

BR

OA

D STREET B

UIL

DI

NGS

SE

WER I.L. 105.320 S.L. 106.531

(18) 225

C.I. I.

L. 105.720

(19)_225

C.I. I.

L. 105.715

(22)_150

V.

C. I.

L. 105.462

225

V.C. I.L. 105.867

150

V.C. I.L. 105.726

I.L. 105.436

S.L. 106.648

AB

AN

DO

NE

D 1939

ABANDONED 1948

Ramp

Steps

Steps

Fire Es

cape

Ventilat

or Roo

m

Plinth

Plinth

Casing

Stair

Metal

110.93

113.03

113.06

UIC

113.15

UIC

113.18

UIC

113.25

113.30

113.41

113.43

113.41

113.43

113.49

113.52

113.53113.54

113.55

Bols

UIC

UIC

UIC

113.570

113.599

113.62

Bols

113.65

113.73

113.76

113.79

114.36

114.370

Greater London Authority

Pillar

Pillar

Pillar

Pillar

Pillar

Pillar

Pillar

Pillar

Stanch

ion

Pillar

2/407

Switch R

oom

No Acc

ess

Retaining Wall

Retaining Wall

Platform Edge

Steps

Pillar

Pillar

Pillar

Escalat

ors to Ce

ntral Lin

e Platf

orms

2/239

2/242

Pillar

Pillar

Pillar

Pillar

Pillar

Locker

s

Operatio

ns

Room

Pillar

Ramp

Steps

Steps

2/151

2/778

2/455

2/454

2/453

2/452

2/451

2/731

2/236

2/317

Fire Po

int

Cable Shaft

Steps

Steps

Switch

Room

Step

Plinth

Plinth

Signal B

ox3/9

93

2/239

Pillar Pilla

r Pillar

Pillar Pilla

r

Pillar

Pillar

Pillar

Pillar

Ramp

Steps

Steps

Steps

Office

Toilet

Pillar

Open To Flo

or Belo

w

LT Elect

icity Su

b Stati

on

Fire Es

cape

Stanch

ion

Stanch

ion

Plinth

Ventilat

or Roo

m

Plinth

Step

Shutters

Shutters

Cladding

Cla

ddin

g

Cladding

Platform 2 (Westbound)

Platform1 (Eastbound)

Circle, Metropolitan, Hammersmith and City Lines

2/664

Metal

Steps

Plinth

Contin

ues

Under

Not

e: T

unnel W

all b

ulges

out from gr

ound line

Arch r

oof co

ntinues

over

2/781

Plinths

appr

ox. 0.13

m high

Plinths

appr

ox. 0.13

m high

Old Quee

n Victo

ria Tun

nel

Gas Me

ter

(disuse

d)

Lo

w

wall

mesh fce

Boarde

d

up

windows

Cable

Shafts

PGM 15

108.20

7m

PGM 13

108.30

3m

PGM 16

108.76

3

Pillar

Open meta

l stairs

Lower Ce

llar to

Pub

Signal B

ox

WC

Disused

Signal B

ox

Access

No

Plinth

Casing

Stair

Metal

110.93

Pillar

Pillar

Pillar

Conc BaseConc Base

Conc Base

Slopin

g Retainin

g Wall

Pillar

Step

Ste

p

Ste

p

Store

Room2/2

81

Steps

Steps

2/663

Elec

2/240

Escape Route

2/662

Elec

Room

Switch

Switch

Roo

m

StepSte

p

Step

Plinth

Plinth

Plinth

Plinth

Inaccessible

Are

a

2/672

2/666

2/667

Escalat

or tray

Plinth

Ste

ps

Shutte

rs

Room

#119

Room

#120

Step

Step

Room

#16

Ra

mp

Plinth

0.6

6m

H

Recess

# 118

Gas

Meter R

oo

m Room

#117

110.181

PGM 1009

AreaLef

t Lugga

ge

Room

WashEscape

Fire

Escape

Fire

Escape

Fire

Step

Room

#15

Ra

mp

Ra

mp

2/239

2/242

Fire

Risers

Cable Shaft

Steps

Step

Pillar

Pillar

Pillar

Pillar

UIC

UICUIC

UIC

UIC

UIC

Ramp

Steps

Steps

Steps

Office

Toilet

Open To Flo

or Belo

w

Fire Es

cape

UIC

Plinth

DP

UIC

UIC

Ventilat

or Roo

m

Plinth

UIC

UIC

Cable

Shafts

UIC

Plinth

Casing

Stair

Metal

110.93

ICe

ICe

ICe

Box

2/672

2/666

2/667

107.95

Room

#120

Step

Step

Room

#16

Ra

mp

Plinth

IC

SumpSump

AreaLef

t Lugga

ge

Room

WashEscape

Fire

Escape

Fire

Escape

Fire

IC

Room

#15

Ra

mp

Grill

(EDF)Elec

ticity S

ub Sta

tionREC

Plinth

Step

Step

Ra

mp

Cable Tro

ugh

Sump

Cable Tro

ugh

IC

Ducts

Cable

Ducts

Cable

(x10)

Cable Ducts

Ducts

Cable

Step

ELDON STREET

BL

OM

FIE

LD

ST

RE

ET

Pillar

Pillar

Pillar

Pillar

Pillar

Pillar Pillar

IR

PillarPillar

Drain

Drain

Pillar

17

Pillar

Pillar

6Broad

Street

17

1

11

100Liverpool Street

23

35

106

Railway

TavernPH

77-7

6

FENCE

SCAFFOLDING

Hatch

RWSteps

Steps

Pillar

PillarPillars

PillarsStep

Vents

Vents

Vents

VentVent

Vent

Vent

Vent

Ste

ps

Steps

RW

RW

Steps

UIC

G

G

Pillar

Pillar Pillar

Pillar

Steps

RW

Steps

BWBW

SC

Drain

Drain

Pillar

Pillar

VentVent

Drain

Step

Steps

Step

BL

BL

BL

BL

BL

BL

UIC

UIC

UIC

Plinth

Steps

Steps

No Acc

ess

Entra

nce to

Liverp

ool St

Und

ergro

und

Entran

ce To

Liverpo

ol St

Underg

round

Shopping Arcade

112.2

2

112.2

2

G

112.2

2

G

IC

112.23

G

G

112.25112.2

7

Steps up

Ramp

ICtel

ICtel

112.29

112.2

9

GV

ICtel

ICtel

112.3

1

STEP

S

DO

WN

ICtel

SC

SC

SC

112.32 UIC G

ICtel

ICe

ICe

ICe

SC

ICtel

ICtel

ICtel

ICtel

112.36

112.3

6

112.3

6

112.37

112.3

8

ICtel

112.38

ICtel

UIC

112.38

112.3

9

GV

112.39

RS

LP

LP

SP

SP

GP

GP

SP

RS

112.39

ICtel

112.4

1

ICtel

112.4

1

ICtel

112.4

2

UIC

UIC

UICUIC

UIC

FH

ICtel

112.42

112.43RS

ICtel

112.43

ICe

112.4

4

UIC

ICtel

MH

RS

SC

LB

ICtel

112.4

6

ICtel

112.47

ICtel

112.4

7

112.4

7

112.4

7

GV

G

112.4

8

112.4

8

GV

ICe

SC

112.4

8

RS

112.48

112.49

112.4

9

112.4

9

SC

SC SC

ICtel

112.4

9

ICtel

SC

112.50

FH

ICtel

112.5

0

SC

112.50

112.51

G

MH

Tarmac

G

UIC

ICtel

Bol

SC

G

ICtel

112.53

112.5

3

112.5

3TPav

112.53

112.5

4

112.54

UIC

G

ICtel

112.54

SVs

112.54

SC

112.55

G

112.55

112.5

5

112.55

SV

IR

G

112.56

112.5

6

112.56

IR

112.57

112.57

SV

112.57

SVs

SV

UICs

SC

IR

TPav

ICe

112.59

ICtel

112.5

9

ICtel

112.5

9

112.5

9

112.6

0ICtel

IR

112.6

0

LB

112.6

0

112.61

IR

G

112.6

1

ICtel

112.6

1

ICe

ICtel

G

TL112.62

IR

ICtel

112.6

2

112.62

112.63

MH

ICtel

ICtel

112.6

3

IR

112.61

112.6

3

IR

112.63

112.63

Bol

112.6

4

MH

TS

112.65

SV

Bol

Bol

Bol

Bol

Bol

Bol

112.6

5

112.6

5

112.66

SC

SC

MH

SCs

TPav

G

112.6

7

Bol

SC

112.6

8

SC

P

112.68

112.6

8

112.6

9

112.69

112.6

9

ICtel

112.6

9

ICtel

ICtel

Bol

ICtel

TPav

Bol

G:0.40S:8.00

H:8

112.71ICtel

TPav

BolICtel

ICtel

112.72

112.7

2

G

ICe

112.7

3

Bol

112.7

4

MH

Bol

112.7

5

112.7

5 TB

TB

112.75

MHws

112.7

5

112.7

6

G

G

TL

ICtel

SV

112.7

7

GV

LP

SCICe

P

P

P

DK

ICe

TL

ICtel

Bol

Bol

TB

112.7

8

G:0.40

S:8.00

H:8

112.78

112.79

ICtel

ICtel

ICtel

UIC

112.7

9

UIC

ICtel

P

FH

Bol

P

ICtel

ICtel

P

P

P

SC

ICtel

ICtel

ICtel

TPav

CAMICtel

TPav

MH

Box

112.83

ICtel

BL

112.83

FH

112.83

G

ICtel

ICtel

Bol

MH

Bol

G

112.8

6

112.86

112.86

112.87

IC

112.87

FH

G

112.88

Line of Marker Studs

SCFH

TL

UIC

SC

112.9

1

112.91

112.91

SC

RS

SCUIC

112.99

G

113.01

113.02

113.02

UIC

113.03113.03

ICtel

113.03

113.04

113.0

5

113.06

GV

113.08

IC

113.10

UIC

G

113.1

1

113.12

Bols

113.13

UIC

113.15

SC

MH

MH

113.16

UIC

ICtel

Bol

113.18

113.18

G

113.20

SC

UIC

113.2

1

Bols

113.22

113.23

113.2

3

FH

FH

UICUIC

UIC

UIC

113.25

MH

RSRS

RS

113.2

7 FH

DK

113.27

ICtel

113.28

113.2

9

113.3

0

113.30

113.30

113.3

1

ICe

113.31

UIC

G

113.3

4

SC’s

113.35

Bols

113.36

113.36

SC

G

MH

MH

UIC

113.3

8

SC’s

SC’s

113.3

9

ICtelSC

113.41

RS

113.4

1

113.4

1

113.4

1

SC

113.4

2

113.4

2

113.42

SC

SC

113.4

3

113.43

113.41

ICtel

113.43

ICtel

RS

ICe

RS

G

113.47

113.47

113.4

7

113.4

8

UIC

UIC

113.4

9

113.4

9

113.49

113.5

0

113.5

0

113.5

0

113.5

0

ICtel

FH

113.5

1

113.5

1

113.5

1

TPav113.51

SC

113.52

GSC

SC

SC

113.53

113.53

SC

113.5

4

113.5

4

FH

113.54

G

113.55

GV

SCLB

SC

LP RS

G

SC

CATV

CATV

113.5

7

Bols

UIC

UIC

ICe

GG

MHMH

ICtel

Bols

ICtel

UIC

113.570

113.599

113.6

0

113.61

113.61

113.61

113.6

2

113.62

113.62

SC

113.63

113.63

Bols

113.64

113.64

Boxs

113.6

5

113.65113.65

G113.65

SC

G

SC

113.6

6113.6

6

113.66

SC

113.67

ICtel

113.68

P

Col

113.68

113.68

113.68

RS

113.69

113.69

113.69

113.7

0

113.70

SCUIC

113.70

113.71

113.7

1

113.72

113.72

113.72

113.72

113.72

Bols

113.73

113.73UIC

113.73

113.73

113.73P

RS

113.75

113.75113.76

LIVERPOOL STREET

113.76

113.76

Bols

P

113.7

8

113.7

8

IR

IR IR IR IR IR

P113.79

113.79

113.7

9

113.79

113.80

113.80

113.80

113.80

Bols

113.82

BolsBols

113.83

113.83 113.83 113.83

BolsCol

113.8

4

113.84

113.84113.85 113.

85

113.85

113.86113.87

113.9

5

UIC

UIC

114.0

3

114.05

114.05

114.08

114.1

4114.16 114.1

7

114.20

MH

114.2

7

114.28

114.2

8

114.33

114.3

6 114.36

114.370

114.37

114.37

114.38

114.3

8114.3

8

114.3

8

114.3

8

114.3

8

114.3

8

114.3

9

114.4

0

114.4

1

114.42

114.43

114.68

Direction of flow

RE

ST

RIC

TE

D

1:200

Plan

Mott MacDonald Limited

Liverpool Street Stn

C138-MMD-U-DDA-C101-50052

S4

Liverpool Street Station Design

---

Key Plan Legend Legend Cont’d

BD Existing Thames Water manhole

Back Drop

100 Liverpool Street Sewer

Existing sewer to be retained

Utilities corridor

Proposed Diversion

Liverpool St. sewer diversion

Proposed sewer diversion as part of

Ex BD

Manhole

Existing British land

Existing sewer connection from 100 Liverpool St.

Crossrail Limited or Crossrail Central.

other parties without consent from either Mott MacDonald Limited or from the party which commissioned it,

This document contains confidential information and proprietary intellectual property. It should not be shown to

being used for any other purpose;

We accept no responsibility for the consequences of this document being relied upon by any other party, or

or used for any other purpose;

It should not be relied upon by any other party, unless the contrary intention is expressly stated in the contract,

Crossrail project only;

This document is issued for the party which commissioned it and for specific purposes connected with the

Subject to the terms of the contract between Crossrail and Mott MacDonald Limited:

Notes

BL

OM

FIE

LD S

TR

EE

T

Eldon Stre

et

1

OL

D B

RO

AD S

TR

EE

T

521

N

Scale 1:100

N = 36300.659

E = 83361.638

Proposed 1400mm Ø sewer

50019

C138-MMD-U-DDB-C101-50012 -

C138-MMD-U-DDA-C101-50010,

diversion works(refer to drg No.s

as part of Liverpool St. sewer

Proposed MH S1 to be constructed

retained.

1230 x 750mm sewer to be

Existing brick egg shaped

to 1230 x 750 mm

sewer. Sewer changes

Stepped section within

units I.D = 1.5m

Pre-cast chamber

=106.980mI.L

=113.210mC.L

Proposed MH S2-100

British Land boundary

I.D= 1.5m

with two backdrops

Pre-cast chamber units

=107.305mI.L

=113.580mC.L

450mm Ø combined sewer

to be located above existing

Proposed MH S1-100

IL = 107.650

CL =112.630

TW MH 0604

(QVT)

Queen Victoria Tunnel

egg shaped sewer.

Existing Brick 1219 x 762mm

be confirmed by further survey.

brickwork invert (refer to note 20). Pipe construction

with concrete lining and cast iron segments with

Existing 1219 x 876mm brick egg shaped sewer

is shown for information only

The proposed Utilties Corridor

Note:

Ex. G

BD

class

A pipe be

dding

450m

m Ø concrete pipe @ 1:70

ductile iron

150mmØ

1

class A pipe bedding

450mm Ø concrete pipe @ 1:70

Basement boundary line

refer to note 19)

(based on existing levels

water drain.Gradient 1:415

combined foul and surface

Existing connections 450Ø

I.L=

BD

I.L=

BD

Ex. BD

refer to note 19)

(based on existing levels

water drain. Gradient 1:415

combined foul and surface

Existing connections 450Ø

I.L. 112.230m**(assumed gradient 1:32)

live and then abandoned after sewer diversion.

to be maintained until new proposed route made

connection from United Bank of Switzerland(UBS)

Approximate location of existing 300mm Ø

MH-EX2

MH S1-100

Gradient 1:100

concrete pipe

Proposed 300Ø

C138-MMD-D-DDA-C101 1-41002)

drainage ( refer to drawing

CRL main works surface water

Backdrop provision for future

BD

BD

A

50057

Broadgate Ticket Hall

Ex. BD

Hall works

to be removed as part of the Broadgate Ticket

Existing brick egg shaped 1230 x 762mm sewer

C138-MMD-U-DDB-C101-50012 to 50019)

drg. No. C138-MMD-U-DDA-C101-50010 &

Liverpool St. sewer diversion works(refer to

Proposed MH S2 to be constructed as part of

using an approved safe method of working.

and competent contractors carrying out the work

These notes are based on the use of experienced

Diii.

Dii.

LIV-004 - Damage to Thames Water Assets Di.

Dismantling/Demolition (Future)

Miii.

Mii.

Mi.

Maintenance

Oiii.

Oii.

LIV-002 - Confined space working Oi.

Operations

LIV-010 Contaminated Land Ciii.

LIV-003 - Working with or near a live sewer Cii.

LIV-001 - Striking or damage to identified/ unidentified utilities Ci.

Construction

normally associated with this type of work:

Notes below are additional to hazards/risks

Safety, Health and Environmental Information

Existing Back Drop

ExG Existing Gully Surface water connection

1

I.L = 106.270

04m 4m 8m 12m 16m 20m

IL = Unknown

CL = Unknown

asset record

TW MH 0605 - based on TW

brick egg shaped sewer

Existing 1480 x 1050mm

MH S2-100

MH S1-100

be retained.

1219 x 762mm sewer to

Existing brick egg shaped

Hall works

and removed as part of Ticket

Existing sewer to be abandoned

=1.5m ID

=107.340m*I.L

=113.600m*C.L

(To be retained)

Existing British land MH - EX 2

diversion. Crown level = 112.230m**(assumed gradient 1:32)

proposed route made live and then abandoned after sewer

United Bank of Swizerland(UBS) to be maintained until new

Approximate location of existing 300mm Ø connection from

I.D= 2.1m

=107.370m*I.L

=114.370m*C.L

(To be retained)

Existing British land MH - EX 3

Plan A

02m 2m 4m 6m 8m 10m

(based on existing levels - refer to note 19)

connected to MH S1-100 Gradient 1:75

foul and surface water drain to be

Existing connection 450mm Ø combined

MH-EX1

Refer to Plan A

Refer to Plan A

Hall works

part of the Broadgate Ticket

MH EX 1 to be removed as

manhole EX 1 is abandoned.

be abandoned once existing

Existing gully connections to

=1.8mI.D

=107.270m*I.L

=113.570m*C.L

(To be abandoned)

Existing British land MH - EX 1

C5

***

M2

C6

C1*

**

*

*

C2

C3

C4

M1

C* - Coordinates of incoming/outgoing pipes inside of manhole

M* - Coordinates at intersection of channels within Manhole

Key:-

Eastings Northings

C1

83401.977 36305.391

83402.431 36305.606

83402.232 36304.861

83401.360 36305.065

83402.068 36305.924

C2

C3

C4

M1

Eastings Northings

83379.474 36309.334

83378.939 36309.062 C6

M2

83380.062 36309.217

MHS1-100 Manhole Internal connection co-ordinates MHS2-100 Manhole Internal connection co-ordinates

C5

Manhole Coordinates

(450mm Ø sewer)

= 106.700IL

shaped sewer)

= 106.320 (existing eggI.L

= 112.480C.L

sewer by Saddle/side connection

existing Thames Water

Proposed connection to

22/08/2011 DKACJBP02

- refer to note 19

water drain (source unknownTBC)

Existing 300mm Ø foul and surface

and removed

Existing sewer to be abandoned

STREET

LIVERPOOL

required into manhole

11.5” connection pipe

at all times

Streets building to be maintained

(flows) from 100 Liverpool

All existing sewer connections

MH S2-100

connected to diverted sewer

Existing gully connection to be

excavation for future main works pilling

to install sheet pile protection barrier within

and is shown for information only. Contractor

main works following the sewer diversion

Will be constructed as part of

Extent of proposed Broadgate Ticket Hall.

clearance for segmental pipe sections

future main works pilling and allow

barrier within excavtion for

Contractor to install protection

existing survey levels - refer to note 19 & 24)

Ticket Hall works, Gradient 1:15(based on

is to be removed as part of the Broadgate

made live and then the existing connection

at all times until the new proposed route is

Existing 450mm Ø sewer flow to be maintained

refer to note 19

drains (source unknown)

300mm Ø (surface water)

Existing 150mm Ø (foul) &

by Thames Water (refer to note 24)

connection is based on the dye testing

Approximate route of existing UBS

Proposed 100 Liverpool Street sewer diverson (ØID)

SADKSC10/05/2011P01 Initial Design Submission

Final Detailed Design Submission (EAI071)

See note 30

assumed 500mm

Extent of basement wall

Contractor.) See note 30

(Extent to be confirmed by the

to accommodate sewer diversion.

cut down/broken out if necessary

Existing sheet pile wall to be

TWDP Final Design Review Comments Resubmission

the existing structure of 100 Liverpool Steet

30. Conctractor to confirm route can be constructed without impacting

protected during trench excvation for sewer installation

29. Existing cables and ducts need to be accommodated and

C138-MMD-U-DDA-C101-50062.

28. For proposed highway arrangements refer to drg. No.

CRL1-XRL-U-DDA-C101-00147.

27. For combined utilities plan refer to drg. No.

by Crossrail.

26. Other utility diversions from 100 Liverpool St. to be coordinated

survey drg. No. A041-XX-00525-DES-A.

25. Levels shown suffix 1, are based on Thames Water line & level

LSS/CS/01.

Water dye testing survey, and City of London survey drg. No.

24. Existing connection location and alignment is based on Thames

23. MH S2-100 to be located within the British Land boundary.

Central

Drg. No. CRL1-XRL-U-DDB-C101-00008 received from Crossrail

22. All levels shown suffixed with double astrix, thus** are based on

to 50019.

C138-MMD-U-DDA-C101-50010, C138-MMD-U-DDB-C101-50012

Sewer diversion drawing refer to drg. No.

advance of Liverpool Street sewer abandonment. For Liverpool St.

21. 100 Liverpool Street sewer diversion works to be completed in

No. LE30-21/07

20. Pipe construction information is based on archive record drg.

site survey, report No. C138-MMD-U-RGN-C101-50008.

19. All levels shown suffixed with an asterisk, thus *, are based on a

are based on the Thames Water drg. No. A041-XX-00525-DES-A

18. Existing Liverpool, Eldon & Blomfield Street sewer alignments

17. Internal diameter of existing & proposed pipe shown on drawing.

times

16. All exisitng sewer connections to be maintained in operation at all

15. Detailed design to be agreed with Thames Water.

commencement of works.

14. All necessary approval/agreement to be obtained prior to

13. All incoming and outgoing pipes to be laid with level soffits.

of the Contractor.

12. All temporary works required for construction are the responsibility

the Engineer.

by the Contractor. Any changes on site to be checked with

connections from 100 Liverpool Street and to be confirmed on site

11. Chamber/Manhole locations subject to position of existing sewer

drawings, reports and specifications.

Liverpool Street utilities corridor works and other consultants

10. This drawing shall be read in conjunction with all structural

C138-MMD-U-DDB-C101-50053.

9. For sewer longitudinal section refer to Drg. No.

C138-MMD-U-DDD-C101-50053 & 50054.

8. For construction details refer to Drg. No.

Drg No. C138-MMD-U-DDB-C101-50057.

and proposed Broadgate Ticket Hall piling refer to

7. For section between 100 Liverpol Street basement

C138-MMD-U-DDA-C101-50063.

6. For proposed water main diversion plan refer to Drg. No.

5. The drainage design is based on the Sewers for Adoption 6th edition.

File No. CRL1-XRL-G-DMA-CR088-00015

Topographical survey drawing received by Crossrail

4. All levels shown on this drawing are based on the existing

See Crossrail standard CR-STD-010.

height datum which is 100 metres below Ordnance Datum Newlyn.

3. Coordinates to the London Survey Grid, heights to the London

2. All dimensions are in metres unless specified otherwise.

1. Do not scale from this drawing.

J.BHAMBRA

JB20/09/2011P03

P03

A.CHAUDHRY

AC

D.KEOGH

DK

Fit for auth

orisation

Page 23: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of
Page 24: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of

www.crossrail.co.uk

Rev :

E14 5LQ

London

Canary Wharf

25 Canada Square

Crossrail Limited

Notes

Originator :

Location :

Scale : Drawing and CAD file No :

Title :

Suitability :

DateRev. Description By Chkd App

' Crossrail

Co

py

Ap

pr

ove

d f

or

Desi

gn -

Create

d:

17-

OC

T-

20

12

By :

Auth :

Contract :

@ A1

Chk :

App :

Auth

Cable

Shafts

ICe

Rev.

Date

b

converted fr

om orig

inal 3d

file to

2d des

ign file

23/11/9

3

15

12

13

14

20

11

23

19

2120SL

LB

17

LBPHSB

SL

18

100

TCB

22

70

74

15

35

TCB

PCPBank

Street

1

Broad

5

4

2

31 to 33

BLO

MFIE

LD S

TREET

Place

3

6

BLO

MFIE

LD S

T

12.8m

1

76 to 8

0

LIVERPOOL STREET

AVENUE

Liverpool St Station

Subway

BROAD STREET

Hope Square

TCBs

4 to 10

Ward B

dy

Ward Bdy

RE

ST

RIC

TE

D

1:200

Site Plan

Mott MacDonald Limited

Liverpool Street Stn

C138-MMD-C-DDA-C101_Z-89001

Liverpool Street Station Design

N

PH

Tavern

Railway

OL

D

BR

OA

D

ST

RE

ET

Western End Typical Section Eastern End

04m 4m 8m 12m 16m 20m

DKDBPC25/09/2012P04CC503

Utilities Corridor

Broadgate Ticket Hall - Enabling Works

4321 5 6 7 8 9 10 114350 4350 4350 4350 4350 4350 9663 9000 9000 9000

C

QVT Support Wall South

Existing Queen Victoria Tunnel (QVT).

Utilities Corridor

1 - 14 Liverpool Street

QVT Support Wall North

Foam Concrete

Sewer Diversion

Proposed Liverpool Street

Crossrail Limited or Crossrail Central.

other parties without consent from either Mott MacDonald Limited or from the party which commissioned it,

This document contains confidential information and proprietary intellectual property. It should not be shown to

being used for any other purpose;

We accept no responsibility for the consequences of this document being relied upon by any other party, or

or used for any other purpose;

It should not be relied upon by any other party, unless the contrary intention is expressly stated in the contract,

Crossrail project only;

This document is issued for the party which commissioned it and for specific purposes connected with the

Subject to the terms of the contract between Crossrail and Mott MacDonald Limited:

Sewer

Existing Liverpool Street

2. Denotes footprint of Utilities Corridor.

1. For General Notes, refer to drg no. C138-MMD-C-DDJ-C101_Z-89004.

Key Plan

N

Granular Backfill

street level escalator piles

Broadgate Ticket Hall

DKACJB25/07/2011C01

BL

OM

FIE

LD

ST

RE

ET

ELDON STREET

using an approved safe method of working.

and competent contractors carrying out the work

These notes are based on the use of experienced

Diii.

Dii.

Di.

Dismantling/Demolition (Future)

equipment due to traffic noise.

UC-018 - Operatives fail to hear gas monitoring Miii.)

UC-001 - Inadequate ventilation within Utilities Corridor. Mii.)

public from open manhole.

- Hazard presented to members of the

UC-004 - Access to chamber in public footpath Mi.)

Maintenance

Oiii.

Oii.

Oi.

Operations

Liverpool Street.

properties on south side of Utilities Corridor

UC-019 - Restricted access for emergency services to Cviii.)

Regus building.

UC-012 - Risk of collapse of basement to adjacent Cvii.)

services.

UC-007 - Operative injury due to striking existing Cvi.)

UC-010 - Exposure to asbestos fibres in existing QVT.Cv.)

excavation caused by Burial Ground BG208.

UC-006 - Risk to operatives from diseases during Civ.)

Sewer - Biohazard to site personnel.

UC-16a - Collapse/Damage to adjacent Thames WaterCiii.)

Corridor.

within the QVT and adjacent to the Utilities

UC-015 - Stability of adjacent inhabited structures Cii.)

UC-011 - Stability of the QVT in the temporary condition.Ci.)

Construction

normally associated with this type of work:

Notes below are additional to hazards/risks

Safety, Health and Environmental Information

DKACJB14/07/2011P03

SABHIW17/02/2011P02

C503 RIBA F Submission

P04

P.CRUTTENDEN

PC17/10/2012C02

C02

D.BARTLES

DB

D.KEOGH

DK

Fit for construction

SAPJ

First Issue

27/08/2010

P01.1

BH

SSIssued as Fit for construction

RIBA E SubmissionP01

-Update to incorporate City of London and UKPN requirements

C503 RIBA F Submission

A

L.EDGE

LEIssued as Fit for construction

Page 25: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of
Page 26: Revision Date: Prepared by: Checked by: Approved by ... · PDF fileRevision Date: Prepared by: Checked by: ... Appendix A — Drawings 15 ... Diversion of utilities in footprint of
mike court
Typewritten Text
mike court
Typewritten Text